Document Control Procedure Example
Document Control Procedure Example
Clause 4.2.3
P001 Document Control Procedure
Company Name/Logo
Document No
Uncontrolled Copy
Rev
Controlled Copy
Date
Company Name/Logo
Approvals
The signatures below certify that this procedure has been reviewed and accepted, and demonstrates that the
signatories are aware of all the requirements contained herein and are committed to ensuring their provision.
Name
Signature
Position
Date
Prepared by
Reviewed by
Approved by
Amendment Record
This procedure is reviewed to ensure its continuing relevance to the systems and process that it describes. A record of
contextual additions or omissions is given below:
Page No.
Document No:
Context
Revision
Date
Page 2 of 6
Company Name/Logo
Contents
P001 Document Control ............................................................................................................................................... 4
1. Introduction & Purpose ............................................................................................................................................... 4
2. References ................................................................................................................................................................... 4
3. Terms & Definitions ..................................................................................................................................................... 4
4. Application & Scope ..................................................................................................................................................... 4
5. Requirements ............................................................................................................................................................... 4
6. Process ......................................................................................................................................................................... 4
6.1 General................................................................................................................................................................... 4
6.2 Document & Data Identification, Approval and Use .............................................................................................. 4
6.3 Revising a Controlled Document ............................................................................................................................ 5
6.4 Obsolete Documents ............................................................................................................................................. 5
6.5 External Documents ............................................................................................................................................... 5
6.6 Uncontrolled Documents ....................................................................................................................................... 6
6.7 Forms & Records .................................................................................................................................................... 6
6.8 Document Change Requests .................................................................................................................................. 6
Document No:
Page 3 of 6
Company Name/Logo
2. References
Reference
4.2.3
F001-1
F001-2
F001-3
ISO Clause
Definition
Document
3.7.2
Procedure
3.4.5
Record
3.7.6
5. Requirements
This procedure applies to all quality management system documentation and is to be followed by all personnel where
appropriate. While the company Directors are responsible for signing all policies and procedures, Your Company may
have other team members such as the Quality Management Representative or other managers to approve work
instructions, etc., which implement the quality procedures.
6. Process
6.1 General
All documents and data are reviewed and approved by authorized personnel prior to issue. Each department issues
and maintains its own documents. Current revisions of appropriate documents are available at locations where they
are used. Documents controlled by this procedure include but are not limited to the following:
1.
2.
Quality manual
Document No:
Page 4 of 6