Ansi Tia 607 C 2015
Ansi Tia 607 C 2015
Ansi Tia 607 C 2015
Table of Contents
FOREWORD ............................................................................................................................................... vii
1 SCOPE .................................................................................................................................................. 1
2 NORMATIVE REFERENCES ............................................................................................................... 1
3 DEFINITIONS, ACRONYMS AND ABBREVIATIONS, UNITS OF MEASURE .................................. 2
3.1 General ........................................................................................................................ 2
3.2 Definitions .................................................................................................................... 2
3.3 Acronyms and abbreviations ........................................................................................ 6
3.4 Units of measure .......................................................................................................... 8
4 REGULATORY ..................................................................................................................................... 9
4.1 National requirements .................................................................................................. 9
4.2 Local code requirements .............................................................................................. 9
5 OVERVIEW OF TELECOMMUNICATIONS BONDING AND GROUNDING SYSTEMS .................. 10
5.1 General .......................................................................................................................10
5.2 Overview of the telecommunications bonding infrastructure........................................10
5.2.1 General ................................................................................................................10
5.2.2 Primary bonding busbar (PBB) ............................................................................12
5.2.3 Telecommunications bonding conductor (TBC)....................................................12
5.2.4 Telecommunications bonding backbone (TBB) ....................................................13
5.2.5 Secondary bonding busbar (SBB) ........................................................................13
5.2.6 Backbone bonding conductor (BBC) ....................................................................13
6 TELECOMMUNICATIONS BONDING COMPONENTS .................................................................... 14
6.1 General .......................................................................................................................14
6.2 Busbars ......................................................................................................................14
6.2.1 Primary bonding busbar (PBB) ............................................................................14
6.2.2 Secondary bonding busbar (SBB) ........................................................................14
6.2.3 Rack bonding busbar (RBB) ................................................................................15
6.3 Conductors .................................................................................................................15
6.3.1 General ................................................................................................................15
6.3.2 Sizing the telecommunications bonding backbone (TBB) .....................................15
6.3.3 Sizing the telecommunications bonding conductor (TBC) ....................................16
6.3.4 Sizing the backbone bonding conductor (BBC) ....................................................16
i
ANSI/TIA-607-C
ii
ANSI/TIA-607-C
iii
ANSI/TIA-607-C
iv
ANSI/TIA-607-C
List of Figures
Figure 1 Relationship between relevant TIA standards ........................................................... ix
Figure 2 Elements of generic cabling topology ........................................................................ 3
Figure 3 Illustrative example of a multi-story large building ....................................................11
Figure 4 Illustrative example of a single story large building ...................................................12
Figure 5 Illustrative example of a smaller building ..................................................................12
Figure 6 Example PBB ...........................................................................................................14
Figure 7 Example SBB ...........................................................................................................15
Figure 8 Label for bonding and grounding conductors............................................................17
Figure 9 Example of three methods to bond equipment and racks .........................................20
Figure 10 Illustration of bend radius and included angle .........................................................24
Figure 11 Bonding to the service equipment (power) ground .................................................24
Figure 12 Example TEBC to rack bonding conductor connection ...........................................26
Figure 13 Example of a TEBC routed on cable tray................................................................27
Figure 14 Illustration of connection point to a rack from a TEBC ............................................28
Figure 15 Illustration of a bond connection from a cabinet to the cabinet door .......................29
Figure 16 A mesh-BN with equipment cabinets, frames, racks and CBN bonded together ....30
Figure 17 A mesh-IBN having a single point of connection.....................................................32
Figure 18 Illustration of test instrument connections ...............................................................37
Figure 19 Four-point method ..................................................................................................39
Figure 20 Example of multiple test locations ..........................................................................40
Figure 21 Recommended resistivity table layout ....................................................................41
Figure 22 Illustrative views of typical ground rods ..................................................................43
Figure 23 Illustrations of a vertical and horizontal electrolytic ground rod ...............................44
Figure 24 Illustrative view of a concrete-encased electrode ...................................................45
Figure 25 Illustrative view of a ground radial electrode ...........................................................46
Figure 26 Illustrative example of ground enhancement materials surrounding a grounding
conductor and a ground rods ....................................................................................................47
Figure 27 Illustrative example view of a site grounding electrode system ...............................48
Figure 28 Illustration of a parallel ground rod installation ........................................................50
v
ANSI/TIA-607-C
List of Tables
Table 1 TBB/BCC conductor size vs length ............................................................................16
Table 2 Stake distance...........................................................................................................36
Table 3 Cross reference of terms ...........................................................................................69
vi
ANSI/TIA-607-C
FOREWORD
(This foreword is not considered part of this Standard)
This Standard was developed by TIA Subcommittee TR-42.16.
Contributing organizations
More than 60 organizations within the telecommunications industry (including manufacturers,
consultants, end users, and other organizations) contributed their expertise to the development
of this Standard.
Documents superseded
This Standard supersedes ANSI/TIA-607-B dated September, 2011, and its addenda.
Annexes
There are six annexes to this Standard. Annexes A through F are informative and not consid-
ered a part of this Standard.
vii
ANSI/TIA-607-C
viii
ANSI/TIA-607-C
ANSI/TIA-607 ANSI/TIA-1005
(Bonding and (Industrial)
grounding
[earthing])
ANSI/TIA-758 ANSI/TIA-1179
(Outside plant) (Healthcare)
ANSI/TIA-862 ANSI/TIA-4966
(Intelligent (Educational)
building
systems)
ix
ANSI/TIA-607-C
NOTE tandard is
The bonding and grounding approach in this Standard is intended to work in concert with prem-
ises cabling, equipment, spaces and pathways specified within the TIA Engineering Committee
TR-42. The requirements specified in this Standard in conjunction with a basic understanding of
bonding and grounding concepts and methodologies will aid in achieving a reliable solution
when applied to telecommunications installations.
Several sources of bonding and grounding information exist within the telecommunications in-
dustry. For example, the NEC specifies requirements regarding the safety aspects of bonding
and grounding of equipment and systems. Yet another example is that of ATIS 0600318, Elec-
trical Protection Applied to Telecommunications Network Plant at Entrances to Customer Struc-
tures or Buildings, which provides information on bonding and grounding to support electrical
protection considerations.
Purpose
The purpose of this Standard is to enable and encourage the planning, design, and installation
of generic telecommunications bonding and grounding systems within premises with or without
prior knowledge of the telecommunications systems that will subsequently be installed. While
primarily intended to provide direction for the design of new buildings, this Standard may be
used for existing building renovations or retrofit treatment. Design requirements and choices are
provided to enable the designer to make informed design decisions.
Stewardship
Telecommunications infrastructure affects raw material consumption. The infrastructure design
and installation methods also influence product life and sustainability of electronic equipment life
cycling. These aspects of telecommunications infrastructure impact our environment. Since
building life cycles are typically planned for decades, technological electronic equipment up-
grades are necessary. The telecommunications infrastructure design and installation process
magnifies the need for sustainable infrastructures with respect to building life, electronic equip-
ment life cycling and considerations of effects on environmental waste. Telecommunications
designers are encouraged to research local building practices for a sustainable environment
and conservation of fossil fuels as part of the design process.
Specification of criteria
Two categories of criteria are specified; mandatory and advisory. The mandatory requirements
are designated by the word "shall;" advisory requirements are designated by the words "should,
"may," or "desirable," which are used interchangeably in this Standard.
Mandatory criteria generally apply to protection, performance, administration and compatibility;
they specify the minimally-compliant requirements. Advisory or desirable criteria are presented
when their attainment will enhance the general performance of the cabling system in all its con-
templated applications.
A note in the text, table, or figure is used for emphasis or offering informative suggestions, or
providing additional information.
x
ANSI/TIA-607-C
xi
ANSI/TIA-607-C
1 SCOPE
This Standard specifies requirements for a generic telecommunications bonding and grounding
infrastructure and its interconnection to electrical systems and telecommunications systems.
This Standard may also be used as a guide for the renovation or retrofit of existing systems.
2 NORMATIVE REFERENCES
The following standards contain provisions which, through reference in this text, constitute pro-
visions of this Standard. At the time of publication, the editions indicated were valid. All stand-
ards are subject to revision, and parties to agreements based on this Standard are encouraged
to investigate the possibility of applying the most recent editions of the standards indicated be-
low. ANSI and TIA maintain registers of currently valid national standards published by them.
ANSI/NECA/BICSI 607-2011, Standard for Telecommunications Bonding and Grounding
Planning and Installation Methods for Commercial Buildings
ANSI/TIA-606-B, 2012, Administration Standard for Telecommunications Infrastructure
ATIS 0600313-2013, Electrical Protection for Telecommunications Central Offices and
Similar Type Facilities
ATIS 0600318-2010, Electrical Protection Applied to Telecommunications Network Plant
at Entrances to Customer Structures or Buildings
ATIS 0600321-2010, Telecommunications Electrical Protection For Network Operator-
Type Equipment Positions
ATIS 0600333-2013, Grounding And Bonding Of Telecommunications Equipment
ATIS 0600334-2013, Electrical Protection Of Communications Towers And Associated
Structures
IEEE C2-2012, National Electrical Safety Code® (NESC®)
IEEE 1100-2005, Recommended Practice for Powering and Grounding Electronic
Equipment
ITU-T Recommendation K.27 1996, Protection against Interference Bonding Configu-
rations and Earthing inside a Telecommunication Building
NFPA 70-2014, National Electrical Code® (NEC®)
NFPA 780-2014, Standard for the Installation of Lightning Protection Systems
1
ANSI/TIA-607-C
3.1 General
For the purposes of this Standard, the following definitions, acronyms, abbreviations and units
of measure apply.
3.2 Definitions
access floor: A system consisting of completely removable and interchangeable floor panels
that are supported on adjustable pedestals or stringers (or both) to allow access to the area be-
neath.
access provider: The operator of any facility that is used to convey telecommunications sig-
nals to and from a customer premises.
administration: The method for labeling, identification, documentation and usage needed for
installation, moves, additions and changes of the telecommunications infrastructure.
backbone: A facility (e.g., pathway, cable or bonding conductor) for Cabling Subsystem 2 and
Cabling Subsystem 3.
backbone bonding conductor: A telecommunication bonding connection which interconnects
telecommunications bonding backbones (formerly known as the grounding equalizer).
bonding: The joining of metallic parts to form an electrically conductive path.
bonding conductor: A conductor that joins metallic parts to form an electrically conductive
path.
bonding network (telecommunications): A set of interconnected conductive structures that
provides a low impedance path for the associated telecommunications infrastructure.
building backbone: 1) Pathways or cabling between telecommunications service entrance
rooms, equipment rooms, telecommunications rooms, or telecommunications enclosures within
a building. 2) Cabling for interconnecting telecommunications spaces from the telecommunica-
tions entrance facility to a horizontal cross-connect within a building.
cabinet: A container that may enclose connection devices, terminations, apparatus, wiring, and
equipment.
cable: An assembly of one or more insulated conductors or optical fibers, within an enveloping
sheath.
cable sheath: A covering over the optical fiber or conductor assembly that may include one or
more metallic members, strength members, or jackets.
cabling: A combination of all cables, jumpers, cords, and connecting hardware.
Cabling Subsystem 1: Cabling from the equipment outlet to Distributor A, Distributor B, or Dis-
tributor C.
Cabling Subsystem 2: Cabling between Distributor A and either Distributor B or Distributor C
(if Distributor B is not implemented).
Cabling Subsystem 3: Cabling between Distributor B and Distributor C.
Note See figure 2 below for an illustration of the generic cabling topology for
Cabling Subsystem 1, Cabling Subsystem 2, Cabling Subsystem 3, Distrib-
2
ANSI/TIA-607-C
3 3
DB DB
2 2
2
1
DA DA DA
1
1 1 1 1
1 1 1
1
CP CP CP CP CP
EO EO EO EO EO EO EO EO EO EO
Legend:
DA Distributor A Cabling
1 Subsystem 1
DB Distributor B cable
DC Distributor C Cabling
2 Subsystem 2
EO Equipment outlet cable
3
ANSI/TIA-607-C
computer room: An architectural space whose primary function is to accommodate data pro-
cessing equipment.
conduit: 1) A raceway of circular cross-section. 2) A structure containing one or more ducts.
connecting hardware: A device providing mechanical cable terminations.
consolidation point: A connection facility within Cabling Subsystem 1 for interconnection of
cables extending from building pathways to the equipment outlet.
cord: 1) An assembly of cord cable with a plug on one or both ends. 2) An assembly of optical
fiber cable with a connector on each end.
cord cable: A cable used to construct patch, work area, and equipment cords .
customer premises: Building(s), grounds and appurtenances (belongings) under the control of
the customer.
Distributor A: Optional connection facility in a hierarchical star topology that is cabled between
the equipment outlet and Distributor B or Distributor C.
Distributor B: Optional intermediate connection facility in a hierarchical star topology that is ca-
bled to Distributor C.
Distributor C: Central connection facility in a hierarchical star topology.
distributor room: An enclosed architectural space designed to contain Distributor A, Distributor
B or Distributor C.
earth: See ground.
earthing: See grounding.
electromagnetic interference: Radiated or conducted electromagnetic energy that has an un-
desirable effect on electronic equipment or signal transmissions.
entrance facility (telecommunications): An entrance to a building for both public and private
network service cables (including wireless) including the entrance point of the building and con-
tinuing to the entrance room or space.
entrance point (telecommunications): The point of emergence for telecommunications ca-
bling through an exterior wall, a floor, or from a conduit.
entrance room or space (telecommunications): A space in which the joining of inter or intra
building telecommunications cabling takes place.
NOTE An entrance room may also serve as a distributor room.
equipment cord: see cord.
equipment outlet: Outermost connection facility in a hierarchical star topology.
equipotential bonding: Bonding between metallic components to achieve a substantially
equal potential.
exothermic weld: A method of permanently bonding two metals together by a controlled heat
reaction resulting in a molecular bond.
grid: A collection of adjacent cells.
4
ANSI/TIA-607-C
5
ANSI/TIA-607-C
6
ANSI/TIA-607-C
7
ANSI/TIA-607-C
8
ANSI/TIA-607-C
4 REGULATORY
9
ANSI/TIA-607-C
5.1 General
The basic principles, components, and design of telecommunications bonding and grounding
infrastructure specified in this Standard shall be followed amongst buildings of differing designs
and structures.
NOTE The requirements in this Standard differ from utility service provider re-
quirements, which are specified in ATIS 0600313. ATIS 0600313 specifications
support a robust level of service appropriate to a service provider. Users of this
Standard are encouraged to refer to ATIS 0600313 where robust service re-
quirements exist.
Bonding and grounding systems within a building are intended to have one electrical potential.
This is achieved to a large extent by following the requirements and guidelines in clauses 6 and
7 of this standard. For an enhanced bonding infrastructure that facilitates a greater degree of
equipotential bonding, the supplementary bonding infrastructure specifications in clause 7.8
should be used.
While the bonding and grounding of the electrical service entrance is outside the scope of this
Standard, coordination between electrical and telecommunications bonding and grounding sys-
tems is essential for the proper application of this Standard. For example, electrical room and
associated electrical panelboard(s) are not part of the telecommunications infrastructure, but
they are depicted in this Standard because they are integral to the telecommunications bonding
and grounding system. See 7.2.1, 7.2.2, 7.3.1 and 7.3.2 for more information regarding bonding
to electrical panelboards.
When installed, the lightning protection system should meet the requirements of the authority
having jurisdiction (AHJ).
Where a tower or antenna is installed, the installation shall meet the bonding and grounding re-
quirements of ATIS 0600334. See annex B for information regarding bonding and grounding of
towers and antennas.
5.2.1 General
Within a building (see illustrative examples figure 3, figure 4 and figure 5), the generic telecom-
munications bonding infrastructure originates at the electrical entrance facility ground and ex-
tends throughout the building. It includes the following major components:
a) primary bonding busbar (PBB);
b) telecommunications bonding conductor (TBC);
and may also include the following:
c) telecommunications bonding backbone (TBB);
d) secondary bonding busbar (SBB); and,
e) backbone bonding conductor (BBC).
These telecommunications bonding
communications pathways and spaces, installed cabling, and administration system.
10
ANSI/TIA-607-C
Distributor Distributor
room room
Backbone
bonding
Equipment conductor Equipment
Pathways
Distributor Distributor
room room
Equipment
Equipment
SBB SBB
Telecommunications
bonding backbone (TBB)
Electrical
entrance
facility Telecommunications Distributor
entrance facility (TEF) room
Equipment
Equipment
Busbar
Building spaces
11
ANSI/TIA-607-C
Telecommunications
bonding conductor
(TBC)
Electrical
entrance Primary bonding busbar (PBB) Secondary bonding busbar (SBB)
facility
Equipme nt Equipme nt
Telecommunications Distributor
entrance facility (TEF) room
Telecommunications
bonding backbone (TBB)
LEGEND
Pathways Panelboard
Bonding conductor
Service equipment as labeled
Equipment Busbar
12
ANSI/TIA-607-C
13
ANSI/TIA-607-C
6.1 General
This clause specifies components of the telecommunications bonding infrastructure. Where the
l ponent, the component shall be listed to the ap-
plicable standard(s) through a nationally recognized testing laboratory (NRTL).
6.2 Busbars
100 mm
(4 in)
Min.
29 mm 50 mm 11 mm dia 29 mm
(1-1/8 in) (2 in) (7/16 in) (1-1/8 in)
typ Mounting holes, typ typ
14
ANSI/TIA-607-C
Figure 7 illustrates an example of a SBB. Hole spacing, size and pattern may vary.
8 mm 11 mm 13 mm
16 mm (5/16 in) (7/16 in) (½ in)
(5/8 in) dia 11 mm
(7/16 in) dia.
25 mm
50 mm (1 in)
(2 in)
mounting holes
29 mm
(1-1/8 in)
6.3 Conductors
6.3.1 General
All bonding conductors shall be copper and may be insulated. When conductors are insulated,
they shall be listed for the application. The bonding conductors shall not decrease in size as the
bonding path moves closer to the termination point of the grounding electrode system.
15
ANSI/TIA-607-C
6.3.5.1 General
place of a TBB, a BBC or both. Before utilizing structural metal in place of a TBB or a BBC,
building plans (including as-builts as applicable) and specifications shall be reviewed to ensure
the structural metal is electrically continuous or can be made so. Additionally, the two point con-
tinuity test as described in 9.1, or equivalent, should be performed on the structural metal to ver-
ify electrical continuity and acceptable resistance along the paths used as bonding conductors.
Concrete reinforcing steel shall not be used as a TBB or a BBC.
16
ANSI/TIA-607-C
cessible. Bonds to the PBB or SBB shall be made as specified in 7.2.2 and 7.3.2, respectively.
Components to be connected to the PBB or SBB shall be as specified in 6.2.1 and 6.2.2, re-
spectively.
6.4 Connectors
All bonding connectors shall be listed for the application.
NOTE Connectors are listed for the application (e.g., above ground, direct bur-
ied).
The surface of all bonding connectors used on a PBB and an SBB shall be of a material that
provides an electro-chemical potential of <300 mV between connector and bonding busbar.
6.5 Identification
6.5.1 Conductors
Where insulated, the TBC and each TBB, BBC, TEBC, RBC and UBC, shall be green, green
with yellow stripe, or marked with a distinctive green color.
6.5.2 Labels
Labels shall include the information depicted in figure 8.
17
ANSI/TIA-607-C
7 DESIGN REQUIREMENTS
7.1 General
Metallic sheaths of outside plant cables entering a facility shall be bonded to ground as close as
.
Where the building backbone telecommunications cabling incorporates a shield or metallic
member, this shield or metallic member shall be bonded to the primary bonding busbar (PBB) or
the secondary bonding busbar (SBB) o-
able sheath.
When secondary protection is provided, the secondary protector grounding conductor (or termi-
nal) shall be connected to the nearest PBB or SBB using the shortest practical path.
Grounding through the equipment alternating current (ac) power cord does not meet the intent
of this Standard. It is intended that the information technology equipment (ITE) be provided a
supplementary and specific ground path for the equipment over and above the required ac or
direct current (dc) power ground path. While the ac or dc powered equipment typically has a
power cord that contains a grounding/bonding wire, the integrity of this path to ground cannot be
easily verified. Rather than relying wholly on the ac or dc power cord grounding/bonding wire, it
scribed in
this Standard.
NOTE Many types of equipment do not require individual bonding conductors
and as such do not have an attachment point for bonding conductors. Equipment
that does not have attachment points for bonding conductors may be bonded ei-
18
ANSI/TIA-607-C
tions system bonding (minimizing practical lengths and number of bends of bonding conductors
to the SBB).
19
ANSI/TIA-607-C
Rack bonding
conductors All
conductors routed
to PBB/SBB
Unit bonding
conductors
2U
4U 4U
4U Unit bonding
Individual equipment
conductors
bonding conductors
from each piece of 2U 2U
equipment and rack to
the rack bonding
conductor
2U 2U 2U
Vertically-
mounted RBB
2U 2U 2U
2U 2U 2U
2U 2U
Individual
equipment
Rack bonding
grounding terminal
conductor extended to
(typical each piece
bottom of rack to
of equipment)
accommodate future
growth
Rack isolation
pads (if
applicable)
Example A Example B Example C
20
ANSI/TIA-607-C
7.2.1 General
The length of the PBB is not specified within this Standard. It is desirable that the busbar be
electrotin-plated for reduced contact resistance. The busbar shall be cleaned and an anti-
oxidant should be applied prior to fastening connectors to the busbar.
The desirable location of the PBB is in the telecommunications entrance room or space. Typi-
cally, there should be a single PBB per building.
NOTE For buildings with more than one electrical service entrance, each of
which serves telecommunications equipment, the user is urged to consult with a
licensed engineer for guidance on locating the PBB.
The PBB shall be as close as practical to the panelboard (electrical power panel) and shall be
installed to maintain clearances required by applicable electrical codes. A practical location for
the PBB is to the side of the panelboard (where provided). The vertical location of the PBB
should be determined by considering whether the bonding conductors are routed in an access
floor or overhead cable support. Its placement should provide for the shortest and straightest
practical routing of the telecommunications bonding conductor (TBC) and the primary protector
grounding conductor (see annex C for more information on telecommunications electrical pro-
tection primary protector grounding). Additionally, the PBB shall be insulated from its support
using an insulator that is listed for the purpose by a nationally recognized testing laboratory
(NRTL). A minimum of 50 mm (2 in) separation from the wall is recommended to allow access
to the rear of the busbar.
When a panelboard for telecommunications equipment is not installed in the telecommunica-
tions entrance room or space, the PBB should be located near the backbone cabling and asso-
ciated terminations. In addition, the PBB should be located so that the TBC is as short and
straight as practical.
The PBB should serve telecommunications equipment that is located within the same room or
space. The PBB serves as the central bonding busbar for the telecommunications bonding in-
frastructure. It also serves as the bonding busbar for equipment located in the telecommunica-
tions entrance room or space.
21
ANSI/TIA-607-C
ductors where the pathway is bonded to the bonding conductor, no additional bond to the PBB
is required.
7.3.1 General
The length of the SBB is not specified within this Standard. It is desirable that the busbar be
electrotin-plated for reduced contact resistance. The busbar shall be cleaned and an anti-
oxidant should be applied prior to fastening connectors to the busbar.
The SBB shall be as close as practical to the panelboard and shall be installed to maintain
clearances required by applicable electrical codes. A practical location for the SBB is to the side
of the panelboard (where provided). The vertical location of the SBB should be determined by
considering whether the bonding conductors are routed in an access floor or overhead cable
support. Additionally, the SBB shall be insulated from its support using an insulator that is listed
for the purpose by a NRTL. A minimum of 50mm (2 in) separation from the wall is recommend-
ed to allow access to the rear of the busbar.
When a panelboard for telecommunications equipment is not installed in the same room or
space as the SBB, that SBB should be located near the backbone cabling and associated ter-
minations.
The bonding conductor between a TBB and an SBB shall be continuous and routed in the
shortest practical straight-line path.
Multiple SBBs may be installed within the same Distributor to aid in minimizing bonding conduc-
tor lengths and minimizing terminating space.
7.4.1 General
The length of the RBB is not specified in this Standard. The busbar shall be cleaned and a
compatible anti-oxidant should be applied prior to fastening connectors to the busbar. The RBB
shall be installed horizontally or vertically on the rack using insulators which provide a minimum
of 19 mm (0.75 in) separation.
7.5 Conductors
7.5.1 General
Bonding conductors for telecommunications should not be placed in ferrous metallic conduit. If it
is necessary to place bonding conductors in ferrous metallic conduit the conductors shall be
bonded to each end of the conduit using a grounding bushing or using a minimum sized con-
ductor of 6 AWG at both ends of the conduit.
23
ANSI/TIA-607-C
Bend
radius
90° minimum
Telecommunications
Grounding bonding conductor
electrode (TBC)
system Outside the scope of this Standard
24
ANSI/TIA-607-C
d) be continuous from the PBB to the furthest SBB to which it is connected (i.e., not be dai-
sy-chained from busbar to busbar); and,
e) minimize, to the extent practical, the lengths of the TBB(s).
TBB conductors shall be protected from physical and mechanical damage. The TBB conductors
should be installed without splices, however, where splices are necessary, the number of splic-
es should be minimized. Splices shall be accessible and be located in telecommunications
spaces. Joined segments of a TBB shall be joined by means of a listed exothermic weld, listed
irreversible compression-type connectors, or equivalent. All joints shall be adequately supported
and protected from damage.
Metallic cable shield(s) or any metal pathway for cable (e.g., conduit) shall not be used as a
TBB nor shall water piping systems be used as a TBB
25
ANSI/TIA-607-C
j) where placed in ferrous metallic conduit that is greater than 0.9 m (3 ft), be bonded to
each end of the conduit using a grounding bushing or with a minimum sized conductor
of 6 AWG.
7.5.8.1 General
The TEBC connects the PBB/SBB to equipment racks/cabinets. More than one TEBC may be
installed from the PBB/TBG (e.g., a separate TEBC per rack). The TEBC shall be a continuous
copper conductor that is sized not less than a 6 AWG or as the largest size equipment ground-
ing conductor in the ac branch power circuit(s) serving the racks/cabinet lineup.
NOTE Cable shields, metal conduit, cable runway or ladder, or any other me-
tallic cable pathway do not satisfy the requirements for a TEBC.
Connections to the TEBC shall be made with listed irreversible compression connectors, suita-
ble for multiple conductors, and with the rack bonding conductors (RBCs) routed toward the
PBB/SBB, see figure 12.
The TEBCs may be routed within cable trays, on the outside of ladder rack, tray supported at no
greater than 0.9 m (3 ft) intervals, or along equipment platforms, see figure 13. Examples of ac-
ceptable means of supporting the TEBCs include the use of lay-in lugs, cable brackets, and
other brackets designed for this purpose.
An alternative method to running TEBCs overhead is to route them under an access floor. All
requirements set forth for running the bonding conductors specified in this Standard shall apply.
Irreversible compression
connection
TEBC (Telecommunications
equipment bonding
conductor)
Rack bonding
conductor
26
ANSI/TIA-607-C
Telecommunications To PBB/SBB
equipment bonding
Irreversible
conductor (TEBC)
crimp connector
7.5.8.2 Separation
TEBCs shall be separated a minimum of 50.8 mm (2 in) from conductors of other cable groups
such as power or telecommunications cables. For mm
(2 in) under or off the side of a cable tray. An exception may be when conductors are grouped
together to enter or exit a cabinet or enclosure. Grouping only at this point is acceptable, pro-
vided the conductors are suitably separated on either side of the opening.
TEBCs shall be separated from ferrous material by a distance of at least 50 mm (2 in) where
achievable, or be effectively bonded to the ferrous material.
27
ANSI/TIA-607-C
28
ANSI/TIA-607-C
IBN. The IBN topology functions by attempting to block extraneous currents (such as
29
ANSI/TIA-607-C
lightning) from flowing within the CBN and then entering and traversing through the IBN.
This topology is especially robust to transients occurring in the CBN.
c) Star IBN An IBN deployed into a star network instead of a mesh network.
7.8.1 Mesh-BN
A mesh-BN is a bonding network to which all associated equipment cabinets, frames and racks
and cabling pathways are bonded together as well as at multiple points to the CBN (see figure
16).
Figure 16 A mesh-BN with equipment cabinets, frames, racks and CBN bonded
together
If the mesh-BN is constructed from flat conductors, the mesh-BN should be prefabricated of
minimum 0.4 mm (0.0159 in; 26 gauge) x 50 mm (2 in) wide copper strips with all crossings and
joined sections properly welded.
30
ANSI/TIA-607-C
Where the mesh-BN is constructed from bare round wire, the conductors shall be a minimum
sized conductor of 6 AWG copper conductors joined together via exothermic welding, brazing,
listed compression connectors, or listed grounding clamps at each of the crossing points.
If the mesh-BN is constructed using the access-floor pedestals, the flooring system shall be
electrically continuous. The mesh-BN shall be bonded together no further than every 3.7 m (12
ft) (approximately 6 pedestals) in each direction using a minimum sized conductor of 6 AWG
copper and listed pedestal grounding clamps. Bonding is recommended at least every 2.4 m (8
ft) (approximately 4 pedestals) in every direction.
The mesh-BN shall have the following connections:
a) 6 AWG or larger bonding conductor to the PBB or SBB in the computer room:
b) 6 AWG or larger bonding conductor to each ITE cabinet and rack cabinets and racks
shall not be bonded serially;
c) A bonding conductor to the ground bus for each power distribution unit (PDU) or panel
board serving the room, sized per NEC mmenda-
tions;
d) 6 AWG or larger bonding conductor to heating, ventilating, and air-conditioning (HVAC)
equipment Each piece of HVAC equipment shall be bonded individually to the mesh-
BN;
e) 6 AWG or larger bonding conductor to each structural metal column in the computer
room;
f) 6 AWG or larger bonding conductor to each metallic cable tray and cable runway in the
room they may be bonded in series;
g) 6 AWG or larger bonding conductor to each metallic conduit, water pipe, metallic air duct
in the room they may be bonded in series;
h) 6 AWG or larger bonding conductor to every 4 to 6 access floor pedestal in each direc-
tion.
7.8.2 Mesh-IBN
A mesh-IBN is a mesh-topology bonding network that has a SPC to either the CBN or another
IBN (see figure 17). The mesh-IBN is typically limited to a restricted area within a building such
as in a computer room. The mesh-IBN is not typical (but can be utilized) for a commercial envi-
ronment or computer room but is recognized and sometimes utilized in the access provider cen-
tral office and computer room. The primary benefit of the IBN is the blocking of building currents,
such as lightning and power faults, from entering into the IBN.
NOTE -
are described in ITU-T K.27 and IEEE 1100.
The mesh-IBN components such as associated equipment cabinets, frames, racks and cabling
pathways are insulated from the CBN except for one controlled SPC location to the CBN. The
SPC location applies to all bonding conductors (including power circuits) entering or exiting the
mesh-IBN. Due to isolation from the CBN, except at the controlled SPC, the mesh-IBN is said to
For a mesh-IBN, an under-access-floor, the SBG is typically only directly connected to the serv-
ing PBB or SBB in order to not violate the isolation requirements for the mesh-IBN. An above
cabinet/rack SBG can be more easily incorporated where desirable into the mesh-IBN by means
of insulating devices between the bonding grid and any nearby CBN components.
31
ANSI/TIA-607-C
To PBB or SBB
Figure 17 A mesh-IBN having a single point of connection
7.9 Administration
Each telecommunications bonding conductor shall be labeled at its points of termination. Labels
shall be located on conductors as close as practical to their points of termination in a readable
position. Refer to ANSI/TIA-606-B for additional labeling requirements.
32
ANSI/TIA-607-C
8 EXTERNAL GROUNDING
8.2.1 General
A telecommunications grounding electrode system is supplemental and connected to the struc-
ectrode system. Whereas the primary purpose of the electrical
stem is
intended to provide enhanced equipment protection and system performance.
Adequate design measures should be taken to obtain a low resistance grounding electrode sys-
tem. Poor soil conditions or limited space may make this difficult to achieve. Potential equaliza-
tion is of greater importance than low resistance. Proper design methods should focus on estab-
lishing an equal potential ground plane, which has the lowest practicable ground resistance.
33
ANSI/TIA-607-C
most common means of designing grounding electrode systems due to their ability to model soil
conditions in detail.
34
ANSI/TIA-607-C
35
ANSI/TIA-607-C
36
ANSI/TIA-607-C
37
ANSI/TIA-607-C
b) to measure soil resistivity (electrical conductivity properties of the soil); this requires the
use of a four-terminal tester (see 9.3.2);
c) to test any complex ground system where a metallic loop exists; test current will return
through metal and not be forced into the soil. These include systems such as ring
grounds, counterpoise, substation grounds, and various other multiple interconnected
ground systems; and
d) to perform any test where a client or third party require conformance to a reference
standard; the clamp-on test method has not been incorporated into any independent
standard.
Before taking a clamp-on ground resistance measurement, ensure that the meter is calibrated.
Once calibrated, attach the clamp to the electrode to be measured and read the ground re-
sistance from the display.
9.3.1 General
Soil resistivity testing measures a volume of soil to determine its conductivity. The soil composi-
tion, moisture content, and temperature affect soil resistivity. Additionally, the resistivity of the
soil will vary geographically, and at different soil depths.
There are several testing methods that can be utilized to measure soil resistivity from taking soil
samples for lab testing to a number of different methods that provide the best indication of con-
ditions at the site. The most common method utilized for measuring soil resistivity is the four-
point method using the equally spaced Wenner arrangement.
9.3.2.1 General
The manufacturer s instructions shall be followed when using the four-point test instrument
when making a soil resistivity measurement. The test instrument uses four terminals to make
this measurement. Four stakes are driven into the earth, all at depth B and spaced (in a straight
line) at equal distance intervals A. The test current I is passed between the two outer stakes (C1
and C2), and the potential V is measured between the two inner stakes (P1 and P2). The re-
Figure 19 shows an example of the four-point
method.
38
ANSI/TIA-607-C
39
ANSI/TIA-607-C
Second location
Fifth location
Fourth location
40
ANSI/TIA-607-C
41
ANSI/TIA-607-C
42
ANSI/TIA-607-C
B.1 General
Grounding electrodes connect electrical systems and equipment to earth. Grounding electrodes
may be ground rods, metal plates, concrete encased electrodes, ground rings, electrolytic
ground rods, the metal frame of the building or structure, and metal underground water pipes.
Metallic underground gas piping is not used as a grounding electrode, but is bonded on the cus-
tomer side of the meter (see NFPA-70 [NEC ] and NFPA-780).
43
ANSI/TIA-607-C
Breather holes
Covered
Finished test well Exothermic connection
grade
Finished
Breather grade 2 AWG minimum
holes copper conductor
44
ANSI/TIA-607-C
45
ANSI/TIA-607-C
46
ANSI/TIA-607-C
47
ANSI/TIA-607-C
C.1 General
This clause describes specific electrical protection considerations for antenna support structures
(towers).
48
ANSI/TIA-607-C
49
ANSI/TIA-607-C
50
ANSI/TIA-607-C
These are free-standing structures with upright support members (legs) mounted on a
foundation or pier that need no other supporting elements.
c) Wooden structures (poles)
These are either free-standing or guyed structures either mounted on a foundation or
partially buried.
The tower ground ring conductor should be a bare tinned or untinned copper conductors, mini-
mum 2 AWG, that is buried to a depth at least 0.75 m (2.5 ft) or 150 mm (6 in) below the frost
line, whichever is deeper. It should be installed at least 0.6 m (2 ft) away from the tower base or
footing using at least two ground rods, 2.4 m (8 ft) minimum length and 16 mm (0.625 in) diame-
ter, driven to a depth of not less than 3 m (10 ft) below the depth of the tower ground ring and
attached to the ground ring using a listed exothermic weld. The ground rods should be made
from copper, copper clad steel, stainless steel or galvanized steel and be listed for the purpose.
The ground rods should be located at opposite ends of the ground ring. The tower ground ring
should bonded to the equipment building/cabinet ground ring in at least two points using the
same size conductor and buried to the same depth as the tower and equipment building/cabinet
reinforcing steel elec-
trically connected to the tower holding bolts.
51
ANSI/TIA-607-C
52
ANSI/TIA-607-C
53
ANSI/TIA-607-C
the tower ground ring. These conductors should be installed to be as short and straight as prac-
tical. The connections to the tower should be made with listed exothermic connections unless
specifically directed otherwise by the tower manufacturer. The connections to the ground ring
should be made with listed exothermic connections or listed irreversible high compression con-
nectors (see figure 31).
54
ANSI/TIA-607-C
2 AWG minimum
bare copper wire
routed from opposite side
from transmission line
Ground kits
Ground
rods
55
ANSI/TIA-607-C
b) The conduit from the weatherhead to the power meter should be at least 6 m (20 ft) long.
This aids the operation of the power arrester at the weatherhead (poles).
56
ANSI/TIA-607-C
57
ANSI/TIA-607-C
To PBB
58
ANSI/TIA-607-C
Electrical service
Ground rods
59
ANSI/TIA-607-C
Electrical
service
60
ANSI/TIA-607-C
conductor. Once inside the building, the waveguide or coaxial cable shield should be bonded to
minimum. 2 AWG conductor, as close
as practical to the entrance.
If there is a metallic waveguide or coaxial cable entrance plate, the entrance plate should be
bonded to both the exterior and interior grounding system with a minimum 2 AWG conductor.
The waveguide or coaxial cable shield should be bonded to the metallic entrance plate on both
the outside and inside of the building with a minimum 2 AWG conductor.
The coaxial cable should be protected by a lightning surge arrester, which is bonded to the exte-
rior grounding electrode system with the proper size grounding conductor specified by the man-
ufacturer.
If the tower is lighted, the conduit for the lighting power conductors should be bonded to ground
as described for waveguide and coaxial cable shields.
61
ANSI/TIA-607-C
Bonded at
Tower ground all corner
ring fence posts
Tower
Metallic Bonding
fence busbar
Communication External
site ground
ring
62
ANSI/TIA-607-C
Figure 38 Illustrative view of a fence fabric and deterrent wiring bonding example
C.2.8.2 Generators
Generators installed outside and within 1.8 m (6 ft) of the structure should be bonded to the
nearest point on the building's grounding electrode system using a minimum 6 AWG copper
conductor, see figure 39. If this conductor is placed underground, then the minimum conductor
size shall be 2 AWG or larger.
Generators installed more than 1.8 m (6 ft) away from the structure shall have a ground rod
driven near the generator and bonded to the generator and to the building's grounding electrode
system using a 2 AWG or larger bare, solid, tinned or un-tinned copper conductor
63
ANSI/TIA-607-C
C.2.9.1 Components
C.2.9.2 Installation
Radio equipment buildings with nonmetallic walls should have an interior ground ring consisting
of a minimum 2 AWG conductor mounted, with nonmetallic connections, to the interior wall with-
in 0.3 m (1 ft) of the ceiling.
Radio equipment buildings with metallic walls should have an interior ground ring consisting of a
minimum 2 AWG conductor mounted directly to the interior wall within 0.3 m (1 ft) of the ceiling.
64
ANSI/TIA-607-C
65
ANSI/TIA-607-C
Maximum effort should be made to keep the primary protector grounding conductor as short as
practical. This may be accomplished by locating the primary protector in close proximity to the
power service entrance at the building or structure. In addition to the primary protector ground-
ing conductor, the overall conductor path between the primary protector and the power service
ground should be kept as short as practical. This path may include the telecommunications
bonding conductor (TBC) as illustrated in figure 3 and figure 5 of this Standard. The length of
the TBC may be minimized by locating the primary bonding busbar (PBB) as close as practica-
ble to the electrical entrance facility.
Requirements for telecommunications electrical protection, bonding and grounding at building or
structure entrances are contained in the NEC , Chapter 8. Additional detailed electrical protec-
tion, bonding and grounding considerations and criteria are contained in ATIS 0600318. The
reader is directed to these documents for guidance regarding the primary protector, and the
placement, routing, and length of the primary protector grounding conductor.
Consideration should be given to installing secondary protectors and data and fire alarm protec-
tors.
66
ANSI/TIA-607-C
67
ANSI/TIA-607-C
Position
bonding
terminal
Processor/controller
Distributor
room
Equipment
Headset intergace
SBB
Telecommunications
bonding backbone (TBB) External secondary
protector
Electrical
entrance Telecommunications
facility entrance facility (TEF)
Bond to furniture
Primary bonding
busbar (PBB)
Grounding
Electrode
Conductor
Telecommunications LEGEND
bonding conductor
Grounding (TBC) Structural
Panelboard
electrode metal
system
68
ANSI/TIA-607-C
69
ANSI/TIA-607-C
70
ANSI/TIA-607-C
IEC
International Electrotechnical Commission
3, rue de Varembe
PO Box 131
1211 Geneva 20
Switzerland
+41 22 919 02 11
www.iec.ch
IEEE
IEEE
445 Hoes Ln
Piscataway, NJ 08854-4141
USA
(732) 981-0060
www.ieee.org
ISO
International Organization for Standards
1, ch. de la Voie-Creuse
CP 56
CH-1211 Geneva 20
Switzerland
+41 22 749 01 11
www.iso.org
ITU
International Telecommunication Union
Place des Nations
1211 Geneva 20
Switzerland
+41 22 730 5111
www.itu.int
MIL
Department of Defense
Defense Standardization Program
8725 John J Kingman Rd
Stop 5100
Fort Belvoir, VA 22060-6220
USA
(703) 767-6888
www.dsp.dla.mil
NECA
National Electrical Contractors Association
3 Bethesda Metro Center
Suite 1100
Bethesda, MD 20814
USA
(301) 657-3110
www.necanet.org
71
ANSI/TIA-607-C
NFPA
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
USA
(617) 770-3000
www.nfpa.org
TIA
Telecommunications Industry Association
1320 N Courthouse Rd
Suite 200
Arlington, VA 22201
USA
(703) 907-7700
www.tiaonline.org
72
THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION
TIA represents the global information and communications technology (ICT)
industry through standards development, advocacy, tradeshows, business
opportunities, market intelligence and world-wide environmental
regulatory analysis. Since 1924, TIA has been enhancing the
business environment for broadband, wireless, information
technology, cable, satellite, and unified communications.