Sap S4hana MM-1
Sap S4hana MM-1
Sap S4hana MM-1
Subcontracting process
Subcontracting process
Classic Subcontracting:
1. Subcontracting
i. External vendor
ii. External vendor with chargeable components
iii. External processing
iv. Inter company
Outsourcing Production:
1. Toll manufacturing
2. Contract manufacturing
1.) Subcontracting:
Configurations :
Maintain the Sales org, Distribution Channel and Division using tcode
SM30 foe the view
‗V_001W_IV ‗.
Change the Transaction Group to ‗8‘ (Proforma Invoice) for Billing type
‗ZSN‘ and save.
Create copy control for the new Billing types(ZSP and ZSN) created
in step 4, by copying
the existing copy control setting of the Billing type ‗FX‘ and Sales
order type ‗OR‘.
1. With Challan
3. Create the material document with 541 movement type using the
transaction
‗MIGO‘.
6. In the next screen, you can select the material document (541
movement type) and
‗ME21N‘.
8. Execute MIRO for the invoice verification for the service charges
paid to the
subcontractor.
First In, First Out (FIFO) – It will automatically assign the existing
challans to the goods receipt
document.
Manual – Enter the challan number to reconcile the challan for the
material document.
11. Once the data is verified, click ‗Save‘ to update the reconciliation
table.
GR Open Quantity – Goods receipt open quantity
Reconciled)
-
material document,
cancelled first.
goods receipt
2. Without Challan
1. Create the subcontracting PO using the transaction ME21N, with
item category ‗L‘
2. Create the material document with 541 movement type using the
transaction
‗MIGO‘.
5. In the next screen, you can select the material document (541
movement type) and
‗ME21N‘.
7. Execute MIRO for the invoice verification for the service charges
paid to the
subcontractor.
Note: You can create ‘With Challan‘ and ‗Without Challan‘ billing in the
same screen. To do
so, select the material document(s) and choose the With Challan and/or
the Without Challan
buttons.
Note: During goods receipt, final product will be received with movement
type 101 and components will be consumed automatically with 543
movement type
Classic Subcontracting
Create Subcontracting Purchase order
– Scrap analysis
– SNC Integration
– Subcontracting Cockpit
– New Movements
– Consumption history
– Scrap Report
1. Subcontracting Cockpit
– Facility to change the shipping point and batch number when the
outbound delivery is getting created
– The output report can be downloaded and the list can be sent via email
Transaction: ME2ON
Goods issue to subcontractor ―outbound delivery‖ will appear in the
purchase order history overview. Hence, it is useful for the SCM team to
check whether the particular SC order components have been issued or
not by navigating further.
2. Serial Number Assignment
When you send the equipment for repair, there is no need of input serial
number again.
3. Inbound Delivery Creation with Subcontracting Components
– Posting Goods receipt from the same screen without entering batches
again
integration
– Batch tracking
Prerequsite:
Configuration Settings:
Menu Path:
Here, create a new combination of delivery type and item category for the
subcontracting delivery type (LB) with usage as ―V‖.
Menu Path:
Here, create a serial number new procedure ―POSL‖ and ―PRSL‖ for
purchase order and purchase requisition respectively and assign the same
to serial profile.
Menu Path:
SPRO—>Materials Management—>Purchasing—>Purchase
Order—>Define Document Typess
Menu Path:
Menu Path:
Here, maintain document type for the supply plant and receiving plant
combination with one step or two step procedure. In case of one step
procedure, the stock will be directly go to subcontractor‘s stock without
going to the receiving plant.
Setting for Field Seletion group for SNC Integration:
Menu Path:
Scenario :-
BOM 1 (CS01)
After saving this document system posts this material stock as stock
provided to vendor.
Therefore no need to transfer the material through ME2O. (It is already
delivered).