0% found this document useful (0 votes)
38 views1 page

Process Flow - Cabinet - WN

This document provides a process flow chart for the production of a cabinet part for LG Electronics. The 14 step process includes: 1) receiving materials, 2) incoming inspection, 3) storage, 4) three press steps including forming, painting, and bending, 5) in-process inspections, 6) packing, 7) coating, 8) more in-process inspections, 9) final packing, 10) in-process inspection, 11) packing, 12) stocking, and 13) final outgoing inspection and delivery. The document was created by Thai Fountain Of Life Co., Ltd. and is the first revision issued on May 8, 2023 for the new process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

Process Flow - Cabinet - WN

This document provides a process flow chart for the production of a cabinet part for LG Electronics. The 14 step process includes: 1) receiving materials, 2) incoming inspection, 3) storage, 4) three press steps including forming, painting, and bending, 5) in-process inspections, 6) packing, 7) coating, 8) more in-process inspections, 9) final packing, 10) in-process inspection, 11) packing, 12) stocking, and 13) final outgoing inspection and delivery. The document was created by Thai Fountain Of Life Co., Ltd. and is the first revision issued on May 8, 2023 for the new process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROCESS FLOW CHART AND SPECIAL Doc. No.

CHARACTERISTIC Rev No. 00


Thai Fountain Of Life Co.,Ltd ’P
‚ ROTOTYPE ’P
‚ RE-LUNCH MASS PRODUCTION Effective Date 05/08/23
Customer Name : LG Electronics Part Name : Cabinet_WN Page 1/1
ECN. No./ Revision No. : '00 Part No. : 3090A23002P

1.Receiving material 10. Inspection in process

2.Incoming inspection 11. Packing

3. Storage Material 12. Stocking

4. Press Step 1 _ Not,PI,Form 13. Inspection ( Outgoing)

5. Press Step 2 _ PI , Bur 14. Delivery

6. Press Step 3 _ Ben , Bur

7. Inspection in process

8. Packing

9. Coating

Symbol
Operation Quantity Check
Transportation Quality Inspection Description
Storage Amendment Description Rev. / Issue No. Date Reason Supplier
00 5/8/23 New TFL
Remark :
Customer Approval Supplier Approval
Approved Reviewed Issued Approved Reviewed Issued

FM-EN-016 Rev.02 (1-Feb-2018)

You might also like