Municipality of Pamplona: (Fill Side) Detail of Grouted Riprap

This document provides details for constructing a grouted riprap and stone masonry wall, including three barrel sections for a reinforced concrete box culvert. It specifies dimensions for weep holes, filter stones, mortar and stone masonry, as well as notes on soil investigation, allowable bearing capacity, and responsibilities for review and approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Municipality of Pamplona: (Fill Side) Detail of Grouted Riprap

This document provides details for constructing a grouted riprap and stone masonry wall, including three barrel sections for a reinforced concrete box culvert. It specifies dimensions for weep holes, filter stones, mortar and stone masonry, as well as notes on soil investigation, allowable bearing capacity, and responsibilities for review and approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHOULDER

3.00%

50mm Ø PVC WEEPHOLES INLET


S=
1.5 (STAGGERED) @ 2000 O.C. WITH FILTER TRIPLE BARREL SECTION
0:1
.00 SINGLE BARREL SECTION

DETAIL OF GROUTED RIPRAP


1 (FILL SIDE)
G14 SCALE 1:100m EXISTING GROUND

100mm.Ø PVC PIPE PHOLES SPACED


@ 2000mm O.C. STAGGERED

S=1:12
300mm thk. FILTER STONES
(COARSE AGGREGATE NEAR OPENING)

:12
S=5
NOTES ON STONE
MASONRY:
DOUBLE BARREL SECTION
CONCRETE CLASS "A" FOR
WALL WHEN ORDERED BY THE
ENGINEER.

DEPTH OF FOOTING:
FOOTING SHALL BE CARRIED
DOWN FROM FOUNDATION
DIRECTED BY ENGINEER.
NOTE :
MORTAR: LEGEND :
TO BE ONE(1) PART CEMENT
AND TWO(2) PARTS SAND.
NOTES :
MORTAR JOINTS:
WITH GENERALLY 221 - 4cms., PRIOR TO CONSTRUCTION, CONDUCT SOIL
2cms MINIMUM, MAXIMUM INVESTIGATION IN ACCORDANCE WITH THE STANDARD
621cms. TESTING REQUIREMENT ALONG THE ALIGNMENT OF
STO NE MASONRY WA LL T O VERIF Y T HE REQ UI RED
BULDGE:
THE BULDGE OF INDIVIDUAL
DESIGN SOIL BEARING CAPACITY OF THE FOUNDATION
BED. ALLOWABLE SOIL BEARING CAPACITY = 196 KPa. STANDARD DETAILS OF REINFORCED CONCRETE BOX CULVERT (RCBC) BARRELS
STONE SHALL VARY BETWEEN
2-21 TO 10cms.

2 DETAIL OF STONE MASONRY


G14 SCALE 1:100m

SUB - PROJECT NAME: SHEET CONTENTS: PREPARED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE CONCRETING OF BRGY. TAMBO TO SAN VICENTE FMR. PAMPLONA, CAMARINES SUR
PHILIPPINE RURAL DEVELOPMENT PROJECT DETAIL OF GROUTED RIPRAP 7
PROJECT CODE: PRDP-IB-R005-CAS-009-PAM-001-2019 STONE MASONRY & DETAIL OF
MUNICIPALITY OF PAMPLONA RCBC BARRELS ENGR. RAMIL P. PORTANOBA ENGR. ALVIN C. FEDERICO DANILO S. BORDON HON. RONALDO F. FRANCO
PROVINCE OF CAMARINES SUR ENGINEER II MUNICIPAL ENGINEER MPMIU HEAD ACTING MUNICIPAL MAYOR 42
LOCATION: Pamplona, Camarines Sur

You might also like