Fratar Method-Example - Students To Verify

The document contains existing and projected trip data between four zones (A, B, C, D). It shows the current and future trip distributions from each zone to the other zones. It then calculates the future trip numbers for each origin-destination pair based on current volumes and growth factors. The new trip distribution matrix projects slightly higher total trips from zones B, C and D compared to the current totals.

Uploaded by

Gilbert Maro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views2 pages

Fratar Method-Example - Students To Verify

The document contains existing and projected trip data between four zones (A, B, C, D). It shows the current and future trip distributions from each zone to the other zones. It then calculates the future trip numbers for each origin-destination pair based on current volumes and growth factors. The new trip distribution matrix projects slightly higher total trips from zones B, C and D compared to the current totals.

Uploaded by

Gilbert Maro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Existing trip ends and trip distribution

Destinations
Zone A B C D Total (b) Total (t)
A 2 16 9 18 45 91
Origins

B 19 3 11 14 47 62
C 14 27 2 26 69 88
D 23 11 4 11 49 66
Total (b) 58 57 26 69
Total (t) 72 85 41 96

Destinations
Zone A B C D Total (b) Total (t)
A 2 16 9 18 45 91
Origins

B 19 3 11 14 47 62
C 14 27 2 26 69 88
D 23 11 4 11 49 66
Total (b) 58 57 26 69
Total (t) 72 85 41 96

From A Future Pi = 91
To Current Tij Current Aj Future Aj Fj Current Tij * Fj Ratio Future Tij
A 2 58 72 1.24 2.48 0.04 3
B 16 57 85 1.49 23.86 0.36 33
C 9 26 41 1.58 14.19 0.22 20
D 18 69 96 1.39 25.04 0.38 35
SUM 65.58 1.00 91

From B Future Pi = 62
To Current Tij Current Aj Future Aj Fj Current Tij * Fj Ratio Future Tij
A 19 58 72 1.24 23.59 0.36 23
B 3 57 85 1.49 4.47 0.07 4
C 11 26 41 1.58 17.35 0.27 17
D 14 69 96 1.39 19.48 0.30 19
SUM 64.88 1.00 62

From C Future Pi = 88
To Current Tij Current Aj Future Aj Fj Current Tij * Fj Ratio Future Tij
A 14 58 72 1.24 17.38 0.18 16
B 27 57 85 1.49 40.26 0.42 37
C 2 26 41 1.58 3.15 0.03 3
D 26 69 96 1.39 36.17 0.37 33
SUM 96.97 1.00 88

From D Future Pi = 66
To Current Tij Current Aj Future Aj Fj Current Tij * Fj Ratio Future Tij
A 23 58 72 1.24 28.55 0.43 28
B 11 57 85 1.49 16.40 0.25 16
C 4 26 41 1.58 6.31 0.09 6
D 11 69 96 1.39 15.30 0.23 15
SUM 66.57 1.00 66

NEW MATRIX
Zone A B C D Total (b) Total (t)
A 3 33 20 35 91 91
B 23 4 17 19 63 62
C 16 37 3 33 89 88
D 28 16 5 15 64 66
Total (b) 70 90 45 102
Total (t) 72 85 41 96
97% 106% 110% 106%