The document appears to be a table listing daily observed discharge measurements in cubic meters per second at the Asaraghat gauge station from 1977 to 1991. The table contains over 15 years of daily discharge readings measured at the gauge station.

Uploaded by

Kapil Jung Shahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views375 pages

Annex Final

The document appears to be a table listing daily observed discharge measurements in cubic meters per second at the Asaraghat gauge station from 1977 to 1991. The table contains over 15 years of daily discharge readings measured at the gauge station.

Uploaded by

Kapil Jung Shahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 375

ANNEXES

ANNEXES

A1.1: Daily observed Discharge (in m3/sec) at Asaraghat gauge station

A1.2: Daily observed Discharge (in m3/sec) at Lalighat gauge station

A1.3: Technical Specification of Automatic Gauging Station

A2.1: Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment
for daily flow Estimation

A2.2: Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment
for PMF Estimation

A3: Plot of observed and estimated discharges at Asaraghat

A4: Daily Estimated Discharge at Phukot Headworks site(m3/sec)

A5.1: Calculation for Peak of Snyder's UH for Sub-basins

A5.2: Sub-basin Unit Hydrograph at Lalighat station

A5.3: Gauge Height Record and Computation of Discharge

A5.4: Automatic Gauge Height Record and Computation of Discharge

A6.1: Data used for Particle Size Distribution Analysis of Sampled Sediment

A6.2: Mineralogical Analysis of Sampled Sediment and Sediment Concentration


ANNEX 1.1- Daily Observed Discharge (in
m3/sec) at Asaraghat Gauge Station
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
1 130.0 147.0 149.0 126.0 153.0 144.0 136.0 176.0 147.0 210.0 131.0 128.0 155.0 139.0 167.0
2 130.0 147.0 147.0 134.0 151.0 144.0 136.0 171.0 151.0 205.0 131.0 131.0 151.0 137.0 163.0
3 130.0 144.0 144.0 130.0 149.0 142.0 134.0 171.0 151.0 202.0 128.0 131.0 155.0 137.0 163.0
4 130.0 142.0 144.0 126.0 151.0 140.0 128.0 167.0 130.0 199.0 128.0 128.0 151.0 135.0 155.0
5 128.0 140.0 142.0 120.0 151.0 139.0 130.0 167.0 140.0 199.0 126.0 126.0 146.0 135.0 151.0
6 128.0 138.0 138.0 118.0 153.0 138.0 130.0 164.0 132.0 202.0 126.0 126.0 153.0 133.0 153.0
7 128.0 136.0 136.0 116.0 155.0 140.0 130.0 162.0 128.0 192.0 124.0 124.0 165.0 131.0 151.0
8 126.0 138.0 138.0 116.0 151.0 138.0 132.0 164.0 126.0 194.0 120.0 120.0 374.0 133.0 151.0
9 126.0 136.0 140.0 120.0 144.0 138.0 128.0 162.0 126.0 192.0 120.0 120.0 197.0 131.0 155.0
10 124.0 134.0 138.0 120.0 142.0 141.0 124.0 160.0 124.0 187.0 122.0 122.0 184.0 128.0 146.0
11 124.0 132.0 136.0 114.0 140.0 139.0 124.0 158.0 124.0 184.0 120.0 120.0 179.0 126.0 146.0
12 122.0 130.0 136.0 112.0 140.0 135.0 124.0 158.0 122.0 182.0 122.0 122.0 172.0 126.0 141.0
13 124.0 134.0 134.0 114.0 140.0 132.0 124.0 158.0 122.0 179.0 128.0 128.0 167.0 124.0 141.0
14 122.0 136.0 134.0 112.0 140.0 133.0 120.0 155.0 120.0 177.0 124.0 124.0 165.0 124.0 141.0
15 120.0 134.0 134.0 112.0 138.0 131.0 120.0 155.0 118.0 177.0 124.0 124.0 163.0 120.0 141.0
16 116.0 132.0 136.0 110.0 136.0 131.0 120.0 160.0 118.0 175.0 120.0 120.0 160.0 118.0 137.0
17 114.0 130.0 140.0 110.0 136.0 129.0 120.0 164.0 116.0 172.0 120.0 120.0 158.0 120.0 133.0
18 114.0 128.0 140.0 110.0 136.0 136.0 120.0 160.0 114.0 170.0 116.0 116.0 158.0 118.0 137.0
19 116.0 128.0 134.0 108.0 136.0 126.0 118.0 160.0 116.0 170.0 120.0 120.0 153.0 120.0 133.0
20 116.0 126.0 132.0 110.0 134.0 126.0 116.0 155.0 122.0 167.0 116.0 116.0 153.0 120.0 133.0
21 114.0 124.0 132.0 106.0 132.0 125.0 114.0 153.0 118.0 167.0 116.0 116.0 151.0 118.0 131.0
22 120.0 128.0 130.0 108.0 134.0 124.0 112.0 151.0 124.0 165.0 114.0 114.0 151.0 118.0 133.0
23 132.0 128.0 130.0 106.0 132.0 122.0 114.0 149.0 120.0 165.0 114.0 114.0 151.0 116.0 133.0
24 130.0 124.0 128.0 104.0 138.0 121.0 114.0 149.0 114.0 163.0 110.0 110.0 151.0 116.0 133.0
25 126.0 122.0 126.0 100.0 144.0 121.0 112.0 147.0 112.0 160.0 110.0 110.0 148.0 114.0 128.0
26 124.0 120.0 126.0 102.0 140.0 142.0 110.0 147.0 112.0 158.0 105.0 105.0 148.0 112.0 128.0
27 120.0 118.0 126.0 104.0 142.0 141.0 110.0 144.0 116.0 155.0 105.0 105.0 146.0 112.0 128.0
28 116.0 120.0 124.0 106.0 138.0 140.0 126.0 140.0 112.0 155.0 105.0 105.0 148.0 112.0 131.0
29 120.0 120.0 128.0 102.0 138.0 131.0 149.0 140.0 112.0 153.0 105.0 105.0 146.0 114.0 133.0
30 118.0 120.0 128.0 100.0 140.0 131.0 130.0 140.0 112.0 158.0 103.0 103.0 146.0 112.0 131.0
31 120.0 116.0 126.0 98.1 140.0 131.0 122.0 138.0 108.0 158.0 101.0 101.0 141.0 112.0 124.0
32 120.0 114.0 126.0 98.1 136.0 137.0 118.0 138.0 110.0 153.0 101.0 101.0 141.0 112.0 124.0
33 118.0 114.0 124.0 98.1 134.0 133.0 112.0 138.0 108.0 148.0 99.0 99.0 141.0 107.0 122.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
34 116.0 114.0 122.0 106.0 134.0 129.0 112.0 136.0 108.0 148.0 99.0 99.0 141.0 103.0 122.0
35 118.0 112.0 120.0 104.0 130.0 129.0 110.0 142.0 108.0 148.0 99.0 99.0 146.0 105.0 124.0
36 128.0 112.0 120.0 106.0 138.0 133.0 110.0 138.0 110.0 148.0 97.1 97.1 146.0 107.0 122.0
37 116.0 112.0 118.0 100.0 134.0 127.0 108.0 136.0 110.0 146.0 99.0 99.0 143.0 105.0 120.0
38 114.0 116.0 120.0 98.1 134.0 124.0 106.0 134.0 108.0 141.0 97.1 97.1 137.0 105.0 120.0
39 112.0 120.0 128.0 98.1 130.0 123.0 106.0 132.0 106.0 141.0 95.2 95.2 133.0 103.0 120.0
40 112.0 116.0 124.0 96.2 126.0 123.0 106.0 130.0 104.0 139.0 95.2 95.2 131.0 120.0 120.0
41 112.0 116.0 118.0 96.2 128.0 123.0 104.0 128.0 106.0 143.0 95.2 95.2 128.0 112.0 118.0
42 110.0 116.0 118.0 96.2 126.0 125.0 104.0 134.0 104.0 151.0 95.2 95.2 128.0 120.0 120.0
43 112.0 116.0 120.0 94.3 128.0 129.0 104.0 134.0 104.0 143.0 95.2 95.2 128.0 116.0 139.0
44 114.0 120.0 116.0 96.2 130.0 126.0 104.0 134.0 102.0 141.0 103.0 103.0 126.0 116.0 128.0
45 114.0 114.0 116.0 98.1 134.0 122.0 112.0 128.0 102.0 141.0 107.0 107.0 124.0 158.0 124.0
46 114.0 114.0 116.0 104.0 132.0 120.0 116.0 126.0 102.0 146.0 105.0 105.0 124.0 128.0 124.0
47 116.0 118.0 118.0 108.0 128.0 127.0 108.0 128.0 100.0 141.0 105.0 105.0 122.0 120.0 124.0
48 114.0 118.0 122.0 100.0 126.0 129.0 106.0 126.0 100.0 137.0 101.0 101.0 122.0 116.0 122.0
49 114.0 134.0 116.0 98.1 126.0 124.0 104.0 126.0 98.1 135.0 99.0 99.0 120.0 126.0 124.0
50 114.0 106.0 130.0 96.2 128.0 121.0 104.0 136.0 100.0 133.0 97.1 97.1 131.0 120.0 122.0
51 114.0 114.0 151.0 94.3 128.0 119.0 102.0 142.0 100.0 133.0 101.0 99.0 122.0 122.0 120.0
52 110.0 120.0 130.0 96.2 126.0 117.0 100.0 183.0 100.0 133.0 118.0 101.0 122.0 118.0 118.0
53 108.0 116.0 126.0 96.2 124.0 117.0 102.0 132.0 96.2 139.0 118.0 118.0 120.0 118.0 120.0
54 106.0 116.0 128.0 96.2 124.0 115.0 98.1 132.0 98.1 139.0 128.0 118.0 118.0 107.0 120.0
55 106.0 114.0 118.0 96.2 124.0 115.0 96.2 132.0 100.0 133.0 112.0 128.0 118.0 110.0 120.0
56 104.0 116.0 120.0 94.3 124.0 112.0 98.1 130.0 100.0 131.0 112.0 112.0 122.0 110.0 120.0
57 106.0 118.0 120.0 94.3 122.0 113.0 96.2 134.0 98.1 128.0 112.0 112.0 128.0 114.0 124.0
58 104.0 118.0 120.0 92.4 120.0 114.0 96.2 136.0 100.0 128.0 124.0 112.0 131.0 107.0 165.0
59 104.0 120.0 118.0 98.1 124.0 120.0 96.2 138.0 102.0 126.0 122.0 118.0 131.0 116.0 135.0
60 102.0 122.0 118.0 108.0 132.0 132.0 98.1 138.0 104.0 126.0 120.0 124.0 128.0 182.0 128.0
61 100.0 142.0 118.0 126.0 126.0 158.0 102.0 140.0 108.0 124.0 120.0 114.0 126.0 133.0 126.0
62 98.1 134.0 120.0 112.0 120.0 143.0 104.0 144.0 106.0 122.0 118.0 118.0 126.0 128.0 124.0
63 98.1 128.0 124.0 108.0 118.0 115.0 102.0 142.0 106.0 122.0 120.0 114.0 126.0 126.0 124.0
64 100.0 130.0 122.0 106.0 122.0 135.0 104.0 147.0 108.0 124.0 120.0 118.0 124.0 122.0 158.0
65 98.1 124.0 126.0 114.0 126.0 166.0 98.1 144.0 110.0 126.0 122.0 122.0 124.0 118.0 155.0
66 98.1 118.0 140.0 155.0 138.0 166.0 96.2 142.0 110.0 126.0 124.0 122.0 131.0 116.0 137.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
67 100.0 118.0 130.0 155.0 140.0 147.0 102.0 142.0 106.0 128.0 128.0 122.0 128.0 116.0 135.0
68 104.0 118.0 122.0 134.0 130.0 147.0 108.0 144.0 100.0 126.0 124.0 126.0 128.0 118.0 143.0
69 110.0 118.0 96.2 124.0 128.0 150.0 110.0 147.0 104.0 128.0 120.0 155.0 126.0 120.0 141.0
70 114.0 128.0 116.0 114.0 126.0 141.0 106.0 147.0 104.0 133.0 118.0 151.0 124.0 120.0 137.0
71 112.0 160.0 126.0 114.0 128.0 139.0 104.0 147.0 104.0 139.0 116.0 141.0 126.0 116.0 135.0
72 108.0 140.0 138.0 112.0 122.0 136.0 106.0 144.0 100.0 135.0 116.0 182.0 126.0 116.0 137.0
73 106.0 134.0 149.0 106.0 120.0 138.0 98.1 142.0 98.1 133.0 118.0 197.0 133.0 118.0 148.0
74 108.0 132.0 142.0 110.0 118.0 144.0 102.0 140.0 98.1 139.0 118.0 165.0 133.0 124.0 205.0
75 106.0 134.0 140.0 112.0 124.0 161.0 110.0 144.0 96.2 143.0 122.0 153.0 128.0 128.0 177.0
76 108.0 140.0 142.0 118.0 128.0 176.0 104.0 149.0 96.2 135.0 124.0 151.0 124.0 155.0 179.0
77 104.0 266.0 160.0 116.0 124.0 184.0 104.0 160.0 96.2 141.0 128.0 155.0 131.0 167.0 179.0
78 104.0 215.0 147.0 116.0 126.0 171.0 108.0 164.0 94.3 148.0 124.0 148.0 135.0 158.0 187.0
79 102.0 185.0 140.0 116.0 134.0 173.0 114.0 164.0 90.5 141.0 122.0 167.0 139.0 151.0 194.0
80 98.1 180.0 142.0 120.0 160.0 180.0 116.0 153.0 90.5 135.0 133.0 165.0 151.0 143.0 194.0
81 94.3 167.0 147.0 132.0 180.0 195.0 100.0 142.0 90.5 135.0 124.0 163.0 155.0 141.0 175.0
82 98.1 158.0 149.0 147.0 147.0 199.0 94.3 147.0 98.1 137.0 124.0 165.0 160.0 212.0 194.0
83 102.0 153.0 153.0 153.0 138.0 204.0 100.0 158.0 108.0 131.0 124.0 167.0 158.0 210.0 207.0
84 108.0 153.0 151.0 149.0 134.0 214.0 122.0 176.0 124.0 131.0 128.0 170.0 155.0 172.0 187.0
85 110.0 153.0 147.0 140.0 132.0 194.0 118.0 190.0 114.0 135.0 137.0 182.0 151.0 153.0 202.0
86 110.0 151.0 144.0 132.0 128.0 177.0 122.0 198.0 110.0 137.0 133.0 192.0 153.0 148.0 210.0
87 110.0 158.0 151.0 138.0 128.0 177.0 118.0 188.0 116.0 148.0 124.0 184.0 158.0 163.0 237.0
88 112.0 158.0 158.0 126.0 132.0 189.0 112.0 164.0 120.0 158.0 128.0 179.0 175.0 189.0 256.0
89 116.0 147.0 169.0 128.0 142.0 220.0 110.0 164.0 118.0 160.0 139.0 172.0 153.0 177.0 273.0
90 126.0 142.0 178.0 149.0 174.0 264.0 114.0 185.0 110.0 163.0 153.0 187.0 151.0 182.0 290.0
91 124.0 138.0 176.0 144.0 164.0 288.0 116.0 200.0 104.0 148.0 160.0 197.0 160.0 187.0 287.0
92 120.0 138.0 183.0 138.0 151.0 296.0 120.0 200.0 104.0 146.0 155.0 192.0 172.0 177.0 273.0
93 122.0 142.0 190.0 140.0 151.0 289.0 124.0 193.0 106.0 148.0 160.0 179.0 170.0 172.0 262.0
94 130.0 155.0 193.0 153.0 151.0 312.0 118.0 185.0 112.0 155.0 146.0 189.0 160.0 167.0 245.0
95 144.0 167.0 185.0 158.0 151.0 291.0 122.0 174.0 104.0 146.0 143.0 197.0 158.0 172.0 237.0
96 169.0 164.0 193.0 149.0 153.0 269.0 132.0 164.0 102.0 151.0 158.0 199.0 155.0 192.0 248.0
97 136.0 171.0 178.0 151.0 142.0 255.0 142.0 155.0 100.0 151.0 177.0 199.0 165.0 210.0 245.0
98 124.0 174.0 188.0 164.0 153.0 247.0 153.0 153.0 102.0 153.0 189.0 220.0 175.0 207.0 226.0
99 118.0 185.0 200.0 178.0 167.0 231.0 147.0 147.0 102.0 163.0 197.0 253.0 189.0 215.0 239.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
100 114.0 198.0 220.0 188.0 174.0 238.0 138.0 144.0 164.0 184.0 207.0 253.0 194.0 229.0 259.0
101 124.0 205.0 243.0 193.0 183.0 247.0 147.0 142.0 142.0 218.0 175.0 256.0 189.0 256.0 242.0
102 118.0 228.0 230.0 198.0 205.0 256.0 128.0 147.0 136.0 245.0 163.0 264.0 172.0 282.0 220.0
103 114.0 249.0 235.0 205.0 230.0 242.0 130.0 149.0 147.0 239.0 151.0 293.0 165.0 299.0 218.0
104 112.0 266.0 255.0 188.0 263.0 242.0 128.0 144.0 149.0 245.0 143.0 302.0 167.0 273.0 218.0
105 122.0 311.0 257.0 183.0 305.0 253.0 130.0 158.0 151.0 248.0 141.0 299.0 175.0 250.0 282.0
106 120.0 320.0 274.0 185.0 293.0 281.0 132.0 171.0 140.0 262.0 141.0 279.0 175.0 250.0 302.0
107 116.0 329.0 243.0 193.0 279.0 277.0 203.0 185.0 140.0 253.0 141.0 262.0 175.0 256.0 285.0
108 114.0 356.0 235.0 185.0 274.0 266.0 213.0 190.0 149.0 239.0 151.0 282.0 172.0 259.0 279.0
109 116.0 320.0 255.0 195.0 220.0 274.0 203.0 195.0 160.0 237.0 160.0 282.0 172.0 308.0 290.0
110 130.0 268.0 271.0 230.0 210.0 260.0 183.0 203.0 171.0 242.0 151.0 267.0 175.0 299.0 270.0
111 126.0 249.0 266.0 241.0 230.0 247.0 178.0 203.0 190.0 256.0 182.0 276.0 175.0 287.0 296.0
112 124.0 238.0 263.0 296.0 263.0 253.0 178.0 200.0 223.0 264.0 239.0 262.0 177.0 299.0 302.0
113 126.0 246.0 246.0 311.0 268.0 290.0 188.0 185.0 223.0 293.0 242.0 253.0 187.0 302.0 296.0
114 126.0 271.0 243.0 290.0 246.0 320.0 185.0 176.0 208.0 305.0 220.0 270.0 194.0 324.0 282.0
115 130.0 296.0 257.0 274.0 225.0 318.0 200.0 164.0 193.0 321.0 248.0 276.0 184.0 346.0 262.0
116 128.0 296.0 277.0 285.0 220.0 330.0 205.0 176.0 164.0 285.0 220.0 290.0 184.0 374.0 279.0
117 132.0 279.0 311.0 311.0 228.0 378.0 252.0 203.0 151.0 273.0 202.0 287.0 182.0 371.0 305.0
118 153.0 302.0 394.0 308.0 260.0 348.0 268.0 228.0 151.0 262.0 215.0 267.0 187.0 339.0 308.0
119 176.0 305.0 440.0 305.0 326.0 313.0 255.0 241.0 153.0 242.0 245.0 299.0 182.0 287.0 336.0
120 176.0 332.0 415.0 305.0 311.0 289.0 274.0 233.0 167.0 229.0 273.0 333.0 177.0 267.0 439.0
121 171.0 359.0 359.0 290.0 287.0 284.0 271.0 210.0 200.0 237.0 282.0 371.0 187.0 267.0 532.0
122 171.0 384.0 408.0 282.0 302.0 330.0 271.0 195.0 220.0 270.0 336.0 456.0 202.0 250.0 506.0
123 164.0 429.0 454.0 365.0 365.0 373.0 243.0 198.0 208.0 296.0 364.0 492.0 194.0 253.0 449.0
124 155.0 450.0 450.0 482.0 412.0 371.0 263.0 208.0 174.0 296.0 327.0 442.0 205.0 267.0 374.0
125 160.0 513.0 391.0 548.0 412.0 395.0 311.0 233.0 171.0 273.0 308.0 397.0 210.0 262.0 352.0
126 158.0 594.0 350.0 523.0 429.0 441.0 317.0 296.0 160.0 270.0 336.0 333.0 215.0 264.0 381.0
127 160.0 594.0 311.0 429.0 356.0 456.0 329.0 341.0 160.0 267.0 339.0 318.0 229.0 273.0 463.0
128 155.0 590.0 311.0 454.0 323.0 432.0 362.0 359.0 176.0 308.0 349.0 324.0 237.0 308.0 485.0
129 158.0 587.0 380.0 433.0 332.0 393.0 412.0 398.0 220.0 384.0 305.0 361.0 336.0 397.0 555.0
130 293.0 604.0 368.0 371.0 341.0 416.0 394.0 398.0 243.0 414.0 308.0 391.0 259.0 540.0 582.0
131 243.0 629.0 353.0 356.0 341.0 401.0 499.0 405.0 279.0 374.0 276.0 456.0 293.0 555.0 449.0
132 215.0 608.0 422.0 356.0 320.0 388.0 440.0 394.0 257.0 342.0 264.0 474.0 276.0 585.0 394.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
133 210.0 580.0 464.0 335.0 282.0 422.0 384.0 447.0 235.0 349.0 259.0 428.0 250.0 585.0 414.0
134 220.0 649.0 478.0 359.0 384.0 807.0 419.0 506.0 238.0 428.0 253.0 449.0 262.0 652.0 521.0
135 225.0 697.0 825.0 426.0 471.0 636.0 513.0 544.0 223.0 432.0 248.0 463.0 276.0 693.0 677.0
136 200.0 669.0 1660.0 503.0 478.0 504.0 482.0 541.0 205.0 387.0 250.0 521.0 352.0 693.0 765.0
137 223.0 745.0 749.0 530.0 377.0 445.0 527.0 520.0 203.0 387.0 262.0 555.0 442.0 812.0 862.0
138 203.0 803.0 569.0 447.0 384.0 418.0 482.0 527.0 210.0 371.0 267.0 620.0 559.0 817.0 817.0
139 203.0 867.0 478.0 489.0 454.0 398.0 489.0 537.0 241.0 387.0 267.0 616.0 640.0 668.0 774.0
140 225.0 737.0 464.0 551.0 534.0 384.0 503.0 601.0 293.0 488.0 293.0 532.0 632.0 644.0 875.0
141 271.0 713.0 429.0 520.0 454.0 385.0 569.0 573.0 317.0 463.0 342.0 529.0 589.0 551.0 907.0
142 279.0 637.0 380.0 496.0 401.0 370.0 551.0 558.0 266.0 358.0 394.0 521.0 563.0 485.0 884.0
143 277.0 608.0 356.0 464.0 347.0 369.0 499.0 569.0 228.0 330.0 418.0 555.0 597.0 485.0 727.0
144 305.0 657.0 344.0 415.0 320.0 371.0 436.0 576.0 249.0 311.0 408.0 559.0 566.0 521.0 632.0
145 329.0 794.0 317.0 419.0 412.0 404.0 391.0 611.0 350.0 324.0 346.0 499.0 456.0 559.0 769.0
146 326.0 749.0 299.0 450.0 527.0 492.0 347.0 661.0 436.0 355.0 327.0 467.0 421.0 624.0 871.0
147 326.0 757.0 323.0 429.0 625.0 525.0 398.0 713.0 398.0 358.0 327.0 521.0 435.0 693.0 982.0
148 398.0 701.0 308.0 374.0 534.0 567.0 475.0 781.0 401.0 404.0 368.0 701.0 460.0 616.0 982.0
149 464.0 558.0 285.0 377.0 419.0 585.0 527.0 821.0 408.0 368.0 456.0 722.0 449.0 862.0 1020.0
150 513.0 580.0 277.0 415.0 387.0 536.0 523.0 842.0 362.0 339.0 521.0 693.0 439.0 706.0 1000.0
151 551.0 637.0 266.0 457.0 408.0 588.0 499.0 697.0 356.0 333.0 620.0 693.0 485.0 673.0 735.0
152 517.0 633.0 268.0 569.0 422.0 571.0 604.0 737.0 305.0 318.0 706.0 761.0 460.0 727.0 566.0
153 499.0 713.0 277.0 625.0 503.0 543.0 745.0 749.0 308.0 342.0 693.0 735.0 435.0 853.0 532.0
154 489.0 633.0 293.0 622.0 478.0 516.0 769.0 798.0 282.0 355.0 697.0 748.0 544.0 916.0 578.0
155 433.0 741.0 317.0 781.0 492.0 560.0 757.0 812.0 268.0 371.0 920.0 616.0 706.0 1030.0 761.0
156 405.0 854.0 329.0 622.0 422.0 569.0 761.0 909.0 271.0 387.0 825.0 547.0 582.0 930.0 916.0
157 405.0 975.0 380.0 548.0 329.0 775.0 721.0 1040.0 344.0 481.0 804.0 547.0 495.0 812.0 844.0
158 359.0 867.0 401.0 633.0 314.0 1200.0 733.0 897.0 353.0 492.0 944.0 481.0 453.0 640.0 1180.0
159 356.0 1060.0 398.0 587.0 374.0 1230.0 657.0 821.0 320.0 536.0 1000.0 432.0 414.0 612.0 982.0
160 323.0 1120.0 461.0 523.0 482.0 1330.0 569.0 733.0 290.0 593.0 1000.0 411.0 485.0 681.0 1180.0
161 302.0 1100.0 544.0 653.0 478.0 1280.0 496.0 701.0 263.0 628.0 907.0 411.0 632.0 652.0 1250.0
162 335.0 753.0 657.0 689.0 510.0 1250.0 443.0 773.0 290.0 844.0 648.0 456.0 570.0 628.0 1270.0
163 320.0 608.0 741.0 721.0 541.0 1220.0 419.0 879.0 287.0 1050.0 681.0 506.0 510.0 636.0 1610.0
164 311.0 558.0 673.0 803.0 534.0 1430.0 384.0 1000.0 341.0 1110.0 697.0 597.0 677.0 652.0 1190.0
165 317.0 622.0 641.0 721.0 562.0 1450.0 368.0 934.0 468.0 1060.0 791.0 636.0 693.0 648.0 1150.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
166 314.0 653.0 625.0 669.0 615.0 1190.0 415.0 789.0 576.0 1080.0 857.0 652.0 608.0 681.0 1090.0
167 305.0 649.0 541.0 601.0 649.0 1290.0 527.0 807.0 548.0 1140.0 866.0 566.0 510.0 722.0 1160.0
168 277.0 717.0 566.0 618.0 611.0 1320.0 510.0 757.0 530.0 1210.0 835.0 525.0 503.0 774.0 1140.0
169 290.0 741.0 693.0 566.0 562.0 1170.0 506.0 749.0 492.0 1310.0 681.0 463.0 449.0 804.0 1030.0
170 347.0 757.0 816.0 551.0 601.0 1060.0 520.0 816.0 464.0 1430.0 644.0 467.0 421.0 722.0 857.0
171 415.0 836.0 934.0 705.0 653.0 938.0 541.0 1000.0 457.0 1420.0 589.0 488.0 418.0 731.0 812.0
172 576.0 981.0 981.0 785.0 749.0 903.0 594.0 915.0 506.0 1380.0 578.0 536.0 414.0 875.0 812.0
173 794.0 969.0 998.0 867.0 773.0 1050.0 685.0 689.0 537.0 1600.0 608.0 566.0 428.0 1050.0 902.0
174 745.0 964.0 1070.0 867.0 733.0 1220.0 737.0 649.0 625.0 1680.0 710.0 616.0 488.0 1000.0 1010.0
175 897.0 987.0 1230.0 885.0 761.0 1160.0 803.0 594.0 541.0 1930.0 689.0 697.0 544.0 953.0 1020.0
176 1080.0 1160.0 1360.0 1020.0 897.0 1080.0 604.0 633.0 548.0 1430.0 681.0 757.0 589.0 920.0 1020.0
177 879.0 1280.0 1290.0 1250.0 1020.0 971.0 618.0 685.0 562.0 1330.0 727.0 769.0 632.0 911.0 1030.0
178 860.0 1130.0 1380.0 1250.0 873.0 1050.0 842.0 657.0 594.0 1440.0 804.0 902.0 644.0 875.0 930.0
179 1160.0 1070.0 1420.0 1380.0 981.0 1130.0 946.0 653.0 569.0 1440.0 825.0 902.0 731.0 817.0 862.0
180 1210.0 1090.0 1520.0 1240.0 1150.0 949.0 940.0 665.0 604.0 1390.0 911.0 967.0 787.0 825.0 884.0
181 1210.0 1040.0 1730.0 1150.0 1170.0 1040.0 1100.0 697.0 534.0 1100.0 884.0 982.0 808.0 920.0 991.0
182 1330.0 1040.0 1870.0 1230.0 1270.0 1270.0 1210.0 677.0 517.0 1090.0 830.0 902.0 774.0 1000.0 934.0
183 1220.0 1300.0 1780.0 1360.0 1420.0 1370.0 1430.0 681.0 534.0 1020.0 782.0 920.0 718.0 1050.0 982.0
184 1170.0 1230.0 1220.0 1420.0 1380.0 1390.0 1350.0 713.0 583.0 996.0 744.0 911.0 660.0 1510.0 1040.0
185 1040.0 1130.0 1000.0 1380.0 1110.0 1430.0 1560.0 737.0 661.0 1140.0 821.0 916.0 578.0 1320.0 1100.0
186 1250.0 1090.0 940.0 1470.0 987.0 1440.0 1270.0 798.0 765.0 1260.0 782.0 977.0 566.0 1440.0 1190.0
187 1350.0 1050.0 842.0 1520.0 952.0 1420.0 969.0 765.0 812.0 1300.0 748.0 1340.0 585.0 1720.0 1040.0
188 1410.0 975.0 921.0 1640.0 1190.0 1350.0 781.0 873.0 816.0 1370.0 808.0 1340.0 673.0 1770.0 963.0
189 1710.0 952.0 1060.0 1850.0 1110.0 1250.0 729.0 915.0 1030.0 1480.0 761.0 1170.0 769.0 1850.0 953.0
190 1480.0 1100.0 1270.0 2020.0 1150.0 1210.0 685.0 1140.0 781.0 1360.0 934.0 967.0 902.0 2420.0 782.0
191 1660.0 1130.0 1190.0 1610.0 993.0 1200.0 709.0 1300.0 725.0 1500.0 1020.0 893.0 848.0 2660.0 735.0
192 1660.0 1130.0 1090.0 1530.0 1010.0 1120.0 733.0 1400.0 885.0 1810.0 930.0 972.0 862.0 2350.0 791.0
193 1610.0 1090.0 1270.0 1480.0 1040.0 1250.0 729.0 1040.0 921.0 1440.0 1000.0 1100.0 871.0 1920.0 778.0
194 1910.0 1130.0 1380.0 1540.0 1270.0 1120.0 777.0 816.0 1090.0 1310.0 1170.0 1350.0 902.0 1400.0 848.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
195 1800.0 1060.0 1580.0 1500.0 1380.0 1270.0 825.0 765.0 1330.0 1440.0 1160.0 1400.0 1040.0 1620.0 830.0
196 1730.0 969.0 1520.0 1430.0 1240.0 1240.0 897.0 749.0 1220.0 1480.0 1150.0 1400.0 1350.0 1350.0 808.0
197 1540.0 969.0 1300.0 1370.0 1270.0 1260.0 987.0 701.0 1340.0 1540.0 1090.0 1360.0 1600.0 1360.0 889.0
198 1570.0 1210.0 1220.0 1650.0 1420.0 1480.0 1080.0 681.0 1460.0 1910.0 920.0 1260.0 1190.0 1330.0 963.0
199 1540.0 1140.0 1180.0 1560.0 1480.0 1540.0 1020.0 697.0 1340.0 2090.0 825.0 1310.0 902.0 1410.0 1130.0
200 1530.0 1160.0 1150.0 1580.0 1480.0 1630.0 946.0 885.0 1370.0 2090.0 800.0 1400.0 880.0 1540.0 1300.0
201 1470.0 1200.0 1380.0 1610.0 1490.0 1500.0 1070.0 1030.0 1420.0 1900.0 821.0 1410.0 949.0 1350.0 1360.0
202 1380.0 1160.0 1410.0 1580.0 1430.0 1580.0 1150.0 1100.0 1340.0 2010.0 830.0 1290.0 1020.0 1390.0 1500.0
203 1370.0 1080.0 1570.0 1620.0 1520.0 1470.0 1200.0 1090.0 1190.0 1800.0 853.0 1380.0 1000.0 1370.0 1580.0
204 1520.0 1130.0 1580.0 1650.0 1690.0 1490.0 1340.0 1260.0 1090.0 1780.0 977.0 1880.0 1040.0 1340.0 1430.0
205 1570.0 1240.0 1680.0 1600.0 1740.0 1560.0 1320.0 1510.0 1230.0 1730.0 1090.0 1720.0 953.0 1330.0 1260.0
206 1760.0 1300.0 1730.0 1690.0 1660.0 1570.0 1200.0 1420.0 1240.0 1910.0 1280.0 1660.0 949.0 1320.0 1210.0
207 1620.0 1510.0 1400.0 1860.0 1540.0 1670.0 1270.0 1350.0 1280.0 1970.0 1700.0 1530.0 1000.0 1300.0 1340.0
208 1660.0 1350.0 1260.0 1860.0 1710.0 1780.0 1470.0 1220.0 1220.0 2140.0 1320.0 1620.0 1090.0 1320.0 1220.0
209 1620.0 1380.0 1180.0 1870.0 1790.0 1760.0 1670.0 1270.0 1240.0 1940.0 1100.0 1750.0 1050.0 1360.0 1250.0
210 1720.0 1570.0 1110.0 1750.0 1850.0 1520.0 1500.0 1360.0 1160.0 1690.0 1050.0 2130.0 1190.0 1330.0 1280.0
211 1740.0 1430.0 1090.0 1650.0 1790.0 1500.0 1380.0 1340.0 1020.0 1570.0 1030.0 1790.0 1410.0 1390.0 1300.0
212 1610.0 1420.0 1130.0 1840.0 1760.0 1620.0 1360.0 1200.0 952.0 1710.0 967.0 1600.0 1580.0 1380.0 1260.0
213 1700.0 1740.0 1260.0 1750.0 1850.0 1410.0 1210.0 1040.0 903.0 1810.0 953.0 1620.0 1660.0 1270.0 1240.0
214 1820.0 2260.0 1250.0 1720.0 1790.0 1370.0 1230.0 1100.0 903.0 1770.0 958.0 1610.0 1620.0 1180.0 1310.0
215 1970.0 2080.0 1180.0 2340.0 1880.0 1330.0 1140.0 1230.0 903.0 1520.0 884.0 1600.0 1360.0 1070.0 1400.0
216 2340.0 1900.0 1090.0 2230.0 2010.0 1340.0 1140.0 1070.0 909.0 1460.0 1300.0 1560.0 1160.0 1070.0 1440.0
217 2080.0 1960.0 1000.0 2590.0 1910.0 1290.0 1130.0 969.0 958.0 1410.0 884.0 1370.0 1000.0 1080.0 1390.0
218 1670.0 1930.0 1010.0 2320.0 1760.0 1280.0 1160.0 909.0 1070.0 1320.0 848.0 1340.0 953.0 1080.0 1430.0
219 1600.0 1870.0 1000.0 2330.0 1720.0 1280.0 1180.0 879.0 993.0 1330.0 939.0 1290.0 949.0 1200.0 1460.0
220 1600.0 1720.0 1090.0 2020.0 1620.0 1430.0 1180.0 842.0 993.0 1270.0 920.0 1280.0 958.0 1260.0 1600.0
221 1690.0 1780.0 1040.0 1970.0 1740.0 1430.0 1240.0 798.0 1040.0 1310.0 944.0 1680.0 911.0 1350.0 1740.0
222 1620.0 1810.0 1100.0 1970.0 1590.0 1540.0 1270.0 777.0 1220.0 1330.0 958.0 1740.0 911.0 1520.0 1410.0
223 1540.0 1880.0 1220.0 2060.0 1510.0 1480.0 1370.0 785.0 1310.0 1230.0 967.0 1800.0 1170.0 1540.0 1240.0
224 1540.0 2080.0 1210.0 1860.0 1420.0 1510.0 1420.0 816.0 1470.0 1330.0 1220.0 1760.0 1020.0 1540.0 1160.0
225 1500.0 2090.0 1230.0 2080.0 1470.0 1490.0 1370.0 781.0 1360.0 1440.0 1380.0 1710.0 1180.0 1910.0 1110.0
226 1910.0 1880.0 1200.0 2010.0 1670.0 1520.0 1210.0 842.0 1240.0 1280.0 1070.0 1660.0 1150.0 1930.0 1060.0
227 1840.0 1660.0 1270.0 1820.0 1990.0 1450.0 1120.0 934.0 1190.0 1200.0 1000.0 1690.0 1090.0 1760.0 1070.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
228 1860.0 1570.0 1340.0 1740.0 1610.0 1510.0 1140.0 891.0 1130.0 1210.0 1040.0 1660.0 1030.0 1630.0 1280.0
229 1640.0 1480.0 1480.0 1680.0 1510.0 1510.0 1210.0 885.0 1280.0 1280.0 958.0 2600.0 1050.0 1560.0 1340.0
230 1440.0 1420.0 1360.0 1590.0 1390.0 1370.0 1350.0 842.0 1660.0 1510.0 953.0 1900.0 1060.0 1620.0 1560.0
231 1310.0 1330.0 1300.0 1470.0 1300.0 1470.0 1550.0 1050.0 2100.0 1600.0 911.0 1850.0 1120.0 1390.0 1550.0
232 1210.0 1270.0 1330.0 1530.0 1270.0 1610.0 1540.0 1000.0 2020.0 1540.0 880.0 1900.0 1140.0 1410.0 1500.0
233 1130.0 1220.0 1290.0 1270.0 1320.0 1540.0 1430.0 934.0 1840.0 1520.0 853.0 1890.0 1160.0 1410.0 1650.0
234 1150.0 1250.0 1160.0 1250.0 1400.0 1560.0 1280.0 860.0 1580.0 1420.0 857.0 1750.0 1210.0 1440.0 1660.0
235 1310.0 1320.0 1040.0 1210.0 1430.0 1540.0 1390.0 830.0 1670.0 1410.0 880.0 1700.0 1310.0 1340.0 1530.0
236 1330.0 1510.0 952.0 1320.0 1540.0 1600.0 1400.0 921.0 1450.0 1390.0 902.0 1720.0 1220.0 1340.0 1380.0
237 1270.0 1570.0 903.0 1330.0 1320.0 1510.0 1330.0 794.0 1380.0 1430.0 949.0 1520.0 1360.0 1180.0 1300.0
238 1180.0 1540.0 848.0 1320.0 1220.0 1700.0 1500.0 867.0 1210.0 1280.0 902.0 1580.0 1340.0 1130.0 1220.0
239 1180.0 1560.0 807.0 1440.0 1150.0 1880.0 1580.0 1020.0 1150.0 1190.0 862.0 1680.0 1280.0 1120.0 1210.0
240 1210.0 1500.0 773.0 1570.0 1180.0 2100.0 1440.0 1300.0 1100.0 1140.0 1290.0 1510.0 1270.0 1070.0 1250.0
241 1440.0 1430.0 733.0 1410.0 1170.0 1970.0 1470.0 1420.0 1120.0 1070.0 1140.0 1350.0 1500.0 1240.0 1340.0
242 1340.0 1320.0 733.0 1380.0 1080.0 1700.0 1590.0 1270.0 1190.0 1040.0 1170.0 1260.0 1420.0 1230.0 1480.0
243 1290.0 1300.0 749.0 1330.0 987.0 1690.0 1520.0 1320.0 1280.0 1020.0 1070.0 1180.0 1370.0 1120.0 1530.0
244 1220.0 1250.0 757.0 1270.0 928.0 1630.0 1380.0 1130.0 1370.0 1050.0 1030.0 1120.0 1330.0 1070.0 1480.0
245 1210.0 1250.0 781.0 1330.0 867.0 1440.0 1320.0 1120.0 1310.0 1000.0 958.0 1060.0 1350.0 1150.0 1400.0
246 1210.0 1390.0 803.0 1520.0 821.0 1320.0 1280.0 1220.0 1250.0 991.0 857.0 1020.0 1290.0 1090.0 1260.0
247 1200.0 1290.0 761.0 1390.0 773.0 1220.0 1510.0 1300.0 1210.0 972.0 839.0 986.0 1170.0 1190.0 1210.0
248 1110.0 1320.0 693.0 1250.0 737.0 1190.0 1520.0 1180.0 1120.0 967.0 871.0 925.0 1100.0 1160.0 1160.0
249 1040.0 1400.0 633.0 1200.0 713.0 1130.0 1410.0 1310.0 991.0 920.0 862.0 902.0 1030.0 1290.0 1150.0
250 1230.0 1390.0 608.0 1430.0 721.0 1070.0 1300.0 1280.0 920.0 884.0 835.0 898.0 963.0 1330.0 1230.0
251 1210.0 1320.0 594.0 1390.0 713.0 1070.0 1220.0 1580.0 857.0 844.0 844.0 866.0 884.0 1190.0 1390.0
252 1090.0 1200.0 580.0 1290.0 816.0 1000.0 1170.0 1530.0 835.0 821.0 884.0 925.0 839.0 1100.0 1160.0
253 1020.0 1200.0 562.0 1290.0 1510.0 993.0 1200.0 1290.0 795.0 800.0 996.0 880.0 787.0 1020.0 1090.0
254 1250.0 1250.0 544.0 1270.0 1300.0 899.0 2380.0 1110.0 812.0 782.0 934.0 782.0 778.0 977.0 1000.0
255 1330.0 1170.0 517.0 1200.0 1010.0 1420.0 2430.0 993.0 893.0 825.0 795.0 727.0 752.0 911.0 958.0
256 1270.0 1110.0 482.0 1120.0 842.0 1400.0 1680.0 987.0 893.0 982.0 752.0 693.0 735.0 967.0 925.0
257 1130.0 1200.0 454.0 1050.0 794.0 1280.0 1430.0 969.0 1260.0 991.0 693.0 673.0 731.0 1020.0 893.0
258 1070.0 1230.0 426.0 964.0 773.0 1170.0 1260.0 897.0 1300.0 853.0 706.0 652.0 782.0 939.0 920.0
259 964.0 1070.0 419.0 903.0 741.0 1050.0 1330.0 816.0 1230.0 765.0 660.0 640.0 804.0 953.0 907.0
260 897.0 952.0 401.0 836.0 697.0 973.0 1180.0 785.0 1190.0 714.0 616.0 612.0 817.0 880.0 844.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
261 830.0 873.0 398.0 812.0 673.0 875.0 1120.0 765.0 1170.0 685.0 597.0 597.0 782.0 830.0 782.0
262 816.0 915.0 391.0 785.0 653.0 836.0 1250.0 737.0 1150.0 652.0 570.0 589.0 744.0 808.0 744.0
263 807.0 975.0 387.0 781.0 622.0 781.0 1570.0 713.0 1180.0 601.0 566.0 648.0 791.0 853.0 701.0
264 749.0 885.0 377.0 915.0 587.0 741.0 1260.0 641.0 1100.0 570.0 578.0 628.0 752.0 853.0 668.0
265 705.0 842.0 356.0 1070.0 566.0 697.0 1130.0 615.0 996.0 551.0 589.0 744.0 706.0 830.0 644.0
266 681.0 836.0 341.0 921.0 548.0 672.0 1120.0 566.0 958.0 544.0 620.0 787.0 677.0 817.0 604.0
267 665.0 798.0 335.0 812.0 537.0 704.0 1420.0 541.0 1040.0 540.0 593.0 898.0 636.0 911.0 574.0
268 622.0 749.0 326.0 781.0 537.0 666.0 1660.0 520.0 934.0 536.0 555.0 804.0 620.0 1010.0 540.0
269 594.0 713.0 317.0 765.0 520.0 618.0 1350.0 499.0 862.0 536.0 532.0 765.0 612.0 853.0 540.0
270 569.0 685.0 311.0 733.0 517.0 583.0 1200.0 475.0 848.0 532.0 481.0 701.0 593.0 804.0 510.0
271 548.0 669.0 305.0 709.0 597.0 553.0 1080.0 454.0 817.0 529.0 460.0 693.0 566.0 752.0 506.0
272 530.0 673.0 299.0 689.0 1900.0 528.0 975.0 436.0 778.0 540.0 432.0 644.0 566.0 714.0 503.0
273 517.0 625.0 293.0 665.0 1500.0 507.0 928.0 422.0 744.0 601.0 418.0 601.0 540.0 664.0 485.0
274 499.0 629.0 290.0 653.0 1050.0 488.0 825.0 408.0 681.0 559.0 404.0 574.0 559.0 644.0 467.0
275 583.0 590.0 296.0 622.0 867.0 471.0 789.0 394.0 648.0 514.0 394.0 555.0 525.0 624.0 456.0
276 527.0 569.0 323.0 608.0 769.0 455.0 753.0 387.0 612.0 510.0 387.0 529.0 532.0 597.0 442.0
277 503.0 548.0 320.0 590.0 717.0 444.0 713.0 359.0 597.0 506.0 368.0 506.0 525.0 578.0 428.0
278 478.0 527.0 296.0 573.0 665.0 429.0 673.0 365.0 612.0 467.0 358.0 481.0 481.0 559.0 421.0
279 471.0 517.0 290.0 558.0 625.0 420.0 637.0 356.0 628.0 446.0 352.0 470.0 463.0 532.0 414.0
280 461.0 503.0 287.0 551.0 601.0 403.0 615.0 350.0 664.0 435.0 339.0 467.0 446.0 506.0 408.0
281 436.0 492.0 279.0 530.0 573.0 392.0 597.0 344.0 972.0 432.0 333.0 446.0 428.0 488.0 397.0
282 422.0 485.0 271.0 513.0 551.0 384.0 580.0 335.0 1350.0 418.0 327.0 428.0 418.0 467.0 378.0
283 412.0 468.0 282.0 527.0 530.0 381.0 576.0 326.0 977.0 408.0 321.0 414.0 411.0 456.0 368.0
284 394.0 454.0 296.0 510.0 517.0 372.0 741.0 320.0 982.0 401.0 315.0 401.0 401.0 463.0 364.0
285 384.0 436.0 299.0 489.0 496.0 363.0 1420.0 314.0 2030.0 401.0 311.0 391.0 394.0 470.0 358.0
286 377.0 426.0 279.0 471.0 478.0 352.0 1030.0 305.0 1520.0 397.0 305.0 378.0 381.0 456.0 352.0
287 371.0 415.0 268.0 457.0 464.0 344.0 798.0 302.0 1250.0 387.0 296.0 368.0 368.0 442.0 344.0
288 377.0 408.0 260.0 447.0 443.0 337.0 737.0 296.0 1100.0 404.0 290.0 361.0 358.0 418.0 338.0
289 362.0 398.0 252.0 436.0 429.0 325.0 681.0 293.0 1070.0 428.0 282.0 352.0 352.0 397.0 326.0
290 347.0 387.0 246.0 422.0 422.0 320.0 641.0 350.0 953.0 421.0 276.0 342.0 339.0 381.0 315.0
291 338.0 377.0 241.0 415.0 408.0 313.0 604.0 326.0 880.0 401.0 349.0 339.0 336.0 371.0 312.0
292 335.0 371.0 235.0 405.0 394.0 311.0 587.0 293.0 812.0 378.0 352.0 336.0 333.0 361.0 309.0
293 323.0 362.0 233.0 401.0 384.0 302.0 569.0 282.0 761.0 364.0 321.0 327.0 327.0 349.0 303.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
294 317.0 353.0 228.0 380.0 371.0 296.0 551.0 274.0 714.0 355.0 296.0 318.0 318.0 339.0 300.0
295 314.0 344.0 223.0 374.0 362.0 292.0 523.0 271.0 677.0 346.0 287.0 315.0 311.0 333.0 295.0
296 305.0 338.0 220.0 365.0 359.0 290.0 517.0 266.0 644.0 339.0 282.0 308.0 299.0 324.0 292.0
297 299.0 332.0 218.0 356.0 344.0 284.0 551.0 263.0 616.0 330.0 273.0 305.0 296.0 321.0 287.0
298 296.0 326.0 218.0 344.0 338.0 277.0 530.0 260.0 589.0 330.0 267.0 299.0 293.0 315.0 281.0
299 293.0 317.0 215.0 335.0 332.0 274.0 510.0 252.0 566.0 321.0 262.0 296.0 287.0 308.0 279.0
300 293.0 308.0 213.0 332.0 335.0 271.0 485.0 249.0 551.0 315.0 253.0 290.0 285.0 305.0 273.0
301 287.0 302.0 210.0 326.0 320.0 268.0 468.0 246.0 529.0 311.0 253.0 285.0 279.0 299.0 268.0
302 282.0 296.0 208.0 314.0 311.0 266.0 454.0 241.0 514.0 305.0 253.0 270.0 276.0 296.0 263.0
303 277.0 293.0 205.0 311.0 302.0 260.0 436.0 235.0 495.0 299.0 248.0 276.0 270.0 285.0 258.0
304 274.0 290.0 205.0 305.0 293.0 252.0 419.0 233.0 488.0 296.0 248.0 270.0 264.0 282.0 253.0
305 271.0 282.0 203.0 302.0 290.0 249.0 408.0 225.0 481.0 293.0 245.0 267.0 262.0 279.0 248.0
306 268.0 277.0 200.0 293.0 285.0 246.0 394.0 223.0 463.0 287.0 239.0 264.0 259.0 276.0 245.0
307 266.0 271.0 195.0 287.0 282.0 241.0 384.0 220.0 449.0 282.0 234.0 259.0 256.0 270.0 238.0
308 268.0 266.0 193.0 282.0 447.0 240.0 371.0 218.0 439.0 276.0 231.0 259.0 250.0 267.0 238.0
309 263.0 263.0 190.0 279.0 314.0 234.0 362.0 218.0 428.0 270.0 226.0 253.0 250.0 264.0 235.0
310 249.0 260.0 188.0 274.0 285.0 231.0 359.0 213.0 418.0 264.0 223.0 250.0 250.0 259.0 233.0
311 246.0 252.0 185.0 268.0 279.0 228.0 353.0 208.0 408.0 262.0 220.0 250.0 248.0 256.0 228.0
312 243.0 249.0 185.0 263.0 268.0 228.0 341.0 208.0 394.0 259.0 215.0 248.0 248.0 253.0 228.0
313 238.0 246.0 180.0 257.0 263.0 227.0 335.0 205.0 384.0 256.0 212.0 245.0 242.0 250.0 225.0
314 233.0 243.0 180.0 255.0 257.0 239.0 329.0 205.0 378.0 253.0 212.0 239.0 237.0 248.0 223.0
315 228.0 241.0 176.0 249.0 252.0 224.0 320.0 200.0 364.0 250.0 210.0 237.0 231.0 250.0 220.0
316 223.0 238.0 174.0 246.0 260.0 219.0 311.0 200.0 358.0 248.0 207.0 234.0 226.0 248.0 230.0
317 228.0 252.0 169.0 241.0 257.0 217.0 308.0 195.0 355.0 245.0 205.0 229.0 223.0 245.0 225.0
318 218.0 241.0 169.0 238.0 249.0 215.0 302.0 193.0 349.0 242.0 202.0 226.0 220.0 239.0 213.0
319 218.0 233.0 167.0 238.0 241.0 213.0 299.0 193.0 339.0 240.0 197.0 223.0 220.0 237.0 211.0
320 215.0 228.0 164.0 235.0 241.0 209.0 293.0 188.0 327.0 239.0 194.0 220.0 218.0 231.0 208.0
321 213.0 223.0 162.0 233.0 238.0 207.0 293.0 188.0 327.0 234.0 NA 218.0 210.0 229.0 206.0
322 213.0 220.0 162.0 230.0 233.0 204.0 282.0 185.0 324.0 234.0 NA 215.0 210.0 223.0 201.0
323 210.0 218.0 164.0 228.0 228.0 202.0 277.0 183.0 315.0 231.0 NA 212.0 205.0 220.0 199.0
324 208.0 213.0 162.0 223.0 223.0 198.0 274.0 178.0 311.0 226.0 NA 207.0 205.0 215.0 199.0
325 205.0 210.0 158.0 223.0 220.0 196.0 268.0 176.0 305.0 226.0 NA 202.0 202.0 223.0 199.0
326 203.0 208.0 158.0 220.0 218.0 195.0 266.0 174.0 302.0 226.0 NA 202.0 199.0 220.0 192.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
327 200.0 252.0 160.0 218.0 215.0 192.0 266.0 174.0 293.0 220.0 NA 199.0 199.0 220.0 190.0
328 198.0 235.0 158.0 215.0 213.0 190.0 260.0 171.0 290.0 218.0 NA 197.0 202.0 215.0 187.0
329 198.0 225.0 155.0 213.0 210.0 180.0 257.0 169.0 287.0 215.0 NA 194.0 210.0 212.0 185.0
330 195.0 220.0 155.0 213.0 208.0 177.0 246.0 167.0 282.0 215.0 NA 189.0 202.0 210.0 185.0
331 193.0 213.0 149.0 208.0 205.0 180.0 246.0 167.0 279.0 212.0 NA 187.0 199.0 202.0 185.0
332 193.0 208.0 147.0 208.0 200.0 175.0 243.0 164.0 270.0 210.0 NA 187.0 194.0 202.0 183.0
333 190.0 208.0 147.0 205.0 198.0 171.0 238.0 162.0 270.0 209.0 NA 184.0 189.0 202.0 183.0
334 188.0 205.0 158.0 205.0 195.0 171.0 238.0 158.0 264.0 207.0 NA 182.0 184.0 202.0 180.0
335 188.0 205.0 164.0 203.0 195.0 170.0 238.0 160.0 259.0 210.0 NA 182.0 184.0 194.0 178.0
336 183.0 213.0 153.0 200.0 190.0 170.0 233.0 158.0 259.0 202.0 NA 182.0 182.0 192.0 176.0
337 180.0 213.0 149.0 198.0 190.0 167.0 230.0 158.0 256.0 202.0 NA 179.0 179.0 189.0 171.0
338 180.0 200.0 147.0 195.0 188.0 168.0 228.0 155.0 250.0 194.0 NA 179.0 177.0 189.0 169.0
339 178.0 198.0 144.0 195.0 185.0 166.0 228.0 153.0 250.0 197.0 NA 179.0 175.0 189.0 169.0
340 174.0 193.0 140.0 195.0 183.0 164.0 223.0 151.0 248.0 202.0 NA 177.0 175.0 187.0 167.0
341 169.0 193.0 138.0 190.0 193.0 161.0 220.0 151.0 245.0 192.0 NA 175.0 175.0 184.0 167.0
342 169.0 188.0 136.0 188.0 193.0 158.0 218.0 151.0 242.0 192.0 NA 175.0 175.0 179.0 165.0
343 167.0 188.0 136.0 180.0 185.0 158.0 215.0 147.0 239.0 189.0 NA 172.0 172.0 179.0 165.0
344 164.0 185.0 136.0 180.0 183.0 158.0 213.0 144.0 234.0 189.0 NA 167.0 170.0 177.0 165.0
345 167.0 183.0 136.0 178.0 180.0 158.0 210.0 144.0 231.0 184.0 NA 165.0 165.0 179.0 163.0
346 164.0 183.0 134.0 176.0 178.0 155.0 208.0 147.0 231.0 182.0 NA 165.0 165.0 175.0 163.0
347 162.0 178.0 132.0 174.0 176.0 155.0 205.0 144.0 234.0 207.0 NA 163.0 165.0 172.0 160.0
348 160.0 178.0 132.0 176.0 171.0 153.0 203.0 147.0 231.0 218.0 NA 165.0 160.0 170.0 158.0
349 160.0 176.0 130.0 176.0 171.0 152.0 205.0 155.0 226.0 187.0 151.0 160.0 158.0 172.0 158.0
350 158.0 174.0 136.0 174.0 169.0 150.0 203.0 147.0 223.0 179.0 151.0 158.0 155.0 167.0 156.0
351 155.0 171.0 134.0 171.0 167.0 148.0 200.0 142.0 226.0 182.0 151.0 158.0 155.0 165.0 156.0
352 151.0 169.0 130.0 169.0 164.0 146.0 203.0 140.0 220.0 179.0 148.0 155.0 155.0 165.0 154.0
353 151.0 169.0 126.0 167.0 164.0 144.0 198.0 138.0 220.0 184.0 143.0 155.0 155.0 163.0 154.0
354 155.0 167.0 126.0 164.0 162.0 142.0 195.0 136.0 215.0 179.0 143.0 155.0 158.0 160.0 152.0
355 153.0 164.0 124.0 167.0 160.0 141.0 190.0 134.0 212.0 177.0 141.0 155.0 155.0 158.0 152.0
356 153.0 162.0 122.0 164.0 160.0 140.0 188.0 134.0 212.0 175.0 139.0 155.0 153.0 155.0 154.0
357 151.0 162.0 120.0 162.0 158.0 140.0 208.0 134.0 210.0 177.0 137.0 153.0 151.0 155.0 154.0
358 147.0 160.0 118.0 162.0 153.0 142.0 183.0 130.0 207.0 175.0 135.0 155.0 155.0 153.0 152.0
359 149.0 158.0 116.0 169.0 153.0 138.0 180.0 130.0 207.0 170.0 135.0 160.0 153.0 151.0 163.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
360 162.0 155.0 124.0 167.0 151.0 135.0 188.0 130.0 220.0 167.0 135.0 167.0 143.0 151.0 160.0
361 164.0 155.0 124.0 169.0 151.0 134.0 190.0 126.0 279.0 167.0 133.0 205.0 146.0 151.0 152.0
362 158.0 153.0 122.0 164.0 149.0 140.0 183.0 126.0 220.0 165.0 133.0 167.0 141.0 151.0 150.0
363 155.0 151.0 120.0 158.0 149.0 155.0 180.0 126.0 215.0 163.0 133.0 160.0 139.0 148.0 146.0
364 151.0 151.0 151.0 155.0 147.0 140.0 178.0 126.0 215.0 163.0 131.0 163.0 139.0 163.0 142.0
365 147.0 149.0 132.0 158.0 144.0 135.0 174.0 124.0 215.0 160.0 131.0 163.0 139.0 167.0 140.0
366 155.0 128.0 160.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
1 138.0 145.0 132.0 123.0 132.0 143.0 142.0 161.0 150.0 145.0 129.0 137.0 136.0 129.0 152.0
2 138.0 144.0 130.0 121.0 131.0 142.0 143.0 159.0 148.0 145.0 128.0 138.0 135.0 129.0 152.0
3 136.0 145.0 130.0 119.0 130.0 142.0 141.0 157.0 147.0 145.0 128.0 136.0 134.0 128.0 150.0
4 138.0 144.0 128.0 119.0 128.0 141.0 141.0 158.0 146.0 152.0 126.0 136.0 134.0 128.0 150.0
5 140.0 143.0 128.0 117.0 128.0 141.0 139.0 157.0 145.0 154.0 125.0 134.0 134.0 127.0 148.0
6 142.0 143.0 128.0 117.0 127.0 140.0 138.0 156.0 143.0 154.0 125.0 133.0 134.0 126.0 146.0
7 140.0 154.0 127.0 115.0 125.0 139.0 137.0 155.0 142.0 153.0 124.0 131.0 133.0 124.0 146.0
8 142.0 163.0 127.0 115.0 125.0 135.0 135.0 156.0 141.0 151.0 123.0 131.0 133.0 124.0 143.0
9 138.0 169.0 123.0 142.0 123.0 132.0 136.0 154.0 139.0 150.0 122.0 129.0 132.0 122.0 143.0
10 134.0 153.0 121.0 138.0 121.0 132.0 133.0 156.0 139.0 150.0 118.0 129.0 131.0 122.0 139.0
11 144.0 150.0 123.0 127.0 121.0 131.0 132.0 151.0 139.0 150.0 111.0 126.0 131.0 121.0 139.0
12 150.0 154.0 128.0 127.0 119.0 130.0 131.0 150.0 139.0 149.0 105.0 126.0 129.0 121.0 136.0
13 140.0 151.0 130.0 125.0 117.0 128.0 132.0 150.0 144.0 148.0 103.0 125.0 129.0 120.0 134.0
14 136.0 147.0 127.0 121.0 118.0 128.0 132.0 146.0 142.0 146.0 103.0 124.0 130.0 119.0 134.0
15 140.0 144.0 128.0 121.0 127.0 127.0 128.0 150.0 141.0 143.0 103.0 122.0 129.0 119.0 134.0
16 136.0 145.0 134.0 128.0 139.0 125.0 127.0 143.0 139.0 143.0 141.0 122.0 129.0 118.0 132.0
17 136.0 145.0 127.0 127.0 137.0 127.0 126.0 141.0 138.0 139.0 136.0 121.0 129.0 125.0 132.0
18 136.0 144.0 128.0 127.0 127.0 121.0 125.0 139.0 136.0 139.0 128.0 120.0 129.0 122.0 131.0
19 134.0 144.0 127.0 127.0 125.0 122.0 122.0 139.0 137.0 139.0 141.0 120.0 128.0 117.0 130.0
20 134.0 143.0 123.0 125.0 125.0 138.0 119.0 139.0 136.0 138.0 134.0 120.0 128.0 116.0 130.0
21 132.0 140.0 125.0 125.0 125.0 143.0 119.0 139.0 134.0 137.0 137.0 120.0 128.0 115.0 129.0
22 132.0 137.0 121.0 121.0 124.0 133.0 117.0 138.0 134.0 136.0 132.0 119.0 128.0 114.0 127.0
23 132.0 137.0 117.0 117.0 121.0 130.0 117.0 138.0 134.0 136.0 126.0 119.0 126.0 113.0 126.0
24 134.0 137.0 119.0 115.0 120.0 128.0 117.0 136.0 134.0 136.0 122.0 117.0 150.0 111.0 125.0
25 134.0 136.0 117.0 115.0 119.0 128.0 117.0 134.0 133.0 136.0 119.0 118.0 143.0 109.0 123.0
26 127.0 136.0 117.0 115.0 119.0 127.0 116.0 134.0 131.0 136.0 119.0 116.0 138.0 111.0 122.0
27 127.0 136.0 117.0 114.0 117.0 127.0 115.0 133.0 133.0 134.0 124.0 117.0 130.0 108.0 122.0
28 128.0 134.0 117.0 114.0 117.0 127.0 114.0 133.0 130.0 134.0 128.0 119.0 129.0 104.0 122.0
29 138.0 134.0 117.0 115.0 116.0 125.0 116.0 137.0 129.0 133.0 127.0 119.0 131.0 103.0 119.0
30 146.0 134.0 123.0 114.0 115.0 125.0 118.0 136.0 128.0 133.0 124.0 120.0 133.0 103.0 119.0
31 171.0 137.0 110.0 112.0 114.0 124.0 115.0 134.0 126.0 133.0 122.0 121.0 133.0 115.0 119.0
32 148.0 137.0 115.0 112.0 113.0 121.0 115.0 134.0 125.0 133.0 119.0 139.0 133.0 120.0 119.0
33 134.0 133.0 115.0 112.0 112.0 120.0 115.0 134.0 125.0 131.0 119.0 141.0 133.0 118.0 119.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
34 138.0 131.0 115.0 110.0 110.0 121.0 118.0 133.0 125.0 130.0 119.0 138.0 133.0 114.0 119.0
35 132.0 131.0 112.0 110.0 109.0 121.0 112.0 133.0 124.0 128.0 119.0 136.0 133.0 112.0 119.0
36 130.0 133.0 112.0 110.0 110.0 121.0 111.0 131.0 126.0 128.0 116.0 131.0 131.0 106.0 119.0
37 127.0 133.0 112.0 110.0 108.0 119.0 110.0 129.0 128.0 124.0 115.0 119.0 131.0 104.0 119.0
38 138.0 133.0 112.0 107.0 108.0 117.0 109.0 129.0 133.0 124.0 116.0 118.0 124.0 107.0 119.0
39 134.0 136.0 115.0 107.0 108.0 117.0 108.0 128.0 130.0 124.0 119.0 116.0 124.0 126.0 119.0
40 127.0 140.0 150.0 108.0 110.0 117.0 107.0 128.0 129.0 122.0 119.0 115.0 116.0 122.0 119.0
41 125.0 143.0 123.0 110.0 114.0 116.0 107.0 127.0 125.0 122.0 116.0 113.0 113.0 112.0 118.0
42 125.0 144.0 130.0 112.0 117.0 114.0 107.0 126.0 124.0 122.0 117.0 113.0 113.0 113.0 118.0
43 121.0 145.0 121.0 112.0 115.0 114.0 107.0 124.0 140.0 120.0 162.0 112.0 113.0 113.0 118.0
44 125.0 141.0 119.0 112.0 110.0 114.0 108.0 124.0 139.0 119.0 161.0 111.0 111.0 112.0 118.0
45 130.0 140.0 117.0 110.0 110.0 115.0 107.0 123.0 133.0 118.0 134.0 112.0 110.0 110.0 118.0
46 125.0 137.0 117.0 136.0 110.0 114.0 108.0 121.0 130.0 120.0 122.0 110.0 110.0 109.0 118.0
47 123.0 134.0 117.0 114.0 109.0 114.0 108.0 120.0 126.0 131.0 116.0 109.0 109.0 107.0 118.0
48 123.0 133.0 115.0 110.0 107.0 113.0 108.0 119.0 122.0 126.0 116.0 110.0 109.0 104.0 117.0
49 119.0 136.0 114.0 112.0 106.0 111.0 106.0 119.0 120.0 124.0 116.0 110.0 109.0 104.0 116.0
50 117.0 137.0 110.0 110.0 107.0 110.0 105.0 119.0 118.0 122.0 116.0 151.0 109.0 103.0 116.0
51 115.0 133.0 110.0 108.0 109.0 110.0 105.0 118.0 117.0 121.0 116.0 169.0 107.0 103.0 116.0
52 115.0 130.0 112.0 108.0 108.0 107.0 104.0 117.0 116.0 121.0 115.0 133.0 104.0 99.8 116.0
53 115.0 129.0 130.0 107.0 107.0 107.0 102.0 116.0 114.0 121.0 115.0 123.0 104.0 102.0 116.0
54 114.0 127.0 110.0 123.0 105.0 107.0 99.5 116.0 113.0 121.0 115.0 119.0 104.0 122.0 116.0
55 114.0 126.0 108.0 112.0 105.0 105.0 103.0 121.0 115.0 121.0 113.0 118.0 104.0 114.0 116.0
56 114.0 127.0 115.0 110.0 133.0 104.0 139.0 130.0 114.0 121.0 127.0 118.0 104.0 115.0 116.0
57 112.0 137.0 117.0 110.0 149.0 115.0 124.0 122.0 115.0 126.0 126.0 116.0 107.0 116.0 116.0
58 112.0 141.0 119.0 112.0 149.0 111.0 120.0 124.0 115.0 122.0 125.0 116.0 107.0 119.0 116.0
59 114.0 143.0 115.0 110.0 127.0 109.0 120.0 125.0 114.0 122.0 120.0 116.0 106.0 123.0 116.0
60 115.0 138.0 114.0 108.0 126.0 107.0 117.0 124.0 113.0 121.0 122.0 119.0 106.0 119.0 115.0
61 115.0 141.0 112.0 108.0 132.0 109.0 115.0 122.0 119.0 121.0 121.0 137.0 101.0 120.0 114.0
62 115.0 137.0 114.0 107.0 129.0 109.0 114.0 121.0 121.0 119.0 129.0 139.0 101.0 122.0 114.0
63 115.0 134.0 117.0 108.0 128.0 105.0 114.0 122.0 119.0 119.0 129.0 139.0 101.0 119.0 114.0
64 115.0 131.0 115.0 108.0 127.0 105.0 116.0 122.0 118.0 119.0 129.0 138.0 101.0 118.0 114.0
65 114.0 130.0 117.0 107.0 125.0 104.0 125.0 124.0 118.0 118.0 128.0 138.0 98.9 119.0 114.0
66 115.0 131.0 115.0 107.0 128.0 104.0 127.0 122.0 120.0 117.0 128.0 136.0 98.4 118.0 114.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
67 112.0 131.0 114.0 115.0 129.0 105.0 119.0 121.0 116.0 116.0 136.0 134.0 101.0 117.0 114.0
68 112.0 130.0 112.0 108.0 136.0 107.0 117.0 120.0 116.0 115.0 139.0 133.0 101.0 117.0 114.0
69 115.0 134.0 110.0 107.0 134.0 107.0 116.0 119.0 115.0 115.0 141.0 129.0 101.0 118.0 127.0
70 115.0 137.0 110.0 107.0 135.0 107.0 117.0 116.0 115.0 115.0 139.0 124.0 102.0 119.0 127.0
71 114.0 136.0 115.0 105.0 144.0 109.0 117.0 113.0 115.0 113.0 149.0 122.0 103.0 119.0 122.0
72 110.0 133.0 117.0 103.0 158.0 108.0 140.0 112.0 114.0 113.0 148.0 122.0 104.0 121.0 121.0
73 114.0 134.0 123.0 101.0 164.0 107.0 132.0 110.0 112.0 112.0 148.0 120.0 104.0 121.0 126.0
74 117.0 136.0 130.0 101.0 157.0 104.0 126.0 109.0 112.0 113.0 149.0 123.0 104.0 122.0 126.0
75 125.0 134.0 121.0 101.0 160.0 105.0 125.0 110.0 110.0 114.0 150.0 126.0 106.0 122.0 126.0
76 121.0 131.0 121.0 107.0 157.0 105.0 124.0 111.0 113.0 113.0 150.0 126.0 107.0 124.0 126.0
77 121.0 130.0 125.0 110.0 150.0 101.0 123.0 110.0 112.0 112.0 150.0 124.0 109.0 125.0 126.0
78 121.0 129.0 132.0 112.0 143.0 104.0 125.0 110.0 112.0 112.0 151.0 122.0 109.0 126.0 125.0
79 117.0 127.0 138.0 117.0 141.0 96.2 122.0 109.0 117.0 112.0 151.0 127.0 110.0 128.0 124.0
80 127.0 127.0 138.0 121.0 133.0 108.0 131.0 109.0 115.0 115.0 156.0 131.0 110.0 129.0 124.0
81 138.0 126.0 127.0 128.0 130.0 103.0 140.0 109.0 113.0 120.0 162.0 135.0 110.0 131.0 124.0
82 128.0 126.0 121.0 136.0 126.0 102.0 148.0 109.0 114.0 120.0 164.0 145.0 112.0 132.0 124.0
83 134.0 138.0 119.0 148.0 142.0 99.5 139.0 108.0 118.0 119.0 171.0 156.0 113.0 138.0 123.0
84 142.0 147.0 121.0 160.0 132.0 97.3 130.0 108.0 121.0 119.0 168.0 153.0 113.0 132.0 122.0
85 134.0 310.0 127.0 171.0 132.0 96.8 127.0 110.0 114.0 116.0 164.0 151.0 110.0 128.0 122.0
86 138.0 186.0 123.0 206.0 133.0 95.7 127.0 109.0 119.0 119.0 161.0 150.0 106.0 128.0 122.0
87 130.0 177.0 117.0 169.0 137.0 98.4 135.0 108.0 118.0 121.0 161.0 148.0 105.0 130.0 121.0
88 140.0 175.0 119.0 158.0 148.0 101.0 159.0 108.0 120.0 121.0 161.0 155.0 101.0 129.0 121.0
89 136.0 175.0 130.0 180.0 151.0 123.0 173.0 110.0 129.0 134.0 161.0 165.0 97.0 128.0 121.0
90 132.0 171.0 146.0 158.0 170.0 113.0 164.0 110.0 141.0 135.0 161.0 166.0 93.7 128.0 121.0
91 127.0 166.0 156.0 148.0 161.0 109.0 156.0 118.0 153.0 136.0 177.0 166.0 92.8 123.0 121.0
92 121.0 160.0 142.0 140.0 144.0 112.0 167.0 120.0 164.0 133.0 176.0 167.0 90.0 122.0 119.0
93 117.0 157.0 130.0 132.0 140.0 108.0 181.0 119.0 164.0 132.0 175.0 168.0 85.3 121.0 119.0
94 121.0 156.0 123.0 130.0 141.0 118.0 203.0 110.0 163.0 133.0 179.0 166.0 92.8 122.0 119.0
95 123.0 157.0 128.0 128.0 143.0 114.0 201.0 109.0 164.0 133.0 176.0 165.0 92.8 122.0 119.0
96 127.0 160.0 144.0 123.0 149.0 109.0 199.0 111.0 163.0 132.0 191.0 157.0 91.9 121.0 119.0
97 134.0 166.0 128.0 119.0 156.0 105.0 210.0 115.0 161.0 128.0 212.0 153.0 92.8 130.0 119.0
98 136.0 175.0 128.0 125.0 157.0 107.0 222.0 116.0 161.0 128.0 221.0 156.0 96.5 139.0 117.0
99 140.0 169.0 121.0 140.0 171.0 110.0 234.0 131.0 167.0 131.0 205.0 159.0 107.0 134.0 116.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
100 148.0 160.0 117.0 156.0 155.0 120.0 215.0 125.0 169.0 132.0 200.0 161.0 113.0 129.0 116.0
101 150.0 162.0 115.0 176.0 153.0 122.0 201.0 127.0 166.0 135.0 185.0 172.0 113.0 120.0 116.0
102 148.0 175.0 112.0 180.0 153.0 122.0 200.0 138.0 154.0 139.0 184.0 180.0 113.0 109.0 116.0
103 142.0 191.0 112.0 156.0 156.0 127.0 203.0 156.0 161.0 144.0 189.0 193.0 109.0 104.0 116.0
104 148.0 199.0 112.0 148.0 163.0 136.0 198.0 155.0 170.0 139.0 198.0 210.0 110.0 110.0 116.0
105 154.0 202.0 115.0 146.0 166.0 147.0 192.0 152.0 184.0 142.0 198.0 213.0 107.0 127.0 116.0
106 152.0 223.0 121.0 150.0 173.0 141.0 199.0 140.0 203.0 150.0 291.0 211.0 110.0 146.0 119.0
107 150.0 238.0 121.0 150.0 204.0 139.0 201.0 133.0 192.0 152.0 325.0 210.0 107.0 149.0 122.0
108 150.0 249.0 114.0 150.0 225.0 119.0 211.0 141.0 179.0 157.0 322.0 213.0 101.0 155.0 123.0
109 154.0 238.0 112.0 158.0 226.0 116.0 235.0 143.0 176.0 156.0 301.0 233.0 101.0 180.0 122.0
110 160.0 234.0 110.0 169.0 226.0 115.0 274.0 157.0 201.0 153.0 301.0 241.0 101.0 179.0 118.0
111 156.0 241.0 112.0 160.0 281.0 112.0 273.0 172.0 251.0 153.0 299.0 219.0 101.0 180.0 118.0
112 171.0 238.0 123.0 165.0 271.0 118.0 274.0 198.0 284.0 153.0 286.0 198.0 120.0 186.0 119.0
113 194.0 279.0 121.0 187.0 255.0 127.0 291.0 205.0 272.0 154.0 287.0 208.0 129.0 195.0 120.0
114 190.0 306.0 121.0 194.0 238.0 138.0 328.0 213.0 250.0 158.0 315.0 258.0 133.0 179.0 122.0
115 171.0 323.0 121.0 192.0 229.0 158.0 350.0 207.0 225.0 161.0 318.0 310.0 136.0 178.0 118.0
116 158.0 321.0 119.0 203.0 233.0 171.0 412.0 199.0 216.0 168.0 364.0 326.0 131.0 180.0 118.0
117 171.0 319.0 121.0 218.0 221.0 188.0 445.0 196.0 229.0 171.0 387.0 346.0 131.0 186.0 119.0
118 178.0 456.0 117.0 230.0 211.0 197.0 346.0 199.0 266.0 171.0 362.0 292.0 131.0 203.0 118.0
119 190.0 515.0 119.0 250.0 253.0 218.0 369.0 203.0 279.0 172.0 329.0 248.0 131.0 247.0 118.0
120 233.0 508.0 128.0 290.0 345.0 204.0 390.0 210.0 252.0 196.0 296.0 224.0 121.0 248.0 116.0
121 253.0 589.0 142.0 281.0 409.0 200.0 390.0 215.0 234.0 213.0 237.0 219.0 121.0 231.0 118.0
122 250.0 644.0 138.0 253.0 398.0 192.0 400.0 198.0 226.0 210.0 238.0 256.0 156.0 189.0 121.0
123 230.0 673.0 163.0 238.0 395.0 187.0 458.0 178.0 229.0 275.0 240.0 267.0 159.0 181.0 122.0
124 223.0 610.0 220.0 233.0 436.0 191.0 534.0 186.0 241.0 272.0 286.0 309.0 155.0 182.0 123.0
125 218.0 557.0 228.0 233.0 417.0 195.0 554.0 187.0 288.0 247.0 342.0 239.0 152.0 247.0 124.0
126 213.0 570.0 211.0 240.0 374.0 190.0 532.0 201.0 366.0 262.0 451.0 218.0 138.0 247.0 126.0
127 192.0 560.0 203.0 258.0 352.0 191.0 530.0 215.0 299.0 387.0 435.0 215.0 138.0 277.0 127.0
128 192.0 579.0 206.0 292.0 415.0 205.0 537.0 234.0 272.0 383.0 645.0 199.0 138.0 282.0 129.0
129 211.0 542.0 287.0 355.0 473.0 228.0 408.0 214.0 250.0 419.0 647.0 192.0 139.0 283.0 131.0
130 235.0 420.0 287.0 401.0 519.0 183.0 356.0 195.0 264.0 514.0 658.0 191.0 139.0 383.0 136.0
131 245.0 403.0 228.0 495.0 470.0 171.0 324.0 189.0 276.0 509.0 695.0 185.0 139.0 429.0 140.0
132 255.0 372.0 196.0 632.0 422.0 168.0 304.0 188.0 350.0 503.0 671.0 208.0 139.0 425.0 150.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
133 292.0 321.0 203.0 782.0 356.0 171.0 312.0 183.0 437.0 561.0 692.0 258.0 141.0 424.0 156.0
134 355.0 300.0 225.0 825.0 295.0 175.0 343.0 201.0 579.0 582.0 979.0 376.0 150.0 421.0 172.0
135 481.0 292.0 206.0 857.0 286.0 170.0 370.0 180.0 503.0 630.0 1070.0 314.0 150.0 247.0 190.0
136 439.0 331.0 194.0 991.0 299.0 156.0 440.0 167.0 518.0 577.0 1200.0 310.0 150.0 295.0 220.0
137 418.0 362.0 203.0 1110.0 304.0 156.0 530.0 177.0 620.0 361.0 1090.0 375.0 164.0 295.0 227.0
138 414.0 337.0 208.0 1110.0 290.0 148.0 605.0 212.0 606.0 323.0 1060.0 355.0 202.0 269.0 229.0
139 358.0 312.0 245.0 916.0 282.0 168.0 588.0 205.0 683.0 311.0 889.0 336.0 286.0 279.0 230.0
140 298.0 282.0 323.0 761.0 287.0 177.0 665.0 194.0 582.0 296.0 703.0 339.0 289.0 287.0 231.0
141 260.0 280.0 470.0 628.0 281.0 191.0 787.0 244.0 683.0 303.0 685.0 350.0 287.0 302.0 243.0
142 248.0 284.0 616.0 529.0 271.0 200.0 858.0 244.0 540.0 307.0 681.0 440.0 358.0 300.0 246.0
143 223.0 321.0 563.0 428.0 307.0 209.0 921.0 268.0 527.0 288.0 682.0 661.0 389.0 316.0 249.0
144 218.0 396.0 620.0 368.0 349.0 220.0 893.0 298.0 588.0 308.0 574.0 573.0 389.0 349.0 253.0
145 271.0 461.0 628.0 347.0 441.0 215.0 872.0 307.0 648.0 327.0 541.0 465.0 388.0 426.0 264.0
146 287.0 508.0 532.0 361.0 600.0 188.0 930.0 341.0 717.0 343.0 469.0 389.0 386.0 366.0 268.0
147 250.0 600.0 467.0 418.0 768.0 213.0 949.0 359.0 626.0 326.0 439.0 451.0 399.0 415.0 273.0
148 260.0 602.0 536.0 506.0 810.0 271.0 978.0 360.0 596.0 302.0 408.0 505.0 172.0 440.0 279.0
149 300.0 628.0 616.0 570.0 844.0 287.0 967.0 369.0 555.0 353.0 404.0 481.0 175.0 435.0 281.0
150 378.0 496.0 624.0 555.0 690.0 273.0 811.0 330.0 544.0 386.0 397.0 525.0 181.0 428.0 282.0
151 411.0 520.0 547.0 632.0 506.0 260.0 772.0 282.0 519.0 346.0 399.0 616.0 177.0 395.0 293.0
152 391.0 542.0 474.0 677.0 427.0 226.0 842.0 248.0 466.0 342.0 410.0 804.0 173.0 366.0 298.0
153 298.0 600.0 485.0 706.0 494.0 238.0 878.0 224.0 427.0 511.0 416.0 789.0 192.0 426.0 319.0
154 287.0 522.0 442.0 735.0 594.0 266.0 860.0 206.0 365.0 636.0 425.0 774.0 196.0 434.0 313.0
155 338.0 524.0 439.0 744.0 525.0 262.0 826.0 200.0 448.0 688.0 445.0 856.0 196.0 439.0 321.0
156 384.0 530.0 364.0 774.0 442.0 248.0 689.0 196.0 414.0 645.0 455.0 832.0 180.0 330.0 329.0
157 394.0 477.0 312.0 782.0 430.0 281.0 610.0 179.0 468.0 568.0 442.0 574.0 180.0 329.0 331.0
158 387.0 602.0 364.0 778.0 369.0 336.0 665.0 180.0 466.0 524.0 489.0 600.0 175.0 326.0 332.0
159 456.0 639.0 506.0 830.0 337.0 335.0 696.0 181.0 468.0 416.0 654.0 636.0 170.0 324.0 334.0
160 432.0 641.0 644.0 889.0 342.0 333.0 717.0 188.0 1310.0 407.0 844.0 811.0 159.0 324.0 329.0
161 467.0 589.0 628.0 902.0 391.0 362.0 677.0 240.0 2240.0 466.0 670.0 932.0 161.0 324.0 332.0
162 384.0 595.0 644.0 871.0 375.0 339.0 658.0 260.0 1310.0 559.0 745.0 872.0 163.0 330.0 335.0
163 352.0 613.0 510.0 880.0 410.0 325.0 590.0 328.0 988.0 804.0 741.0 775.0 172.0 395.0 326.0
164 435.0 865.0 463.0 839.0 467.0 319.0 611.0 1200.0 797.0 907.0 758.0 829.0 164.0 521.0 297.0
165 547.0 941.0 404.0 739.0 912.0 280.0 695.0 635.0 685.0 899.0 650.0 585.0 164.0 775.0 285.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
166 540.0 763.0 470.0 689.0 965.0 311.0 488.0 429.0 704.0 871.0 745.0 622.0 199.0 835.0 280.0
167 604.0 687.0 547.0 652.0 880.0 397.0 501.0 374.0 820.0 794.0 660.0 715.0 239.0 862.0 276.0
168 628.0 689.0 612.0 744.0 768.0 461.0 539.0 413.0 939.0 943.0 622.0 655.0 328.0 851.0 270.0
169 628.0 723.0 640.0 648.0 794.0 420.0 688.0 531.0 899.0 1010.0 677.0 627.0 442.0 578.0 262.0
170 632.0 600.0 718.0 664.0 862.0 491.0 777.0 616.0 865.0 1260.0 677.0 602.0 388.0 599.0 252.0
171 648.0 503.0 722.0 628.0 1000.0 403.0 907.0 784.0 1070.0 913.0 678.0 681.0 395.0 717.0 247.0
172 693.0 493.0 782.0 574.0 1050.0 453.0 927.0 744.0 1600.0 860.0 673.0 844.0 389.0 813.0 237.0
173 830.0 522.0 1000.0 492.0 1080.0 648.0 1050.0 714.0 1530.0 932.0 541.0 878.0 391.0 821.0 242.0
174 735.0 605.0 706.0 446.0 1140.0 759.0 1010.0 597.0 1530.0 1400.0 633.0 829.0 389.0 866.0 247.0
175 808.0 689.0 722.0 510.0 1190.0 838.0 1010.0 540.0 1330.0 1340.0 688.0 829.0 387.0 829.0 252.0
176 731.0 907.0 739.0 453.0 1220.0 715.0 985.0 505.0 1080.0 1280.0 699.0 913.0 320.0 778.0 285.0
177 612.0 913.0 893.0 463.0 1220.0 862.0 1110.0 506.0 1100.0 1260.0 547.0 827.0 297.0 804.0 319.0
178 578.0 926.0 714.0 563.0 1130.0 955.0 1140.0 536.0 878.0 1330.0 703.0 919.0 275.0 874.0 342.0
179 563.0 972.0 812.0 660.0 1060.0 880.0 1150.0 630.0 924.0 1000.0 767.0 917.0 283.0 820.0 365.0
180 536.0 1180.0 769.0 597.0 1110.0 829.0 1160.0 547.0 1010.0 1180.0 744.0 857.0 265.0 802.0 378.0
181 499.0 1110.0 718.0 585.0 1170.0 798.0 1170.0 594.0 1340.0 953.0 746.0 983.0 264.0 811.0 405.0
182 463.0 932.0 739.0 632.0 1450.0 946.0 1150.0 654.0 978.0 950.0 722.0 889.0 291.0 937.0 417.0
183 477.0 868.0 697.0 582.0 1100.0 828.0 1110.0 765.0 975.0 958.0 729.0 711.0 307.0 872.0 427.0
184 467.0 788.0 765.0 601.0 904.0 737.0 1130.0 1170.0 991.0 1020.0 876.0 720.0 351.0 958.0 437.0
185 418.0 679.0 930.0 585.0 810.0 767.0 1210.0 1020.0 955.0 958.0 892.0 841.0 346.0 764.0 451.0
186 401.0 673.0 1000.0 644.0 794.0 810.0 1340.0 844.0 839.0 912.0 989.0 922.0 420.0 811.0 475.0
187 456.0 740.0 902.0 735.0 778.0 913.0 1390.0 677.0 838.0 865.0 850.0 1020.0 432.0 1140.0 513.0
188 474.0 820.0 862.0 668.0 732.0 893.0 1460.0 655.0 877.0 898.0 848.0 1020.0 471.0 1120.0 542.0
189 495.0 791.0 821.0 660.0 664.0 892.0 1360.0 679.0 1000.0 1100.0 673.0 1060.0 658.0 1190.0 561.0
190 544.0 877.0 875.0 866.0 678.0 991.0 1280.0 640.0 905.0 1120.0 734.0 1320.0 966.0 784.0 578.0
191 555.0 985.0 866.0 853.0 801.0 967.0 1110.0 688.0 1040.0 1080.0 754.0 1240.0 841.0 1020.0 591.0
192 608.0 904.0 830.0 853.0 1120.0 958.0 1040.0 792.0 1090.0 1160.0 741.0 1400.0 908.0 1040.0 624.0
193 601.0 892.0 791.0 821.0 1130.0 986.0 1040.0 752.0 1030.0 1450.0 789.0 1490.0 705.0 1090.0 687.0
194 628.0 895.0 739.0 844.0 1210.0 971.0 1040.0 677.0 1040.0 1540.0 721.0 1220.0 580.0 1250.0 783.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
195 677.0 979.0 765.0 880.0 1380.0 1060.0 1050.0 654.0 1250.0 1460.0 696.0 1070.0 555.0 1340.0 1030.0
196 925.0 1130.0 727.0 1150.0 1610.0 1130.0 1140.0 668.0 1250.0 1700.0 699.0 1040.0 535.0 1430.0 1080.0
197 787.0 1260.0 731.0 953.0 1500.0 1110.0 1260.0 769.0 1290.0 1710.0 682.0 1100.0 511.0 1500.0 1090.0
198 787.0 1260.0 774.0 949.0 1210.0 1020.0 1350.0 789.0 1360.0 1950.0 890.0 1340.0 659.0 1450.0 1100.0
199 761.0 1430.0 835.0 1030.0 1110.0 906.0 1340.0 986.0 1620.0 1690.0 737.0 1320.0 729.0 1470.0 1130.0
200 902.0 1340.0 1160.0 935.0 1080.0 842.0 1430.0 1040.0 1490.0 1400.0 839.0 1350.0 850.0 1270.0 1150.0
201 925.0 1100.0 1320.0 996.0 1230.0 839.0 1560.0 1030.0 1500.0 1400.0 975.0 1330.0 863.0 1120.0 1190.0
202 871.0 1040.0 1580.0 1120.0 1280.0 802.0 1650.0 1080.0 1490.0 1320.0 1130.0 1210.0 781.0 1090.0 1240.0
203 1150.0 1210.0 1410.0 1250.0 1180.0 887.0 1340.0 966.0 1490.0 1290.0 1220.0 1110.0 769.0 986.0 1200.0
204 1330.0 1110.0 1430.0 1220.0 1240.0 875.0 1200.0 967.0 2090.0 1360.0 1150.0 1060.0 701.0 983.0 1400.0
205 1260.0 960.0 1600.0 1200.0 1220.0 976.0 1120.0 983.0 1940.0 1310.0 839.0 1050.0 561.0 928.0 1440.0
206 1140.0 904.0 1420.0 1220.0 1190.0 1350.0 1070.0 1300.0 1460.0 1350.0 784.0 1150.0 594.0 1100.0 1530.0
207 1190.0 935.0 1250.0 967.0 1330.0 1360.0 997.0 1480.0 1340.0 1500.0 704.0 1010.0 659.0 1250.0 1600.0
208 1290.0 991.0 1200.0 893.0 1450.0 1400.0 974.0 1400.0 1350.0 1510.0 685.0 1010.0 713.0 1500.0 1590.0
209 1090.0 907.0 1540.0 821.0 1260.0 1240.0 996.0 1840.0 1410.0 1550.0 693.0 1020.0 897.0 1450.0 1600.0
210 1050.0 926.0 1480.0 848.0 1280.0 1200.0 1050.0 1780.0 1720.0 1310.0 759.0 1110.0 1250.0 1500.0 1610.0
211 1080.0 1020.0 1430.0 889.0 1300.0 1470.0 1020.0 1670.0 1580.0 1540.0 752.0 1050.0 1380.0 1490.0 1580.0
212 1000.0 953.0 1390.0 866.0 1210.0 1330.0 1000.0 1820.0 1620.0 1410.0 767.0 1130.0 1420.0 1440.0 1590.0
213 991.0 883.0 1360.0 1160.0 1150.0 1260.0 1070.0 1600.0 2010.0 1400.0 691.0 1150.0 1460.0 1400.0 1580.0
214 1170.0 907.0 1260.0 1310.0 1180.0 1220.0 1240.0 1330.0 2700.0 1180.0 670.0 1240.0 1410.0 1520.0 1580.0
215 1230.0 1080.0 1180.0 1510.0 1120.0 1540.0 1390.0 1280.0 1710.0 1320.0 867.0 1350.0 1400.0 1570.0 1600.0
216 1370.0 1260.0 1150.0 1590.0 1260.0 1520.0 1600.0 1150.0 1780.0 1390.0 1290.0 1490.0 1350.0 1340.0 1600.0
217 1260.0 1270.0 1130.0 1320.0 1230.0 1320.0 1310.0 1320.0 1520.0 1290.0 1140.0 1390.0 1180.0 1590.0 1610.0
218 1400.0 1600.0 1090.0 1260.0 1470.0 1320.0 1230.0 1520.0 1350.0 1230.0 1170.0 1330.0 1140.0 2080.0 1620.0
219 1250.0 1590.0 1170.0 1230.0 1450.0 1180.0 1560.0 1490.0 1220.0 1160.0 1070.0 1300.0 1360.0 1820.0 1620.0
220 1360.0 1330.0 1150.0 1370.0 1400.0 1160.0 1460.0 1470.0 1160.0 1180.0 1050.0 1230.0 1280.0 1580.0 1580.0
221 1320.0 1150.0 1400.0 1380.0 1480.0 1180.0 1650.0 1380.0 1180.0 1210.0 1090.0 1230.0 1470.0 1360.0 1580.0
222 1240.0 1150.0 1380.0 1320.0 1500.0 1100.0 1830.0 1590.0 1170.0 1240.0 1120.0 1270.0 1570.0 1340.0 1500.0
223 1150.0 1210.0 1360.0 1340.0 1290.0 1170.0 1810.0 1660.0 1330.0 1190.0 1310.0 1210.0 1680.0 1350.0 1490.0
224 1070.0 1090.0 1580.0 1420.0 1620.0 1280.0 1910.0 1830.0 1370.0 1200.0 1150.0 1100.0 1610.0 1350.0 1480.0
225 1170.0 938.0 1310.0 1880.0 1860.0 1660.0 1910.0 1950.0 1340.0 1390.0 1100.0 1080.0 1610.0 1030.0 1480.0
226 1210.0 850.0 1300.0 1920.0 1840.0 1330.0 1720.0 1690.0 1310.0 1460.0 1280.0 1120.0 1490.0 1030.0 1480.0
227 1090.0 829.0 1640.0 1620.0 1760.0 1120.0 1670.0 1360.0 1260.0 1480.0 1310.0 1110.0 1540.0 1300.0 1470.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
228 1250.0 805.0 1840.0 1310.0 1710.0 1000.0 1740.0 1230.0 1310.0 1460.0 1440.0 1180.0 1440.0 1500.0 1460.0
229 1250.0 1000.0 1520.0 1190.0 1720.0 947.0 1740.0 1140.0 1470.0 1480.0 1470.0 1170.0 1390.0 1680.0 1450.0
230 1290.0 901.0 1270.0 1140.0 1700.0 953.0 1580.0 1290.0 1410.0 1270.0 1320.0 1350.0 1390.0 1650.0 1460.0
231 1510.0 898.0 1140.0 1200.0 1680.0 904.0 1740.0 1370.0 1360.0 1310.0 1220.0 1640.0 1450.0 1700.0 1440.0
232 1600.0 1030.0 1090.0 1080.0 1620.0 860.0 1560.0 1410.0 1450.0 1300.0 1250.0 1630.0 1390.0 1710.0 1440.0
233 1520.0 988.0 1060.0 1260.0 1640.0 798.0 1480.0 1370.0 1390.0 1370.0 1520.0 1750.0 1390.0 1430.0 1430.0
234 1580.0 797.0 1280.0 1220.0 1550.0 757.0 1600.0 1380.0 1290.0 1320.0 1350.0 1490.0 1340.0 1310.0 1420.0
235 1580.0 797.0 1420.0 1160.0 1560.0 735.0 1560.0 1560.0 1360.0 1340.0 1640.0 1470.0 1320.0 1180.0 1380.0
236 1420.0 829.0 1380.0 1180.0 1420.0 711.0 1570.0 1410.0 1270.0 1190.0 1650.0 1290.0 1390.0 1140.0 1370.0
237 1400.0 829.0 1700.0 1340.0 1370.0 702.0 1490.0 1320.0 1170.0 1160.0 1630.0 1270.0 1410.0 1070.0 1360.0
238 1340.0 1020.0 1830.0 1270.0 1250.0 639.0 1530.0 1520.0 1220.0 1100.0 1710.0 1310.0 1340.0 961.0 1320.0
239 1450.0 865.0 1780.0 1300.0 1140.0 603.0 1510.0 1570.0 1160.0 1060.0 1530.0 1340.0 1120.0 884.0 1450.0
240 1450.0 850.0 1650.0 1200.0 1150.0 655.0 1520.0 1370.0 1230.0 1010.0 1380.0 1450.0 1050.0 817.0 1390.0
241 1500.0 1020.0 1650.0 1220.0 1200.0 632.0 1400.0 1190.0 1390.0 982.0 1390.0 1400.0 1110.0 771.0 1370.0
242 1540.0 1040.0 1620.0 1240.0 1150.0 639.0 1290.0 1130.0 1380.0 975.0 1420.0 1520.0 778.0 765.0 1380.0
243 1380.0 1020.0 1520.0 1250.0 1200.0 644.0 1200.0 1040.0 1390.0 936.0 1330.0 1460.0 725.0 748.0 1310.0
244 1280.0 1420.0 1500.0 1160.0 1330.0 782.0 1160.0 986.0 1600.0 986.0 1380.0 1360.0 767.0 738.0 1280.0
245 1330.0 1360.0 1450.0 1150.0 1370.0 822.0 1260.0 1020.0 1740.0 792.0 1350.0 1340.0 768.0 798.0 1260.0
246 1240.0 1370.0 1310.0 1020.0 1340.0 779.0 1170.0 1100.0 1690.0 765.0 1230.0 1260.0 732.0 781.0 1250.0
247 1280.0 1380.0 1490.0 972.0 1600.0 731.0 1020.0 1020.0 1500.0 936.0 1220.0 1630.0 685.0 818.0 1240.0
248 1170.0 1380.0 1510.0 1070.0 1520.0 761.0 964.0 909.0 1460.0 890.0 1340.0 1510.0 641.0 787.0 1230.0
249 1100.0 1410.0 1390.0 1560.0 1390.0 853.0 930.0 956.0 1500.0 859.0 1730.0 1460.0 631.0 749.0 1230.0
250 1100.0 1620.0 1260.0 1620.0 1360.0 1050.0 941.0 960.0 1430.0 782.0 1320.0 1340.0 614.0 724.0 1220.0
251 1100.0 1360.0 1160.0 1410.0 1350.0 1120.0 896.0 899.0 1320.0 742.0 1290.0 1220.0 598.0 741.0 1210.0
252 1050.0 1330.0 1080.0 1370.0 1310.0 985.0 860.0 955.0 1420.0 685.0 1300.0 1180.0 578.0 751.0 1200.0
253 1020.0 1240.0 1040.0 1170.0 1280.0 920.0 830.0 963.0 1500.0 663.0 1260.0 1240.0 579.0 649.0 1180.0
254 1500.0 1150.0 1010.0 1060.0 1140.0 922.0 829.0 1000.0 1650.0 632.0 1280.0 1140.0 588.0 662.0 1180.0
255 1460.0 1130.0 982.0 972.0 1080.0 1160.0 816.0 1000.0 1560.0 603.0 1190.0 1070.0 718.0 656.0 1150.0
256 1390.0 1450.0 911.0 893.0 1040.0 1000.0 767.0 1020.0 1380.0 647.0 1040.0 1020.0 667.0 603.0 1130.0
257 1250.0 1210.0 857.0 844.0 1060.0 895.0 762.0 1020.0 1240.0 759.0 1050.0 1420.0 564.0 607.0 1080.0
258 1160.0 1220.0 804.0 795.0 1010.0 817.0 732.0 1090.0 1150.0 778.0 1010.0 1180.0 546.0 652.0 1060.0
259 1100.0 1060.0 808.0 774.0 1030.0 755.0 829.0 1100.0 1100.0 727.0 953.0 1190.0 544.0 833.0 1020.0
260 1220.0 1030.0 791.0 718.0 1040.0 734.0 686.0 1060.0 1040.0 678.0 889.0 1240.0 500.0 782.0 611.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
261 1050.0 979.0 744.0 673.0 1000.0 739.0 706.0 974.0 1060.0 570.0 856.0 1300.0 480.0 681.0 603.0
262 935.0 901.0 718.0 640.0 930.0 667.0 644.0 921.0 1070.0 539.0 807.0 1160.0 441.0 644.0 594.0
263 853.0 862.0 718.0 612.0 842.0 637.0 689.0 866.0 1180.0 514.0 781.0 1060.0 442.0 589.0 592.0
264 778.0 829.0 652.0 585.0 791.0 625.0 820.0 827.0 975.0 505.0 728.0 988.0 419.0 587.0 585.0
265 718.0 808.0 616.0 563.0 762.0 652.0 761.0 795.0 910.0 480.0 675.0 1040.0 386.0 556.0 583.0
266 681.0 808.0 578.0 570.0 718.0 582.0 737.0 826.0 872.0 460.0 680.0 975.0 377.0 544.0 582.0
267 632.0 947.0 551.0 559.0 688.0 536.0 903.0 788.0 831.0 406.0 670.0 972.0 815.0 640.0 579.0
268 597.0 811.0 532.0 547.0 659.0 515.0 788.0 746.0 787.0 418.0 670.0 972.0 830.0 970.0 570.0
269 570.0 740.0 518.0 510.0 632.0 506.0 727.0 711.0 744.0 419.0 679.0 938.0 835.0 970.0 562.0
270 559.0 754.0 488.0 492.0 608.0 482.0 679.0 672.0 720.0 410.0 555.0 893.0 839.0 965.0 556.0
271 536.0 728.0 481.0 492.0 594.0 463.0 653.0 645.0 688.0 393.0 529.0 804.0 825.0 938.0 540.0
272 521.0 684.0 463.0 481.0 587.0 444.0 690.0 628.0 671.0 387.0 526.0 778.0 421.0 815.0 535.0
273 514.0 639.0 456.0 463.0 560.0 423.0 764.0 616.0 643.0 380.0 493.0 777.0 452.0 584.0 515.0
274 510.0 600.0 446.0 442.0 534.0 411.0 700.0 598.0 611.0 384.0 471.0 735.0 426.0 555.0 503.0
275 485.0 582.0 442.0 428.0 509.0 393.0 673.0 592.0 599.0 368.0 465.0 715.0 399.0 568.0 484.0
276 477.0 557.0 421.0 418.0 511.0 385.0 651.0 627.0 580.0 361.0 443.0 690.0 400.0 518.0 459.0
277 449.0 527.0 401.0 401.0 487.0 380.0 627.0 671.0 564.0 354.0 427.0 596.0 425.0 503.0 445.0
278 421.0 503.0 391.0 384.0 521.0 364.0 578.0 689.0 554.0 348.0 418.0 566.0 418.0 502.0 419.0
279 411.0 482.0 381.0 381.0 1260.0 352.0 552.0 717.0 539.0 342.0 414.0 544.0 433.0 499.0 407.0
280 401.0 473.0 368.0 368.0 953.0 347.0 519.0 1360.0 530.0 327.0 413.0 524.0 392.0 499.0 398.0
281 384.0 453.0 358.0 361.0 718.0 347.0 482.0 1100.0 518.0 324.0 395.0 503.0 365.0 499.0 389.0
282 371.0 442.0 349.0 355.0 620.0 342.0 470.0 863.0 495.0 326.0 388.0 492.0 360.0 499.0 379.0
283 364.0 436.0 352.0 355.0 570.0 330.0 454.0 755.0 446.0 320.0 368.0 485.0 354.0 499.0 373.0
284 361.0 425.0 349.0 352.0 544.0 321.0 441.0 685.0 458.0 318.0 359.0 481.0 328.0 499.0 371.0
285 349.0 416.0 335.0 344.0 520.0 315.0 415.0 629.0 443.0 317.0 351.0 437.0 330.0 492.0 359.0
286 442.0 392.0 329.0 338.0 504.0 304.0 408.0 593.0 402.0 315.0 343.0 423.0 485.0 489.0 353.0
287 428.0 381.0 320.0 320.0 480.0 297.0 402.0 556.0 389.0 316.0 337.0 412.0 415.0 486.0 344.0
288 378.0 372.0 309.0 318.0 476.0 293.0 387.0 535.0 379.0 315.0 332.0 395.0 369.0 486.0 333.0
289 352.0 366.0 303.0 315.0 437.0 290.0 381.0 529.0 376.0 308.0 326.0 388.0 380.0 486.0 327.0
290 341.0 362.0 300.0 312.0 429.0 281.0 395.0 527.0 375.0 303.0 321.0 372.0 324.0 439.0 319.0
291 335.0 339.0 290.0 309.0 429.0 277.0 575.0 460.0 374.0 294.0 305.0 371.0 318.0 334.0 313.0
292 329.0 331.0 284.0 292.0 391.0 271.0 602.0 441.0 366.0 284.0 301.0 368.0 307.0 334.0 306.0
293 315.0 325.0 281.0 287.0 381.0 270.0 485.0 428.0 360.0 269.0 300.0 365.0 300.0 332.0 301.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
294 306.0 314.0 279.0 279.0 372.0 268.0 440.0 417.0 357.0 257.0 294.0 334.0 297.0 329.0 300.0
295 303.0 308.0 273.0 271.0 361.0 262.0 420.0 397.0 351.0 249.0 292.0 332.0 300.0 330.0 298.0
296 300.0 304.0 268.0 271.0 353.0 260.0 403.0 383.0 346.0 248.0 294.0 331.0 297.0 329.0 298.0
297 292.0 298.0 268.0 266.0 349.0 255.0 388.0 376.0 336.0 246.0 289.0 329.0 289.0 329.0 298.0
298 284.0 294.0 263.0 260.0 342.0 254.0 377.0 368.0 330.0 241.0 284.0 316.0 277.0 326.0 297.0
299 281.0 290.0 258.0 255.0 335.0 252.0 373.0 359.0 325.0 241.0 282.0 308.0 277.0 324.0 296.0
300 276.0 280.0 255.0 250.0 343.0 244.0 366.0 347.0 312.0 238.0 277.0 306.0 273.0 324.0 286.0
301 273.0 275.0 253.0 245.0 356.0 247.0 353.0 353.0 308.0 237.0 272.0 304.0 263.0 324.0 269.0
302 266.0 271.0 248.0 245.0 374.0 247.0 343.0 342.0 305.0 227.0 254.0 303.0 261.0 324.0 256.0
303 263.0 268.0 245.0 243.0 353.0 245.0 338.0 333.0 300.0 225.0 250.0 300.0 245.0 324.0 239.0
304 260.0 266.0 233.0 235.0 331.0 240.0 332.0 320.0 297.0 225.0 245.0 300.0 243.0 278.0 223.0
305 255.0 264.0 233.0 233.0 322.0 229.0 321.0 307.0 294.0 213.0 238.0 270.0 241.0 278.0 216.0
306 253.0 259.0 228.0 230.0 315.0 224.0 313.0 301.0 288.0 211.0 231.0 268.0 236.0 276.0 212.0
307 253.0 254.0 225.0 220.0 307.0 220.0 310.0 299.0 286.0 209.0 230.0 265.0 231.0 276.0 211.0
308 250.0 252.0 223.0 220.0 302.0 218.0 305.0 294.0 282.0 207.0 228.0 261.0 228.0 276.0 209.0
309 248.0 251.0 218.0 215.0 297.0 211.0 301.0 286.0 277.0 203.0 227.0 256.0 222.0 276.0 207.0
310 240.0 247.0 213.0 218.0 290.0 206.0 300.0 280.0 272.0 198.0 222.0 241.0 220.0 276.0 206.0
311 233.0 241.0 211.0 215.0 286.0 203.0 298.0 275.0 266.0 206.0 218.0 239.0 215.0 276.0 204.0
312 230.0 238.0 208.0 211.0 281.0 199.0 297.0 269.0 264.0 205.0 215.0 238.0 213.0 276.0 202.0
313 225.0 234.0 206.0 201.0 276.0 196.0 294.0 263.0 262.0 205.0 213.0 236.0 209.0 247.0 202.0
314 223.0 230.0 206.0 206.0 271.0 208.0 282.0 262.0 257.0 205.0 209.0 230.0 205.0 247.0 200.0
315 223.0 228.0 203.0 273.0 269.0 212.0 271.0 254.0 253.0 192.0 207.0 227.0 205.0 245.0 197.0
316 220.0 225.0 199.0 260.0 263.0 208.0 264.0 251.0 254.0 192.0 205.0 225.0 203.0 245.0 195.0
317 215.0 223.0 196.0 233.0 254.0 203.0 262.0 248.0 251.0 192.0 203.0 223.0 194.0 245.0 190.0
318 211.0 218.0 194.0 215.0 250.0 201.0 263.0 246.0 241.0 190.0 203.0 220.0 184.0 245.0 188.0
319 208.0 213.0 190.0 208.0 250.0 196.0 258.0 238.0 238.0 190.0 200.0 217.0 182.0 212.0 185.0
320 208.0 211.0 192.0 206.0 245.0 196.0 254.0 236.0 235.0 190.0 200.0 214.0 182.0 212.0 184.0
321 206.0 208.0 190.0 206.0 243.0 193.0 252.0 234.0 227.0 186.0 200.0 212.0 180.0 212.0 182.0
322 201.0 205.0 185.0 199.0 240.0 190.0 251.0 231.0 227.0 186.0 200.0 210.0 180.0 208.0 181.0
323 201.0 202.0 185.0 194.0 236.0 183.0 262.0 225.0 225.0 180.0 198.0 208.0 184.0 208.0 179.0
324 199.0 200.0 183.0 192.0 233.0 182.0 285.0 222.0 222.0 180.0 196.0 207.0 182.0 208.0 178.0
325 194.0 199.0 183.0 192.0 230.0 179.0 265.0 217.0 218.0 178.0 195.0 205.0 182.0 208.0 176.0
326 194.0 199.0 178.0 185.0 229.0 174.0 257.0 212.0 216.0 176.0 193.0 205.0 180.0 210.0 174.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
327 192.0 197.0 176.0 185.0 220.0 173.0 250.0 212.0 215.0 172.0 191.0 203.0 180.0 210.0 172.0
328 194.0 194.0 176.0 185.0 220.0 172.0 244.0 212.0 210.0 168.0 189.0 200.0 180.0 210.0 170.0
329 190.0 192.0 174.0 183.0 216.0 172.0 239.0 210.0 209.0 167.0 187.0 197.0 180.0 195.0 167.0
330 185.0 191.0 171.0 178.0 215.0 200.0 233.0 210.0 207.0 164.0 185.0 196.0 182.0 193.0 165.0
331 183.0 187.0 165.0 176.0 211.0 208.0 231.0 201.0 205.0 163.0 184.0 193.0 157.0 189.0 163.0
332 183.0 186.0 165.0 180.0 208.0 186.0 221.0 198.0 204.0 164.0 183.0 191.0 157.0 187.0 159.0
333 180.0 186.0 167.0 171.0 206.0 180.0 219.0 198.0 207.0 164.0 181.0 188.0 155.0 187.0 158.0
334 180.0 184.0 165.0 169.0 196.0 174.0 215.0 196.0 205.0 163.0 179.0 178.0 154.0 179.0 156.0
335 176.0 183.0 165.0 169.0 193.0 204.0 213.0 196.0 205.0 163.0 172.0 172.0 152.0 166.0 155.0
336 174.0 181.0 160.0 165.0 190.0 185.0 213.0 194.0 203.0 162.0 171.0 172.0 148.0 165.0 154.0
337 174.0 178.0 158.0 165.0 190.0 182.0 210.0 191.0 202.0 157.0 170.0 172.0 143.0 165.0 154.0
338 174.0 177.0 160.0 165.0 188.0 175.0 210.0 192.0 197.0 156.0 168.0 172.0 141.0 165.0 153.0
339 169.0 175.0 158.0 163.0 187.0 172.0 209.0 188.0 192.0 155.0 164.0 170.0 148.0 165.0 152.0
340 169.0 174.0 160.0 160.0 186.0 167.0 207.0 187.0 190.0 157.0 161.0 168.0 150.0 165.0 151.0
341 167.0 172.0 154.0 158.0 183.0 167.0 205.0 186.0 188.0 156.0 159.0 166.0 149.0 165.0 150.0
342 165.0 171.0 154.0 156.0 183.0 165.0 205.0 185.0 186.0 156.0 157.0 164.0 149.0 165.0 150.0
343 165.0 171.0 152.0 156.0 180.0 170.0 205.0 183.0 184.0 156.0 155.0 164.0 148.0 165.0 149.0
344 165.0 169.0 150.0 158.0 178.0 337.0 196.0 181.0 183.0 156.0 151.0 164.0 147.0 167.0 148.0
345 163.0 168.0 146.0 156.0 177.0 211.0 193.0 178.0 181.0 155.0 152.0 164.0 147.0 167.0 148.0
346 167.0 166.0 140.0 156.0 174.0 191.0 192.0 175.0 179.0 154.0 153.0 161.0 147.0 167.0 148.0
347 156.0 163.0 140.0 152.0 174.0 190.0 194.0 173.0 178.0 149.0 152.0 159.0 147.0 169.0 148.0
348 154.0 160.0 140.0 148.0 171.0 198.0 187.0 171.0 177.0 143.0 149.0 157.0 146.0 169.0 147.0
349 152.0 159.0 140.0 148.0 169.0 184.0 188.0 169.0 175.0 143.0 147.0 157.0 145.0 169.0 146.0
350 152.0 157.0 140.0 148.0 167.0 175.0 188.0 167.0 174.0 145.0 145.0 157.0 143.0 169.0 146.0
351 150.0 157.0 136.0 144.0 165.0 174.0 188.0 163.0 174.0 143.0 143.0 155.0 140.0 167.0 146.0
352 148.0 156.0 136.0 144.0 163.0 171.0 181.0 162.0 172.0 145.0 141.0 155.0 139.0 167.0 145.0
353 148.0 156.0 136.0 144.0 171.0 166.0 178.0 161.0 172.0 143.0 139.0 154.0 138.0 167.0 145.0
354 148.0 154.0 134.0 142.0 160.0 165.0 172.0 160.0 171.0 142.0 138.0 153.0 137.0 164.0 145.0
355 146.0 154.0 134.0 142.0 157.0 164.0 174.0 158.0 166.0 142.0 136.0 152.0 137.0 156.0 143.0
356 146.0 153.0 132.0 142.0 156.0 162.0 172.0 156.0 164.0 139.0 134.0 150.0 135.0 154.0 143.0
357 144.0 151.0 132.0 142.0 154.0 157.0 168.0 156.0 164.0 139.0 134.0 149.0 134.0 154.0 143.0
358 140.0 148.0 130.0 140.0 156.0 156.0 167.0 157.0 164.0 140.0 135.0 148.0 134.0 154.0 143.0
359 140.0 148.0 130.0 136.0 156.0 155.0 169.0 156.0 163.0 139.0 136.0 145.0 133.0 154.0 141.0
Annex A 1.1

Daily observed Discharge (in m3/sec) at Asaraghat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
360 142.0 145.0 130.0 136.0 155.0 151.0 166.0 155.0 164.0 138.0 137.0 143.0 132.0 154.0 141.0
361 140.0 145.0 130.0 134.0 154.0 151.0 161.0 155.0 161.0 137.0 136.0 142.0 132.0 154.0 140.0
362 140.0 144.0 130.0 140.0 154.0 149.0 165.0 154.0 161.0 133.0 136.0 141.0 133.0 154.0 139.0
363 138.0 144.0 128.0 134.0 150.0 150.0 165.0 154.0 161.0 133.0 135.0 139.0 131.0 154.0 137.0
364 136.0 144.0 125.0 132.0 148.0 147.0 164.0 152.0 161.0 132.0 135.0 138.0 130.0 154.0 137.0
365 134.0 143.0 127.0 132.0 148.0 144.0 163.0 151.0 157.0 130.0 135.0 138.0 130.0 154.0 136.0
366 136.0 145.0 155.0 129.0
ANNEX 1.2- Daily Observed Discharge (in
m3/sec) at Lalighat Gauge Station
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
1 104.0 91.9 92.4 106.0 96.8 132.0 107.0 111.0 76.7 117.0 101.0 93.6 96.0 98.2 99.0
2 90.3 91.4 92.4 108.0 96.8 131.0 108.0 110.0 77.5 117.0 101.0 93.6 96.0 97.1 94.4
3 90.3 90.8 92.4 112.0 96.8 129.0 106.0 110.0 79.6 116.0 99.4 93.6 94.6 97.1 96.7
4 90.3 90.3 92.1 110.0 96.8 126.0 104.0 109.0 82.6 114.0 98.2 92.4 94.6 95.9 94.8
5 90.3 90.8 91.4 106.0 96.8 132.0 103.0 109.0 86.5 111.0 97.1 92.4 94.6 95.9 92.4
6 88.2 90.3 88.5 104.0 96.8 132.0 103.0 109.0 90.4 108.0 95.9 92.4 103.0 94.8 92.4
7 88.2 89.2 89.2 104.0 96.8 130.0 102.0 107.0 94.2 105.0 95.9 91.4 97.4 94.8 92.4
8 87.1 89.2 87.1 103.0 96.8 129.0 102.0 107.0 102.0 103.0 94.8 91.4 149.0 93.6 92.4
9 87.1 87.6 87.1 103.0 95.0 131.0 100.0 106.0 100.0 103.0 92.4 90.3 86.5 93.6 93.2
10 87.1 88.2 87.1 103.0 93.2 133.0 98.8 106.0 97.4 102.0 92.4 90.3 90.0 92.4 91.0
11 87.1 87.1 86.0 101.0 91.3 130.0 97.9 104.0 94.6 102.0 92.4 89.2 87.3 92.4 88.9
12 88.2 83.9 86.0 101.0 89.5 128.0 97.4 104.0 91.8 102.0 91.4 88.2 113.0 92.4 87.8
13 87.1 87.1 86.0 98.7 87.7 126.0 96.0 104.0 93.7 100.0 91.4 87.1 103.0 91.4 86.7
14 86.0 87.1 86.0 98.7 85.9 124.0 94.6 103.0 100.0 100.0 90.3 89.9 103.0 91.4 86.0
15 86.0 87.1 86.0 98.7 84.1 123.0 93.2 103.0 96.9 100.0 90.3 88.2 106.0 91.4 87.1
16 84.9 82.8 86.0 96.8 82.2 121.0 93.2 103.0 98.8 98.8 92.4 87.1 109.0 90.3 87.1
17 83.9 82.3 86.0 116.0 80.4 118.0 91.8 104.0 98.8 98.8 113.0 85.7 102.0 90.3 87.1
18 82.8 81.7 86.0 116.0 78.6 117.0 90.4 104.0 99.3 98.8 102.0 84.6 96.5 89.2 86.0
19 81.7 81.7 87.1 95.0 78.6 117.0 89.0 103.0 98.8 97.4 98.2 83.9 94.6 89.2 86.0
20 81.7 81.2 84.9 95.0 76.9 115.0 88.2 102.0 98.8 97.4 98.2 83.9 93.7 88.2 86.0
21 81.7 80.7 84.9 93.2 75.2 115.0 87.8 102.0 97.4 96.0 98.2 82.8 92.8 88.2 84.9
22 81.7 80.2 83.2 91.3 73.5 112.0 89.0 100.0 94.2 96.0 95.9 82.8 90.4 87.1 84.9
23 81.7 80.7 82.1 89.5 73.5 114.0 89.0 100.0 93.2 94.6 95.9 81.7 91.8 87.1 83.9
24 81.7 79.7 81.7 87.7 71.8 115.0 89.0 98.8 93.2 93.2 94.8 81.1 91.8 87.1 83.9
25 83.9 79.7 81.7 85.9 70.2 118.0 87.8 98.8 91.8 91.8 94.8 80.7 91.8 87.1 82.8
26 86.0 79.7 81.7 84.1 70.2 121.0 86.9 97.4 90.4 90.4 94.0 79.7 90.4 86.0 82.8
27 87.1 80.2 80.7 84.1 68.5 123.0 86.5 97.4 90.4 89.0 92.4 78.7 90.4 86.0 81.7
28 81.7 78.7 80.7 84.1 68.5 117.0 92.8 96.0 89.0 89.0 92.4 77.7 89.0 86.0 82.8
29 81.7 78.7 80.1 82.2 66.8 119.0 101.0 96.0 89.0 87.8 89.2 76.7 89.0 84.9 82.8
30 83.3 78.7 79.7 82.2 65.1 120.0 94.2 94.6 87.8 87.8 90.7 75.7 89.0 84.9 81.7
31 86.0 78.7 79.7 80.4 63.4 122.0 88.6 93.2 87.8 86.5 89.2 75.7 89.0 84.9 81.7
32 83.9 77.7 79.7 78.6 63.4 123.0 91.8 91.8 86.5 86.5 88.2 74.7 87.8 84.9 81.7
33 83.3 77.7 79.7 78.6 61.7 119.0 89.0 90.4 86.5 85.2 87.1 74.7 87.8 83.9 80.7
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
34 82.8 76.7 79.7 79.8 61.7 120.0 89.0 89.0 85.2 83.9 86.0 73.7 87.8 83.9 80.7
35 82.8 77.2 79.7 84.7 61.7 118.0 88.2 89.0 85.2 83.9 86.0 73.7 89.0 83.9 81.7
36 86.0 75.7 79.7 80.4 60.2 117.0 87.3 85.2 83.1 82.6 84.9 73.7 91.8 82.8 79.7
37 82.8 76.7 79.7 80.4 60.2 117.0 86.5 81.4 82.6 81.4 83.9 72.7 91.8 82.8 78.7
38 80.7 75.7 78.7 78.6 58.6 115.0 86.5 76.3 82.6 80.1 82.8 72.7 87.8 81.7 78.7
39 80.7 76.7 78.7 78.6 58.6 113.0 86.5 72.6 80.9 78.8 81.7 72.7 87.8 84.9 78.7
40 80.7 77.7 78.7 78.6 58.6 114.0 85.2 70.6 79.6 77.5 79.4 78.0 86.5 83.9 77.7
41 80.7 77.2 78.7 76.9 57.0 112.0 85.2 67.0 78.4 86.0 78.0 72.7 86.5 83.9 77.7
42 81.7 80.2 78.7 76.9 57.0 118.0 83.9 63.1 77.5 80.5 78.7 80.7 83.9 86.0 86.7
43 80.7 78.7 77.7 76.9 57.0 117.0 83.9 63.5 76.2 77.5 78.7 80.7 82.6 84.9 84.2
44 80.7 77.2 76.7 78.6 57.0 115.0 85.6 61.6 75.0 76.2 78.7 77.7 82.6 84.2 81.7
45 82.3 78.2 76.7 78.6 55.5 113.0 89.0 60.2 73.0 75.8 77.7 79.7 81.4 94.4 81.7
46 81.7 77.7 76.7 85.9 58.6 110.0 86.0 59.1 71.4 74.6 77.7 81.7 81.4 87.1 80.7
47 81.7 78.7 76.7 89.5 61.7 112.0 83.9 57.6 69.4 73.8 89.6 77.4 81.4 84.9 80.7
48 81.7 75.7 76.7 82.2 61.7 114.0 82.6 57.2 67.8 71.4 119.0 75.4 80.1 86.0 79.7
49 81.2 93.0 76.7 78.6 61.7 112.0 82.6 58.7 67.0 70.2 112.0 73.7 80.1 87.1 79.7
50 80.7 81.7 77.7 78.6 61.7 109.0 82.6 58.7 65.0 69.0 102.0 73.7 80.1 85.7 79.7
51 79.7 76.7 88.9 76.9 61.7 110.0 81.4 59.8 63.5 67.8 86.7 76.4 78.8 83.9 79.7
52 80.2 92.4 76.7 76.9 60.2 109.0 81.4 65.4 60.9 66.6 84.6 75.0 78.8 81.7 79.7
53 77.7 81.7 79.7 78.6 60.2 109.0 81.4 59.4 60.9 65.4 82.8 81.1 76.2 80.7 79.7
54 77.7 75.7 79.7 78.6 60.2 110.0 80.1 56.1 60.9 66.6 82.8 86.0 76.2 80.7 79.7
55 77.7 78.7 76.7 78.6 60.2 109.0 79.2 56.5 59.8 65.4 83.9 83.9 76.2 81.4 79.7
56 78.7 80.7 76.7 76.9 58.6 109.0 77.5 69.0 62.0 65.4 84.9 81.7 78.8 81.7 79.7
57 77.2 79.2 77.7 76.9 58.6 109.0 76.2 67.4 62.0 65.4 83.9 79.4 81.4 81.4 79.7
58 76.7 78.7 76.7 75.2 58.6 110.0 76.2 73.0 64.2 65.4 85.3 84.9 81.4 80.7 79.7
59 76.7 79.7 75.7 85.9 57.0 114.0 75.0 86.0 64.6 64.2 84.2 94.4 82.6 81.7 79.7
60 77.7 80.2 75.7 93.2 65.1 120.0 75.0 94.6 66.6 64.2 83.2 84.6 82.6 91.0 79.7
61 78.7 79.7 75.7 102.0 57.0 119.0 76.7 100.0 68.2 64.2 82.8 82.8 82.6 82.8 79.7
62 79.7 79.2 76.7 89.5 57.0 118.0 86.5 95.5 67.0 63.1 81.7 85.3 83.9 88.2 79.7
63 79.7 87.1 80.4 85.9 55.5 101.0 82.2 100.0 67.8 63.1 81.7 83.5 83.9 87.1 79.7
64 79.7 81.2 79.7 87.7 58.6 139.0 79.2 98.3 68.6 64.2 81.7 86.0 83.9 87.4 79.7
65 80.2 79.7 80.7 95.0 61.7 136.0 77.1 101.0 70.2 66.6 81.7 87.4 85.2 84.6 79.7
66 80.7 79.2 89.2 119.0 61.7 132.0 80.9 103.0 69.8 67.8 83.9 87.8 85.2 85.7 81.7
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
67 79.7 82.8 81.7 116.0 70.2 125.0 87.8 101.0 68.2 69.0 83.9 87.4 85.2 86.4 90.3
68 82.8 82.3 73.7 102.0 71.8 120.0 102.0 97.9 65.4 70.2 82.8 86.7 82.6 86.4 92.9
69 83.9 76.7 73.7 95.6 63.4 115.0 103.0 95.5 66.6 73.0 82.8 103.0 82.6 87.1 89.2
70 84.9 87.6 73.7 89.5 61.7 117.0 89.1 103.0 67.4 76.7 81.7 97.8 83.9 86.0 88.2
71 84.9 90.3 81.7 89.5 58.1 117.0 89.0 104.0 65.8 74.2 81.7 98.2 83.9 83.9 87.1
72 81.7 81.8 98.2 87.7 55.0 116.0 83.1 102.0 66.6 71.8 81.7 132.0 85.2 83.9 84.9
73 81.7 81.7 98.2 85.9 53.4 118.0 81.8 101.0 65.8 70.2 81.7 110.0 85.2 86.7 93.6
74 80.7 83.9 94.8 85.9 53.4 137.0 89.0 99.7 63.5 76.7 81.7 98.6 83.9 92.1 96.3
75 80.7 81.7 92.4 87.7 58.1 143.0 103.0 103.0 62.8 82.6 82.8 95.9 83.9 98.6 97.8
76 80.7 80.7 92.4 93.2 60.2 165.0 89.0 112.0 62.0 83.9 83.9 93.6 83.9 113.0 93.7
77 80.7 90.3 104.0 95.0 60.2 157.0 91.4 116.0 60.5 86.9 87.1 96.3 85.2 109.0 90.7
78 76.7 143.0 95.9 93.2 61.2 147.0 89.5 124.0 59.8 90.4 84.9 95.1 86.5 105.0 111.0
79 75.7 134.0 92.4 93.2 66.8 151.0 107.0 117.0 59.1 91.8 83.5 97.8 89.0 102.0 112.0
80 78.7 105.0 92.4 96.8 88.9 154.0 90.0 108.0 58.7 83.5 84.6 94.8 103.0 98.6 109.0
81 77.7 98.2 93.6 110.0 88.3 165.0 80.5 90.9 59.8 81.4 82.8 94.0 103.0 107.0 105.0
82 77.7 94.2 98.2 126.0 55.5 166.0 77.1 103.0 59.8 80.1 83.5 96.7 107.0 123.0 89.9
83 83.3 97.1 98.2 133.0 52.9 176.0 85.2 118.0 70.2 78.8 84.6 99.0 97.9 109.0 114.0
84 86.0 97.6 99.4 130.0 49.8 179.0 109.0 131.0 79.6 77.5 87.1 104.0 103.0 107.0 112.0
85 86.0 94.2 97.1 116.0 46.7 165.0 98.3 146.0 71.0 76.2 94.4 117.0 95.5 104.0 107.0
86 86.0 93.0 93.6 110.0 45.7 154.0 102.0 153.0 71.8 82.2 92.5 123.0 91.4 102.0 115.0
87 88.2 110.0 98.2 116.0 48.3 147.0 101.0 139.0 75.0 92.8 86.7 119.0 104.0 105.0 136.0
88 82.9 94.8 104.0 108.0 52.4 167.0 96.9 126.0 79.2 92.3 88.2 114.0 102.0 119.0 148.0
89 77.7 94.2 111.0 113.0 64.5 198.0 101.0 118.0 77.9 93.7 101.0 110.0 96.0 112.0 162.0
90 76.7 91.4 114.0 121.0 84.1 225.0 99.7 151.0 75.8 95.5 110.0 116.0 93.7 117.0 159.0
91 87.1 89.2 114.0 116.0 75.8 265.0 98.8 147.0 69.4 93.7 115.0 122.0 95.1 116.0 164.0
92 97.6 88.7 121.0 114.0 67.3 263.0 106.0 148.0 69.8 77.9 111.0 120.0 111.0 114.0 153.0
93 98.2 97.6 127.0 122.0 61.2 256.0 103.0 146.0 68.6 77.1 108.0 112.0 107.0 114.0 151.0
94 97.1 103.0 127.0 127.0 68.5 277.0 110.0 137.0 72.6 84.8 105.0 115.0 105.0 109.0 144.0
95 107.0 103.0 123.0 129.0 65.1 249.0 110.0 124.0 64.3 82.6 98.6 117.0 105.0 119.0 137.0
96 110.0 113.0 117.0 127.0 61.2 236.0 120.0 121.0 64.2 86.0 102.0 129.0 103.0 122.0 131.0
97 105.0 116.0 112.0 126.0 59.1 224.0 122.0 110.0 65.4 84.8 113.0 135.0 108.0 132.0 135.0
98 85.5 115.0 111.0 154.0 79.9 214.0 137.0 103.0 66.6 87.3 126.0 152.0 119.0 128.0 131.0
99 80.7 116.0 131.0 159.0 88.3 206.0 122.0 103.0 67.8 91.4 139.0 175.0 128.0 135.0 147.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
100 80.2 124.0 148.0 170.0 101.0 205.0 118.0 108.0 110.0 103.0 124.0 186.0 134.0 143.0 144.0
101 84.4 156.0 140.0 178.0 111.0 226.0 120.0 111.0 84.3 125.0 113.0 190.0 122.0 165.0 131.0
102 78.2 158.0 152.0 190.0 137.0 232.0 103.0 106.0 86.0 161.0 104.0 195.0 106.0 180.0 133.0
103 78.7 165.0 157.0 210.0 164.0 238.0 106.0 99.3 105.0 164.0 96.3 235.0 109.0 187.0 128.0
104 80.7 190.0 166.0 168.0 184.0 256.0 105.0 95.5 96.5 156.0 92.9 234.0 104.0 170.0 190.0
105 83.3 214.0 174.0 160.0 240.0 246.0 103.0 106.0 100.0 168.0 92.4 226.0 116.0 152.0 180.0
106 78.7 220.0 168.0 173.0 200.0 259.0 117.0 129.0 92.8 179.0 97.5 196.0 113.0 157.0 174.0
107 78.2 227.0 153.0 179.0 202.0 256.0 142.0 158.0 97.9 198.0 100.0 191.0 113.0 164.0 169.0
108 83.9 178.0 156.0 176.0 170.0 240.0 179.0 149.0 108.0 174.0 106.0 193.0 114.0 172.0 176.0
109 91.4 156.0 178.0 188.0 138.0 245.0 158.0 163.0 118.0 154.0 110.0 183.0 114.0 199.0 162.0
110 84.4 149.0 186.0 229.0 126.0 228.0 140.0 164.0 128.0 163.0 117.0 190.0 116.0 189.0 169.0
111 81.2 146.0 183.0 246.0 163.0 238.0 136.0 154.0 144.0 181.0 149.0 187.0 117.0 188.0 164.0
112 87.6 158.0 178.0 318.0 188.0 242.0 141.0 144.0 152.0 206.0 213.0 192.0 118.0 195.0 187.0
113 91.4 158.0 168.0 360.0 209.0 272.0 142.0 135.0 161.0 215.0 174.0 187.0 125.0 198.0 174.0
114 90.3 142.0 172.0 312.0 165.0 309.0 148.0 124.0 184.0 232.0 172.0 184.0 127.0 207.0 160.0
115 88.2 160.0 182.0 318.0 156.0 329.0 166.0 98.3 176.0 272.0 180.0 189.0 130.0 227.0 167.0
116 93.6 175.0 208.0 328.0 154.0 316.0 174.0 123.0 163.0 238.0 143.0 217.0 119.0 240.0 180.0
117 104.0 188.0 247.0 383.0 185.0 322.0 219.0 181.0 102.0 189.0 135.0 203.0 119.0 243.0 206.0
118 112.0 192.0 298.0 366.0 210.0 295.0 220.0 198.0 103.0 167.0 142.0 184.0 126.0 223.0 241.0
119 112.0 200.0 336.0 369.0 256.0 282.0 227.0 189.0 105.0 149.0 185.0 229.0 120.0 192.0 263.0
120 121.0 220.0 326.0 369.0 230.0 267.0 236.0 186.0 125.0 135.0 217.0 249.0 122.0 185.0 285.0
121 114.0 243.0 303.0 342.0 215.0 266.0 220.0 173.0 162.0 181.0 237.0 287.0 127.0 172.0 309.0
122 106.0 260.0 326.0 340.0 261.0 308.0 219.0 159.0 177.0 181.0 276.0 361.0 137.0 160.0 274.0
123 109.0 298.0 341.0 448.0 294.0 353.0 197.0 158.0 164.0 193.0 254.0 386.0 132.0 166.0 260.0
124 94.2 315.0 350.0 600.0 353.0 349.0 226.0 173.0 150.0 192.0 220.0 350.0 138.0 176.0 257.0
125 97.1 365.0 298.0 671.0 370.0 376.0 283.0 198.0 137.0 186.0 208.0 283.0 142.0 170.0 254.0
126 99.4 412.0 266.0 651.0 384.0 451.0 276.0 262.0 131.0 189.0 220.0 259.0 145.0 166.0 312.0
127 110.0 411.0 232.0 521.0 271.0 466.0 293.0 318.0 125.0 184.0 217.0 230.0 159.0 174.0 306.0
128 109.0 421.0 250.0 576.0 255.0 447.0 370.0 371.0 123.0 236.0 206.0 245.0 180.0 214.0 327.0
129 108.0 426.0 303.0 569.0 278.0 370.0 379.0 339.0 198.0 316.0 190.0 261.0 175.0 302.0 348.0
130 170.0 435.0 289.0 528.0 266.0 410.0 348.0 368.0 250.0 378.0 199.0 287.0 186.0 360.0 322.0
131 141.0 456.0 286.0 496.0 283.0 374.0 467.0 393.0 246.0 328.0 172.0 319.0 224.0 415.0 263.0
132 129.0 442.0 355.0 441.0 247.0 365.0 371.0 363.0 212.0 289.0 169.0 360.0 184.0 413.0 292.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
133 130.0 433.0 374.0 419.0 227.0 357.0 331.0 386.0 198.0 337.0 180.0 302.0 183.0 426.0 440.0
134 143.0 502.0 392.0 485.0 324.0 564.0 359.0 501.0 189.0 381.0 176.0 325.0 183.0 603.0 504.0
135 139.0 538.0 454.0 586.0 455.0 494.0 434.0 584.0 182.0 317.0 176.0 342.0 206.0 614.0 504.0
136 110.0 518.0 1210.0 728.0 418.0 377.0 459.0 629.0 178.0 311.0 183.0 372.0 273.0 601.0 570.0
137 132.0 608.0 485.0 693.0 297.0 349.0 451.0 666.0 180.0 299.0 198.0 426.0 351.0 615.0 614.0
138 132.0 688.0 384.0 625.0 353.0 337.0 459.0 593.0 185.0 293.0 198.0 474.0 440.0 603.0 523.0
139 142.0 732.0 338.0 684.0 405.0 328.0 476.0 617.0 198.0 300.0 210.0 491.0 496.0 451.0 472.0
140 153.0 574.0 335.0 821.0 486.0 335.0 473.0 679.0 210.0 348.0 237.0 381.0 478.0 419.0 501.0
141 190.0 573.0 311.0 687.0 382.0 329.0 598.0 662.0 223.0 332.0 267.0 410.0 441.0 383.0 565.0
142 186.0 583.0 302.0 689.0 342.0 315.0 513.0 548.0 246.0 307.0 317.0 384.0 471.0 348.0 645.0
143 186.0 466.0 300.0 642.0 279.0 324.0 447.0 495.0 262.0 262.0 330.0 487.0 531.0 326.0 525.0
144 222.0 508.0 275.0 561.0 292.0 333.0 387.0 508.0 278.0 230.0 310.0 466.0 527.0 365.0 488.0
145 251.0 709.0 230.0 618.0 397.0 387.0 340.0 689.0 366.0 226.0 263.0 438.0 531.0 419.0 523.0
146 232.0 593.0 226.0 650.0 518.0 476.0 325.0 823.0 438.0 250.0 242.0 378.0 543.0 485.0 625.0
147 250.0 624.0 238.0 576.0 577.0 514.0 369.0 846.0 461.0 351.0 245.0 429.0 581.0 591.0 702.0
148 311.0 553.0 223.0 510.0 432.0 571.0 487.0 918.0 431.0 339.0 308.0 549.0 657.0 466.0 666.0
149 345.0 409.0 209.0 548.0 399.0 526.0 525.0 1030.0 389.0 272.0 365.0 601.0 373.0 585.0 847.0
150 478.0 461.0 200.0 607.0 338.0 487.0 529.0 1020.0 369.0 258.0 386.0 524.0 385.0 883.0 790.0
151 399.0 514.0 195.0 665.0 337.0 560.0 487.0 973.0 340.0 212.0 537.0 531.0 394.0 954.0 573.0
152 397.0 497.0 195.0 602.0 397.0 536.0 554.0 932.0 276.0 258.0 579.0 615.0 352.0 911.0 506.0
153 375.0 590.0 202.0 883.0 461.0 501.0 784.0 820.0 265.0 259.0 739.0 494.0 305.0 1150.0 425.0
154 375.0 501.0 223.0 855.0 426.0 487.0 818.0 821.0 257.0 277.0 830.0 611.0 418.0 1120.0 523.0
155 303.0 663.0 247.0 1050.0 472.0 523.0 813.0 988.0 252.0 299.0 904.0 456.0 560.0 1090.0 584.0
156 307.0 750.0 264.0 871.0 372.0 565.0 777.0 1040.0 277.0 322.0 730.0 400.0 527.0 1190.0 659.0
157 316.0 838.0 317.0 859.0 269.0 719.0 693.0 1080.0 331.0 375.0 857.0 387.0 353.0 740.0 742.0
158 302.0 790.0 324.0 775.0 276.0 1120.0 748.0 1000.0 321.0 419.0 822.0 361.0 315.0 713.0 864.0
159 300.0 934.0 340.0 808.0 397.0 1160.0 663.0 953.0 300.0 475.0 819.0 325.0 318.0 737.0 727.0
160 243.0 1040.0 385.0 783.0 463.0 1320.0 560.0 760.0 274.0 508.0 837.0 306.0 256.0 768.0 916.0
161 227.0 861.0 475.0 848.0 451.0 1220.0 524.0 809.0 262.0 614.0 978.0 299.0 330.0 750.0 1100.0
162 228.0 765.0 564.0 806.0 532.0 1200.0 443.0 868.0 271.0 818.0 916.0 360.0 487.0 756.0 846.0
163 223.0 430.0 547.0 914.0 559.0 1240.0 386.0 934.0 285.0 1030.0 540.0 386.0 424.0 752.0 1230.0
164 229.0 413.0 544.0 1070.0 512.0 1260.0 349.0 1030.0 387.0 1070.0 595.0 432.0 543.0 746.0 726.0
165 227.0 452.0 513.0 885.0 560.0 1380.0 370.0 994.0 409.0 1110.0 602.0 465.0 615.0 813.0 742.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
166 234.0 516.0 506.0 804.0 609.0 1180.0 425.0 797.0 427.0 1180.0 796.0 490.0 459.0 812.0 705.0
167 226.0 536.0 424.0 742.0 660.0 1280.0 627.0 778.0 445.0 1210.0 815.0 412.0 403.0 887.0 759.0
168 193.0 606.0 466.0 810.0 597.0 1350.0 524.0 752.0 472.0 1290.0 810.0 385.0 390.0 855.0 732.0
169 223.0 628.0 585.0 699.0 588.0 1180.0 525.0 768.0 508.0 1440.0 776.0 352.0 337.0 834.0 662.0
170 353.0 664.0 810.0 684.0 599.0 1030.0 532.0 776.0 529.0 1660.0 583.0 326.0 306.0 844.0 532.0
171 364.0 704.0 873.0 931.0 662.0 809.0 538.0 731.0 546.0 1620.0 510.0 304.0 289.0 1120.0 528.0
172 483.0 796.0 841.0 1050.0 786.0 866.0 640.0 695.0 534.0 1600.0 503.0 353.0 299.0 1080.0 511.0
173 556.0 737.0 918.0 1150.0 771.0 1060.0 679.0 670.0 549.0 1830.0 532.0 389.0 307.0 1200.0 634.0
174 553.0 782.0 1020.0 1110.0 690.0 1200.0 788.0 622.0 566.0 1840.0 612.0 494.0 351.0 1190.0 677.0
175 875.0 827.0 1210.0 1110.0 818.0 1150.0 799.0 589.0 571.0 2120.0 579.0 540.0 394.0 1210.0 672.0
176 802.0 986.0 1200.0 1280.0 911.0 1070.0 775.0 631.0 559.0 1870.0 581.0 618.0 497.0 1160.0 709.0
177 742.0 1080.0 1130.0 1500.0 949.0 985.0 618.0 689.0 562.0 1770.0 664.0 610.0 546.0 1140.0 692.0
178 726.0 889.0 1290.0 1470.0 904.0 1000.0 836.0 617.0 553.0 1690.0 724.0 644.0 481.0 1600.0 531.0
179 1010.0 888.0 1290.0 1660.0 984.0 1140.0 896.0 631.0 540.0 1540.0 819.0 677.0 553.0 1550.0 605.0
180 1160.0 890.0 1380.0 1410.0 1110.0 1250.0 876.0 611.0 636.0 1300.0 851.0 796.0 677.0 1840.0 590.0
181 1220.0 816.0 1600.0 1240.0 1180.0 1110.0 1040.0 681.0 635.0 1180.0 827.0 768.0 848.0 2010.0 567.0
182 1210.0 821.0 1670.0 1490.0 1360.0 1300.0 1230.0 723.0 576.0 1120.0 802.0 735.0 734.0 2060.0 609.0
183 1400.0 1080.0 1650.0 1650.0 1520.0 1510.0 1520.0 665.0 598.0 1010.0 715.0 707.0 710.0 1200.0 653.0
184 985.0 996.0 1360.0 1490.0 1260.0 1520.0 1360.0 677.0 602.0 917.0 718.0 736.0 710.0 1140.0 680.0
185 817.0 848.0 1160.0 1710.0 992.0 1640.0 1660.0 776.0 630.0 1040.0 739.0 716.0 676.0 1380.0 692.0
186 1120.0 819.0 1050.0 1700.0 872.0 1660.0 1150.0 869.0 659.0 1300.0 691.0 734.0 644.0 1200.0 708.0
187 1120.0 778.0 989.0 1770.0 877.0 1540.0 878.0 813.0 708.0 1410.0 689.0 872.0 605.0 932.0 641.0
188 1200.0 746.0 1120.0 2070.0 1130.0 1380.0 785.0 814.0 786.0 1450.0 649.0 942.0 759.0 984.0 640.0
189 1420.0 737.0 1250.0 2210.0 975.0 1310.0 664.0 842.0 834.0 1420.0 588.0 868.0 781.0 892.0 613.0
190 1140.0 964.0 1400.0 1730.0 1050.0 1240.0 622.0 1180.0 895.0 1480.0 786.0 715.0 726.0 835.0 541.0
191 1440.0 836.0 1350.0 1640.0 886.0 1160.0 720.0 1210.0 964.0 1510.0 775.0 710.0 681.0 1180.0 543.0
192 1380.0 864.0 1310.0 1520.0 914.0 1110.0 722.0 1100.0 1010.0 1850.0 688.0 737.0 654.0 1180.0 497.0
193 1300.0 827.0 1430.0 1610.0 953.0 1070.0 694.0 979.0 966.0 1300.0 906.0 1080.0 629.0 1130.0 496.0
194 1780.0 885.0 1690.0 1600.0 1260.0 1110.0 785.0 751.0 995.0 1140.0 933.0 1260.0 692.0 1070.0 529.0
195 1460.0 785.0 1690.0 1500.0 1280.0 1290.0 846.0 663.0 1030.0 1420.0 973.0 1290.0 799.0 1360.0 499.0
196 1420.0 747.0 1610.0 1380.0 1090.0 1180.0 927.0 678.0 1060.0 1460.0 905.0 1120.0 805.0 1140.0 514.0
197 1240.0 704.0 1440.0 1870.0 1050.0 1330.0 1010.0 615.0 1100.0 1600.0 866.0 1100.0 820.0 1140.0 510.0
198 1230.0 930.0 1340.0 1640.0 1280.0 1490.0 1100.0 562.0 1200.0 1960.0 711.0 1070.0 918.0 1340.0 558.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
199 1240.0 832.0 1270.0 1720.0 1360.0 1550.0 1000.0 469.0 1390.0 2170.0 632.0 1120.0 837.0 1320.0 658.0
200 1180.0 889.0 1240.0 1680.0 1410.0 1520.0 990.0 785.0 1550.0 2300.0 638.0 1140.0 880.0 1360.0 861.0
201 1010.0 968.0 1660.0 1720.0 1350.0 1490.0 993.0 920.0 1350.0 2050.0 632.0 1150.0 846.0 1380.0 900.0
202 1030.0 863.0 1640.0 1640.0 1280.0 1560.0 1010.0 977.0 1110.0 1930.0 677.0 988.0 760.0 1360.0 1050.0
203 1220.0 816.0 1690.0 1700.0 1350.0 1640.0 759.0 1000.0 1020.0 1690.0 711.0 1340.0 725.0 1260.0 1040.0
204 1260.0 952.0 1700.0 1620.0 1660.0 1570.0 808.0 1160.0 953.0 1750.0 871.0 1600.0 686.0 1200.0 1020.0
205 1390.0 953.0 1880.0 1750.0 1780.0 1560.0 855.0 1390.0 1000.0 1630.0 942.0 1420.0 650.0 1180.0 970.0
206 1260.0 985.0 1810.0 2080.0 1620.0 1550.0 929.0 1310.0 1030.0 1920.0 1260.0 1290.0 600.0 1280.0 882.0
207 1460.0 1130.0 1470.0 2010.0 1370.0 1700.0 1150.0 1120.0 991.0 1940.0 1450.0 1180.0 756.0 1030.0 789.0
208 1220.0 1260.0 1280.0 2030.0 1720.0 1550.0 1720.0 1030.0 1000.0 2110.0 1040.0 1280.0 818.0 810.0 794.0
209 1250.0 1100.0 1200.0 1780.0 1720.0 1550.0 1500.0 1030.0 1030.0 1790.0 851.0 1340.0 781.0 839.0 731.0
210 1280.0 1160.0 1090.0 1640.0 1800.0 1540.0 1310.0 1100.0 945.0 1460.0 794.0 1870.0 843.0 1030.0 791.0
211 1470.0 1050.0 1040.0 1900.0 1750.0 1430.0 1190.0 1120.0 810.0 1340.0 821.0 1420.0 1130.0 880.0 777.0
212 1390.0 1060.0 1090.0 1780.0 1920.0 1410.0 1120.0 960.0 794.0 1650.0 759.0 1200.0 1160.0 693.0 752.0
213 1380.0 1400.0 1130.0 1800.0 1890.0 1310.0 1040.0 847.0 754.0 1780.0 747.0 1110.0 1260.0 718.0 690.0
214 1650.0 2080.0 1210.0 2450.0 1780.0 1300.0 1020.0 872.0 775.0 1640.0 783.0 1260.0 1090.0 810.0 852.0
215 2140.0 1810.0 1080.0 2210.0 1830.0 1320.0 1030.0 950.0 794.0 1390.0 713.0 1200.0 917.0 839.0 897.0
216 2130.0 1610.0 1010.0 2510.0 2250.0 1260.0 1020.0 840.0 768.0 1240.0 659.0 1140.0 777.0 672.0 852.0
217 1640.0 1780.0 961.0 2630.0 1830.0 1180.0 1030.0 765.0 834.0 1130.0 665.0 1090.0 687.0 686.0 787.0
218 1210.0 1600.0 996.0 2500.0 1770.0 1150.0 1040.0 774.0 880.0 1070.0 680.0 1030.0 661.0 770.0 825.0
219 1170.0 1560.0 1010.0 2190.0 1640.0 1130.0 1080.0 785.0 865.0 1090.0 783.0 878.0 627.0 693.0 810.0
220 1270.0 1350.0 1160.0 1800.0 1580.0 1280.0 999.0 728.0 829.0 1030.0 749.0 888.0 618.0 693.0 784.0
221 1350.0 1460.0 1040.0 1760.0 1820.0 1270.0 1170.0 699.0 939.0 1150.0 781.0 1470.0 607.0 645.0 970.0
222 1340.0 1420.0 1120.0 1880.0 1630.0 1540.0 1140.0 666.0 1130.0 1070.0 761.0 1630.0 646.0 677.0 980.0
223 1190.0 1520.0 1190.0 1780.0 1500.0 1480.0 1460.0 705.0 1350.0 965.0 751.0 1440.0 688.0 538.0 716.0
224 1160.0 1700.0 1260.0 1700.0 1330.0 1440.0 1350.0 730.0 1450.0 1070.0 1260.0 1380.0 727.0 614.0 654.0
225 1550.0 1760.0 1280.0 1920.0 1440.0 1500.0 1100.0 677.0 1280.0 1270.0 1040.0 1360.0 940.0 645.0 607.0
226 1680.0 1530.0 1180.0 1890.0 1510.0 1600.0 968.0 758.0 1100.0 1150.0 762.0 1260.0 822.0 688.0 568.0
227 1640.0 1260.0 1230.0 1630.0 1860.0 1300.0 924.0 804.0 985.0 910.0 725.0 1280.0 761.0 614.0 605.0
228 1260.0 1150.0 1280.0 1570.0 1540.0 1380.0 932.0 791.0 905.0 857.0 751.0 1320.0 712.0 634.0 756.0
229 1140.0 1090.0 1470.0 1540.0 1300.0 1290.0 923.0 741.0 1060.0 990.0 793.0 1410.0 657.0 1140.0 441.0
230 1120.0 1020.0 1400.0 1450.0 1180.0 1240.0 1210.0 714.0 1960.0 1190.0 784.0 1380.0 691.0 1200.0 439.0
231 870.0 934.0 1290.0 1270.0 1120.0 1170.0 1590.0 916.0 2230.0 1420.0 752.0 1320.0 756.0 1380.0 387.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
232 793.0 859.0 1410.0 1100.0 1080.0 1640.0 1370.0 869.0 2040.0 1300.0 707.0 1310.0 742.0 1220.0 376.0
233 764.0 810.0 1260.0 1010.0 1130.0 1740.0 1160.0 803.0 2030.0 1260.0 688.0 1340.0 752.0 1320.0 381.0
234 793.0 884.0 1190.0 950.0 1130.0 1440.0 1080.0 782.0 1610.0 1160.0 590.0 1270.0 858.0 1380.0 361.0
235 934.0 916.0 1050.0 998.0 1160.0 1410.0 1310.0 736.0 1640.0 1100.0 677.0 1240.0 845.0 1120.0 354.0
236 916.0 1170.0 931.0 757.0 1240.0 1390.0 1320.0 720.0 1420.0 1060.0 725.0 1340.0 799.0 1080.0 350.0
237 884.0 1230.0 877.0 724.0 990.0 1340.0 1090.0 674.0 1120.0 1190.0 736.0 1110.0 949.0 1190.0 345.0
238 791.0 1240.0 842.0 1110.0 921.0 1480.0 1250.0 680.0 964.0 1010.0 749.0 1220.0 868.0 1260.0 340.0
239 762.0 1140.0 829.0 1280.0 858.0 1550.0 1220.0 898.0 912.0 908.0 812.0 1310.0 771.0 1120.0 336.0
240 898.0 1190.0 810.0 1380.0 920.0 1950.0 1180.0 1350.0 866.0 847.0 965.0 1120.0 820.0 1240.0 312.0
241 1030.0 1030.0 766.0 1140.0 924.0 1830.0 1260.0 1270.0 886.0 815.0 950.0 878.0 990.0 1320.0 304.0
242 970.0 923.0 778.0 1110.0 816.0 1460.0 1410.0 1140.0 953.0 792.0 846.0 882.0 910.0 1300.0 311.0
243 884.0 882.0 810.0 1040.0 777.0 1490.0 1190.0 1090.0 1040.0 746.0 795.0 789.0 855.0 1360.0 288.0
244 836.0 867.0 851.0 983.0 758.0 1300.0 1130.0 916.0 1180.0 718.0 828.0 797.0 819.0 1400.0 280.0
245 891.0 837.0 829.0 1030.0 815.0 1120.0 1090.0 872.0 1080.0 697.0 819.0 710.0 869.0 1180.0 276.0
246 872.0 1080.0 878.0 1440.0 686.0 970.0 1010.0 1070.0 1010.0 704.0 796.0 671.0 813.0 988.0 272.0
247 827.0 896.0 847.0 972.0 646.0 891.0 1060.0 1010.0 940.0 686.0 777.0 632.0 776.0 792.0 266.0
248 729.0 936.0 767.0 972.0 614.0 889.0 1140.0 950.0 854.0 678.0 749.0 606.0 734.0 776.0 268.0
249 677.0 973.0 666.0 913.0 599.0 897.0 1160.0 1080.0 793.0 671.0 677.0 572.0 679.0 934.0 268.0
250 870.0 1000.0 657.0 1140.0 596.0 865.0 1030.0 1320.0 686.0 654.0 649.0 549.0 604.0 816.0 265.0
251 852.0 875.0 642.0 1110.0 579.0 851.0 973.0 1220.0 638.0 594.0 625.0 531.0 528.0 843.0 256.0
252 719.0 760.0 632.0 1090.0 885.0 800.0 884.0 1100.0 615.0 583.0 752.0 512.0 501.0 1010.0 250.0
253 693.0 743.0 622.0 1060.0 1230.0 769.0 996.0 939.0 602.0 551.0 787.0 589.0 481.0 1180.0 243.0
254 902.0 770.0 613.0 1020.0 912.0 865.0 2380.0 894.0 596.0 557.0 754.0 590.0 462.0 1200.0 238.0
255 941.0 733.0 570.0 914.0 759.0 1010.0 1820.0 841.0 714.0 612.0 615.0 575.0 446.0 1240.0 232.0
256 880.0 723.0 539.0 858.0 679.0 949.0 1270.0 768.0 834.0 742.0 549.0 566.0 431.0 1200.0 222.0
257 729.0 692.0 511.0 831.0 646.0 992.0 1040.0 720.0 968.0 694.0 493.0 557.0 435.0 1320.0 208.0
258 849.0 840.0 476.0 804.0 619.0 884.0 971.0 686.0 942.0 645.0 475.0 526.0 502.0 1800.0 202.0
259 428.0 661.0 465.0 761.0 589.0 777.0 1040.0 646.0 889.0 574.0 459.0 494.0 491.0 1210.0 199.0
260 571.0 592.0 449.0 737.0 566.0 726.0 958.0 606.0 916.0 509.0 440.0 460.0 483.0 614.0 197.0
261 511.0 550.0 453.0 707.0 561.0 678.0 896.0 593.0 865.0 438.0 423.0 439.0 484.0 645.0 197.0
262 529.0 553.0 427.0 640.0 511.0 645.0 976.0 573.0 877.0 413.0 407.0 420.0 477.0 541.0 197.0
263 494.0 606.0 425.0 761.0 487.0 606.0 1020.0 542.0 897.0 380.0 425.0 398.0 459.0 466.0 196.0
264 450.0 530.0 422.0 794.0 469.0 575.0 966.0 517.0 810.0 431.0 406.0 419.0 442.0 494.0 194.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
265 451.0 558.0 410.0 862.0 459.0 546.0 878.0 479.0 717.0 409.0 429.0 529.0 435.0 598.0 193.0
266 422.0 537.0 397.0 641.0 443.0 525.0 862.0 431.0 690.0 385.0 423.0 523.0 430.0 451.0 190.0
267 399.0 503.0 380.0 636.0 429.0 510.0 1160.0 403.0 746.0 372.0 402.0 550.0 422.0 614.0 188.0
268 392.0 468.0 376.0 625.0 444.0 499.0 1240.0 384.0 642.0 365.0 377.0 561.0 406.0 662.0 184.0
269 364.0 441.0 361.0 613.0 428.0 466.0 1220.0 359.0 588.0 357.0 359.0 552.0 392.0 452.0 182.0
270 358.0 417.0 347.0 590.0 457.0 441.0 1160.0 337.0 570.0 347.0 345.0 502.0 380.0 466.0 180.0
271 362.0 406.0 340.0 570.0 545.0 423.0 745.0 318.0 563.0 338.0 336.0 490.0 371.0 438.0 179.0
272 353.0 418.0 307.0 578.0 811.0 401.0 688.0 309.0 558.0 331.0 326.0 473.0 360.0 625.0 176.0
273 342.0 393.0 304.0 572.0 1110.0 375.0 676.0 304.0 551.0 341.0 320.0 452.0 350.0 629.0 170.0
274 322.0 392.0 305.0 575.0 873.0 370.0 599.0 295.0 544.0 336.0 317.0 431.0 340.0 483.0 166.0
275 370.0 378.0 300.0 568.0 671.0 352.0 570.0 289.0 537.0 326.0 315.0 412.0 326.0 263.0 163.0
276 316.0 363.0 331.0 560.0 612.0 345.0 550.0 282.0 522.0 321.0 313.0 397.0 314.0 323.0 161.0
277 311.0 348.0 324.0 550.0 582.0 330.0 531.0 280.0 501.0 318.0 311.0 381.0 311.0 342.0 159.0
278 300.0 337.0 301.0 543.0 539.0 325.0 520.0 276.0 480.0 309.0 309.0 360.0 309.0 368.0 158.0
279 305.0 325.0 290.0 599.0 499.0 321.0 502.0 272.0 456.0 303.0 307.0 334.0 298.0 322.0 156.0
280 300.0 320.0 283.0 593.0 491.0 315.0 466.0 269.0 441.0 294.0 305.0 316.0 285.0 285.0 155.0
281 272.0 312.0 277.0 586.0 478.0 309.0 428.0 268.0 480.0 289.0 303.0 299.0 269.0 302.0 152.0
282 268.0 300.0 272.0 577.0 452.0 304.0 403.0 265.0 543.0 284.0 302.0 290.0 261.0 263.0 150.0
283 263.0 296.0 305.0 587.0 418.0 300.0 399.0 263.0 816.0 275.0 298.0 280.0 256.0 269.0 148.0
284 252.0 292.0 324.0 539.0 397.0 292.0 481.0 261.0 925.0 270.0 287.0 270.0 254.0 236.0 147.0
285 247.0 281.0 302.0 517.0 389.0 282.0 827.0 258.0 1140.0 265.0 272.0 259.0 252.0 265.0 148.0
286 247.0 275.0 283.0 496.0 374.0 278.0 663.0 255.0 1600.0 262.0 252.0 254.0 250.0 249.0 146.0
287 246.0 267.0 279.0 475.0 358.0 272.0 541.0 252.0 1390.0 258.0 228.0 250.0 249.0 238.0 142.0
288 241.0 259.0 256.0 465.0 353.0 267.0 518.0 248.0 1120.0 267.0 207.0 242.0 245.0 241.0 141.0
289 238.0 255.0 246.0 452.0 337.0 262.0 497.0 245.0 811.0 287.0 199.0 234.0 241.0 219.0 139.0
290 222.0 252.0 239.0 435.0 336.0 258.0 471.0 251.0 677.0 290.0 192.0 228.0 231.0 214.0 139.0
291 220.0 245.0 233.0 423.0 326.0 256.0 435.0 250.0 642.0 283.0 NA 224.0 225.0 214.0 150.0
292 218.0 239.0 230.0 410.0 318.0 251.0 401.0 247.0 606.0 271.0 NA 220.0 220.0 207.0 147.0
293 212.0 233.0 225.0 400.0 310.0 246.0 381.0 244.0 582.0 263.0 NA 217.0 213.0 211.0 144.0
294 202.0 225.0 219.0 394.0 296.0 240.0 365.0 239.0 561.0 258.0 NA 213.0 208.0 207.0 139.0
295 199.0 223.0 216.0 376.0 291.0 236.0 355.0 233.0 545.0 252.0 NA 212.0 204.0 186.0 136.0
296 199.0 215.0 214.0 353.0 288.0 231.0 349.0 227.0 516.0 247.0 NA 208.0 202.0 172.0 132.0
297 196.0 216.0 210.0 327.0 283.0 221.0 376.0 218.0 496.0 243.0 NA 206.0 199.0 181.0 129.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
298 189.0 212.0 205.0 309.0 283.0 212.0 363.0 210.0 479.0 238.0 NA 204.0 195.0 164.0 128.0
299 183.0 208.0 202.0 295.0 280.0 205.0 351.0 204.0 457.0 233.0 NA 202.0 193.0 186.0 127.0
300 183.0 205.0 200.0 282.0 276.0 199.0 333.0 201.0 437.0 229.0 NA 200.0 189.0 194.0 126.0
301 180.0 197.0 198.0 266.0 271.0 205.0 315.0 196.0 428.0 223.0 NA 198.0 186.0 164.0 126.0
302 180.0 193.0 194.0 256.0 268.0 199.0 301.0 191.0 425.0 216.0 NA 193.0 184.0 164.0 124.0
303 178.0 186.0 192.0 249.0 264.0 196.0 286.0 185.0 421.0 212.0 NA 187.0 182.0 178.0 123.0
304 176.0 196.0 192.0 241.0 260.0 196.0 281.0 182.0 416.0 209.0 NA 183.0 177.0 156.0 122.0
305 172.0 189.0 189.0 235.0 254.0 193.0 283.0 181.0 409.0 206.0 NA 180.0 170.0 156.0 121.0
306 168.0 186.0 187.0 224.0 250.0 189.0 275.0 181.0 397.0 204.0 NA 176.0 164.0 144.0 120.0
307 168.0 182.0 185.0 213.0 246.0 183.0 268.0 180.0 377.0 202.0 NA 174.0 158.0 154.0 118.0
308 172.0 178.0 182.0 207.0 282.0 183.0 260.0 180.0 359.0 199.0 NA 173.0 155.0 160.0 118.0
309 171.0 176.0 179.0 202.0 258.0 181.0 256.0 180.0 341.0 197.0 NA 171.0 150.0 149.0 117.0
310 162.0 172.0 176.0 199.0 248.0 180.0 254.0 178.0 322.0 193.0 NA 169.0 148.0 149.0 115.0
311 156.0 170.0 173.0 196.0 236.0 177.0 250.0 178.0 306.0 191.0 NA 167.0 148.0 143.0 114.0
312 156.0 168.0 173.0 192.0 226.0 175.0 248.0 176.0 293.0 188.0 NA 164.0 146.0 142.0 114.0
313 149.0 167.0 169.0 195.0 212.0 178.0 244.0 176.0 280.0 184.0 NA 160.0 146.0 142.0 113.0
314 148.0 155.0 167.0 200.0 205.0 181.0 240.0 176.0 246.0 181.0 NA 158.0 146.0 140.0 115.0
315 147.0 150.0 162.0 195.0 199.0 177.0 238.0 174.0 230.0 179.0 NA 155.0 145.0 144.0 113.0
316 145.0 149.0 158.0 192.0 193.0 173.0 236.0 173.0 220.0 175.0 NA 150.0 145.0 136.0 112.0
317 144.0 148.0 156.0 191.0 200.0 171.0 233.0 173.0 217.0 170.0 NA 146.0 145.0 138.0 112.0
318 139.0 147.0 151.0 189.0 209.0 168.0 230.0 171.0 213.0 166.0 NA 144.0 143.0 134.0 111.0
319 139.0 143.0 149.0 187.0 217.0 166.0 226.0 171.0 210.0 162.0 NA 143.0 143.0 134.0 110.0
320 137.0 141.0 147.0 184.0 218.0 165.0 222.0 169.0 208.0 160.0 NA 141.0 142.0 131.0 110.0
321 136.0 139.0 147.0 181.0 214.0 162.0 230.0 169.0 206.0 158.0 121.0 139.0 142.0 132.0 108.0
322 134.0 137.0 145.0 178.0 212.0 160.0 215.0 168.0 204.0 156.0 120.0 138.0 141.0 136.0 108.0
323 133.0 136.0 145.0 174.0 210.0 160.0 212.0 168.0 202.0 154.0 120.0 136.0 139.0 132.0 107.0
324 132.0 134.0 143.0 171.0 208.0 157.0 210.0 166.0 202.0 150.0 119.0 135.0 138.0 131.0 107.0
325 129.0 132.0 140.0 168.0 206.0 155.0 207.0 164.0 200.0 148.0 119.0 133.0 137.0 131.0 106.0
326 128.0 130.0 138.0 165.0 204.0 151.0 203.0 163.0 198.0 146.0 119.0 131.0 137.0 131.0 106.0
327 128.0 149.0 137.0 162.0 201.0 149.0 198.0 161.0 197.0 144.0 117.0 125.0 136.0 130.0 107.0
328 125.0 142.0 135.0 160.0 199.0 146.0 192.0 159.0 192.0 142.0 118.0 125.0 136.0 129.0 105.0
329 125.0 129.0 134.0 158.0 194.0 142.0 186.0 158.0 191.0 142.0 117.0 123.0 137.0 129.0 108.0
330 123.0 129.0 134.0 156.0 191.0 140.0 182.0 156.0 189.0 140.0 116.0 123.0 134.0 128.0 107.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
331 122.0 129.0 132.0 154.0 188.0 137.0 178.0 154.0 187.0 138.0 116.0 122.0 133.0 124.0 105.0
332 121.0 128.0 132.0 151.0 186.0 134.0 176.0 152.0 185.0 135.0 116.0 121.0 132.0 126.0 105.0
333 121.0 126.0 132.0 149.0 184.0 130.0 172.0 151.0 183.0 129.0 115.0 120.0 130.0 121.0 104.0
334 120.0 124.0 132.0 144.0 188.0 128.0 171.0 149.0 183.0 132.0 115.0 120.0 129.0 120.0 103.0
335 117.0 122.0 132.0 142.0 179.0 126.0 168.0 147.0 181.0 129.0 114.0 119.0 129.0 120.0 102.0
336 116.0 129.0 130.0 138.0 176.0 126.0 168.0 163.0 180.0 126.0 113.0 119.0 128.0 114.0 101.0
337 111.0 128.0 128.0 135.0 173.0 123.0 166.0 144.0 178.0 124.0 112.0 117.0 126.0 115.0 99.3
338 110.0 122.0 128.0 133.0 171.0 122.0 164.0 143.0 176.0 122.0 111.0 117.0 125.0 113.0 99.0
339 110.0 120.0 126.0 130.0 169.0 121.0 162.0 141.0 174.0 120.0 111.0 116.0 122.0 112.0 97.9
340 110.0 122.0 122.0 128.0 167.0 119.0 158.0 139.0 173.0 119.0 110.0 116.0 120.0 110.0 96.9
341 109.0 118.0 118.0 125.0 164.0 117.0 152.0 138.0 171.0 117.0 109.0 114.0 116.0 110.0 96.9
342 106.0 117.0 118.0 123.0 165.0 117.0 148.0 136.0 169.0 116.0 109.0 114.0 116.0 109.0 96.9
343 106.0 114.0 116.0 121.0 165.0 120.0 146.0 135.0 166.0 113.0 108.0 113.0 116.0 109.0 96.9
344 105.0 112.0 116.0 119.0 162.0 123.0 144.0 133.0 164.0 112.0 108.0 113.0 115.0 106.0 95.9
345 104.0 112.0 108.0 116.0 160.0 123.0 143.0 131.0 160.0 110.0 110.0 111.0 115.0 106.0 95.9
346 104.0 110.0 114.0 115.0 159.0 122.0 141.0 130.0 154.0 109.0 116.0 111.0 114.0 105.0 95.9
347 103.0 109.0 112.0 112.0 158.0 120.0 140.0 128.0 149.0 110.0 109.0 110.0 114.0 103.0 94.9
348 103.0 109.0 110.0 111.0 156.0 119.0 138.0 127.0 146.0 111.0 106.0 110.0 111.0 101.0 97.6
349 101.0 108.0 110.0 110.0 155.0 118.0 138.0 127.0 143.0 111.0 104.0 109.0 110.0 105.0 96.9
350 95.9 108.0 110.0 109.0 152.0 117.0 136.0 125.0 141.0 111.0 104.0 107.0 110.0 99.4 110.0
351 95.9 106.0 108.0 108.0 149.0 117.0 135.0 123.0 139.0 114.0 103.0 106.0 109.0 100.0 108.0
352 94.8 106.0 108.0 106.0 148.0 116.0 133.0 122.0 138.0 114.0 103.0 103.0 109.0 98.2 108.0
353 94.8 104.0 108.0 106.0 146.0 116.0 132.0 120.0 136.0 112.0 102.0 103.0 108.0 97.5 107.0
354 92.4 104.0 108.0 104.0 144.0 115.0 131.0 119.0 133.0 111.0 101.0 102.0 108.0 97.5 107.0
355 92.4 103.0 106.0 103.0 148.0 112.0 125.0 117.0 131.0 111.0 101.0 102.0 106.0 97.1 106.0
356 92.4 102.0 106.0 103.0 148.0 110.0 125.0 114.0 129.0 110.0 99.4 100.0 105.0 96.3 106.0
357 92.4 101.0 106.0 101.0 146.0 109.0 123.0 111.0 124.0 109.0 98.2 100.0 105.0 96.7 107.0
358 110.0 98.2 106.0 101.0 145.0 109.0 122.0 107.0 123.0 108.0 97.1 98.8 104.0 94.0 105.0
359 110.0 98.2 106.0 103.0 143.0 109.0 120.0 103.0 122.0 106.0 97.1 98.8 104.0 93.2 108.0
360 106.0 97.1 104.0 103.0 142.0 107.0 119.0 96.0 126.0 105.0 95.9 115.0 103.0 93.6 107.0
361 94.8 95.9 104.0 101.0 140.0 107.0 117.0 91.8 129.0 104.0 95.9 111.0 102.0 92.8 105.0
362 94.8 94.8 104.0 101.0 139.0 107.0 116.0 87.8 123.0 103.0 95.9 97.4 101.0 92.4 105.0
363 94.8 93.6 108.0 98.7 137.0 106.0 115.0 83.9 120.0 103.0 94.8 97.4 101.0 92.4 104.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
364 94.2 93.6 116.0 98.7 136.0 106.0 113.0 80.9 119.0 102.0 94.8 96.0 99.4 101.0 103.0
365 93.6 92.4 113.0 98.7 134.0 107.0 111.0 77.5 117.0 102.0 94.8 97.4 98.2 93.6 102.0
366 98.7 77.5 100.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
1 101.0 76.4 78.2 89.7 88.8 94.9 87.8 97.9 92.8 103.0 86.8 78.5 86.8 76.4 87.7
2 99.3 77.3 77.3 90.7 88.8 93.9 87.8 93.9 92.8 106.0 85.9 78.5 85.9 75.5 88.6
3 99.0 77.6 76.4 90.2 88.1 93.9 86.8 93.9 91.8 104.0 85.9 78.5 84.9 74.6 88.6
4 97.9 78.5 76.4 89.5 88.1 92.5 85.9 92.8 90.8 100.0 84.9 78.5 84.0 73.6 88.6
5 96.9 79.5 75.5 89.5 87.4 92.2 85.9 92.8 90.8 89.6 84.9 76.4 83.0 72.7 89.4
6 96.9 81.1 75.5 89.3 86.7 90.5 87.8 91.8 89.8 93.9 84.6 76.7 82.0 71.8 89.4
7 96.9 82.0 75.5 88.8 86.7 87.8 86.8 90.8 88.8 93.9 85.9 76.7 81.1 70.9 89.4
8 95.9 83.0 74.6 88.3 88.1 86.8 84.9 90.8 88.8 93.9 84.9 77.3 80.1 70.0 89.4
9 95.9 84.0 74.6 93.6 88.1 86.8 85.9 89.8 88.8 92.5 84.0 76.4 79.2 69.1 90.3
10 95.9 84.9 73.6 95.7 89.5 85.6 84.0 89.8 89.5 91.8 84.0 75.5 78.2 68.2 90.3
11 94.9 86.2 73.6 93.1 89.5 85.2 83.0 86.8 87.8 91.8 83.0 75.2 77.3 67.4 90.3
12 94.9 87.8 74.9 90.7 88.8 84.9 83.0 86.8 87.8 91.8 83.0 74.9 76.4 66.3 90.3
13 97.9 88.8 76.7 90.0 88.8 84.0 83.0 87.8 91.8 91.8 82.0 74.3 75.5 65.4 89.4
14 96.9 89.5 73.6 89.3 87.4 83.0 81.1 86.8 89.8 90.5 82.0 73.0 74.6 64.6 89.4
15 96.9 87.8 72.7 88.8 87.4 82.0 80.1 84.9 87.8 89.8 84.3 72.1 73.6 64.0 89.4
16 96.9 87.8 77.0 94.5 87.4 82.0 80.1 84.9 87.8 89.8 78.2 71.8 72.7 63.4 89.4
17 95.9 88.5 73.6 93.1 86.0 80.1 78.2 84.9 86.2 88.8 78.2 71.8 71.8 65.4 88.6
18 95.9 88.5 73.6 90.9 86.0 80.1 77.9 83.0 85.9 90.8 81.1 71.8 70.9 66.3 88.6
19 94.9 86.8 72.7 90.9 86.0 80.1 75.5 82.0 85.9 96.9 77.3 71.2 70.0 66.8 88.6
20 93.9 84.9 72.7 90.2 85.3 87.5 74.6 82.0 85.9 87.8 77.3 70.9 70.0 68.2 88.0
21 93.9 84.6 71.8 90.9 85.3 85.9 73.6 80.1 84.6 87.8 74.6 70.6 69.1 68.8 87.7
22 92.8 83.6 70.9 90.2 84.6 83.3 74.6 83.0 85.9 86.8 74.6 69.4 68.2 69.1 87.7
23 91.8 84.9 70.0 88.8 86.7 83.0 72.7 82.0 84.9 85.9 73.6 68.2 70.0 67.4 87.7
24 90.8 85.6 69.1 88.8 86.7 83.6 72.7 82.0 84.0 85.9 73.6 67.4 78.2 66.6 86.6
25 89.8 83.6 69.1 90.2 88.1 82.7 73.6 81.1 83.0 85.9 73.6 66.8 76.4 66.3 86.6
26 88.8 84.3 69.1 89.5 88.1 81.7 71.8 81.1 82.0 85.9 72.7 65.7 76.1 65.7 86.6
27 87.8 85.6 72.7 88.8 88.1 81.7 73.6 80.1 84.0 84.9 75.5 65.4 74.3 65.1 86.4
28 93.2 84.6 73.6 90.9 90.2 81.7 73.6 79.2 84.0 84.9 78.2 64.8 73.3 64.6 86.1
29 93.9 83.3 72.7 90.2 90.2 81.1 72.1 80.1 84.3 84.9 75.5 70.0 71.2 63.7 86.1
30 118.0 85.2 71.8 89.5 92.4 81.4 72.1 79.2 82.0 84.0 73.6 69.1 70.0 63.4 86.1
31 112.0 83.6 69.1 88.8 92.4 80.4 71.8 80.1 80.1 85.9 72.7 69.1 69.1 62.3 86.1
32 102.0 81.7 69.1 88.1 72.7 78.2 72.7 78.2 78.2 84.9 71.8 74.6 68.2 60.6 86.1
33 94.2 80.4 68.2 88.8 72.7 78.2 73.6 78.2 85.6 83.0 71.8 71.5 67.4 62.3 86.1
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
34 92.8 82.4 67.4 89.5 72.1 78.2 75.2 78.2 82.0 82.0 70.9 70.9 67.4 64.0 86.1
35 91.8 82.7 66.6 86.7 70.6 78.8 70.9 78.2 81.1 80.1 70.9 70.6 66.6 64.8 86.1
36 90.8 83.0 65.7 86.0 69.4 77.3 70.0 77.3 84.9 79.2 70.9 69.1 65.7 65.7 85.3
37 89.8 82.7 65.7 86.0 70.9 77.3 69.1 77.3 84.9 78.2 70.0 69.1 64.8 73.6 85.3
38 90.8 87.5 64.8 86.7 70.9 76.4 69.1 76.4 82.0 78.2 73.6 69.1 64.8 74.6 84.5
39 89.8 91.8 64.8 88.1 70.9 76.4 68.2 76.4 80.4 80.1 78.2 68.2 64.0 74.6 84.5
40 88.8 91.2 64.8 86.7 70.9 76.4 67.7 76.4 80.1 80.1 76.4 68.2 64.0 73.6 84.5
41 88.8 91.8 64.0 87.8 70.9 76.4 68.5 77.3 78.8 79.2 74.6 68.2 63.2 72.7 84.5
42 87.8 92.5 64.0 86.0 72.1 75.5 67.7 75.5 83.0 78.2 74.6 67.4 63.2 71.8 84.5
43 87.8 90.5 64.0 86.7 72.1 75.5 68.0 74.6 84.3 78.2 87.8 67.4 62.3 70.9 83.7
44 88.8 87.8 70.9 88.1 71.2 75.5 68.8 73.6 81.7 77.3 80.1 66.6 62.3 70.0 83.7
45 92.8 86.8 70.0 86.7 70.3 75.5 69.1 74.6 81.4 77.3 77.3 66.6 61.4 69.1 83.7
46 91.8 84.6 69.1 86.0 69.7 74.9 70.3 72.7 81.1 78.5 76.4 66.6 61.4 78.2 84.5
47 90.8 87.8 69.1 86.0 68.5 73.6 68.5 72.7 82.0 83.0 82.0 65.7 60.6 78.2 83.7
48 89.8 85.2 67.4 88.6 67.4 73.6 68.0 72.4 81.1 81.1 81.1 65.7 60.6 81.1 83.7
49 86.8 83.3 69.1 86.7 68.0 73.0 67.1 71.8 78.2 80.1 82.0 66.0 60.6 83.0 83.7
50 86.8 83.6 67.7 86.0 67.7 71.8 68.0 70.9 78.2 79.8 78.2 86.5 59.8 82.0 82.9
51 85.9 81.1 66.6 88.8 70.3 71.8 66.6 70.9 77.3 78.2 76.4 81.1 59.8 81.4 82.9
52 84.9 79.8 66.6 88.1 68.2 70.9 66.6 69.7 77.3 78.2 74.6 66.0 59.0 81.1 82.9
53 83.6 78.2 66.6 86.7 67.1 70.9 65.7 69.1 77.3 78.2 75.5 78.6 59.0 80.1 82.9
54 83.0 78.2 65.7 88.8 67.4 70.9 65.7 68.2 76.1 77.3 74.6 73.0 58.2 80.1 82.9
55 82.0 80.8 65.7 88.1 75.3 70.9 65.7 74.6 75.5 77.3 82.4 73.6 58.2 79.2 82.3
56 82.0 83.3 67.7 86.7 85.6 74.6 80.1 79.8 75.5 80.4 78.2 76.4 58.2 79.2 82.1
57 81.1 85.9 68.0 86.0 84.6 75.2 70.9 73.3 75.5 82.7 75.8 71.8 57.4 79.2 82.1
58 80.1 87.5 67.7 86.0 79.8 72.7 72.1 76.4 75.2 80.1 72.7 79.2 57.4 77.3 82.1
59 79.2 83.6 68.2 86.7 80.2 71.8 72.7 74.6 75.2 79.2 70.9 81.1 56.6 77.3 81.8
60 82.0 83.0 67.4 88.1 84.0 70.9 73.6 73.6 75.2 78.2 70.9 78.2 56.6 68.2 81.2
61 83.0 84.0 65.7 86.7 79.5 73.6 72.4 72.7 79.2 77.3 84.0 84.3 56.6 68.0 81.2
62 84.0 84.0 67.4 86.7 76.4 72.4 70.9 72.7 79.5 77.0 85.9 86.8 55.7 64.0 81.2
63 84.9 83.0 69.1 88.8 83.0 70.9 71.8 74.6 77.9 77.3 85.2 81.5 55.7 70.3 81.2
64 85.2 83.0 67.4 86.7 79.2 70.0 73.6 76.4 76.7 77.3 83.0 75.5 56.8 71.8 81.2
65 82.7 81.1 65.7 90.2 76.7 70.0 78.2 76.4 76.4 75.5 81.1 74.3 57.6 75.5 81.2
66 83.6 83.0 69.1 86.0 77.3 71.8 78.9 77.3 77.3 75.5 86.8 70.9 58.2 78.2 81.2
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
67 83.0 84.0 67.4 86.0 77.6 72.4 72.1 73.6 76.4 76.4 86.2 66.6 58.4 77.3 81.2
68 81.7 83.6 65.7 84.6 78.5 74.0 73.6 72.7 76.4 75.5 84.9 77.3 59.0 75.8 81.2
69 81.1 84.0 63.2 86.0 76.7 72.4 74.0 71.8 74.6 74.6 84.3 74.9 59.2 77.3 80.4
70 85.9 84.0 64.8 84.6 82.7 74.6 72.7 70.0 74.6 73.6 87.8 73.6 59.8 79.5 80.4
71 84.6 81.1 67.4 83.9 89.5 75.2 77.0 71.8 75.5 73.6 90.8 69.1 59.8 80.4 80.4
72 83.6 84.9 69.1 85.3 97.2 72.7 80.1 69.1 76.4 75.2 92.8 70.9 60.3 80.8 80.4
73 82.4 83.3 78.2 86.0 95.9 71.2 78.2 66.8 75.5 75.8 92.8 79.2 60.6 81.7 80.4
74 90.2 86.8 77.9 86.7 92.8 70.6 79.5 65.7 74.6 76.4 94.2 77.9 60.6 84.3 80.4
75 90.5 83.6 73.6 86.0 105.0 70.9 76.4 67.4 73.6 74.6 95.9 75.2 60.9 87.2 79.6
76 87.5 84.9 72.7 88.1 92.5 70.9 77.6 68.2 75.5 73.6 96.9 73.3 62.9 93.2 79.6
77 89.5 84.9 78.2 93.1 89.8 70.0 77.0 67.4 74.6 73.6 98.0 70.0 64.3 101.0 79.6
78 90.8 81.1 84.0 93.1 84.9 70.3 76.1 67.4 75.5 74.6 98.6 72.4 66.0 107.0 79.6
79 89.1 80.1 85.6 95.2 82.7 69.7 75.5 66.6 80.1 73.6 102.0 74.3 70.6 102.0 78.9
80 91.2 78.2 84.0 96.7 79.2 73.0 82.0 66.6 77.0 73.6 99.3 82.0 74.9 95.5 78.9
81 95.5 78.5 77.6 95.9 75.2 70.0 89.8 66.6 76.4 80.1 108.0 83.0 75.5 94.5 78.9
82 97.9 83.0 73.6 100.0 78.8 69.1 92.2 66.6 76.4 78.2 107.0 90.8 73.6 91.8 78.9
83 95.5 88.6 71.5 103.0 82.0 66.8 85.9 65.7 81.1 80.1 103.0 103.0 71.5 86.2 78.9
84 93.5 98.6 78.2 104.0 81.1 65.7 80.8 68.0 78.3 81.1 102.0 107.0 68.8 84.3 78.9
85 102.0 115.0 81.7 104.0 80.4 65.7 78.8 69.1 82.0 80.1 106.0 110.0 66.6 82.4 78.9
86 99.7 97.4 75.2 106.0 82.4 68.7 80.4 68.2 80.1 82.0 100.0 99.0 63.2 84.6 78.9
87 101.0 97.3 69.1 106.0 90.2 68.0 90.5 65.7 79.5 83.0 97.6 105.0 59.8 80.1 79.6
88 103.0 105.0 82.4 107.0 94.5 73.0 108.0 65.7 81.7 84.9 96.2 120.0 58.4 78.8 79.6
89 102.0 103.0 87.2 108.0 94.5 85.9 107.0 69.1 85.6 88.5 104.0 125.0 56.8 78.5 79.6
90 99.3 102.0 101.0 109.0 107.0 78.2 101.0 74.6 94.5 95.9 105.0 111.0 55.7 78.5 80.4
91 101.0 97.9 98.3 108.0 101.0 76.4 96.6 77.6 106.0 89.8 107.0 114.0 54.9 78.5 80.7
92 90.5 93.9 87.8 104.0 93.9 75.2 107.0 77.3 115.0 87.8 116.0 109.0 54.9 78.5 81.2
93 87.8 92.5 83.0 94.5 90.2 73.6 119.0 74.0 115.0 76.1 118.0 110.0 54.1 79.5 81.2
94 85.6 93.9 78.2 95.2 92.8 76.1 128.0 69.1 118.0 86.8 114.0 108.0 54.1 80.4 82.9
95 90.5 96.6 81.4 94.5 91.8 74.6 126.0 69.7 118.0 87.8 115.0 108.0 53.3 84.6 82.9
96 97.9 100.0 92.2 93.1 101.0 73.6 137.0 73.0 117.0 87.8 117.0 102.0 53.3 98.3 84.2
97 104.0 105.0 81.1 92.4 104.0 70.6 135.0 76.4 117.0 86.8 138.0 97.9 60.6 105.0 86.6
98 103.0 104.0 78.2 100.0 102.0 72.7 148.0 78.0 118.0 85.9 117.0 99.0 62.3 106.0 90.8
99 104.0 101.0 73.6 104.0 106.0 74.3 143.0 88.1 122.0 91.8 130.0 107.0 63.2 108.0 96.5
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
100 119.0 101.0 71.2 112.0 101.0 80.4 139.0 83.3 124.0 95.9 124.0 112.0 64.0 110.0 109.0
101 113.0 110.0 69.1 117.0 100.0 79.5 129.0 87.2 117.0 97.2 126.0 124.0 66.6 113.0 98.9
102 110.0 114.0 68.5 116.0 102.0 83.0 128.0 101.0 110.0 96.9 108.0 134.0 69.1 116.0 91.7
103 107.0 121.0 68.2 114.0 103.0 84.6 131.0 115.0 117.0 97.6 121.0 142.0 68.2 120.0 91.1
104 113.0 121.0 68.2 112.0 109.0 91.2 126.0 117.0 125.0 94.2 141.0 149.0 67.4 123.0 91.1
105 120.0 131.0 64.8 107.0 109.0 96.6 129.0 113.0 140.0 102.0 166.0 139.0 66.6 125.0 91.1
106 117.0 148.0 66.6 106.0 119.0 94.2 131.0 102.0 139.0 107.0 197.0 138.0 66.6 128.0 90.3
107 114.0 158.0 71.2 105.0 143.0 89.2 131.0 98.3 131.0 107.0 221.0 136.0 67.4 130.0 90.3
108 117.0 157.0 72.4 107.0 156.0 80.1 141.0 106.0 121.0 108.0 206.0 139.0 69.1 135.0 90.3
109 122.0 153.0 70.9 111.0 143.0 77.3 160.0 107.0 128.0 105.0 190.0 142.0 71.8 138.0 89.1
110 123.0 161.0 70.9 120.0 180.0 78.2 180.0 115.0 178.0 100.0 189.0 147.0 76.4 144.0 88.6
111 121.0 153.0 71.8 112.0 203.0 76.4 170.0 128.0 183.0 103.0 194.0 141.0 87.8 150.0 87.7
112 134.0 175.0 70.0 117.0 178.0 83.3 183.0 156.0 186.0 103.0 184.0 148.0 92.8 156.0 87.5
113 147.0 190.0 69.1 121.0 169.0 88.5 194.0 159.0 175.0 108.0 200.0 200.0 93.9 166.0 89.1
114 141.0 211.0 78.2 129.0 155.0 100.0 218.0 167.0 161.0 119.0 204.0 236.0 95.9 171.0 98.6
115 125.0 204.0 76.4 128.0 159.0 114.0 242.0 161.0 150.0 126.0 203.0 244.0 93.9 175.0 97.4
116 118.0 207.0 73.6 137.0 148.0 126.0 281.0 160.0 184.0 123.0 224.0 235.0 91.8 178.0 105.0
117 120.0 225.0 74.6 143.0 140.0 131.0 271.0 161.0 193.0 124.0 196.0 196.0 87.8 181.0 114.0
118 128.0 295.0 76.4 152.0 144.0 140.0 242.0 163.0 172.0 126.0 175.0 171.0 84.9 183.0 207.0
119 148.0 322.0 80.8 166.0 190.0 144.0 245.0 168.0 164.0 130.0 156.0 150.0 81.1 185.0 266.0
120 180.0 373.0 83.0 186.0 293.0 139.0 258.0 172.0 160.0 150.0 150.0 155.0 70.9 189.0 280.0
121 196.0 410.0 88.8 173.0 297.0 134.0 256.0 169.0 162.0 154.0 163.0 193.0 73.6 192.0 287.0
122 181.0 418.0 93.2 159.0 285.0 133.0 277.0 146.0 172.0 196.0 153.0 191.0 74.9 196.0 296.0
123 167.0 407.0 96.6 156.0 290.0 128.0 315.0 133.0 201.0 209.0 157.0 198.0 103.0 203.0 314.0
124 156.0 385.0 102.0 158.0 329.0 133.0 352.0 147.0 263.0 190.0 192.0 162.0 90.8 207.0 318.0
125 150.0 379.0 124.0 155.0 305.0 134.0 368.0 148.0 222.0 177.0 251.0 153.0 91.8 211.0 318.0
126 153.0 352.0 149.0 167.0 276.0 128.0 346.0 160.0 183.0 211.0 286.0 143.0 93.9 212.0 318.0
127 143.0 399.0 159.0 175.0 261.0 132.0 351.0 175.0 176.0 274.0 277.0 138.0 87.8 205.0 328.0
128 140.0 407.0 142.0 194.0 309.0 142.0 329.0 186.0 186.0 302.0 338.0 135.0 95.9 264.0 336.0
129 157.0 327.0 137.0 227.0 356.0 141.0 257.0 168.0 207.0 349.0 415.0 137.0 96.9 280.0 340.0
130 194.0 287.0 143.0 257.0 379.0 120.0 231.0 146.0 255.0 341.0 475.0 162.0 87.8 302.0 339.0
131 180.0 280.0 220.0 368.0 328.0 115.0 211.0 140.0 315.0 325.0 487.0 166.0 108.0 313.0 340.0
132 190.0 241.0 204.0 426.0 292.0 115.0 202.0 134.0 384.0 319.0 487.0 205.0 110.0 325.0 347.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
133 226.0 220.0 145.0 512.0 243.0 117.0 212.0 134.0 341.0 361.0 537.0 209.0 114.0 334.0 350.0
134 273.0 203.0 141.0 518.0 214.0 119.0 238.0 144.0 367.0 339.0 637.0 214.0 120.0 292.0 354.0
135 353.0 204.0 135.0 546.0 197.0 113.0 255.0 129.0 404.0 401.0 692.0 234.0 123.0 277.0 362.0
136 326.0 230.0 142.0 652.0 216.0 110.0 309.0 122.0 393.0 312.0 766.0 246.0 127.0 282.0 388.0
137 318.0 234.0 141.0 729.0 209.0 106.0 350.0 135.0 450.0 252.0 690.0 264.0 145.0 271.0 416.0
138 297.0 227.0 137.0 673.0 207.0 110.0 410.0 162.0 405.0 203.0 732.0 270.0 204.0 259.0 454.0
139 270.0 212.0 142.0 653.0 206.0 126.0 391.0 151.0 437.0 194.0 559.0 259.0 250.0 246.0 435.0
140 251.0 197.0 151.0 729.0 209.0 132.0 430.0 143.0 356.0 213.0 443.0 252.0 271.0 232.0 348.0
141 224.0 196.0 176.0 669.0 199.0 139.0 521.0 178.0 381.0 200.0 412.0 271.0 214.0 223.0 355.0
142 185.0 205.0 220.0 569.0 203.0 145.0 607.0 185.0 405.0 210.0 397.0 379.0 199.0 230.0 356.0
143 164.0 242.0 316.0 479.0 271.0 158.0 589.0 205.0 445.0 198.0 389.0 407.0 192.0 229.0 346.0
144 176.0 275.0 407.0 443.0 270.0 166.0 551.0 221.0 453.0 227.0 373.0 305.0 181.0 252.0 358.0
145 222.0 272.0 401.0 443.0 362.0 146.0 583.0 238.0 453.0 271.0 339.0 274.0 173.0 281.0 368.0
146 205.0 366.0 434.0 455.0 464.0 131.0 648.0 246.0 414.0 248.0 323.0 355.0 150.0 325.0 380.0
147 189.0 478.0 385.0 482.0 575.0 175.0 618.0 269.0 390.0 227.0 296.0 320.0 141.0 307.0 368.0
148 215.0 485.0 369.0 523.0 603.0 212.0 636.0 275.0 367.0 230.0 278.0 407.0 135.0 249.0 357.0
149 259.0 481.0 327.0 428.0 616.0 204.0 633.0 278.0 366.0 288.0 286.0 386.0 130.0 255.0 355.0
150 307.0 567.0 351.0 428.0 452.0 196.0 561.0 244.0 319.0 261.0 284.0 420.0 130.0 299.0 352.0
151 330.0 423.0 430.0 440.0 555.0 174.0 502.0 206.0 314.0 235.0 274.0 456.0 127.0 242.0 360.0
152 281.0 472.0 421.0 450.0 331.0 156.0 565.0 182.0 307.0 259.0 268.0 530.0 128.0 245.0 360.0
153 243.0 398.0 408.0 449.0 387.0 176.0 578.0 164.0 295.0 332.0 289.0 510.0 149.0 260.0 366.0
154 234.0 412.0 354.0 507.0 434.0 183.0 613.0 150.0 265.0 404.0 287.0 548.0 141.0 276.0 380.0
155 284.0 407.0 386.0 519.0 354.0 180.0 574.0 147.0 291.0 446.0 299.0 597.0 150.0 296.0 370.0
156 313.0 368.0 337.0 471.0 326.0 179.0 444.0 141.0 291.0 352.0 336.0 533.0 131.0 317.0 364.0
157 298.0 390.0 329.0 540.0 306.0 208.0 412.0 134.0 299.0 324.0 311.0 385.0 129.0 341.0 378.0
158 313.0 441.0 263.0 537.0 261.0 240.0 446.0 132.0 319.0 288.0 304.0 420.0 127.0 324.0 387.0
159 375.0 456.0 236.0 556.0 243.0 234.0 480.0 141.0 350.0 274.0 368.0 455.0 126.0 317.0 392.0
160 334.0 417.0 257.0 570.0 255.0 245.0 525.0 159.0 825.0 281.0 575.0 559.0 122.0 305.0 397.0
161 352.0 432.0 315.0 569.0 322.0 265.0 504.0 188.0 1240.0 298.0 585.0 623.0 120.0 345.0 400.0
162 280.0 448.0 484.0 646.0 404.0 237.0 455.0 193.0 691.0 356.0 615.0 532.0 127.0 379.0 381.0
163 269.0 463.0 497.0 590.0 509.0 246.0 411.0 251.0 538.0 456.0 547.0 454.0 124.0 400.0 366.0
164 318.0 485.0 459.0 613.0 687.0 232.0 431.0 625.0 444.0 605.0 494.0 422.0 121.0 442.0 358.0
165 393.0 606.0 366.0 558.0 707.0 201.0 371.0 361.0 400.0 556.0 489.0 417.0 120.0 526.0 353.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
166 238.0 514.0 422.0 524.0 703.0 232.0 345.0 294.0 305.0 528.0 477.0 443.0 146.0 550.0 348.0
167 439.0 491.0 306.0 502.0 666.0 307.0 339.0 269.0 505.0 497.0 462.0 498.0 158.0 521.0 340.0
168 424.0 512.0 327.0 461.0 547.0 319.0 394.0 315.0 565.0 568.0 458.0 501.0 258.0 609.0 335.0
169 457.0 488.0 374.0 494.0 577.0 291.0 465.0 366.0 528.0 605.0 454.0 485.0 298.0 476.0 332.0
170 492.0 384.0 446.0 455.0 613.0 334.0 551.0 440.0 544.0 600.0 450.0 447.0 354.0 481.0 312.0
171 452.0 367.0 441.0 473.0 679.0 275.0 656.0 502.0 671.0 488.0 439.0 522.0 379.0 492.0 293.0
172 490.0 355.0 489.0 495.0 713.0 324.0 654.0 471.0 993.0 449.0 403.0 509.0 350.0 541.0 269.0
173 562.0 383.0 516.0 384.0 789.0 428.0 701.0 451.0 977.0 548.0 383.0 549.0 387.0 591.0 248.0
174 489.0 546.0 559.0 335.0 810.0 470.0 659.0 393.0 1030.0 823.0 389.0 557.0 377.0 497.0 219.0
175 536.0 622.0 574.0 301.0 865.0 521.0 710.0 353.0 799.0 701.0 399.0 588.0 284.0 582.0 204.0
176 468.0 548.0 609.0 338.0 909.0 458.0 638.0 323.0 640.0 693.0 428.0 554.0 223.0 529.0 204.0
177 432.0 568.0 565.0 317.0 817.0 555.0 752.0 347.0 560.0 705.0 456.0 533.0 190.0 527.0 209.0
178 415.0 521.0 523.0 306.0 750.0 615.0 783.0 366.0 504.0 645.0 487.0 601.0 157.0 574.0 208.0
179 387.0 499.0 682.0 449.0 700.0 540.0 770.0 388.0 539.0 538.0 519.0 605.0 144.0 585.0 210.0
180 380.0 470.0 604.0 437.0 752.0 482.0 710.0 348.0 603.0 552.0 542.0 567.0 157.0 632.0 213.0
181 363.0 623.0 552.0 406.0 713.0 514.0 710.0 391.0 561.0 495.0 544.0 605.0 174.0 768.0 214.0
182 353.0 556.0 478.0 792.0 1000.0 593.0 725.0 415.0 569.0 514.0 506.0 530.0 188.0 783.0 217.0
183 344.0 509.0 478.0 690.0 701.0 469.0 702.0 443.0 578.0 533.0 482.0 492.0 201.0 815.0 217.0
184 337.0 470.0 522.0 644.0 541.0 466.0 684.0 764.0 584.0 541.0 498.0 470.0 270.0 826.0 219.0
185 323.0 456.0 658.0 634.0 509.0 469.0 811.0 596.0 601.0 531.0 467.0 528.0 281.0 823.0 224.0
186 309.0 434.0 696.0 502.0 528.0 515.0 932.0 498.0 531.0 529.0 565.0 707.0 327.0 835.0 225.0
187 336.0 503.0 561.0 465.0 500.0 601.0 906.0 404.0 487.0 492.0 589.0 641.0 360.0 813.0 226.0
188 350.0 523.0 529.0 607.0 477.0 559.0 960.0 392.0 526.0 549.0 558.0 582.0 434.0 791.0 232.0
189 364.0 554.0 514.0 824.0 457.0 610.0 845.0 387.0 553.0 648.0 478.0 703.0 466.0 764.0 244.0
190 397.0 567.0 557.0 726.0 460.0 591.0 727.0 391.0 522.0 669.0 463.0 600.0 575.0 718.0 268.0
191 405.0 585.0 534.0 819.0 520.0 568.0 666.0 432.0 612.0 590.0 470.0 784.0 579.0 691.0 293.0
192 429.0 576.0 528.0 990.0 561.0 569.0 631.0 449.0 659.0 703.0 461.0 831.0 567.0 725.0 323.0
193 406.0 558.0 509.0 1120.0 716.0 585.0 630.0 452.0 593.0 968.0 469.0 916.0 488.0 797.0 349.0
194 420.0 526.0 471.0 1010.0 752.0 573.0 628.0 419.0 600.0 987.0 470.0 640.0 445.0 807.0 370.0
195 447.0 716.0 473.0 853.0 825.0 676.0 650.0 393.0 728.0 932.0 430.0 710.0 411.0 760.0 394.0
196 575.0 729.0 445.0 673.0 1060.0 685.0 674.0 415.0 697.0 1010.0 413.0 707.0 354.0 1050.0 418.0
197 567.0 718.0 455.0 616.0 1010.0 689.0 781.0 453.0 737.0 1080.0 449.0 783.0 354.0 1080.0 469.0
198 545.0 770.0 478.0 591.0 945.0 679.0 782.0 488.0 822.0 1210.0 528.0 788.0 374.0 1030.0 521.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
199 565.0 853.0 484.0 580.0 666.0 536.0 792.0 608.0 990.0 1010.0 458.0 810.0 397.0 1130.0 573.0
200 603.0 728.0 471.0 557.0 749.0 511.0 869.0 597.0 821.0 813.0 467.0 798.0 445.0 857.0 631.0
201 567.0 617.0 458.0 678.0 882.0 503.0 982.0 640.0 911.0 772.0 542.0 783.0 607.0 770.0 676.0
202 517.0 575.0 467.0 693.0 852.0 494.0 1080.0 662.0 848.0 770.0 696.0 692.0 446.0 710.0 689.0
203 801.0 612.0 500.0 616.0 743.0 525.0 798.0 563.0 878.0 728.0 740.0 640.0 460.0 593.0 705.0
204 788.0 554.0 665.0 648.0 767.0 573.0 679.0 573.0 1440.0 787.0 577.0 607.0 387.0 577.0 725.0
205 706.0 487.0 737.0 821.0 775.0 632.0 653.0 595.0 975.0 723.0 481.0 600.0 397.0 666.0 754.0
206 701.0 465.0 689.0 776.0 749.0 970.0 631.0 826.0 779.0 799.0 456.0 524.0 358.0 796.0 790.0
207 697.0 448.0 594.0 731.0 838.0 841.0 577.0 868.0 732.0 914.0 429.0 609.0 416.0 853.0 814.0
208 770.0 483.0 662.0 682.0 882.0 833.0 569.0 814.0 781.0 950.0 424.0 618.0 538.0 1100.0 838.0
209 706.0 465.0 953.0 744.0 790.0 710.0 567.0 1160.0 807.0 1000.0 413.0 594.0 868.0 891.0 847.0
210 605.0 585.0 949.0 708.0 799.0 702.0 605.0 1110.0 1070.0 937.0 404.0 647.0 870.0 1120.0 797.0
211 592.0 575.0 922.0 669.0 798.0 945.0 565.0 1040.0 965.0 908.0 375.0 602.0 812.0 1010.0 739.0
212 616.0 534.0 806.0 615.0 707.0 753.0 562.0 1180.0 1130.0 906.0 379.0 656.0 985.0 998.0 633.0
213 568.0 525.0 677.0 658.0 654.0 690.0 631.0 894.0 1500.0 715.0 369.0 631.0 952.0 988.0 609.0
214 796.0 500.0 798.0 694.0 646.0 699.0 715.0 722.0 1730.0 665.0 421.0 720.0 874.0 959.0 720.0
215 764.0 528.0 721.0 671.0 643.0 1070.0 830.0 711.0 1420.0 764.0 1030.0 896.0 793.0 938.0 708.0
216 699.0 569.0 673.0 664.0 724.0 829.0 976.0 642.0 994.0 833.0 760.0 952.0 763.0 1190.0 893.0
217 778.0 542.0 658.0 740.0 767.0 733.0 728.0 696.0 924.0 772.0 664.0 837.0 751.0 1500.0 923.0
218 868.0 736.0 644.0 711.0 965.0 707.0 700.0 968.0 707.0 690.0 724.0 881.0 799.0 1450.0 813.0
219 673.0 673.0 621.0 664.0 883.0 643.0 873.0 898.0 665.0 669.0 657.0 727.0 838.0 1560.0 837.0
220 813.0 624.0 709.0 583.0 762.0 633.0 939.0 850.0 641.0 687.0 615.0 694.0 1130.0 1060.0 961.0
221 690.0 605.0 705.0 597.0 955.0 631.0 905.0 800.0 644.0 684.0 647.0 706.0 1110.0 1020.0 873.0
222 668.0 575.0 911.0 566.0 877.0 609.0 1190.0 973.0 666.0 669.0 645.0 819.0 1100.0 1000.0 809.0
223 670.0 556.0 874.0 483.0 1030.0 644.0 1180.0 984.0 797.0 664.0 718.0 616.0 1150.0 973.0 752.0
224 617.0 522.0 812.0 503.0 1150.0 706.0 1210.0 1170.0 710.0 665.0 624.0 606.0 1130.0 927.0 696.0
225 557.0 447.0 808.0 483.0 1280.0 1060.0 1070.0 1100.0 702.0 799.0 615.0 580.0 1100.0 951.0 674.0
226 716.0 451.0 727.0 464.0 1280.0 715.0 987.0 1060.0 724.0 824.0 670.0 612.0 1080.0 976.0 642.0
227 674.0 446.0 940.0 443.0 1180.0 584.0 911.0 727.0 693.0 874.0 700.0 639.0 1130.0 847.0 637.0
228 756.0 442.0 1200.0 425.0 1160.0 510.0 1040.0 717.0 804.0 869.0 827.0 737.0 1150.0 811.0 672.0
229 714.0 506.0 1150.0 420.0 1140.0 495.0 1000.0 556.0 772.0 827.0 858.0 635.0 1130.0 890.0 621.0
230 742.0 465.0 682.0 417.0 1080.0 505.0 920.0 634.0 729.0 724.0 742.0 726.0 1180.0 1010.0 541.0
231 844.0 495.0 603.0 414.0 1050.0 473.0 972.0 714.0 732.0 716.0 704.0 1070.0 1040.0 1040.0 499.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
232 932.0 556.0 600.0 412.0 1000.0 467.0 896.0 776.0 770.0 720.0 653.0 1130.0 993.0 1120.0 513.0
233 819.0 446.0 654.0 392.0 1020.0 427.0 814.0 752.0 700.0 788.0 747.0 1180.0 937.0 1060.0 649.0
234 1040.0 435.0 781.0 374.0 867.0 415.0 928.0 786.0 677.0 894.0 715.0 1040.0 886.0 817.0 665.0
235 1060.0 421.0 858.0 383.0 796.0 403.0 840.0 1050.0 704.0 684.0 917.0 749.0 796.0 737.0 712.0
236 1090.0 470.0 911.0 357.0 783.0 385.0 968.0 906.0 640.0 609.0 1110.0 744.0 770.0 595.0 591.0
237 1040.0 559.0 1190.0 344.0 742.0 389.0 865.0 745.0 587.0 563.0 982.0 676.0 690.0 589.0 683.0
238 1060.0 471.0 1170.0 329.0 681.0 361.0 878.0 927.0 565.0 530.0 947.0 680.0 665.0 562.0 679.0
239 1160.0 424.0 1150.0 311.0 637.0 367.0 800.0 998.0 605.0 583.0 864.0 844.0 631.0 503.0 852.0
240 1130.0 433.0 1020.0 309.0 620.0 375.0 854.0 695.0 647.0 487.0 842.0 833.0 571.0 475.0 756.0
241 960.0 424.0 984.0 296.0 702.0 362.0 787.0 615.0 711.0 460.0 762.0 817.0 501.0 438.0 695.0
242 1140.0 444.0 987.0 283.0 626.0 354.0 738.0 566.0 740.0 463.0 847.0 812.0 476.0 418.0 735.0
243 1050.0 467.0 965.0 272.0 680.0 380.0 654.0 506.0 760.0 442.0 739.0 932.0 456.0 425.0 685.0
244 752.0 590.0 889.0 268.0 731.0 435.0 628.0 513.0 930.0 426.0 804.0 822.0 434.0 420.0 614.0
245 711.0 494.0 827.0 265.0 785.0 424.0 758.0 555.0 1000.0 419.0 755.0 758.0 414.0 421.0 550.0
246 777.0 533.0 758.0 262.0 764.0 415.0 593.0 546.0 918.0 453.0 711.0 689.0 386.0 418.0 483.0
247 718.0 617.0 691.0 260.0 971.0 397.0 548.0 502.0 811.0 526.0 685.0 1030.0 369.0 423.0 441.0
248 615.0 728.0 663.0 258.0 933.0 417.0 525.0 479.0 778.0 474.0 751.0 899.0 389.0 409.0 439.0
249 578.0 789.0 771.0 257.0 1090.0 456.0 508.0 489.0 786.0 451.0 955.0 854.0 359.0 391.0 413.0
250 569.0 663.0 734.0 255.0 1030.0 628.0 503.0 487.0 777.0 406.0 797.0 743.0 353.0 379.0 404.0
251 605.0 617.0 712.0 254.0 1030.0 728.0 491.0 462.0 690.0 379.0 664.0 641.0 386.0 388.0 389.0
252 534.0 621.0 700.0 253.0 977.0 536.0 469.0 487.0 759.0 365.0 656.0 612.0 372.0 390.0 388.0
253 515.0 611.0 684.0 252.0 1000.0 488.0 451.0 506.0 827.0 359.0 625.0 634.0 403.0 399.0 383.0
254 480.0 618.0 662.0 250.0 821.0 488.0 430.0 513.0 932.0 347.0 698.0 581.0 397.0 353.0 400.0
255 489.0 606.0 645.0 249.0 602.0 656.0 436.0 528.0 813.0 335.0 644.0 539.0 385.0 374.0 433.0
256 471.0 569.0 620.0 248.0 561.0 535.0 419.0 514.0 705.0 356.0 589.0 514.0 340.0 373.0 422.0
257 451.0 534.0 569.0 246.0 577.0 476.0 410.0 539.0 628.0 392.0 579.0 530.0 302.0 331.0 388.0
258 593.0 516.0 460.0 245.0 557.0 431.0 412.0 627.0 585.0 364.0 536.0 632.0 282.0 347.0 353.0
259 680.0 500.0 449.0 244.0 596.0 398.0 389.0 611.0 542.0 337.0 510.0 626.0 329.0 368.0 338.0
260 667.0 477.0 439.0 242.0 565.0 462.0 398.0 534.0 519.0 321.0 482.0 652.0 299.0 435.0 327.0
261 641.0 459.0 429.0 241.0 537.0 419.0 370.0 520.0 503.0 306.0 457.0 682.0 276.0 407.0 318.0
262 424.0 450.0 419.0 240.0 499.0 381.0 369.0 483.0 498.0 294.0 426.0 588.0 269.0 360.0 308.0
263 421.0 441.0 413.0 238.0 434.0 369.0 385.0 457.0 477.0 282.0 420.0 528.0 264.0 320.0 305.0
264 415.0 432.0 410.0 237.0 421.0 363.0 494.0 429.0 469.0 276.0 397.0 491.0 256.0 301.0 298.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
265 425.0 420.0 407.0 236.0 403.0 374.0 415.0 426.0 440.0 272.0 371.0 484.0 292.0 302.0 291.0
266 364.0 410.0 394.0 233.0 392.0 338.0 440.0 440.0 411.0 263.0 361.0 473.0 388.0 299.0 282.0
267 336.0 427.0 384.0 227.0 374.0 311.0 526.0 421.0 399.0 256.0 343.0 581.0 364.0 296.0 272.0
268 292.0 413.0 374.0 223.0 364.0 306.0 430.0 395.0 381.0 254.0 332.0 601.0 327.0 456.0 266.0
269 354.0 405.0 360.0 213.0 354.0 291.0 394.0 381.0 350.0 250.0 322.0 563.0 288.0 534.0 262.0
270 342.0 412.0 349.0 205.0 346.0 282.0 376.0 371.0 339.0 238.0 320.0 496.0 275.0 432.0 249.0
271 315.0 403.0 342.0 199.0 328.0 273.0 365.0 354.0 331.0 230.0 306.0 452.0 266.0 370.0 239.0
272 304.0 397.0 330.0 191.0 346.0 258.0 382.0 330.0 317.0 226.0 289.0 422.0 256.0 336.0 228.0
273 300.0 391.0 297.0 183.0 311.0 247.0 415.0 331.0 309.0 223.0 277.0 403.0 309.0 330.0 220.0
274 289.0 383.0 292.0 179.0 302.0 238.0 386.0 327.0 297.0 217.0 271.0 389.0 286.0 322.0 216.0
275 282.0 374.0 287.0 178.0 297.0 231.0 371.0 336.0 285.0 214.0 264.0 360.0 276.0 316.0 211.0
276 278.0 354.0 286.0 175.0 293.0 225.0 353.0 359.0 274.0 212.0 256.0 345.0 269.0 301.0 207.0
277 277.0 334.0 285.0 171.0 289.0 222.0 345.0 365.0 268.0 207.0 250.0 334.0 288.0 285.0 202.0
278 275.0 309.0 283.0 169.0 500.0 217.0 336.0 367.0 266.0 202.0 243.0 325.0 286.0 273.0 197.0
279 275.0 278.0 282.0 166.0 555.0 211.0 318.0 387.0 265.0 198.0 238.0 316.0 264.0 268.0 194.0
280 273.0 263.0 280.0 171.0 511.0 209.0 297.0 627.0 257.0 194.0 234.0 300.0 247.0 262.0 192.0
281 272.0 252.0 277.0 159.0 378.0 209.0 320.0 513.0 254.0 192.0 230.0 280.0 234.0 258.0 191.0
282 270.0 244.0 275.0 156.0 334.0 207.0 276.0 435.0 251.0 190.0 228.0 268.0 215.0 251.0 189.0
283 268.0 238.0 272.0 151.0 300.0 199.0 285.0 400.0 245.0 190.0 221.0 266.0 230.0 244.0 188.0
284 266.0 233.0 271.0 159.0 291.0 196.0 262.0 337.0 242.0 189.0 212.0 251.0 280.0 241.0 186.0
285 265.0 230.0 269.0 156.0 285.0 192.0 251.0 318.0 235.0 184.0 209.0 245.0 288.0 235.0 185.0
286 263.0 224.0 268.0 153.0 281.0 186.0 245.0 307.0 229.0 180.0 207.0 242.0 276.0 230.0 183.0
287 261.0 217.0 266.0 147.0 271.0 183.0 240.0 294.0 220.0 179.0 203.0 234.0 272.0 225.0 182.0
288 260.0 219.0 265.0 144.0 259.0 177.0 236.0 282.0 216.0 170.0 197.0 226.0 257.0 218.0 180.0
289 257.0 220.0 264.0 143.0 252.0 174.0 232.0 269.0 212.0 170.0 194.0 219.0 205.0 215.0 178.0
290 252.0 214.0 262.0 141.0 242.0 171.0 245.0 260.0 209.0 167.0 190.0 214.0 194.0 210.0 175.0
291 235.0 211.0 261.0 139.0 232.0 168.0 374.0 257.0 205.0 161.0 187.0 206.0 189.0 204.0 171.0
292 234.0 207.0 259.0 134.0 227.0 165.0 339.0 251.0 203.0 159.0 187.0 202.0 187.0 200.0 167.0
293 224.0 205.0 258.0 130.0 222.0 164.0 277.0 244.0 203.0 156.0 182.0 202.0 183.0 196.0 162.0
294 219.0 194.0 257.0 129.0 214.0 166.0 263.0 238.0 201.0 154.0 177.0 197.0 179.0 194.0 160.0
295 207.0 190.0 255.0 128.0 210.0 160.0 248.0 232.0 200.0 152.0 173.0 191.0 176.0 191.0 155.0
296 202.0 189.0 254.0 127.0 208.0 157.0 243.0 226.0 197.0 143.0 169.0 188.0 172.0 185.0 152.0
297 198.0 187.0 253.0 124.0 207.0 156.0 236.0 222.0 194.0 143.0 166.0 185.0 169.0 182.0 152.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
298 197.0 186.0 252.0 121.0 204.0 151.0 229.0 213.0 191.0 142.0 162.0 181.0 168.0 176.0 150.0
299 193.0 183.0 250.0 119.0 203.0 150.0 226.0 209.0 183.0 142.0 161.0 178.0 166.0 172.0 149.0
300 188.0 176.0 249.0 118.0 205.0 148.0 219.0 204.0 183.0 141.0 159.0 175.0 162.0 169.0 148.0
301 183.0 172.0 248.0 117.0 211.0 152.0 211.0 202.0 180.0 141.0 156.0 173.0 160.0 163.0 146.0
302 176.0 169.0 246.0 116.0 222.0 151.0 206.0 197.0 177.0 138.0 153.0 171.0 154.0 156.0 145.0
303 166.0 168.0 232.0 114.0 205.0 152.0 203.0 196.0 174.0 138.0 152.0 169.0 150.0 149.0 144.0
304 161.0 166.0 229.0 113.0 196.0 144.0 198.0 190.0 173.0 137.0 149.0 164.0 146.0 143.0 143.0
305 160.0 165.0 226.0 113.0 191.0 142.0 194.0 189.0 170.0 131.0 146.0 159.0 143.0 139.0 142.0
306 159.0 162.0 218.0 113.0 186.0 140.0 190.0 186.0 169.0 131.0 144.0 156.0 141.0 136.0 141.0
307 157.0 161.0 210.0 112.0 183.0 137.0 184.0 182.0 168.0 130.0 142.0 153.0 139.0 134.0 139.0
308 156.0 160.0 203.0 111.0 182.0 133.0 183.0 182.0 166.0 125.0 140.0 150.0 138.0 131.0 136.0
309 155.0 143.0 198.0 111.0 178.0 133.0 179.0 180.0 164.0 124.0 139.0 146.0 137.0 124.0 134.0
310 152.0 141.0 192.0 110.0 173.0 131.0 178.0 172.0 163.0 123.0 137.0 145.0 136.0 121.0 132.0
311 148.0 137.0 184.0 110.0 172.0 129.0 176.0 166.0 161.0 123.0 137.0 145.0 135.0 120.0 131.0
312 143.0 137.0 181.0 109.0 169.0 129.0 174.0 162.0 160.0 124.0 135.0 143.0 133.0 118.0 130.0
313 143.0 136.0 179.0 109.0 165.0 127.0 172.0 162.0 157.0 124.0 132.0 140.0 132.0 117.0 128.0
314 139.0 131.0 176.0 108.0 162.0 134.0 170.0 159.0 154.0 123.0 131.0 138.0 131.0 115.0 127.0
315 139.0 130.0 173.0 109.0 161.0 130.0 165.0 156.0 150.0 122.0 128.0 135.0 130.0 113.0 127.0
316 137.0 129.0 169.0 106.0 160.0 127.0 162.0 154.0 149.0 120.0 133.0 131.0 129.0 111.0 126.0
317 135.0 128.0 165.0 107.0 159.0 124.0 160.0 153.0 148.0 119.0 137.0 130.0 128.0 111.0 125.0
318 133.0 127.0 160.0 107.0 156.0 122.0 156.0 153.0 147.0 118.0 133.0 131.0 127.0 109.0 125.0
319 133.0 127.0 157.0 106.0 156.0 122.0 156.0 151.0 145.0 115.0 128.0 132.0 126.0 105.0 124.0
320 132.0 126.0 154.0 105.0 150.0 121.0 155.0 150.0 142.0 114.0 132.0 131.0 124.0 105.0 123.0
321 132.0 123.0 151.0 104.0 150.0 120.0 152.0 146.0 142.0 113.0 134.0 128.0 123.0 104.0 122.0
322 131.0 122.0 148.0 103.0 147.0 118.0 151.0 145.0 140.0 112.0 129.0 127.0 122.0 102.0 121.0
323 131.0 121.0 145.0 103.0 145.0 119.0 176.0 143.0 139.0 111.0 125.0 126.0 120.0 100.0 120.0
324 130.0 120.0 141.0 103.0 142.0 119.0 162.0 142.0 137.0 108.0 121.0 124.0 119.0 98.0 118.0
325 130.0 118.0 139.0 103.0 141.0 116.0 156.0 141.0 134.0 108.0 118.0 122.0 118.0 96.2 120.0
326 129.0 117.0 137.0 102.0 139.0 113.0 152.0 138.0 133.0 107.0 117.0 121.0 117.0 95.1 119.0
327 128.0 114.0 134.0 101.0 136.0 112.0 147.0 136.0 133.0 106.0 116.0 120.0 115.0 94.5 118.0
328 126.0 113.0 131.0 100.0 134.0 113.0 143.0 134.0 131.0 105.0 115.0 119.0 114.0 94.0 118.0
329 124.0 112.0 129.0 99.6 133.0 111.0 141.0 136.0 130.0 104.0 114.0 118.0 113.0 92.3 117.0
330 123.0 111.0 125.0 98.8 133.0 126.0 140.0 131.0 128.0 103.0 113.0 117.0 112.0 92.0 116.0
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
331 122.0 108.0 121.0 98.1 130.0 120.0 138.0 130.0 126.0 102.0 112.0 115.0 111.0 92.0 105.0
332 122.0 108.0 118.0 97.4 129.0 117.0 136.0 129.0 124.0 102.0 111.0 113.0 110.0 90.3 105.0
333 120.0 107.0 114.0 96.7 128.0 113.0 135.0 128.0 131.0 101.0 108.0 110.0 108.0 88.6 104.0
334 119.0 106.0 113.0 95.9 126.0 112.0 132.0 126.0 126.0 100.0 107.0 108.0 107.0 87.7 103.0
335 118.0 105.0 112.0 95.2 124.0 123.0 131.0 126.0 124.0 99.0 106.0 107.0 106.0 86.1 102.0
336 115.0 104.0 111.0 94.5 122.0 110.0 129.0 124.0 123.0 97.9 104.0 106.0 105.0 85.3 101.0
337 114.0 103.0 110.0 94.5 122.0 112.0 127.0 123.0 121.0 96.9 102.0 105.0 104.0 85.3 101.0
338 114.0 102.0 109.0 93.8 120.0 110.0 127.0 122.0 119.0 96.9 101.0 104.0 103.0 85.3 100.0
339 113.0 101.0 108.0 96.7 120.0 108.0 126.0 122.0 119.0 95.9 100.0 102.0 102.0 83.9 99.7
340 112.0 100.0 106.0 95.9 118.0 105.0 125.0 121.0 118.0 94.9 98.6 102.0 101.0 83.4 99.4
341 111.0 100.0 107.0 93.8 115.0 104.0 125.0 119.0 117.0 93.9 96.2 101.0 100.0 82.9 98.9
342 108.0 99.0 107.0 93.8 113.0 103.0 123.0 117.0 117.0 92.8 94.9 100.0 99.0 82.3 98.9
343 107.0 96.9 105.0 91.6 112.0 107.0 121.0 115.0 115.0 92.8 94.2 101.0 97.9 82.1 98.0
344 106.0 95.9 104.0 92.4 112.0 134.0 120.0 114.0 114.0 91.8 93.9 100.0 96.9 81.5 97.7
345 105.0 94.9 103.0 91.6 110.0 115.0 118.0 113.0 113.0 90.8 93.9 97.9 96.9 82.3 97.1
346 104.0 93.9 101.0 90.9 108.0 114.0 117.0 112.0 113.0 89.8 93.2 96.9 95.9 83.1 96.8
347 103.0 92.8 100.0 90.2 108.0 114.0 114.0 111.0 113.0 89.8 92.2 95.9 95.9 83.9 96.2
348 102.0 91.8 100.0 91.6 107.0 117.0 113.0 111.0 112.0 90.8 91.8 94.9 94.9 84.5 96.2
349 102.0 87.8 99.6 97.4 107.0 111.0 112.0 110.0 111.0 91.8 91.8 93.9 93.9 85.3 95.7
350 101.0 86.8 98.8 99.6 107.0 106.0 112.0 108.0 110.0 88.8 91.2 92.8 92.8 85.6 95.4
351 100.0 86.8 97.4 92.6 107.0 110.0 112.0 107.0 109.0 87.8 90.8 91.8 91.8 86.4 94.5
352 100.0 85.9 97.4 94.5 105.0 105.0 111.0 106.0 108.0 86.8 90.2 90.8 90.8 86.9 94.5
353 99.0 85.9 98.1 93.8 105.0 101.0 108.0 104.0 108.0 85.9 89.5 89.8 89.8 84.8 93.7
354 97.9 84.9 97.4 93.1 104.0 102.0 107.0 106.0 106.0 84.0 88.1 88.8 88.8 86.9 92.8
355 97.9 84.0 96.7 92.4 103.0 102.0 107.0 104.0 104.0 83.0 86.8 87.8 87.8 85.0 92.8
356 96.9 83.0 95.9 91.6 102.0 101.0 107.0 102.0 104.0 82.0 85.9 86.8 86.8 83.4 92.0
357 96.9 82.0 95.2 91.6 101.0 100.0 106.0 104.0 103.0 81.1 84.6 85.9 85.9 82.1 91.4
358 95.9 81.1 94.7 90.9 101.0 99.0 105.0 101.0 103.0 80.1 84.0 84.9 84.9 82.3 90.6
359 95.9 81.1 94.5 90.2 100.0 97.9 104.0 102.0 103.0 79.2 83.3 84.0 84.0 82.9 89.7
360 94.9 81.1 95.9 90.2 100.0 96.9 103.0 100.0 102.0 79.2 82.0 83.0 83.0 83.1 89.1
361 93.9 81.1 95.2 90.2 100.0 95.9 103.0 99.0 102.0 79.2 82.0 82.0 82.0 83.9 88.3
362 92.8 80.1 94.0 89.5 99.0 94.9 102.0 99.0 100.0 78.2 81.1 81.1 81.1 84.5 87.7
363 91.8 80.1 93.3 89.5 99.0 93.9 101.0 97.9 96.9 78.2 80.1 80.1 80.1 85.3 86.9
Annex A 1.2

Daily observed Discharge (in m3/sec) at Lalighat gauge station


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
364 90.8 79.2 92.8 88.8 96.9 92.8 100.0 96.9 96.6 86.8 79.5 79.2 79.2 86.4 86.6
365 89.8 79.2 90.2 88.8 95.9 88.8 100.0 94.9 94.9 86.8 78.5 78.2 78.2 87.2 86.4
366 89.8 94.9 94.9 77.3
ANNEX 1.3- Technical Specifications of
Automatic Gauging Station
Annex 1.3- Technical Specification of Automatic Gauging Station

Instruments Used in Automatic Gauging Station:


The main instruments consist of Radar level Sensor (RL-15/35) and Data Logger (MRL-6) with
other accessories. As per the agreement and further consultation with client, we have installed
the sensor and data logger of SOMMER Company, Austria. The detailed brochure and
specification of the instruments are attached in this report. The Specifications of the Radar
Level Sensor (RL-15/35) and Data Logger ( MRL-6) is provided below.
Annex 1.3- Technical Specification of Automatic Gauging Station

RL-15/35
Contact-free radar sensor to measure
the water level

Properties and benefits

» Maintenance free

» Measurement range from 15 m / 35 m

» Near blanking zone 0.5 m

» High accuracy +/-2 mm

» Compact design

» Independent of environmental influences

» Easy integration in existing systems

» Vandalism secure as design does not


attract attention
Annex 1.3- Technical Specification of Automatic Gauging Station

Description

Radar sensor
The RL is a high accuracy measuring device to measure the surface water level without direct contact to
the medium.

Measurement principle
The so-called pulse procedure sends a short microwave impulse to the
water surface. Afterwards the sensor remains in standby for a short time.
Within this time the water reflects the pulses to the integrated evaluation
system. The run time of the impulses corresponds directly to the distance
to the current surface water level.

Technical Data

General
153 x 325 x 200 mm
Dimensions
2 brackets for pipe Ø 34 - 48 mm
Operating temperature -40 ... +80°C
Power supply 9.6 ... 36 VDC
Measurement frequency 26 GHz (K-Band)
Total weight 3 kg
Level measurement
Measurement range 0 ... 15 m / 0 ... 35 m
Resolution 1 mm
Accuracy +/- 2 mm
Near blanking zone 0.5 m
Holdback time 60 s (after power on)
Step response time < 3 s (time after a sudden change in the
measured distance to max. 0.5 m)
Output 4 ... 20 mA = 0 ...15 m / 0 ... 35 m
Annex 1.3- Technical Specification of Automatic Gauging Station

MRL-6
Data Logger
Collecting, processing and storing measurement
data – easy, convenient and quick

Features and Advantages


 Reliable and energy-saving: optimised to collect
monitoring data in remote areas without any
infrastructure
 Logger operates fully independently (with internal
batteries or integrated solar charge regulator), no
switch cabinet required, protection type IP 67
 Ideal integration and compatibility with complete
Sommer sensor family as well as common sensors
 Backlit display for easy data readout
 Parameterization via RS-232 and Bluetooth
 Data readout with USB flash drive or
Bluetooth-interface
 Minimum energy demand
 Solid, compact, weatherproof aluminium housing
 Connection for remote data transmission through
modem / 3G possible (with external 3G modem)
Annex 1.3- Technical Specification of Automatic Gauging Station

Technical Data
General
Dimensions (box) 160 mm x 90 mm x 60 mm (width x height x depth)
Weight 1050 g (incl. batteries)
Material aluminum box, powder coated
Protection IP 67 - suitable for outside application; over voltage and reverse power protection
- battery (not within scope of supply): 4 x AA 1.2 V NiMH batteries (L-type) or
Power supply alkaline batteries- external power supply: 5 ... 28 V
- integrated solar charge regulator for solar panel
Power consumption (in standby - 0.2 mA with integrated battery
mode) - 0.44 mA at 12 V with external power supply
Sensor supply 5 V / max. 20 mA or 12 V / max. 50 mA
Reference voltage 2.5 V for potentiometer (max. 0.5 mA)
- LC display with digital contrast setting, 2 x 16 characters
Display
- LED backlight with a splash waterproof cover (foil) and extended temperature range
5 keys-keyboard:
Keyboard - for displaying current measurement values
- confirmations for observer, manual input and adjustments
Number of variables up to 40 (optionally up to 80)
- non-volatile flash memory
Memory
- 4 megabyte internal (equivalent to approx. 600.000 measurement values)
- measurement interval: 1 s ... 24 h
Intervals (adjustable)
- storage interval: 5 s ... 24 h
Software-compatibility Commander by Sommer Messtechnik, FAT 32/16 USB flash drive
Operating & storage temperature -40° C ... +60° C
Installation easy installation; wall mount possible without extra housing
Functions actual values, intensity, minimum, maximum, aggregated values, mean values, etc.
Deep discharge protection for logger and for MRL-6 supplied sensors
A/D converter 16 bit resolution
Interface
- 4 x analogue 0 ... 2.5 V (thereof 1 x PT-1000 4-wire connection, 1 x NTC, 1 x
0 ... 0.3 V) - 1 x counter
Inputs - 1 x frequency input for wind speed
- 1 x potentiometer input for wind direction
Overvoltage protection all inputs with integrated overvoltage fine protection, continuous voltage safe up to 36
V
- 1 x RS 485 (various ASCII protocols)
Digital sensor inputs
- 1 x SDI-12 interface (vers. 1.3)
- 1 x Bluetooth
User interfaces - 1 x USB host (only for readout of data on USB flash drive)
- 1 x communication interface: RS 232; 9.6 ... 115 kBd
Output 1 x switching output: semi-conductor relay, max. 0.5 A / 28 VDC
ANNEX 2.1- Daily Weighted Precipitaion (in
mm) Data Using Thiessen Polygon at
Asaraghat Catchment for Daily Flow
Estimation
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/1/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1977 2.6 0.2 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1977 2.1 0.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1977 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1977 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1977 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1977 0.2 0.1 0.9 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1977 0.0 0.0 0.0 1.7 0.3 6.4 21.3 11.5 4.4 8.6 0.9 1.8 1.5 4.3
1/20/1977 0.9 3.1 0.4 1.0 0.0 0.0 0.5 0.0 8.7 0.3 2.3 3.9 4.0 8.7
1/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1977 1.0 1.9 0.9 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1977 0.8 2.9 0.4 0.1 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.5
1/28/1977 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
1/29/1977 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1977 3.3 0.2 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1977 2.3 0.1 3.1 1.4 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1977 4.2 0.3 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1977 0.8 0.0 1.0 1.5 3.0 2.8 2.3 2.5 1.0 1.9 0.0 0.1 0.0 0.9
2/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1977 14.2 0.9 20.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1977 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1977 18.6 9.6 13.1 35.2 36.7 32.5 14.4 33.0 24.9 27.7 12.7 13.5 13.0 24.9
2/18/1977 9.1 13.5 2.6 15.5 3.2 10.4 21.2 20.3 17.6 18.7 19.0 25.8 25.9 17.6
2/19/1977 3.8 3.9 2.4 2.5 5.9 4.5 0.3 3.8 7.8 3.0 0.9 1.1 1.0 7.8
2/20/1977 6.1 10.6 5.5 8.8 12.8 8.3 1.0 2.5 19.6 2.5 2.5 2.5 2.5 19.7
2/21/1977 1.5 0.0 1.9 1.7 6.0 9.1 1.9 20.3 7.7 15.1 0.5 1.3 0.8 7.6
2/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1977 1.9 0.0 2.8 0.0 8.3 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1977 5.6 3.9 6.3 1.3 18.0 12.3 2.5 5.1 11.9 3.8 0.0 0.1 0.0 11.9
2/27/1977 1.2 3.9 0.5 4.5 0.0 3.2 1.5 11.5 7.1 8.8 2.1 4.0 3.8 7.1
2/28/1977 2.3 0.0 0.0 20.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1977 0.0 0.0 0.0 0.1 0.0 0.1 0.8 0.0 0.0 0.6 4.7 8.2 8.4 0.0
3/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1977 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
3/12/1977 0.0 0.0 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1977 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1977 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1977 1.8 6.8 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/19/1977 1.5 0.0 2.0 2.4 6.1 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1977 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1977 0.0 0.0 0.0 0.0 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
3/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1977 5.5 0.4 7.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1977 4.1 0.2 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1977 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1977 0.7 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1977 0.1 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 1.5 3.5 0.0 0.0 1.3
3/30/1977 2.0 0.0 1.4 0.1 4.3 5.1 1.4 8.9 3.4 6.7 0.6 1.2 1.0 3.4
3/31/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1977 0.5 0.0 0.9 0.0 2.0 4.5 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
4/2/1977 2.6 3.1 2.4 6.0 6.2 5.4 0.0 6.4 2.4 4.7 0.0 0.2 0.0 2.4
4/3/1977 4.6 11.7 1.5 6.1 0.1 2.0 4.2 5.1 8.1 3.8 0.2 0.4 0.3 8.2
4/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.8 0.0 0.0 0.0
4/5/1977 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1977 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1977 1.2 0.1 0.7 2.7 0.0 0.0 0.2 0.0 3.0 0.0 0.0 0.0 0.0 3.0
4/9/1977 1.5 0.0 2.4 0.0 6.2 6.4 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
4/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1977 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1977 1.1 0.0 1.4 2.6 4.2 2.5 0.1 0.0 1.6 0.0 0.0 0.0 0.0 1.6
4/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1977 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1977 1.0 0.0 1.4 0.7 4.2 2.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.5
4/18/1977 1.7 0.0 2.0 5.2 6.0 3.6 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
4/19/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1977 1.3 0.0 1.3 7.3 4.0 3.7 0.1 5.1 2.9 3.8 0.0 0.1 0.0 2.9
4/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1977 1.3 4.8 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1977 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1977 0.2 0.0 0.0 2.3 0.2 5.8 13.3 14.0 7.4 11.7 10.9 19.2 19.3 7.4
4/25/1977 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.8 13.3 0.0 0.0 0.0
4/26/1977 1.1 0.0 1.4 2.6 4.3 3.2 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
4/27/1977 3.2 5.8 0.7 1.4 0.0 1.2 2.5 3.3 8.7 2.5 0.0 0.1 0.0 8.7
4/28/1977 1.8 0.0 0.0 0.3 0.0 2.3 0.1 8.9 5.6 6.6 0.0 0.2 0.0 5.6
4/29/1977 0.4 0.0 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1977 2.6 2.9 2.4 0.0 6.1 5.0 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
5/1/1977 1.1 0.0 1.3 4.6 4.0 8.3 4.1 20.3 12.4 15.4 3.2 6.0 5.6 12.4
5/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1977 0.8 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1977 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1977 3.8 6.1 3.3 0.7 7.9 6.2 0.3 5.6 8.0 5.2 2.3 0.1 0.0 8.0
5/11/1977 0.3 0.0 0.0 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1977 0.0 0.0 0.0 0.2 0.0 3.1 2.9 10.2 3.9 7.6 0.0 0.3 0.0 3.8
5/13/1977 0.0 0.0 0.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
5/14/1977 0.7 1.5 0.2 1.7 0.0 2.7 0.0 10.2 3.9 7.9 2.9 5.2 5.1 3.8
5/15/1977 0.7 0.0 0.6 3.0 2.0 3.4 3.5 6.4 2.4 4.7 0.0 0.2 0.0 2.4
5/16/1977 4.9 4.8 2.2 5.3 5.3 12.1 28.7 17.8 15.4 19.0 49.0 85.2 86.9 15.4
5/17/1977 1.0 1.9 0.2 0.9 0.0 0.1 0.8 0.0 1.0 0.1 0.7 1.3 1.3 1.0
5/18/1977 1.9 5.8 1.2 1.7 1.8 10.2 19.9 23.4 8.9 24.5 20.1 9.5 9.1 8.8
5/19/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
5/20/1977 1.2 2.9 0.4 1.2 0.1 1.5 5.7 2.5 1.9 4.7 7.7 2.8 2.8 1.9
5/21/1977 0.7 1.9 0.2 6.4 0.2 22.7 17.2 76.2 32.6 56.5 0.0 1.9 0.0 32.4
5/22/1977 0.8 2.9 0.4 1.2 0.1 3.9 4.1 12.7 12.3 9.5 0.7 1.6 1.3 12.3
5/23/1977 4.2 0.3 5.6 4.3 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
5/24/1977 0.1 0.0 0.0 1.2 0.0 6.7 0.1 25.4 10.8 18.8 0.0 0.6 0.0 10.7
5/25/1977 1.0 1.0 0.1 16.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
5/26/1977 0.5 1.9 0.2 0.8 0.0 1.2 1.9 3.3 1.3 2.6 1.3 2.3 2.3 1.2
5/27/1977 0.0 0.0 0.0 1.2 0.0 1.2 0.4 4.5 9.2 3.3 0.0 0.1 0.0 9.2
5/28/1977 0.0 0.0 0.0 0.3 0.0 2.7 0.2 10.2 6.7 7.6 0.0 0.3 0.0 6.7
5/29/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1977 3.1 0.2 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1977 3.7 0.2 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1977 0.0 0.0 0.0 0.0 0.0 2.7 0.0 10.2 3.9 8.1 1.2 0.3 0.0 3.8
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/4/1977 0.0 0.0 0.0 0.0 0.0 4.1 0.0 15.7 6.0 12.0 0.9 0.4 0.0 5.9
6/5/1977 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.1 1.9 4.6 1.8 0.1 0.0 1.9
6/6/1977 0.5 0.1 1.2 1.1 2.2 2.6 0.4 5.1 8.5 3.8 0.0 0.1 0.0 8.5
6/7/1977 6.1 9.5 12.5 16.7 12.6 28.8 1.3 81.3 55.7 60.7 3.6 8.3 6.4 55.5
6/8/1977 5.6 0.0 4.1 17.1 11.9 11.9 6.4 15.2 16.8 20.5 29.8 21.2 21.3 16.8
6/9/1977 5.0 0.1 1.3 6.6 0.4 5.7 27.9 5.1 1.9 5.1 4.8 4.5 4.5 1.9
6/10/1977 1.4 0.2 1.5 0.6 0.1 1.3 8.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1977 2.1 7.9 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1977 4.3 0.2 7.0 8.1 16.9 18.7 0.9 33.0 29.4 25.5 5.8 9.0 8.4 29.4
6/13/1977 0.5 0.6 5.7 0.9 1.2 6.4 2.5 20.3 7.7 16.4 8.1 12.4 12.2 7.6
6/14/1977 2.6 0.1 4.4 5.1 10.3 14.4 15.3 22.9 13.2 23.6 20.2 12.8 12.5 13.1
6/15/1977 2.5 6.4 1.0 3.0 0.8 3.1 4.0 7.6 5.7 7.9 7.1 4.9 4.8 5.7
6/16/1977 1.7 5.7 0.6 1.3 0.7 2.4 9.2 2.5 3.2 8.2 15.5 2.5 2.5 3.2
6/17/1977 3.9 8.7 1.4 1.1 3.4 3.5 5.3 2.8 6.7 5.3 10.0 6.5 6.6 6.7
6/18/1977 4.7 10.0 2.9 4.9 6.2 8.2 19.0 6.4 2.4 4.7 0.0 0.2 0.0 2.4
6/19/1977 12.7 5.2 11.8 10.3 15.9 12.8 5.3 10.2 8.6 8.9 7.3 10.5 10.5 8.6
6/20/1977 6.8 9.8 3.9 5.2 0.1 1.7 7.0 2.5 5.9 1.9 0.2 0.4 0.3 5.9
6/21/1977 1.7 0.3 2.4 0.1 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1977 8.6 1.4 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1977 6.8 0.5 9.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1977 4.5 0.3 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/28/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/29/1977 3.4 0.4 3.9 13.1 0.0 4.5 3.3 15.2 6.3 16.8 12.6 0.4 0.0 6.2
6/30/1977 3.6 0.2 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/1/1977 8.4 0.7 11.2 10.4 0.0 3.3 0.1 12.7 6.3 9.4 0.0 0.3 0.0 6.3
7/2/1977 5.9 3.6 6.5 2.9 0.1 1.3 3.9 2.5 1.0 2.1 2.0 3.5 3.5 0.9
7/3/1977 12.8 0.7 12.2 13.7 14.1 48.8 19.3 143.5 71.8 109.9 11.8 12.4 9.1 71.5
7/4/1977 5.1 0.2 6.2 0.6 11.9 11.1 0.6 15.2 10.5 11.3 0.0 0.4 0.0 10.5
7/5/1977 2.1 0.1 3.0 0.2 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
7/6/1977 6.5 16.6 2.2 8.6 5.3 15.0 26.6 30.5 24.0 25.4 8.3 5.4 4.8 24.0
7/7/1977 1.9 1.3 0.8 2.6 0.0 1.2 3.4 2.5 3.4 1.9 0.6 1.0 1.0 3.4
7/8/1977 1.8 6.6 7.4 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
7/9/1977 0.4 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/10/1977 8.9 0.7 12.6 1.2 0.2 3.8 15.9 5.1 1.9 5.2 12.2 21.2 21.6 1.9
7/11/1977 6.3 0.8 9.4 0.0 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
7/12/1977 2.6 1.5 3.5 0.9 0.1 3.1 11.0 5.1 2.2 4.7 7.6 13.3 13.5 2.2
7/13/1977 3.6 4.2 4.0 3.7 5.4 15.1 34.8 25.4 9.6 20.8 16.9 29.8 29.9 9.6
7/14/1977 5.1 9.0 5.7 2.4 0.4 10.2 31.0 20.3 7.7 15.1 0.3 1.0 0.5 7.6
7/15/1977 12.6 30.0 9.7 1.1 17.8 13.8 3.8 10.2 10.7 7.6 0.0 0.3 0.0 10.7
7/16/1977 10.0 15.3 8.7 10.8 9.1 16.3 20.1 30.5 26.5 29.1 18.9 10.5 10.0 26.5
7/17/1977 3.1 4.5 3.3 3.2 5.4 9.8 35.4 5.1 5.7 5.7 10.7 15.0 15.2 5.7
7/18/1977 5.7 1.8 4.2 5.8 8.3 18.4 28.8 35.6 35.2 29.9 11.8 9.7 9.0 35.2
7/19/1977 9.5 4.9 8.1 18.0 18.6 17.4 20.5 12.7 11.6 11.8 20.1 35.0 35.6 11.6
7/20/1977 4.6 0.6 7.6 1.0 8.2 7.0 9.8 2.5 2.8 4.1 14.0 21.1 21.6 2.8
7/21/1977 3.6 4.5 3.4 3.0 0.4 5.3 29.8 2.5 3.9 6.4 25.3 35.8 36.6 3.9
7/22/1977 0.3 0.1 0.9 6.8 0.2 3.6 14.8 5.1 6.9 25.4 49.8 1.4 1.3 6.9
7/23/1977 0.1 0.2 1.8 2.2 0.1 10.3 6.5 35.6 19.0 29.2 9.8 9.3 8.6 18.9
7/24/1977 0.2 1.1 2.8 0.6 0.1 1.2 7.7 0.0 0.0 0.1 1.1 2.0 2.0 0.0
7/25/1977 3.9 3.1 3.4 34.1 8.1 13.8 52.3 5.1 32.2 5.0 10.0 17.5 17.8 32.4
7/26/1977 1.4 5.1 1.1 3.5 0.2 14.2 18.7 43.2 22.1 32.6 4.9 9.5 8.6 22.0
7/27/1977 2.5 4.0 2.5 0.0 0.0 1.3 0.0 5.1 1.9 11.4 29.8 29.9 30.5 1.9
7/28/1977 3.7 0.7 2.1 0.3 0.0 0.2 1.4 0.0 1.6 0.1 0.6 1.0 1.0 1.6
7/29/1977 6.1 17.2 3.1 0.4 4.0 3.2 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/30/1977 9.5 30.4 1.8 0.6 0.1 3.3 4.0 10.2 6.5 7.6 0.0 0.3 0.0 6.5
7/31/1977 5.9 14.1 1.6 0.3 0.0 1.2 3.5 2.5 1.0 1.9 0.2 0.4 0.3 0.9
8/1/1977 5.2 10.5 0.7 12.0 0.1 2.5 11.7 2.5 6.7 3.2 11.2 19.4 19.8 6.7
8/2/1977 12.2 18.1 3.7 3.5 0.0 6.7 0.8 25.4 25.2 18.8 0.0 0.6 0.0 25.2
8/3/1977 11.3 12.5 10.1 16.4 0.2 9.3 17.8 25.4 27.5 19.1 2.1 4.3 3.8 27.5
8/4/1977 12.4 10.9 13.1 0.3 15.8 10.2 1.1 2.5 2.8 1.9 0.3 0.6 0.5 2.8
8/5/1977 13.7 6.4 16.7 0.0 11.9 7.0 0.0 0.0 0.0 15.7 35.8 0.0 0.0 0.0
8/6/1977 7.8 11.2 5.5 16.5 0.4 8.0 33.9 10.2 11.9 14.3 19.4 9.6 9.6 12.0
8/7/1977 9.7 4.5 13.5 0.4 15.8 10.4 2.6 2.5 2.8 3.1 5.4 6.0 6.1 2.8
8/8/1977 8.2 2.2 11.2 0.4 0.0 5.5 1.1 20.3 10.6 15.5 1.0 0.8 0.3 10.5
8/9/1977 2.3 2.0 2.8 4.1 0.1 3.8 8.0 10.2 16.7 10.8 14.3 16.5 16.7 16.7
8/10/1977 7.1 15.6 4.3 4.1 0.5 10.0 42.0 12.7 4.8 9.6 1.7 3.2 3.0 4.8
8/11/1977 7.2 16.5 8.9 5.7 0.5 13.3 42.6 25.4 18.1 27.2 23.2 10.6 10.2 18.0
8/12/1977 6.8 1.9 12.1 2.4 18.7 15.7 31.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/13/1977 14.1 10.2 10.9 0.0 0.0 5.6 0.2 21.3 8.1 16.3 4.6 8.4 8.1 8.0
8/14/1977 11.0 2.2 13.0 0.3 21.0 13.0 3.9 0.0 0.0 0.0 0.3 0.5 0.5 0.0
8/15/1977 15.3 23.8 13.6 7.2 15.3 9.1 0.0 0.0 0.0 0.4 3.4 6.0 6.1 0.0
8/16/1977 15.1 2.4 13.8 12.5 16.6 24.9 65.1 20.3 16.4 15.7 5.3 9.7 9.4 16.4
8/17/1977 7.4 15.5 11.0 6.1 0.1 2.4 12.1 2.5 16.7 2.8 7.7 13.4 13.7 16.8
8/18/1977 13.9 32.5 11.8 7.3 20.3 17.1 11.0 14.0 30.1 11.4 8.3 14.7 14.7 30.2
8/19/1977 12.3 7.0 8.1 0.8 22.2 20.5 5.0 25.4 13.4 24.9 15.5 4.8 4.3 13.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/20/1977 8.9 5.0 10.5 5.1 5.3 10.0 32.2 7.6 7.9 17.2 26.9 1.5 1.3 7.9
8/21/1977 11.4 9.6 11.4 26.3 7.6 21.7 35.0 46.2 39.1 36.7 20.9 37.3 37.1 39.1
8/22/1977 9.3 3.0 10.6 3.1 10.2 9.5 5.0 10.2 6.4 12.4 14.1 7.5 7.4 6.3
8/23/1977 7.9 0.7 11.6 0.8 0.1 1.6 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/24/1977 6.9 11.1 4.6 8.3 0.0 4.7 0.7 17.8 19.2 14.1 7.7 13.8 13.7 19.2
8/25/1977 8.3 0.8 12.3 1.2 0.0 1.3 0.2 5.1 5.9 3.8 0.0 0.1 0.0 5.9
8/26/1977 15.9 23.2 15.6 4.4 10.4 9.5 0.3 12.7 11.3 23.7 43.9 27.3 27.7 11.3
8/27/1977 17.2 13.9 9.6 13.5 8.7 11.8 35.4 5.1 12.4 7.5 11.5 7.3 7.4 12.4
8/28/1977 6.7 4.7 10.7 0.8 6.4 7.6 5.8 11.0 4.2 8.3 1.0 2.0 1.8 4.1
8/29/1977 6.4 6.3 6.1 1.5 5.2 5.3 6.3 5.1 10.6 3.8 0.0 0.1 0.0 10.7
8/30/1977 8.0 3.3 10.5 0.3 4.2 3.1 0.1 2.5 3.4 1.9 0.0 0.1 0.0 3.4
8/31/1977 4.8 9.0 2.3 3.5 1.1 7.2 39.2 2.5 3.4 3.8 4.5 0.1 0.0 3.4
9/1/1977 5.2 12.1 0.0 5.9 0.3 5.0 27.5 2.5 1.0 1.9 0.3 0.4 0.3 0.9
9/2/1977 9.7 23.6 1.7 2.9 5.8 12.4 37.1 12.7 4.8 9.5 0.9 1.8 1.5 4.8
9/3/1977 15.3 8.2 18.5 4.5 10.5 10.9 19.9 6.6 13.7 8.0 7.0 0.2 0.0 13.7
9/4/1977 14.1 34.2 2.7 3.2 8.5 11.2 18.6 12.7 4.8 10.2 2.0 0.8 0.5 4.8
9/5/1977 8.0 13.2 7.2 2.6 6.6 12.1 19.4 20.3 11.4 16.7 8.9 12.9 12.7 11.4
9/6/1977 6.0 11.2 4.8 2.1 0.2 3.0 15.0 2.5 3.4 3.0 4.8 5.3 5.4 3.4
9/7/1977 13.3 26.7 5.9 7.9 0.4 7.3 34.2 7.6 12.6 11.1 15.2 6.9 6.9 12.6
9/8/1977 7.7 13.5 1.4 0.2 0.0 1.1 2.9 2.5 1.0 4.2 5.2 0.1 0.0 0.9
9/9/1977 6.6 8.8 0.5 8.2 0.1 2.6 8.5 5.1 8.4 5.0 10.5 18.3 18.6 8.4
9/10/1977 7.5 3.5 7.7 0.5 16.2 13.3 2.5 12.7 7.3 9.4 0.0 0.3 0.0 7.3
9/11/1977 12.2 14.8 6.6 13.1 12.5 26.5 26.3 58.4 44.5 44.4 9.3 17.5 16.5 44.4
9/12/1977 8.0 10.5 4.5 16.7 10.1 7.3 4.5 2.5 1.0 3.5 13.6 23.7 24.2 0.9
9/13/1977 3.1 5.3 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/14/1977 4.5 4.1 7.5 11.4 0.0 3.7 4.5 12.7 42.3 11.8 20.3 35.5 36.1 42.5
9/15/1977 58.8 13.2 79.8 0.0 6.3 7.1 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
9/16/1977 2.3 8.3 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/1977 5.0 0.3 6.8 0.0 21.0 12.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1977 3.3 0.0 4.6 0.0 14.2 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1977 2.4 0.3 3.5 0.0 10.2 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1977 1.4 0.2 3.4 0.0 5.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1977 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1977 0.0 0.0 0.0 0.3 0.0 0.7 0.1 2.5 3.4 1.9 0.0 0.1 0.0 3.4
9/26/1977 1.0 0.0 1.4 0.0 4.2 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1977 0.8 0.0 1.0 0.7 3.2 5.2 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
9/28/1977 0.0 0.0 0.0 0.6 0.1 0.6 4.0 0.0 2.5 0.0 0.0 0.0 0.0 2.5
9/29/1977 9.0 0.6 12.9 1.5 15.5 11.9 18.6 0.0 0.0 1.1 9.3 16.1 16.5 0.0
9/30/1977 3.4 0.1 4.7 1.1 10.2 7.4 0.0 5.1 2.3 3.8 0.3 0.6 0.5 2.3
10/1/1977 0.0 0.0 0.0 0.1 0.0 3.6 1.6 12.7 4.8 9.4 0.0 0.3 0.0 4.8
10/2/1977 0.0 0.0 0.0 0.1 0.0 0.7 0.0 2.5 1.7 1.9 0.0 0.1 0.0 1.7
10/3/1977 0.1 0.0 0.0 2.5 0.0 1.3 0.1 5.1 2.8 4.9 9.6 16.7 17.0 2.8
10/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1977 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1977 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 1.1 0.0 0.0 0.0 0.0 1.1
10/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1977 1.0 0.0 1.3 3.2 4.2 6.6 18.7 5.1 3.7 4.3 4.0 7.1 7.1 3.7
10/11/1977 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1977 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/5/1977 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1977 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1977 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1977 2.8 2.5 2.6 2.7 8.0 6.1 4.3 3.0 1.1 2.7 3.4 5.3 5.4 1.1
12/29/1977 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1977 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1977 0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1978 0.1 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1978 0.0 0.0 0.0 0.3 0.0 0.3 0.1 1.3 2.7 1.0 0.0 0.0 0.0 2.7
1/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1978 0.0 0.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1978 0.0 0.1 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1978 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1978 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/21/1978 1.3 0.0 1.9 0.0 4.2 2.8 0.0 1.3 0.5 1.0 0.0 0.0 0.0 0.5
1/22/1978 0.4 1.2 0.0 1.7 0.0 0.5 3.2 0.0 1.0 0.0 0.0 0.0 0.0 1.0
1/23/1978 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1978 7.9 0.5 11.3 0.0 0.0 0.0 0.0 0.0 0.0 1.1 9.2 15.9 16.3 0.0
1/26/1978 17.1 8.1 13.8 31.2 33.4 27.6 17.8 20.3 30.1 15.1 0.7 1.8 1.3 30.1
1/27/1978 3.8 3.0 2.5 8.0 4.4 4.3 2.6 5.1 10.6 3.8 0.0 0.1 0.0 10.7
1/28/1978 4.8 8.5 1.5 2.2 4.8 4.0 6.6 0.5 0.2 8.8 19.5 0.5 0.5 0.2
1/29/1978 1.5 4.2 0.0 0.3 0.0 2.1 0.4 7.6 3.9 5.6 0.0 0.2 0.0 3.9
1/30/1978 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1978 0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.6 0.0 0.0 0.0
2/1/1978 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1978 8.6 16.9 5.9 0.0 0.0 0.3 0.0 1.3 0.5 1.0 0.5 0.8 0.8 0.5
2/7/1978 8.2 0.0 5.9 16.1 18.4 22.2 16.2 34.0 23.6 31.5 23.4 22.4 22.1 23.5
2/8/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1978 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1978 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1978 0.7 0.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1978 0.8 1.0 0.0 0.1 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1978 0.0 0.2 2.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1978 7.1 0.4 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1978 8.5 19.9 3.9 4.6 9.9 6.7 1.3 2.5 7.4 1.9 0.7 1.3 1.3 7.4
3/30/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
3/31/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1978 1.2 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1978 1.0 0.1 1.2 2.5 2.0 1.5 0.1 1.3 1.7 1.0 0.0 0.0 0.0 1.7
4/3/1978 0.2 0.0 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1978 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1978 5.3 0.4 8.3 0.0 0.0 11.7 0.0 44.4 16.8 32.9 0.0 1.1 0.0 16.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/8/1978 12.2 17.6 5.1 13.2 14.1 12.9 21.9 5.1 14.4 7.4 18.7 24.7 25.2 14.4
4/9/1978 1.0 2.8 0.0 5.3 0.0 1.7 2.1 5.1 1.9 4.0 0.4 0.1 0.0 1.9
4/10/1978 0.5 0.0 0.6 0.0 2.0 1.8 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
4/11/1978 0.1 0.0 0.0 2.8 0.0 0.7 0.1 2.5 3.2 1.9 0.0 0.1 0.0 3.2
4/12/1978 1.8 1.8 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1978 1.9 0.5 2.7 2.6 7.2 10.2 26.2 7.6 7.9 8.9 20.2 30.4 31.0 7.9
4/14/1978 2.4 7.3 0.3 3.9 1.0 1.2 0.1 2.5 2.4 1.9 0.0 0.1 0.0 2.4
4/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1978 3.1 0.1 4.3 0.0 8.3 4.9 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
4/17/1978 0.9 0.1 1.0 2.3 0.1 1.3 4.0 2.5 3.4 1.9 0.0 0.1 0.0 3.4
4/18/1978 2.6 4.3 1.3 3.5 4.2 8.2 22.0 9.1 9.7 7.8 8.9 15.6 15.8 9.7
4/19/1978 0.9 2.7 2.7 0.2 0.0 0.4 0.5 1.3 1.7 1.0 0.0 0.0 0.0 1.7
4/20/1978 1.7 0.1 1.8 0.4 0.0 0.7 0.0 2.5 1.7 2.2 3.3 5.7 5.8 1.7
4/21/1978 0.3 1.2 0.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
4/22/1978 2.9 5.0 0.9 12.7 2.8 2.6 6.3 0.0 2.1 0.2 1.3 2.2 2.3 2.1
4/23/1978 0.1 0.6 1.2 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
4/24/1978 1.8 6.6 0.0 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
4/25/1978 4.1 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1978 4.6 3.3 3.8 0.0 1.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1978 4.6 11.0 0.8 10.4 2.4 1.4 0.3 0.0 6.2 0.8 1.8 0.0 0.0 6.2
4/28/1978 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1978 3.0 0.2 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1978 4.9 0.2 5.6 7.7 4.0 2.3 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
5/1/1978 8.3 7.8 6.2 6.5 7.0 5.4 4.3 2.5 8.4 2.4 2.3 2.5 2.5 8.4
5/2/1978 10.6 14.3 5.6 11.7 5.2 4.2 3.6 2.5 11.1 2.1 1.2 1.3 1.3 11.2
5/3/1978 17.7 21.3 13.9 5.6 8.4 5.6 0.3 2.3 6.6 2.3 1.4 0.1 0.0 6.6
5/4/1978 11.3 13.1 11.1 2.9 10.2 8.2 10.1 2.5 1.7 3.1 4.4 3.8 3.8 1.7
5/5/1978 4.0 12.5 0.8 0.8 0.0 0.7 0.1 2.5 2.1 2.5 1.4 0.1 0.0 2.1
5/6/1978 1.6 2.5 1.2 0.2 0.0 0.7 1.2 1.8 1.4 2.0 2.7 3.0 3.0 1.4
5/7/1978 1.6 0.0 2.2 0.8 7.0 6.0 5.9 3.8 3.9 4.7 9.0 11.2 11.4 3.9
5/8/1978 2.8 0.1 3.0 5.1 2.8 3.0 2.5 3.8 5.2 3.8 3.7 3.3 3.3 5.2
5/9/1978 2.3 0.0 0.2 2.4 0.1 2.2 4.8 5.6 4.6 4.5 2.9 5.1 5.1 4.6
5/10/1978 0.9 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
5/11/1978 7.6 27.5 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1978 12.2 0.5 11.0 25.5 1.5 18.4 29.2 50.8 44.1 50.4 57.6 69.1 69.6 44.1
5/13/1978 13.2 25.4 7.0 6.5 16.0 12.2 18.2 0.0 0.0 0.1 0.6 1.0 1.0 0.0
5/14/1978 8.7 24.5 3.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
5/15/1978 2.5 4.3 1.9 0.1 0.0 1.0 1.0 3.3 1.3 2.5 0.0 0.1 0.0 1.2
5/16/1978 3.2 0.5 2.9 4.7 9.0 6.7 8.8 0.5 5.2 0.5 1.0 1.8 1.8 5.2
5/17/1978 6.1 9.0 0.5 0.0 0.0 0.9 0.0 3.3 1.3 2.5 0.0 0.1 0.0 1.2
5/18/1978 7.3 5.2 5.4 2.0 4.4 2.9 0.1 1.2 2.9 0.9 0.0 0.0 0.0 3.0
5/19/1978 2.8 0.5 2.2 9.6 7.0 4.8 4.6 0.0 6.2 1.3 3.6 1.8 1.8 6.2
5/20/1978 4.4 9.0 2.7 0.0 8.4 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1978 7.4 0.2 10.4 0.0 18.8 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1978 5.4 0.2 7.6 0.4 9.9 6.0 0.0 0.5 0.2 1.3 2.7 1.3 1.3 0.2
5/23/1978 4.9 0.1 3.8 5.5 4.6 14.9 4.1 44.4 32.0 34.2 6.5 9.3 8.4 31.9
5/24/1978 2.5 5.0 0.6 3.0 2.1 4.5 12.6 5.1 1.9 5.9 6.4 3.6 3.6 1.9
5/25/1978 1.3 3.8 0.0 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1978 1.4 0.1 2.0 0.8 0.0 1.2 3.4 2.5 5.9 2.9 2.8 1.0 1.0 5.9
5/27/1978 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1978 0.0 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 3.5 0.0 0.0 0.0
5/31/1978 0.7 2.5 0.0 1.4 0.0 0.1 0.8 0.0 0.0 0.4 3.6 6.2 6.4 0.0
6/1/1978 1.5 0.1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1978 9.7 25.2 4.0 12.9 10.3 13.1 1.2 26.7 32.5 21.8 9.5 12.3 11.9 32.5
6/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1978 0.4 1.6 0.0 0.7 0.1 0.8 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1978 0.8 0.7 0.9 2.2 0.3 4.7 24.3 3.3 4.1 4.2 7.0 7.3 7.4 4.1
6/7/1978 7.4 1.2 8.6 7.4 7.9 5.5 0.3 3.0 6.1 5.6 16.4 20.7 21.1 6.1
6/8/1978 5.1 1.3 7.3 29.8 14.4 9.9 0.7 5.1 15.1 5.1 3.9 2.4 2.3 15.1
6/9/1978 3.2 10.3 0.1 0.0 0.0 2.7 0.0 10.2 3.9 10.0 8.5 7.2 7.1 3.8
6/10/1978 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 8.2 3.2 3.3 0.0
6/11/1978 1.6 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.9 0.0 0.0 0.0
6/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1978 0.9 1.7 0.0 0.8 0.0 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/1978 0.5 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1978 4.6 8.5 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/1978 5.5 6.2 5.9 6.1 2.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1978 3.9 4.6 5.3 6.5 10.3 6.1 0.4 0.0 0.0 0.1 0.6 1.0 1.0 0.0
6/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1978 0.8 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/1978 0.4 0.0 0.5 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1978 1.6 5.8 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 1.3 1.3 0.0
6/23/1978 0.9 3.4 0.3 0.5 0.1 1.1 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/24/1978 0.1 0.1 0.7 8.8 1.4 27.6 113.4 36.8 14.0 30.9 30.3 53.4 53.8 13.9
6/25/1978 2.8 0.5 3.8 0.1 0.0 2.5 0.8 8.9 3.9 6.8 1.4 2.7 2.5 3.9
6/26/1978 3.8 9.1 2.6 0.8 0.1 1.2 7.8 0.0 1.2 4.6 12.0 3.5 3.6 1.3
6/27/1978 5.5 9.4 6.1 2.4 10.2 9.1 7.2 7.6 6.9 20.6 59.3 60.4 61.7 6.9
6/28/1978 2.7 0.4 2.1 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/29/1978 12.9 33.0 3.2 0.5 0.1 0.7 4.7 0.0 1.2 2.9 6.6 0.0 0.0 1.3
6/30/1978 2.5 2.3 2.0 0.9 0.1 2.4 10.8 2.5 1.0 1.9 0.0 0.1 0.0 0.9
7/1/1978 5.6 8.9 4.1 0.4 6.4 4.5 4.8 0.0 0.0 2.3 15.5 24.8 25.4 0.0
7/2/1978 1.3 1.7 0.9 3.8 0.6 8.0 48.8 1.0 0.4 3.7 12.5 13.7 14.0 0.4
7/3/1978 3.8 3.4 2.4 5.1 1.6 8.3 18.7 17.8 23.4 17.1 9.5 1.7 1.3 23.4
7/4/1978 6.4 9.1 1.3 13.7 0.2 5.9 11.8 15.2 5.8 14.4 7.3 0.9 0.5 5.7
7/5/1978 4.1 3.3 1.8 6.8 0.3 4.7 21.5 5.1 1.9 4.7 7.4 13.0 13.2 1.9
7/6/1978 11.6 2.3 12.6 1.9 1.0 6.9 2.1 22.8 8.7 17.9 8.0 14.4 14.2 8.6
7/7/1978 20.8 34.7 13.9 4.9 6.0 4.8 6.5 1.3 9.4 7.0 34.0 48.3 49.5 9.5
7/8/1978 10.1 18.4 6.0 2.0 0.3 3.9 22.4 1.3 2.5 1.0 0.6 1.0 1.0 2.5
7/9/1978 13.8 18.8 7.6 2.5 3.5 6.5 11.9 10.2 6.0 7.7 0.7 1.5 1.3 6.0
7/10/1978 12.3 15.5 9.0 7.4 9.5 11.2 18.8 10.7 8.0 15.9 22.6 10.7 10.7 8.0
7/11/1978 12.4 11.1 10.9 2.1 2.4 7.0 4.4 19.0 16.6 14.2 0.6 1.5 1.0 16.6
7/12/1978 17.1 22.6 11.9 19.0 17.6 17.6 29.8 10.2 3.9 8.5 7.4 13.1 13.2 3.8
7/13/1978 9.3 11.1 5.3 13.2 0.3 9.2 20.8 22.8 14.7 19.5 22.0 38.7 39.1 14.7
7/14/1978 12.3 4.3 10.3 17.4 16.1 16.7 21.1 15.8 27.5 12.0 2.3 4.4 4.1 27.5
7/15/1978 13.7 15.5 7.6 24.5 12.3 12.0 5.9 15.2 22.5 11.5 2.0 3.9 3.6 22.6
7/16/1978 10.8 8.8 13.7 12.1 2.0 10.9 33.8 17.8 8.7 14.0 7.0 12.5 12.4 8.7
7/17/1978 7.0 16.6 2.6 6.1 2.8 9.3 4.9 26.2 15.5 21.5 7.0 6.1 5.6 15.5
7/18/1978 4.9 5.5 2.1 7.1 0.1 2.3 4.0 6.4 7.8 7.1 8.4 7.1 7.1 7.8
7/19/1978 11.2 21.4 4.7 2.4 2.0 5.0 3.3 12.7 8.5 11.2 5.5 3.8 3.6 8.5
7/20/1978 8.2 11.5 4.1 11.6 5.0 9.1 19.3 12.7 18.5 19.8 23.9 0.8 0.5 18.5
7/21/1978 5.2 5.1 2.9 4.5 3.8 13.1 19.0 30.5 16.7 22.9 2.0 4.3 3.6 16.6
7/22/1978 3.6 4.5 1.7 0.6 0.1 1.4 8.1 0.5 0.2 0.4 0.0 0.0 0.0 0.2
7/23/1978 10.1 6.3 8.6 0.0 9.1 5.6 0.0 1.0 0.4 1.3 3.3 5.0 5.1 0.4
7/24/1978 8.7 16.8 2.3 9.6 0.5 6.7 40.5 1.3 6.2 8.4 21.4 10.7 10.9 6.2
7/25/1978 9.9 11.6 9.5 1.4 0.2 3.8 13.7 6.4 5.7 7.0 5.2 0.2 0.0 5.7
7/26/1978 9.3 0.9 10.8 7.5 13.0 10.8 12.0 5.1 8.4 6.0 9.0 9.5 9.6 8.4
7/27/1978 7.7 1.9 6.6 25.1 13.9 36.7 8.8 104.1 59.3 89.2 52.0 60.8 59.7 59.1
7/28/1978 7.5 9.0 5.9 1.5 0.1 1.7 8.5 1.3 3.7 2.1 7.0 10.7 10.9 3.7
7/29/1978 9.0 13.3 6.0 9.2 5.3 9.1 12.9 15.2 8.7 14.0 6.7 1.4 1.0 8.7
7/30/1978 11.5 12.4 10.9 6.7 11.1 14.1 32.3 10.2 7.6 7.6 0.3 0.7 0.5 7.6
7/31/1978 12.8 17.2 7.4 9.3 3.0 5.9 5.2 12.7 8.5 9.5 0.6 1.3 1.0 8.5
8/1/1978 17.8 21.8 14.5 3.9 13.6 15.3 30.4 10.2 7.1 9.5 4.8 1.0 0.8 7.1
8/2/1978 12.9 10.6 15.9 4.8 14.7 10.5 3.5 5.1 8.9 4.3 4.6 8.0 8.1 8.9
8/3/1978 13.6 32.8 4.7 6.2 5.4 7.8 21.9 5.1 5.5 7.6 16.4 18.7 19.0 5.5
8/4/1978 5.2 12.6 2.1 1.8 1.1 4.4 7.0 10.2 4.1 11.6 25.6 39.4 40.1 4.1
8/5/1978 19.3 33.4 11.2 24.6 13.7 20.9 72.5 7.6 19.6 9.5 22.6 33.2 33.8 19.7
8/6/1978 9.0 11.4 7.6 8.4 7.0 12.3 10.3 25.4 16.8 24.8 17.9 11.1 10.7 16.8
8/7/1978 5.6 4.5 5.8 3.2 0.2 5.8 15.6 12.7 7.3 12.9 8.1 0.8 0.5 7.3
8/8/1978 9.0 14.7 7.4 14.6 1.4 5.5 0.1 17.8 8.0 13.2 0.0 0.4 0.0 8.0
8/9/1978 6.4 14.0 3.6 7.1 0.3 5.7 23.3 7.6 4.6 6.7 8.7 15.3 15.5 4.6
8/10/1978 9.1 10.0 6.9 5.0 4.0 3.4 2.5 2.5 4.4 6.7 13.7 6.3 6.4 4.4
8/11/1978 6.8 9.4 3.5 11.2 4.8 17.3 80.6 8.9 5.9 9.1 18.5 30.7 31.2 5.8
8/12/1978 5.5 4.4 3.9 13.6 6.3 4.2 1.2 1.3 8.7 1.1 0.7 1.3 1.3 8.7
8/13/1978 7.3 15.9 1.9 0.2 5.7 3.9 0.5 1.8 2.1 1.3 0.0 0.0 0.0 2.1
8/14/1978 2.0 2.0 0.1 2.2 0.2 3.5 13.2 5.6 6.0 4.3 1.3 2.4 2.3 6.0
8/15/1978 4.4 0.8 3.5 6.2 2.5 5.4 7.3 11.2 11.5 9.4 8.9 15.7 15.8 11.5
8/16/1978 8.9 16.0 2.7 14.8 3.3 22.5 39.9 55.9 40.3 51.5 57.5 83.6 84.3 40.3
8/17/1978 8.6 15.5 6.4 12.8 8.8 13.5 20.2 20.3 16.4 29.6 44.4 27.5 27.7 16.4
8/18/1978 2.8 1.6 2.6 3.9 2.5 10.5 24.9 20.3 18.5 18.7 30.5 53.3 54.1 18.5
8/19/1978 2.9 6.3 0.1 2.3 0.4 4.6 28.8 0.0 0.0 3.6 30.3 52.5 53.8 0.0
8/20/1978 2.3 2.3 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/21/1978 2.1 1.8 0.8 1.2 2.6 3.7 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/22/1978 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/23/1978 2.9 0.6 2.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.6 0.0 0.0 0.0
8/24/1978 10.9 12.9 9.0 0.3 0.0 0.0 0.1 0.0 2.2 1.2 2.6 0.0 0.0 2.3
8/25/1978 6.9 12.9 6.1 10.8 6.9 22.6 79.5 25.4 25.8 19.8 8.3 15.0 14.7 25.8
8/26/1978 6.2 14.3 2.6 2.4 2.7 6.9 31.0 2.5 1.0 7.2 14.2 5.0 5.1 0.9
8/27/1978 3.1 3.4 0.6 8.3 0.2 4.0 13.0 7.6 6.9 11.4 16.6 8.6 8.6 6.9
8/28/1978 3.7 4.1 2.1 6.4 0.6 8.4 49.0 2.5 1.0 6.1 13.7 9.4 9.6 0.9
8/29/1978 6.8 15.0 2.8 3.4 5.3 3.8 0.3 2.5 6.3 3.5 4.0 0.6 0.5 6.3
8/30/1978 10.5 12.2 9.7 1.9 0.0 0.3 0.1 1.3 1.7 1.0 0.0 0.0 0.0 1.7
8/31/1978 12.3 23.8 8.7 10.1 17.9 12.6 11.2 1.3 6.7 2.0 8.3 14.4 14.7 6.7
9/1/1978 3.5 7.0 2.7 0.9 0.0 0.3 0.0 1.0 0.9 4.4 8.3 0.0 0.0 0.9
9/2/1978 4.2 6.9 2.4 2.6 0.0 0.7 0.0 2.5 1.0 4.1 8.7 8.7 8.9 0.9
9/3/1978 1.9 5.6 1.4 0.9 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
9/4/1978 1.9 0.5 0.4 2.2 0.1 1.4 6.8 1.3 0.5 1.1 0.9 1.5 1.5 0.5
9/5/1978 2.5 3.7 1.1 6.1 0.2 4.0 12.4 7.6 2.9 9.0 10.3 6.6 6.6 2.9
9/6/1978 4.1 3.4 3.0 4.1 3.6 3.1 2.4 2.5 2.7 1.9 0.0 0.1 0.0 2.7
9/7/1978 2.4 1.1 2.4 9.9 2.8 11.6 53.1 7.6 8.6 14.9 25.8 11.6 11.7 8.6
9/8/1978 2.3 2.0 2.9 0.2 1.5 1.9 0.1 3.8 2.7 2.8 0.0 0.1 0.0 2.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/9/1978 6.5 11.9 4.4 15.1 6.9 17.8 0.5 52.1 29.7 49.1 24.4 2.8 1.5 29.6
9/10/1978 1.7 2.6 0.9 1.6 2.2 4.5 20.1 0.5 0.3 1.7 6.3 7.9 8.1 0.3
9/11/1978 3.7 0.5 3.6 0.0 0.0 0.3 0.0 1.0 0.4 0.9 1.1 2.0 2.0 0.4
9/12/1978 5.3 8.0 4.1 3.9 4.0 3.2 3.2 1.3 3.0 1.0 0.0 0.0 0.0 3.0
9/13/1978 8.8 9.0 8.4 12.0 10.2 10.7 11.1 11.4 9.3 13.9 15.6 7.7 7.6 9.3
9/14/1978 5.9 11.2 6.1 2.5 1.5 4.7 16.3 5.1 3.4 3.8 0.0 0.1 0.0 3.4
9/15/1978 4.7 7.2 5.1 9.8 8.7 19.9 31.8 38.1 15.7 33.8 14.7 5.9 5.1 15.6
9/16/1978 2.3 3.2 3.0 0.9 2.8 4.5 1.2 10.2 3.9 8.4 7.2 12.6 12.7 3.8
9/17/1978 0.4 1.3 0.0 0.6 0.0 0.3 0.3 1.0 5.5 0.7 0.0 0.0 0.0 5.5
9/18/1978 0.1 0.0 0.0 0.1 0.0 0.5 1.0 1.3 0.5 1.0 0.0 0.0 0.0 0.5
9/19/1978 0.1 0.0 0.2 1.1 0.2 2.2 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1978 0.3 1.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1978 1.6 5.3 0.0 2.3 0.2 2.3 14.5 0.0 4.0 1.0 2.2 0.0 0.0 4.0
9/22/1978 0.3 0.3 0.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
9/23/1978 0.1 0.5 0.0 0.0 0.0 5.3 0.0 20.3 7.7 15.0 0.0 0.5 0.0 7.6
9/24/1978 0.0 0.0 0.0 0.0 0.0 2.7 0.2 10.2 3.9 7.6 0.0 0.3 0.0 3.8
9/25/1978 0.5 1.8 0.0 0.5 0.1 1.4 7.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
9/26/1978 0.7 1.3 0.0 0.2 0.0 4.4 2.3 15.2 5.8 11.3 0.3 0.9 0.5 5.7
9/27/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1978 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1978 4.6 0.3 6.6 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.9 1.5 1.5 0.0
10/4/1978 11.7 12.4 4.3 42.9 2.2 15.6 20.8 43.2 43.7 37.7 19.7 17.0 16.3 43.7
10/5/1978 3.3 8.3 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.9 1.4 2.5 2.5 0.4
10/6/1978 0.7 1.7 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
10/7/1978 1.1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.2 0.0 0.0 0.0
10/8/1978 0.1 0.0 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.9 2.1 0.0 0.0 0.0
10/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1978 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.7 0.0 0.0 0.0 0.0 1.8
10/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1978 0.1 0.0 0.0 2.0 0.0 0.1 0.9 0.0 6.2 0.0 0.0 0.0 0.0 6.2
10/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1978 0.9 0.6 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1978 0.0 0.0 0.0 0.4 0.1 0.8 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1978 0.0 0.0 0.0 0.0 0.0 2.0 0.0 7.6 2.9 5.6 0.0 0.2 0.0 2.9
11/7/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/25/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1978 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1978 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1978 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1978 3.2 0.6 2.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 3.5 0.0 0.0 0.0
12/28/1978 8.9 5.9 8.0 16.7 0.1 6.1 6.2 20.3 30.5 17.7 8.1 5.5 5.1 30.6
12/29/1978 10.3 6.9 11.9 8.1 23.8 19.7 10.5 15.2 7.0 13.7 8.9 8.3 8.1 7.0
12/30/1978 2.5 2.6 1.8 5.2 3.0 6.1 6.5 12.7 10.5 11.0 6.3 6.8 6.6 10.5
12/31/1978 0.4 0.0 0.3 4.1 1.0 3.7 2.7 10.2 7.8 8.6 4.1 4.3 4.1 7.8
1/1/1979 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.8
1/2/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1979 0.4 0.0 0.0 0.1 0.0 1.4 0.6 5.1 1.9 3.8 0.0 0.1 0.0 1.9
1/12/1979 0.9 3.5 0.0 0.0 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
1/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1979 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1979 1.2 0.3 1.4 1.6 4.4 4.0 5.1 2.5 2.2 3.5 6.1 5.5 5.6 2.2
1/17/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1979 1.5 0.1 2.1 2.4 5.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1979 1.6 6.4 5.5 1.7 0.2 2.2 14.2 0.0 5.0 0.8 6.3 10.9 11.2 5.0
1/25/1979 0.0 0.0 0.0 0.0 0.0 2.0 0.0 7.6 2.9 5.6 0.0 0.2 0.0 2.9
1/26/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 5.6 0.0 0.0 0.0
1/27/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1979 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1979 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1979 0.4 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1979 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1979 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1979 14.2 0.5 17.0 13.7 19.2 17.0 3.0 20.3 27.6 15.2 1.3 2.8 2.3 27.6
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/10/1979 6.0 10.2 1.7 16.2 5.2 11.1 22.4 17.8 6.8 14.7 12.9 22.8 22.9 6.7
2/11/1979 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
2/12/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1979 1.6 0.1 1.7 9.3 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
2/15/1979 2.7 2.9 2.1 0.1 6.3 7.2 0.8 12.7 4.8 14.8 12.5 0.8 0.5 4.8
2/16/1979 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1979 2.1 0.5 3.2 0.4 0.0 0.7 0.2 2.5 4.7 1.9 0.0 0.1 0.0 4.7
2/18/1979 3.3 3.2 3.2 4.2 8.3 4.9 0.7 0.0 12.4 0.0 0.0 0.0 0.0 12.5
2/19/1979 9.2 2.3 13.6 1.5 0.2 5.4 17.5 10.2 4.7 7.6 0.0 0.3 0.0 4.7
2/20/1979 15.1 16.3 9.3 24.2 26.9 26.6 4.7 38.1 14.6 30.2 16.6 29.6 29.4 14.5
2/21/1979 1.2 0.0 0.6 6.8 2.0 4.5 0.0 12.7 4.8 18.5 20.6 0.3 0.0 4.8
2/22/1979 0.0 0.0 0.0 0.0 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
2/23/1979 0.0 0.0 0.0 0.1 0.0 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1979 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1979 4.7 0.2 4.8 2.8 0.0 0.0 1.2 0.0 23.6 6.5 14.8 0.0 0.0 23.7
3/4/1979 13.6 3.6 11.8 21.5 25.0 21.9 11.7 20.3 9.2 15.9 7.3 13.2 13.0 9.1
3/5/1979 4.6 7.4 3.3 8.1 7.1 7.1 11.0 5.1 5.7 6.0 8.4 8.0 8.1 5.7
3/6/1979 1.3 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1979 4.5 4.2 2.7 8.6 8.3 5.1 1.0 0.0 0.0 0.5 2.0 1.8 1.8 0.0
3/8/1979 0.1 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1979 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1979 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1979 0.2 0.8 0.7 0.8 0.1 1.5 9.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1979 4.1 3.7 7.3 1.1 0.1 1.5 9.6 0.0 2.6 0.0 0.0 0.0 0.0 2.6
3/13/1979 13.3 8.7 17.7 9.6 14.0 13.2 15.1 10.2 15.0 10.6 9.7 7.0 6.9 15.1
3/14/1979 10.2 15.6 5.7 37.5 11.0 22.2 12.8 53.3 50.3 52.2 50.3 52.1 52.1 50.2
3/15/1979 8.8 0.8 12.8 1.4 37.1 26.7 9.8 12.7 7.4 9.4 0.2 0.6 0.3 7.4
3/16/1979 0.0 0.0 0.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
3/17/1979 0.0 0.0 0.0 0.0 0.0 5.3 0.0 20.3 7.7 15.0 0.0 0.5 0.0 7.6
3/18/1979 0.5 0.0 0.8 0.0 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
3/19/1979 19.3 1.8 24.0 9.8 3.4 5.2 3.6 10.2 13.1 9.0 3.8 1.7 1.5 13.1
3/20/1979 24.7 2.6 29.6 35.0 42.3 29.6 31.8 0.0 31.5 6.1 24.1 24.5 25.1 31.7
3/21/1979 3.9 2.3 7.9 10.6 10.4 14.2 13.5 22.9 8.7 22.1 21.8 24.6 24.6 8.6
3/22/1979 0.0 0.0 0.0 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
3/23/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1979 1.2 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1979 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1979 1.3 0.0 1.4 5.4 4.4 2.6 0.3 0.0 2.5 0.1 0.6 1.0 1.0 2.5
3/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1979 1.4 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1979 3.4 3.7 1.2 1.4 3.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1979 0.5 0.0 0.0 9.4 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
4/2/1979 1.9 0.0 0.8 0.4 2.4 4.8 0.2 12.7 4.8 9.7 2.1 4.0 3.8 4.8
4/3/1979 0.1 0.3 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1979 0.4 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1979 1.5 1.4 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1979 5.6 7.9 5.5 9.1 11.3 6.9 1.8 0.0 12.9 0.0 0.0 0.0 0.0 13.0
4/7/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1979 0.1 0.6 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1979 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1979 0.5 0.9 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1979 5.2 0.3 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1979 0.1 0.0 0.1 0.0 0.2 0.8 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
4/16/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1979 3.3 0.2 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1979 4.7 0.0 4.2 18.5 12.9 10.3 5.0 7.6 12.8 7.9 8.6 8.6 8.6 12.8
4/19/1979 8.2 0.5 11.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1979 3.8 0.0 4.1 22.2 11.9 13.1 6.0 20.3 33.9 17.5 9.4 9.7 9.4 34.0
4/21/1979 0.5 2.8 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1979 0.0 0.0 0.0 0.0 0.0 5.3 0.0 20.3 7.7 15.0 0.0 0.5 0.0 7.6
4/24/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1979 1.5 0.1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1979 9.7 2.4 15.7 11.0 0.1 3.0 7.1 7.6 13.6 6.4 3.0 3.1 3.0 13.6
4/27/1979 9.1 1.6 13.0 2.7 14.9 10.2 8.7 0.0 0.0 1.7 6.4 6.2 6.4 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/28/1979 2.9 0.0 3.7 5.9 11.3 6.9 1.3 0.0 2.6 0.2 0.8 0.8 0.8 2.6
4/29/1979 0.0 0.0 0.0 0.0 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
4/30/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1979 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1979 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
5/3/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1979 0.6 0.0 0.9 0.0 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
5/6/1979 0.1 0.3 0.0 0.2 0.0 2.0 0.1 7.6 4.1 5.6 0.0 0.2 0.0 4.1
5/7/1979 0.0 0.0 0.0 0.5 0.0 2.0 0.2 7.6 7.2 5.6 0.0 0.2 0.0 7.2
5/8/1979 1.5 0.0 1.5 8.7 4.7 2.8 0.7 0.0 12.7 0.0 0.0 0.0 0.0 12.7
5/9/1979 0.0 0.0 0.0 0.0 0.0 2.0 0.0 7.6 2.9 9.6 15.2 15.0 15.2 2.9
5/10/1979 1.3 4.7 0.0 0.0 0.0 8.7 0.0 33.0 12.5 26.6 8.4 9.0 8.4 12.4
5/11/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1979 0.6 0.0 0.3 8.3 1.0 2.6 0.7 7.6 15.6 11.7 23.6 23.2 23.6 15.6
5/13/1979 0.0 0.0 0.0 2.5 0.3 3.9 24.5 0.0 2.5 0.0 0.0 0.0 0.0 2.5
5/14/1979 0.3 0.0 0.0 5.6 0.0 2.0 0.2 7.6 6.6 9.3 14.0 13.8 14.0 6.6
5/15/1979 1.4 0.0 0.0 28.4 0.0 8.7 0.2 33.0 15.5 24.5 0.0 0.8 0.0 15.4
5/16/1979 0.4 0.0 0.0 0.0 0.0 2.0 0.0 7.6 2.9 5.6 0.0 0.2 0.0 2.9
5/17/1979 1.1 0.0 0.6 7.0 2.1 12.9 8.2 40.6 37.9 31.3 4.6 5.5 4.6 37.9
5/18/1979 2.4 0.0 0.1 0.0 0.4 4.2 0.0 15.2 5.8 11.3 0.0 0.4 0.0 5.7
5/19/1979 1.1 0.0 0.0 2.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
5/20/1979 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1979 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1979 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1979 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1979 5.8 0.4 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1979 1.6 6.3 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1979 2.1 5.0 0.9 3.9 2.6 6.6 2.8 17.8 16.2 15.4 8.4 8.6 8.4 16.2
5/27/1979 0.1 0.0 0.1 0.2 0.0 0.7 0.1 2.5 2.8 1.9 0.0 0.1 0.0 2.8
5/28/1979 0.6 0.0 0.3 0.3 0.8 0.7 1.2 0.0 1.4 0.5 2.0 2.0 2.0 1.4
5/29/1979 5.0 6.5 4.1 0.9 2.0 1.8 4.1 0.0 5.0 0.7 2.8 2.7 2.8 5.0
5/30/1979 5.1 1.2 4.0 1.6 3.0 1.8 0.7 0.0 13.2 0.0 0.0 0.0 0.0 13.2
5/31/1979 0.3 0.0 0.5 0.2 1.4 1.2 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1979 3.2 0.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1979 4.9 7.2 4.2 1.5 8.3 5.6 0.7 2.5 13.4 1.9 0.0 0.1 0.0 13.4
6/3/1979 2.3 4.2 1.2 0.3 0.6 2.0 0.3 6.1 4.9 5.0 2.0 2.1 2.0 4.9
6/4/1979 1.6 2.5 2.9 2.7 4.0 4.3 4.8 5.1 15.0 3.8 0.0 0.1 0.0 15.0
6/5/1979 0.4 0.0 0.0 0.1 0.0 3.6 1.6 12.7 4.8 9.4 0.0 0.3 0.0 4.8
6/6/1979 0.2 0.9 1.7 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
6/7/1979 0.6 0.0 0.8 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
6/8/1979 6.9 13.3 4.5 2.6 14.0 18.1 15.6 28.4 12.4 25.4 16.9 17.1 16.8 12.3
6/9/1979 0.6 0.2 1.1 0.0 0.0 2.7 0.4 10.2 3.9 8.1 1.3 0.3 0.0 3.8
6/10/1979 2.6 2.2 1.7 10.7 4.0 13.1 5.9 38.1 30.8 28.3 0.2 1.2 0.3 30.7
6/11/1979 4.6 2.5 4.0 1.6 3.1 9.4 10.7 22.9 12.5 19.1 9.9 12.7 12.4 12.5
6/12/1979 6.0 1.3 7.8 16.3 4.3 19.1 26.7 48.3 32.1 42.9 24.8 21.8 21.1 32.0
6/13/1979 9.2 14.9 5.8 0.4 17.8 12.6 4.5 5.1 1.9 4.4 4.4 7.5 7.6 1.9
6/14/1979 0.2 0.7 0.0 0.2 0.0 0.7 0.1 2.5 2.8 1.9 0.0 0.1 0.0 2.8
6/15/1979 0.3 0.0 0.4 0.0 0.0 3.3 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
6/16/1979 1.9 2.3 2.0 0.5 5.6 7.6 6.2 12.7 4.8 19.2 28.7 15.6 15.7 4.8
6/17/1979 0.9 0.0 1.4 0.3 4.0 3.0 3.9 0.0 0.0 0.2 1.7 2.9 3.0 0.0
6/18/1979 0.5 1.7 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1979 0.0 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1979 0.0 0.1 0.6 0.3 0.0 0.7 0.3 2.5 3.4 3.6 12.2 19.7 20.1 3.4
6/21/1979 1.0 0.2 2.0 0.6 0.1 9.1 5.1 31.5 13.6 25.4 4.7 0.8 0.0 13.5
6/22/1979 6.0 2.6 6.7 1.7 0.2 6.2 17.8 12.7 4.8 18.9 28.1 15.6 15.7 4.8
6/23/1979 14.3 28.5 17.4 1.8 10.9 9.9 0.6 12.7 4.8 11.5 12.7 19.1 19.3 4.8
6/24/1979 6.4 6.4 3.7 1.0 8.2 7.5 0.0 10.2 3.9 7.9 2.6 4.7 4.6 3.8
6/25/1979 8.5 20.4 0.6 5.3 1.2 3.7 2.2 10.2 8.1 7.6 0.0 0.3 0.0 8.1
6/26/1979 4.2 6.3 2.7 1.1 5.0 6.0 7.2 7.6 7.9 6.7 8.9 15.5 15.7 7.9
6/27/1979 11.1 28.1 5.4 0.7 0.5 3.5 3.3 10.2 7.6 7.6 0.0 0.3 0.0 7.6
6/28/1979 7.7 16.3 3.0 5.9 6.5 8.2 15.9 7.6 6.2 11.1 15.6 7.6 7.6 6.2
6/29/1979 3.8 8.5 0.1 0.2 0.0 12.3 1.9 45.7 17.3 33.9 0.5 1.9 0.8 17.2
6/30/1979 0.7 0.0 0.2 0.0 0.0 10.7 0.0 40.6 15.4 30.6 1.1 1.0 0.0 15.3
7/1/1979 2.7 0.1 1.7 0.5 0.1 2.3 6.2 5.1 1.9 6.5 11.3 12.5 12.7 1.9
7/2/1979 3.2 5.3 1.4 0.0 0.0 10.7 0.0 40.6 15.4 30.1 0.0 1.0 0.0 15.3
7/3/1979 10.2 17.5 7.0 6.6 7.2 24.4 63.9 40.6 29.6 38.1 36.1 43.6 43.7 29.5
7/4/1979 14.1 34.4 7.0 5.6 16.2 18.1 31.6 15.2 33.1 24.2 51.5 52.8 53.8 33.2
7/5/1979 1.4 1.6 1.3 6.2 2.2 4.7 13.9 5.1 2.1 4.0 1.4 2.6 2.5 2.0
7/6/1979 0.4 1.5 0.0 0.8 0.1 1.5 5.2 2.5 4.2 3.4 7.8 10.2 10.4 4.2
7/7/1979 1.0 0.1 1.5 4.8 0.7 4.4 12.9 8.1 6.4 7.0 5.3 7.4 7.4 6.4
7/8/1979 4.5 11.0 3.0 1.7 0.5 3.8 18.7 2.5 2.8 11.4 37.6 38.0 38.9 2.8
7/9/1979 6.9 8.3 4.4 7.3 1.0 13.8 78.9 5.1 1.9 4.9 9.6 16.7 17.0 1.9
7/10/1979 5.2 6.9 2.4 3.3 0.4 7.3 29.2 10.2 6.5 7.7 0.9 1.7 1.5 6.5
7/11/1979 8.9 10.5 7.6 3.7 10.1 11.3 17.4 10.2 3.9 9.8 7.9 7.2 7.1 3.8
7/12/1979 7.6 13.2 6.8 0.0 0.2 3.5 0.0 12.7 4.8 9.4 0.0 0.3 0.0 4.8
7/13/1979 7.7 7.5 7.5 5.4 11.3 9.0 15.8 0.0 7.0 2.3 12.6 17.9 18.3 7.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/14/1979 3.2 5.1 3.0 4.9 1.4 5.8 15.2 10.2 6.6 7.6 0.0 0.3 0.0 6.6
7/15/1979 3.0 6.0 2.7 0.2 1.2 0.9 1.2 0.0 1.2 2.2 6.3 2.9 3.0 1.3
7/16/1979 1.2 1.7 0.2 1.7 0.0 5.3 0.0 20.3 7.7 15.0 0.0 0.5 0.0 7.6
7/17/1979 2.8 6.2 1.1 0.0 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
7/18/1979 8.0 8.2 5.5 4.9 1.2 3.8 2.8 10.2 6.0 9.9 5.7 1.0 0.8 6.0
7/19/1979 10.6 11.1 7.3 9.1 10.4 6.8 0.3 2.5 6.0 2.6 4.0 5.2 5.3 6.1
7/20/1979 6.4 6.0 3.1 9.2 3.2 6.0 22.7 2.8 6.8 7.4 20.3 19.4 19.8 6.8
7/21/1979 6.7 3.1 2.8 4.0 5.9 9.1 11.3 15.2 14.7 14.3 9.8 7.1 6.9 14.7
7/22/1979 6.1 12.1 1.3 2.8 3.0 2.5 0.3 3.0 7.4 2.4 0.4 0.1 0.0 7.4
7/23/1979 3.0 2.2 2.1 1.3 4.0 3.0 0.1 2.5 3.4 4.8 10.0 8.0 8.1 3.4
7/24/1979 6.9 5.5 6.4 2.4 1.1 3.0 10.9 2.5 2.2 2.0 1.2 2.0 2.0 2.2
7/25/1979 8.8 23.7 3.5 0.0 1.3 4.1 0.0 12.7 4.9 10.4 2.6 0.8 0.5 4.9
7/26/1979 9.0 20.5 3.6 4.5 2.6 9.9 51.3 2.5 2.4 6.2 15.8 14.2 14.5 2.4
7/27/1979 11.0 19.5 9.0 8.3 8.8 17.1 70.2 5.1 5.8 7.1 20.7 31.3 32.0 5.8
7/28/1979 10.4 20.3 6.3 6.1 15.2 16.0 29.7 10.2 16.5 11.4 11.1 5.7 5.6 16.6
7/29/1979 1.9 0.1 1.0 1.2 0.0 15.6 2.1 58.4 25.4 43.3 0.0 1.5 0.0 25.2
7/30/1979 4.0 0.8 3.3 10.2 2.0 2.5 4.9 2.5 12.3 2.7 2.1 0.4 0.3 12.3
7/31/1979 10.6 21.1 5.2 18.1 10.4 42.6 40.2 116.8 72.4 101.1 58.6 63.6 62.2 72.2
8/1/1979 6.8 3.9 7.8 3.5 2.9 10.5 40.8 10.2 6.9 10.7 13.6 15.6 15.7 6.8
8/2/1979 10.4 1.3 11.7 5.1 19.3 48.3 41.1 116.8 46.2 89.1 6.1 3.7 0.8 45.8
8/3/1979 15.1 1.7 16.2 19.9 27.8 19.2 14.3 2.5 16.0 4.4 8.7 6.8 6.9 16.0
8/4/1979 21.7 58.2 6.4 8.4 7.9 12.2 32.5 10.2 10.5 11.3 16.4 18.9 19.1 10.5
8/5/1979 6.0 7.1 3.6 3.1 3.6 5.7 14.8 5.1 3.7 5.3 9.8 15.4 15.7 3.7
8/6/1979 10.9 12.6 7.5 6.9 6.0 6.6 7.1 7.6 4.6 5.7 0.9 1.7 1.5 4.6
8/7/1979 7.4 15.4 5.5 3.3 6.2 5.9 6.5 5.1 8.1 7.1 9.9 5.6 5.6 8.2
8/8/1979 5.6 6.8 2.3 1.4 1.1 5.0 7.0 12.7 12.4 16.7 24.0 18.2 18.3 12.4
8/9/1979 10.7 18.1 5.9 2.5 7.5 11.1 9.0 20.3 16.4 18.1 8.9 5.2 4.8 16.4
8/10/1979 5.0 0.9 5.0 3.8 3.5 8.5 38.8 2.5 1.6 4.5 13.0 16.5 16.8 1.6
8/11/1979 11.3 0.5 11.9 6.7 6.1 9.2 13.0 14.0 10.3 14.3 13.2 10.3 10.2 10.3
8/12/1979 13.2 26.9 6.2 18.7 3.0 5.8 9.8 10.2 20.5 9.9 11.6 15.1 15.2 20.6
8/13/1979 14.4 28.4 18.6 6.7 3.2 13.7 18.3 35.6 44.7 28.2 9.9 14.5 14.0 44.7
8/14/1979 11.1 18.9 9.7 6.0 7.0 7.3 3.4 10.2 9.6 9.3 14.3 25.0 25.4 9.6
8/15/1979 5.1 1.1 3.3 12.0 3.3 18.4 65.5 25.4 16.2 24.2 19.6 18.2 18.0 16.2
8/16/1979 9.3 18.1 3.5 7.3 4.9 17.5 17.5 45.7 19.4 34.3 1.3 1.9 0.8 19.3
8/17/1979 8.8 3.5 10.2 1.7 0.3 16.1 21.7 48.3 18.3 37.4 3.9 1.7 0.5 18.2
8/18/1979 5.1 5.2 2.9 1.1 7.4 10.4 13.5 15.2 5.8 11.5 1.4 2.3 2.0 5.7
8/19/1979 2.3 1.0 0.8 0.2 0.0 2.4 2.3 7.6 2.9 5.6 0.0 0.2 0.0 2.9
8/20/1979 6.0 4.9 2.7 0.6 0.1 4.0 8.1 10.2 3.9 8.1 1.4 0.6 0.3 3.8
8/21/1979 5.1 11.0 1.4 1.2 0.2 5.8 15.7 12.7 4.8 9.5 1.0 2.1 1.8 4.8
8/22/1979 4.3 1.1 3.9 1.8 0.1 6.7 9.0 20.3 17.5 23.0 23.7 13.7 13.5 17.5
8/23/1979 8.4 11.7 6.7 0.3 0.1 4.0 3.9 12.7 4.8 9.5 0.5 1.1 0.8 4.8
8/24/1979 2.9 2.0 3.3 2.3 1.2 4.1 18.3 2.5 2.9 3.4 9.8 15.2 15.5 2.9
8/25/1979 12.7 26.9 5.4 2.0 3.7 8.6 20.5 12.7 8.5 15.3 29.4 38.3 38.9 8.5
8/26/1979 15.0 34.9 8.0 3.8 0.1 6.6 8.0 20.3 11.9 19.5 22.0 28.5 28.7 11.9
8/27/1979 19.5 47.7 11.0 3.4 0.5 9.0 40.3 10.2 5.9 8.6 3.0 1.7 1.5 5.8
8/28/1979 12.4 24.4 10.5 6.3 1.5 7.1 36.8 2.8 1.1 2.1 0.0 0.1 0.0 1.1
8/29/1979 2.8 2.2 3.3 3.0 3.4 9.1 37.9 5.1 1.9 3.8 0.0 0.1 0.0 1.9
8/30/1979 6.7 15.9 1.8 2.0 0.1 5.2 7.7 15.2 5.8 15.5 11.0 3.3 3.0 5.7
8/31/1979 2.8 3.7 2.0 0.3 2.0 3.9 0.1 10.2 6.4 7.6 0.1 0.3 0.0 6.3
9/1/1979 6.6 1.8 4.1 0.0 3.5 2.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
9/2/1979 3.3 5.5 1.8 1.5 0.0 6.0 0.1 22.9 9.6 17.0 0.0 0.6 0.0 9.5
9/3/1979 6.1 2.0 9.3 0.1 5.4 3.6 0.1 1.6 1.6 1.5 0.7 0.0 0.0 1.6
9/4/1979 5.2 9.4 4.0 6.5 1.6 5.5 12.0 10.6 10.6 9.9 6.1 3.5 3.3 10.6
9/5/1979 4.7 1.9 4.3 7.9 2.5 7.9 17.5 14.8 14.8 20.5 25.4 9.2 9.1 14.8
9/6/1979 6.1 8.9 3.6 2.2 1.0 3.7 0.4 12.0 12.0 9.7 4.9 7.7 7.6 12.0
9/7/1979 4.4 0.5 2.3 2.5 3.1 6.0 9.3 10.8 10.8 8.4 0.9 0.3 0.0 10.8
9/8/1979 10.6 22.8 4.6 6.2 7.8 8.4 0.5 14.2 14.2 10.5 0.0 0.4 0.0 14.2
9/9/1979 7.0 2.1 9.1 5.7 3.0 4.9 6.1 8.6 8.6 6.7 0.9 0.7 0.5 8.6
9/10/1979 5.0 9.0 6.9 3.1 6.1 6.5 16.5 1.6 1.6 1.5 0.7 0.0 0.0 1.6
9/11/1979 0.9 0.0 0.1 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1979 2.7 4.2 5.2 1.2 1.2 3.0 15.1 0.0 0.0 0.1 0.7 1.0 1.0 0.0
9/13/1979 3.4 7.3 1.5 3.3 1.6 11.1 13.8 31.3 31.3 26.5 24.5 40.9 41.1 31.3
9/14/1979 2.0 2.0 2.6 1.2 0.0 4.4 0.6 16.8 16.8 12.5 0.6 1.4 1.0 16.8
9/15/1979 5.3 0.5 7.3 0.0 1.0 0.6 0.0 0.0 0.0 0.5 1.1 0.0 0.0 0.0
9/16/1979 5.5 2.0 4.6 0.8 1.5 3.3 5.2 6.0 6.0 4.6 1.0 1.9 1.8 6.0
9/17/1979 5.8 12.8 3.6 5.0 2.6 3.2 11.2 0.0 0.0 4.9 41.2 71.4 73.2 0.0
9/18/1979 0.7 1.5 1.6 0.1 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1979 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1979 7.6 0.3 11.0 0.0 14.8 8.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1979 7.2 13.0 6.8 6.7 7.6 7.6 10.3 6.0 6.0 5.4 3.4 2.9 2.8 6.0
9/22/1979 1.9 3.0 2.1 5.9 0.0 4.8 3.6 16.4 16.4 14.4 5.6 1.4 1.0 16.4
9/23/1979 2.9 8.9 1.5 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1979 2.2 6.7 0.5 1.8 0.3 3.5 22.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1979 1.0 0.0 0.4 2.4 0.3 3.4 21.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1979 1.5 5.7 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1979 0.5 0.2 0.2 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3 7.5 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/29/1979 1.0 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1979 0.6 0.0 0.8 3.9 0.6 8.1 47.8 2.0 2.0 2.2 6.3 11.0 11.2 2.0
10/1/1979 3.8 7.4 2.5 17.1 2.8 7.5 4.5 20.0 20.0 23.9 20.9 1.0 0.5 20.0
10/2/1979 2.3 1.8 2.7 1.6 0.3 3.4 20.7 0.4 0.4 2.2 4.4 0.0 0.0 0.4
10/3/1979 0.6 2.1 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1979 0.0 0.0 0.0 3.0 0.5 6.0 37.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1979 0.1 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1979 0.0 0.1 0.0 0.1 0.0 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1979 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 4.7 0.0 0.0 0.0 0.0 4.7
11/11/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1979 1.4 0.1 2.0 0.0 0.0 0.7 0.0 2.5 1.0 2.7 1.9 0.1 0.0 0.9
11/15/1979 3.3 7.1 2.3 2.8 5.4 3.3 0.4 0.0 0.0 0.0 0.2 0.3 0.3 0.0
11/16/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1979 7.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1979 11.3 0.6 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1979 20.2 27.6 19.7 28.4 26.4 26.8 27.3 27.9 43.5 26.1 30.3 43.3 43.7 43.6
11/26/1979 6.4 7.2 7.1 11.8 17.0 14.3 4.4 14.0 16.0 15.6 18.2 15.2 15.2 16.0
11/27/1979 0.9 1.7 0.6 0.1 2.0 1.9 0.2 2.5 1.7 1.9 0.0 0.1 0.0 1.7
11/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1979 1.4 0.1 2.0 1.8 0.0 0.0 0.8 0.0 15.0 0.0 0.0 0.0 0.0 15.1
12/4/1979 6.0 8.4 7.0 10.8 12.0 11.6 7.7 12.7 4.8 14.1 16.8 14.9 15.0 4.8
12/5/1979 1.9 4.4 1.4 0.3 3.0 5.1 0.0 12.7 4.8 11.8 6.1 1.8 1.5 4.8
12/6/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/15/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1979 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1979 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1980 0.0 0.0 0.0 0.0 0.0 4.7 0.0 18.0 6.8 13.3 0.0 0.5 0.0 6.8
1/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1980 0.6 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1980 1.4 2.7 1.9 0.2 3.0 1.9 0.8 0.0 1.2 0.6 1.7 0.6 0.6 1.3
1/18/1980 0.9 0.1 1.3 1.1 0.0 0.0 0.5 0.0 9.2 0.0 0.0 0.0 0.0 9.2
1/19/1980 5.8 5.0 3.6 8.0 10.5 8.0 11.8 0.0 2.7 7.8 33.8 38.0 39.0 2.7
1/20/1980 1.0 0.0 1.1 3.9 3.5 2.3 1.7 0.0 0.0 1.3 8.8 13.7 14.0 0.0
1/21/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1980 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1980 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1980 0.3 0.8 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1980 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1980 0.7 0.2 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1980 1.8 0.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1980 8.7 4.7 7.9 12.4 12.9 8.8 8.4 0.0 12.4 4.5 20.9 25.4 26.0 12.5
2/1/1980 1.1 1.1 2.0 4.1 3.0 1.8 0.0 0.0 0.0 0.4 0.9 0.0 0.0 0.0
2/2/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1980 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1980 4.0 3.0 7.9 7.7 2.5 1.6 1.1 0.0 6.8 0.1 0.2 0.1 0.1 6.9
2/10/1980 5.9 5.0 3.8 9.1 12.0 9.4 15.5 0.0 6.8 7.0 19.8 9.0 9.2 6.9
2/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1980 0.7 2.1 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1980 1.0 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1980 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
2/17/1980 0.6 0.0 0.8 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
2/18/1980 1.9 2.1 0.5 18.0 0.0 0.2 1.0 0.0 0.0 0.4 3.2 5.5 5.6 0.0
2/19/1980 1.6 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
2/20/1980 2.3 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1980 10.9 1.9 12.7 21.0 3.2 2.9 8.1 0.0 29.6 4.6 11.2 1.9 1.9 29.7
2/22/1980 13.7 0.0 13.7 17.7 40.8 28.1 26.1 0.0 3.2 1.2 8.1 12.6 12.9 3.2
2/23/1980 1.6 0.0 0.0 1.5 0.0 0.4 2.9 0.0 11.2 8.0 19.9 4.3 4.4 11.2
2/24/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.3 5.7 5.8 0.0
2/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1980 0.5 2.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/1980 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/1/1980 1.5 1.5 0.6 0.0 1.8 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1980 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1980 0.8 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1980 1.0 0.0 0.7 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
3/5/1980 1.6 0.6 1.3 4.4 0.0 0.8 0.3 3.0 6.6 2.4 0.4 0.4 0.3 6.6
3/6/1980 1.1 0.1 1.6 0.0 0.8 1.6 0.2 4.0 1.5 3.0 0.1 0.3 0.2 1.5
3/7/1980 5.0 4.8 3.9 17.9 0.4 0.4 0.3 0.4 1.6 1.9 12.6 21.5 22.0 1.7
3/8/1980 12.4 4.1 11.5 16.0 17.8 11.0 3.0 0.4 11.3 1.5 9.9 17.1 17.5 11.4
3/9/1980 8.2 7.9 6.1 1.8 16.8 10.4 2.3 0.5 2.8 3.2 6.4 0.1 0.1 2.8
3/10/1980 1.6 1.2 0.4 0.0 1.2 0.8 0.5 0.0 0.0 0.5 1.4 0.6 0.6 0.0
3/11/1980 1.2 0.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1980 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1980 0.6 1.1 1.5 0.2 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
3/16/1980 0.8 1.3 1.2 9.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1980 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
3/18/1980 1.6 0.0 2.2 0.5 6.3 3.8 0.4 0.0 3.7 0.0 0.0 0.0 0.0 3.7
3/19/1980 2.4 0.0 0.0 8.1 0.0 0.0 0.0 0.0 0.0 1.3 2.8 0.0 0.0 0.0
3/20/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1980 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1980 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1980 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1980 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1980 0.3 0.0 0.2 0.0 0.6 0.4 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.4
3/26/1980 0.6 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1980 1.4 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1980 0.8 2.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1980 0.7 0.6 1.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1980 0.9 2.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
4/1/1980 1.8 0.3 5.2 2.6 7.2 4.5 1.2 0.2 0.1 0.9 1.8 0.0 0.0 0.1
4/2/1980 0.1 0.0 0.1 0.0 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1980 0.8 0.7 6.3 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1980 16.6 17.5 14.6 10.6 18.2 18.1 35.2 8.1 19.2 7.7 5.7 4.8 4.7 19.3
4/8/1980 0.3 0.3 2.7 0.0 0.0 2.1 0.0 8.1 3.1 6.0 0.0 0.2 0.0 3.1
4/9/1980 0.0 0.0 0.0 0.0 0.0 2.7 0.0 10.1 3.8 7.5 0.0 0.3 0.0 3.8
4/10/1980 2.6 1.4 7.3 11.1 7.9 5.8 0.4 4.1 9.0 3.0 0.0 0.1 0.0 9.0
4/11/1980 4.5 0.3 6.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1980 5.9 9.1 2.2 8.9 6.9 5.7 0.0 6.0 2.3 5.0 1.3 0.2 0.0 2.3
4/13/1980 0.8 0.6 1.4 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
4/14/1980 1.6 0.1 2.3 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
4/15/1980 2.9 4.7 2.4 3.2 7.3 10.9 29.5 8.0 3.0 9.6 11.3 6.8 6.8 3.0
4/16/1980 3.4 1.0 2.6 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
4/17/1980 0.3 0.1 0.8 1.8 1.1 1.9 8.2 0.0 0.0 0.1 0.9 1.5 1.5 0.0
4/18/1980 0.2 0.0 0.4 3.8 0.1 1.1 5.3 1.0 0.4 1.6 2.5 1.3 1.3 0.4
4/19/1980 0.6 0.0 0.9 0.0 2.7 1.8 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
4/20/1980 0.1 0.0 0.4 0.5 0.1 6.3 6.8 20.0 7.6 14.8 0.0 0.5 0.0 7.5
4/21/1980 0.2 0.8 0.1 0.6 0.0 2.1 0.3 8.0 8.0 5.9 0.0 0.2 0.0 8.0
4/22/1980 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.7 0.0 0.0 0.0 0.0 1.7
4/23/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1980 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1980 3.6 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1980 10.4 12.3 8.4 5.4 3.4 7.9 0.0 22.5 9.2 18.4 3.9 0.6 0.0 9.2
5/1/1980 4.5 12.0 2.8 0.3 3.7 2.5 2.0 0.0 0.8 0.0 0.3 0.5 0.5 0.8
5/2/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1980 0.3 0.3 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1980 0.1 0.0 0.1 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1980 0.1 0.0 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1980 2.1 0.1 3.0 0.2 0.0 0.0 0.1 0.0 1.7 19.4 44.1 0.0 0.0 1.8
5/16/1980 28.1 27.2 21.2 44.8 9.6 25.5 111.8 13.0 52.8 31.0 56.9 19.8 20.0 53.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/17/1980 28.0 33.2 17.2 15.2 43.0 70.8 118.9 104.5 39.6 83.5 50.7 90.4 90.0 39.3
5/18/1980 0.1 0.1 0.9 7.2 0.0 0.0 3.2 0.0 60.6 0.0 0.2 0.3 0.3 60.9
5/19/1980 0.2 0.0 0.1 0.0 0.0 2.9 0.0 11.0 4.2 8.2 0.0 0.3 0.0 4.1
5/20/1980 0.3 0.0 0.0 5.1 0.0 0.0 0.0 0.0 0.0 0.1 1.0 1.7 1.7 0.0
5/21/1980 0.5 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1980 1.4 0.0 0.3 0.0 1.0 3.5 0.0 11.0 4.2 8.5 2.9 5.3 5.2 4.1
5/23/1980 0.7 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.1 0.0 0.0 0.0
5/24/1980 14.2 44.1 2.7 2.8 0.5 0.3 0.0 0.0 0.0 1.0 2.2 0.0 0.0 0.0
5/25/1980 3.8 6.7 2.4 6.2 5.0 4.9 2.4 6.0 2.3 4.7 1.7 3.1 3.0 2.3
5/26/1980 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.9 0.0 0.0 0.0 0.0 5.9
5/27/1980 1.9 1.4 3.4 0.0 3.7 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1980 0.4 0.0 0.0 8.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1980 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1980 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1980 1.2 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1980 0.4 0.0 0.0 2.6 0.4 5.4 33.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1980 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1980 0.0 0.0 0.0 2.7 0.4 5.5 34.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1980 0.0 0.3 2.9 1.4 0.2 2.8 17.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1980 0.6 0.0 0.8 1.3 0.2 6.3 16.4 14.0 5.3 16.8 16.0 3.8 3.5 5.3
6/11/1980 4.6 8.8 7.2 0.0 6.2 3.7 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0
6/12/1980 4.6 7.3 3.2 9.4 1.0 0.6 0.0 0.0 0.0 0.2 1.3 2.2 2.3 0.0
6/13/1980 2.6 7.5 1.3 0.6 0.0 0.3 0.0 1.0 0.5 3.5 9.5 7.7 7.9 0.5
6/14/1980 1.2 1.7 0.2 1.1 0.0 0.0 0.1 0.0 2.5 0.2 0.5 0.5 0.5 2.5
6/15/1980 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.7 0.5 0.5 0.0
6/16/1980 0.3 1.4 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/1980 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1980 1.0 2.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1980 2.6 5.9 0.9 0.2 0.0 0.0 0.1 0.0 1.7 0.0 0.0 0.0 0.0 1.8
6/20/1980 0.0 0.0 0.3 0.2 0.0 0.3 1.9 0.0 0.0 0.4 0.8 0.0 0.0 0.0
6/21/1980 1.2 4.5 0.9 2.2 0.4 4.4 28.1 0.0 0.0 1.3 10.0 16.8 17.2 0.0
6/22/1980 0.7 1.4 1.1 0.2 0.0 0.0 0.3 0.0 1.4 4.6 18.6 19.5 20.0 1.4
6/23/1980 1.3 4.6 0.1 2.6 0.1 0.9 5.8 0.0 0.5 2.3 19.2 33.2 34.0 0.5
6/24/1980 2.4 1.1 3.9 0.5 0.0 0.0 0.2 0.0 3.8 1.5 12.4 21.5 22.0 3.8
6/25/1980 16.0 9.3 19.3 3.1 8.2 5.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/1980 17.6 20.0 17.2 5.0 33.8 23.2 20.3 0.4 0.3 5.8 12.5 0.0 0.0 0.3
6/27/1980 10.6 24.1 4.7 1.6 8.1 6.6 11.9 0.4 4.9 2.7 20.0 34.5 35.4 5.0
6/28/1980 16.4 42.0 4.5 14.7 11.7 10.5 24.9 0.2 22.5 1.9 4.4 0.9 0.9 22.6
6/29/1980 1.2 1.9 2.5 1.3 3.2 2.0 0.2 0.5 3.9 0.4 0.6 1.0 1.0 3.9
6/30/1980 6.1 2.4 9.6 11.3 3.2 5.3 21.8 0.5 9.4 3.4 6.9 0.0 0.0 9.4
7/1/1980 14.8 24.5 9.7 13.0 14.2 12.6 28.5 0.4 20.1 5.8 13.5 2.5 2.5 20.2
7/2/1980 7.3 10.0 5.9 13.5 7.6 9.0 15.2 9.2 25.3 7.4 4.5 7.9 7.9 25.4
7/3/1980 8.5 3.8 5.8 2.0 17.0 12.4 0.8 8.5 8.8 9.4 7.3 0.8 0.6 8.8
7/4/1980 0.0 0.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/5/1980 1.2 0.1 1.1 6.8 0.0 0.0 0.0 0.0 0.0 0.6 4.6 7.9 8.1 0.0
7/6/1980 1.1 2.4 0.4 0.0 0.0 0.0 0.2 0.0 0.0 0.7 5.9 10.1 10.4 0.0
7/7/1980 3.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/8/1980 0.4 0.4 0.2 1.2 0.2 2.4 14.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/9/1980 5.0 11.5 4.9 0.0 0.0 0.2 0.3 0.6 0.2 0.4 0.0 0.0 0.0 0.2
7/10/1980 1.1 2.5 0.9 0.0 0.0 0.5 0.5 1.7 0.6 1.3 0.0 0.0 0.0 0.6
7/11/1980 2.7 7.5 0.5 0.2 0.0 0.1 0.8 0.0 1.3 5.8 20.1 16.2 16.6 1.3
7/12/1980 7.1 9.7 2.7 1.0 1.8 1.3 0.1 1.0 1.8 0.8 0.3 0.6 0.6 1.8
7/13/1980 11.3 15.1 9.1 4.8 0.3 3.8 23.4 0.5 3.5 3.5 7.9 2.0 2.0 3.5
7/14/1980 16.3 35.1 10.1 6.2 12.7 11.4 24.4 1.1 4.6 7.8 24.3 19.9 20.4 4.7
7/15/1980 8.0 7.1 6.8 2.0 1.1 2.2 8.8 1.0 11.7 2.0 3.6 1.6 1.6 11.7
7/16/1980 10.3 21.1 6.2 0.2 0.0 1.1 0.6 4.0 2.9 7.4 10.2 0.1 0.0 2.9
7/17/1980 4.5 1.4 6.6 1.5 16.0 12.3 18.6 0.0 0.4 7.1 22.9 16.0 16.4 0.4
7/18/1980 1.5 2.7 0.0 1.8 0.2 2.2 12.1 1.0 0.4 0.7 0.0 0.0 0.0 0.4
7/19/1980 2.6 4.5 0.4 0.0 0.0 0.8 0.0 3.0 1.1 6.8 10.5 0.1 0.0 1.1
7/20/1980 4.1 9.1 1.8 0.2 0.0 0.5 0.1 1.9 2.6 1.8 1.1 0.4 0.4 2.6
7/21/1980 8.1 14.4 4.3 1.8 0.1 0.2 0.6 0.2 0.7 2.3 5.0 0.1 0.1 0.7
7/22/1980 5.5 10.1 4.1 0.5 0.0 0.2 0.9 0.4 0.3 4.7 10.5 1.2 1.2 0.3
7/23/1980 6.4 8.2 5.2 1.0 0.4 1.2 4.9 1.0 4.2 0.8 0.6 1.1 1.1 4.2
7/24/1980 10.1 11.3 5.9 4.3 2.2 4.7 21.2 1.1 8.5 3.9 10.9 9.0 9.2 8.5
7/25/1980 11.6 5.8 8.4 2.3 6.2 6.9 20.6 0.5 6.0 10.9 34.6 25.2 25.8 6.1
7/26/1980 6.9 16.0 1.2 3.1 0.5 6.4 39.8 0.4 0.2 2.4 11.0 14.9 15.3 0.2
7/27/1980 0.0 0.1 0.5 0.1 0.0 0.4 0.9 1.0 0.4 0.7 0.0 0.0 0.0 0.4
7/28/1980 0.0 0.0 0.2 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
7/29/1980 1.1 0.0 0.1 23.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
7/30/1980 2.4 1.6 3.0 2.8 0.2 4.7 19.4 6.0 2.3 13.7 25.4 10.8 10.9 2.3
7/31/1980 6.0 7.5 6.3 6.3 16.5 18.4 57.1 0.7 16.7 5.8 13.9 4.3 4.4 16.8
8/1/1980 1.9 2.0 1.9 5.7 1.5 6.7 38.4 0.5 12.7 4.2 21.1 29.3 30.0 12.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/2/1980 5.3 5.3 5.0 7.5 1.4 5.2 29.7 0.4 22.9 8.8 23.5 9.8 10.0 23.0
8/3/1980 11.6 25.6 4.4 4.9 12.1 9.8 16.6 0.5 2.1 10.2 28.9 15.6 16.0 2.1
8/4/1980 0.4 0.1 0.7 4.0 0.2 2.5 14.2 1.2 3.4 4.3 13.3 13.2 13.5 3.5
8/5/1980 4.8 7.0 4.2 0.2 4.3 3.0 0.5 1.4 0.5 1.5 3.6 6.3 6.4 0.5
8/6/1980 1.1 3.6 2.9 0.1 0.0 0.5 0.8 1.6 0.6 5.6 18.1 19.1 19.5 0.6
8/7/1980 5.6 1.9 0.6 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/8/1980 2.6 2.0 3.0 1.0 0.0 0.4 1.7 0.6 7.9 0.4 0.0 0.0 0.0 8.0
8/9/1980 3.7 5.2 4.2 9.0 7.1 7.8 17.9 3.5 8.3 10.4 35.1 41.2 42.2 8.3
8/10/1980 4.6 4.6 5.2 0.0 0.0 0.9 0.0 3.5 1.3 2.6 0.0 0.1 0.0 1.3
8/11/1980 12.9 5.9 15.4 4.4 0.0 0.3 1.9 0.0 0.0 0.0 0.3 0.5 0.5 0.0
8/12/1980 8.7 6.1 5.2 0.2 0.0 0.3 2.1 0.0 0.0 1.7 3.9 0.0 0.0 0.0
8/13/1980 4.0 15.0 0.9 4.8 0.4 6.4 35.8 3.2 11.1 2.5 0.3 0.1 0.0 11.1
8/14/1980 3.9 0.8 0.5 4.8 1.0 0.7 0.3 0.3 4.8 0.9 1.4 0.0 0.0 4.8
8/15/1980 6.1 1.0 8.4 1.9 12.8 7.7 0.3 0.3 5.4 0.7 3.9 6.8 7.0 5.4
8/16/1980 11.3 7.1 11.9 12.4 16.0 11.9 16.7 0.5 23.2 1.1 1.8 0.0 0.0 23.3
8/17/1980 3.0 8.4 2.1 2.2 2.3 6.0 28.1 1.5 0.6 3.0 12.8 20.5 21.0 0.6
8/18/1980 5.1 5.8 7.5 0.9 9.9 6.3 0.4 1.6 0.6 2.3 5.3 6.5 6.6 0.6
8/19/1980 1.2 4.1 1.0 0.0 0.2 0.3 0.0 0.5 0.2 1.6 3.0 0.3 0.3 0.2
8/20/1980 1.7 4.2 0.8 0.0 2.0 1.8 0.0 2.2 0.8 1.6 0.0 0.1 0.0 0.8
8/21/1980 2.8 10.3 0.3 1.0 0.0 0.7 1.2 2.0 9.0 2.3 6.7 11.6 11.8 9.0
8/22/1980 3.6 3.4 0.4 0.2 0.0 0.7 0.9 2.1 2.2 1.9 3.2 5.6 5.7 2.2
8/23/1980 0.6 2.3 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.8 2.8 4.9 5.0 0.2
8/24/1980 0.4 1.3 0.1 0.0 0.0 0.2 0.0 0.9 0.3 0.7 0.0 0.0 0.0 0.3
8/25/1980 0.0 0.0 0.0 0.0 0.0 0.5 0.0 1.9 0.7 1.4 0.0 0.1 0.0 0.7
8/26/1980 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.6 0.6 1.2 0.0 0.0 0.0 0.6
8/27/1980 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/28/1980 0.2 0.0 0.1 0.0 0.0 0.3 0.0 1.2 0.5 0.9 0.0 0.0 0.0 0.5
8/29/1980 0.0 0.0 0.3 0.0 0.0 0.3 0.4 1.0 0.4 4.1 8.2 1.5 1.5 0.4
8/30/1980 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
8/31/1980 0.0 0.0 0.0 0.3 0.0 1.3 3.4 3.0 1.3 2.2 0.0 0.1 0.0 1.3
9/1/1980 0.0 0.0 0.0 0.2 0.0 0.4 0.3 1.2 1.7 1.1 1.6 2.8 2.8 1.7
9/2/1980 0.0 0.0 0.1 0.1 0.0 0.1 0.1 0.2 1.0 0.6 1.1 0.0 0.0 1.0
9/3/1980 2.5 5.0 1.7 0.3 1.0 0.7 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
9/4/1980 5.1 9.1 0.9 0.4 2.0 1.2 0.3 0.0 0.0 0.0 0.2 0.3 0.3 0.0
9/5/1980 3.9 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/6/1980 0.2 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/7/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/9/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1980 3.4 6.2 1.1 12.6 0.2 0.1 0.3 0.0 5.7 0.4 0.9 0.0 0.0 5.7
9/13/1980 1.2 1.8 2.1 2.8 0.2 0.1 0.1 0.0 1.9 0.2 0.4 0.0 0.0 1.9
9/14/1980 1.5 2.1 0.6 0.1 0.0 0.1 0.6 0.0 0.0 0.2 1.0 1.6 1.6 0.0
9/15/1980 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
9/16/1980 0.4 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/1980 1.3 0.1 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1980 2.4 0.2 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1980 2.7 9.2 1.5 4.9 0.3 3.5 22.5 0.0 5.1 0.4 1.0 0.0 0.0 5.1
9/20/1980 1.6 0.0 2.4 0.0 4.9 2.9 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
9/21/1980 1.1 0.3 1.7 0.1 4.5 2.7 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
9/23/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1980 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1980 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1980 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1980 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
10/3/1980 3.3 1.6 6.1 0.1 0.0 0.4 0.6 1.0 0.4 0.9 0.4 0.0 0.0 0.4
10/4/1980 5.9 0.0 5.4 14.4 15.8 9.5 1.6 0.0 13.4 1.5 6.9 8.4 8.6 13.4
10/5/1980 1.6 6.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
10/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1980 1.4 1.7 0.9 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1980 1.3 0.0 1.8 0.1 5.4 3.6 0.6 1.0 0.4 0.7 0.0 0.0 0.0 0.4
10/9/1980 1.8 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1980 0.6 0.0 0.5 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1980 1.5 0.0 0.1 10.4 0.0 0.5 0.1 2.0 2.1 1.5 0.0 0.1 0.0 2.1
10/12/1980 1.8 0.1 1.8 0.0 1.0 1.1 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
10/13/1980 1.7 4.2 0.8 1.2 2.7 4.3 16.0 1.0 0.4 1.1 0.8 0.0 0.0 0.4
10/14/1980 1.1 0.0 0.0 1.1 0.0 0.0 0.5 0.0 8.9 0.0 0.0 0.0 0.0 8.9
10/15/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0
10/16/1980 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1980 3.9 0.5 5.7 0.0 16.2 9.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/18/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1980 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1980 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1980 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1980 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1980 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1980 0.5 0.0 0.0 9.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1980 2.9 0.2 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1980 8.1 4.6 7.9 3.7 13.3 13.2 35.7 0.0 8.0 2.6 12.7 16.4 16.8 8.0
12/2/1980 1.9 7.2 0.9 0.1 0.0 0.1 0.9 0.0 0.0 3.7 9.5 2.6 2.7 0.0
12/3/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1980 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
12/14/1980 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
12/15/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1980 1.7 0.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1980 5.7 7.1 4.4 9.9 13.0 9.6 12.6 0.0 0.0 1.2 3.0 0.7 0.7 0.0
12/18/1980 0.2 0.4 4.0 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1980 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1980 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1980 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
12/30/1980 7.4 0.2 9.4 0.3 12.8 7.6 0.2 0.0 2.8 6.5 14.8 0.0 0.0 2.8
12/31/1980 21.6 6.4 17.6 20.0 39.5 27.0 1.9 13.5 30.3 12.1 9.9 12.6 12.6 30.3
1/1/1981 7.1 8.3 1.6 41.7 5.3 10.8 27.6 13.5 15.6 13.0 18.2 27.4 27.7 15.6
1/2/1981 3.4 2.5 5.7 0.0 0.0 0.0 0.0 0.0 0.1 1.2 2.6 0.0 0.0 0.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/3/1981 4.8 5.8 0.0 43.2 0.0 4.8 0.5 18.0 12.4 13.5 1.5 3.1 2.7 12.4
1/4/1981 0.9 0.0 0.0 18.2 0.0 0.1 0.7 0.0 5.7 3.9 11.4 6.1 6.3 5.7
1/5/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1981 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
1/27/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1981 0.5 0.0 0.4 0.0 1.3 0.8 0.0 0.0 0.0 0.0 0.2 0.4 0.4 0.0
1/30/1981 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1981 4.0 0.3 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1981 10.1 12.9 7.1 8.6 14.2 14.5 12.6 16.0 6.1 12.6 3.1 3.4 3.1 6.0
2/5/1981 1.2 3.0 1.7 2.9 0.0 0.0 0.2 0.0 0.5 0.4 1.0 0.0 0.0 0.5
2/6/1981 3.7 3.3 2.0 0.2 6.2 4.1 2.9 0.0 0.1 3.0 8.5 3.9 4.0 0.1
2/7/1981 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
2/8/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1981 1.7 0.6 1.4 7.4 0.0 0.5 2.9 0.0 0.4 0.7 2.6 2.7 2.8 0.4
2/17/1981 2.5 2.9 1.9 0.4 6.0 4.3 5.1 0.0 0.3 0.6 5.0 8.6 8.8 0.3
2/18/1981 0.1 0.4 0.0 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
2/19/1981 0.8 1.7 0.5 0.0 1.4 8.1 0.0 27.9 10.6 20.8 0.3 0.7 0.0 10.5
2/20/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1981 0.7 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1981 4.6 1.1 5.1 0.2 0.0 0.0 0.1 0.0 1.6 0.0 0.0 0.0 0.0 1.6
3/2/1981 14.4 9.3 14.2 22.4 14.0 9.9 12.0 0.0 16.3 4.0 20.4 27.1 27.8 16.3
3/3/1981 20.3 22.4 9.9 26.7 23.9 16.7 17.6 0.0 13.2 6.5 15.9 2.3 2.4 13.3
3/4/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.7 2.9 3.0 0.0
3/5/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1981 0.6 0.0 0.7 0.8 2.1 2.7 9.7 0.1 0.0 0.2 0.7 1.3 1.3 0.0
3/7/1981 11.8 0.8 16.9 0.0 0.0 0.0 0.0 0.0 0.0 2.5 18.9 31.2 32.0 0.0
3/8/1981 21.4 18.6 25.5 23.4 49.9 42.7 38.7 28.0 10.6 28.5 18.6 3.0 2.4 10.5
3/9/1981 6.4 3.2 6.1 7.8 16.8 15.7 1.5 21.0 8.0 19.5 8.9 0.5 0.0 7.9
3/10/1981 2.6 1.4 3.2 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.6 1.1 1.0 1.5
3/11/1981 7.1 7.7 5.9 0.0 4.0 2.4 0.0 0.1 0.0 0.4 1.0 0.6 0.6 0.0
3/12/1981 4.0 8.5 2.4 1.2 4.0 2.5 0.1 0.4 0.2 0.3 0.0 0.0 0.0 0.2
3/13/1981 1.3 0.8 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1981 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1981 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1981 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1981 0.3 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/21/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1981 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1981 2.0 0.2 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1981 3.1 5.9 2.1 0.0 4.0 2.4 0.1 0.0 0.0 0.1 0.6 1.0 1.0 0.0
3/28/1981 2.1 0.1 3.0 0.2 0.0 0.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1981 5.8 8.5 2.4 2.0 4.0 2.3 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
3/30/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1981 7.2 0.5 10.3 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1981 13.3 27.0 11.7 16.4 23.8 15.0 6.9 0.0 12.4 2.2 7.1 5.1 5.2 12.5
4/2/1981 1.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1981 1.2 0.0 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1981 0.5 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1981 0.8 1.1 0.2 3.8 0.0 0.1 0.6 0.0 3.1 0.5 1.1 0.1 0.1 3.1
4/7/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1981 0.1 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1981 0.8 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1981 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1981 2.9 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1981 0.1 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1981 0.9 1.8 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1981 0.3 1.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1981 1.2 0.0 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1981 2.1 1.2 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1981 6.4 6.6 0.0 52.4 0.1 0.8 5.4 0.0 4.2 0.0 0.0 0.0 0.0 4.2
4/26/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1981 1.0 1.5 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1981 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
5/3/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
5/4/1981 1.6 0.8 1.4 0.0 4.5 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1981 4.1 0.1 1.8 3.8 0.0 0.0 0.7 0.0 13.9 0.4 0.9 0.0 0.0 14.0
5/6/1981 4.0 4.2 0.0 0.3 0.0 2.6 0.2 10.0 6.7 7.4 0.1 0.4 0.1 6.6
5/7/1981 3.0 0.0 4.2 0.0 12.8 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1981 1.6 0.1 1.5 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.2 0.4 0.4 0.8
5/9/1981 2.9 1.9 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1981 4.8 1.4 2.6 51.5 3.0 1.8 0.2 0.0 3.7 2.9 7.1 1.2 1.2 3.7
5/11/1981 1.7 2.8 1.5 0.2 0.0 0.0 0.1 0.0 1.3 0.0 0.0 0.0 0.0 1.3
5/12/1981 5.2 1.5 6.5 2.3 13.8 8.2 0.8 0.0 14.4 1.7 3.9 0.0 0.0 14.5
5/13/1981 4.6 4.8 3.4 1.5 10.0 12.4 8.2 20.0 7.6 14.9 0.5 1.4 0.9 7.5
5/14/1981 0.5 0.0 0.0 0.6 0.0 0.5 3.5 0.0 2.9 1.1 2.7 0.7 0.7 2.9
5/15/1981 0.4 0.0 0.6 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1981 1.0 1.2 1.0 3.2 0.6 8.6 31.3 13.7 12.2 10.2 0.6 1.4 1.1 12.1
5/17/1981 1.2 1.9 1.2 0.5 3.0 1.8 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.1
5/18/1981 0.1 0.3 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1981 3.7 1.3 3.2 0.1 1.0 0.8 1.6 0.0 0.0 1.5 4.2 2.1 2.1 0.0
5/20/1981 2.2 1.1 2.3 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1981 1.3 0.1 1.9 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.4
5/22/1981 8.0 3.9 7.9 17.2 15.9 10.0 4.2 0.0 6.4 0.8 4.0 5.4 5.5 6.4
5/23/1981 1.5 2.0 1.2 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.0 3.5 3.6 0.0
5/25/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1981 0.0 0.0 0.0 0.0 0.0 3.4 0.0 13.0 4.9 9.6 0.0 0.3 0.0 4.9
5/27/1981 0.6 0.0 0.9 0.0 2.7 5.3 0.0 14.0 5.3 10.4 0.0 0.4 0.0 5.3
5/28/1981 0.4 0.3 0.2 0.3 0.0 0.0 0.1 0.0 2.1 0.0 0.0 0.0 0.0 2.1
5/29/1981 0.8 0.8 1.5 0.9 2.5 1.5 0.0 0.0 0.0 0.4 2.0 2.7 2.8 0.0
5/30/1981 0.7 0.9 0.9 9.6 0.2 7.5 14.5 20.0 7.6 16.5 7.0 8.1 7.8 7.5
5/31/1981 0.7 1.7 0.3 2.1 1.2 3.1 16.2 0.0 0.0 3.4 20.1 29.5 30.2 0.0
6/1/1981 0.3 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
6/2/1981 0.0 0.0 0.0 1.1 0.1 4.0 10.7 9.0 5.3 13.1 18.5 9.5 9.5 5.3
6/3/1981 0.2 0.0 0.1 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1981 5.0 5.2 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.7 2.9 3.0 0.0
6/5/1981 9.3 2.5 8.0 19.4 24.2 20.0 38.6 0.0 16.8 9.1 30.3 22.8 23.4 16.9
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/6/1981 4.5 16.8 1.0 0.1 0.0 3.2 0.0 12.1 5.2 11.2 5.1 0.5 0.2 5.2
6/7/1981 0.3 1.2 1.1 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1981 0.8 1.4 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1981 3.0 1.1 4.5 0.0 0.0 0.0 0.1 0.0 0.0 1.5 4.3 2.4 2.5 0.0
6/10/1981 8.1 2.8 10.3 0.2 3.8 2.3 0.7 0.0 1.2 0.1 0.6 1.0 1.0 1.3
6/11/1981 5.9 8.1 3.1 1.6 2.9 4.8 15.5 3.0 1.1 2.2 0.0 0.1 0.0 1.1
6/12/1981 9.5 30.3 1.9 7.9 5.0 5.4 16.8 0.0 5.8 0.0 0.0 0.0 0.0 5.8
6/13/1981 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 18.2 0.0 0.0 0.0
6/14/1981 4.5 4.7 4.4 2.3 0.0 2.7 0.5 10.0 8.8 10.6 19.2 28.5 29.0 8.8
6/15/1981 5.1 0.3 3.2 0.6 7.8 5.7 7.0 0.0 0.3 1.6 6.0 5.9 6.0 0.3
6/16/1981 3.0 6.2 0.4 1.6 0.3 3.3 20.8 0.0 0.0 1.1 4.2 4.1 4.2 0.0
6/17/1981 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1981 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 5.3 13.5 3.4 3.5 0.0
6/19/1981 2.1 0.1 3.0 0.1 0.0 0.9 0.9 3.0 1.1 2.3 0.5 0.9 0.8 1.1
6/20/1981 0.9 1.1 1.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
6/21/1981 5.0 15.2 1.2 0.1 0.0 0.9 0.8 3.0 1.1 4.5 5.1 0.1 0.0 1.1
6/22/1981 1.8 1.4 2.9 0.0 0.0 0.0 0.2 0.0 0.0 1.4 3.8 1.3 1.3 0.0
6/23/1981 5.9 3.6 5.8 0.1 6.9 6.8 0.7 10.0 3.8 8.9 4.7 3.5 3.3 3.8
6/24/1981 3.6 6.8 2.5 5.5 0.0 0.0 0.5 0.0 10.1 0.7 1.9 0.8 0.8 10.1
6/25/1981 3.9 8.2 1.2 1.4 2.1 2.3 7.3 0.0 0.0 1.8 10.9 16.4 16.8 0.0
6/26/1981 8.3 8.6 7.9 1.7 0.3 3.4 21.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1981 11.9 1.1 7.0 31.0 10.8 11.5 35.1 0.0 23.8 1.0 3.5 3.0 3.1 24.0
6/28/1981 10.0 5.6 10.7 0.9 12.4 7.3 0.1 0.0 0.0 0.4 0.9 0.0 0.0 0.0
6/29/1981 13.3 4.5 9.4 8.5 13.3 20.2 76.4 3.0 1.1 5.0 20.3 33.3 34.1 1.1
6/30/1981 8.0 7.5 2.2 3.7 5.0 10.1 47.4 0.0 0.0 0.6 4.9 8.4 8.6 0.0
7/1/1981 6.4 8.5 6.1 1.2 10.1 8.4 16.0 0.0 0.0 0.6 1.3 0.0 0.0 0.0
7/2/1981 2.3 1.3 1.1 4.9 3.2 4.4 16.9 0.0 9.3 1.3 4.0 2.3 2.4 9.4
7/3/1981 5.2 11.3 2.0 0.2 3.0 16.2 0.1 55.1 22.2 41.8 2.2 1.4 0.0 22.1
7/4/1981 8.8 7.6 10.1 1.9 0.2 10.8 15.8 31.9 18.0 28.6 14.2 7.9 7.3 17.9
7/5/1981 8.4 28.0 3.6 1.5 0.0 0.0 0.7 0.0 12.4 0.0 0.0 0.0 0.0 12.5
7/6/1981 5.3 18.8 2.7 3.4 0.2 1.9 12.8 0.0 13.4 0.4 0.9 0.0 0.0 13.5
7/7/1981 9.3 9.4 8.5 4.1 12.4 7.4 0.7 0.0 5.2 13.0 42.7 31.2 32.0 5.2
7/8/1981 15.5 21.0 11.0 26.2 6.9 4.1 0.3 0.0 5.7 0.9 2.3 0.6 0.6 5.7
7/9/1981 18.8 16.8 13.3 15.1 20.9 14.6 11.3 2.4 13.6 7.4 22.6 23.2 23.7 13.6
7/10/1981 14.8 17.3 9.1 12.7 18.3 17.3 40.2 2.1 10.1 4.2 14.7 20.9 21.4 10.2
7/11/1981 7.5 16.3 3.1 4.9 2.3 5.3 22.6 2.1 6.1 6.6 22.4 26.1 26.7 6.2
7/12/1981 16.0 10.8 17.0 1.2 11.9 8.7 0.5 6.1 5.1 5.3 4.3 6.0 6.0 5.1
7/13/1981 4.1 0.2 5.0 5.7 4.2 21.6 22.0 60.2 27.5 50.1 22.9 26.5 25.6 27.3
7/14/1981 9.5 10.5 10.2 18.7 21.0 18.3 24.6 8.4 15.6 7.9 4.6 2.1 1.9 15.6
7/15/1981 9.3 13.1 5.4 15.1 9.6 5.9 1.5 0.0 1.6 0.1 0.1 0.0 0.0 1.6
7/16/1981 6.9 13.2 3.1 1.8 2.6 2.7 8.1 0.0 2.6 2.9 18.0 26.8 27.5 2.6
7/17/1981 7.6 10.1 6.7 0.0 1.5 9.4 0.4 32.1 12.2 24.3 3.4 6.0 5.3 12.1
7/18/1981 10.1 17.2 6.0 5.4 11.6 14.7 16.4 21.0 18.7 17.4 8.5 10.5 10.2 18.7
7/19/1981 10.2 17.9 7.4 4.4 7.6 11.9 11.9 21.5 12.9 20.5 17.6 17.3 17.2 12.9
7/20/1981 5.9 4.5 3.8 4.4 2.3 5.1 21.9 2.0 6.7 5.0 12.2 10.0 10.2 6.7
7/21/1981 4.8 2.7 4.1 5.7 3.9 16.0 73.0 10.3 3.9 7.8 0.5 0.3 0.0 3.9
7/22/1981 10.7 1.6 9.7 10.8 21.1 17.1 30.6 0.0 2.9 2.8 11.5 12.2 12.5 2.9
7/23/1981 16.8 10.8 17.8 3.4 20.2 27.3 32.4 40.0 22.8 35.6 16.9 9.0 8.2 22.7
7/24/1981 13.8 12.2 12.3 0.3 2.5 9.4 0.3 30.0 13.9 25.3 7.5 2.0 1.3 13.8
7/25/1981 9.2 12.4 7.5 1.6 2.7 17.2 18.0 49.0 20.0 41.5 15.3 9.6 8.6 19.8
7/26/1981 10.8 15.5 8.2 3.0 4.3 14.6 27.6 30.0 11.4 22.5 0.7 1.2 0.5 11.4
7/27/1981 14.0 24.2 4.0 2.7 3.7 5.5 21.8 0.0 1.0 6.2 15.1 2.4 2.5 1.0
7/28/1981 8.9 19.6 2.7 4.9 3.3 6.3 28.9 0.0 8.4 10.8 31.9 17.4 17.8 8.4
7/29/1981 5.5 14.9 1.5 0.4 0.5 0.4 0.9 0.0 2.6 0.6 3.2 4.6 4.7 2.6
7/30/1981 12.4 13.9 11.9 8.7 12.4 7.5 0.9 0.0 1.2 1.3 6.3 7.9 8.1 1.3
7/31/1981 4.4 7.8 5.5 1.5 2.1 3.2 13.3 0.0 3.9 0.4 1.4 0.9 0.9 3.9
8/1/1981 9.7 16.3 4.4 17.9 3.1 4.0 16.2 0.0 41.3 1.4 5.0 4.2 4.3 41.5
8/2/1981 1.9 1.4 1.8 0.0 1.0 0.6 0.2 0.0 0.1 0.0 0.0 0.0 0.0 0.1
8/3/1981 12.2 7.2 15.8 7.1 2.3 5.7 27.0 1.2 7.3 2.7 12.7 20.4 20.9 7.3
8/4/1981 15.8 8.5 16.2 45.3 23.0 17.4 22.8 2.5 39.1 13.3 41.2 36.1 36.9 39.3
8/5/1981 10.1 4.4 14.0 10.7 4.2 6.5 18.0 5.1 8.8 7.7 12.0 7.3 7.3 8.8
8/6/1981 18.5 31.7 12.8 5.8 17.3 17.4 37.3 6.2 12.8 9.2 16.2 13.6 13.8 12.8
8/7/1981 11.9 19.1 4.1 9.1 10.0 7.9 5.8 4.5 10.3 6.5 8.8 3.8 3.8 10.3
8/8/1981 11.0 21.1 6.0 18.4 0.3 3.2 12.5 4.5 4.8 3.8 1.8 2.1 2.0 4.8
8/9/1981 5.8 9.1 5.0 3.7 6.2 8.0 21.0 4.5 4.8 14.6 40.9 36.1 36.9 4.8
8/10/1981 6.8 9.4 4.6 0.5 0.5 1.3 1.4 3.0 1.1 2.3 0.1 0.1 0.0 1.1
8/11/1981 14.3 21.0 7.1 6.5 8.1 7.0 13.4 1.0 3.1 6.2 13.6 3.0 3.0 3.1
8/12/1981 11.0 8.6 7.2 8.7 7.2 7.9 20.9 2.0 3.2 2.6 4.2 4.0 4.0 3.3
8/13/1981 10.1 9.3 4.9 3.5 5.1 4.9 10.1 2.0 17.0 2.2 4.9 7.9 8.0 17.1
8/14/1981 14.3 12.4 9.0 31.7 10.1 10.2 20.8 5.0 26.7 16.1 43.2 35.5 36.3 26.8
8/15/1981 10.5 10.9 7.9 8.8 8.0 8.0 9.4 7.0 6.6 7.4 11.7 16.3 16.5 6.6
8/16/1981 8.4 11.3 6.4 9.2 11.4 12.7 39.7 0.0 1.6 2.1 11.5 15.8 16.2 1.6
8/17/1981 6.6 12.9 4.2 1.4 3.1 3.4 10.4 0.0 5.2 1.0 4.5 5.1 5.2 5.2
8/18/1981 9.2 8.8 6.9 0.0 6.9 4.1 0.1 0.0 0.0 1.6 4.1 1.2 1.2 0.0
8/19/1981 1.4 0.8 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.3 0.6 0.0 0.0 0.0
8/20/1981 6.4 13.3 0.7 0.0 2.0 2.2 0.0 4.0 1.5 3.2 0.6 0.1 0.0 1.5
8/21/1981 1.3 5.0 0.0 0.0 0.0 1.4 0.0 5.2 2.0 4.6 1.6 0.1 0.0 2.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/22/1981 1.4 3.3 0.6 0.0 2.0 1.8 0.0 2.4 0.9 1.8 0.0 0.1 0.0 0.9
8/23/1981 1.3 0.1 1.7 2.1 0.3 5.1 27.1 3.0 1.1 5.8 16.6 20.3 20.7 1.1
8/24/1981 10.0 2.6 10.2 0.0 1.0 0.9 0.0 1.2 0.5 1.1 2.1 3.6 3.7 0.5
8/25/1981 8.6 0.9 6.2 5.1 15.0 11.6 15.9 1.4 4.9 1.6 2.2 2.4 2.4 4.9
8/26/1981 6.6 15.5 2.9 0.0 0.0 1.3 0.1 5.0 1.9 4.5 2.3 1.0 0.9 1.9
8/27/1981 16.5 18.2 15.1 0.0 1.0 2.7 0.1 8.0 3.0 6.2 0.6 0.2 0.0 3.0
8/28/1981 16.4 16.8 10.2 13.8 13.2 10.8 5.0 9.0 20.4 13.9 19.2 6.5 6.4 20.5
8/29/1981 10.8 6.2 2.0 24.7 5.2 7.3 18.7 6.0 19.7 4.5 0.0 0.2 0.0 19.7
8/30/1981 8.7 14.2 5.6 0.2 13.8 8.9 0.9 2.1 2.1 3.4 4.2 0.2 0.1 2.1
8/31/1981 8.5 16.1 5.0 10.3 9.1 9.0 19.7 2.4 3.4 3.6 6.1 4.6 4.7 3.4
9/1/1981 1.3 2.1 0.9 4.9 1.0 1.1 0.3 2.1 6.3 7.7 15.7 4.0 4.0 6.3
9/2/1981 3.8 9.4 3.7 0.0 1.8 2.2 0.0 4.2 1.6 3.4 0.6 0.1 0.0 1.6
9/3/1981 6.0 4.7 2.5 11.8 0.9 9.9 55.6 4.0 11.1 13.8 45.1 48.7 49.8 11.2
9/4/1981 1.5 1.2 5.6 0.0 1.0 2.0 0.4 5.0 1.9 4.1 1.3 1.3 1.2 1.9
9/5/1981 3.7 9.7 5.5 0.1 0.3 1.7 0.9 5.2 2.0 5.6 4.0 0.1 0.0 2.0
9/6/1981 6.3 10.2 3.6 1.2 0.2 2.2 4.3 5.4 2.1 4.2 0.9 1.1 1.0 2.0
9/7/1981 7.5 2.3 11.1 10.8 6.4 10.3 37.7 3.4 10.6 2.8 1.3 1.6 1.6 10.6
9/8/1981 10.7 0.3 11.2 18.8 21.3 13.9 5.1 2.7 20.3 14.7 47.2 43.8 44.8 20.4
9/9/1981 5.2 9.5 1.8 5.5 5.8 8.2 27.0 2.8 8.1 7.1 18.5 17.0 17.4 8.2
9/10/1981 4.1 9.2 1.8 0.0 1.4 2.1 0.4 4.5 1.7 3.3 0.1 0.2 0.1 1.7
9/11/1981 3.7 3.2 2.2 0.0 0.0 0.9 0.4 3.0 1.1 2.2 0.0 0.1 0.0 1.1
9/12/1981 2.7 5.8 0.0 0.0 0.1 0.9 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
9/13/1981 1.1 4.1 0.7 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
9/14/1981 1.6 6.0 1.2 0.4 0.0 0.6 0.2 2.1 4.5 1.6 0.0 0.1 0.0 4.5
9/15/1981 0.0 0.0 0.0 0.2 0.0 0.6 0.1 2.2 2.2 1.6 0.0 0.1 0.0 2.2
9/16/1981 0.0 0.0 0.2 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
9/17/1981 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.4 0.9 1.8 0.0 0.1 0.0 0.9
9/18/1981 0.2 1.1 1.0 0.0 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
9/19/1981 0.1 0.0 0.1 2.8 0.3 4.2 25.2 1.0 0.4 3.2 9.3 9.1 9.3 0.4
9/20/1981 1.2 0.1 1.6 0.9 0.0 0.3 0.1 1.0 0.4 4.3 23.4 36.5 37.4 0.4
9/21/1981 10.5 0.8 7.4 8.1 2.0 1.9 3.2 1.2 16.6 6.4 12.7 0.5 0.5 16.7
9/22/1981 14.7 0.3 13.2 25.4 19.8 12.8 5.2 1.8 18.2 11.7 34.2 25.3 25.9 18.3
9/23/1981 9.7 7.7 8.7 1.4 17.8 11.3 2.9 1.7 11.2 4.0 9.2 6.8 6.9 11.2
9/24/1981 5.3 15.4 0.7 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
9/25/1981 3.5 8.7 0.7 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
9/26/1981 1.6 1.7 1.7 3.3 0.5 7.8 42.6 4.0 1.5 3.0 0.0 0.1 0.0 1.5
9/27/1981 0.6 0.8 0.7 0.0 0.0 1.2 0.0 4.5 1.7 3.3 0.0 0.1 0.0 1.7
9/28/1981 2.8 8.3 0.0 0.0 0.0 1.3 0.1 5.0 1.9 3.7 0.0 0.1 0.0 1.9
9/29/1981 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
9/30/1981 0.9 3.6 1.0 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
10/1/1981 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
10/2/1981 0.2 0.9 0.8 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/3/1981 0.5 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
10/4/1981 2.0 0.1 2.1 0.0 0.0 0.2 0.0 0.7 0.3 0.5 0.0 0.0 0.0 0.3
10/5/1981 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
10/6/1981 0.1 0.0 0.2 0.0 0.0 1.4 0.0 5.2 2.0 3.9 0.0 0.1 0.0 2.0
10/7/1981 0.8 2.9 0.0 0.0 0.0 0.3 0.0 1.2 0.5 0.9 0.0 0.0 0.0 0.5
10/8/1981 0.0 0.0 0.0 0.3 0.0 0.8 3.2 1.0 0.4 2.3 3.6 0.2 0.2 0.4
10/9/1981 2.1 7.7 0.3 0.0 0.0 0.3 0.0 1.2 0.5 0.9 0.0 0.0 0.0 0.5
10/10/1981 12.4 1.7 16.7 0.0 51.4 32.0 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
10/11/1981 1.6 0.0 1.7 0.6 5.3 3.4 1.1 0.6 4.6 3.1 8.7 6.4 6.5 4.7
10/12/1981 0.0 0.0 0.1 1.2 0.0 1.8 0.5 7.0 12.6 5.2 0.0 0.2 0.0 12.6
10/13/1981 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
10/14/1981 0.3 1.1 0.2 0.0 0.0 1.4 0.0 5.3 2.0 3.9 0.0 0.1 0.0 2.0
10/15/1981 0.0 0.0 0.0 0.0 0.0 2.2 0.0 8.2 3.1 6.1 0.0 0.2 0.0 3.1
10/16/1981 0.0 0.0 0.0 0.0 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
10/17/1981 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 1.0 0.5 0.0 0.0 0.4
10/18/1981 0.0 0.0 0.0 0.2 0.0 0.3 0.1 1.2 1.9 0.9 0.0 0.0 0.0 2.0
10/19/1981 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
10/20/1981 0.0 0.0 0.2 0.0 0.0 1.1 0.0 4.2 1.6 3.1 0.0 0.1 0.0 1.6
10/21/1981 0.6 0.0 0.9 0.1 2.5 2.7 1.2 4.0 1.5 7.5 12.0 4.3 4.3 1.5
10/22/1981 0.0 0.0 0.0 0.0 0.0 1.2 0.0 4.5 1.7 3.3 0.0 0.1 0.0 1.7
10/23/1981 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.1 0.4 0.8 0.0 0.0 0.0 0.4
10/24/1981 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.3 0.5 1.0 0.0 0.0 0.0 0.5
10/25/1981 0.0 0.0 0.0 0.0 0.0 1.6 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
10/26/1981 2.6 6.6 0.0 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
10/27/1981 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.3 0.5 1.0 0.0 0.0 0.0 0.5
10/28/1981 0.0 0.0 0.0 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
10/29/1981 0.2 0.8 0.0 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
10/30/1981 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
10/31/1981 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
11/1/1981 0.2 0.8 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
11/2/1981 0.0 0.0 0.0 0.0 0.0 1.1 0.0 4.2 1.6 3.1 0.0 0.1 0.0 1.6
11/3/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/7/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1981 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0
12/24/1981 0.9 0.0 1.3 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1981 2.2 0.3 3.3 0.2 8.7 5.5 1.9 0.0 0.0 0.5 1.1 0.0 0.0 0.0
12/26/1981 1.3 0.9 1.1 5.1 0.0 0.0 0.2 0.0 0.0 0.2 0.5 0.0 0.0 0.0
12/27/1981 0.4 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1981 4.4 6.0 3.9 0.9 0.1 1.8 11.3 0.0 0.0 3.5 10.7 6.3 6.5 0.0
12/29/1981 0.8 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1981 0.1 0.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1981 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1982 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1982 3.0 0.8 3.9 0.4 11.9 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1982 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1982 0.8 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1982 1.2 1.7 0.6 8.2 2.2 12.1 18.4 30.6 11.6 30.3 28.5 27.4 27.3 11.5
1/10/1982 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1982 0.0 0.0 0.0 1.1 0.2 4.9 13.5 10.6 4.0 9.5 4.7 2.6 2.4 4.0
1/16/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1982 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1982 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1982 1.2 0.0 1.7 0.0 5.3 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/23/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1982 0.4 1.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1982 0.4 0.6 6.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
1/26/1982 11.8 16.1 12.8 12.2 9.9 6.4 3.3 0.2 0.1 5.2 14.7 7.7 7.9 0.1
1/27/1982 16.5 9.8 23.2 21.0 48.3 33.6 32.1 1.1 13.1 8.1 24.9 19.7 20.2 13.1
1/28/1982 3.8 5.3 3.8 3.4 2.0 1.5 0.0 1.1 0.4 1.4 1.8 1.0 1.0 0.4
1/29/1982 0.0 0.1 1.3 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
1/30/1982 0.0 0.0 0.2 0.0 0.0 1.5 0.0 5.6 2.1 4.2 0.0 0.1 0.0 2.1
1/31/1982 0.2 0.2 0.8 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
2/1/1982 3.6 7.0 2.7 0.9 5.3 3.2 0.0 0.0 0.0 0.2 1.7 2.9 3.0 0.0
2/2/1982 2.2 0.9 2.8 4.3 6.1 5.3 11.6 0.0 0.0 1.6 5.4 4.1 4.2 0.0
2/3/1982 0.7 1.1 2.5 2.3 1.4 0.9 1.5 0.0 19.1 2.4 8.1 6.1 6.3 19.2
2/4/1982 0.6 0.0 0.8 0.0 2.5 1.5 0.4 0.0 0.0 0.6 1.6 0.5 0.5 0.0
2/5/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1982 1.1 0.1 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1982 3.4 1.7 2.3 4.3 6.9 4.1 0.0 0.0 0.0 0.5 1.4 1.0 1.0 0.0
2/8/1982 2.0 0.1 2.4 0.9 1.0 1.7 0.0 4.1 1.6 3.1 0.1 0.2 0.1 1.5
2/9/1982 3.0 6.3 2.2 3.3 3.0 1.8 0.6 0.0 5.7 2.7 6.6 1.0 1.0 5.7
2/10/1982 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1982 4.0 0.2 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1982 3.9 8.8 3.1 1.7 5.9 3.5 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0
2/13/1982 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1982 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1982 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.1 0.0 0.0 0.0 0.0 5.1
2/24/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
2/25/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1982 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1982 0.8 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1982 6.2 4.7 6.1 1.7 3.0 4.8 0.1 11.7 4.4 9.1 0.9 0.3 0.0 4.4
3/3/1982 11.3 8.3 9.7 16.4 28.9 20.6 18.5 3.0 12.7 7.5 21.2 21.8 22.3 12.7
3/4/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1982 0.2 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
3/8/1982 2.9 0.2 3.6 0.9 0.0 0.0 0.4 0.0 7.9 0.0 0.0 0.0 0.0 7.9
3/9/1982 7.4 5.8 4.4 6.5 13.0 9.3 9.3 1.0 2.9 0.7 0.0 0.0 0.0 2.9
3/10/1982 0.5 2.0 1.8 0.9 0.0 0.5 0.0 2.0 0.8 2.3 7.1 12.3 12.6 0.8
3/11/1982 0.6 0.0 0.9 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1982 1.5 0.8 2.4 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1982 4.3 5.5 3.2 0.6 5.9 3.6 0.7 0.0 5.1 0.0 0.0 0.0 0.0 5.1
3/14/1982 0.8 2.8 1.3 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1982 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0
3/17/1982 1.1 0.3 1.7 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
3/18/1982 2.0 2.5 0.7 1.0 2.0 1.6 2.4 0.0 0.0 0.1 0.7 1.3 1.3 0.0
3/19/1982 0.7 0.0 0.4 0.5 1.0 0.8 1.8 0.0 3.1 0.3 2.1 3.7 3.8 3.1
3/20/1982 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1982 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1982 6.0 1.7 6.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1982 14.1 16.2 13.1 24.3 10.0 6.8 6.2 0.0 0.0 4.1 14.6 12.2 12.5 0.0
3/24/1982 9.7 10.8 6.5 3.5 19.8 17.2 0.6 20.6 7.8 15.3 0.1 0.5 0.0 7.8
3/25/1982 0.2 0.5 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1982 0.2 0.7 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1982 0.1 0.0 0.2 1.8 0.6 1.0 5.0 0.0 12.4 0.0 0.0 0.0 0.0 12.5
3/28/1982 0.4 0.4 0.4 2.9 0.2 0.4 1.4 1.0 25.2 0.9 1.1 2.0 2.0 25.3
3/29/1982 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1982 1.1 0.0 1.1 6.7 1.0 0.6 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
4/1/1982 6.8 11.0 5.1 0.4 1.5 1.0 0.6 0.0 1.2 1.8 7.7 8.7 8.9 1.3
4/2/1982 6.0 0.8 4.7 8.3 11.9 7.5 3.2 0.0 0.0 3.2 8.0 1.8 1.8 0.0
4/3/1982 1.2 4.2 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.1 0.2 0.2 0.0
4/4/1982 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1982 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1982 0.4 0.9 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1982 5.0 5.8 2.2 9.4 6.6 3.9 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
4/8/1982 1.6 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1982 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/10/1982 1.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1982 1.9 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1982 0.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1982 0.1 0.0 0.2 0.0 0.6 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1982 2.4 0.2 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1982 3.2 0.0 0.2 0.2 0.0 0.4 0.1 1.4 1.9 1.0 0.0 0.0 0.0 1.9
4/18/1982 5.1 0.4 6.5 14.5 10.5 6.3 0.6 0.0 4.0 0.0 0.0 0.0 0.0 4.0
4/19/1982 6.1 8.5 4.3 6.9 11.3 8.0 0.7 4.8 6.5 5.2 5.1 3.6 3.6 6.6
4/20/1982 4.4 3.8 3.0 12.0 8.2 6.5 2.7 5.0 8.2 4.4 3.1 3.4 3.4 8.2
4/21/1982 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.5 0.2 0.5 1.3 2.3 2.3 0.2
4/22/1982 0.8 0.5 1.4 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1982 0.6 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1982 2.6 0.0 2.9 0.0 6.3 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1982 1.4 2.9 0.1 1.5 0.2 5.1 18.9 8.1 3.1 7.0 3.0 1.7 1.5 3.1
4/26/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
4/27/1982 1.5 1.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1982 1.2 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1982 0.0 0.0 0.0 0.6 0.1 1.1 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1982 0.5 0.8 0.4 0.0 0.0 1.1 0.0 4.2 1.6 3.1 0.0 0.1 0.0 1.6
5/1/1982 2.9 6.8 0.1 0.6 0.0 11.0 0.3 41.8 21.1 31.0 0.0 1.0 0.0 21.0
5/2/1982 4.2 6.0 3.8 0.0 0.0 1.3 0.0 5.0 1.9 3.8 0.5 0.9 0.8 1.9
5/3/1982 1.6 0.0 2.1 2.9 6.4 6.4 0.1 10.0 6.5 7.4 0.0 0.3 0.0 6.5
5/4/1982 1.7 6.1 0.0 0.2 0.0 0.0 0.1 0.0 2.0 0.0 0.0 0.0 0.0 2.0
5/5/1982 0.2 0.5 0.3 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1982 4.0 0.7 5.6 0.1 0.0 10.7 1.2 40.0 15.2 31.4 3.9 1.0 0.0 15.1
5/7/1982 1.9 0.5 2.3 0.8 0.1 1.6 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1982 3.3 11.9 1.0 1.6 0.3 5.8 20.0 10.1 3.8 8.2 3.0 3.2 3.0 3.8
5/9/1982 3.4 4.1 2.8 5.7 8.1 8.9 18.2 5.0 1.9 5.6 10.4 14.7 14.9 1.9
5/10/1982 3.1 0.0 4.2 2.0 13.0 11.4 11.6 8.0 13.0 6.4 2.9 4.3 4.2 13.0
5/11/1982 0.2 0.8 0.8 0.4 0.0 2.6 0.2 10.0 7.0 8.5 2.9 1.4 1.2 7.0
5/12/1982 1.6 3.7 0.3 1.7 1.0 1.9 0.0 5.0 1.9 4.5 1.8 0.1 0.0 1.9
5/13/1982 3.1 7.5 1.5 0.2 3.0 1.8 0.1 0.0 1.4 0.9 7.3 12.6 12.9 1.4
5/14/1982 2.8 1.2 2.7 0.8 5.4 4.1 0.8 3.0 7.6 2.2 0.0 0.1 0.0 7.6
5/15/1982 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1982 0.1 0.1 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1982 0.9 0.1 1.0 5.8 0.6 2.6 8.4 4.0 9.6 7.1 11.2 4.5 4.5 9.6
5/18/1982 0.6 2.3 1.6 1.1 0.0 0.8 0.3 3.0 7.5 3.8 12.9 22.3 22.8 7.5
5/19/1982 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/20/1982 0.2 0.0 0.3 0.0 0.0 0.4 0.0 1.5 0.6 1.1 0.0 0.0 0.0 0.6
5/21/1982 3.4 2.0 4.5 2.1 11.2 16.0 27.5 20.0 7.6 15.7 3.8 4.7 4.3 7.5
5/22/1982 1.3 0.2 1.1 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1982 1.3 0.3 0.2 0.3 0.1 0.6 3.9 0.0 0.0 2.1 8.1 7.9 8.1 0.0
5/24/1982 1.9 3.7 0.5 2.6 1.5 1.4 3.6 0.0 5.1 1.1 3.3 1.7 1.7 5.1
5/25/1982 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 0.7 0.0
5/26/1982 0.1 0.3 0.6 0.3 0.1 0.6 3.7 0.0 0.0 0.4 3.5 6.1 6.2 0.0
5/27/1982 0.4 1.5 0.5 0.0 0.0 0.0 0.2 0.0 0.0 0.4 1.2 1.0 1.0 0.0
5/28/1982 2.0 2.9 2.9 0.8 1.1 2.3 10.6 0.0 0.0 0.1 0.2 0.0 0.0 0.0
5/29/1982 7.1 6.9 6.9 5.2 6.1 7.1 10.5 8.0 19.2 11.2 15.2 8.0 8.0 19.2
5/30/1982 5.1 0.1 5.3 7.6 12.9 8.9 8.1 0.0 1.2 3.3 9.6 4.7 4.8 1.3
5/31/1982 1.2 0.5 1.0 0.9 0.2 1.9 11.6 0.0 0.0 1.3 2.9 0.1 0.1 0.0
6/1/1982 1.9 0.7 1.6 0.0 2.8 1.6 0.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
6/2/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1982 0.1 0.3 0.0 0.8 0.1 1.6 10.2 0.0 0.0 1.4 4.8 3.8 3.9 0.0
6/4/1982 0.7 1.7 0.3 0.5 1.1 1.7 7.0 0.0 0.0 4.9 13.8 6.4 6.6 0.0
6/5/1982 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 0.7 0.0
6/6/1982 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.1 0.1 1.0 1.8 1.8 0.1
6/7/1982 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.6 1.4 0.0 0.0 0.0
6/8/1982 0.6 2.1 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
6/9/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1982 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
6/11/1982 0.3 0.0 0.5 0.4 1.6 1.7 5.1 0.0 0.0 0.7 2.4 2.0 2.0 0.0
6/12/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.7 0.0 0.0 0.0
6/13/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
6/14/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1982 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1982 0.8 1.0 1.0 0.9 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/20/1982 2.5 3.4 3.0 1.4 0.0 8.1 1.3 30.2 14.9 23.1 4.6 7.6 7.0 14.9
6/21/1982 0.8 1.1 1.7 0.8 2.4 1.4 0.4 0.0 6.6 0.1 0.5 0.5 0.5 6.6
6/22/1982 3.7 4.6 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1982 9.0 7.5 12.4 7.2 8.7 9.3 27.1 0.0 0.0 6.1 15.6 4.4 4.5 0.0
6/24/1982 1.5 2.0 3.5 0.5 0.1 1.7 5.8 3.0 1.1 4.4 5.7 2.0 2.0 1.1
6/25/1982 1.4 4.4 1.2 0.8 1.0 1.3 4.6 0.0 0.0 0.4 1.7 2.2 2.3 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/26/1982 4.4 6.7 4.5 0.2 11.3 7.1 2.9 0.0 0.0 0.7 1.8 0.5 0.5 0.0
6/27/1982 4.8 9.0 6.6 10.0 7.1 6.8 17.9 0.0 8.4 4.5 10.7 1.0 1.0 8.4
6/28/1982 1.4 0.7 2.7 1.5 0.2 2.0 12.8 0.0 4.7 15.7 45.9 24.0 24.6 4.7
6/29/1982 0.6 0.4 3.4 0.7 0.1 1.5 9.2 0.0 0.0 0.3 1.3 1.6 1.6 0.0
6/30/1982 6.7 1.9 12.9 4.6 11.9 8.5 3.0 4.0 9.8 6.4 10.6 6.7 6.8 9.9
7/1/1982 2.3 0.8 5.7 4.5 0.7 5.8 35.3 0.0 0.0 11.6 63.1 87.4 89.6 0.0
7/2/1982 8.1 18.6 6.1 10.0 9.9 6.8 3.5 2.0 11.3 2.3 2.7 2.2 2.2 11.4
7/3/1982 20.8 23.3 24.2 1.0 0.0 3.2 2.4 10.8 4.1 9.2 5.2 6.1 6.0 4.1
7/4/1982 6.0 16.8 5.6 4.9 1.6 16.5 50.7 30.5 20.0 24.4 4.3 1.3 0.6 19.9
7/5/1982 3.3 0.8 8.3 1.5 10.9 12.2 3.8 20.2 18.2 15.0 0.0 0.5 0.0 18.2
7/6/1982 4.7 10.3 12.9 1.3 6.7 4.0 0.6 0.0 10.9 0.0 0.0 0.0 0.0 10.9
7/7/1982 4.7 11.3 3.6 1.7 0.7 10.5 14.3 30.5 16.7 25.9 14.1 16.4 16.0 16.6
7/8/1982 5.4 7.1 3.3 6.6 4.2 10.4 17.5 20.4 9.0 15.2 0.2 0.9 0.4 8.9
7/9/1982 14.2 4.5 23.2 12.0 33.2 28.8 8.2 30.2 14.1 25.1 8.4 5.8 5.2 14.1
7/10/1982 3.3 5.1 2.8 3.1 0.2 13.6 19.6 40.6 29.1 31.5 6.1 7.6 6.8 29.0
7/11/1982 2.3 7.1 8.7 2.7 2.6 15.9 8.3 50.1 22.4 45.8 23.1 9.1 8.1 22.3
7/12/1982 3.7 11.7 9.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/13/1982 1.8 7.4 6.0 0.4 0.0 1.2 2.5 3.0 2.8 2.2 0.0 0.1 0.0 2.8
7/14/1982 8.5 6.1 18.1 2.0 0.0 1.1 0.1 4.0 4.0 3.0 0.0 0.1 0.0 4.0
7/15/1982 9.8 7.1 10.2 3.1 7.2 15.9 25.6 30.0 20.6 33.3 50.3 60.1 60.9 20.5
7/16/1982 10.4 10.7 5.8 3.9 2.9 23.2 38.2 60.0 31.1 49.5 13.1 5.5 4.1 31.0
7/17/1982 5.1 12.1 11.2 0.3 0.1 1.4 3.9 3.0 1.1 4.2 7.7 7.9 8.0 1.1
7/18/1982 5.7 9.2 8.4 2.4 5.3 8.5 28.6 4.0 2.8 14.7 55.4 68.4 70.0 2.8
7/19/1982 4.5 7.3 5.8 7.1 0.7 20.0 42.9 50.0 21.7 45.0 33.3 37.3 37.0 21.6
7/20/1982 6.2 2.8 5.6 2.4 0.2 20.6 14.2 70.0 30.5 56.2 14.8 13.4 12.0 30.3
7/21/1982 7.7 6.1 15.7 0.4 0.0 10.5 0.2 40.0 18.3 33.1 7.9 1.0 0.0 18.2
7/22/1982 6.3 7.9 7.4 14.0 6.9 29.5 81.3 50.0 19.0 38.6 6.1 7.6 6.5 18.9
7/23/1982 6.0 4.4 8.1 2.5 0.2 3.7 17.0 4.0 11.6 5.5 6.3 1.2 1.1 11.6
7/24/1982 13.6 6.3 24.1 5.7 9.2 9.7 23.1 3.0 5.5 8.2 21.3 18.5 18.9 5.5
7/25/1982 13.8 9.4 23.9 10.4 15.2 14.2 35.2 0.1 7.0 0.8 5.7 9.9 10.1 7.0
7/26/1982 12.6 10.2 14.4 1.6 11.4 8.7 6.1 4.0 7.3 3.5 2.3 2.9 2.9 7.3
7/27/1982 7.2 10.5 4.3 1.8 12.1 10.3 17.4 2.0 0.8 2.2 1.7 0.3 0.3 0.8
7/28/1982 4.5 7.2 4.1 2.5 0.0 1.2 1.3 4.0 8.0 4.2 6.0 7.9 8.0 8.0
7/29/1982 10.7 6.9 10.0 2.1 8.2 7.0 9.0 3.1 6.1 4.5 7.9 6.9 7.0 6.2
7/30/1982 10.2 5.4 15.1 15.3 14.1 12.2 23.5 1.2 6.1 2.1 6.0 7.8 8.0 6.1
7/31/1982 8.4 13.0 2.5 10.2 2.0 9.7 43.2 8.1 25.2 18.8 29.9 2.2 2.0 25.3
8/1/1982 6.6 15.0 5.2 7.9 1.0 1.7 2.9 2.4 1.0 2.0 0.4 0.1 0.0 1.0
8/2/1982 6.1 4.1 5.0 11.8 5.4 9.7 35.5 5.0 13.9 7.2 13.7 13.8 14.0 14.0
8/3/1982 9.0 3.8 13.2 2.2 0.2 5.7 19.5 10.1 6.7 13.5 25.4 28.0 28.5 6.7
8/4/1982 10.2 8.3 10.9 28.7 12.9 10.1 8.1 5.0 8.9 5.4 6.7 6.8 6.8 8.9
8/5/1982 17.1 29.0 30.5 12.3 10.2 24.0 66.4 30.3 14.0 26.8 15.6 14.6 14.2 13.9
8/6/1982 9.8 17.5 10.8 9.4 7.3 11.5 29.9 10.5 17.8 9.3 4.6 2.9 2.7 17.8
8/7/1982 10.3 6.8 10.0 2.1 0.0 1.9 3.5 5.0 3.2 4.2 1.6 1.3 1.2 3.2
8/8/1982 5.1 12.2 6.7 3.3 3.6 3.8 8.2 2.0 9.1 4.2 7.6 3.4 3.4 9.2
8/9/1982 7.8 1.1 8.4 1.0 0.1 2.4 7.0 5.0 6.1 4.2 2.6 3.5 3.5 6.1
8/10/1982 5.2 12.3 4.4 2.1 0.1 4.2 10.3 10.0 15.0 7.4 0.0 0.3 0.0 15.0
8/11/1982 3.8 5.4 5.6 0.1 0.0 0.2 1.0 0.0 0.0 1.0 2.2 0.0 0.0 0.0
8/12/1982 5.9 2.8 7.7 1.1 0.2 2.1 13.5 0.0 0.0 2.8 7.0 1.4 1.4 0.0
8/13/1982 2.8 2.8 3.3 1.9 0.3 3.7 23.7 0.0 0.0 2.1 6.1 2.9 3.0 0.0
8/14/1982 2.9 2.4 5.6 1.7 0.1 4.5 10.6 10.6 4.0 9.4 6.1 6.3 6.2 4.0
8/15/1982 12.7 10.9 6.8 1.0 0.0 8.3 1.9 30.5 11.6 22.7 0.9 2.2 1.5 11.5
8/16/1982 14.8 14.0 6.6 2.6 0.0 10.6 0.4 40.5 22.9 31.6 3.7 1.0 0.0 22.9
8/17/1982 23.2 44.8 11.2 27.7 16.8 24.0 77.3 10.0 29.7 8.4 8.1 14.3 14.4 29.8
8/18/1982 6.3 7.1 13.1 0.9 2.1 10.1 5.8 30.6 11.6 22.7 0.3 1.3 0.5 11.5
8/19/1982 1.3 0.8 1.4 1.6 4.6 15.0 10.2 40.8 15.5 30.2 0.0 1.0 0.0 15.4
8/20/1982 0.9 0.0 0.1 0.2 0.0 2.7 1.9 9.1 3.5 7.1 0.9 0.2 0.0 3.4
8/21/1982 0.5 0.9 1.2 0.1 0.0 2.8 0.1 10.8 5.0 8.0 0.0 0.3 0.0 5.0
8/22/1982 0.7 1.8 1.9 0.0 1.0 8.6 0.0 30.5 11.6 22.7 0.5 1.5 0.8 11.5
8/23/1982 9.9 11.8 12.9 28.7 7.2 13.1 24.2 20.4 26.6 16.2 2.4 0.5 0.0 26.6
8/24/1982 5.8 17.5 1.5 1.7 0.0 13.1 0.0 50.0 19.0 37.1 0.0 1.2 0.0 18.8
8/25/1982 9.0 10.9 12.4 19.1 13.2 13.4 32.7 3.5 34.7 19.7 68.1 69.2 70.9 34.8
8/26/1982 4.5 1.2 7.7 20.1 15.3 16.4 39.7 5.0 1.9 9.3 20.4 18.5 18.8 1.9
8/27/1982 0.0 0.2 1.9 0.0 0.0 0.4 0.0 1.5 0.6 1.1 0.0 0.0 0.0 0.6
8/28/1982 3.5 4.2 0.8 0.0 0.0 0.5 0.0 1.8 0.7 1.3 0.0 0.0 0.0 0.7
8/29/1982 4.3 2.0 4.8 6.4 0.2 3.7 19.6 2.5 5.9 4.8 10.9 10.2 10.4 5.9
8/30/1982 9.6 12.7 8.9 7.4 4.4 5.4 14.5 2.2 0.8 2.0 1.2 0.9 0.9 0.8
8/31/1982 4.8 0.8 1.2 1.4 3.9 4.9 12.6 2.6 1.0 2.9 3.4 3.0 3.0 1.0
9/1/1982 0.9 3.5 1.4 0.0 0.0 0.6 0.0 2.4 0.9 2.4 5.0 8.6 8.8 0.9
9/2/1982 0.6 2.4 1.2 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
9/3/1982 4.5 16.9 0.9 0.0 0.0 2.7 0.0 10.3 3.9 7.6 0.0 0.3 0.0 3.9
9/4/1982 1.3 1.7 1.3 0.0 0.0 21.0 0.0 80.1 30.4 59.4 0.0 2.0 0.0 30.2
9/5/1982 2.2 3.5 1.9 0.2 0.0 4.1 2.9 14.0 5.3 10.4 0.0 0.4 0.0 5.3
9/6/1982 1.9 1.2 2.9 0.2 0.0 8.3 2.5 30.0 11.4 22.2 0.0 0.7 0.0 11.3
9/7/1982 1.8 7.0 3.1 0.0 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
9/8/1982 4.7 15.8 4.9 0.0 0.0 2.9 0.0 10.9 4.1 8.1 0.0 0.3 0.0 4.1
9/9/1982 4.0 10.9 1.5 0.2 0.0 3.3 2.9 10.8 4.1 8.3 0.7 0.3 0.0 4.1
9/10/1982 13.4 18.7 10.2 2.5 8.5 9.1 9.1 10.6 12.0 8.1 0.7 0.3 0.0 12.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/11/1982 32.9 25.0 38.7 2.4 51.5 37.3 10.0 20.4 14.3 17.3 5.0 0.5 0.0 14.3
9/12/1982 12.0 1.8 14.1 42.5 1.7 11.7 59.9 7.0 28.7 16.9 28.7 4.9 4.8 28.8
9/13/1982 8.0 1.1 0.2 2.0 0.3 5.8 25.3 7.0 2.7 6.1 3.6 3.7 3.6 2.6
9/14/1982 0.6 0.9 0.6 0.0 0.0 0.0 0.0 0.0 0.0 3.2 26.4 45.6 46.8 0.0
9/15/1982 0.9 3.5 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.4 7.6 7.8 0.0
9/16/1982 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/1982 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1982 0.2 0.4 1.8 0.5 0.1 0.9 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1982 0.0 0.0 0.0 1.5 0.2 3.1 19.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1982 3.6 3.5 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.4 4.1 4.2 0.0
9/21/1982 0.8 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1982 0.8 0.3 2.5 3.1 0.5 6.3 40.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1982 0.6 2.7 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1982 2.0 7.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1982 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1982 2.7 8.3 0.7 0.0 0.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1982 3.1 4.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 1.8 4.2 0.0 0.0 0.0
9/28/1982 4.0 7.0 3.5 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1982 6.0 13.2 2.9 1.1 0.1 0.7 4.7 0.0 6.5 0.0 0.0 0.0 0.0 6.6
9/30/1982 26.2 1.3 30.3 19.0 7.0 15.8 8.7 40.0 34.2 31.6 7.6 8.6 7.8 34.1
10/1/1982 20.7 0.4 21.5 58.4 52.9 38.3 41.4 3.0 7.5 19.3 41.6 6.7 6.8 7.5
10/2/1982 7.3 0.5 9.2 12.0 15.8 9.6 1.6 0.0 0.1 16.9 67.4 68.8 70.5 0.1
10/3/1982 3.4 3.5 1.7 0.4 0.1 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1982 0.5 1.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1982 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1982 0.2 0.0 0.0 0.4 0.0 1.6 0.2 6.0 6.0 4.5 0.0 0.2 0.0 6.0
10/7/1982 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1982 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1982 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1982 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1982 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1982 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1982 0.1 0.5 0.5 0.0 0.0 2.8 0.0 10.6 4.0 7.9 0.0 0.3 0.0 4.0
10/15/1982 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1982 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1982 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1982 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
10/28/1982 0.2 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1982 2.2 0.1 2.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1982 9.7 0.6 11.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1982 17.4 21.7 22.0 36.3 42.5 31.2 40.2 0.0 0.0 13.2 54.8 58.9 60.4 0.0
11/7/1982 0.2 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
11/8/1982 0.3 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1982 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.1 0.0 0.0 0.0 0.0 6.1
11/11/1982 0.2 0.7 0.6 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
11/12/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 2.4 0.0 0.0 0.0
11/14/1982 3.9 0.2 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.1 8.8 9.0 0.0
11/15/1982 9.7 11.0 5.8 11.3 13.2 8.2 2.9 0.0 0.0 1.5 3.6 0.5 0.5 0.0
11/16/1982 2.3 0.2 2.2 1.0 2.0 1.6 3.3 0.0 6.7 0.0 0.0 0.0 0.0 6.7
11/17/1982 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
11/25/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/27/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1982 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.2 0.0 0.0 0.0 0.0 5.2
11/29/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1982 2.3 0.2 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1982 0.5 0.0 0.8 1.0 0.0 2.7 0.5 10.4 12.6 7.7 0.0 0.3 0.0 12.7
12/9/1982 9.0 6.9 7.3 23.6 22.0 18.8 19.4 10.9 4.1 12.0 14.0 12.5 12.5 4.1
12/10/1982 3.4 8.9 10.4 2.2 0.1 1.6 6.8 2.0 0.8 6.1 12.1 3.6 3.6 0.8
12/11/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1982 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1982 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1982 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
12/28/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1982 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
12/30/1982 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1983 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1983 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1983 0.3 1.3 1.2 1.1 0.0 2.7 0.5 10.3 13.0 7.6 0.0 0.3 0.0 13.0
1/5/1983 0.3 1.6 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1983 6.8 4.4 9.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1983 7.5 6.0 7.4 12.7 22.9 15.0 10.1 0.0 0.0 3.6 14.1 13.9 14.2 0.0
1/8/1983 0.6 2.7 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1983 0.0 0.0 0.0 0.5 0.0 0.3 0.2 1.0 4.4 0.7 0.0 0.0 0.0 4.4
1/10/1983 0.9 4.0 3.6 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
1/11/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1983 0.8 1.1 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1983 2.9 4.4 2.6 0.2 4.0 2.7 2.3 0.0 0.0 1.3 4.8 4.3 4.4 0.0
1/14/1983 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1983 0.3 1.2 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1983 0.1 0.5 0.5 0.4 0.0 1.1 0.2 4.2 5.1 3.1 0.0 0.1 0.0 5.1
1/19/1983 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
1/20/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1983 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1983 0.2 0.4 0.4 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1983 1.2 4.7 4.2 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1983 4.4 8.2 7.5 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.6
1/28/1983 11.4 8.4 10.9 28.3 14.9 10.6 9.4 2.2 26.0 10.1 31.2 28.3 29.0 26.2
1/29/1983 12.5 10.8 11.7 3.0 20.6 20.4 19.5 20.5 20.4 22.0 26.8 27.2 27.4 20.4
1/30/1983 5.1 0.6 10.5 23.9 15.0 11.2 11.9 2.0 0.8 4.5 13.3 15.5 15.8 0.8
1/31/1983 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1983 0.2 0.8 0.7 0.8 0.0 1.1 0.3 4.0 7.9 3.0 0.0 0.1 0.0 7.9
2/2/1983 2.2 0.5 2.4 0.3 0.0 0.3 0.1 1.0 2.9 0.7 0.0 0.0 0.0 2.9
2/3/1983 4.0 5.4 4.4 1.7 6.1 5.3 11.1 0.0 0.0 2.6 6.0 0.0 0.0 0.0
2/4/1983 0.5 0.1 0.7 0.0 0.0 1.3 0.0 5.0 1.9 4.8 8.3 13.8 14.0 1.9
2/5/1983 0.3 0.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1983 2.5 1.9 7.2 0.4 2.0 2.1 4.5 0.9 0.3 3.6 6.7 0.0 0.0 0.3
2/7/1983 0.9 0.2 2.8 0.7 4.0 3.1 3.2 1.0 4.4 1.7 2.3 0.2 0.2 4.4
2/8/1983 0.2 0.8 0.7 0.1 0.0 0.7 1.0 2.0 0.8 1.5 0.2 0.3 0.3 0.8
2/9/1983 0.4 1.3 1.2 0.3 0.0 1.1 0.1 4.0 4.0 3.0 0.0 0.1 0.0 4.0
2/10/1983 0.0 0.0 0.0 0.2 0.0 2.8 0.1 10.7 5.4 7.9 0.0 0.3 0.0 5.4
2/11/1983 5.7 0.4 8.1 0.0 0.0 1.6 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/12/1983 0.7 0.0 0.8 0.3 0.0 2.7 0.1 10.4 6.6 7.7 0.0 0.3 0.0 6.5
2/13/1983 3.2 0.2 4.1 0.1 0.0 0.7 1.6 1.7 0.6 2.5 6.9 9.8 10.0 0.6
2/14/1983 7.5 0.3 9.2 4.3 10.9 6.4 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.0
2/15/1983 2.4 0.2 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1983 1.6 1.4 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1983 0.9 3.3 3.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
2/18/1983 2.9 4.4 3.5 1.7 0.1 1.8 11.5 0.0 7.3 2.5 8.5 6.7 6.9 7.3
2/19/1983 6.4 2.7 8.1 0.3 13.4 8.5 3.8 0.0 0.0 0.7 2.3 1.8 1.8 0.0
2/20/1983 4.4 2.6 7.5 1.7 5.9 4.6 0.0 4.0 1.5 3.4 1.0 0.1 0.0 1.5
2/21/1983 2.8 1.9 4.9 2.6 0.0 0.3 0.4 1.2 7.9 1.2 0.7 0.0 0.0 7.9
2/22/1983 2.1 0.1 3.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
2/23/1983 0.8 0.1 1.2 0.0 0.0 1.1 0.0 4.0 1.6 3.0 0.0 0.1 0.0 1.6
2/24/1983 3.1 4.8 7.2 1.3 0.0 0.8 0.6 3.0 12.4 2.2 0.0 0.1 0.0 12.5
2/25/1983 1.7 1.4 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1983 0.6 0.0 0.8 1.1 0.0 0.8 0.5 3.0 10.1 2.2 0.0 0.1 0.0 10.1
2/28/1983 2.0 4.0 3.6 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
3/1/1983 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1983 5.0 5.5 3.2 3.3 9.5 8.1 6.8 6.0 11.7 5.6 3.5 2.1 2.0 11.7
3/3/1983 9.8 14.7 13.1 8.4 14.0 10.8 9.7 4.3 1.6 3.7 3.9 6.9 7.0 1.6
3/4/1983 7.8 5.6 9.5 3.0 2.0 2.5 2.0 4.0 11.7 23.7 48.5 3.2 3.2 11.7
3/5/1983 10.3 11.4 11.3 11.9 11.6 10.1 17.5 2.2 3.3 16.4 45.4 28.0 28.7 3.3
3/6/1983 4.9 4.0 4.2 0.4 0.0 0.5 0.2 2.0 4.0 1.5 0.0 0.1 0.0 4.0
3/7/1983 8.1 2.7 16.2 3.0 8.9 5.9 0.2 2.3 4.9 1.9 0.6 0.3 0.2 4.9
3/8/1983 11.4 0.7 16.5 14.5 18.0 13.6 13.9 3.6 7.1 8.5 21.2 19.0 19.4 7.2
3/9/1983 15.9 0.8 22.4 3.5 27.0 20.6 26.3 2.8 13.6 10.3 28.8 23.9 24.4 13.7
3/10/1983 3.5 0.2 4.7 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
3/11/1983 1.3 5.3 5.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
3/12/1983 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1983 1.2 0.1 2.0 6.1 4.0 2.6 1.5 0.0 0.0 0.5 1.4 0.7 0.7 0.0
3/14/1983 0.7 0.0 1.0 0.1 3.0 2.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1983 0.2 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1983 0.6 1.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1983 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1983 3.4 0.2 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1983 7.9 8.8 6.9 2.3 14.9 10.4 7.2 2.0 0.8 2.5 3.6 3.0 3.0 0.8
3/20/1983 3.4 5.8 2.5 1.5 7.8 6.8 4.5 6.0 4.9 6.2 6.1 5.2 5.2 4.9
3/21/1983 0.0 0.0 0.0 0.3 0.0 0.4 2.3 0.0 0.6 0.1 0.9 1.5 1.5 0.6
3/22/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1983 0.4 0.7 0.9 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1983 0.8 0.8 1.5 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1983 5.7 1.5 7.8 3.4 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1983 8.3 4.0 13.2 13.6 19.5 17.1 21.0 9.0 3.4 8.1 4.3 2.7 2.5 3.4
3/27/1983 5.3 0.0 3.5 6.2 10.9 7.8 3.5 3.0 1.1 2.3 0.6 1.2 1.1 1.1
3/28/1983 1.1 2.6 5.2 0.5 0.0 0.0 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.1
3/29/1983 0.1 0.5 0.5 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1983 0.2 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1983 0.3 0.7 0.6 3.4 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
4/2/1983 0.8 1.3 1.8 0.5 2.0 1.6 0.2 1.5 4.5 1.1 0.0 0.0 0.0 4.6
4/3/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1983 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1983 0.5 2.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1983 0.6 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1983 1.6 5.5 0.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1983 5.5 4.4 3.4 0.0 7.4 4.4 0.0 0.0 0.0 0.2 1.4 2.3 2.4 0.0
4/10/1983 4.3 0.1 3.3 0.0 9.9 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1983 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.6 0.6 1.2 0.0 0.0 0.0 0.6
4/12/1983 0.4 1.9 1.7 0.5 0.0 0.0 0.2 0.0 4.6 0.0 0.0 0.0 0.0 4.6
4/13/1983 3.2 7.4 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1983 3.1 0.1 3.5 9.7 9.9 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1983 0.9 2.5 4.9 0.9 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1983 0.1 0.0 0.1 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1983 2.6 1.0 2.4 9.7 3.0 2.3 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
4/19/1983 0.9 1.5 1.3 0.8 1.0 0.9 0.3 1.0 6.9 0.7 0.0 0.0 0.0 6.9
4/20/1983 4.4 3.7 5.8 1.7 0.1 4.2 10.1 10.0 11.4 7.5 0.5 1.1 0.9 11.4
4/21/1983 5.4 7.1 4.7 10.2 7.5 4.4 0.0 0.0 0.1 2.0 9.3 11.0 11.3 0.1
4/22/1983 0.4 1.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
4/23/1983 1.0 4.7 6.7 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
4/24/1983 0.1 0.4 0.4 0.2 0.0 0.8 1.9 2.0 0.8 1.5 0.0 0.1 0.0 0.8
4/25/1983 0.6 0.7 0.6 1.6 0.0 5.8 0.7 22.0 21.5 16.3 0.0 0.6 0.0 21.5
4/26/1983 3.2 0.1 4.5 0.7 9.9 6.1 0.3 1.0 6.0 0.7 0.0 0.0 0.0 6.1
4/27/1983 1.9 2.8 3.5 1.8 4.0 2.9 0.4 2.0 8.3 2.7 2.8 0.1 0.0 8.4
4/28/1983 10.1 1.9 8.4 0.2 11.9 7.3 1.9 0.0 0.0 3.2 10.4 7.1 7.3 0.0
4/29/1983 4.7 6.9 10.0 0.8 1.1 2.3 10.6 0.0 0.0 2.3 8.0 6.6 6.8 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/30/1983 3.2 9.3 2.0 1.7 2.5 1.5 0.1 0.0 0.0 1.9 4.5 0.7 0.7 0.0
5/1/1983 1.9 0.5 2.1 12.8 4.9 7.1 0.0 15.7 6.0 12.6 2.1 0.4 0.0 5.9
5/2/1983 0.4 2.0 1.8 1.5 0.0 1.6 0.7 6.0 14.9 4.5 0.0 0.2 0.0 15.0
5/3/1983 0.6 2.6 1.6 2.7 0.0 8.9 1.2 33.8 35.4 25.1 0.0 0.8 0.0 35.4
5/4/1983 3.3 6.4 8.5 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/5/1983 2.5 8.0 1.0 0.0 1.5 1.2 0.0 1.1 0.4 1.6 1.8 0.0 0.0 0.4
5/6/1983 2.1 1.4 1.6 2.3 0.0 3.7 0.5 14.0 14.7 10.4 0.0 0.4 0.0 14.8
5/7/1983 0.3 1.5 1.3 1.2 0.0 1.8 0.5 7.0 12.7 5.2 0.0 0.2 0.0 12.7
5/8/1983 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 1.8 4.2 0.0 0.0 0.0
5/9/1983 1.4 0.1 1.4 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1983 0.7 0.4 0.4 1.0 0.0 0.1 0.4 0.2 8.4 0.2 0.0 0.0 0.0 8.4
5/11/1983 1.5 1.2 1.8 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1983 3.6 0.6 9.2 5.4 7.4 4.6 1.6 0.0 8.7 0.8 2.7 2.1 2.1 8.7
5/13/1983 8.6 5.3 12.1 5.9 8.0 6.9 7.8 4.0 11.0 3.8 3.5 3.8 3.8 11.0
5/14/1983 26.2 5.3 35.3 0.0 19.3 13.0 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
5/15/1983 10.1 13.9 2.9 33.2 0.3 11.3 21.8 30.0 11.4 30.0 27.0 23.0 22.8 11.3
5/16/1983 35.5 46.0 32.5 50.7 83.6 57.0 50.1 0.0 0.0 11.9 43.7 39.3 40.3 0.0
5/17/1983 3.4 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1983 2.8 0.0 3.8 1.3 12.1 9.6 16.2 0.0 0.0 1.9 9.8 13.1 13.4 0.0
5/19/1983 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1983 1.0 0.9 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1983 0.5 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1983 2.1 0.3 4.8 0.0 3.0 1.8 0.0 0.0 0.0 3.6 8.3 0.0 0.0 0.0
5/25/1983 0.3 1.1 1.0 2.5 0.1 1.6 9.9 0.0 0.0 0.7 5.8 10.0 10.2 0.0
5/26/1983 1.4 5.2 0.8 0.3 0.1 0.6 3.9 0.0 0.0 0.3 2.6 4.5 4.6 0.0
5/27/1983 0.2 0.9 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1983 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1983 0.1 0.4 0.4 0.4 0.0 1.1 0.2 4.0 5.2 3.1 0.9 1.6 1.5 5.3
5/30/1983 4.7 0.4 6.7 0.2 0.0 1.1 0.1 4.0 2.8 3.0 0.0 0.1 0.0 2.8
5/31/1983 0.2 0.7 0.6 0.9 0.0 1.3 0.0 5.0 1.9 5.5 4.0 0.1 0.0 1.9
6/1/1983 0.4 1.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1983 0.5 2.3 2.0 0.3 0.0 0.5 0.1 1.7 3.3 1.3 0.0 0.0 0.0 3.3
6/3/1983 3.3 1.7 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1983 0.3 0.3 0.6 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1983 0.2 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1983 4.2 0.6 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1983 3.0 1.3 4.9 0.6 2.1 4.4 7.3 8.0 3.0 6.1 1.1 2.2 2.0 3.0
6/8/1983 2.7 0.7 6.0 5.2 10.4 7.5 2.5 4.0 8.0 3.9 3.9 4.2 4.2 8.0
6/9/1983 0.4 0.9 3.5 4.3 0.5 3.2 0.0 11.0 4.2 8.9 1.8 0.3 0.0 4.1
6/10/1983 7.3 0.5 5.7 1.0 3.1 3.0 7.7 0.0 3.7 7.1 17.5 3.1 3.2 3.7
6/11/1983 2.8 0.4 5.6 11.9 5.1 4.5 10.2 0.0 0.0 1.4 8.0 11.1 11.4 0.0
6/12/1983 3.2 4.2 2.9 0.0 8.9 5.3 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
6/13/1983 4.7 8.1 4.0 2.6 4.9 3.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1983 2.8 3.6 3.9 7.4 5.5 4.5 8.1 0.0 0.0 2.2 8.9 9.3 9.5 0.0
6/15/1983 3.4 0.3 5.1 8.4 13.5 12.8 31.5 0.0 0.0 15.6 65.6 71.2 73.0 0.0
6/16/1983 3.1 3.1 6.4 15.6 2.2 3.5 14.9 0.0 0.0 9.4 35.6 33.6 34.5 0.0
6/17/1983 0.9 3.6 0.6 1.1 0.2 2.2 13.6 0.0 0.0 0.4 3.5 6.1 6.2 0.0
6/18/1983 2.3 4.4 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.6 0.6 0.0
6/19/1983 1.3 0.4 0.5 0.0 1.5 0.9 0.1 0.0 0.0 0.0 0.2 0.3 0.3 0.0
6/20/1983 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.0 0.0 3.2 14.3 16.9 17.3 0.0
6/21/1983 1.9 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.1 0.2 0.2 0.2
6/22/1983 2.5 0.5 8.4 0.0 10.9 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1983 0.3 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1983 5.5 15.7 4.5 0.0 4.9 2.9 0.0 0.0 0.0 2.8 6.3 0.0 0.0 0.0
6/25/1983 1.5 3.8 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.0 0.0 0.0 0.0
6/26/1983 0.1 0.4 0.0 0.7 0.1 2.0 9.5 2.0 0.8 2.2 3.2 3.8 3.8 0.8
6/27/1983 0.0 0.7 5.1 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
6/28/1983 0.3 0.0 0.0 1.3 0.0 4.7 0.6 18.0 18.1 13.3 0.0 0.5 0.0 18.1
6/29/1983 0.9 0.0 1.3 0.9 4.0 4.7 0.4 9.0 11.1 6.7 0.0 0.2 0.0 11.1
6/30/1983 1.1 3.5 0.0 2.4 0.0 3.1 2.9 10.8 22.7 8.8 2.3 1.6 1.4 22.8
7/1/1983 2.6 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/2/1983 2.0 3.9 13.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/1983 1.6 5.7 2.0 1.3 0.1 2.1 7.1 4.0 7.9 8.8 24.0 25.8 26.4 7.9
7/4/1983 2.8 0.4 7.2 1.9 8.0 19.4 10.6 50.0 27.9 38.8 11.2 18.4 17.6 27.8
7/5/1983 0.0 0.3 2.9 6.6 0.9 13.4 73.5 6.8 2.6 5.2 1.2 2.3 2.2 2.6
7/6/1983 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.5 0.7 0.0 0.0 0.0 0.5
7/7/1983 0.1 0.0 0.1 1.0 0.2 0.9 0.4 3.0 9.4 2.2 0.0 0.1 0.0 9.4
7/8/1983 0.0 0.0 0.0 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
7/9/1983 1.0 4.2 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/10/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/11/1983 0.0 0.3 3.0 1.1 0.2 2.2 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/12/1983 1.6 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.8 0.0 0.0 0.0
7/13/1983 3.5 2.4 4.2 1.9 0.3 3.7 23.7 0.0 0.0 6.9 20.7 12.1 12.4 0.0
7/14/1983 7.6 20.2 5.2 10.0 3.3 6.4 29.7 0.0 0.0 10.3 52.6 69.1 70.9 0.0
7/15/1983 4.2 6.3 6.5 0.0 0.0 0.5 0.0 2.0 0.8 2.3 2.3 1.0 1.0 0.8
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/16/1983 5.7 13.3 9.9 8.8 5.5 15.8 47.6 20.5 7.8 16.4 9.9 17.6 17.5 7.7
7/17/1983 8.1 4.2 15.4 1.3 0.0 3.5 1.0 13.0 15.7 9.6 0.0 0.3 0.0 15.7
7/18/1983 7.5 16.0 9.7 5.6 2.1 2.1 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/19/1983 7.0 12.5 6.5 6.9 9.5 7.5 12.1 0.0 0.0 0.4 0.9 0.0 0.0 0.0
7/20/1983 1.6 1.8 12.4 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/21/1983 3.9 2.3 14.8 19.1 1.8 16.6 65.4 22.1 18.9 34.0 71.8 76.0 77.4 18.9
7/22/1983 8.7 16.9 6.6 8.0 9.6 14.5 19.2 23.0 21.3 20.2 17.9 26.3 26.4 21.3
7/23/1983 6.1 11.6 0.7 1.7 1.1 9.3 5.5 30.0 15.1 22.2 0.0 0.7 0.0 15.0
7/24/1983 4.2 15.1 1.5 2.6 0.0 5.4 0.0 20.4 7.9 15.9 2.7 2.9 2.4 7.8
7/25/1983 6.9 12.6 7.9 4.4 5.6 7.4 15.3 7.0 8.4 6.1 3.6 3.6 3.5 8.4
7/26/1983 4.1 3.1 5.8 1.6 8.5 8.2 18.9 1.0 0.4 2.8 5.3 1.2 1.2 0.4
7/27/1983 5.3 1.6 4.3 1.9 0.2 1.0 2.7 2.0 15.9 2.9 5.5 5.4 5.5 16.0
7/28/1983 5.0 4.4 7.4 14.2 8.0 13.8 50.2 6.0 17.9 12.2 21.9 10.4 10.5 18.0
7/29/1983 1.8 7.4 6.6 1.8 0.2 7.4 13.4 20.2 13.9 15.5 1.3 0.5 0.0 13.8
7/30/1983 1.5 5.1 4.8 1.8 1.2 3.9 19.5 1.0 3.0 2.4 6.1 5.7 5.8 3.0
7/31/1983 1.9 0.9 4.2 0.9 0.1 2.2 10.2 2.1 2.0 3.6 16.2 27.4 28.0 2.0
8/1/1983 4.4 3.0 5.3 1.7 0.2 3.2 13.9 4.0 7.3 3.2 0.5 0.2 0.1 7.3
8/2/1983 1.8 4.1 2.5 5.6 0.9 11.2 71.2 0.0 0.0 2.7 6.6 1.3 1.3 0.0
8/3/1983 2.7 3.8 1.6 0.6 1.1 6.8 8.2 18.7 7.1 15.8 12.3 19.3 19.3 7.0
8/4/1983 3.6 10.0 8.8 0.0 3.0 12.4 0.0 40.5 15.5 30.0 0.0 1.0 0.0 15.4
8/5/1983 0.6 2.3 1.9 1.1 0.1 1.2 8.0 0.0 4.1 0.8 4.3 5.9 6.0 4.1
8/6/1983 3.5 4.6 15.9 4.8 0.8 10.0 61.9 1.0 0.4 5.6 35.7 58.4 59.9 0.4
8/7/1983 1.9 2.1 5.0 0.5 2.5 2.5 0.2 4.0 6.1 3.5 1.4 0.6 0.5 6.1
8/8/1983 1.2 2.4 8.3 5.7 0.8 11.5 63.3 6.0 9.4 9.7 38.9 64.5 66.0 9.4
8/9/1983 7.5 3.1 10.8 7.3 4.9 5.2 0.2 8.5 7.1 6.5 1.4 2.6 2.4 7.1
8/10/1983 6.2 5.7 16.3 9.4 13.1 12.9 18.0 9.3 6.1 10.5 30.4 52.9 54.0 6.1
8/11/1983 5.3 0.9 5.8 0.3 0.0 3.1 3.1 10.1 4.0 7.5 0.1 0.3 0.0 3.9
8/12/1983 5.0 6.4 9.5 1.4 4.1 6.2 9.1 9.4 10.0 7.6 3.5 5.1 5.0 10.0
8/13/1983 7.7 3.6 10.4 0.4 0.1 0.8 5.3 0.0 0.0 0.1 0.5 0.8 0.8 0.0
8/14/1983 3.7 3.5 14.6 0.4 0.1 0.8 4.8 0.0 0.0 3.1 7.0 0.0 0.0 0.0
8/15/1983 10.2 20.5 13.0 3.5 4.1 4.2 11.6 0.0 0.0 1.5 9.5 14.6 15.0 0.0
8/16/1983 8.4 17.6 13.2 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/17/1983 2.8 3.8 10.9 2.2 1.2 3.2 16.6 0.0 0.0 2.9 18.1 27.2 27.9 0.0
8/18/1983 2.0 6.6 3.1 0.7 1.1 2.0 8.9 0.0 0.0 1.2 4.3 3.6 3.7 0.0
8/19/1983 1.5 4.4 4.9 2.7 1.8 7.7 23.1 12.2 12.2 14.6 27.5 35.4 36.0 12.2
8/20/1983 4.6 14.3 1.9 0.2 0.0 15.9 0.1 60.7 24.5 45.0 0.0 1.5 0.0 24.3
8/21/1983 6.2 3.4 10.1 9.2 1.7 8.3 36.2 7.0 6.6 9.8 11.5 2.6 2.5 6.6
8/22/1983 9.2 24.4 9.3 3.7 3.4 7.7 33.0 3.0 3.9 2.9 5.8 10.0 10.2 3.9
8/23/1983 17.0 23.3 21.9 0.4 17.3 10.2 0.2 0.0 3.2 0.0 0.0 0.0 0.0 3.2
8/24/1983 4.4 1.1 12.3 5.9 3.1 3.6 10.1 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/25/1983 8.8 3.9 12.0 12.8 16.3 9.8 1.0 0.0 0.0 0.4 3.3 5.8 5.9 0.0
8/26/1983 7.8 12.5 10.3 3.4 4.0 8.9 43.5 0.0 0.0 12.0 30.3 7.0 7.2 0.0
8/27/1983 5.3 6.0 5.6 1.6 1.4 3.2 7.7 5.0 11.0 6.2 6.2 1.4 1.3 11.0
8/28/1983 8.7 9.3 8.9 9.2 2.5 12.4 38.2 20.2 17.4 20.8 19.7 15.7 15.6 17.4
8/29/1983 15.5 27.2 15.5 31.6 17.3 31.8 117.0 16.0 31.8 19.7 33.6 37.8 38.4 31.8
8/30/1983 19.6 24.1 26.2 13.9 20.3 27.4 83.8 11.0 16.4 22.0 51.8 48.5 49.4 16.4
8/31/1983 8.3 12.2 8.7 9.7 3.5 5.1 2.0 10.3 5.3 7.7 0.2 0.3 0.0 5.3
9/1/1983 12.4 9.2 15.1 11.9 11.5 14.1 21.3 15.6 5.9 20.8 29.1 19.4 19.5 5.9
9/2/1983 10.0 5.3 12.0 1.7 0.2 2.6 16.4 0.0 0.0 3.6 10.2 4.9 5.0 0.0
9/3/1983 8.8 19.7 10.0 0.8 0.1 6.8 9.7 20.0 7.6 15.3 1.6 1.8 1.3 7.5
9/4/1983 7.4 3.1 9.5 1.3 23.1 16.3 0.6 10.0 15.0 7.6 1.2 2.3 2.1 15.1
9/5/1983 0.9 0.2 1.0 4.6 0.0 2.9 0.1 11.0 6.9 8.2 0.0 0.3 0.0 6.9
9/6/1983 0.2 0.0 0.2 1.9 0.2 7.4 18.4 17.3 10.3 12.8 0.0 0.4 0.0 10.3
9/7/1983 0.1 1.0 8.6 0.7 0.0 1.3 0.3 5.0 8.1 5.6 7.0 6.9 6.9 8.1
9/8/1983 4.4 0.9 0.7 0.0 0.0 0.0 0.0 0.0 0.1 0.8 1.8 0.0 0.0 0.1
9/9/1983 2.2 6.3 3.0 2.0 0.5 0.8 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1983 2.1 4.2 0.6 1.0 0.2 2.1 13.1 0.0 0.0 0.0 0.3 0.5 0.5 0.0
9/11/1983 2.2 2.3 4.9 0.5 0.0 1.8 0.2 7.0 7.0 5.2 0.0 0.2 0.0 7.0
9/12/1983 6.1 2.3 5.2 0.6 1.1 2.3 5.9 3.0 2.6 7.1 11.1 0.1 0.0 2.6
9/13/1983 16.1 17.5 20.9 1.1 3.1 8.3 8.0 20.1 11.6 15.2 1.4 2.2 1.7 11.6
9/14/1983 26.0 25.3 31.3 37.4 41.5 33.6 40.7 11.2 6.2 16.6 33.9 35.9 36.5 6.2
9/15/1983 13.8 22.4 15.9 3.6 21.4 17.2 13.0 10.2 11.4 7.9 2.6 4.7 4.6 11.5
9/16/1983 7.5 14.4 4.1 0.8 3.0 5.7 0.4 15.0 12.4 11.1 0.0 0.4 0.0 12.4
9/17/1983 2.1 4.8 2.7 2.6 0.0 1.1 0.0 4.0 1.5 7.7 10.7 0.1 0.0 1.5
9/18/1983 2.5 3.8 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1983 0.0 0.0 0.0 0.3 0.0 0.5 3.4 0.0 0.0 0.2 0.4 0.0 0.0 0.0
9/20/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1983 11.0 17.8 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1983 11.1 18.4 17.5 2.1 23.1 17.7 27.1 0.0 0.0 11.5 45.7 46.2 47.4 0.0
9/27/1983 5.3 16.6 0.0 0.2 0.0 0.5 2.9 0.0 0.0 1.0 2.4 0.4 0.4 0.0
9/28/1983 4.7 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1983 4.4 16.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1983 4.7 17.4 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/1/1983 4.0 14.9 0.0 0.6 0.0 8.0 0.3 30.3 16.7 22.5 0.0 0.8 0.0 16.6
10/2/1983 4.3 16.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1983 0.0 0.0 0.0 1.2 0.0 3.7 0.5 14.0 15.4 10.4 0.0 0.4 0.0 15.4
10/6/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1983 0.4 0.3 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1983 2.0 0.3 1.6 0.0 4.3 2.5 0.0 0.0 0.0 2.5 9.8 9.8 10.0 0.0
10/13/1983 1.1 0.0 1.5 0.0 3.0 1.8 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1983 0.0 0.0 0.0 0.4 0.0 8.0 0.2 30.5 15.3 22.6 0.0 0.8 0.0 15.2
10/16/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1983 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
10/21/1983 0.0 0.0 0.0 0.3 0.0 13.2 0.1 50.1 21.6 37.1 0.0 1.2 0.0 21.5
10/22/1983 0.0 0.0 0.0 0.0 0.0 1.9 0.0 7.2 2.7 5.3 0.0 0.2 0.0 2.7
10/23/1983 0.0 0.0 0.0 0.4 0.0 0.1 0.2 0.3 3.8 0.2 0.0 0.0 0.0 3.9
10/24/1983 0.0 0.0 0.0 1.5 0.0 4.5 0.7 17.2 18.9 12.8 0.0 0.4 0.0 19.0
10/25/1983 0.0 0.7 6.4 0.2 0.0 1.2 1.9 3.2 1.2 3.0 5.4 9.3 9.5 1.2
10/26/1983 0.0 0.9 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1983 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1983 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1983 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1983 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
11/1/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1983 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1983 2.5 0.4 5.9 0.5 0.1 1.1 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1983 2.8 1.3 6.1 8.4 10.3 10.8 31.2 0.0 0.0 1.9 8.3 9.5 9.7 0.0
11/13/1983 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1983 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
11/17/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1983 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
11/22/1983 0.0 0.0 0.0 0.6 0.0 1.9 0.3 7.1 8.0 5.3 0.0 0.2 0.0 8.0
11/23/1983 0.0 0.0 0.0 0.8 0.0 2.5 0.3 9.5 10.1 7.0 0.0 0.2 0.0 10.1
11/24/1983 0.0 0.0 0.0 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
11/25/1983 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.2 1.2 2.4 0.0 0.1 0.0 1.2
11/26/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1983 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/17/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 2.4 2.5 0.0
12/27/1983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1983 0.0 0.0 0.0 0.4 0.0 1.4 0.2 5.2 5.7 3.9 0.0 0.1 0.0 5.7
12/29/1983 0.3 1.3 1.2 0.3 0.0 0.8 0.1 3.1 3.7 2.3 0.0 0.1 0.0 3.7
12/30/1983 5.2 1.3 7.0 4.3 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
12/31/1983 18.8 13.2 19.0 30.3 38.4 26.9 28.1 0.0 0.0 7.9 30.6 30.0 30.8 0.0
1/1/1984 1.5 5.5 0.8 0.2 0.0 0.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1984 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1984 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1984 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1984 0.5 0.0 0.0 11.1 0.0 0.0 0.4 0.0 7.6 0.0 0.0 0.0 0.0 7.6
1/29/1984 4.6 0.1 1.4 44.4 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.4
1/30/1984 15.3 15.6 14.0 3.0 8.8 17.8 14.9 40.0 31.1 33.1 9.6 5.1 4.2 31.0
1/31/1984 7.9 14.3 12.8 3.4 16.4 16.2 43.4 0.0 0.0 13.5 58.2 65.1 66.8 0.0
2/1/1984 8.7 3.7 14.3 0.0 33.6 19.9 0.0 0.0 0.0 1.4 5.3 5.1 5.2 0.0
2/2/1984 0.7 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1984 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1984 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1984 3.5 1.2 5.6 0.3 0.0 0.5 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1984 6.2 8.4 5.7 0.9 11.0 10.9 11.6 10.0 3.8 8.2 3.0 3.0 2.8 3.8
2/17/1984 0.7 0.1 1.8 0.0 3.0 1.8 0.0 0.0 0.0 0.5 2.8 3.7 3.8 0.0
2/18/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
2/19/1984 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1984 1.9 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1984 0.0 0.0 0.0 0.3 0.1 0.6 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 5.5 5.8 5.9 0.0
2/25/1984 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 1.2 2.6 0.0 0.0 3.7
2/26/1984 0.0 0.0 0.0 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
2/27/1984 1.0 0.0 0.0 0.2 0.0 0.5 2.9 0.0 0.0 0.8 4.7 6.6 6.8 0.0
2/28/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1984 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1984 3.1 5.6 3.3 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/3/1984 1.9 0.1 2.2 3.4 5.9 4.0 0.0 2.0 0.8 2.0 1.3 0.4 0.4 0.8
3/4/1984 1.6 0.0 1.7 5.4 5.2 3.6 0.1 2.0 3.2 1.8 1.4 1.7 1.7 3.3
3/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1984 0.7 0.0 1.0 0.4 3.0 2.2 1.9 0.6 0.2 0.6 1.6 2.8 2.8 0.2
3/14/1984 0.2 0.0 0.2 0.2 0.7 1.1 1.9 1.3 0.5 1.0 0.5 0.8 0.8 0.5
3/15/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1984 0.4 0.0 0.2 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1984 2.7 0.0 2.9 9.4 8.9 5.4 0.4 0.6 7.4 3.9 7.9 0.0 0.0 7.4
3/18/1984 1.6 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1984 1.3 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1984 4.9 0.4 3.3 2.4 0.1 0.6 4.4 0.0 10.6 0.2 0.4 0.0 0.0 10.6
3/21/1984 2.5 0.3 5.2 8.7 7.9 5.1 0.1 1.4 2.4 3.3 6.3 3.0 3.0 2.4
3/22/1984 2.6 0.3 4.7 12.8 4.6 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1984 1.5 0.0 1.6 8.2 5.0 4.4 1.2 5.2 5.8 3.9 0.0 0.1 0.0 5.8
3/24/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1984 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1984 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
3/28/1984 0.4 0.0 0.3 3.4 1.0 0.6 0.0 0.0 0.0 0.1 0.5 0.9 0.9 0.0
3/29/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1984 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1984 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1984 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.5 0.0 0.0 0.0 0.0 1.5
4/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1984 0.6 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1984 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1984 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1984 2.6 0.2 3.5 1.7 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
4/12/1984 1.4 0.0 2.0 0.7 4.8 2.9 0.2 0.3 3.8 0.2 0.0 0.0 0.0 3.9
4/13/1984 3.8 0.8 5.7 0.8 5.5 3.3 0.3 0.1 6.4 0.1 0.0 0.0 0.0 6.4
4/14/1984 3.2 0.8 4.0 3.9 12.5 9.3 12.1 0.4 0.2 1.7 4.8 3.7 3.8 0.2
4/15/1984 1.4 0.1 1.9 0.9 1.0 0.9 0.0 1.3 0.5 1.2 2.1 3.7 3.8 0.5
4/16/1984 4.1 0.2 5.1 7.8 9.9 6.7 3.6 1.3 14.2 6.0 24.4 30.9 31.6 14.2
4/17/1984 0.5 0.1 1.0 3.7 1.0 0.8 1.5 0.4 9.5 0.9 1.9 1.0 1.0 9.5
4/18/1984 8.3 0.7 12.4 27.8 8.6 7.8 13.9 3.3 26.3 22.0 61.6 40.6 41.5 26.4
4/19/1984 18.5 1.0 23.1 26.9 22.5 16.9 24.9 0.1 25.1 7.9 28.6 25.6 26.2 25.2
4/20/1984 12.8 0.1 10.5 0.5 28.7 17.9 6.2 0.0 0.0 0.0 0.3 0.5 0.5 0.0
4/21/1984 1.6 1.8 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1984 0.9 0.1 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1984 1.0 0.0 0.6 12.9 1.8 2.4 1.9 4.0 1.5 3.7 2.4 2.1 2.0 1.5
4/25/1984 0.5 0.0 0.6 0.0 2.0 1.5 0.0 1.4 0.5 1.5 1.1 0.4 0.4 0.5
4/26/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1984 2.6 0.8 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1984 4.8 8.3 2.0 4.3 4.9 3.3 0.0 1.4 0.5 1.2 0.4 0.0 0.0 0.5
4/29/1984 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
4/30/1984 0.2 0.0 0.2 2.6 0.0 0.3 0.4 1.3 7.9 1.0 0.0 0.0 0.0 8.0
5/1/1984 3.8 0.3 5.5 0.9 0.0 0.4 0.4 1.4 8.4 2.3 4.8 4.5 4.6 8.4
5/2/1984 8.4 1.2 8.2 8.5 13.3 9.3 8.4 0.6 9.4 3.1 7.9 4.7 4.8 9.5
5/3/1984 4.4 0.1 3.2 3.3 4.0 2.4 0.3 0.2 6.4 0.3 0.6 0.5 0.5 6.4
5/4/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.4 0.0
5/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1984 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
5/9/1984 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
5/10/1984 1.1 0.1 1.6 0.0 0.0 0.3 0.0 1.1 0.4 0.8 0.0 0.0 0.0 0.4
5/11/1984 6.3 3.2 32.7 6.8 14.3 9.8 8.2 0.4 2.0 4.4 23.7 34.2 35.1 2.0
5/12/1984 3.7 0.8 6.6 16.5 10.7 11.9 36.8 0.2 0.1 3.7 21.0 30.6 31.4 0.1
5/13/1984 1.8 0.1 3.2 1.9 7.2 4.7 1.9 0.3 0.1 1.1 3.3 3.0 3.1 0.1
5/14/1984 0.3 0.0 0.3 1.8 1.1 2.4 11.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1984 0.5 0.0 0.8 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/16/1984 1.4 0.0 1.3 0.9 4.0 2.8 0.0 1.6 0.6 1.4 0.4 0.0 0.0 0.6
5/17/1984 4.2 3.5 4.5 1.7 13.8 8.6 0.0 1.4 0.5 1.0 0.0 0.0 0.0 0.5
5/18/1984 1.6 0.3 2.7 6.0 0.6 8.4 50.1 2.1 4.5 2.6 2.4 0.1 0.0 4.5
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/19/1984 1.0 0.0 1.4 1.3 2.1 2.1 6.2 0.1 6.7 4.0 31.4 53.2 54.5 6.8
5/20/1984 2.3 0.3 3.1 0.8 1.0 0.6 0.4 0.2 6.9 0.2 0.0 0.0 0.0 6.9
5/21/1984 3.1 2.9 1.1 0.3 3.5 2.2 0.0 0.4 0.2 0.5 1.6 2.7 2.8 0.2
5/22/1984 3.5 0.7 7.4 4.6 0.0 0.1 0.2 0.2 3.2 0.2 0.0 0.0 0.0 3.2
5/23/1984 7.8 1.9 13.7 7.1 4.3 3.6 3.4 2.2 0.8 4.1 19.3 32.7 33.5 0.8
5/24/1984 6.5 2.4 12.4 2.6 14.3 10.9 11.6 2.5 1.0 7.5 25.9 31.3 32.0 0.9
5/25/1984 1.3 1.7 2.7 6.8 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1984 1.9 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1984 2.5 0.1 2.8 0.0 0.0 0.7 0.0 2.5 1.0 1.9 0.0 0.1 0.0 0.9
5/30/1984 2.4 6.0 1.6 0.9 3.5 2.1 0.4 0.0 7.5 0.6 1.4 0.0 0.0 7.5
5/31/1984 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.1 0.0 0.0 0.0 0.0 8.1
6/1/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1984 0.1 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1984 6.8 16.9 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1984 0.0 0.0 0.0 0.4 0.1 1.0 4.5 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/5/1984 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
6/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1984 0.2 0.8 0.8 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
6/10/1984 2.1 0.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.9 0.9 0.0
6/11/1984 5.1 1.1 5.7 11.5 7.0 5.2 6.5 0.4 6.7 2.3 5.2 1.5 1.5 6.7
6/12/1984 2.6 0.3 4.1 0.0 0.0 0.2 0.0 0.6 0.2 0.5 0.6 1.0 1.0 0.2
6/13/1984 1.9 0.0 1.2 0.6 3.7 2.2 0.2 0.3 3.2 0.5 0.9 0.4 0.4 3.2
6/14/1984 1.6 0.4 0.8 2.1 1.1 1.4 5.0 0.0 0.0 0.3 0.7 0.0 0.0 0.0
6/15/1984 6.7 9.0 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1984 1.7 0.6 2.7 1.8 2.7 1.6 0.8 0.0 15.5 0.0 0.0 0.0 0.0 15.6
6/17/1984 2.7 0.0 3.6 3.0 11.2 7.7 6.2 0.4 0.2 2.0 12.0 19.1 19.6 0.2
6/18/1984 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1984 2.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1984 4.5 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1984 0.3 0.0 0.0 5.1 0.0 1.6 0.0 6.1 2.3 4.5 0.0 0.2 0.0 2.3
6/26/1984 5.3 12.6 2.7 0.8 0.0 0.0 0.4 0.0 7.1 0.0 0.0 0.0 0.0 7.1
6/27/1984 6.6 1.6 11.5 6.2 8.4 5.6 3.4 0.4 0.2 5.0 13.4 6.3 6.4 0.2
6/28/1984 15.8 2.1 16.0 18.8 27.1 21.3 34.4 0.6 7.2 24.5 72.5 42.4 43.5 7.2
6/29/1984 3.9 2.2 7.8 4.6 7.0 5.1 6.3 0.1 6.6 0.5 1.4 1.0 1.0 6.6
6/30/1984 2.8 1.2 5.7 3.9 4.5 2.9 1.6 0.2 0.1 2.3 4.8 0.0 0.0 0.1
7/1/1984 2.7 6.8 0.5 4.3 0.4 5.4 33.9 0.2 0.1 7.1 25.9 23.6 24.2 0.1
7/2/1984 1.2 1.2 8.4 5.0 0.8 9.8 61.4 0.2 0.1 1.1 4.3 4.9 5.0 0.1
7/3/1984 6.4 1.5 8.0 6.7 1.0 1.8 3.4 2.7 1.0 2.7 4.4 6.6 6.7 1.0
7/4/1984 8.0 7.0 11.5 8.5 6.0 9.1 37.6 0.2 16.2 7.3 41.6 60.3 61.8 16.3
7/5/1984 2.1 1.2 2.8 0.5 3.5 3.6 6.8 1.7 0.6 1.9 3.2 4.4 4.5 0.6
7/6/1984 1.5 0.0 0.6 0.4 0.1 1.1 5.3 1.0 0.4 0.9 0.4 0.3 0.3 0.4
7/7/1984 8.2 8.9 5.9 1.8 10.7 10.1 23.2 1.1 0.4 1.1 2.0 3.5 3.6 0.4
7/8/1984 0.1 0.0 0.0 2.8 0.0 0.5 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/9/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/10/1984 3.8 10.5 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/11/1984 2.3 0.4 5.1 8.7 0.1 1.2 5.5 1.3 5.5 4.3 7.6 0.0 0.0 5.5
7/12/1984 11.1 8.2 5.3 2.0 6.5 5.1 4.4 2.3 0.9 2.3 1.6 0.4 0.3 0.9
7/13/1984 2.2 0.2 5.1 2.5 9.8 11.0 32.4 1.2 0.5 1.7 2.9 2.5 2.5 0.5
7/14/1984 0.8 1.9 2.2 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
7/15/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.2 0.2 0.0
7/16/1984 0.0 0.3 2.8 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
7/17/1984 3.6 0.3 5.9 0.2 0.0 0.7 1.9 1.6 0.6 1.2 0.0 0.0 0.0 0.6
7/18/1984 7.5 4.0 9.2 15.6 15.0 12.3 17.6 3.1 13.6 7.1 26.3 36.6 37.4 13.6
7/19/1984 0.5 0.4 3.7 0.0 0.0 0.3 0.0 1.1 0.4 0.8 0.0 0.0 0.0 0.4
7/20/1984 4.9 0.7 10.2 2.5 0.0 0.5 4.4 0.0 18.6 0.2 1.6 2.7 2.8 18.7
7/21/1984 10.7 2.8 19.1 22.5 25.9 19.8 18.6 6.3 7.4 17.7 49.9 48.4 49.5 7.4
7/22/1984 6.4 9.6 5.3 4.0 6.1 6.3 12.8 2.9 4.8 7.8 23.9 26.4 27.0 4.8
7/23/1984 1.1 2.5 5.2 0.2 0.5 0.6 1.9 0.1 0.0 0.7 2.6 2.9 3.0 0.0
7/24/1984 0.7 0.2 2.4 2.9 1.5 6.4 36.8 0.0 0.0 5.3 15.9 9.1 9.3 0.0
7/25/1984 1.7 0.5 3.5 3.3 1.3 4.4 22.9 1.3 13.5 5.6 25.7 36.1 37.0 13.6
7/26/1984 4.9 2.5 12.2 0.2 3.5 3.4 2.4 3.8 1.4 3.1 0.7 0.1 0.0 1.4
7/27/1984 1.7 2.7 4.3 1.9 0.0 0.3 2.1 0.0 0.0 3.2 8.9 3.7 3.8 0.0
7/28/1984 7.4 3.2 4.7 3.6 1.6 2.3 8.9 0.0 3.4 4.0 11.0 4.7 4.8 3.4
7/29/1984 5.7 4.8 5.6 6.2 4.4 5.0 15.8 0.0 6.2 5.8 19.7 15.2 15.6 6.2
7/30/1984 1.8 1.7 4.2 19.0 0.0 0.5 3.3 0.0 0.0 0.1 0.8 1.4 1.4 0.0
7/31/1984 0.0 0.3 2.7 3.2 0.5 6.5 41.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/1/1984 0.6 2.1 0.2 1.4 0.1 0.6 4.5 0.0 9.3 0.1 1.0 1.7 1.7 9.4
8/2/1984 0.0 1.3 11.7 2.0 0.2 2.3 12.6 1.4 9.8 4.9 8.7 0.0 0.0 9.9
8/3/1984 1.1 4.3 1.0 5.2 0.6 7.6 46.4 1.3 14.2 9.5 25.1 13.2 13.5 14.2
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/4/1984 0.1 0.3 0.2 0.0 0.0 0.7 0.0 2.5 1.0 2.9 9.0 15.7 16.0 0.9
8/5/1984 0.0 0.6 5.1 1.3 0.2 2.7 16.6 0.2 0.1 1.7 10.1 15.6 16.0 0.1
8/6/1984 3.0 4.8 5.5 3.7 0.5 5.9 37.1 0.4 7.0 1.8 4.1 1.8 1.8 7.0
8/7/1984 3.9 5.5 7.8 29.2 0.1 1.4 3.7 3.0 1.1 4.7 10.4 11.6 11.8 1.1
8/8/1984 5.7 0.6 5.6 6.2 1.5 7.5 42.2 1.8 26.1 1.4 0.2 0.3 0.3 26.3
8/9/1984 7.4 7.5 6.2 28.8 0.1 10.1 6.5 35.0 22.3 30.9 21.2 24.3 24.0 22.2
8/10/1984 9.8 19.7 13.2 4.7 8.5 7.1 10.9 1.6 4.3 3.0 7.5 8.1 8.3 4.3
8/11/1984 7.2 13.3 13.3 6.5 0.4 0.5 0.6 1.1 12.0 0.8 0.0 0.0 0.0 12.1
8/12/1984 10.5 12.5 13.2 6.5 4.0 2.7 0.6 1.3 12.4 1.0 0.0 0.0 0.0 12.4
8/13/1984 13.2 8.1 9.8 18.4 6.0 4.9 2.9 4.0 18.9 10.3 19.4 6.7 6.8 19.0
8/14/1984 9.6 18.1 17.1 12.5 18.5 17.3 33.0 6.0 22.5 6.1 14.1 24.5 25.0 22.6
8/15/1984 3.0 9.8 9.4 1.2 0.0 38.3 0.0 146.0 55.4 110.8 8.1 8.6 5.1 55.0
8/16/1984 7.9 13.2 14.2 6.1 4.5 26.7 45.9 65.6 32.3 48.6 0.0 1.6 0.0 32.2
8/17/1984 6.9 16.1 17.4 1.2 3.1 16.9 11.3 51.0 21.8 41.1 10.3 7.8 6.7 21.7
8/18/1984 9.8 9.1 17.1 4.5 7.8 10.2 35.8 1.0 0.4 7.5 20.1 11.2 11.5 0.4
8/19/1984 15.9 19.2 15.2 3.0 11.4 7.9 5.8 1.1 0.4 17.4 53.3 37.1 38.0 0.4
8/20/1984 9.0 9.9 9.8 15.2 3.2 5.3 19.8 1.6 0.6 9.5 29.2 24.4 25.0 0.6
8/21/1984 2.2 0.0 3.1 0.5 9.0 6.8 6.8 1.6 0.6 1.3 1.1 2.0 2.0 0.6
8/22/1984 3.9 13.4 4.6 1.0 1.0 1.7 2.4 2.6 1.0 17.6 39.1 8.0 8.1 1.0
8/23/1984 5.1 6.2 12.2 2.9 1.9 10.5 3.9 33.4 12.7 25.4 1.9 1.8 1.0 12.6
8/24/1984 8.3 11.8 11.0 7.1 7.4 14.4 57.8 5.0 1.9 9.0 17.4 12.8 13.0 1.9
8/25/1984 6.2 7.4 15.6 1.3 1.2 4.3 13.5 6.0 4.1 10.4 16.3 6.5 6.5 4.1
8/26/1984 5.2 5.2 20.1 7.3 4.5 4.8 6.8 4.0 1.5 9.5 16.3 3.4 3.4 1.5
8/27/1984 7.0 1.5 6.9 2.8 3.9 2.9 0.3 2.2 6.6 2.6 2.8 1.5 1.5 6.6
8/28/1984 3.0 5.2 14.5 5.5 6.3 7.7 26.3 0.4 15.3 4.5 9.6 0.0 0.0 15.4
8/29/1984 1.0 1.5 10.1 3.9 3.9 5.9 23.2 1.0 19.0 15.0 33.8 3.0 3.0 19.1
8/30/1984 2.4 0.7 3.6 6.2 1.4 5.5 30.5 1.1 19.2 4.6 13.5 11.8 12.1 19.3
8/31/1984 6.7 1.4 12.3 11.3 25.9 22.5 46.4 0.9 0.3 2.7 5.9 3.1 3.1 0.3
9/1/1984 2.9 0.0 0.4 1.6 0.3 3.5 19.8 1.3 0.5 2.4 4.1 2.3 2.3 0.5
9/2/1984 3.9 1.0 6.1 3.9 2.3 8.9 49.6 0.3 0.1 4.6 19.3 22.4 23.0 0.1
9/3/1984 6.7 3.5 14.8 1.5 19.9 13.3 8.2 1.4 8.3 2.5 7.8 10.6 10.8 8.3
9/4/1984 7.0 14.7 10.3 1.9 1.0 4.3 24.7 0.0 0.0 0.2 1.7 2.9 3.0 0.0
9/5/1984 12.4 5.9 10.8 31.4 21.0 35.2 57.2 54.5 33.0 44.0 22.6 35.5 35.0 32.9
9/6/1984 9.4 11.8 10.2 17.8 25.8 22.3 46.3 1.2 35.2 3.2 16.6 27.0 27.7 35.4
9/7/1984 4.2 13.5 4.1 1.7 0.0 0.3 0.0 1.0 0.4 0.8 0.6 1.0 1.0 0.4
9/8/1984 1.4 3.1 2.9 0.3 0.1 9.6 3.9 34.1 12.9 25.3 0.0 0.9 0.0 12.8
9/9/1984 4.7 16.2 0.5 0.3 0.0 9.2 0.1 35.0 15.8 25.9 0.0 0.9 0.0 15.7
9/10/1984 2.1 2.2 2.1 2.2 0.3 5.5 26.6 4.8 3.1 3.6 0.1 0.3 0.2 3.1
9/11/1984 15.7 14.6 19.4 17.1 7.7 5.4 6.2 1.4 56.4 3.7 16.8 25.7 26.3 56.7
9/12/1984 26.6 39.0 26.4 45.7 22.2 19.5 42.7 1.3 58.2 26.2 94.6 88.2 90.4 58.5
9/13/1984 27.6 4.4 33.1 47.1 66.8 60.1 47.4 51.2 19.4 66.8 73.1 18.5 17.7 19.3
9/14/1984 0.0 0.0 0.0 0.0 0.0 4.5 0.0 17.0 6.5 12.6 0.1 0.6 0.2 6.4
9/15/1984 0.0 0.0 0.0 0.0 0.0 13.6 0.0 51.7 19.6 45.2 15.7 1.3 0.0 19.5
9/16/1984 0.8 0.9 0.8 0.4 0.1 1.1 4.8 1.3 0.5 1.2 1.8 3.2 3.2 0.5
9/17/1984 7.6 21.9 6.9 9.0 4.8 7.2 28.5 0.4 0.2 0.5 1.7 2.9 3.0 0.2
9/18/1984 3.3 10.4 5.3 0.8 0.1 1.9 10.6 0.9 0.3 0.7 0.0 0.0 0.0 0.3
9/19/1984 2.3 3.9 1.9 0.5 0.1 1.5 6.8 1.6 0.6 1.2 0.0 0.0 0.0 0.6
9/20/1984 17.9 13.5 16.6 13.9 12.5 10.0 14.0 1.8 0.7 5.3 9.9 2.0 2.0 0.7
9/21/1984 14.1 5.1 13.2 15.5 25.0 30.2 24.5 45.0 24.0 36.5 12.5 13.6 12.8 23.9
9/22/1984 1.2 4.8 4.5 1.2 0.0 0.8 0.5 3.0 11.3 2.2 0.0 0.1 0.0 11.4
9/23/1984 3.7 8.6 6.9 0.3 1.0 1.2 0.1 2.3 3.4 1.7 0.0 0.1 0.0 3.4
9/24/1984 7.1 6.2 10.4 6.1 4.1 4.3 10.3 1.3 2.4 10.5 32.3 25.4 26.0 2.4
9/25/1984 11.1 4.4 15.4 23.2 14.1 24.6 18.5 51.7 31.4 68.5 78.6 24.7 24.0 31.3
9/26/1984 14.0 9.9 11.6 21.4 26.9 18.8 20.5 0.3 39.5 7.5 34.1 41.6 42.6 39.7
9/27/1984 0.0 0.0 0.0 0.3 0.1 0.9 4.2 0.9 0.3 0.7 0.0 0.0 0.0 0.3
9/28/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1984 1.6 4.2 0.0 12.0 0.2 2.4 15.7 0.0 12.5 0.3 2.8 4.9 5.0 12.6
10/2/1984 6.8 17.2 18.7 0.2 0.0 0.3 0.1 1.0 1.7 0.7 0.0 0.0 0.0 1.8
10/3/1984 1.0 1.9 2.6 1.9 2.2 4.6 20.5 0.8 3.0 0.6 0.3 0.5 0.5 3.1
10/4/1984 4.5 10.3 2.7 0.3 1.0 1.2 3.4 0.4 0.2 0.3 0.0 0.0 0.0 0.2
10/5/1984 0.5 0.3 0.9 0.0 1.7 1.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
10/6/1984 0.0 0.0 0.0 0.4 0.0 0.2 0.2 0.7 3.9 0.6 0.2 0.4 0.4 3.9
10/7/1984 0.0 0.0 0.0 0.9 0.0 0.1 0.4 0.4 7.6 0.3 0.0 0.0 0.0 7.6
10/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1984 0.0 1.0 8.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1984 4.6 0.0 1.6 0.7 5.1 4.3 8.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1984 11.0 0.5 10.3 11.9 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
10/12/1984 26.9 24.8 27.2 26.4 31.7 25.3 43.5 0.0 0.0 8.0 32.4 33.8 34.7 0.0
10/13/1984 34.8 58.9 27.7 52.1 46.0 33.5 42.1 0.0 10.2 29.9 75.0 16.5 16.9 10.2
10/14/1984 5.2 8.8 14.9 0.0 13.8 8.2 0.0 0.0 0.0 1.3 10.7 18.5 19.0 0.0
10/15/1984 0.7 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1984 5.5 0.9 3.8 0.4 1.0 0.6 0.2 0.0 3.2 0.0 0.0 0.0 0.0 3.2
10/17/1984 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
10/18/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/20/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1984 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.6
10/24/1984 7.3 19.2 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
10/25/1984 2.9 1.3 4.9 0.9 11.5 8.5 11.2 0.0 0.0 4.0 14.5 12.9 13.2 0.0
10/26/1984 0.0 0.0 0.0 0.1 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1984 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
10/28/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
11/4/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1984 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
11/9/1984 0.0 0.0 0.0 1.1 0.0 0.0 0.5 0.0 9.1 0.0 0.0 0.0 0.0 9.2
11/10/1984 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.1 0.0 0.0 0.0 0.0 6.1
11/11/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1984 0.0 0.0 0.0 0.8 0.0 0.0 0.4 0.0 6.8 0.0 0.0 0.0 0.0 6.9
11/17/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1984 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.6 0.0 0.0 0.0 0.0 1.6
11/24/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1984 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
12/2/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1984 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
12/11/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1984 0.0 0.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1984 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
12/20/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1984 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1984 0.5 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1984 6.3 0.2 8.9 0.0 16.8 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1984 3.8 10.0 5.7 16.2 0.5 4.0 22.7 1.1 0.4 6.9 24.1 24.4 25.0 0.4
12/28/1984 0.8 0.5 4.2 18.0 0.1 0.9 4.2 0.9 6.4 3.2 7.4 4.1 4.2 6.5
12/29/1984 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
12/30/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1984 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1985 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 2.1 0.0 0.0 0.0 0.0 2.1
1/2/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/5/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1985 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
1/8/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1985 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
1/14/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1985 0.0 0.0 0.0 1.2 0.0 0.0 0.6 0.0 10.4 0.0 0.0 0.0 0.0 10.4
1/17/1985 15.9 1.2 25.2 36.5 29.7 19.1 3.5 4.3 13.4 4.6 6.9 9.1 9.2 13.4
1/18/1985 3.7 14.3 2.0 4.2 0.7 8.4 53.2 0.0 0.0 15.7 52.9 40.5 41.5 0.0
1/19/1985 1.2 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1985 0.0 0.9 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1985 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
1/30/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1985 0.1 0.0 0.2 0.4 0.0 0.0 0.2 0.0 3.4 0.0 0.0 0.0 0.0 3.4
2/4/1985 1.8 6.7 0.1 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
2/5/1985 0.0 0.0 0.0 0.1 0.0 0.2 1.0 0.0 0.0 3.8 10.7 4.9 5.0 0.0
2/6/1985 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1985 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
2/8/1985 0.0 0.0 0.0 0.3 0.0 0.0 0.2 0.0 2.8 0.0 0.0 0.0 0.0 2.8
2/9/1985 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.4 0.0 0.0 0.0 0.0 3.4
2/10/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1985 0.3 0.1 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1985 4.6 6.0 4.2 10.9 11.0 8.1 8.9 0.9 0.3 1.3 5.4 9.3 9.5 0.3
2/14/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1985 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1985 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1985 4.8 3.3 5.0 8.9 9.9 5.9 0.9 0.0 17.6 0.4 0.9 0.0 0.0 17.7
2/20/1985 15.8 6.4 20.5 8.3 24.8 15.5 4.4 0.9 10.0 4.7 11.2 5.1 5.2 10.0
2/21/1985 5.3 7.6 9.3 13.9 5.6 5.8 14.0 1.5 0.6 4.6 11.3 7.8 8.0 0.6
2/22/1985 1.9 2.9 4.9 19.5 0.0 1.7 3.4 4.3 1.6 25.8 84.4 78.1 80.0 1.6
2/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.4 0.5 0.5 0.0
2/24/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1985 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
3/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1985 0.2 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1985 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
3/7/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1985 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
3/12/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1985 1.2 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1985 4.3 12.3 1.3 1.6 4.0 2.6 0.2 0.9 3.5 0.7 0.0 0.0 0.0 3.5
3/15/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/23/1985 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
3/24/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1985 7.5 5.3 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1985 6.5 6.6 5.8 12.4 17.9 11.7 6.8 0.5 0.2 3.4 10.3 8.2 8.4 0.2
3/30/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1985 0.2 0.0 0.3 0.2 1.0 1.0 2.9 0.0 0.0 0.1 0.9 1.5 1.5 0.0
4/5/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1985 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.4 0.0 0.0 0.0 0.0 3.4
4/7/1985 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
4/8/1985 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.4 0.0 0.0 0.0 0.0 4.4
4/9/1985 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1985 1.1 2.8 0.6 2.6 1.0 0.7 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
4/11/1985 4.7 7.4 4.1 0.0 0.8 0.6 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
4/12/1985 3.4 1.4 7.8 7.6 7.2 5.1 2.6 1.8 13.1 1.4 0.1 0.2 0.2 13.2
4/13/1985 3.5 7.7 1.8 0.1 5.0 3.2 1.7 0.0 0.0 0.2 1.2 2.2 2.2 0.0
4/14/1985 0.7 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1985 1.5 0.4 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1985 5.2 16.6 2.2 0.1 3.5 2.3 1.5 0.0 0.0 4.8 13.3 5.7 5.8 0.0
4/18/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1985 1.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1985 0.4 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1985 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1985 0.2 0.0 0.3 0.2 0.0 0.3 1.9 0.1 0.0 0.6 1.8 1.7 1.7 0.0
4/25/1985 0.8 2.4 0.0 0.2 0.0 0.5 1.9 0.8 0.3 0.6 0.0 0.0 0.0 0.3
4/26/1985 0.8 0.2 0.5 0.2 0.0 0.5 2.9 0.3 0.1 0.2 0.1 0.2 0.2 0.1
4/27/1985 4.8 4.4 4.9 0.7 14.4 9.7 6.8 0.6 1.5 2.3 9.2 11.7 12.0 1.5
4/28/1985 0.9 3.3 0.0 0.7 0.1 1.0 5.3 0.4 0.2 0.3 0.0 0.0 0.0 0.2
4/29/1985 2.1 6.6 0.6 0.9 0.0 0.2 0.0 0.9 1.0 0.9 1.9 3.3 3.4 1.0
4/30/1985 0.7 1.0 0.7 3.7 0.1 1.0 6.0 0.4 13.2 4.3 12.8 8.9 9.1 13.3
5/1/1985 1.4 5.9 3.8 0.3 0.1 0.7 3.9 0.5 0.2 0.4 0.0 0.0 0.0 0.2
5/2/1985 0.0 0.0 0.0 0.2 0.0 0.7 2.4 1.1 0.4 1.2 3.4 5.9 6.0 0.4
5/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1985 0.0 0.3 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1985 0.1 0.0 0.1 2.9 0.0 0.2 1.3 0.6 25.1 2.2 3.9 0.0 0.0 25.2
5/10/1985 5.2 2.3 7.5 13.3 16.9 11.7 9.2 1.2 6.7 2.8 10.2 13.9 14.2 6.7
5/11/1985 0.3 0.0 0.4 2.0 0.3 2.9 15.0 1.6 0.6 4.3 12.7 13.3 13.6 0.6
5/12/1985 0.1 0.2 1.9 1.5 0.0 0.2 0.7 0.7 13.3 2.7 5.1 0.2 0.2 13.4
5/13/1985 2.3 0.0 3.2 1.4 8.6 7.7 15.5 1.2 1.7 1.4 4.5 7.8 8.0 1.7
5/14/1985 1.6 0.0 2.2 0.0 4.5 2.6 0.0 0.0 0.1 1.2 2.6 0.0 0.0 0.1
5/15/1985 0.2 0.0 0.3 0.1 0.0 0.3 1.5 0.2 0.1 2.7 6.9 2.4 2.5 0.1
5/16/1985 0.0 0.1 0.1 0.9 0.1 2.9 11.1 4.5 1.7 3.6 2.0 3.5 3.5 1.7
5/17/1985 0.6 2.6 2.8 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
5/18/1985 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1985 0.9 3.4 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1985 0.7 2.9 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1985 2.9 11.1 4.4 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.4
5/24/1985 0.0 0.4 3.9 0.3 0.0 0.0 0.2 0.0 2.9 0.0 0.0 0.0 0.0 2.9
5/25/1985 4.1 15.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1985 2.2 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1985 3.6 9.1 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1985 3.1 7.3 3.2 1.4 0.1 0.8 5.8 0.0 8.2 0.0 0.0 0.0 0.0 8.2
5/29/1985 2.9 4.8 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.9 0.0 0.0 0.0
5/30/1985 3.1 6.6 3.0 11.5 1.7 3.2 19.5 0.0 87.7 8.1 18.6 0.5 0.5 88.1
5/31/1985 3.5 5.9 4.1 5.4 7.7 7.5 21.1 0.0 25.0 3.7 12.0 8.3 8.5 25.1
6/1/1985 1.4 5.5 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1985 0.2 1.3 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1985 0.7 3.0 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1985 0.2 0.8 7.2 0.5 0.1 1.1 7.0 0.0 0.0 0.5 4.4 7.6 7.8 0.0
6/5/1985 2.9 11.4 6.6 0.1 0.0 0.2 1.2 0.0 0.0 0.2 0.5 0.0 0.0 0.0
6/6/1985 2.4 0.8 3.2 10.3 2.3 16.5 22.4 45.0 17.1 44.3 39.4 35.7 35.5 16.9
6/7/1985 7.8 16.0 4.3 19.1 6.7 29.6 12.2 91.0 47.6 72.7 23.7 30.1 28.5 47.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/8/1985 4.8 8.0 3.5 2.9 11.0 14.0 9.9 23.0 12.7 21.8 22.7 28.8 28.9 12.7
6/9/1985 3.3 9.2 0.6 8.8 0.1 3.2 3.9 10.0 3.8 9.5 4.8 0.6 0.4 3.8
6/10/1985 4.1 8.0 5.0 2.3 0.3 4.3 26.6 0.2 0.1 7.5 19.8 7.4 7.6 0.1
6/11/1985 2.4 5.3 3.5 2.7 1.0 4.3 1.9 13.0 4.9 10.8 3.8 3.2 2.9 4.9
6/12/1985 3.7 6.6 4.0 9.3 2.6 8.6 48.2 0.2 33.3 2.9 11.0 11.1 11.4 33.4
6/13/1985 2.9 4.7 2.1 0.3 0.1 0.6 3.9 0.0 0.0 0.1 0.6 1.0 1.0 0.0
6/14/1985 6.4 6.2 6.7 11.3 13.2 12.4 30.7 0.0 3.7 4.9 16.8 13.2 13.5 3.7
6/15/1985 4.4 1.7 5.3 0.4 0.0 0.1 0.2 0.4 3.6 2.6 7.5 5.4 5.5 3.6
6/16/1985 2.5 2.9 5.2 0.5 0.0 0.0 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.0
6/17/1985 4.9 11.2 8.2 26.9 2.6 11.3 12.8 30.0 14.7 22.2 0.0 0.7 0.0 14.7
6/18/1985 2.8 11.3 8.8 1.5 0.0 0.2 1.6 0.3 12.5 0.5 0.7 0.0 0.0 12.6
6/19/1985 4.6 9.2 2.1 14.5 0.1 5.6 8.8 16.0 7.6 19.4 17.6 1.4 1.0 7.5
6/20/1985 4.0 6.5 5.5 5.7 0.4 9.9 18.4 26.0 9.9 27.3 36.4 43.6 44.0 9.8
6/21/1985 6.0 9.3 5.6 0.7 11.5 15.0 9.2 26.0 9.9 28.5 36.4 37.2 37.5 9.8
6/22/1985 2.6 7.5 9.2 0.4 3.6 2.9 4.8 0.0 0.0 0.9 7.2 12.5 12.8 0.0
6/23/1985 1.0 3.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1985 8.2 12.6 12.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1985 4.2 2.8 11.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/1985 2.6 2.4 10.2 0.1 0.0 0.2 1.5 0.0 0.0 6.6 20.3 12.5 12.8 0.0
6/27/1985 0.5 1.4 9.8 1.2 1.7 3.4 15.5 0.4 0.2 3.4 10.8 8.8 9.0 0.2
6/28/1985 2.0 7.6 1.8 2.7 0.4 5.4 34.3 0.0 0.0 6.2 34.3 48.1 49.3 0.0
6/29/1985 3.2 5.5 2.7 1.0 0.0 0.0 0.4 0.0 8.2 0.1 0.6 1.0 1.0 8.2
6/30/1985 1.5 4.7 0.4 0.9 1.0 0.9 2.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
7/1/1985 1.9 5.5 0.4 2.1 0.0 0.1 0.9 0.5 17.9 3.8 7.9 0.0 0.0 18.0
7/2/1985 0.8 1.7 8.5 0.8 1.1 2.3 10.6 0.0 0.0 1.5 3.4 0.2 0.2 0.0
7/3/1985 7.0 5.6 10.8 1.9 0.3 3.2 19.8 0.4 0.2 2.1 13.8 23.1 23.7 0.2
7/4/1985 8.0 13.1 15.7 4.4 9.2 13.4 52.7 0.3 0.1 0.8 2.8 3.3 3.4 0.1
7/5/1985 0.7 1.1 6.7 0.8 1.6 2.4 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/6/1985 3.1 2.6 5.1 0.9 1.0 3.7 0.0 12.0 4.6 9.4 3.8 6.9 6.8 4.5
7/7/1985 7.5 16.3 9.8 0.6 0.1 1.4 8.2 0.5 0.2 0.6 1.7 2.9 3.0 0.2
7/8/1985 8.0 16.6 10.3 3.8 12.1 15.2 15.5 22.0 8.3 18.4 5.0 0.8 0.3 8.3
7/9/1985 2.2 1.0 10.8 0.9 1.1 2.4 11.6 0.0 0.0 1.3 2.8 0.0 0.0 0.0
7/10/1985 7.5 16.4 8.6 0.2 3.0 6.3 2.4 16.0 6.1 16.7 21.6 25.8 26.0 6.0
7/11/1985 6.7 19.7 23.6 5.2 7.1 18.3 18.4 44.0 49.2 35.3 7.1 3.6 2.6 49.2
7/12/1985 3.6 11.8 3.2 2.8 2.1 6.6 12.0 14.0 21.6 10.7 2.8 5.2 5.0 21.6
7/13/1985 0.9 3.8 5.0 2.3 0.0 0.4 3.3 0.0 17.5 0.2 1.6 2.7 2.8 17.6
7/14/1985 2.6 7.9 5.6 0.8 0.0 0.0 0.3 0.0 6.5 0.8 1.8 0.0 0.0 6.5
7/15/1985 1.6 4.9 2.8 0.6 0.0 0.5 3.1 0.0 2.8 0.0 0.0 0.0 0.0 2.8
7/16/1985 5.5 9.7 7.2 1.5 7.7 6.9 14.7 0.5 3.4 0.4 0.0 0.0 0.0 3.4
7/17/1985 0.6 0.0 0.7 2.6 0.0 0.0 0.0 0.0 0.0 0.6 1.3 0.0 0.0 0.0
7/18/1985 4.5 12.3 3.0 0.0 1.0 0.6 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
7/19/1985 7.1 9.3 8.8 2.6 2.4 6.6 33.4 0.5 0.2 2.6 7.3 5.1 5.2 0.2
7/20/1985 3.9 8.0 12.3 0.9 1.7 2.9 12.1 0.0 0.0 10.1 27.3 10.2 10.5 0.0
7/21/1985 4.7 13.1 9.6 1.0 3.7 4.2 13.1 0.0 0.0 0.5 2.7 3.6 3.7 0.0
7/22/1985 1.4 3.7 6.0 10.8 2.1 18.0 88.7 13.0 8.8 12.2 10.8 12.2 12.2 8.8
7/23/1985 5.6 1.2 16.9 2.3 10.9 6.4 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
7/24/1985 7.8 16.3 16.6 20.1 10.6 9.2 2.5 10.2 13.9 7.7 1.5 2.8 2.6 13.9
7/25/1985 4.8 5.0 9.7 2.4 16.0 11.8 14.6 0.9 11.1 3.1 11.6 14.7 15.0 11.1
7/26/1985 2.6 7.7 18.9 5.3 0.1 4.1 9.7 10.0 13.7 7.5 0.6 1.2 1.0 13.7
7/27/1985 5.6 5.5 9.2 1.0 0.1 3.7 5.6 11.0 9.1 8.5 1.0 0.9 0.6 9.1
7/28/1985 3.4 7.1 3.6 0.7 4.6 4.1 9.2 0.2 0.3 1.1 6.4 10.3 10.6 0.3
7/29/1985 0.7 0.1 1.2 5.9 2.5 13.7 40.2 24.0 18.4 26.1 32.3 32.4 32.6 18.4
7/30/1985 2.6 0.3 5.0 22.1 7.9 19.6 37.4 36.0 25.0 29.3 14.3 20.8 20.4 24.9
7/31/1985 2.6 3.2 6.8 1.4 8.0 9.6 11.3 12.2 8.7 9.1 0.6 1.3 1.0 8.7
8/1/1985 3.6 11.1 3.7 1.1 0.2 3.2 14.5 3.4 1.3 2.5 0.0 0.1 0.0 1.3
8/2/1985 4.5 14.3 4.7 1.1 0.2 2.3 14.5 0.1 0.0 0.1 0.0 0.0 0.0 0.0
8/3/1985 11.9 18.2 15.4 4.6 7.6 6.9 15.0 0.5 0.2 2.5 9.9 11.9 12.2 0.2
8/4/1985 4.1 0.1 6.4 7.2 16.4 17.1 16.3 19.0 7.2 19.3 13.4 4.1 3.7 7.2
8/5/1985 1.4 4.3 7.3 2.3 0.6 4.7 29.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/6/1985 0.8 2.9 3.7 5.5 0.6 7.7 48.9 0.0 0.0 1.7 5.9 5.0 5.1 0.0
8/7/1985 0.0 0.0 0.0 0.2 0.0 0.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/8/1985 2.2 7.3 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/9/1985 2.1 0.4 2.0 0.1 0.0 0.2 1.0 0.0 0.0 0.4 3.7 6.3 6.5 0.0
8/10/1985 3.7 0.7 7.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3 22.3 35.1 36.0 0.0
8/11/1985 0.8 1.4 1.7 0.2 0.0 0.5 2.9 0.0 0.0 0.3 2.9 5.0 5.1 0.0
8/12/1985 5.2 4.4 13.2 3.6 3.0 8.9 45.7 0.8 0.3 3.9 10.6 6.9 7.1 0.3
8/13/1985 1.1 1.4 5.1 0.0 2.8 1.6 0.0 0.0 0.0 0.8 6.5 11.2 11.5 0.0
8/14/1985 0.0 0.1 0.1 3.4 0.5 6.7 42.1 0.3 0.1 2.3 4.8 0.0 0.0 0.1
8/15/1985 5.8 14.0 3.7 0.5 2.8 2.7 6.0 0.3 0.1 0.4 1.4 2.5 2.5 0.1
8/16/1985 1.7 1.1 3.0 0.4 0.1 4.6 3.9 15.0 5.7 11.3 1.3 2.6 2.3 5.7
8/17/1985 1.1 0.9 3.6 2.4 0.4 4.9 31.0 0.0 0.0 9.5 47.4 61.4 63.0 0.0
8/18/1985 1.2 0.8 2.2 0.5 1.6 2.0 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/1985 2.7 1.2 3.7 2.2 1.8 2.6 9.4 0.8 12.8 3.7 16.9 23.6 24.2 12.9
8/20/1985 1.1 0.9 1.7 6.6 3.4 11.1 60.1 0.3 11.4 0.6 2.9 5.1 5.2 11.4
8/21/1985 0.5 0.2 0.7 3.2 0.3 3.1 20.6 0.0 13.9 0.4 2.9 5.1 5.2 14.0
8/22/1985 0.7 1.0 0.9 1.3 0.1 1.4 9.0 0.1 5.1 0.1 0.3 0.5 0.5 5.2
8/23/1985 0.3 0.2 2.1 0.8 0.1 0.6 4.1 0.0 3.8 0.1 0.8 1.4 1.4 3.8
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/24/1985 0.3 0.1 1.4 1.9 0.1 1.1 7.6 0.0 11.2 0.0 0.0 0.0 0.0 11.2
8/25/1985 0.1 0.5 1.7 1.4 0.1 1.1 6.1 0.7 6.7 10.3 36.6 34.0 34.8 6.8
8/26/1985 1.5 0.9 5.6 2.9 1.2 1.0 1.3 0.3 2.6 0.2 0.0 0.0 0.0 2.6
8/27/1985 1.5 1.5 5.8 15.7 2.8 12.0 68.7 0.0 1.2 0.0 0.0 0.0 0.0 1.3
8/28/1985 4.5 0.7 9.2 6.1 3.0 2.1 1.9 0.3 0.1 0.8 5.1 8.8 9.0 0.1
8/29/1985 4.5 3.7 7.9 7.4 3.0 7.0 3.9 18.0 16.3 22.4 29.9 22.3 22.4 16.3
8/30/1985 3.4 2.0 8.6 4.1 11.5 19.0 46.6 20.0 11.6 21.4 16.8 5.1 4.7 11.5
8/31/1985 3.4 2.5 11.7 5.8 5.0 3.6 5.0 0.3 17.6 0.3 0.2 0.0 0.0 17.7
9/1/1985 3.6 0.8 8.4 0.2 9.9 6.0 0.1 0.5 1.6 0.4 0.1 0.2 0.2 1.6
9/2/1985 3.9 0.4 7.5 3.2 7.0 10.7 9.1 20.0 14.5 15.8 4.5 5.6 5.2 14.5
9/3/1985 8.0 8.7 18.4 4.5 0.2 3.6 20.7 2.2 25.7 3.0 6.2 7.4 7.5 25.8
9/4/1985 5.1 5.0 23.5 11.8 0.2 3.0 16.1 1.8 3.4 7.9 18.0 7.4 7.5 3.4
9/5/1985 1.6 6.5 8.8 9.4 0.5 6.1 37.9 0.6 4.1 3.4 6.9 0.7 0.7 4.1
9/6/1985 5.6 7.8 7.7 4.4 2.2 3.9 18.3 0.2 26.3 0.4 1.8 3.0 3.1 26.4
9/7/1985 2.4 2.3 6.9 10.5 4.4 14.3 77.6 1.1 31.5 1.2 3.0 5.3 5.4 31.7
9/8/1985 16.2 0.9 23.1 0.5 22.8 14.3 4.9 0.2 1.4 0.3 0.9 1.5 1.5 1.4
9/9/1985 12.3 6.5 20.9 2.5 24.8 16.6 9.9 1.7 4.4 5.4 26.8 41.5 42.5 4.4
9/10/1985 2.5 2.4 6.5 5.7 0.9 11.5 72.6 0.2 0.1 0.2 0.0 0.0 0.0 0.1
9/11/1985 3.2 10.4 0.6 0.1 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1985 0.2 0.6 5.2 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1985 1.3 0.8 2.1 1.2 1.2 3.0 15.5 0.0 0.0 0.7 1.9 0.6 0.6 0.0
9/14/1985 1.1 1.3 2.3 1.2 3.3 2.4 2.4 0.7 9.3 0.5 0.0 0.0 0.0 9.4
9/15/1985 0.7 0.8 1.0 1.2 1.2 3.2 15.5 0.8 0.3 2.6 6.7 5.2 5.3 0.3
9/16/1985 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
9/17/1985 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
9/18/1985 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
9/19/1985 0.4 0.1 1.2 0.0 1.8 1.1 0.0 0.0 0.0 1.1 9.4 16.3 16.7 0.0
9/20/1985 2.4 0.1 4.3 2.4 10.7 9.7 22.9 0.0 5.0 0.1 0.2 0.0 0.0 5.0
9/21/1985 0.0 0.9 7.9 0.4 0.0 0.1 0.2 0.5 3.9 0.4 0.0 0.0 0.0 3.9
9/22/1985 0.3 0.9 8.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 2.0 3.4 3.5 0.0
9/23/1985 0.0 0.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1985 0.0 1.0 9.2 0.2 0.0 0.0 0.1 0.0 1.5 0.0 0.0 0.0 0.0 1.5
9/25/1985 0.4 1.4 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1985 0.0 0.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1985 2.2 10.1 18.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1985 0.1 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1985 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1985 0.1 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1985 0.0 0.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1985 0.0 0.5 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1985 0.0 0.3 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1985 0.0 0.3 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1985 0.0 0.5 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1985 0.0 1.2 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1985 0.0 0.4 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1985 0.0 0.4 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1985 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1985 0.0 0.2 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1985 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
10/14/1985 1.4 5.7 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1985 1.0 4.2 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1985 2.5 9.4 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1985 4.5 1.7 6.0 1.6 0.0 0.0 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.8
10/18/1985 5.9 0.3 9.0 22.5 20.5 16.1 26.6 0.0 0.0 3.8 15.1 15.2 15.6 0.0
10/19/1985 1.4 0.1 0.7 0.0 1.8 1.1 0.0 0.0 0.0 0.4 2.9 5.1 5.2 0.0
10/20/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1985 0.2 0.0 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1985 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1985 0.0 0.9 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1985 0.0 0.9 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/9/1985 0.0 0.2 1.5 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
11/10/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1985 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
11/17/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1985 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.5 0.0 0.0 0.0 0.0 1.5
12/14/1985 0.6 0.0 0.9 0.3 0.0 0.0 0.1 0.0 2.1 0.0 0.0 0.0 0.0 2.1
12/15/1985 2.4 0.3 3.3 4.2 6.1 5.4 10.6 0.6 0.2 2.6 8.5 8.7 8.9 0.2
12/16/1985 2.8 0.4 3.7 7.3 10.5 11.7 11.6 14.0 5.3 13.1 9.1 7.4 7.2 5.3
12/17/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1985 1.5 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1985 0.5 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1985 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 12.5 0.0 0.0 0.0 0.0 12.6
12/27/1985 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.4
12/28/1985 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
12/29/1985 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1985 0.0 0.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1985 0.0 0.5 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1986 2.1 0.1 2.3 0.0 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1986 6.1 0.2 7.6 18.0 13.0 18.6 12.8 35.0 35.1 32.0 22.9 22.3 22.0 35.1
1/4/1986 5.1 2.4 7.4 18.7 16.4 17.8 12.8 24.0 22.3 22.2 15.4 13.3 13.0 22.3
1/5/1986 0.1 0.5 0.5 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
1/6/1986 2.2 0.1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1986 4.3 0.0 3.0 7.7 8.9 5.3 0.4 0.0 0.0 0.7 3.7 5.0 5.1 0.0
1/8/1986 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.4 0.0
1/9/1986 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1986 1.8 0.0 0.4 0.0 1.2 0.7 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
1/11/1986 2.6 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.3 0.0 0.0 0.0 0.0 1.3
1/12/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1986 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.7 0.0 0.0 0.0 0.0 2.7
1/21/1986 3.4 0.2 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1986 4.0 3.5 6.0 0.5 9.0 6.4 6.8 0.4 0.2 0.4 0.5 0.9 0.9 0.2
1/23/1986 2.3 1.1 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1986 6.8 0.0 4.1 0.7 12.7 9.0 8.7 0.9 0.3 4.2 10.5 5.7 5.8 0.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1986 0.0 0.5 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1986 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.7 0.0 0.0 0.0
1/30/1986 0.0 0.8 7.0 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1986 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1986 0.0 0.3 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1986 0.0 0.3 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1986 2.0 0.1 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1986 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
2/6/1986 1.6 5.1 4.6 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
2/7/1986 1.8 1.8 3.5 0.2 5.0 3.7 1.9 1.6 0.6 1.2 0.1 0.2 0.2 0.6
2/8/1986 1.7 0.0 2.3 0.5 7.2 5.3 6.8 0.0 0.0 3.9 13.1 10.1 10.4 0.0
2/9/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1986 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1986 0.0 0.2 1.7 0.6 0.0 0.2 0.3 0.9 5.6 0.7 0.0 0.0 0.0 5.6
2/18/1986 0.1 0.0 0.1 0.0 0.2 0.1 0.0 0.0 0.0 3.2 7.2 0.0 0.0 0.0
2/19/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1986 0.9 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1986 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.6
3/18/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1986 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
3/20/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1986 3.9 0.3 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1986 5.9 2.3 8.9 0.0 6.9 4.1 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
3/27/1986 6.7 5.9 5.8 0.5 12.9 8.8 5.8 1.0 0.4 1.0 2.2 3.8 3.9 0.4
3/28/1986 0.0 0.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1986 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1986 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1986 0.6 0.0 0.6 4.4 0.0 0.0 0.3 0.0 5.2 0.0 0.0 0.0 0.0 5.2
4/10/1986 6.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1986 11.2 0.7 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/12/1986 12.8 5.8 24.6 32.9 44.2 40.3 24.5 40.1 21.6 38.2 31.8 30.7 30.5 21.5
4/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1986 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1986 0.3 0.1 0.4 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1986 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1986 1.4 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1986 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1986 0.3 0.0 0.2 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1986 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1986 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1986 0.0 0.0 0.0 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
4/27/1986 0.4 0.0 0.6 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1986 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1986 1.6 0.1 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1986 0.4 0.8 1.0 0.5 0.0 0.0 0.2 0.0 4.4 7.3 16.8 0.4 0.4 4.4
5/2/1986 0.2 0.6 0.7 0.0 0.0 6.6 0.0 25.0 9.5 20.1 3.7 0.9 0.3 9.4
5/3/1986 1.0 0.2 2.2 0.5 0.0 2.9 2.1 10.0 7.0 11.9 14.4 10.5 10.5 7.0
5/4/1986 0.2 0.6 0.9 1.1 0.2 4.2 10.0 10.0 6.5 10.4 7.4 1.7 1.5 6.5
5/5/1986 1.1 3.7 0.2 0.0 0.5 0.3 0.0 0.0 0.0 0.9 6.2 10.0 10.2 0.0
5/6/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 7.0 12.2 12.5 0.0
5/8/1986 0.2 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1986 0.0 0.3 1.3 0.2 0.0 0.5 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1986 0.5 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1986 0.0 0.2 0.1 0.1 0.0 0.3 1.6 0.3 0.1 2.2 4.6 0.0 0.0 0.1
5/12/1986 5.0 0.4 7.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1986 11.7 3.4 16.0 19.2 24.1 23.5 28.6 19.5 29.1 21.6 32.5 39.0 39.5 29.2
5/14/1986 3.3 0.5 5.2 15.7 11.5 10.8 8.4 11.5 31.9 9.4 2.1 0.5 0.2 32.0
5/15/1986 0.5 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1986 0.6 0.0 0.8 0.0 2.0 1.2 0.0 0.0 0.0 0.7 5.4 9.4 9.6 0.0
5/17/1986 0.2 0.7 0.6 0.2 0.0 0.5 2.9 0.0 0.0 1.4 3.2 0.2 0.2 0.0
5/18/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1986 2.4 8.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1986 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1986 2.1 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1986 2.8 5.4 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1986 3.1 0.2 4.2 0.0 5.4 3.2 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
5/24/1986 2.1 0.2 3.5 5.3 2.6 6.3 31.1 0.3 3.2 3.0 6.4 0.1 0.1 3.2
5/25/1986 0.6 0.0 0.9 0.2 2.8 1.9 1.9 0.0 0.0 0.5 1.4 0.5 0.5 0.0
5/26/1986 1.6 0.2 1.8 3.4 0.0 0.0 0.0 0.0 0.0 2.1 4.9 0.2 0.2 0.0
5/27/1986 0.4 0.0 0.5 1.9 1.5 1.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1986 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
5/29/1986 3.7 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1986 0.0 0.0 0.0 1.2 0.1 1.1 7.0 0.2 3.9 0.2 0.0 0.0 0.0 3.9
6/4/1986 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
6/5/1986 0.2 0.1 0.1 3.3 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
6/6/1986 1.5 0.2 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1986 6.1 0.7 8.9 0.4 0.0 0.0 0.2 0.0 3.1 7.5 17.0 0.0 0.0 3.1
6/8/1986 1.6 1.6 5.9 7.4 4.2 9.1 19.7 14.0 11.5 16.8 24.4 23.8 24.0 11.5
6/9/1986 0.2 0.4 3.3 0.9 0.5 0.3 0.0 0.0 0.0 0.6 3.6 5.2 5.3 0.0
6/10/1986 0.1 0.7 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0
6/11/1986 0.3 0.0 0.5 0.0 1.5 1.1 0.0 0.7 0.3 1.9 5.4 5.2 5.3 0.3
6/12/1986 0.1 0.5 0.5 0.0 0.0 0.3 0.0 1.0 0.4 0.8 0.2 0.4 0.4 0.4
6/13/1986 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
6/14/1986 0.0 0.1 0.9 0.2 0.0 0.3 1.9 0.0 0.0 0.7 5.9 10.1 10.4 0.0
6/15/1986 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1986 3.6 4.7 3.3 0.8 0.1 0.1 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.6
6/17/1986 0.6 0.7 0.6 9.3 0.1 6.4 0.3 24.0 15.3 17.8 0.0 0.6 0.0 15.3
6/18/1986 1.0 0.0 1.4 0.7 4.5 2.6 0.3 0.0 6.2 1.1 2.4 0.0 0.0 6.2
6/19/1986 0.0 0.0 0.0 1.2 0.1 3.2 4.3 10.0 11.2 7.4 0.0 0.3 0.0 11.3
6/20/1986 0.0 0.0 0.0 0.0 0.0 2.9 0.0 11.0 4.2 13.0 11.1 0.3 0.0 4.1
6/21/1986 2.3 0.0 3.2 0.0 9.9 9.3 0.0 13.0 4.9 9.7 0.9 1.8 1.5 4.9
6/22/1986 2.3 8.6 0.0 0.3 0.0 0.6 3.4 0.2 0.1 1.1 8.2 14.2 14.6 0.1
6/23/1986 3.7 9.7 2.7 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1986 0.1 0.0 0.5 2.0 0.3 4.0 25.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1986 5.8 12.5 3.5 0.8 10.0 26.3 9.7 72.0 27.3 53.4 0.0 1.8 0.0 27.1
6/26/1986 3.6 13.6 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1986 3.6 0.7 5.4 11.6 4.2 8.3 21.5 10.0 16.5 13.7 25.7 27.3 27.7 16.6
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/28/1986 1.6 0.1 0.5 2.8 0.2 2.1 13.5 0.0 0.0 5.4 12.5 0.4 0.4 0.0
6/29/1986 2.9 0.3 3.9 0.9 0.2 2.0 11.6 0.6 0.2 2.4 8.5 9.8 10.0 0.2
6/30/1986 3.5 2.3 11.2 14.1 7.5 9.7 10.8 14.0 17.0 11.9 6.1 6.8 6.6 17.1
7/1/1986 4.9 1.4 9.7 27.8 4.8 12.4 7.7 32.0 12.1 24.2 3.7 7.1 6.5 12.0
7/2/1986 0.4 0.5 1.9 0.3 1.0 1.0 1.6 0.7 0.3 1.9 7.7 10.7 11.0 0.3
7/3/1986 1.5 0.4 1.7 0.8 1.0 1.2 3.0 0.7 2.8 0.5 0.0 0.0 0.0 2.8
7/4/1986 6.3 5.1 5.2 1.2 6.6 6.0 12.6 0.7 0.3 5.3 13.1 5.3 5.4 0.3
7/5/1986 8.3 15.7 9.2 2.9 0.0 0.1 0.1 0.4 2.8 0.3 0.0 0.0 0.0 2.8
7/6/1986 4.7 0.9 12.4 3.7 0.6 6.9 43.5 0.2 0.1 1.4 10.4 18.1 18.5 0.1
7/7/1986 9.1 1.3 6.7 41.0 17.8 31.3 78.4 35.5 50.8 39.5 47.3 41.8 42.0 50.9
7/8/1986 4.2 0.9 5.0 16.7 1.0 5.1 3.6 16.0 37.6 19.1 20.8 10.7 10.6 37.7
7/9/1986 6.2 6.2 12.0 11.3 13.7 22.2 70.8 14.0 36.8 23.8 55.5 59.4 60.5 36.9
7/10/1986 6.4 7.6 6.1 16.3 5.0 11.0 5.0 28.0 23.2 23.5 8.6 6.6 6.0 23.1
7/11/1986 3.8 2.8 4.2 2.6 4.0 5.0 0.0 10.0 3.8 13.1 14.9 4.8 4.7 3.8
7/12/1986 13.8 0.9 18.4 5.4 42.7 27.4 14.5 0.0 0.0 8.3 34.6 37.3 38.2 0.0
7/13/1986 2.8 1.0 3.7 2.8 2.1 8.0 6.9 22.0 10.2 20.1 13.5 12.3 12.0 10.2
7/14/1986 7.2 4.2 9.7 10.5 10.8 24.9 73.2 29.0 23.4 42.8 53.5 12.4 12.0 23.4
7/15/1986 7.1 1.0 7.2 4.9 7.2 11.6 19.7 17.0 13.9 12.6 0.0 0.4 0.0 13.9
7/16/1986 4.4 4.5 8.0 2.4 9.2 12.6 21.6 15.0 12.0 14.2 11.1 10.1 10.0 12.0
7/17/1986 6.5 5.9 11.0 14.5 6.2 11.7 25.4 16.0 11.3 15.0 16.7 23.2 23.4 11.3
7/18/1986 11.2 8.5 24.8 4.8 10.2 10.6 26.6 2.5 9.7 6.9 17.5 14.1 14.4 9.7
7/19/1986 13.0 6.6 22.0 3.8 21.9 21.9 13.4 27.0 34.1 32.3 45.9 43.1 43.5 34.1
7/20/1986 8.5 3.6 8.4 4.9 0.8 13.2 60.5 14.0 6.6 11.0 2.3 2.5 2.2 6.5
7/21/1986 2.2 1.5 5.2 2.1 0.2 10.2 18.2 28.0 16.8 20.8 0.2 1.1 0.4 16.8
7/22/1986 3.6 1.4 7.1 7.8 0.8 14.0 61.9 16.0 6.1 13.8 16.5 28.9 29.2 6.1
7/23/1986 2.3 1.6 4.2 0.6 1.1 12.6 7.7 41.0 15.6 30.8 3.3 6.7 5.8 15.4
7/24/1986 3.5 2.2 4.6 2.1 2.2 10.1 20.1 22.0 13.1 17.9 5.9 5.8 5.4 13.0
7/25/1986 4.3 1.2 9.1 0.6 0.1 4.3 4.0 14.0 7.8 10.9 4.5 8.2 8.0 7.8
7/26/1986 9.1 1.8 18.4 6.9 29.4 30.5 31.4 32.0 20.8 25.9 18.4 32.7 32.7 20.8
7/27/1986 9.8 0.8 9.5 13.0 12.2 14.4 31.3 10.0 28.8 12.7 22.8 25.8 26.2 28.8
7/28/1986 10.7 2.6 26.0 28.6 20.3 21.0 40.8 11.0 10.5 8.9 2.0 1.2 0.9 10.5
7/29/1986 8.4 2.5 9.1 1.8 0.9 4.1 5.5 11.0 16.0 8.2 0.1 0.5 0.2 16.1
7/30/1986 2.6 1.5 6.6 4.7 6.4 9.8 40.8 0.0 13.4 0.2 2.0 3.4 3.5 13.5
7/31/1986 0.6 1.0 4.1 1.4 0.1 1.4 9.0 0.1 6.3 1.7 3.9 0.4 0.4 6.3
8/1/1986 0.1 0.3 1.0 0.5 0.1 0.7 4.4 0.0 1.2 4.2 9.7 0.1 0.1 1.3
8/2/1986 0.2 0.4 1.9 2.9 0.2 2.3 15.3 0.0 14.7 2.3 15.5 24.6 25.2 14.7
8/3/1986 0.5 0.3 2.2 9.1 0.3 3.7 22.5 0.8 4.8 16.7 39.8 7.3 7.5 4.8
8/4/1986 0.5 1.0 2.4 6.1 1.6 7.8 45.5 0.1 0.0 2.4 7.9 6.1 6.2 0.0
8/5/1986 6.4 0.4 9.0 2.9 2.0 2.1 5.0 0.5 0.2 6.5 14.3 0.5 0.5 0.2
8/6/1986 10.0 4.0 22.5 1.6 27.8 17.5 7.2 0.2 8.8 5.3 12.4 1.8 1.8 8.9
8/7/1986 1.1 1.2 5.6 8.4 1.1 1.6 5.8 0.8 17.7 1.5 2.0 0.0 0.0 17.8
8/8/1986 3.4 0.7 4.5 2.0 0.2 31.6 17.7 110.0 46.7 89.1 30.0 32.7 30.7 46.5
8/9/1986 7.5 10.0 7.7 1.6 12.5 11.6 11.0 10.0 10.6 10.6 8.0 2.0 1.8 10.6
8/10/1986 0.4 0.1 1.1 0.7 0.0 0.5 3.1 0.2 3.9 9.2 20.5 0.0 0.0 3.9
8/11/1986 2.5 1.3 3.6 1.8 0.1 1.0 6.4 0.4 11.1 0.3 0.0 0.0 0.0 11.1
8/12/1986 2.0 2.1 5.8 8.7 0.1 6.9 11.5 20.0 23.6 20.0 12.3 1.8 1.3 23.6
8/13/1986 5.4 1.1 8.0 7.4 11.9 10.5 5.3 10.0 5.0 8.0 2.8 4.0 3.8 5.0
8/14/1986 2.5 1.5 4.9 0.2 4.0 2.7 1.9 0.2 0.1 0.2 0.1 0.1 0.1 0.1
8/15/1986 0.7 0.1 1.6 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
8/16/1986 2.9 0.3 0.6 11.5 1.0 0.6 0.6 0.0 10.6 0.0 0.0 0.0 0.0 10.6
8/17/1986 1.9 3.8 5.7 6.1 1.0 17.5 75.8 21.0 10.0 20.0 17.5 18.3 18.2 10.0
8/18/1986 5.9 4.0 11.0 2.2 4.0 2.3 1.0 0.0 18.9 0.0 0.0 0.0 0.0 19.0
8/19/1986 8.9 6.3 14.1 2.9 0.6 1.1 5.7 0.0 6.2 4.9 15.1 9.6 9.8 6.2
8/20/1986 12.4 4.5 12.9 5.4 6.8 8.3 29.9 0.0 26.4 0.9 4.2 5.1 5.2 26.5
8/21/1986 14.7 14.4 34.7 1.6 15.1 11.9 19.0 0.4 1.4 11.2 36.7 28.0 28.7 1.4
8/22/1986 4.6 4.8 19.5 5.5 8.3 7.8 20.4 0.3 34.6 3.0 18.1 28.0 28.7 34.7
8/23/1986 4.1 2.9 4.4 4.4 4.2 5.2 17.6 0.1 0.0 0.1 0.1 0.2 0.2 0.0
8/24/1986 1.1 1.0 10.2 0.1 0.0 0.3 1.7 0.0 0.0 4.6 10.5 0.0 0.0 0.0
8/25/1986 3.8 0.5 2.5 4.9 0.8 9.9 62.7 0.0 0.0 2.5 21.2 36.7 37.6 0.0
8/26/1986 3.5 0.4 2.7 0.6 0.0 0.2 1.8 0.0 3.9 0.2 1.7 2.9 3.0 3.9
8/27/1986 1.7 0.5 1.6 3.6 0.0 0.3 1.8 0.0 0.3 1.6 4.5 2.1 2.1 0.3
8/28/1986 0.6 0.5 1.1 0.1 1.0 0.8 0.8 0.5 0.2 0.4 0.0 0.0 0.0 0.2
8/29/1986 0.0 0.1 0.1 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
8/30/1986 0.6 0.0 0.8 0.0 0.0 0.5 0.0 1.7 0.6 1.3 0.0 0.0 0.0 0.6
8/31/1986 1.8 0.8 5.0 0.7 2.6 2.9 9.3 0.0 0.0 1.4 11.3 19.5 20.0 0.0
9/1/1986 2.9 1.6 6.9 1.0 1.2 1.2 3.2 0.0 6.2 3.3 7.7 0.5 0.5 6.2
9/2/1986 1.4 1.8 7.9 1.3 0.2 2.7 16.9 0.0 0.0 0.7 5.6 9.8 10.0 0.0
9/3/1986 2.6 2.9 16.6 10.1 6.0 7.8 5.2 14.0 30.1 11.1 1.5 0.4 0.0 30.2
9/4/1986 0.9 1.4 4.9 2.6 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
9/5/1986 2.3 1.1 11.0 2.1 6.4 4.0 0.0 0.7 0.3 0.5 0.0 0.0 0.0 0.3
9/6/1986 0.4 0.8 7.1 4.2 0.7 8.6 54.2 0.0 0.0 4.4 28.2 43.1 44.2 0.0
9/7/1986 1.0 0.2 2.6 0.7 0.0 0.0 0.3 0.0 6.2 1.3 6.8 9.2 9.4 6.2
9/8/1986 0.8 0.6 1.5 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
9/9/1986 0.3 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1986 0.6 1.1 2.4 1.7 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.3
9/11/1986 0.1 0.9 4.8 0.2 0.0 0.5 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1986 1.3 0.0 0.0 2.1 0.3 4.3 27.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/13/1986 6.9 1.3 14.3 0.3 0.1 0.6 3.9 0.0 0.0 1.1 9.3 16.1 16.5 0.0
9/14/1986 9.7 6.6 11.5 9.1 12.2 15.4 30.7 14.0 19.3 13.1 10.9 11.3 11.2 19.3
9/15/1986 9.5 1.9 13.5 6.8 0.0 2.6 0.0 10.0 3.9 7.7 0.9 0.6 0.4 3.9
9/16/1986 15.8 4.1 19.7 29.2 22.2 31.2 34.3 50.0 46.5 39.9 17.8 28.3 27.7 46.5
9/17/1986 10.2 3.3 14.3 4.1 24.7 21.0 40.7 0.9 0.7 10.3 29.0 17.0 17.4 0.7
9/18/1986 9.9 3.5 11.4 1.4 7.1 6.0 11.8 0.3 4.2 3.2 10.1 7.9 8.1 4.2
9/19/1986 7.3 4.9 6.2 4.3 8.9 5.9 4.7 0.5 34.6 10.4 29.9 17.1 17.5 34.7
9/20/1986 4.1 0.6 2.7 0.3 0.0 3.2 3.4 10.0 3.8 7.8 1.3 1.4 1.2 3.8
9/21/1986 4.5 1.1 9.0 0.1 1.8 1.3 0.6 0.4 0.2 0.3 0.0 0.0 0.0 0.2
9/22/1986 6.5 1.8 11.2 3.2 5.3 13.1 31.8 20.0 13.9 15.2 1.2 1.5 1.0 13.9
9/23/1986 1.8 1.3 5.3 1.8 4.1 4.7 15.3 0.0 5.2 6.9 23.5 18.8 19.3 5.2
9/24/1986 0.4 0.3 0.0 1.8 0.0 0.0 0.8 0.0 15.3 0.0 0.0 0.0 0.0 15.3
9/25/1986 2.5 0.8 3.6 1.1 0.2 2.3 13.6 0.5 0.3 1.1 4.2 6.2 6.3 0.3
9/26/1986 1.7 1.2 4.2 16.9 0.3 10.0 20.3 26.0 9.9 28.1 31.1 26.5 26.5 9.8
9/27/1986 0.1 1.1 9.5 3.3 0.1 1.2 8.0 0.5 23.3 1.3 6.0 9.3 9.5 23.4
9/28/1986 1.2 4.6 2.2 0.2 0.0 0.4 1.9 0.4 0.2 0.3 0.0 0.0 0.0 0.2
9/29/1986 0.6 0.2 1.9 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
9/30/1986 3.6 3.6 8.0 0.0 1.4 0.9 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/1/1986 1.4 1.6 4.8 0.0 1.8 1.1 0.0 0.1 0.0 0.6 3.9 6.8 7.0 0.0
10/2/1986 1.6 1.1 5.5 0.3 0.1 0.7 3.9 0.5 0.2 2.9 5.7 0.0 0.0 0.2
10/3/1986 0.3 0.3 0.6 0.0 1.0 0.8 0.0 0.8 0.3 0.6 0.0 0.0 0.0 0.3
10/4/1986 0.0 0.3 2.4 0.0 0.0 0.2 0.0 0.9 0.3 0.7 0.0 0.0 0.0 0.3
10/5/1986 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
10/6/1986 0.2 0.8 0.0 0.0 0.0 3.4 0.0 13.0 4.9 9.6 0.0 0.3 0.0 4.9
10/7/1986 1.3 0.1 1.9 1.0 0.0 10.8 0.4 41.0 23.6 31.4 8.1 15.1 14.4 23.5
10/8/1986 4.4 1.5 9.4 10.2 10.2 9.8 24.5 0.7 13.4 5.4 17.8 15.6 16.0 13.5
10/9/1986 3.8 0.2 5.9 6.5 6.7 6.9 1.4 11.0 30.5 12.7 13.6 7.9 7.8 30.6
10/10/1986 10.1 1.6 14.6 15.5 12.0 12.9 7.5 18.0 10.6 19.2 26.7 32.2 32.6 10.6
10/11/1986 11.6 3.7 22.1 16.0 27.5 20.2 26.9 0.4 32.6 10.8 44.7 49.4 50.6 32.8
10/12/1986 8.5 3.5 24.9 15.3 32.5 33.0 37.9 31.0 15.6 32.3 21.2 0.8 0.0 15.5
10/13/1986 4.7 0.2 5.3 21.7 0.0 7.9 0.6 30.0 22.0 22.8 5.1 9.5 9.0 22.0
10/14/1986 20.9 3.4 32.5 23.4 15.2 14.0 32.9 0.7 19.0 9.2 44.5 58.9 60.4 19.1
10/15/1986 17.9 9.6 36.6 60.3 57.9 45.2 50.0 14.0 37.1 33.5 54.7 5.0 4.8 37.2
10/16/1986 1.0 0.3 0.9 9.5 2.0 4.6 1.9 12.0 4.6 11.1 5.4 0.9 0.6 4.5
10/17/1986 0.6 0.2 0.9 6.0 1.0 3.3 0.4 10.0 3.8 8.0 1.3 0.3 0.0 3.8
10/18/1986 2.0 2.1 3.2 0.0 0.0 0.1 0.0 0.3 0.1 2.5 18.9 32.7 33.5 0.1
10/19/1986 2.3 0.0 3.2 2.1 10.2 15.4 27.1 20.0 7.6 20.6 13.2 0.7 0.2 7.5
10/20/1986 0.0 0.0 0.0 0.0 0.0 7.9 0.0 30.0 11.4 22.2 0.0 0.7 0.0 11.3
10/21/1986 0.0 0.0 0.0 0.0 0.0 21.3 0.0 81.0 30.7 60.0 0.0 2.0 0.0 30.5
10/22/1986 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/23/1986 0.2 0.0 0.3 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
10/24/1986 0.6 1.9 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/29/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1986 2.9 0.2 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1986 15.6 6.9 17.9 23.6 4.1 4.6 7.7 4.0 1.5 6.8 12.6 9.1 9.2 1.5
12/29/1986 29.2 18.3 30.1 28.6 20.0 23.5 17.9 34.0 12.9 34.8 31.9 24.8 24.6 12.8
12/30/1986 1.5 2.7 2.4 21.1 0.4 5.6 30.5 3.0 1.1 10.0 38.1 48.5 49.7 1.1
12/31/1986 4.6 0.0 6.4 0.0 19.8 11.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1987 1.2 0.0 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1987 0.5 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
1/5/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1987 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1987 0.7 0.4 4.4 0.9 0.0 0.0 0.4 0.0 7.9 0.0 0.0 0.0 0.0 7.9
2/1/1987 0.1 0.5 0.5 0.2 0.0 0.5 2.9 0.0 0.0 0.9 2.7 1.4 1.4 0.0
2/2/1987 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
2/3/1987 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
2/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1987 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.5 0.0 0.0 0.0 0.0 13.6
2/7/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1987 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1987 1.3 0.3 3.8 0.4 0.1 0.9 4.8 0.4 0.2 2.7 8.2 6.5 6.6 0.2
2/13/1987 0.9 0.7 1.6 0.8 3.3 3.5 10.2 0.0 0.0 5.7 14.2 2.6 2.7 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/14/1987 1.2 0.0 1.7 0.0 5.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1987 1.7 0.1 2.4 0.0 1.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1987 0.7 1.1 4.3 0.2 2.2 1.6 1.9 0.0 0.0 1.3 3.4 1.1 1.1 0.0
2/18/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1987 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1987 1.8 0.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1987 2.5 0.9 4.0 0.2 7.7 5.0 2.9 0.0 0.0 0.8 2.1 0.5 0.5 0.0
2/25/1987 0.6 0.6 1.2 0.2 2.0 1.5 1.9 0.0 0.0 0.1 1.0 1.7 1.7 0.0
2/26/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1987 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
2/28/1987 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.3 0.0 0.0 0.0 0.0 4.3
3/1/1987 1.1 4.2 0.0 0.3 0.0 0.0 0.1 0.0 2.2 0.0 0.0 0.0 0.0 2.3
3/2/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1987 0.0 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1987 1.2 0.0 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1987 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1987 0.2 0.0 0.3 0.5 1.0 0.6 0.2 0.0 4.3 0.0 0.0 0.0 0.0 4.3
3/13/1987 0.7 0.0 0.9 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
3/14/1987 0.1 0.1 1.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1987 4.2 8.4 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1987 11.2 2.3 17.9 8.2 20.8 16.2 4.9 12.0 6.1 11.6 9.6 8.3 8.2 6.1
3/18/1987 3.0 2.0 5.3 7.0 9.9 6.3 3.3 0.0 6.5 0.6 2.3 2.5 2.6 6.6
3/19/1987 1.5 4.2 0.6 0.3 0.0 0.0 0.1 0.0 2.3 0.0 0.0 0.0 0.0 2.3
3/20/1987 3.3 0.9 6.3 7.2 0.0 0.5 3.7 0.0 15.5 1.1 3.3 1.8 1.8 15.6
3/21/1987 9.1 14.0 8.4 17.2 19.8 12.0 1.9 0.0 0.0 4.1 11.1 4.5 4.6 0.0
3/22/1987 0.1 0.0 0.2 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1987 0.9 0.0 1.3 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1987 0.7 0.3 1.2 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1987 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
3/26/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1987 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1987 0.1 0.1 0.1 1.1 0.0 0.5 2.9 0.0 0.0 0.2 1.3 2.2 2.3 0.0
4/1/1987 1.4 0.1 2.6 0.0 2.8 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1987 4.5 0.4 2.1 13.8 5.3 3.4 1.9 0.0 0.0 1.3 4.4 3.4 3.5 0.0
4/3/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1987 2.3 0.2 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1987 9.1 11.0 10.9 9.2 15.9 10.9 8.7 0.7 0.3 2.1 5.3 3.9 4.0 0.3
4/6/1987 5.9 5.7 8.0 5.4 10.4 7.3 1.9 3.1 1.2 3.4 2.7 0.7 0.6 1.2
4/7/1987 1.2 1.0 5.0 0.5 4.5 3.0 0.2 1.2 4.4 0.9 0.0 0.0 0.0 4.4
4/8/1987 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
4/9/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1987 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1987 0.8 0.0 1.1 0.8 3.5 2.1 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.1
4/14/1987 1.8 0.4 2.1 15.5 2.0 1.2 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
4/15/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1987 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.0
4/17/1987 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
4/18/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1987 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1987 0.5 0.2 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1987 0.1 0.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1987 0.1 0.1 0.6 1.5 0.2 3.0 18.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1987 2.9 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1987 1.6 0.8 2.9 0.4 0.0 0.1 0.1 0.2 1.9 0.2 0.0 0.0 0.0 2.0
4/27/1987 6.8 1.6 8.7 17.6 5.6 5.3 13.1 0.3 10.7 1.4 4.8 5.2 5.3 10.8
4/28/1987 9.9 3.0 13.6 12.0 18.0 14.2 0.6 13.0 4.9 10.9 4.6 4.4 4.2 4.9
4/29/1987 7.8 1.8 15.1 7.0 17.8 12.2 1.9 5.2 2.0 3.9 0.5 1.0 0.9 2.0
4/30/1987 3.1 2.0 7.6 1.0 12.0 9.0 12.6 0.0 0.0 1.3 3.8 1.8 1.8 0.0
5/1/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/2/1987 0.6 0.0 0.0 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1987 2.3 0.2 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1987 2.5 2.1 3.8 0.0 6.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1987 0.7 2.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1987 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.1 0.8 1.6 0.0 0.1 0.0 0.8
5/9/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1987 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1987 0.1 0.5 1.0 1.1 0.2 7.2 13.7 19.0 7.2 15.8 7.1 8.3 8.0 7.2
5/13/1987 1.8 0.2 1.8 0.6 0.0 0.1 0.3 0.3 5.5 0.6 0.9 0.0 0.0 5.5
5/14/1987 3.2 5.0 2.7 0.5 4.5 2.8 0.2 0.6 4.1 0.5 0.4 0.7 0.7 4.1
5/15/1987 0.2 0.2 2.3 0.0 0.0 0.8 0.2 3.1 1.2 2.3 0.0 0.1 0.0 1.2
5/16/1987 2.8 6.1 2.5 2.4 2.4 11.5 30.5 21.0 8.0 23.6 26.3 19.5 19.5 7.9
5/17/1987 2.5 0.5 4.3 2.7 10.1 17.4 16.0 34.5 14.3 43.3 56.8 39.9 40.0 14.2
5/18/1987 0.1 0.3 3.0 2.5 0.0 0.3 2.2 0.0 5.8 7.1 17.2 2.5 2.6 5.8
5/19/1987 1.3 0.0 0.0 5.0 0.4 4.9 31.0 0.0 0.0 1.9 9.3 12.0 12.3 0.0
5/20/1987 2.2 0.1 2.4 9.5 3.5 2.4 1.9 0.3 0.1 2.5 5.8 1.3 1.3 0.1
5/21/1987 6.6 4.9 4.5 26.5 4.5 7.0 5.4 14.0 25.2 13.4 11.5 11.6 11.5 25.2
5/22/1987 5.2 7.5 6.3 4.6 7.6 16.0 15.5 35.0 13.3 37.8 32.9 15.1 14.6 13.2
5/23/1987 5.0 0.6 9.1 0.5 21.0 13.5 6.3 0.3 0.1 4.0 12.5 9.3 9.5 0.1
5/24/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1987 0.0 0.1 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
5/26/1987 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
5/27/1987 1.7 1.7 0.5 19.0 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
5/28/1987 0.3 0.3 1.5 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1987 10.2 1.8 16.8 8.6 0.5 0.5 1.0 0.0 0.0 2.6 7.2 2.9 3.0 0.0
5/30/1987 15.0 31.8 13.3 3.5 28.8 21.8 12.1 11.7 27.0 12.7 12.2 7.6 7.5 27.1
5/31/1987 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
6/1/1987 1.4 0.1 1.3 10.6 0.0 0.8 0.5 3.2 11.3 2.4 0.0 0.1 0.0 11.3
6/2/1987 3.7 5.2 2.2 19.8 6.0 4.7 3.1 2.7 1.2 3.1 5.2 6.4 6.5 1.1
6/3/1987 1.0 0.1 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1987 1.0 0.3 1.4 3.4 3.5 2.7 0.0 2.5 1.0 2.1 0.7 0.1 0.0 0.9
6/5/1987 0.6 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1987 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1987 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
6/8/1987 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.1 0.0 0.0 0.0 0.0 5.1
6/9/1987 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
6/10/1987 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1987 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1987 0.6 0.0 0.5 5.2 0.0 4.5 1.7 16.0 6.1 11.9 0.0 0.4 0.0 6.0
6/15/1987 1.0 0.4 2.3 4.5 3.5 7.3 13.7 12.0 4.6 11.7 8.7 6.0 5.8 4.5
6/16/1987 1.3 0.1 2.9 1.0 5.5 3.8 2.1 0.9 0.3 1.4 2.6 2.0 2.0 0.3
6/17/1987 0.4 0.2 1.4 8.9 0.0 0.0 0.2 0.0 3.4 0.0 0.0 0.0 0.0 3.4
6/18/1987 1.1 4.0 0.6 0.5 0.0 0.5 2.7 0.2 2.6 0.2 0.0 0.0 0.0 2.6
6/19/1987 0.0 0.1 1.1 2.9 0.3 4.1 26.2 0.0 7.1 1.2 4.8 4.9 5.0 7.1
6/20/1987 0.1 0.2 1.5 0.2 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
6/21/1987 1.4 3.6 5.8 3.6 3.1 11.8 46.0 11.8 4.8 9.4 5.5 9.8 9.7 4.8
6/22/1987 0.2 0.9 1.3 1.4 0.0 0.2 0.6 0.6 11.7 1.1 5.2 9.1 9.3 11.8
6/23/1987 1.0 1.5 8.9 4.3 4.0 11.1 49.1 5.4 6.0 6.8 8.5 5.4 5.4 6.0
6/24/1987 2.3 0.6 7.3 3.7 0.6 19.9 46.0 48.0 19.4 37.7 18.0 32.4 32.0 19.3
6/25/1987 2.1 4.3 5.0 5.9 2.4 16.6 47.0 31.5 31.8 25.7 19.4 34.3 34.4 31.8
6/26/1987 11.2 6.9 11.6 3.0 10.3 20.5 6.1 52.0 42.2 55.5 53.6 37.0 36.6 42.2
6/27/1987 9.2 8.3 4.6 31.5 3.1 12.4 11.5 34.0 19.7 30.7 20.3 19.4 19.0 19.7
6/28/1987 4.6 9.2 2.4 2.5 1.6 1.9 6.4 0.0 2.5 1.1 4.2 3.9 4.0 2.5
6/29/1987 4.9 13.5 20.8 3.5 0.0 0.6 3.4 0.3 5.8 0.2 0.0 0.0 0.0 5.9
6/30/1987 9.8 15.4 12.5 40.9 10.4 23.8 42.1 43.0 17.4 33.1 10.4 19.1 18.5 17.2
7/1/1987 5.7 10.7 7.4 5.2 2.0 1.4 1.2 0.0 0.0 0.4 3.7 6.3 6.5 0.0
7/2/1987 4.6 10.4 9.1 10.1 0.1 3.5 4.3 11.0 7.9 8.5 2.9 5.3 5.2 7.9
7/3/1987 5.7 1.7 5.7 6.9 10.1 9.7 13.9 6.5 8.7 5.1 2.4 4.3 4.2 8.7
7/4/1987 2.3 5.3 5.8 3.0 0.1 1.1 6.2 0.4 0.2 0.3 0.4 0.7 0.7 0.2
7/5/1987 1.2 2.5 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/6/1987 0.0 0.0 0.0 0.9 0.2 1.9 11.6 0.1 0.0 0.1 0.0 0.0 0.0 0.0
7/7/1987 0.3 0.1 1.0 1.1 0.2 2.1 13.5 0.0 0.0 0.1 0.9 1.5 1.5 0.0
7/8/1987 6.8 6.9 9.8 6.4 0.9 13.8 70.6 10.0 3.8 15.3 36.4 44.4 45.3 3.8
7/9/1987 10.7 12.9 14.1 7.6 6.2 18.5 60.3 22.0 15.2 22.6 22.4 20.0 19.9 15.1
7/10/1987 18.8 27.5 13.2 16.5 17.9 12.6 13.0 0.3 9.0 0.7 1.6 1.5 1.5 9.0
7/11/1987 8.9 17.8 9.8 3.3 9.7 11.7 4.1 20.5 11.6 16.9 5.9 5.4 5.0 11.5
7/12/1987 8.9 23.2 4.0 6.9 3.1 3.9 14.2 0.0 13.3 3.8 12.8 9.8 10.0 13.4
7/13/1987 5.3 8.6 5.1 4.7 0.4 5.5 33.9 0.6 0.2 13.9 51.2 49.0 50.2 0.2
7/14/1987 4.2 0.0 3.2 3.4 9.9 14.5 0.0 33.0 12.6 24.5 0.0 0.8 0.0 12.5
7/15/1987 11.5 7.3 18.4 5.9 6.3 7.6 26.2 0.0 11.3 0.0 0.1 0.1 0.1 11.4
7/16/1987 18.8 28.5 25.3 16.0 13.3 19.7 34.0 26.0 22.5 24.1 30.5 47.2 47.7 22.5
7/17/1987 6.5 10.3 5.0 5.6 1.2 5.4 30.3 0.6 6.4 1.3 4.1 4.9 5.0 6.5
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/18/1987 23.3 12.7 31.8 7.6 11.0 8.7 13.8 0.5 5.3 2.1 8.9 11.7 12.0 5.3
7/19/1987 27.9 41.1 19.0 8.5 17.0 26.7 55.0 32.5 27.2 29.8 22.0 22.3 22.0 27.2
7/20/1987 13.9 34.5 22.5 4.6 3.7 4.5 15.0 0.4 0.2 4.9 14.5 9.8 10.0 0.2
7/21/1987 9.0 7.0 8.6 7.7 1.0 0.6 0.0 0.2 0.1 0.7 1.6 1.0 1.0 0.1
7/22/1987 8.4 7.5 7.4 1.0 5.9 3.7 0.2 0.6 4.0 5.4 11.3 0.3 0.3 4.0
7/23/1987 6.4 9.3 10.7 13.8 0.5 16.0 40.3 37.0 25.5 35.5 34.1 38.5 38.5 25.4
7/24/1987 6.0 12.2 10.9 23.2 1.0 0.7 0.1 0.5 2.3 0.4 0.0 0.0 0.0 2.3
7/25/1987 9.1 25.5 1.8 2.5 2.2 4.5 21.7 0.0 7.0 7.4 27.6 25.7 26.4 7.1
7/26/1987 17.0 17.1 18.4 2.0 0.2 2.8 17.7 0.0 5.7 8.7 34.0 33.6 34.5 5.7
7/27/1987 19.4 18.0 18.4 10.4 16.0 24.6 13.5 50.0 19.0 42.5 21.2 21.9 21.2 18.8
7/28/1987 11.1 15.9 18.0 2.2 6.2 10.7 17.4 17.0 6.5 23.4 27.5 7.3 7.0 6.4
7/29/1987 17.5 20.8 20.7 10.8 21.0 18.3 18.4 12.0 4.6 11.1 8.7 9.1 9.0 4.5
7/30/1987 7.6 10.0 6.8 5.5 13.4 11.8 4.8 12.0 4.6 11.2 5.9 2.1 1.8 4.5
7/31/1987 3.2 4.7 11.1 5.4 4.9 7.9 34.6 0.1 23.8 0.6 3.9 6.8 7.0 23.9
8/1/1987 4.0 7.2 10.4 12.5 1.3 0.8 0.7 0.0 12.5 7.0 16.1 0.2 0.2 12.5
8/2/1987 12.1 17.0 17.2 2.1 21.0 17.8 17.3 11.0 11.0 9.5 7.2 10.0 10.0 11.0
8/3/1987 3.4 9.7 2.3 1.7 1.5 1.2 2.6 0.1 13.4 1.3 7.9 12.1 12.4 13.5
8/4/1987 1.6 3.6 3.1 2.6 3.2 4.3 15.7 0.8 12.7 1.1 1.7 1.0 1.0 12.8
8/5/1987 0.4 0.1 1.6 1.6 0.0 0.0 0.7 0.0 13.4 0.0 0.0 0.0 0.0 13.4
8/6/1987 6.6 11.4 5.9 0.3 0.1 0.6 3.9 0.0 0.0 1.8 4.0 0.0 0.0 0.0
8/7/1987 6.4 0.9 8.9 20.1 0.0 0.0 0.2 0.0 4.5 7.0 15.9 0.0 0.0 4.6
8/8/1987 5.2 5.6 6.6 0.9 1.9 2.8 11.1 0.0 0.0 0.1 0.5 0.7 0.7 0.0
8/9/1987 7.6 21.0 9.2 0.0 1.0 0.6 0.0 0.0 0.0 2.6 8.9 6.8 7.0 0.0
8/10/1987 1.4 1.3 1.7 0.0 0.0 3.2 0.0 12.0 4.6 8.9 0.0 0.3 0.0 4.5
8/11/1987 2.1 2.5 4.2 1.1 0.1 1.2 7.5 0.0 4.4 3.0 12.0 12.3 12.6 4.4
8/12/1987 2.6 3.8 2.1 3.5 0.6 7.1 44.7 0.2 0.1 4.1 21.4 29.5 30.2 0.1
8/13/1987 5.9 3.0 6.7 0.1 9.9 13.3 0.8 28.0 10.6 22.7 4.4 0.7 0.0 10.5
8/14/1987 13.0 19.7 13.5 1.1 10.0 13.0 10.7 21.0 10.0 16.0 3.4 6.5 6.1 9.9
8/15/1987 4.4 8.8 4.9 1.7 3.0 13.4 21.3 32.0 12.1 23.7 0.1 1.0 0.2 12.0
8/16/1987 2.0 3.6 4.8 0.2 3.0 2.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/17/1987 0.1 0.1 0.3 2.6 0.2 2.9 19.1 0.0 9.9 2.3 5.5 0.5 0.5 10.0
8/18/1987 3.8 10.3 2.9 2.9 0.5 10.0 36.8 16.0 6.1 18.2 23.9 22.8 23.0 6.0
8/19/1987 7.1 11.1 13.0 13.8 0.3 9.5 25.9 21.0 21.6 17.4 8.5 10.8 10.5 21.6
8/20/1987 12.1 20.2 14.3 11.9 1.7 18.9 15.1 60.0 34.6 44.8 2.4 5.6 4.2 34.5
8/21/1987 12.1 4.5 14.5 15.4 34.8 28.2 18.0 19.0 17.8 14.2 1.0 2.1 1.7 17.8
8/22/1987 7.3 2.3 16.8 7.4 9.0 13.0 23.4 16.0 9.8 11.9 0.0 0.4 0.0 9.8
8/23/1987 6.1 3.1 5.9 10.7 7.6 10.5 16.9 13.0 5.1 17.8 21.9 8.1 8.0 5.0
8/24/1987 3.9 1.9 5.5 2.3 7.1 6.9 18.3 0.0 7.9 0.5 1.2 0.0 0.0 7.9
8/25/1987 1.2 1.8 1.6 2.8 0.2 9.0 13.5 26.0 9.9 19.3 0.6 1.6 1.0 9.8
8/26/1987 2.1 3.5 11.1 4.2 0.3 3.4 21.3 0.3 0.1 0.9 1.9 0.6 0.6 0.1
8/27/1987 0.3 1.1 10.1 2.3 0.1 1.4 7.7 0.8 0.3 0.8 0.4 0.0 0.0 0.3
8/28/1987 1.5 0.9 0.6 11.9 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/1987 0.1 0.1 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/30/1987 0.1 0.6 4.6 3.6 0.6 7.2 45.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/31/1987 0.9 1.1 2.6 6.0 0.1 1.3 7.9 0.2 2.6 0.8 5.1 8.8 9.0 2.6
9/1/1987 0.0 0.1 0.9 1.1 0.0 0.5 3.3 0.0 7.0 0.0 0.0 0.0 0.0 7.0
9/2/1987 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/3/1987 1.7 0.1 2.8 0.0 5.9 3.7 0.0 0.9 0.3 1.3 5.5 9.6 9.8 0.3
9/4/1987 0.0 0.0 0.3 6.0 1.0 14.7 76.4 10.0 3.8 7.4 0.0 0.3 0.0 3.8
9/5/1987 0.0 0.1 0.6 0.5 0.1 1.0 5.8 0.2 0.1 0.2 0.2 0.4 0.4 0.1
9/6/1987 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/7/1987 0.0 0.3 2.7 1.4 0.2 6.5 17.9 14.1 5.4 10.7 0.7 0.4 0.0 5.3
9/8/1987 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/9/1987 1.9 5.1 0.0 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1987 1.8 5.9 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/1987 0.7 2.5 0.0 0.8 0.0 0.0 0.4 0.0 7.1 0.0 0.0 0.0 0.0 7.1
9/12/1987 0.7 1.8 0.7 4.3 0.0 0.0 0.0 0.0 0.0 0.9 2.0 0.0 0.0 0.0
9/13/1987 6.2 0.6 8.5 18.2 0.4 5.4 35.2 0.0 15.6 4.7 12.5 4.1 4.2 15.7
9/14/1987 10.2 4.2 16.9 16.0 16.7 18.2 31.7 14.0 19.7 13.3 9.3 6.7 6.5 19.7
9/15/1987 5.3 0.5 3.7 1.6 6.0 8.5 7.2 15.0 14.4 21.3 29.9 16.7 16.7 14.4
9/16/1987 1.1 1.2 4.3 0.9 1.0 0.9 2.3 0.0 6.3 1.3 3.5 1.2 1.2 6.3
9/17/1987 0.8 0.0 0.0 0.7 0.1 0.7 4.0 0.5 3.3 0.4 0.0 0.0 0.0 3.3
9/18/1987 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1987 0.0 0.1 0.8 0.2 0.0 0.3 1.9 0.0 0.0 1.9 4.2 0.0 0.0 0.0
9/24/1987 3.3 0.5 3.9 0.2 0.0 10.8 1.9 40.0 15.2 29.7 0.3 1.5 0.5 15.1
9/25/1987 2.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1987 3.0 0.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1987 2.3 2.2 2.3 1.2 1.2 3.0 15.5 0.0 0.0 8.9 30.2 23.6 24.2 0.0
9/28/1987 0.2 0.6 5.7 1.9 0.0 0.2 0.9 0.9 16.6 0.7 0.0 0.0 0.0 16.7
9/29/1987 1.8 0.9 7.8 1.5 0.1 0.6 4.4 0.0 10.0 0.2 1.3 2.2 2.3 10.0
9/30/1987 5.3 8.7 8.4 11.5 0.1 1.1 7.1 0.0 6.2 0.0 0.0 0.0 0.0 6.2
10/1/1987 9.1 10.1 8.4 4.7 6.8 11.0 27.1 11.0 4.2 11.2 9.4 6.1 6.0 4.1
10/2/1987 7.7 3.6 8.5 2.8 20.0 25.6 35.3 32.0 12.1 30.4 30.9 38.2 38.4 12.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/3/1987 3.9 2.6 1.8 0.1 3.5 2.2 1.0 0.1 0.0 0.2 1.3 2.3 2.3 0.0
10/4/1987 0.0 0.1 1.1 0.3 0.1 0.6 3.9 0.0 0.0 0.6 1.3 0.0 0.0 0.0
10/5/1987 1.1 0.1 1.2 1.1 0.2 2.1 13.5 0.0 0.0 0.9 6.6 10.7 11.0 0.0
10/6/1987 1.1 2.0 2.7 0.1 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1987 0.3 0.8 0.7 2.0 0.0 0.5 2.0 0.8 1.5 1.3 1.5 0.0 0.0 1.6
10/8/1987 1.3 1.9 1.7 0.2 0.0 0.5 2.9 0.0 0.1 0.0 0.0 0.0 0.0 0.1
10/9/1987 2.6 7.0 3.0 0.2 0.0 0.3 1.9 0.1 0.0 0.4 0.7 0.0 0.0 0.0
10/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1987 1.7 5.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1987 1.8 0.6 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1987 4.0 8.4 2.3 0.2 0.0 0.1 0.1 0.3 2.0 5.1 13.9 6.4 6.5 2.0
10/14/1987 0.8 3.2 0.6 0.6 0.1 11.7 7.7 40.0 15.2 32.8 9.8 7.3 6.5 15.1
10/15/1987 3.7 10.0 1.0 0.7 3.0 1.8 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
10/16/1987 8.0 18.4 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1987 9.7 4.8 11.5 0.7 8.0 9.7 8.7 14.0 5.3 14.6 14.2 11.3 11.2 5.3
10/18/1987 8.2 3.5 12.6 0.7 20.9 17.6 8.7 15.0 5.7 15.5 14.7 11.5 11.4 5.7
10/19/1987 3.3 5.0 2.7 0.0 8.4 5.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
10/20/1987 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1987 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1987 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1987 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1987 2.9 10.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1987 2.2 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1987 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1987 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1987 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1987 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1987 5.4 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.0 0.0 0.0 0.0
11/13/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1987 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.8
11/26/1987 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
11/27/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
11/28/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1987 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1987 1.8 0.3 4.8 0.8 8.0 6.3 9.7 0.4 0.2 2.1 4.2 0.0 0.0 0.2
12/3/1987 1.3 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 3.9 6.8 7.0 0.0
12/4/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1987 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
12/9/1987 0.2 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1987 0.3 0.0 0.0 5.6 0.0 0.0 0.2 0.0 3.8 0.0 0.0 0.0 0.0 3.8
12/11/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1987 0.5 0.0 0.0 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1987 1.3 0.0 0.6 0.0 2.0 1.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1987 1.7 1.7 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1987 7.6 0.3 9.2 0.2 9.9 14.3 1.9 31.0 11.8 25.8 11.8 13.5 13.0 11.7
12/16/1987 9.4 19.4 16.9 1.5 19.5 22.8 19.1 32.0 12.1 41.5 56.6 39.3 39.5 12.0
12/17/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/19/1987 5.3 0.4 7.6 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
12/20/1987 2.8 3.1 5.4 0.4 0.1 0.7 4.4 0.0 0.1 0.0 0.0 0.0 0.0 0.1
12/21/1987 35.8 16.8 2.0 0.1 0.0 0.1 0.7 0.0 0.0 0.0 0.3 0.5 0.5 0.0
12/22/1987 7.9 0.0 0.2 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1987 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.7
12/28/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1988 0.0 0.0 0.0 1.2 0.0 0.0 0.5 0.0 10.0 0.0 0.0 0.0 0.0 10.0
1/7/1988 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.2 0.0 0.0 0.0 0.0 8.2
1/8/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1988 2.1 0.1 2.9 0.9 4.9 2.9 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
1/14/1988 1.9 4.0 0.6 0.3 0.0 0.5 3.4 0.0 0.0 1.3 4.1 2.9 3.0 0.0
1/15/1988 0.9 0.0 0.0 0.0 0.0 8.1 0.0 31.0 11.8 23.0 0.0 0.8 0.0 11.7
1/16/1988 0.0 0.0 0.0 0.0 0.0 8.4 0.0 32.0 12.1 23.7 0.0 0.8 0.0 12.0
1/17/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1988 1.2 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1988 5.2 4.1 5.1 0.6 0.1 1.2 7.3 0.0 0.0 4.0 12.1 6.8 7.0 0.0
1/20/1988 2.1 0.0 2.9 0.8 8.9 5.3 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
1/21/1988 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.2 0.0 0.0 0.0 0.0 7.2
1/22/1988 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.3 0.0 0.0 0.0 0.0 5.4
1/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
1/24/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1988 1.2 0.0 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1988 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1988 2.2 3.0 4.3 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
2/6/1988 1.6 1.1 2.1 1.7 3.5 7.6 2.6 20.0 20.7 14.8 0.0 0.5 0.0 20.8
2/7/1988 1.1 4.2 0.0 0.0 0.0 4.2 0.0 16.0 6.1 11.9 0.0 0.4 0.0 6.0
2/8/1988 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
2/9/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
2/10/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1988 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 12.8 0.0 0.0 0.0 0.0 12.9
2/12/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1988 1.2 0.0 1.6 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1988 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1988 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.3
2/16/1988 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
2/17/1988 4.6 2.7 4.3 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
2/18/1988 9.1 2.0 12.0 1.2 16.0 11.7 15.0 0.0 0.0 8.3 27.2 19.9 20.4 0.0
2/19/1988 7.8 0.1 8.1 0.7 21.8 14.2 8.7 0.0 0.0 3.0 11.3 10.5 10.8 0.0
2/20/1988 3.2 0.4 2.8 0.2 7.5 4.8 2.9 0.0 0.0 3.1 9.5 5.7 5.8 0.0
2/21/1988 1.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1988 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
2/25/1988 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.0
2/26/1988 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
2/27/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/1988 0.1 0.0 0.1 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
3/1/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
3/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1988 0.0 0.0 0.0 0.3 0.1 0.7 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/5/1988 1.7 2.5 1.4 2.0 4.5 2.8 1.6 0.0 16.3 0.1 0.7 1.2 1.2 16.3
3/6/1988 0.8 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
3/7/1988 2.4 4.5 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1988 4.9 1.1 3.1 0.1 6.7 4.2 1.2 0.0 0.0 0.1 1.1 2.0 2.0 0.0
3/9/1988 0.5 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
3/10/1988 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
3/11/1988 0.4 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1988 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1988 0.3 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1988 0.1 0.0 0.0 3.9 0.0 0.0 1.0 0.0 18.8 0.0 0.0 0.0 0.0 18.8
3/15/1988 1.2 0.4 1.0 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1988 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1988 0.2 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1988 5.6 17.4 1.3 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1988 2.4 2.0 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1988 6.6 1.2 8.9 0.4 15.9 10.1 4.8 0.0 0.0 0.2 1.7 2.9 3.0 0.0
3/22/1988 1.8 1.7 1.0 0.3 3.0 2.4 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1988 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1988 0.7 0.1 1.6 0.0 3.1 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1988 0.7 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1988 0.6 0.4 1.0 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1988 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1988 0.0 0.3 3.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
4/7/1988 0.0 0.4 3.2 0.8 0.0 0.0 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.0
4/8/1988 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1988 6.7 0.4 9.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1988 6.1 2.8 5.6 1.5 0.2 10.0 18.6 27.0 10.2 28.0 23.5 13.4 13.0 10.2
4/11/1988 7.9 0.5 9.1 0.8 26.7 16.1 1.3 0.6 6.4 1.7 3.2 1.0 1.0 6.5
4/12/1988 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 12.8 0.0 0.0 0.0 0.0 12.9
4/13/1988 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1988 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1988 0.9 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1988 0.7 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1988 1.5 0.4 1.3 0.3 3.0 2.5 3.4 0.7 0.3 1.5 5.9 8.7 8.9 0.3
4/21/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1988 4.1 4.3 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1988 7.4 7.4 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1988 7.1 1.2 8.7 24.6 10.4 7.9 0.2 6.5 6.2 5.0 1.5 2.7 2.6 6.2
4/25/1988 7.2 2.0 8.5 7.8 7.9 5.0 1.9 0.0 0.0 1.2 2.9 0.5 0.5 0.0
4/26/1988 6.1 1.3 7.6 1.7 14.6 12.0 21.8 0.3 0.1 0.6 3.4 5.9 6.0 0.1
4/27/1988 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1988 3.5 0.1 1.1 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1988 4.5 16.8 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1988 2.4 6.7 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1988 6.0 0.8 5.3 3.7 4.1 3.8 10.4 0.0 25.0 3.6 10.5 5.5 5.6 25.1
5/2/1988 25.6 10.4 15.8 4.3 7.6 7.4 18.7 0.9 25.4 1.6 7.5 13.0 13.3 25.5
5/3/1988 32.4 22.8 35.6 15.6 43.4 41.0 32.3 40.5 40.5 44.0 41.3 23.6 23.2 40.5
5/4/1988 15.9 1.2 19.0 13.4 37.0 36.2 37.4 33.7 29.7 30.3 22.1 24.7 24.5 29.7
5/5/1988 1.8 0.3 3.2 5.8 3.1 11.5 8.2 32.0 12.1 24.0 2.0 4.3 3.6 12.0
5/6/1988 5.7 15.2 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1988 11.0 27.4 7.1 1.9 1.0 0.9 2.2 0.0 0.0 0.6 4.7 8.2 8.4 0.0
5/8/1988 10.2 11.8 11.2 21.0 14.1 17.1 17.9 23.0 8.7 22.3 16.5 11.3 11.0 8.7
5/9/1988 3.8 0.3 4.4 2.5 13.0 9.3 11.4 0.0 13.8 0.3 2.5 4.4 4.5 13.9
5/10/1988 1.7 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1988 2.7 3.8 2.9 0.4 4.0 3.1 4.8 0.0 0.0 0.9 7.3 12.7 13.0 0.0
5/12/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1988 0.6 1.7 0.2 0.2 0.5 0.8 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1988 0.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1988 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1988 1.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1988 1.7 4.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1988 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/21/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1988 0.8 0.0 1.1 0.0 3.5 2.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
5/24/1988 4.5 7.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1988 7.4 1.1 3.4 1.2 7.4 4.6 0.5 0.7 10.5 1.8 3.3 1.0 1.0 10.5
5/26/1988 1.3 4.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1988 1.7 6.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1988 2.1 7.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1988 0.3 0.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1988 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1988 4.0 9.2 2.2 0.0 4.0 2.4 0.0 0.1 0.0 0.6 1.3 0.0 0.0 0.0
6/3/1988 1.0 3.7 0.1 0.0 0.0 0.1 0.0 0.2 0.1 0.5 2.7 4.7 4.8 0.1
6/4/1988 0.6 0.0 0.8 0.1 0.0 5.5 1.7 20.0 7.6 14.8 0.0 0.5 0.0 7.5
6/5/1988 1.0 0.3 0.3 0.9 0.2 10.3 12.1 32.0 12.1 27.8 12.9 9.3 8.7 12.0
6/6/1988 3.9 10.3 2.7 0.0 0.0 0.3 0.0 1.0 0.4 0.8 0.3 0.5 0.5 0.4
6/7/1988 5.7 19.6 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0
6/8/1988 2.7 8.0 2.9 0.0 0.0 3.4 0.0 13.0 4.9 9.6 0.0 0.3 0.0 4.9
6/9/1988 11.1 10.5 12.3 53.9 0.5 21.1 35.8 59.0 22.4 50.3 25.9 27.3 26.5 22.2
6/10/1988 5.6 1.5 7.7 3.8 13.0 39.9 48.4 95.0 36.0 73.7 16.1 22.5 20.6 35.8
6/11/1988 4.9 1.2 5.4 1.1 8.1 6.9 14.0 0.0 0.0 4.2 11.8 5.5 5.6 0.0
6/12/1988 0.7 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/1988 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1988 5.1 16.9 1.1 0.1 2.5 1.6 0.8 0.0 0.0 3.7 10.3 4.7 4.8 0.0
6/19/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1988 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1988 0.8 0.0 0.3 2.8 1.3 4.8 26.9 0.0 6.2 0.9 7.5 13.0 13.3 6.2
6/25/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/1988 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1988 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/30/1988 6.7 7.2 6.8 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/1/1988 5.1 17.2 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/2/1988 1.5 0.0 1.2 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/1988 8.1 9.4 5.6 21.3 9.9 5.9 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.0
7/4/1988 3.3 1.3 2.2 3.1 3.5 11.5 0.6 36.0 25.1 26.7 0.0 0.9 0.0 25.0
7/5/1988 2.4 1.9 0.1 33.7 0.7 17.0 54.8 32.0 24.2 29.8 32.2 44.3 44.6 24.1
7/6/1988 1.6 0.1 2.3 6.1 0.3 4.1 27.6 0.0 27.4 2.6 8.7 6.8 7.0 27.6
7/7/1988 6.4 3.5 13.4 13.1 0.0 0.0 0.5 0.0 9.9 5.0 11.7 1.0 1.0 10.0
7/8/1988 11.3 17.1 16.7 6.1 16.7 26.2 34.8 42.0 15.9 36.4 34.6 54.7 55.0 15.8
7/9/1988 12.5 9.7 19.9 3.4 15.1 25.3 21.8 50.0 19.1 37.4 1.1 2.2 1.0 18.9
7/10/1988 30.3 24.9 38.6 31.0 38.8 25.6 19.3 0.3 35.1 2.8 15.3 22.2 22.8 35.3
7/11/1988 21.5 39.7 23.2 8.4 23.0 17.2 23.8 0.5 20.2 0.6 0.5 0.0 0.0 20.3
7/12/1988 5.5 3.1 13.0 5.2 7.6 15.1 13.8 33.0 26.3 26.9 17.5 29.1 29.0 26.3
7/13/1988 9.3 8.9 10.6 5.6 8.0 12.6 4.4 28.0 19.7 27.1 15.8 3.6 3.0 19.6
7/14/1988 12.8 13.6 10.0 15.9 14.8 8.8 0.3 0.0 5.0 20.6 87.9 97.8 100.3 5.0
7/15/1988 5.3 5.1 5.6 8.8 5.6 8.9 35.8 0.9 0.3 2.8 7.3 5.9 6.0 0.3
7/16/1988 6.2 8.4 4.6 5.7 4.7 12.1 40.8 12.0 4.6 20.6 38.8 29.0 29.4 4.5
7/17/1988 5.7 4.3 6.2 0.9 13.0 16.3 12.1 26.0 9.9 27.5 27.4 21.1 21.0 9.8
7/18/1988 0.7 1.9 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/19/1988 2.4 5.3 2.6 0.0 0.0 2.9 0.0 11.0 4.2 8.2 0.0 0.3 0.0 4.1
7/20/1988 3.9 10.9 1.6 7.4 0.1 1.2 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/21/1988 4.9 15.6 0.6 1.0 0.0 0.1 0.3 0.3 6.5 1.1 2.3 0.6 0.6 6.5
7/22/1988 0.5 1.9 0.6 0.4 0.0 0.0 0.2 0.0 3.7 1.3 2.8 0.0 0.0 3.7
7/23/1988 6.0 20.9 0.7 4.2 0.1 1.7 10.2 0.4 0.2 0.8 4.2 7.3 7.5 0.2
7/24/1988 6.1 6.6 24.9 2.5 12.0 9.1 12.0 0.8 7.9 2.7 13.3 20.0 20.5 7.9
7/25/1988 11.6 3.1 13.8 21.6 15.8 16.0 2.4 24.0 18.1 18.0 1.7 3.3 2.8 18.1
7/26/1988 16.4 11.7 11.4 11.2 20.9 17.5 9.8 14.0 6.9 12.8 19.7 34.0 34.5 6.9
7/27/1988 7.2 6.7 4.7 9.3 9.4 30.1 42.6 69.0 26.2 67.1 78.9 103.0 103.9 26.0
7/28/1988 3.5 3.5 10.2 7.5 0.5 12.7 41.1 23.5 8.9 27.2 27.2 12.6 12.3 8.8
7/29/1988 0.2 0.8 0.7 0.5 0.1 1.1 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/30/1988 0.0 0.0 0.0 1.4 0.1 8.9 5.3 31.0 20.6 23.3 2.4 5.0 4.3 20.5
7/31/1988 0.1 0.0 0.0 0.6 0.0 14.5 3.5 53.0 23.0 39.3 0.0 1.3 0.0 22.8
8/1/1988 0.0 0.0 0.0 1.4 0.2 2.8 17.4 0.2 0.1 0.2 0.0 0.0 0.0 0.1
8/2/1988 0.0 0.0 0.0 0.2 0.0 6.3 1.9 23.0 8.7 17.1 0.0 0.6 0.0 8.7
8/3/1988 0.9 1.4 13.3 0.4 2.0 2.1 4.8 0.8 0.3 0.6 0.0 0.0 0.0 0.3
8/4/1988 1.2 0.1 1.7 0.3 0.1 6.4 3.9 22.0 8.3 20.0 8.5 0.6 0.0 8.3
8/5/1988 0.1 1.3 8.1 4.2 0.7 8.6 54.2 0.0 0.0 15.2 71.7 88.5 90.7 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/6/1988 2.4 4.5 0.8 0.5 0.1 1.1 6.8 0.0 0.0 0.8 4.5 6.3 6.5 0.0
8/7/1988 4.4 3.3 3.1 1.5 2.0 1.9 4.9 0.0 10.1 0.0 0.0 0.0 0.0 10.1
8/8/1988 8.5 22.5 3.7 5.1 0.8 10.3 65.3 0.0 0.0 0.2 1.4 2.3 2.4 0.0
8/9/1988 0.8 0.5 4.9 1.1 0.2 2.2 14.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
8/10/1988 2.0 0.2 3.7 2.6 4.9 5.8 0.0 11.0 4.3 8.2 0.0 0.3 0.0 4.3
8/11/1988 3.1 3.9 3.0 23.4 4.0 2.7 1.9 0.9 17.9 0.7 0.0 0.0 0.0 17.9
8/12/1988 7.3 9.0 7.2 5.9 5.7 10.7 19.3 17.0 15.5 12.8 0.4 0.4 0.0 15.4
8/13/1988 8.9 12.6 14.4 10.6 8.4 31.2 0.6 100.0 48.3 78.3 12.6 9.7 7.4 48.1
8/14/1988 13.7 12.5 21.8 30.6 30.1 36.1 41.0 48.0 79.4 49.1 49.6 46.1 46.0 79.6
8/15/1988 1.5 0.3 2.5 3.0 0.1 5.3 3.9 18.0 8.1 13.7 1.9 2.9 2.5 8.0
8/16/1988 1.8 3.3 4.9 0.2 0.5 0.8 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/17/1988 7.3 18.4 6.7 0.3 7.9 4.7 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
8/18/1988 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
8/19/1988 0.5 0.1 1.2 0.4 2.0 8.1 5.4 23.0 8.7 21.0 19.2 24.7 24.7 8.7
8/20/1988 3.2 11.7 0.6 0.0 0.0 0.1 0.0 0.5 0.2 6.2 13.5 0.3 0.3 0.2
8/21/1988 4.4 10.5 9.9 0.9 0.1 1.8 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/22/1988 4.5 9.2 7.1 2.3 3.8 6.7 29.5 0.0 0.0 4.8 12.6 4.1 4.2 0.0
8/23/1988 4.1 4.8 0.5 1.6 0.2 2.6 16.0 0.2 2.8 0.7 4.4 7.6 7.8 2.8
8/24/1988 6.9 8.9 4.9 13.8 0.3 5.5 4.0 18.0 13.0 14.5 3.1 1.6 1.2 13.0
8/25/1988 7.2 7.2 8.7 0.5 4.0 3.3 6.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
8/26/1988 0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/27/1988 2.7 4.3 9.8 3.8 0.6 10.5 46.7 12.0 6.0 10.2 10.7 18.8 19.0 6.0
8/28/1988 13.4 38.3 3.9 2.1 1.7 8.4 20.9 16.0 9.9 13.6 4.4 1.6 1.2 9.9
8/29/1988 9.0 6.8 9.0 7.0 12.6 15.8 56.9 0.0 22.7 19.6 70.9 62.4 64.0 22.8
8/30/1988 5.8 7.0 12.4 0.7 10.0 7.3 9.3 0.0 0.0 1.5 5.2 4.4 4.5 0.0
8/31/1988 1.6 5.8 3.8 0.6 0.1 1.4 7.7 0.5 0.2 3.6 12.1 11.1 11.4 0.2
9/1/1988 0.2 0.0 0.0 1.9 0.3 3.7 23.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/2/1988 0.7 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/3/1988 1.3 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/4/1988 1.1 4.2 0.7 0.0 0.0 5.3 0.0 20.0 7.6 14.9 0.6 1.5 1.0 7.5
9/5/1988 1.3 4.3 0.0 1.1 0.1 1.5 9.8 0.0 2.9 0.4 0.9 0.0 0.0 2.9
9/6/1988 3.5 8.7 10.2 4.2 0.7 8.4 53.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/7/1988 2.8 8.7 3.8 0.2 2.0 1.6 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/1988 0.1 0.1 0.8 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/9/1988 3.3 8.7 1.4 0.3 0.1 0.7 4.3 0.2 0.1 5.4 12.3 1.0 1.0 0.1
9/10/1988 6.9 5.8 6.8 4.3 14.9 24.0 55.1 26.0 9.9 21.8 8.9 8.0 7.5 9.8
9/11/1988 1.9 3.8 11.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.6 0.2 0.2 0.0
9/12/1988 2.5 7.9 0.3 0.4 0.0 0.0 0.2 0.0 3.7 0.6 2.9 3.8 3.9 3.7
9/13/1988 2.3 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/14/1988 1.1 0.3 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/15/1988 2.7 2.3 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/1988 2.8 5.8 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/1988 2.2 4.3 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1988 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 10.5 18.1 18.6 0.0
9/20/1988 0.0 0.1 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1988 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1988 2.4 1.9 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1988 3.8 5.9 4.0 0.0 3.0 1.8 0.0 0.0 0.0 0.1 0.7 1.3 1.3 0.0
9/24/1988 3.9 2.9 4.9 0.9 0.1 1.8 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1988 1.1 1.9 1.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1988 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1988 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 3.3 0.0 0.0 0.0
10/4/1988 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1988 0.7 0.0 0.1 0.5 0.0 0.4 2.1 0.3 3.0 0.2 0.0 0.0 0.0 3.0
10/10/1988 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1988 1.1 4.2 0.0 0.5 0.1 0.9 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1988 2.8 10.5 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1988 19.8 1.1 24.6 0.0 0.0 0.0 0.0 0.0 0.0 1.4 11.7 20.2 20.7 0.0
10/20/1988 35.4 48.4 36.4 21.8 49.8 46.3 30.0 48.0 54.3 38.9 7.7 1.5 0.3 54.4
10/21/1988 3.5 1.2 4.3 1.1 10.0 6.8 6.5 0.0 5.0 0.0 0.0 0.0 0.0 5.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/22/1988 0.0 0.0 0.0 0.5 0.0 0.1 0.6 0.0 3.7 0.0 0.0 0.0 0.0 3.7
10/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1988 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1988 0.0 0.1 0.4 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
10/27/1988 0.4 0.0 0.6 1.6 0.3 3.2 20.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1988 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1988 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1988 3.2 0.2 4.3 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1988 10.2 2.3 12.4 3.3 16.9 11.8 12.7 0.0 20.2 3.4 11.6 9.3 9.5 20.3
12/14/1988 2.6 9.1 0.0 0.9 0.1 1.8 11.2 0.0 0.1 0.8 2.5 1.5 1.5 0.1
12/15/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/7/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1989 0.0 0.0 0.0 0.5 0.1 1.1 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1989 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1989 4.2 5.4 3.9 1.0 6.0 4.2 3.2 0.8 6.6 1.8 3.5 2.0 2.0 6.7
1/14/1989 3.4 4.7 3.2 0.2 4.9 3.0 0.1 0.1 1.4 0.2 0.9 1.5 1.5 1.4
1/15/1989 1.3 0.8 0.7 1.6 0.1 1.2 7.3 0.5 9.2 1.9 5.8 5.4 5.5 9.2
1/16/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1989 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.1 0.0 0.0 0.0 0.0 4.1
1/19/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
2/2/1989 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.3
2/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.7 0.0 0.0 0.0
2/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1989 0.1 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1989 6.3 11.6 5.2 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1989 7.4 9.5 10.0 6.0 8.9 5.3 0.0 0.2 0.1 0.2 0.1 0.1 0.1 0.1
2/15/1989 4.5 4.7 3.3 0.3 3.0 1.8 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
2/16/1989 4.1 0.3 4.4 0.5 12.9 10.6 6.8 7.5 2.9 5.8 2.0 3.6 3.5 2.9
2/17/1989 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.7 0.0 0.0 0.0 0.0 1.8
2/18/1989 0.2 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
2/19/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1989 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1989 0.5 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1989 5.8 0.7 7.3 0.8 4.5 2.7 0.3 0.3 6.5 0.7 1.0 0.0 0.0 6.5
2/23/1989 8.8 2.7 12.9 17.8 16.3 10.3 2.5 0.9 1.8 2.1 3.9 1.4 1.4 1.8
2/24/1989 14.3 3.8 19.0 18.9 4.5 3.3 0.5 2.5 9.6 2.1 0.5 0.1 0.0 9.7
2/25/1989 16.7 3.5 18.7 25.7 48.4 42.3 34.8 32.0 12.1 28.2 16.0 14.6 14.2 12.0
2/26/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1989 0.9 0.0 1.3 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1989 1.7 0.1 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1989 9.5 7.6 7.4 2.1 9.7 5.7 0.9 0.0 17.5 0.5 1.1 0.0 0.0 17.6
3/2/1989 5.3 1.6 8.2 11.0 11.5 8.4 9.5 0.5 0.2 1.8 3.8 1.5 1.5 0.2
3/3/1989 1.3 4.0 6.6 6.8 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
3/4/1989 0.7 0.1 0.7 0.0 1.8 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1989 0.0 0.0 0.0 0.0 0.0 3.2 0.0 12.0 4.6 8.9 0.0 0.3 0.0 4.5
3/8/1989 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.7 0.0 0.0 0.0 0.0 7.7
3/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1989 5.7 0.3 7.2 1.3 0.1 1.7 11.1 0.0 4.0 1.0 3.1 2.1 2.1 4.1
3/11/1989 9.6 12.2 10.7 2.7 18.0 13.7 20.4 0.0 9.7 2.6 8.2 5.7 5.8 9.7
3/12/1989 0.4 0.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1989 7.3 0.4 8.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1989 22.4 19.0 22.0 5.4 25.0 24.7 25.6 23.0 8.7 28.3 38.1 30.0 30.2 8.7
3/15/1989 10.9 17.7 10.5 4.1 19.8 14.9 19.9 0.5 0.2 1.6 7.3 10.7 11.0 0.2
3/16/1989 1.2 1.2 1.9 0.3 2.0 1.9 4.1 0.2 0.1 1.8 9.5 13.7 14.0 0.1
3/17/1989 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1989 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1989 0.7 0.1 1.1 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
3/20/1989 5.4 1.4 9.1 0.8 0.1 1.4 8.4 0.2 1.3 0.2 0.3 0.6 0.6 1.3
3/21/1989 17.9 2.3 24.5 17.4 27.9 19.0 16.0 0.5 0.2 4.7 13.8 9.5 9.7 0.2
3/22/1989 8.2 2.6 9.1 13.6 21.7 20.7 0.0 30.0 11.4 26.1 16.3 18.5 18.2 11.3
3/23/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/25/1989 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.6 0.0 0.0 0.0 0.0 7.6
3/26/1989 0.6 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1989 2.1 0.1 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1989 2.9 0.8 3.6 0.5 3.0 2.9 6.0 0.8 0.3 2.1 4.1 1.5 1.5 0.3
3/30/1989 0.6 0.0 0.0 0.0 0.0 0.2 0.0 0.8 0.3 0.6 0.0 0.0 0.0 0.3
3/31/1989 1.8 6.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1989 0.9 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1989 2.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1989 4.0 14.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1989 4.3 15.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1989 0.4 0.0 0.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1989 0.8 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1989 1.1 0.1 1.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1989 6.9 4.2 10.3 1.3 8.6 7.6 16.6 0.0 0.0 1.7 5.1 2.7 2.8 0.0
4/20/1989 8.7 17.1 10.6 1.0 18.4 12.7 12.2 0.0 0.0 10.3 30.4 16.6 17.0 0.0
4/21/1989 0.1 0.0 0.1 0.6 0.0 0.0 0.3 0.0 5.3 0.0 0.0 0.0 0.0 5.4
4/22/1989 1.1 4.3 1.4 0.6 0.1 1.3 7.9 0.0 0.0 1.0 5.1 6.8 7.0 0.0
4/23/1989 2.9 9.2 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1989 2.3 6.1 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1989 1.8 2.6 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
4/26/1989 1.2 4.6 0.4 0.6 0.1 1.3 7.5 0.5 0.2 0.4 0.0 0.0 0.0 0.2
4/27/1989 1.0 0.8 0.1 0.9 0.0 0.3 1.0 0.8 7.9 0.9 0.8 0.0 0.0 7.9
4/28/1989 1.4 0.5 0.9 0.4 0.0 3.6 2.8 12.0 6.0 9.3 3.7 6.6 6.5 6.0
4/29/1989 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 10.9 0.0 0.0 0.0 0.0 10.9
4/30/1989 0.1 0.0 0.1 0.0 0.2 0.2 0.0 0.3 0.1 0.9 1.5 0.0 0.0 0.1
5/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.7 12.1 3.4 3.5 0.0
5/2/1989 1.2 3.3 0.1 0.0 0.0 4.7 0.0 18.0 6.8 13.3 0.0 0.5 0.0 6.8
5/3/1989 11.2 3.1 16.2 0.0 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
5/4/1989 6.4 12.9 5.0 8.0 6.0 5.0 6.7 2.0 14.2 3.8 8.4 7.9 8.0 14.2
5/5/1989 2.8 2.9 3.9 5.9 4.5 4.9 6.7 5.0 11.3 3.7 0.0 0.1 0.0 11.4
5/6/1989 1.0 0.1 1.2 3.2 1.0 8.8 2.9 30.0 30.0 25.2 8.7 5.3 4.7 30.0
5/7/1989 2.0 3.6 2.9 0.4 1.8 2.1 5.1 1.0 0.4 0.9 0.4 0.0 0.0 0.4
5/8/1989 1.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.5 0.4 2.1 2.9 3.0 1.5
5/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1989 0.0 0.0 0.1 0.3 0.0 1.5 3.5 3.5 1.3 4.4 4.7 1.6 1.5 1.3
5/11/1989 0.0 0.0 0.0 0.5 0.1 3.5 6.6 9.2 3.5 8.5 4.1 1.0 0.8 3.5
5/12/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1989 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1989 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/16/1989 0.3 0.0 0.5 0.0 1.5 0.9 0.0 0.0 0.0 3.0 7.1 0.5 0.5 0.0
5/17/1989 6.1 17.4 0.0 28.1 0.1 6.5 11.0 18.0 6.8 16.4 15.3 20.2 20.2 6.8
5/18/1989 3.1 11.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 4.0 0.0 0.0 0.0
5/19/1989 2.2 7.5 0.0 1.2 0.2 7.0 15.9 17.0 6.5 19.9 29.1 30.1 30.4 6.4
5/20/1989 0.1 0.0 0.2 0.7 0.6 1.8 9.2 0.1 0.0 2.5 11.4 14.1 14.5 0.0
5/21/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1989 2.5 0.3 4.6 0.0 6.6 4.8 0.0 3.5 1.3 2.6 0.0 0.1 0.0 1.3
5/23/1989 1.5 0.3 4.6 0.4 1.8 9.2 5.6 28.0 10.6 20.8 0.0 0.7 0.0 10.5
5/24/1989 1.8 0.2 2.3 0.0 2.0 2.2 0.0 4.0 1.5 3.6 5.0 8.7 8.8 1.5
5/25/1989 1.3 0.2 2.5 0.0 1.6 1.7 0.0 3.0 1.1 3.5 3.8 2.2 2.2 1.1
5/26/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1989 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1989 1.6 0.0 1.9 1.3 6.1 7.1 16.1 4.0 1.5 3.7 6.1 10.7 10.9 1.5
6/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1989 1.6 1.9 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1989 5.3 7.9 5.0 1.1 0.2 3.2 13.8 3.9 1.5 6.0 15.4 20.1 20.5 1.5
6/4/1989 5.0 3.2 5.6 5.1 11.0 11.1 10.5 11.5 4.4 13.3 21.3 25.1 25.4 4.3
6/5/1989 2.5 2.5 1.4 0.1 4.5 2.8 0.8 0.0 0.0 1.2 3.8 2.4 2.5 0.0
6/6/1989 0.7 0.0 0.9 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1989 2.9 5.6 1.7 6.6 4.5 5.7 7.9 7.0 2.7 6.1 7.8 13.6 13.8 2.6
6/8/1989 4.1 9.4 1.8 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1989 3.5 4.6 5.0 0.0 1.7 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/10/1989 0.7 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1989 0.0 0.0 0.3 0.2 0.0 0.4 2.4 0.0 0.0 2.6 7.1 2.7 2.8 0.0
6/13/1989 2.0 7.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1989 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/1989 0.5 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/1989 0.3 0.7 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
6/17/1989 4.1 10.9 1.4 4.3 4.0 3.3 0.0 3.5 1.3 4.9 6.1 2.2 2.2 1.3
6/18/1989 0.3 0.9 0.5 3.2 0.6 10.2 40.8 14.0 5.3 13.1 7.5 3.7 3.4 5.3
6/19/1989 1.8 0.4 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1989 3.0 8.0 5.3 0.2 1.0 1.0 2.4 0.0 0.0 0.3 2.5 4.4 4.5 0.0
6/21/1989 1.3 1.7 0.3 0.4 1.1 1.4 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1989 1.2 2.7 2.0 1.6 0.3 3.3 20.9 0.0 0.0 0.1 0.4 0.7 0.7 0.0
6/23/1989 10.9 6.4 13.3 0.9 4.0 3.9 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
6/24/1989 8.5 21.3 19.1 3.1 11.7 13.0 28.6 7.0 10.2 6.3 9.0 15.8 16.0 10.2
6/25/1989 6.0 11.6 5.5 3.9 1.9 9.8 37.0 12.0 13.3 8.9 0.0 0.3 0.0 13.3
6/26/1989 2.1 5.3 7.9 1.4 0.2 2.7 17.1 0.0 0.6 0.0 0.0 0.0 0.0 0.6
6/27/1989 0.1 0.5 4.5 1.6 0.3 6.9 20.1 14.0 5.3 10.8 3.1 5.7 5.5 5.3
6/28/1989 0.1 0.0 0.3 0.1 0.0 1.4 1.6 4.5 1.7 3.4 0.7 1.3 1.2 1.7
6/29/1989 2.6 5.1 1.7 0.1 0.0 0.6 1.2 1.5 0.6 4.7 8.3 0.5 0.5 0.6
6/30/1989 2.2 7.3 9.4 0.6 1.7 2.2 7.9 0.0 0.0 1.4 11.4 19.7 20.2 0.0
7/1/1989 5.1 0.7 8.9 1.2 0.2 2.9 14.7 2.2 0.8 2.7 4.6 5.4 5.5 0.8
7/2/1989 0.6 1.7 6.5 0.4 0.1 8.7 5.0 30.0 11.4 28.9 19.4 10.9 10.4 11.3
7/3/1989 5.6 21.0 0.7 2.4 0.2 8.7 12.7 26.0 22.4 23.3 20.8 28.0 28.0 22.4
7/4/1989 5.4 12.5 8.8 11.6 0.6 6.9 44.5 0.0 11.6 6.6 44.1 69.1 70.9 11.6
7/5/1989 6.4 20.7 7.8 1.8 0.0 0.2 1.6 0.0 0.0 1.2 2.6 0.0 0.0 0.0
7/6/1989 3.6 6.3 10.6 4.4 0.1 1.5 10.8 0.0 30.9 0.0 0.0 0.0 0.0 31.0
7/7/1989 5.8 3.8 19.2 4.9 8.2 18.8 24.4 40.0 41.4 36.9 31.6 37.1 37.0 41.4
7/8/1989 15.6 22.6 14.6 23.1 25.2 41.4 43.6 76.0 37.5 74.1 44.8 11.9 10.3 37.3
7/9/1989 7.0 16.9 4.4 14.2 4.7 11.1 18.4 21.5 15.7 21.3 20.2 19.7 19.6 15.6
7/10/1989 1.5 5.2 0.1 2.9 0.0 0.0 0.9 0.0 16.9 0.0 0.0 0.0 0.0 17.0
7/11/1989 5.6 1.1 5.3 5.9 0.8 10.4 62.0 2.5 10.3 2.0 1.2 2.2 2.2 10.3
7/12/1989 12.5 2.5 10.4 17.1 5.6 9.1 16.3 13.0 13.1 10.7 5.5 7.3 7.2 13.1
7/13/1989 18.5 13.0 25.7 12.1 3.9 6.0 25.6 0.0 17.8 0.0 0.0 0.0 0.0 17.8
7/14/1989 19.8 57.4 14.7 10.6 6.9 15.7 32.1 26.0 17.6 21.7 14.0 20.6 20.5 17.5
7/15/1989 5.0 7.6 9.8 3.2 0.2 2.4 15.8 0.0 17.4 2.6 10.8 11.9 12.2 17.5
7/16/1989 7.8 6.9 9.8 0.6 2.0 22.2 0.3 80.0 35.3 59.3 0.1 2.0 0.0 35.1
7/17/1989 4.3 2.7 6.3 1.6 2.1 7.4 11.6 17.0 12.9 13.1 1.2 0.4 0.0 12.9
7/18/1989 5.7 11.1 9.2 3.4 2.0 9.9 41.3 9.5 4.8 9.8 6.3 0.2 0.0 4.8
7/19/1989 8.1 12.2 14.4 7.3 3.0 8.4 39.3 2.8 1.1 5.0 8.5 4.5 4.5 1.1
7/20/1989 19.9 51.8 23.3 6.7 14.0 11.7 18.5 3.2 32.1 5.3 11.9 12.3 12.5 32.2
7/21/1989 7.7 7.0 6.9 3.5 0.1 0.8 6.7 0.0 26.4 0.9 3.2 2.7 2.8 26.6
7/22/1989 5.1 4.6 5.4 9.5 0.2 4.6 12.2 10.0 3.8 11.5 15.1 13.9 14.0 3.8
7/23/1989 7.0 2.3 8.1 19.0 0.3 9.3 25.5 20.0 7.6 17.2 5.3 0.5 0.0 7.5
7/24/1989 13.9 22.4 26.1 7.2 9.9 10.9 5.1 16.0 6.1 15.6 14.6 14.6 14.6 6.0
7/25/1989 11.3 32.8 9.9 14.2 0.4 8.3 29.4 14.0 5.3 12.6 7.2 5.4 5.2 5.3
7/26/1989 6.3 22.7 8.5 2.1 1.1 5.9 8.9 15.0 14.4 11.2 0.9 1.8 1.5 14.4
7/27/1989 8.9 25.3 10.8 1.8 0.3 6.3 23.4 10.0 3.8 7.5 0.7 1.5 1.3 3.8
7/28/1989 16.0 13.2 17.9 3.3 2.4 8.8 31.8 10.0 11.2 18.5 46.0 49.4 50.4 11.3
7/29/1989 24.9 30.6 26.5 6.4 19.8 26.3 3.4 54.0 37.3 46.7 17.8 7.5 6.3 37.2
7/30/1989 17.0 32.6 20.0 2.9 26.2 33.4 37.1 47.0 17.8 42.2 24.6 19.5 18.8 17.7
7/31/1989 1.7 3.0 3.3 1.5 0.2 3.3 19.2 1.0 0.4 3.1 18.7 31.8 32.6 0.4
8/1/1989 4.0 6.5 4.8 1.5 7.2 7.6 19.0 2.0 0.9 3.4 5.9 4.0 4.0 0.9
8/2/1989 10.2 19.2 6.3 8.2 0.2 5.6 14.6 13.0 14.6 20.4 45.2 49.6 50.5 14.6
8/3/1989 5.9 6.9 5.9 6.3 6.2 10.5 25.0 12.0 12.8 16.9 32.5 33.9 34.5 12.8
8/4/1989 2.3 2.5 5.5 2.3 1.8 4.9 4.2 12.5 22.3 10.8 4.0 1.7 1.4 22.3
8/5/1989 6.6 22.0 2.0 0.0 1.0 0.9 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/6/1989 5.2 16.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/7/1989 2.5 4.1 0.6 0.0 0.0 10.1 0.0 38.5 14.6 30.2 5.1 3.9 3.0 14.5
8/8/1989 0.9 1.3 0.6 4.7 0.3 4.7 26.9 2.0 8.2 1.5 0.0 0.1 0.0 8.2
8/9/1989 11.5 9.5 10.8 6.3 1.4 6.1 32.8 2.0 18.3 2.6 4.1 4.0 4.0 18.3
8/10/1989 17.0 14.2 13.4 10.4 22.7 17.4 10.6 9.5 12.9 10.6 13.9 13.9 14.0 12.9
8/11/1989 11.3 28.2 11.3 10.2 1.6 6.9 24.8 8.5 8.3 6.4 0.9 1.7 1.5 8.3
8/12/1989 7.6 5.9 12.7 7.0 0.3 5.4 24.0 6.0 2.3 7.6 11.6 10.4 10.5 2.3
8/13/1989 9.0 10.1 6.0 23.3 1.8 11.9 32.4 23.0 19.6 17.2 1.5 3.2 2.7 19.6
8/14/1989 9.3 14.0 6.9 5.3 2.5 3.3 2.3 5.5 2.1 8.6 13.4 7.7 7.7 2.1
8/15/1989 10.2 15.0 7.9 34.2 6.9 14.9 1.9 40.0 15.2 31.0 3.6 2.4 1.4 15.1
8/16/1989 6.1 12.0 5.0 7.3 2.3 6.6 28.0 4.2 8.8 3.1 0.0 0.1 0.0 8.8
8/17/1989 7.8 8.6 8.7 6.0 1.1 10.6 10.0 33.0 43.7 24.5 0.7 2.0 1.2 43.7
8/18/1989 18.7 27.7 13.4 8.2 25.0 43.4 70.1 69.0 27.8 67.0 83.0 113.4 114.5 27.6
8/19/1989 9.8 6.1 18.3 2.4 7.0 5.4 3.4 3.0 1.1 6.1 13.5 11.3 11.5 1.1
8/20/1989 7.8 9.8 16.2 7.4 4.0 6.3 4.2 13.0 21.8 14.6 20.4 22.1 22.3 21.9
8/21/1989 10.8 20.7 17.3 8.2 6.6 23.3 54.7 43.5 51.3 38.7 20.3 14.5 13.8 51.4
8/22/1989 4.6 10.8 12.3 0.2 2.0 9.4 2.4 30.0 11.4 22.4 1.7 3.7 3.0 11.3
8/23/1989 3.8 6.1 10.1 0.0 5.7 3.4 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
8/24/1989 2.7 1.4 4.4 5.8 1.0 1.4 1.5 3.0 28.7 7.4 11.7 0.1 0.0 28.8
8/25/1989 3.6 2.3 4.2 4.7 2.1 17.7 41.9 39.0 27.3 30.7 14.9 26.8 26.5 27.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/26/1989 4.6 7.0 11.1 3.5 0.0 1.3 0.2 5.0 5.9 7.1 8.9 3.1 3.0 5.9
8/27/1989 6.3 10.3 5.0 2.8 7.3 12.2 31.5 12.0 7.4 10.4 4.8 3.7 3.5 7.4
8/28/1989 0.5 0.8 0.7 2.3 0.4 5.8 27.6 5.6 3.4 4.2 0.3 0.6 0.5 3.4
8/29/1989 1.9 7.0 2.9 0.2 0.0 0.4 2.3 0.0 0.0 0.2 1.7 2.9 3.0 0.0
8/30/1989 0.6 2.4 2.3 0.0 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
8/31/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 12.8 22.1 22.7 0.0
9/2/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
9/3/1989 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/4/1989 2.1 7.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/5/1989 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/6/1989 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.6 0.0 0.0 0.0 0.0 1.6
9/7/1989 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/1989 0.0 0.0 0.0 2.5 0.4 5.0 31.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/9/1989 1.5 0.0 0.7 1.4 0.1 2.5 8.5 4.6 8.2 4.0 1.9 1.6 1.5 8.2
9/10/1989 0.8 0.6 3.5 0.7 0.0 0.5 3.5 0.0 4.0 3.4 13.3 13.1 13.4 4.1
9/11/1989 5.4 13.5 2.6 1.9 0.1 4.0 6.1 12.0 17.2 20.0 35.7 25.2 25.5 17.2
9/12/1989 1.7 1.9 0.1 3.4 0.0 0.0 0.4 0.0 7.5 0.1 0.6 1.0 1.0 7.6
9/13/1989 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.4 0.0 0.0 0.0 0.0 2.4
9/14/1989 0.5 1.7 0.0 0.8 0.0 0.0 0.3 0.0 6.5 0.0 0.0 0.0 0.0 6.5
9/15/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/1989 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/1989 0.8 0.0 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1989 1.4 0.0 1.4 4.8 4.4 5.2 17.2 0.0 0.0 2.8 8.2 4.4 4.5 0.0
9/19/1989 2.0 3.6 1.3 5.9 0.0 0.0 0.3 0.0 6.3 0.7 1.6 0.0 0.0 6.3
9/20/1989 5.5 5.4 11.5 2.7 2.0 2.5 0.1 5.0 3.4 7.3 8.2 0.1 0.0 3.4
9/21/1989 11.1 9.6 9.9 5.1 18.8 12.7 0.0 6.0 2.3 7.0 8.7 7.2 7.2 2.3
9/22/1989 6.5 1.6 7.0 4.3 3.8 4.6 0.0 9.0 3.4 10.4 8.6 0.5 0.3 3.4
9/23/1989 12.8 4.7 18.0 1.6 20.0 20.4 16.8 23.0 11.6 20.3 11.5 10.4 10.1 11.5
9/24/1989 7.6 9.8 12.4 8.0 3.0 6.1 15.3 8.0 10.6 8.1 7.4 6.2 6.2 10.6
9/25/1989 16.7 5.6 3.0 1.0 0.2 3.4 13.2 5.0 1.9 4.1 3.2 5.7 5.7 1.9
9/26/1989 0.8 0.2 0.8 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1989 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
9/28/1989 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1989 0.3 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1989 0.2 0.0 0.2 0.6 0.0 0.0 0.3 0.0 5.1 2.8 6.4 0.0 0.0 5.1
10/8/1989 1.0 0.0 1.1 0.0 3.4 3.6 0.0 6.0 2.3 4.5 0.6 1.1 1.0 2.3
10/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1989 0.3 0.3 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 1.6 1.6 0.0
11/8/1989 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1989 1.1 3.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1989 0.5 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1989 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1989 0.3 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1989 0.4 0.0 0.6 0.0 1.8 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1989 0.1 0.0 0.0 1.7 0.0 0.5 0.0 2.0 0.8 2.0 1.3 0.1 0.0 0.8
12/26/1989 2.2 0.1 3.1 0.6 0.0 2.6 0.3 10.0 9.1 7.9 3.9 7.1 7.0 9.1
12/27/1989 27.6 2.0 40.8 30.0 68.3 45.1 8.8 13.0 15.6 18.2 25.9 15.4 15.5 15.6
12/28/1989 17.6 47.3 12.4 40.9 0.4 19.7 36.1 54.0 40.8 56.2 55.1 44.9 44.7 40.7
12/29/1989 2.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1989 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1989 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1990 0.6 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1990 1.0 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1990 4.0 1.2 8.4 5.3 12.6 10.1 2.2 9.0 11.2 8.4 3.9 0.2 0.0 11.2
1/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1990 0.7 0.4 3.6 0.4 0.1 3.3 4.5 10.0 3.8 9.3 7.0 6.4 6.3 3.8
1/9/1990 9.9 1.6 10.2 7.3 26.9 16.4 4.0 0.1 23.6 3.1 6.9 0.0 0.0 23.7
1/10/1990 18.2 36.6 3.1 65.6 0.5 29.9 40.8 90.0 59.0 85.6 82.5 96.0 96.1 58.8
1/11/1990 5.5 4.1 5.2 12.9 5.0 19.7 43.0 40.0 38.9 40.2 40.4 40.2 40.2 38.9
1/12/1990 0.0 0.0 0.0 1.7 0.0 0.0 0.7 0.0 14.0 0.0 0.0 0.0 0.0 14.0
1/13/1990 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1990 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1990 0.9 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1990 0.0 0.0 0.0 2.5 0.0 0.0 1.1 0.0 21.2 0.0 0.0 0.0 0.0 21.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/27/1990 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.0
1/28/1990 0.0 0.0 0.0 2.7 0.0 0.0 1.2 0.0 22.7 0.0 0.0 0.0 0.0 22.8
1/29/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
1/30/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1990 0.0 0.0 0.0 1.9 0.0 0.5 0.9 2.0 17.2 1.5 0.0 0.1 0.0 17.2
2/7/1990 0.8 0.1 1.2 1.4 0.0 0.0 0.6 0.0 11.4 0.0 0.0 0.0 0.0 11.5
2/8/1990 1.6 4.6 0.8 1.0 1.6 1.4 3.0 0.0 6.3 0.6 2.5 2.9 3.0 6.4
2/9/1990 0.0 1.7 15.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1990 0.0 1.5 13.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1990 0.5 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1990 0.6 0.3 0.8 2.6 1.8 1.1 0.0 0.0 0.0 0.5 1.4 1.0 1.0 0.0
2/17/1990 1.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
2/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1990 2.2 0.1 1.1 17.9 0.0 0.0 0.8 0.0 14.9 0.0 0.0 0.0 0.0 15.0
2/21/1990 2.9 1.3 4.8 1.3 11.1 14.0 16.1 19.0 7.2 19.8 17.9 12.2 12.0 7.2
2/22/1990 1.3 0.2 0.5 0.0 1.0 0.6 0.0 0.0 0.0 0.2 1.4 2.4 2.5 0.0
2/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1990 0.1 0.0 0.0 3.6 0.0 0.0 0.5 0.0 8.7 0.3 2.4 4.2 4.3 8.7
2/25/1990 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1990 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1990 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
3/3/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1990 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 12.8 0.0 0.0 0.0 0.0 12.9
3/5/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1990 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1990 1.5 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1990 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
3/15/1990 1.7 0.1 1.5 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
3/16/1990 2.7 1.1 9.7 3.4 8.0 6.9 11.2 1.8 0.7 3.2 9.6 12.7 13.0 0.7
3/17/1990 0.7 0.0 1.0 0.4 3.0 2.6 5.1 0.0 0.0 0.8 3.0 2.9 3.0 0.0
3/18/1990 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1990 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1990 1.3 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1990 3.5 4.5 2.9 2.5 0.0 0.0 1.1 0.0 21.4 0.0 0.0 0.0 0.0 21.5
3/30/1990 9.3 4.9 19.0 8.4 8.5 8.0 4.8 9.0 14.0 9.0 8.5 8.0 8.0 14.0
3/31/1990 1.3 2.5 2.3 9.4 0.1 5.7 6.2 18.0 6.8 19.3 18.8 13.1 13.0 6.8
4/1/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1990 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 1.0 0.0 0.0 0.0 0.0 1.0
4/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1990 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.4 0.0 0.0 0.0 0.0 5.4
4/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1990 1.3 0.1 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
4/13/1990 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/14/1990 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1990 0.9 0.0 1.2 0.0 3.7 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1990 0.5 0.0 0.7 0.0 2.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1990 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1990 1.5 0.9 2.6 0.0 5.4 3.7 0.0 2.0 0.8 1.5 0.3 0.5 0.5 0.8
4/29/1990 1.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1990 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1990 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1990 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1990 0.9 0.0 0.9 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1990 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1990 1.1 0.2 1.6 2.3 0.1 1.9 7.9 3.0 16.0 2.4 1.8 3.2 3.2 16.1
5/16/1990 1.6 0.4 2.1 4.8 5.5 5.3 6.6 4.0 1.5 5.8 9.8 8.3 8.4 1.5
5/17/1990 1.3 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1990 0.1 0.0 0.1 0.0 0.2 0.1 0.0 0.0 0.0 2.8 6.6 0.5 0.5 0.0
5/20/1990 2.4 2.3 2.5 5.5 0.3 12.4 23.5 33.0 15.0 26.1 6.9 8.2 7.6 14.9
5/21/1990 4.2 5.2 4.2 19.6 6.6 11.0 11.6 20.5 15.2 17.3 7.2 5.9 5.5 15.2
5/22/1990 2.2 0.2 1.0 39.9 1.2 14.8 13.2 46.2 22.5 41.5 24.0 19.2 18.5 22.4
5/23/1990 0.0 0.2 2.2 0.1 0.0 0.1 0.7 0.0 0.0 4.4 16.4 15.1 15.5 0.0
5/24/1990 0.5 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1990 2.8 2.3 6.5 3.8 3.1 15.1 8.4 46.0 22.3 34.2 0.7 2.3 1.2 22.2
5/26/1990 2.1 3.6 1.6 1.7 1.0 1.1 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/27/1990 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1990 1.1 3.4 0.0 2.0 0.0 2.3 0.1 8.6 5.6 6.4 0.0 0.2 0.0 5.5
5/29/1990 1.6 0.6 4.1 3.8 0.1 1.0 5.5 0.5 0.2 1.2 7.1 12.3 12.6 0.2
5/30/1990 6.7 8.5 7.1 0.9 0.0 1.3 0.0 5.0 1.9 4.4 5.8 10.2 10.3 1.9
5/31/1990 5.0 15.8 1.4 5.0 0.0 5.5 0.4 21.0 14.5 15.6 0.0 0.5 0.0 14.5
6/1/1990 3.0 6.8 0.8 0.9 0.1 2.8 10.9 4.0 1.5 3.2 1.8 3.2 3.2 1.5
6/2/1990 1.0 1.1 1.0 0.3 0.1 2.2 4.2 6.0 2.3 4.6 1.2 2.2 2.1 2.3
6/3/1990 4.5 4.1 9.3 0.2 6.9 4.1 0.1 0.0 1.9 0.6 2.9 3.4 3.5 1.9
6/4/1990 3.3 4.6 3.5 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
6/5/1990 7.3 14.4 5.5 8.4 4.4 5.8 7.1 8.0 4.7 14.0 27.4 21.4 21.7 4.7
6/6/1990 7.6 7.6 6.9 6.6 16.1 10.4 6.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
6/7/1990 2.8 5.1 1.6 2.5 0.2 3.1 19.1 0.6 9.4 2.0 13.0 22.4 23.0 9.4
6/8/1990 1.5 3.8 0.4 0.1 0.0 0.2 1.4 0.0 0.0 0.2 1.5 2.5 2.6 0.0
6/9/1990 0.6 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1990 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1990 2.0 6.8 0.0 0.2 0.0 0.0 0.1 0.0 1.3 0.5 1.1 0.0 0.0 1.3
6/13/1990 0.9 1.2 0.8 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/1990 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 1.5 1.5 0.0
6/16/1990 0.2 0.1 0.1 4.7 0.2 7.4 14.2 20.0 16.9 20.6 20.2 17.3 17.2 16.9
6/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.8 0.0 0.0 0.0
6/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1990 4.0 2.1 5.9 10.2 0.0 4.5 0.0 17.0 6.5 12.6 0.0 0.4 0.0 6.4
6/20/1990 7.3 10.1 6.0 5.9 8.5 16.4 11.4 37.0 20.4 27.8 2.8 5.8 5.0 20.3
6/21/1990 3.3 6.3 9.7 0.5 4.8 8.3 6.2 17.0 6.5 13.5 3.1 3.0 2.6 6.4
6/22/1990 5.8 2.2 1.4 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/23/1990 7.4 4.4 1.9 1.4 3.5 6.5 0.6 17.0 18.2 12.7 1.0 2.1 1.7 18.3
6/24/1990 3.0 0.4 2.1 1.8 0.0 1.3 0.8 5.0 17.1 3.7 0.0 0.1 0.0 17.2
6/25/1990 0.8 1.0 3.7 0.4 0.3 2.3 5.2 5.0 1.9 5.3 5.0 3.5 3.5 1.9
6/26/1990 1.0 0.4 4.8 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1990 1.0 1.3 7.4 0.5 3.0 10.9 6.2 31.0 11.8 25.8 6.3 0.8 0.0 11.7
6/28/1990 1.9 2.3 2.9 0.4 0.3 0.8 4.5 0.0 0.0 1.6 5.4 4.4 4.5 0.0
6/29/1990 4.8 13.5 8.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.9 0.9 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/30/1990 2.8 1.0 9.2 0.0 4.5 2.8 0.0 0.5 0.2 0.8 1.0 0.0 0.0 0.2
7/1/1990 5.8 9.5 4.6 1.6 0.3 5.6 20.5 9.0 3.4 9.3 10.8 11.9 12.0 3.4
7/2/1990 3.8 3.5 2.7 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.3 0.5 0.5 0.2
7/3/1990 0.8 2.8 8.2 0.1 0.0 0.0 0.0 0.0 0.7 0.0 0.2 0.4 0.4 0.8
7/4/1990 2.6 1.7 6.8 0.8 5.5 4.8 10.1 0.0 0.0 4.0 33.8 58.5 60.0 0.0
7/5/1990 2.0 4.7 1.1 1.2 0.0 0.3 0.5 1.2 10.2 1.2 1.8 2.5 2.5 10.2
7/6/1990 0.0 0.6 5.3 0.0 0.0 0.0 0.0 0.0 0.0 2.0 6.1 3.4 3.5 0.0
7/7/1990 0.4 0.3 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/8/1990 2.6 1.8 8.2 0.0 0.0 0.6 0.0 2.2 0.8 3.4 9.5 13.2 13.5 0.8
7/9/1990 7.0 10.1 11.4 0.2 5.0 4.6 2.3 5.0 1.9 7.4 16.1 18.5 18.8 1.9
7/10/1990 5.4 9.0 10.3 1.2 5.9 9.4 15.3 13.5 5.1 10.0 0.2 0.6 0.3 5.1
7/11/1990 5.2 8.4 4.4 1.0 8.1 9.6 13.0 11.0 4.2 9.1 2.1 0.3 0.0 4.1
7/12/1990 1.1 1.5 9.5 0.7 4.0 2.3 0.3 0.0 6.2 0.2 2.0 3.4 3.5 6.2
7/13/1990 2.1 0.0 1.6 5.2 5.2 16.7 22.6 39.0 14.8 29.0 0.7 2.2 1.3 14.7
7/14/1990 5.0 7.6 5.0 16.0 6.3 10.7 34.5 8.0 44.6 12.5 43.8 68.9 70.4 44.8
7/15/1990 15.1 18.4 13.5 9.3 14.9 10.9 3.5 6.0 6.9 5.7 2.8 0.2 0.0 6.9
7/16/1990 19.8 20.3 19.8 21.3 7.4 13.0 39.3 10.5 7.3 9.7 5.3 2.6 2.4 7.3
7/17/1990 24.9 24.2 26.9 33.4 14.2 14.1 28.2 7.0 52.4 8.0 12.8 15.3 15.5 52.6
7/18/1990 21.4 54.9 12.5 38.8 0.6 17.1 44.3 39.0 26.3 59.7 107.4 89.5 90.8 26.2
7/19/1990 3.3 1.7 1.6 0.9 0.1 1.7 10.8 0.0 0.0 0.1 1.1 2.0 2.0 0.0
7/20/1990 0.6 2.2 0.0 0.7 0.1 1.4 9.1 0.0 0.0 0.0 0.3 0.5 0.5 0.0
7/21/1990 1.4 2.6 0.8 3.3 2.4 2.7 0.3 5.0 8.2 4.4 1.6 0.1 0.0 8.2
7/22/1990 10.8 4.2 13.4 9.5 0.0 0.1 0.4 0.5 8.5 4.3 8.9 0.0 0.0 8.6
7/23/1990 4.7 11.6 5.3 3.9 0.2 12.0 12.0 38.5 18.5 33.6 12.3 2.9 2.0 18.4
7/24/1990 5.3 6.8 7.2 7.1 0.5 9.9 38.3 15.0 12.2 17.0 16.4 7.4 7.2 12.2
7/25/1990 1.4 0.7 3.9 6.2 0.2 8.9 19.0 23.2 27.5 26.4 29.0 19.5 19.4 27.5
7/26/1990 6.0 4.8 7.5 0.7 7.5 4.7 0.3 1.0 6.0 1.3 3.5 5.4 5.5 6.1
7/27/1990 3.2 4.1 6.0 4.7 0.7 8.6 54.6 0.0 3.7 0.2 1.4 2.4 2.5 3.7
7/28/1990 4.6 6.1 5.8 1.7 8.5 7.6 17.0 0.0 3.1 0.2 1.4 2.4 2.5 3.1
7/29/1990 1.0 0.3 2.4 20.8 0.2 8.7 14.2 25.0 17.9 33.2 46.0 30.4 30.5 17.9
7/30/1990 5.6 0.7 9.6 4.2 0.2 3.0 14.0 3.0 6.2 4.4 7.0 5.2 5.2 6.2
7/31/1990 11.8 13.4 17.1 2.9 0.2 3.4 19.8 1.0 4.5 1.3 2.8 3.7 3.8 4.6
8/1/1990 14.9 15.9 18.2 14.1 4.4 12.3 33.9 18.0 18.0 27.6 57.4 59.7 60.8 18.0
8/2/1990 22.3 62.4 12.9 12.7 3.4 10.7 32.3 15.0 20.0 13.6 12.0 15.6 15.6 20.0
8/3/1990 10.7 18.6 9.2 15.7 8.5 7.1 7.3 4.0 14.7 3.2 2.3 4.0 4.0 14.8
8/4/1990 12.5 16.2 11.3 47.2 19.3 34.7 58.5 55.0 21.5 42.5 13.6 24.2 23.4 21.3
8/5/1990 4.1 8.1 2.3 0.4 1.2 1.1 2.4 0.0 2.2 1.6 4.6 2.3 2.4 2.2
8/6/1990 5.9 9.7 4.7 1.5 1.0 0.6 0.7 0.0 13.0 0.0 0.0 0.0 0.0 13.1
8/7/1990 2.3 8.7 6.5 0.1 0.0 0.3 0.0 1.0 1.0 0.8 0.3 0.5 0.5 1.0
8/8/1990 0.9 3.5 0.0 0.5 0.0 0.1 0.2 0.5 4.6 0.4 0.0 0.0 0.0 4.6
8/9/1990 1.2 4.7 1.5 0.8 0.0 1.3 0.3 5.0 8.2 3.7 0.0 0.1 0.0 8.2
8/10/1990 2.5 5.7 5.3 3.7 2.0 5.1 5.5 12.0 10.5 9.2 2.3 4.2 4.0 10.4
8/11/1990 3.3 9.7 9.9 1.7 0.0 0.5 0.0 2.0 0.8 1.9 1.1 0.2 0.2 0.8
8/12/1990 5.0 11.4 16.1 2.7 1.0 1.4 0.1 3.0 2.1 2.2 0.2 0.4 0.3 2.1
8/13/1990 3.7 8.6 8.6 4.9 1.0 1.4 3.9 1.0 11.2 1.3 1.9 1.4 1.4 11.2
8/14/1990 6.7 7.9 9.7 1.4 1.1 1.9 6.5 1.0 0.4 5.7 14.0 6.4 6.5 0.4
8/15/1990 7.1 13.5 16.4 3.0 10.7 10.7 27.3 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/16/1990 10.6 33.9 2.4 0.4 0.1 0.8 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/17/1990 19.9 37.7 15.7 3.2 0.3 4.9 27.4 2.0 1.6 2.9 7.0 8.8 9.0 1.6
8/18/1990 2.1 5.2 5.3 2.2 0.1 13.0 11.1 43.0 20.7 35.0 14.7 19.1 18.5 20.6
8/19/1990 5.6 4.8 0.5 2.5 0.1 2.0 6.8 3.5 3.4 2.6 0.0 0.1 0.0 3.4
8/20/1990 2.7 6.9 0.7 10.4 0.8 7.1 24.6 11.0 4.2 8.2 0.0 0.3 0.0 4.1
8/21/1990 7.7 17.8 10.2 2.9 1.0 1.1 1.3 1.4 2.4 1.0 0.0 0.0 0.0 2.4
8/22/1990 2.9 3.3 5.4 3.9 5.0 4.6 5.1 3.5 2.0 5.7 22.4 36.7 37.5 1.9
8/23/1990 14.6 29.5 9.2 6.0 1.3 6.7 24.2 9.1 16.7 9.3 12.6 16.2 16.4 16.7
8/24/1990 5.2 15.5 3.5 6.1 1.2 8.5 15.2 22.0 36.6 30.3 33.2 4.1 3.6 36.7
8/25/1990 8.8 10.6 6.9 4.9 9.5 9.7 8.5 11.0 11.5 12.0 8.7 0.3 0.0 11.5
8/26/1990 10.6 18.6 6.7 3.6 12.6 8.5 0.1 4.0 3.5 3.0 0.0 0.1 0.0 3.5
8/27/1990 8.1 7.8 11.1 11.6 2.1 6.1 13.3 11.0 14.9 11.8 20.4 29.0 29.5 14.9
8/28/1990 9.0 5.6 13.1 2.9 8.9 11.4 20.5 12.0 15.5 12.8 14.4 13.7 13.7 15.6
8/29/1990 8.9 11.7 5.8 5.2 8.8 12.8 30.6 11.5 6.3 12.2 17.4 21.9 22.2 6.3
8/30/1990 8.0 7.6 18.2 10.6 10.8 13.9 32.9 10.0 14.4 13.9 21.2 15.5 15.6 14.4
8/31/1990 12.6 9.9 13.1 8.8 7.6 10.5 13.8 15.5 20.9 33.5 64.6 34.7 35.2 20.9
9/1/1990 6.8 17.4 5.6 3.0 1.0 1.4 3.7 1.0 8.8 2.4 4.0 0.4 0.4 8.9
9/2/1990 4.4 2.0 9.6 4.2 6.0 10.2 3.1 24.0 21.8 21.7 17.4 20.9 20.8 21.8
9/3/1990 7.8 2.5 7.3 5.5 5.5 10.8 1.8 28.0 20.4 23.9 9.0 5.0 4.4 20.4
9/4/1990 4.9 4.0 2.4 7.1 4.0 12.0 6.7 33.0 25.7 26.8 5.8 2.1 1.3 25.6
9/5/1990 4.3 8.2 0.6 11.7 1.1 8.7 8.2 26.0 9.9 20.4 3.7 3.6 3.0 9.8
9/6/1990 7.9 29.1 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/7/1990 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.2 0.5 0.0 0.0 0.0
9/8/1990 2.6 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.5 4.3 4.4 0.0
9/9/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1990 1.3 4.4 0.2 0.9 0.2 1.9 12.1 0.0 0.0 0.7 1.5 0.0 0.0 0.0
9/11/1990 1.8 5.4 0.8 0.4 0.1 0.8 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1990 2.6 9.0 2.5 0.2 0.0 0.4 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1990 2.3 0.9 6.0 38.8 0.1 13.2 7.0 46.0 17.4 34.4 2.5 5.5 4.5 17.3
9/14/1990 4.1 10.0 22.3 1.6 0.0 0.3 2.3 0.0 4.7 1.7 4.3 1.0 1.0 4.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/15/1990 3.3 3.3 7.1 1.5 1.0 0.9 0.3 1.0 6.0 0.7 0.0 0.0 0.0 6.0
9/16/1990 8.0 7.1 12.1 11.5 15.5 19.6 50.6 11.0 10.5 10.0 10.3 14.6 14.7 10.5
9/17/1990 9.9 0.8 10.9 14.0 22.5 18.7 18.9 10.0 9.4 8.9 4.3 2.4 2.2 9.4
9/18/1990 8.5 1.3 10.5 5.2 13.1 12.3 16.5 8.0 7.6 7.7 8.3 10.4 10.5 7.6
9/19/1990 4.6 1.5 4.2 17.9 9.2 11.2 24.3 8.5 16.9 7.5 10.1 17.8 18.0 16.9
9/20/1990 12.8 42.3 0.2 11.2 0.5 2.4 1.0 7.5 9.4 5.6 0.0 0.2 0.0 9.4
9/21/1990 0.7 0.3 2.8 6.8 0.0 0.5 4.1 1.0 50.0 0.7 0.0 0.0 0.0 50.3
9/22/1990 5.5 20.4 1.6 1.1 0.1 6.6 5.5 22.0 14.2 17.6 4.4 4.0 3.5 14.2
9/23/1990 1.8 3.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1990 1.6 3.5 0.5 0.0 0.0 0.3 0.0 1.0 0.4 0.8 0.1 0.0 0.0 0.4
9/25/1990 2.1 5.0 6.0 1.7 0.0 0.5 0.0 2.0 0.8 3.8 17.2 28.3 29.0 0.8
9/26/1990 1.0 2.1 2.7 0.6 2.0 2.8 5.2 3.2 2.5 2.4 0.3 0.6 0.5 2.5
9/27/1990 1.4 0.0 0.9 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1990 7.7 10.0 6.2 8.1 0.1 2.6 11.2 3.3 5.0 2.8 2.8 5.0 5.0 5.0
9/29/1990 1.9 4.9 1.5 3.4 2.0 4.3 0.3 12.0 10.5 8.9 0.0 0.3 0.0 10.4
9/30/1990 0.6 0.0 0.5 4.9 1.5 2.2 3.8 3.0 11.3 2.2 0.0 0.1 0.0 11.4
10/1/1990 0.1 0.0 0.0 2.6 0.0 6.2 0.0 23.5 8.9 20.0 8.8 7.4 7.0 8.8
10/2/1990 1.3 3.5 1.7 0.5 1.6 2.4 6.0 2.0 0.8 1.7 1.7 3.0 3.0 0.8
10/3/1990 1.2 0.3 0.3 6.0 0.0 1.3 0.0 5.0 1.9 3.9 1.4 2.6 2.5 1.9
10/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1990 2.0 1.9 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1990 3.0 0.8 3.8 0.3 11.9 10.0 3.7 9.0 3.4 10.2 10.0 4.6 4.5 3.4
10/7/1990 1.0 0.3 2.7 0.0 0.0 3.7 0.0 14.0 5.3 10.4 0.0 0.4 0.0 5.3
10/8/1990 2.3 2.8 0.2 0.1 0.0 0.3 1.7 0.0 0.0 0.0 0.1 0.2 0.2 0.0
10/9/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1990 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1990 2.6 5.5 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1990 4.3 2.3 13.0 0.0 0.0 0.4 0.0 1.5 0.6 1.1 0.0 0.0 0.0 0.6
10/13/1990 0.4 1.9 4.3 0.2 0.0 0.5 2.7 0.1 0.0 1.2 9.6 16.6 17.0 0.0
10/14/1990 0.2 0.3 0.4 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1990 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1990 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 2.4 2.5 0.0
11/7/1990 0.8 0.0 1.2 0.3 1.0 1.8 3.5 2.5 1.0 3.7 5.5 3.4 3.4 0.9
11/8/1990 0.8 0.1 1.2 0.4 3.5 3.4 0.2 5.0 5.0 4.4 1.5 0.2 0.1 5.0
11/9/1990 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
11/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1990 0.0 0.0 0.0 0.8 0.0 0.0 0.4 0.0 6.6 0.0 0.0 0.0 0.0 6.6
11/16/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1990 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1990 1.6 0.1 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1990 4.1 1.1 6.7 8.9 12.5 12.2 10.9 12.0 4.6 11.4 5.6 0.3 0.0 4.5
11/28/1990 2.3 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 6.8 11.7 12.0 0.0
11/29/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/1/1990 0.3 0.0 0.0 0.0 0.0 0.8 0.0 3.0 1.1 4.1 4.3 0.1 0.0 1.1
12/2/1990 0.0 0.0 0.0 1.2 0.0 0.0 0.5 0.0 10.2 0.0 0.0 0.0 0.0 10.3
12/3/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1990 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1990 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1990 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.4 0.2 0.4 0.0 0.0 1.4
12/23/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
12/24/1990 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.4 0.1 0.9 1.5 1.5 1.4
12/25/1990 1.9 2.9 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 1.5 1.5 0.0
12/26/1990 2.7 0.4 3.2 0.8 8.5 8.9 10.1 9.0 3.4 7.8 2.7 0.2 0.0 3.4
12/27/1990 0.4 0.0 0.3 1.0 1.2 3.5 12.8 3.5 1.3 3.2 1.3 0.1 0.0 1.3
12/28/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1990 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1991 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
1/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1991 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.9 0.0 0.0 0.0 0.0 0.9
1/9/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1991 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.6 0.0 0.0 0.0 0.0 4.6
1/31/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1991 0.1 0.0 0.2 0.6 0.1 0.9 5.5 0.0 1.1 0.0 0.0 0.0 0.0 1.1
2/10/1991 12.4 19.5 10.1 5.1 1.0 1.4 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
2/11/1991 7.1 2.3 11.1 6.0 27.2 18.3 0.0 8.5 3.2 9.2 10.5 9.3 9.3 3.2
2/12/1991 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1991 2.4 0.3 3.5 13.4 7.5 5.2 5.3 0.0 1.6 4.0 20.0 25.8 26.5 1.6
2/14/1991 2.0 0.0 2.9 0.0 5.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1991 27.1 18.2 26.9 16.2 41.6 26.8 8.9 3.3 1.3 4.9 7.8 5.6 5.7 1.2
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/16/1991 5.4 13.3 3.6 26.7 0.6 13.4 48.2 22.0 8.3 26.7 41.3 42.1 42.6 8.3
2/17/1991 0.0 0.0 0.0 0.9 0.0 0.2 1.7 0.0 7.0 0.1 1.0 1.7 1.7 7.1
2/18/1991 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.8
2/19/1991 0.0 0.0 0.0 3.0 0.0 0.0 1.3 0.0 25.1 0.0 0.0 0.0 0.0 25.3
2/20/1991 8.5 8.1 6.4 0.2 0.0 2.1 0.1 8.0 4.5 10.5 15.0 11.3 11.4 4.5
2/21/1991 9.5 3.6 5.4 12.5 11.7 15.5 24.1 19.0 7.2 20.3 23.6 22.9 23.0 7.2
2/22/1991 3.0 0.1 1.9 0.7 5.0 4.1 5.6 1.0 2.3 7.1 17.2 6.4 6.5 2.3
2/23/1991 0.0 0.0 0.0 0.2 0.0 0.6 1.6 1.2 1.1 1.5 2.5 2.5 2.5 1.1
2/24/1991 0.7 2.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1991 1.6 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1991 1.0 0.6 2.0 0.9 2.0 2.0 5.3 0.0 4.2 0.1 1.1 2.0 2.0 4.2
2/27/1991 4.4 4.7 5.7 0.5 6.9 4.1 0.2 0.0 3.9 0.0 0.3 0.5 0.5 3.9
2/28/1991 0.7 1.7 4.6 3.9 1.0 1.9 1.9 4.0 4.1 4.4 4.2 2.5 2.5 4.1
3/1/1991 3.5 8.6 0.0 0.7 0.0 0.1 1.1 0.0 5.0 0.0 0.0 0.0 0.0 5.0
3/2/1991 6.9 2.5 11.1 10.8 5.0 3.2 3.6 0.0 32.5 3.8 11.1 5.6 5.7 32.7
3/3/1991 16.9 8.2 15.4 26.2 29.9 22.8 22.1 7.0 7.0 22.1 56.2 41.8 42.7 7.0
3/4/1991 1.7 0.8 9.7 1.8 6.9 14.7 0.4 40.0 15.9 30.7 2.4 1.0 0.0 15.8
3/5/1991 3.2 5.1 0.0 10.7 0.0 0.7 2.1 1.5 0.6 1.1 0.0 0.0 0.0 0.6
3/6/1991 0.0 0.0 0.0 0.0 0.0 0.9 0.0 3.5 1.3 2.6 0.0 0.1 0.0 1.3
3/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1991 0.6 0.0 0.6 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
3/12/1991 0.8 0.4 1.3 0.8 3.0 2.5 0.4 3.0 7.8 2.2 0.0 0.1 0.0 7.9
3/13/1991 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
3/14/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1991 2.7 0.3 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1991 0.9 1.2 2.2 0.3 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1991 2.6 0.3 3.6 0.2 8.4 5.8 0.0 3.2 1.2 2.6 0.6 0.1 0.0 1.2
3/21/1991 0.9 0.3 0.8 11.5 2.1 6.3 28.4 3.1 3.8 2.9 2.2 2.2 2.2 3.8
3/22/1991 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1991 0.7 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1991 13.8 1.6 17.3 8.7 2.0 3.3 0.0 8.0 3.0 6.9 2.9 1.9 1.7 3.0
3/25/1991 25.1 24.7 23.7 37.6 51.7 39.9 23.4 22.5 23.5 21.6 17.5 15.5 15.3 23.5
3/26/1991 11.5 21.2 6.7 16.7 10.0 12.0 7.2 19.2 7.3 19.0 13.7 7.0 6.7 7.2
3/27/1991 2.4 1.3 3.3 2.8 4.5 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1991 0.6 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1991 5.3 12.8 2.0 0.0 0.0 0.1 0.0 0.5 0.4 0.4 0.0 0.0 0.0 0.4
3/30/1991 12.3 10.9 13.4 17.5 15.0 16.5 10.9 23.0 9.5 22.2 14.8 7.9 7.5 9.4
3/31/1991 6.1 2.7 5.5 10.4 14.4 14.3 9.9 16.5 12.7 18.1 17.2 9.5 9.3 12.6
4/1/1991 5.7 8.7 2.1 1.8 4.9 2.9 0.8 0.0 15.0 0.0 0.0 0.0 0.0 15.1
4/2/1991 3.1 0.4 2.4 8.8 0.0 5.0 0.0 19.0 7.2 15.3 3.9 2.9 2.5 7.2
4/3/1991 3.2 2.1 11.0 2.6 5.0 4.6 5.7 3.0 1.1 2.3 0.7 1.2 1.2 1.1
4/4/1991 0.7 0.0 0.3 2.1 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1991 0.6 0.3 2.3 13.2 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
4/6/1991 0.5 0.1 1.5 1.3 2.2 4.7 17.1 3.0 1.1 2.2 0.0 0.1 0.0 1.1
4/7/1991 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.5 0.0 0.0 0.0 0.0 1.5
4/8/1991 0.5 0.0 0.7 1.2 0.0 0.0 0.5 0.0 10.1 0.0 0.0 0.0 0.0 10.1
4/9/1991 1.5 0.5 1.7 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1991 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 2.0 2.0 0.0
4/11/1991 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1991 5.8 0.2 7.1 6.0 8.5 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1991 3.0 3.2 0.6 2.6 0.0 0.5 0.0 2.0 0.8 2.8 3.2 0.2 0.2 0.8
4/17/1991 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.2 0.8 2.5 3.6 4.0 4.0 0.8
4/18/1991 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1991 0.7 0.0 0.0 1.3 0.0 1.4 0.6 5.5 12.8 4.1 0.0 0.1 0.0 12.8
4/20/1991 1.7 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1991 3.9 6.9 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1991 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.5 0.0 0.0 0.0 0.0 1.5
4/27/1991 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.9 0.0 0.0 0.0 0.0 7.9
4/28/1991 1.6 0.0 1.7 1.4 5.4 5.9 17.9 0.0 0.0 0.2 2.0 3.4 3.5 0.0
4/29/1991 4.2 5.9 1.3 3.4 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
4/30/1991 2.7 3.1 1.1 1.9 0.0 0.9 2.8 1.7 0.6 2.2 2.7 1.5 1.5 0.6
5/1/1991 2.3 5.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
5/2/1991 5.5 0.2 6.7 3.4 8.4 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1991 3.0 1.4 1.5 1.7 0.0 2.4 0.0 9.1 3.5 12.1 15.1 7.1 7.0 3.4
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/4/1991 0.6 1.7 0.0 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
5/5/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
5/6/1991 1.6 2.9 3.0 2.9 0.2 3.9 18.9 4.0 14.0 3.0 0.0 0.1 0.0 14.0
5/7/1991 6.1 0.5 8.6 0.8 19.8 15.0 0.4 12.5 11.6 12.7 14.5 16.4 16.5 11.6
5/8/1991 3.4 0.3 1.0 1.7 2.0 1.6 3.5 0.0 12.5 1.0 2.6 1.0 1.0 12.6
5/9/1991 2.5 5.6 1.0 2.0 2.3 4.8 22.9 0.0 2.2 1.1 5.0 5.9 6.0 2.2
5/10/1991 0.0 0.0 0.0 0.0 0.0 1.5 0.0 5.7 2.2 4.2 0.0 0.1 0.0 2.2
5/11/1991 0.9 3.4 0.0 0.4 0.1 0.8 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1991 0.7 0.0 0.9 0.0 0.0 1.1 0.0 4.0 1.5 4.5 8.3 11.8 12.0 1.5
5/13/1991 0.3 0.6 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 1.5 1.5 0.0
5/14/1991 1.0 0.2 0.8 0.0 0.0 0.3 0.0 1.2 0.5 1.0 0.7 1.3 1.3 0.5
5/15/1991 0.7 0.3 0.8 0.9 0.3 1.9 11.1 0.0 0.0 0.0 0.3 0.5 0.5 0.0
5/16/1991 1.6 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1991 0.0 0.0 0.0 1.6 0.3 3.2 20.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 7.6 13.1 13.4 0.0
5/19/1991 1.2 4.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1991 1.5 0.3 2.8 1.2 1.5 2.7 0.1 7.1 5.2 7.2 5.2 2.1 2.0 5.2
5/21/1991 0.8 0.0 0.3 0.3 1.0 7.7 3.7 24.7 9.4 21.0 9.5 8.4 8.0 9.3
5/22/1991 0.0 0.0 0.0 0.0 0.0 1.4 0.0 5.4 2.1 6.5 5.6 0.1 0.0 2.0
5/23/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1991 1.9 0.8 0.0 6.8 0.0 1.6 0.0 6.0 2.3 5.9 3.2 0.2 0.0 2.3
5/25/1991 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1991 2.1 4.1 1.0 2.6 1.0 5.6 0.0 19.0 7.2 25.1 28.8 9.3 9.0 7.2
5/27/1991 0.7 0.3 2.6 1.4 0.3 1.5 3.0 3.5 11.6 5.0 14.8 22.5 23.0 11.7
5/28/1991 0.5 0.8 0.3 0.6 1.0 3.0 0.3 9.3 8.7 6.9 0.0 0.2 0.0 8.7
5/29/1991 2.1 0.0 1.1 10.7 4.0 12.5 61.3 3.5 1.3 4.8 5.5 1.2 1.1 1.3
5/30/1991 1.1 2.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1991 4.5 0.1 3.8 24.2 7.7 23.4 63.2 36.0 33.6 36.9 39.8 40.0 40.1 33.6
6/1/1991 6.8 0.7 7.0 12.4 19.8 16.2 5.5 14.0 5.3 10.6 0.8 1.1 0.8 5.3
6/2/1991 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.1 7.0 7.2 0.0
6/4/1991 0.0 0.3 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1991 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1991 0.7 2.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1991 0.5 0.0 0.0 0.9 0.1 6.9 6.5 22.5 11.8 17.2 4.7 8.8 8.4 11.7
6/8/1991 0.5 1.7 0.0 0.7 0.0 0.0 0.3 0.0 5.9 0.2 2.0 3.4 3.5 5.9
6/9/1991 1.0 3.3 0.1 0.6 0.3 2.1 0.3 7.3 7.9 5.4 0.0 0.2 0.0 7.9
6/10/1991 1.4 0.1 2.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
6/11/1991 21.2 7.3 26.4 0.3 79.0 47.8 0.1 4.0 4.0 3.0 0.0 0.1 0.0 4.0
6/12/1991 8.3 8.8 7.4 11.1 15.3 14.6 0.0 21.0 8.0 15.6 0.0 0.5 0.0 7.9
6/13/1991 2.0 0.4 1.2 8.9 2.7 5.1 15.7 4.5 1.7 4.5 2.6 0.1 0.0 1.7
6/14/1991 0.6 0.0 0.0 11.9 0.0 1.8 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
6/15/1991 0.1 0.0 0.0 2.6 0.0 5.8 0.0 22.0 8.3 16.3 0.0 0.6 0.0 8.3
6/16/1991 0.9 3.4 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/17/1991 2.5 5.4 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1991 6.7 7.6 8.5 0.4 10.9 7.7 4.5 2.0 0.8 9.9 35.9 39.5 40.5 0.8
6/19/1991 4.6 4.2 3.1 1.9 0.0 1.9 2.3 6.0 2.3 4.5 0.0 0.2 0.0 2.3
6/20/1991 7.3 6.3 11.0 1.2 0.2 2.4 14.9 0.0 0.0 1.5 7.8 10.4 10.7 0.0
6/21/1991 1.8 6.6 4.0 0.2 0.0 0.4 2.7 0.0 0.0 0.2 1.8 3.0 3.1 0.0
6/22/1991 10.1 34.9 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1991 2.0 1.6 5.3 3.4 0.6 7.0 44.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1991 2.3 4.6 14.2 4.0 0.2 4.2 18.2 5.0 1.9 6.1 7.5 5.2 5.2 1.9
6/25/1991 0.3 1.5 3.6 0.4 0.1 5.2 4.7 17.0 6.5 13.0 0.9 0.4 0.0 6.4
6/26/1991 0.0 0.0 0.0 0.1 0.0 0.3 1.6 0.0 0.0 3.5 28.9 49.9 51.2 0.0
6/27/1991 0.0 0.0 0.0 0.4 0.0 0.8 1.8 2.0 3.2 3.3 10.7 15.7 16.0 3.2
6/28/1991 0.6 0.1 1.5 0.7 0.0 0.0 0.3 0.0 5.8 0.0 0.0 0.0 0.0 5.8
6/29/1991 2.4 8.5 0.0 5.2 0.4 5.5 33.4 1.0 0.4 17.0 57.2 47.8 49.0 0.4
6/30/1991 6.6 6.3 6.7 13.0 9.7 9.7 0.1 15.0 7.2 11.1 0.0 0.4 0.0 7.2
7/1/1991 19.4 9.1 32.4 5.1 27.8 19.0 11.3 3.0 1.1 2.2 0.0 0.1 0.0 1.1
7/2/1991 8.4 18.4 8.9 16.1 1.2 18.0 97.1 10.0 3.8 10.9 13.9 14.4 14.5 3.8
7/3/1991 6.6 18.9 3.7 3.0 1.5 6.7 38.9 0.0 0.0 1.2 3.2 1.0 1.0 0.0
7/4/1991 4.9 1.5 4.7 11.4 11.6 22.0 97.0 2.2 4.4 1.7 0.6 1.0 1.0 4.5
7/5/1991 5.1 6.5 2.5 19.3 3.0 9.5 40.1 6.5 2.5 10.2 14.6 5.8 5.8 2.5
7/6/1991 6.4 12.2 11.4 4.8 3.4 8.5 39.9 2.0 0.8 3.9 7.0 3.9 3.9 0.8
7/7/1991 13.3 24.5 14.8 6.4 5.4 12.0 39.7 11.0 11.0 8.4 1.9 3.5 3.3 11.0
7/8/1991 13.0 16.1 19.0 49.9 4.0 48.0 79.8 128.3 58.7 102.1 23.2 20.1 17.3 58.4
7/9/1991 7.6 10.6 8.5 24.3 3.4 14.8 39.2 26.5 24.8 19.8 1.1 2.6 2.0 24.8
7/10/1991 6.0 1.4 11.7 10.5 8.5 11.2 5.4 21.0 28.8 18.6 21.2 34.3 34.6 28.9
7/11/1991 20.6 52.3 12.9 11.2 8.3 12.9 34.1 11.0 4.2 20.9 47.3 43.7 44.5 4.1
7/12/1991 10.5 6.1 11.9 10.7 12.5 23.6 49.8 33.0 12.5 38.5 58.3 63.6 64.4 12.4
7/13/1991 9.9 11.5 19.7 16.0 8.7 20.3 63.1 22.0 23.4 24.9 20.1 1.5 1.0 23.4
7/14/1991 4.1 8.4 2.2 5.8 3.0 2.4 3.1 1.2 19.4 0.9 0.0 0.0 0.0 19.5
7/15/1991 3.3 5.4 10.9 0.2 5.8 3.8 2.7 0.0 0.0 0.4 3.1 5.4 5.5 0.0
7/16/1991 3.9 2.1 4.2 6.2 9.5 7.4 11.3 1.0 24.3 2.4 5.8 4.9 5.0 24.4
7/17/1991 3.4 4.9 7.8 2.6 0.1 2.0 11.2 1.0 8.1 1.5 3.1 3.2 3.2 8.1
7/18/1991 2.6 1.6 2.3 1.7 0.1 4.9 8.4 14.0 14.6 14.4 15.8 16.0 16.0 14.6
7/19/1991 1.9 3.6 3.5 21.4 0.2 2.9 15.6 2.0 13.4 1.5 0.0 0.1 0.0 13.5
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/20/1991 2.0 0.9 8.8 23.5 3.1 3.8 8.6 3.0 14.4 2.5 1.9 3.4 3.4 14.4
7/21/1991 4.6 5.1 10.3 4.1 7.9 5.6 2.8 2.1 8.6 3.4 7.4 8.0 8.1 8.6
7/22/1991 9.8 3.6 9.9 4.4 5.9 18.1 56.5 23.0 8.7 17.4 0.7 0.6 0.0 8.7
7/23/1991 11.2 9.3 9.6 13.1 15.9 13.8 4.6 14.0 5.3 10.8 3.6 6.5 6.3 5.3
7/24/1991 7.7 8.7 8.9 1.3 5.0 3.8 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/25/1991 9.6 7.7 16.4 7.1 14.9 16.0 9.2 22.0 8.3 19.4 12.2 12.5 12.3 8.3
7/26/1991 3.8 7.8 1.4 2.4 0.0 0.6 0.3 2.3 6.8 1.7 0.0 0.1 0.0 6.9
7/27/1991 1.2 1.7 1.0 5.0 0.4 5.6 36.2 0.0 18.6 0.0 0.0 0.0 0.0 18.7
7/28/1991 3.0 5.8 10.2 4.3 0.2 3.6 15.2 5.5 29.0 10.2 26.4 29.6 30.2 29.1
7/29/1991 2.3 5.2 13.1 1.8 0.2 4.1 11.8 8.5 3.2 12.8 26.7 28.3 28.8 3.2
7/30/1991 4.4 2.5 3.6 3.4 0.0 2.2 0.4 8.0 3.0 11.7 23.7 25.0 25.4 3.0
7/31/1991 11.2 5.8 12.8 5.4 6.0 8.0 3.4 15.0 5.7 14.0 14.0 18.0 18.1 5.7
8/1/1991 11.3 22.5 11.9 3.2 6.2 12.3 40.8 9.5 3.7 7.0 0.0 0.2 0.0 3.7
8/2/1991 6.4 1.0 9.6 3.4 0.4 7.2 33.8 7.3 9.2 9.7 14.0 10.1 10.2 9.2
8/3/1991 1.2 2.6 5.1 1.9 3.0 2.7 6.4 0.0 12.5 0.2 0.5 0.0 0.0 12.6
8/4/1991 1.9 0.1 1.2 2.1 0.2 2.3 13.3 1.0 9.7 1.7 7.9 13.7 14.0 9.7
8/5/1991 2.1 5.8 4.0 1.2 0.1 1.8 8.2 2.0 6.0 1.5 0.0 0.1 0.0 6.0
8/6/1991 1.7 0.6 4.3 0.6 2.1 2.2 6.3 0.0 1.4 0.0 0.0 0.0 0.0 1.4
8/7/1991 6.4 7.6 5.8 9.4 6.7 11.8 21.3 18.0 22.7 21.1 22.7 12.3 12.2 22.7
8/8/1991 3.6 9.2 2.3 2.4 0.3 4.3 24.0 2.0 5.2 1.5 0.0 0.1 0.0 5.2
8/9/1991 14.6 17.9 20.5 8.5 3.3 25.0 25.8 74.0 54.9 72.5 82.9 103.1 103.8 54.8
8/10/1991 10.8 3.3 18.0 0.8 6.1 5.9 9.9 3.0 1.1 2.6 2.4 3.4 3.4 1.1
8/11/1991 4.8 3.8 14.1 6.6 0.1 6.1 8.1 18.2 6.9 14.3 3.9 5.5 5.2 6.9
8/12/1991 4.3 10.2 11.1 1.5 0.1 1.5 6.7 2.0 7.0 1.9 3.4 5.9 6.0 7.1
8/13/1991 5.6 7.9 9.1 0.9 5.9 3.8 0.4 1.0 7.8 2.0 3.0 0.0 0.0 7.9
8/14/1991 8.1 1.3 15.5 10.6 3.1 6.9 10.9 13.0 5.7 9.9 2.3 4.2 4.0 5.6
8/15/1991 13.4 9.4 16.4 19.0 23.0 24.1 19.0 29.3 15.2 27.1 45.3 79.1 80.4 15.1
8/16/1991 6.3 7.4 11.1 12.4 5.2 10.0 21.1 14.2 8.6 28.7 60.2 44.9 45.7 8.6
8/17/1991 3.5 1.9 11.2 4.5 3.1 7.1 11.9 13.4 6.3 9.9 0.0 0.3 0.0 6.3
8/18/1991 5.8 2.9 9.3 9.9 4.2 7.6 17.3 9.5 3.6 7.0 0.0 0.2 0.0 3.6
8/19/1991 2.9 4.6 5.0 2.7 2.3 2.1 3.6 1.0 6.7 1.7 5.6 7.8 8.0 6.7
8/20/1991 1.6 0.2 3.4 12.4 6.8 32.5 86.8 59.0 34.3 50.7 24.1 21.2 20.2 34.2
8/21/1991 6.6 0.4 8.7 3.5 4.5 3.9 1.5 4.0 1.5 3.0 0.0 0.1 0.0 1.5
8/22/1991 5.4 9.5 1.7 0.0 0.0 0.8 0.0 3.0 1.1 2.7 1.1 0.1 0.0 1.1
8/23/1991 2.4 6.9 0.4 0.9 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
8/24/1991 3.2 8.7 1.5 0.9 0.0 0.0 0.4 0.0 8.0 0.0 0.0 0.0 0.0 8.0
8/25/1991 3.9 4.2 3.6 15.8 0.6 9.4 47.2 7.4 2.8 12.5 18.0 5.1 5.0 2.8
8/26/1991 0.8 0.1 0.2 2.3 0.3 5.6 20.3 9.3 9.7 8.2 3.0 0.2 0.0 9.7
8/27/1991 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/28/1991 2.1 7.6 0.0 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/1991 2.8 6.9 2.1 6.5 0.6 7.2 45.4 0.0 3.3 0.0 0.0 0.0 0.0 3.3
8/30/1991 11.0 4.7 15.3 1.4 6.6 6.6 17.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/31/1991 8.4 2.1 6.8 2.6 11.8 15.5 33.1 13.4 5.1 12.8 23.7 41.3 42.0 5.0
9/1/1991 6.5 7.2 5.7 0.9 12.0 13.5 10.8 18.0 6.8 22.0 22.9 7.8 7.5 6.8
9/2/1991 1.5 0.6 4.2 0.0 3.5 6.8 0.0 18.0 6.8 15.5 6.4 3.8 3.4 6.8
9/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 6.9 11.0 11.3 0.0
9/4/1991 1.2 3.0 26.5 14.5 2.4 15.2 33.4 33.3 12.6 33.2 22.3 7.7 7.0 12.5
9/5/1991 6.8 8.9 7.7 1.7 3.0 2.7 4.9 1.2 12.1 1.5 2.5 2.6 2.6 12.2
9/6/1991 5.9 1.5 6.5 1.1 9.3 6.4 0.5 3.3 10.6 6.2 13.8 12.3 12.5 10.7
9/7/1991 7.9 10.9 11.0 15.7 4.9 13.1 37.3 17.3 6.6 16.5 8.6 1.3 0.9 6.5
9/8/1991 17.4 20.1 10.9 3.4 6.1 14.3 10.8 34.4 13.1 30.9 24.7 30.1 30.0 13.0
9/9/1991 9.2 3.1 23.1 45.3 16.8 24.7 3.3 55.0 42.6 41.5 6.4 12.4 11.3 42.5
9/10/1991 2.2 0.4 3.2 1.6 2.2 5.2 19.9 3.5 2.0 5.3 6.1 0.1 0.0 1.9
9/11/1991 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
9/12/1991 0.7 2.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.2 9.1 9.3 0.0
9/13/1991 1.8 6.9 0.4 0.6 0.0 0.0 0.3 0.0 5.3 0.0 0.0 0.0 0.0 5.3
9/14/1991 3.7 8.1 3.1 1.0 1.7 3.0 13.3 0.0 0.0 0.9 7.5 13.0 13.3 0.0
9/15/1991 7.3 2.7 16.4 0.0 3.0 1.8 0.0 0.0 0.0 0.5 2.6 3.4 3.5 0.0
9/16/1991 6.3 7.9 10.1 1.7 3.8 5.6 21.9 0.0 0.0 2.6 18.5 29.7 30.5 0.0
9/17/1991 1.6 1.6 2.4 0.2 2.5 1.8 2.4 0.0 0.0 0.6 1.7 1.0 1.0 0.0
9/18/1991 1.8 0.4 0.7 2.7 0.9 6.2 34.2 2.0 0.8 1.9 0.8 0.1 0.0 0.8
9/19/1991 0.0 0.2 1.8 0.6 0.1 1.3 8.1 0.0 0.0 0.1 0.7 1.2 1.2 0.0
9/20/1991 0.7 2.8 2.5 3.7 0.6 7.2 45.7 0.0 0.8 1.3 9.5 15.6 16.0 0.8
9/21/1991 1.3 4.3 0.2 3.2 0.2 2.3 13.8 1.0 19.3 1.3 1.3 0.0 0.0 19.3
9/22/1991 1.5 1.5 2.2 12.0 0.3 9.8 22.4 24.0 9.1 18.8 2.2 0.6 0.0 9.0
9/23/1991 2.0 5.2 0.5 0.6 0.3 0.2 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
9/24/1991 1.0 0.7 6.7 20.0 0.2 8.3 15.7 22.0 8.3 16.3 0.0 0.6 0.0 8.3
9/25/1991 3.8 8.5 1.1 4.5 3.4 3.6 3.0 4.3 1.6 3.2 0.0 0.1 0.0 1.6
9/26/1991 5.1 0.8 6.6 3.9 0.2 3.2 20.6 0.5 20.1 0.7 2.9 5.1 5.2 20.2
9/27/1991 14.2 20.1 7.8 19.5 20.3 34.9 10.1 81.4 30.9 69.7 23.1 6.1 4.2 30.6
9/28/1991 0.0 0.0 0.0 0.0 0.0 2.7 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
9/29/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 12.1 21.0 21.5 0.0
9/30/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.1 7.1 7.3 0.0
10/1/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 3.9 6.8 7.0 0.0
10/2/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1991 0.0 0.2 0.2 0.9 0.2 1.9 12.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
10/4/1991 1.5 0.2 0.4 0.0 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/5/1991 0.0 0.0 0.0 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
10/6/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1991 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
10/9/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1991 1.8 6.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1991 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1991 2.1 0.3 2.6 1.3 0.0 0.0 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.3
10/15/1991 5.9 2.2 6.0 0.0 5.3 4.2 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
10/16/1991 5.3 10.3 2.5 0.9 3.9 4.0 10.9 0.0 0.0 0.3 0.6 0.0 0.0 0.0
10/17/1991 0.2 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1991 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1991 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
11/15/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
11/19/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1991 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1991 0.1 0.1 0.3 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1991 1.6 0.0 0.1 0.0 0.4 0.8 0.0 2.0 0.8 1.7 1.6 2.9 2.9 0.8
11/25/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1991 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
11/28/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1991 0.0 0.0 0.0 0.3 0.0 0.0 0.2 0.0 2.9 0.0 0.0 0.0 0.0 2.9
12/6/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1991 0.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1991 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/21/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1991 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1991 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1991 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1992 6.1 0.9 6.3 23.5 4.8 10.2 3.9 26.0 19.2 24.9 18.7 14.8 14.5 19.1
1/2/1992 21.8 1.7 30.0 42.0 28.6 20.4 14.0 5.0 1.9 9.3 19.8 17.2 17.5 1.9
1/3/1992 12.7 24.0 17.3 1.9 28.3 29.0 19.7 35.5 13.5 31.7 18.7 16.0 15.5 13.4
1/4/1992 8.6 4.6 3.9 23.0 2.0 5.6 0.0 17.0 6.5 13.8 10.1 17.9 17.9 6.4
1/5/1992 1.7 0.9 2.6 6.5 2.6 4.2 18.0 0.0 0.0 2.1 4.9 0.0 0.0 0.0
1/6/1992 0.3 1.2 0.0 0.5 0.0 0.0 0.2 0.0 3.8 0.0 0.0 0.0 0.0 3.8
1/7/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1992 0.0 0.0 0.0 2.2 0.0 0.0 1.0 0.0 18.9 0.0 0.0 0.0 0.0 19.0
1/9/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1992 2.5 0.9 1.1 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1992 0.7 0.0 0.0 0.0 0.0 0.4 0.0 1.5 0.6 1.1 0.0 0.0 0.0 0.6
1/12/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1992 3.3 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.8 0.0 0.0 0.0 0.0 3.8
1/15/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1992 1.4 3.8 0.5 0.0 0.0 2.9 0.0 11.0 4.2 8.4 1.8 3.4 3.2 4.1
1/17/1992 1.6 0.4 1.5 3.7 3.6 4.0 12.1 0.0 0.0 0.8 1.9 0.0 0.0 0.0
1/18/1992 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.3
1/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1992 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.8 0.0 0.0 0.0 0.0 3.8
1/25/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1992 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 11.3 0.0 0.0 0.0 0.0 11.4
1/31/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1992 1.6 6.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1992 2.4 1.2 10.7 6.0 8.7 5.2 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
2/7/1992 0.0 0.0 0.0 0.0 0.0 2.9 0.0 11.0 4.2 8.2 0.0 0.3 0.0 4.2
2/8/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1992 0.3 0.2 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1992 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1992 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1992 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1992 6.7 15.5 1.4 13.2 2.0 4.6 0.0 13.0 4.9 10.1 4.1 7.3 7.2 4.9
2/14/1992 11.0 3.9 20.9 12.8 41.5 27.2 0.0 10.0 3.8 10.6 11.0 9.0 9.0 3.8
2/15/1992 0.0 0.0 0.0 2.3 0.1 1.3 8.8 0.0 13.7 0.0 0.0 0.0 0.0 13.7
2/16/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1992 0.6 2.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1992 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1992 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.7
2/23/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1992 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1992 8.4 25.2 3.2 9.0 4.0 6.2 5.9 11.0 4.2 10.5 8.2 7.1 7.0 4.1
2/29/1992 12.1 4.7 21.6 37.0 35.9 35.7 27.3 39.5 15.0 40.9 42.8 40.0 40.0 14.9
3/1/1992 0.2 0.1 0.8 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1992 4.6 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1992 0.1 0.1 0.5 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
3/5/1992 8.1 13.6 6.5 8.8 0.0 0.3 0.1 1.0 2.9 0.7 0.0 0.0 0.0 2.9
3/6/1992 10.5 2.8 16.8 11.9 12.0 12.3 15.1 12.0 31.1 13.7 14.8 9.5 9.4 31.2
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/7/1992 11.8 15.7 12.6 0.4 32.2 24.4 5.2 17.5 6.6 16.0 12.9 15.0 14.9 6.6
3/8/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1992 2.4 4.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1992 1.1 1.2 2.2 0.0 3.5 2.1 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0
3/11/1992 0.0 0.1 0.8 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
3/12/1992 0.0 0.0 0.0 3.0 0.0 0.0 1.3 0.0 25.0 0.0 0.0 0.0 0.0 25.1
3/13/1992 4.6 0.0 6.4 0.0 19.8 11.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1992 13.4 0.3 16.0 3.7 26.7 15.8 1.6 0.0 31.0 2.7 6.2 0.0 0.0 31.2
3/15/1992 20.3 42.9 16.3 19.1 0.0 3.9 0.2 15.0 8.8 16.0 14.1 7.2 7.0 8.8
3/16/1992 0.7 3.1 2.8 0.3 0.0 6.8 3.3 24.0 9.1 19.0 10.3 18.3 18.2 9.0
3/17/1992 0.0 0.0 0.0 0.6 0.1 1.3 8.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1992 2.9 0.2 4.1 0.5 0.0 0.0 0.2 0.0 3.8 0.0 0.0 0.0 0.0 3.8
3/24/1992 31.1 52.6 25.4 1.7 20.5 19.7 16.0 20.0 11.2 24.6 31.8 23.4 23.5 11.1
3/25/1992 17.8 8.1 21.4 3.6 39.7 32.8 18.6 25.3 28.5 21.5 17.1 26.5 26.5 28.5
3/26/1992 1.1 0.3 1.7 1.6 4.5 2.9 2.1 0.0 12.5 0.3 0.6 0.0 0.0 12.6
3/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1992 1.1 0.0 0.0 22.1 0.0 5.3 0.0 20.0 7.6 14.8 0.0 0.5 0.0 7.5
3/31/1992 2.2 0.8 0.0 40.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1992 4.6 7.8 5.5 0.4 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1992 1.8 0.6 0.5 23.4 0.0 0.5 3.4 0.0 0.0 0.8 6.5 11.2 11.5 0.0
4/3/1992 0.3 0.0 0.0 5.7 0.0 0.0 0.1 0.0 1.3 0.0 0.0 0.0 0.0 1.3
4/4/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1992 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1992 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1992 4.4 0.5 8.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1992 21.7 30.6 24.8 1.2 10.1 13.9 16.0 21.0 8.0 21.4 18.8 13.9 13.7 7.9
4/11/1992 10.1 2.0 12.6 1.2 31.8 26.3 15.9 19.3 7.3 17.7 13.3 13.6 13.5 7.3
4/12/1992 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
4/13/1992 1.6 5.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1992 3.5 3.0 3.2 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1992 9.9 10.5 9.2 3.7 9.4 6.1 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
4/16/1992 11.1 8.8 9.3 30.3 10.0 6.8 6.3 0.0 0.0 0.6 1.4 0.0 0.0 0.0
4/17/1992 3.4 0.0 3.4 0.0 10.4 7.5 0.0 5.0 1.9 8.7 14.5 7.4 7.5 1.9
4/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1992 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
4/20/1992 0.0 0.0 0.0 2.2 0.0 0.0 1.0 0.0 18.6 0.0 0.0 0.0 0.0 18.7
4/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1992 0.5 0.9 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1992 6.2 13.2 4.2 2.7 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
4/25/1992 3.4 0.7 3.0 0.0 7.3 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1992 3.1 11.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1992 17.8 17.1 13.6 21.6 5.3 3.2 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
5/4/1992 13.1 3.5 14.5 3.1 35.1 26.9 12.9 16.5 24.9 17.2 17.0 13.6 13.5 25.0
5/5/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1992 1.9 2.5 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1992 0.5 0.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1992 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1992 1.7 0.5 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1992 0.2 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1992 0.8 2.2 0.0 3.8 0.0 0.5 0.2 2.0 3.9 1.5 0.0 0.1 0.0 3.9
5/18/1992 9.2 14.7 6.5 26.9 3.0 2.0 1.0 1.0 19.1 0.7 0.0 0.0 0.0 19.2
5/19/1992 6.7 2.7 13.5 0.6 12.9 8.9 5.1 2.0 2.6 2.9 3.2 0.1 0.0 2.6
5/20/1992 2.9 3.7 10.0 0.1 0.0 0.6 0.0 2.3 1.5 1.7 0.0 0.1 0.0 1.5
5/21/1992 1.6 1.3 1.7 3.0 3.5 7.8 38.5 0.0 0.0 4.0 33.8 58.5 60.0 0.0
5/22/1992 2.0 3.6 1.3 4.4 0.5 3.2 1.1 11.0 24.7 8.2 0.0 0.3 0.0 24.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/23/1992 6.0 3.8 4.0 25.3 1.5 4.3 0.0 13.0 4.9 10.5 3.9 5.2 5.0 4.9
5/24/1992 6.4 0.7 5.5 0.3 14.9 13.1 4.1 14.0 5.3 12.0 7.2 8.4 8.3 5.3
5/25/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1992 1.0 1.7 0.7 3.0 0.0 0.3 0.6 1.0 10.9 0.7 0.0 0.0 0.0 11.0
5/27/1992 0.4 0.2 0.7 0.4 1.6 0.9 0.0 0.0 0.0 5.5 14.0 3.4 3.5 0.0
5/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1992 4.3 5.7 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1992 3.1 2.5 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1992 1.1 1.4 0.5 0.1 1.5 1.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1992 2.8 7.6 0.3 0.0 0.0 0.5 0.0 2.0 0.8 2.0 1.2 0.1 0.0 0.8
6/3/1992 0.0 0.2 0.1 0.1 0.0 0.3 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1992 3.3 10.2 0.4 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1992 3.0 10.0 1.2 0.4 0.1 1.1 5.2 1.0 0.4 2.6 10.5 14.7 15.0 0.4
6/6/1992 2.2 1.1 1.5 0.1 0.0 6.4 0.9 24.0 9.1 20.6 7.2 2.3 1.7 9.0
6/7/1992 12.5 21.9 11.2 1.8 0.0 0.5 0.8 2.0 16.0 1.5 0.1 0.1 0.0 16.0
6/8/1992 8.4 18.6 11.9 1.9 2.2 13.0 20.8 32.5 12.3 32.7 60.7 98.6 100.3 12.2
6/9/1992 4.3 7.7 2.7 11.1 7.4 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1992 5.2 11.9 7.2 3.4 0.5 6.8 43.0 0.0 0.0 1.3 9.1 14.6 15.0 0.0
6/11/1992 7.5 9.4 8.8 6.5 9.5 7.2 5.7 3.0 7.7 5.4 7.5 0.4 0.3 7.7
6/12/1992 11.4 2.6 16.1 7.5 16.9 15.6 14.0 15.0 61.9 15.9 10.9 0.6 0.2 62.1
6/13/1992 14.2 4.8 12.5 9.4 19.0 23.0 20.6 35.0 81.7 45.7 54.0 22.2 21.9 81.9
6/14/1992 2.1 4.6 8.8 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/15/1992 0.8 1.4 2.3 0.0 0.0 2.9 0.0 11.0 4.2 9.7 3.4 0.3 0.0 4.1
6/16/1992 1.6 1.3 9.1 1.1 6.5 4.8 6.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
6/17/1992 0.0 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1992 3.7 1.4 1.0 6.5 0.4 15.7 31.7 41.0 20.7 39.3 29.8 23.8 23.4 20.6
6/19/1992 1.6 3.6 2.6 2.8 0.2 3.7 13.7 6.0 2.3 4.6 0.9 1.6 1.5 2.3
6/20/1992 1.3 5.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/1992 0.1 0.5 0.5 0.1 0.0 0.3 0.0 1.0 1.0 0.7 0.0 0.0 0.0 1.0
6/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1992 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1992 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1992 0.4 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/1992 1.1 0.9 9.2 0.0 0.0 1.9 0.0 7.3 2.8 5.4 0.0 0.2 0.0 2.8
6/28/1992 2.1 0.9 10.1 0.9 3.6 5.4 11.0 6.1 2.3 8.3 19.6 26.0 26.5 2.3
6/29/1992 0.5 1.8 0.8 2.3 0.4 5.9 29.2 5.0 1.9 5.2 4.2 2.0 1.9 1.9
6/30/1992 1.4 0.8 2.1 0.7 3.1 3.9 8.5 3.0 1.1 4.6 8.8 7.9 8.0 1.1
7/1/1992 11.7 36.2 6.4 3.4 0.5 16.0 38.4 38.0 18.3 36.9 43.4 56.6 57.1 18.2
7/2/1992 1.6 3.4 7.6 0.8 0.0 0.2 1.6 0.0 6.3 1.4 3.1 0.0 0.0 6.3
7/3/1992 1.3 1.4 2.3 0.0 1.5 4.0 0.0 12.0 4.6 13.5 10.6 0.3 0.0 4.5
7/4/1992 2.3 0.7 2.9 8.1 4.0 6.7 6.2 13.0 4.9 9.6 0.0 0.3 0.0 4.9
7/5/1992 2.3 6.6 2.7 2.8 0.2 2.4 15.8 0.0 13.9 6.3 34.8 48.7 49.9 14.0
7/6/1992 4.8 2.0 5.7 26.4 13.0 22.1 11.0 49.2 41.0 40.3 10.6 5.8 4.7 41.0
7/7/1992 1.9 4.1 4.4 10.1 1.0 8.9 5.4 29.1 35.9 21.6 0.0 0.7 0.0 36.0
7/8/1992 3.6 1.1 5.4 5.6 9.5 7.3 6.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
7/9/1992 0.7 1.3 1.4 0.7 1.0 3.0 0.3 9.0 9.6 17.1 39.6 37.8 38.5 9.6
7/10/1992 0.7 1.8 0.0 0.5 0.1 1.0 6.0 0.0 0.0 0.8 3.1 3.1 3.2 0.0
7/11/1992 1.7 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/12/1992 0.4 0.8 0.2 0.1 0.0 0.8 0.0 3.0 1.8 2.9 1.5 0.1 0.0 1.8
7/13/1992 3.3 5.9 8.0 1.9 1.2 4.7 19.2 4.2 5.4 3.4 1.5 2.1 2.0 5.4
7/14/1992 2.1 2.6 3.1 0.8 0.1 2.4 10.1 3.1 1.2 2.9 2.8 3.5 3.5 1.2
7/15/1992 0.0 0.8 7.6 0.0 0.0 0.3 0.0 1.0 0.4 0.9 1.6 2.8 2.8 0.4
7/16/1992 6.1 5.9 5.4 0.3 0.1 5.2 4.2 17.2 6.5 22.0 21.0 0.4 0.0 6.5
7/17/1992 8.6 12.0 7.4 11.6 0.5 7.5 39.1 5.0 1.9 14.5 37.3 30.4 31.0 1.9
7/18/1992 3.8 11.5 9.4 6.0 1.5 12.2 40.6 20.0 17.0 16.0 6.6 9.8 9.5 17.0
7/19/1992 13.3 30.6 13.6 1.1 1.2 3.9 14.2 4.0 1.5 3.0 0.0 0.1 0.0 1.5
7/20/1992 9.4 17.6 9.0 3.2 2.5 10.0 37.7 11.0 6.7 15.5 22.8 14.9 15.0 6.7
7/21/1992 5.6 4.2 4.5 2.0 2.6 6.1 10.1 12.0 15.1 12.2 13.9 15.4 15.5 15.1
7/22/1992 6.3 2.7 6.8 11.9 7.6 18.6 15.2 45.0 21.4 37.9 11.1 2.6 1.5 21.3
7/23/1992 7.7 15.0 4.3 14.3 2.7 5.3 19.9 3.0 8.8 3.3 2.4 0.1 0.0 8.8
7/24/1992 4.0 10.3 3.8 4.1 0.6 9.3 49.2 6.0 4.3 5.4 2.1 0.2 0.0 4.3
7/25/1992 4.5 10.9 5.9 0.6 2.0 1.2 0.3 0.0 5.3 0.1 0.2 0.0 0.0 5.3
7/26/1992 18.4 10.7 23.4 3.4 10.3 13.4 34.7 8.0 9.4 18.2 46.2 43.4 44.3 9.4
7/27/1992 4.2 4.2 4.3 3.9 4.5 12.8 40.2 16.0 13.0 14.2 10.0 11.6 11.5 12.9
7/28/1992 2.9 6.9 7.4 1.2 0.2 2.5 15.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/29/1992 3.2 5.2 9.2 5.1 2.5 3.0 0.0 6.0 2.3 4.5 0.4 0.8 0.7 2.3
7/30/1992 5.9 15.9 10.3 0.3 4.0 7.6 3.3 18.0 6.8 13.8 3.9 7.3 7.0 6.8
7/31/1992 7.1 17.1 3.5 0.7 2.1 2.9 6.3 3.0 3.0 2.6 2.8 5.0 5.0 3.0
8/1/1992 6.8 16.5 3.1 1.9 0.2 4.3 12.4 9.0 11.6 8.6 8.2 9.0 9.0 11.6
8/2/1992 2.7 10.4 3.0 0.1 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/3/1992 3.5 12.6 1.6 2.0 0.2 2.7 14.0 2.0 0.8 3.1 3.6 0.1 0.0 0.8
8/4/1992 8.0 21.5 7.8 4.0 4.0 7.7 3.7 18.3 16.3 14.4 6.6 11.9 11.7 16.2
8/5/1992 13.8 42.6 9.1 8.8 4.2 11.5 23.0 21.1 13.8 21.6 13.5 0.5 0.0 13.7
8/6/1992 5.3 6.2 4.7 8.7 6.6 9.3 23.8 7.2 10.8 7.6 5.1 0.2 0.0 10.8
8/7/1992 8.9 10.6 10.6 3.3 1.3 6.3 26.3 6.2 9.3 5.0 0.9 0.2 0.0 9.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/8/1992 6.2 14.2 5.9 3.8 2.5 12.9 38.3 22.0 15.8 27.5 31.4 14.5 14.3 15.8
8/9/1992 9.7 13.7 10.5 39.3 12.4 27.0 4.4 72.5 33.1 65.5 47.3 50.6 50.0 32.9
8/10/1992 3.5 3.3 9.3 1.8 9.5 7.1 10.5 0.0 8.1 7.2 19.3 6.8 7.0 8.2
8/11/1992 0.6 2.0 4.8 0.0 1.0 3.3 0.0 10.2 3.9 7.6 0.0 0.3 0.0 3.8
8/12/1992 0.5 2.2 4.2 0.1 0.0 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/13/1992 0.0 0.2 1.7 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
8/14/1992 0.8 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/15/1992 3.0 2.6 3.3 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
8/16/1992 9.5 13.6 21.6 0.4 4.0 2.3 0.2 0.0 3.7 3.7 8.4 0.0 0.0 3.7
8/17/1992 15.4 28.8 14.0 13.9 3.0 4.5 2.4 9.0 4.0 12.2 20.1 17.8 18.0 4.0
8/18/1992 19.4 35.5 17.0 4.5 3.2 11.7 19.1 26.4 12.7 24.0 18.6 21.1 21.0 12.6
8/19/1992 16.1 14.6 22.0 13.3 17.3 15.8 37.3 0.0 5.6 3.5 12.1 10.0 10.3 5.6
8/20/1992 6.8 6.1 13.4 0.4 8.5 8.7 5.0 11.0 4.2 11.4 8.1 1.7 1.5 4.1
8/21/1992 20.7 38.8 17.8 0.0 0.0 10.2 0.0 39.0 14.8 30.6 5.9 5.6 4.7 14.7
8/22/1992 20.0 18.0 17.7 3.6 31.6 19.2 0.1 2.0 2.0 1.5 0.0 0.1 0.0 2.0
8/23/1992 6.6 6.1 8.6 0.3 0.1 0.6 4.1 0.0 0.0 0.1 0.1 0.0 0.0 0.0
8/24/1992 2.5 0.7 1.3 8.4 0.0 3.7 0.3 14.0 11.5 10.7 0.8 0.4 0.0 11.5
8/25/1992 1.1 0.1 1.1 0.5 0.0 0.8 1.6 2.0 3.9 2.9 11.5 19.7 20.1 3.9
8/26/1992 0.6 0.4 0.9 1.5 0.1 1.1 5.7 1.0 9.9 3.4 6.0 0.0 0.0 9.9
8/27/1992 3.7 5.9 2.4 1.0 0.0 2.4 0.4 9.0 11.6 6.8 0.4 0.2 0.0 11.6
8/28/1992 11.2 20.7 14.5 13.1 10.9 19.1 5.8 45.2 27.1 35.9 9.7 11.1 10.2 27.1
8/29/1992 11.3 13.3 13.6 0.3 1.0 1.6 1.6 3.0 3.0 2.6 0.8 0.1 0.0 3.0
8/30/1992 16.0 24.5 12.0 10.0 6.1 8.1 14.3 9.0 6.5 10.6 13.2 10.5 10.5 6.5
8/31/1992 11.8 18.6 13.6 9.1 10.6 19.6 59.9 16.2 6.1 22.9 35.1 24.5 24.7 6.1
9/1/1992 8.1 11.7 4.9 7.5 7.4 14.8 36.0 19.0 7.2 15.8 3.8 0.5 0.0 7.2
9/2/1992 4.2 8.0 2.2 2.6 5.7 9.1 21.0 10.0 11.9 8.0 1.4 0.3 0.0 11.9
9/3/1992 0.0 0.4 3.6 1.4 0.0 4.7 0.6 18.0 18.7 13.3 0.0 0.5 0.0 18.7
9/4/1992 1.2 4.6 1.3 1.5 0.0 5.8 0.7 22.0 21.4 16.6 2.3 4.5 4.1 21.4
9/5/1992 1.8 7.2 5.5 0.8 0.1 8.1 9.9 25.0 9.5 19.0 1.9 2.6 2.0 9.4
9/6/1992 2.2 4.4 3.1 0.9 0.2 4.0 11.8 8.1 3.1 8.0 13.0 20.2 20.5 3.1
9/7/1992 8.5 14.3 7.4 3.6 7.3 12.4 34.6 11.1 11.7 12.1 10.0 3.2 3.0 11.7
9/8/1992 9.0 17.8 10.2 0.5 9.9 8.5 0.2 10.2 8.3 8.5 5.6 8.4 8.4 8.3
9/9/1992 1.1 1.7 6.4 1.4 0.1 7.1 6.7 23.2 16.3 17.3 0.2 0.6 0.0 16.2
9/10/1992 0.0 0.2 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/1992 0.2 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1992 0.9 3.3 1.5 0.4 0.1 0.8 5.1 0.0 0.0 1.0 2.3 0.0 0.0 0.0
9/13/1992 0.9 1.2 3.8 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
9/14/1992 1.6 2.4 3.1 0.7 0.1 1.4 8.9 0.0 0.0 1.0 6.1 9.1 9.3 0.0
9/15/1992 5.2 18.5 4.8 1.6 0.3 3.1 19.8 0.0 0.0 0.7 2.2 1.2 1.2 0.0
9/16/1992 4.3 4.8 2.4 10.5 0.4 5.4 34.1 0.0 0.0 0.6 3.8 5.6 5.7 0.0
9/17/1992 5.3 9.9 11.6 1.1 0.2 2.2 13.8 0.0 0.0 1.5 7.2 9.1 9.3 0.0
9/18/1992 0.2 0.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1992 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1992 0.5 1.8 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1992 1.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/24/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.7 0.0 0.0 0.0
10/30/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1992 0.6 2.4 0.8 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.0 0.0 0.0 0.2
11/10/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1992 0.8 1.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1992 3.2 4.1 7.1 4.4 0.4 0.5 1.3 0.1 0.0 1.0 2.8 1.9 1.9 0.0
11/13/1992 3.4 1.1 3.9 0.3 3.2 2.5 4.0 0.0 0.0 1.5 4.6 2.7 2.8 0.0
11/14/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1992 0.6 0.9 0.5 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1992 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1992 6.1 9.4 5.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1992 7.9 6.4 8.1 1.2 15.0 11.3 16.0 0.0 0.0 6.7 25.6 24.9 25.5 0.0
12/27/1992 17.0 2.0 9.0 1.7 8.2 8.2 22.2 0.0 0.0 3.0 13.0 14.6 15.0 0.0
12/28/1992 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1992 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/9/1993 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1993 3.5 9.2 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1993 11.7 11.6 12.6 3.7 16.4 11.2 5.0 3.0 7.5 3.5 4.0 2.5 2.5 7.5
1/13/1993 7.0 1.9 7.4 22.6 16.0 19.3 14.0 30.1 35.8 33.9 36.5 24.6 24.5 35.8
1/14/1993 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1993 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
1/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1993 0.0 0.5 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1993 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1993 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1993 0.0 0.0 0.0 0.1 0.0 0.3 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1993 0.0 0.8 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1993 1.2 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1993 5.9 3.9 5.3 0.4 2.0 1.2 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
1/30/1993 9.4 10.9 9.0 7.2 12.9 10.2 6.5 6.0 8.0 5.4 2.5 1.0 0.9 8.0
1/31/1993 12.6 11.0 12.6 3.3 9.9 7.4 5.5 3.0 9.2 3.5 4.0 2.6 2.6 9.2
2/1/1993 10.5 1.7 10.9 25.6 29.4 25.8 21.5 20.0 22.0 20.6 19.1 14.6 14.5 22.0
2/2/1993 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
2/4/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1993 1.8 0.3 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1993 7.0 2.1 14.5 3.4 26.5 25.5 25.7 23.1 20.7 24.2 24.9 21.3 21.3 20.7
2/9/1993 0.7 0.0 0.0 14.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1993 1.8 0.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1993 1.7 1.1 2.6 0.2 6.2 4.0 2.3 0.0 0.0 1.1 3.7 2.9 3.0 0.0
2/15/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1993 0.0 0.0 0.0 0.0 0.0 8.0 0.0 30.3 11.5 22.5 0.0 0.8 0.0 11.4
2/19/1993 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.1 1.2 2.3 0.0 0.1 0.0 1.2
2/20/1993 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1993 0.7 2.8 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1993 0.4 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
3/15/1993 4.0 7.8 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1993 3.8 2.0 4.3 0.0 10.4 6.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1993 0.5 0.3 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1993 4.4 5.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1993 2.6 0.9 3.3 4.7 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1993 1.7 2.4 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1993 6.7 7.3 4.6 3.2 2.0 1.2 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
3/26/1993 2.3 1.1 3.3 3.9 6.9 4.1 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/27/1993 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1993 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1993 0.3 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1993 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.7 0.0 0.0 0.0
4/4/1993 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1993 0.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1993 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1993 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1993 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1993 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1993 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1993 0.7 2.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1993 1.5 5.3 2.9 2.5 0.4 5.1 32.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1993 7.2 13.7 6.4 0.4 0.1 15.5 5.0 56.0 21.2 41.9 3.4 7.2 6.0 21.1
5/2/1993 7.7 8.9 8.7 4.3 13.7 20.0 25.6 31.2 24.3 31.5 29.6 25.6 25.5 24.2
5/3/1993 2.5 2.4 3.7 1.4 3.0 2.6 1.1 3.0 12.4 2.3 0.2 0.5 0.4 12.5
5/4/1993 1.7 0.0 1.1 9.7 3.5 3.6 1.8 5.0 9.4 5.6 4.4 0.3 0.2 9.4
5/5/1993 0.1 0.0 0.2 0.1 0.0 1.7 0.6 6.0 2.3 6.1 3.8 0.2 0.0 2.3
5/6/1993 0.6 0.5 4.6 9.4 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
5/7/1993 2.1 0.7 3.0 1.8 7.4 4.4 0.8 0.0 14.9 1.7 5.8 4.6 4.7 15.0
5/8/1993 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
5/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1993 0.2 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1993 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1993 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1993 1.2 0.8 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1993 2.8 0.5 3.2 4.3 8.3 4.9 0.0 0.1 0.0 6.1 17.9 10.1 10.3 0.0
5/17/1993 8.6 30.1 0.2 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
5/18/1993 2.1 4.2 0.4 12.8 0.0 1.3 0.0 5.1 1.9 3.8 0.0 0.1 0.0 1.9
5/19/1993 1.7 0.0 2.2 4.0 6.9 12.1 1.0 30.3 30.7 22.5 0.0 0.8 0.0 30.7
5/20/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1993 2.6 0.2 3.7 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
5/23/1993 5.5 8.9 7.6 2.6 11.9 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1993 0.4 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1993 2.0 3.4 1.6 0.1 1.0 0.8 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1993 5.4 5.4 7.8 3.5 8.4 10.3 35.9 0.0 5.7 5.6 18.9 14.7 15.1 5.7
5/27/1993 3.3 5.1 3.8 4.8 0.1 1.8 12.1 0.0 11.2 3.6 12.7 10.6 10.9 11.2
5/28/1993 6.4 4.9 2.4 1.0 0.0 0.0 0.5 0.0 8.8 0.9 4.5 5.9 6.0 8.8
5/29/1993 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1993 0.9 0.0 1.7 0.9 4.1 4.2 12.0 0.0 0.0 0.4 3.0 5.2 5.3 0.0
5/31/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1993 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1993 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1993 0.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1993 0.8 1.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1993 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1993 1.8 4.2 0.0 1.3 0.0 0.0 0.6 0.0 11.3 0.0 0.0 0.0 0.0 11.4
6/9/1993 3.1 4.3 2.8 1.0 0.0 0.0 0.5 0.0 8.7 0.0 0.0 0.0 0.0 8.7
6/10/1993 5.0 1.2 10.1 0.0 12.8 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1993 6.0 5.4 8.0 0.0 11.4 8.2 0.0 5.5 2.1 6.1 4.5 0.1 0.0 2.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/12/1993 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1993 0.0 0.0 0.0 0.0 0.0 6.4 0.0 24.4 9.3 18.1 0.0 0.6 0.0 9.2
6/14/1993 0.7 0.3 3.0 0.0 0.0 0.5 0.0 2.0 0.8 1.7 2.1 3.7 3.7 0.8
6/15/1993 1.0 2.1 1.2 0.3 2.0 2.1 4.4 1.0 0.4 2.6 4.3 0.0 0.0 0.4
6/16/1993 0.9 2.0 0.0 0.0 0.0 0.8 0.0 3.1 1.2 2.3 0.0 0.1 0.0 1.2
6/17/1993 0.0 0.0 0.0 0.2 0.0 0.4 2.3 0.0 0.0 2.5 10.4 11.0 11.3 0.0
6/18/1993 0.0 0.0 0.0 1.7 0.3 3.4 21.5 0.0 0.0 8.8 30.1 23.9 24.5 0.0
6/19/1993 4.0 3.1 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/1993 3.6 3.0 8.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/1993 3.5 12.0 3.7 1.1 0.2 2.2 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1993 4.9 7.3 11.6 0.9 8.6 7.7 12.0 3.1 1.2 2.3 0.0 0.1 0.0 1.2
6/23/1993 3.1 1.4 1.7 14.3 2.3 6.6 24.6 6.1 6.7 30.6 100.7 98.2 100.5 6.7
6/24/1993 8.4 13.8 6.3 4.5 0.2 2.4 12.8 2.0 16.4 1.5 0.0 0.1 0.0 16.5
6/25/1993 9.9 9.1 9.5 21.5 16.3 16.2 0.1 25.0 11.3 24.9 34.7 48.7 49.3 11.3
6/26/1993 1.8 3.6 2.2 15.3 0.0 0.0 0.0 0.0 0.0 0.6 5.3 9.2 9.4 0.0
6/27/1993 0.1 0.3 2.4 0.0 0.0 14.5 0.0 55.2 20.9 42.9 8.4 10.6 9.5 20.8
6/28/1993 0.0 0.0 0.0 0.9 0.0 4.3 0.4 16.2 13.6 12.3 2.5 4.8 4.5 13.6
6/29/1993 0.5 2.1 2.5 1.0 0.0 3.5 0.4 13.2 13.1 12.9 8.9 4.5 4.3 13.1
6/30/1993 0.3 0.8 0.1 0.2 0.2 0.5 2.3 0.0 0.0 0.5 2.8 3.8 3.9 0.0
7/1/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/2/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/1993 1.5 4.3 0.5 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/4/1993 0.3 0.0 0.2 0.6 0.5 0.3 0.3 0.0 5.1 0.5 3.8 6.5 6.7 5.1
7/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/6/1993 0.3 1.5 2.5 0.0 0.0 3.5 0.0 13.5 5.1 10.0 0.0 0.3 0.0 5.1
7/7/1993 0.0 0.3 2.7 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
7/8/1993 0.0 0.3 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/9/1993 3.1 6.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/10/1993 0.6 1.2 3.9 1.0 1.7 2.9 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/11/1993 2.1 7.2 3.5 0.4 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/12/1993 4.1 7.6 4.8 3.0 0.0 0.0 1.3 0.0 25.5 0.0 0.0 0.0 0.0 25.6
7/13/1993 6.9 12.8 11.2 9.8 5.9 10.7 0.6 27.3 21.5 21.1 2.0 0.7 0.0 21.5
7/14/1993 11.4 18.6 14.5 10.3 0.9 9.9 34.1 16.2 13.7 16.5 15.7 13.4 13.3 13.6
7/15/1993 16.8 32.9 16.1 14.1 19.9 19.7 8.4 25.5 15.3 23.9 11.6 1.3 0.7 15.2
7/16/1993 9.3 5.2 11.7 21.9 19.2 17.9 37.1 3.5 3.8 12.0 42.2 49.8 51.0 3.8
7/17/1993 5.5 0.5 6.9 2.0 0.0 0.8 3.6 1.0 0.4 0.7 0.0 0.0 0.0 0.4
7/18/1993 5.0 13.7 2.0 3.5 0.1 7.5 4.3 26.0 14.8 19.3 0.0 0.7 0.0 14.8
7/19/1993 9.9 10.6 6.6 0.9 0.0 4.8 0.4 18.2 14.5 18.2 15.7 12.4 12.2 14.5
7/20/1993 7.7 4.3 13.1 0.9 11.9 12.5 1.1 20.3 7.7 16.4 3.4 1.3 0.8 7.6
7/21/1993 18.6 52.5 14.5 3.8 1.0 4.0 5.6 10.2 10.7 12.8 16.3 10.5 10.5 10.7
7/22/1993 17.9 33.7 19.1 3.6 13.9 12.9 7.9 13.0 4.9 10.4 1.7 0.3 0.0 4.9
7/23/1993 21.4 27.8 24.4 6.7 23.4 17.1 14.9 4.0 12.8 10.6 40.4 54.7 56.0 12.9
7/24/1993 11.7 7.8 18.0 3.8 21.0 18.1 21.9 9.3 7.3 14.9 21.6 8.3 8.3 7.2
7/25/1993 10.4 14.3 10.3 2.8 0.0 7.6 1.8 28.2 19.4 32.7 27.5 2.4 1.7 19.3
7/26/1993 6.3 15.1 9.8 2.3 0.0 0.4 3.1 0.0 10.6 0.0 0.1 0.0 0.0 10.6
7/27/1993 5.5 7.9 9.3 0.9 3.5 2.1 0.3 0.3 5.1 0.7 4.3 7.5 7.7 5.2
7/28/1993 11.4 22.7 8.7 2.1 0.1 2.5 4.8 7.0 10.1 7.2 6.0 3.6 3.5 10.1
7/29/1993 8.1 13.2 9.4 2.3 0.2 2.1 13.0 0.2 0.2 2.3 9.1 9.8 10.0 0.2
7/30/1993 10.2 22.9 7.3 4.4 7.1 6.5 15.3 0.2 10.8 1.4 3.1 0.7 0.7 10.8
7/31/1993 6.8 15.7 5.0 4.8 1.3 5.1 23.9 3.0 4.9 2.8 1.6 0.9 0.8 4.9
8/1/1993 3.2 12.2 3.0 2.2 0.1 9.4 4.9 33.0 20.7 25.2 1.6 0.9 0.1 20.7
8/2/1993 3.6 0.6 6.2 6.0 0.1 1.8 11.1 0.1 0.7 0.1 0.0 0.0 0.0 0.7
8/3/1993 18.5 27.8 18.7 2.2 9.5 6.9 5.1 2.0 2.0 3.1 13.5 23.5 24.0 2.0
8/4/1993 14.6 30.9 11.7 3.8 0.2 4.4 18.3 6.0 8.0 4.7 0.6 0.2 0.0 8.0
8/5/1993 15.3 23.3 11.3 8.2 1.6 4.9 12.6 8.0 14.2 22.1 56.2 46.0 47.0 14.2
8/6/1993 11.4 10.3 18.4 6.6 4.8 7.9 24.8 5.2 5.8 8.2 14.2 10.4 10.5 5.8
8/7/1993 9.7 3.3 10.8 4.2 16.4 14.4 11.4 11.4 11.3 9.5 5.8 8.6 8.5 11.3
8/8/1993 13.2 20.3 9.2 12.0 0.4 8.1 33.7 10.4 3.9 8.4 5.6 9.7 9.7 3.9
8/9/1993 7.5 10.8 28.2 19.7 15.4 11.5 8.3 4.2 4.1 3.2 0.3 0.3 0.2 4.1
8/10/1993 5.7 6.1 6.0 3.7 11.5 9.6 2.8 9.4 11.6 10.3 7.7 0.2 0.0 11.7
8/11/1993 9.0 7.3 11.4 3.2 5.4 8.7 2.2 20.3 34.5 15.0 0.0 0.5 0.0 34.5
8/12/1993 6.2 6.2 3.3 41.6 6.0 15.9 1.5 47.0 45.8 34.8 0.0 1.2 0.0 45.8
8/13/1993 2.6 6.5 2.4 2.0 0.0 0.8 0.0 3.0 1.1 2.3 0.1 0.1 0.0 1.1
8/14/1993 11.1 28.4 7.8 1.6 0.1 1.4 9.5 0.0 7.5 2.7 6.2 0.0 0.0 7.5
8/15/1993 8.5 3.0 15.7 16.6 20.7 31.9 73.4 33.0 16.9 24.5 0.0 0.8 0.0 16.9
8/16/1993 6.9 8.1 14.6 4.0 0.3 3.9 25.5 0.0 17.4 0.0 0.0 0.0 0.0 17.5
8/17/1993 18.1 20.3 26.6 28.1 15.9 18.6 35.3 15.0 11.3 20.3 36.5 37.4 38.0 11.3
8/18/1993 6.2 10.8 7.7 1.7 4.2 6.3 21.7 2.0 0.8 2.3 1.9 0.2 0.1 0.8
8/19/1993 11.4 31.1 4.2 2.5 0.2 4.4 14.9 8.0 7.4 5.9 0.0 0.2 0.0 7.4
8/20/1993 14.6 35.4 14.8 7.3 2.1 4.1 12.9 4.0 19.0 9.9 15.9 0.1 0.0 19.1
8/21/1993 4.0 8.1 8.4 1.0 2.0 4.7 2.7 12.0 11.4 10.3 12.1 21.3 21.5 11.4
8/22/1993 5.9 5.3 7.3 2.4 0.0 0.5 0.2 2.0 5.1 1.5 0.0 0.1 0.0 5.1
8/23/1993 8.7 23.1 9.1 2.1 0.2 2.9 15.3 2.0 8.3 1.8 0.7 0.1 0.0 8.4
8/24/1993 3.4 12.3 21.6 0.8 2.0 2.4 1.7 4.0 7.2 4.3 11.5 20.0 20.4 7.2
8/25/1993 2.9 3.8 22.4 19.5 0.0 1.0 3.9 2.0 11.9 1.5 0.0 0.1 0.0 12.0
8/26/1993 5.3 12.1 4.7 2.4 1.0 2.3 4.2 4.0 4.7 3.0 0.0 0.1 0.0 4.7
8/27/1993 8.1 18.6 6.0 4.0 4.0 3.8 6.8 2.0 15.7 1.5 0.0 0.1 0.0 15.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/28/1993 9.2 13.3 15.1 1.2 16.4 10.0 1.8 0.1 1.3 0.1 0.0 0.0 0.0 1.3
8/29/1993 13.5 28.2 13.7 1.6 4.7 7.0 12.3 9.0 8.6 11.3 17.2 16.1 16.3 8.6
8/30/1993 6.1 16.5 9.3 2.1 2.6 3.7 15.1 0.0 8.1 0.1 0.3 0.1 0.1 8.1
8/31/1993 5.5 3.0 3.2 10.4 6.0 9.9 3.1 23.1 23.0 18.2 2.4 0.6 0.0 23.0
9/1/1993 4.6 9.6 3.1 0.9 1.5 5.3 12.0 10.0 3.8 8.0 1.6 0.7 0.5 3.8
9/2/1993 4.5 12.4 2.2 0.4 0.1 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/3/1993 2.0 2.3 1.9 0.9 1.5 7.3 12.0 17.4 6.6 14.0 2.7 0.7 0.3 6.6
9/4/1993 7.3 6.9 19.9 3.4 12.4 10.1 14.0 2.4 5.3 1.8 0.0 0.1 0.0 5.3
9/5/1993 3.7 6.2 12.7 2.3 1.2 6.2 20.8 9.1 9.0 10.8 9.3 0.2 0.0 9.0
9/6/1993 1.5 1.1 6.4 2.1 6.2 8.3 21.8 5.3 5.1 3.9 0.0 0.1 0.0 5.1
9/7/1993 3.6 2.0 6.3 2.6 4.3 6.3 11.0 8.0 3.0 11.4 29.5 40.7 41.5 3.0
9/8/1993 3.4 2.7 12.4 2.0 0.1 6.3 6.7 20.4 20.8 15.1 0.0 0.5 0.0 20.8
9/9/1993 10.3 15.8 22.3 0.2 6.0 3.9 2.3 0.0 0.0 2.0 6.4 4.6 4.7 0.0
9/10/1993 11.9 16.8 13.0 1.7 12.4 8.7 9.7 0.0 8.1 0.0 0.0 0.0 0.0 8.2
9/11/1993 8.6 9.5 12.3 2.2 6.6 6.3 10.3 3.4 6.4 2.9 0.9 0.4 0.3 6.4
9/12/1993 6.4 7.6 15.9 11.0 9.9 10.2 1.9 15.6 16.5 14.9 9.0 3.8 3.5 16.5
9/13/1993 3.2 3.4 16.4 8.9 3.0 3.7 2.2 6.0 4.1 4.5 0.0 0.2 0.0 4.1
9/14/1993 0.9 1.0 7.9 0.5 0.5 3.4 6.2 8.3 3.2 8.8 5.9 0.2 0.0 3.1
9/15/1993 14.6 17.3 13.0 0.4 15.9 12.4 4.1 9.1 4.1 7.4 3.3 4.4 4.3 4.1
9/16/1993 11.7 8.0 15.4 47.9 0.3 14.5 25.3 40.3 29.6 42.4 36.4 20.0 19.5 29.5
9/17/1993 12.5 9.3 13.4 8.5 12.1 11.9 19.1 7.3 12.1 6.5 5.6 8.0 8.0 12.2
9/18/1993 5.7 2.0 10.2 17.1 16.7 14.5 6.4 14.0 9.0 13.4 8.7 4.6 4.4 9.0
9/19/1993 2.3 0.9 2.1 1.1 2.0 6.6 2.3 19.2 7.3 14.8 1.2 0.5 0.0 7.2
9/20/1993 1.9 0.5 1.4 0.5 0.1 1.0 6.6 0.0 0.0 1.0 4.0 3.9 4.0 0.0
9/21/1993 2.5 2.2 1.6 0.0 2.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1993 0.1 1.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1993 0.0 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1993 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
10/1/1993 0.0 0.1 0.8 0.9 0.1 1.7 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1993 0.0 0.0 0.0 2.7 0.4 5.4 34.1 0.0 0.0 0.2 1.4 2.4 2.5 0.0
10/3/1993 0.0 0.0 0.0 0.9 0.2 1.9 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1993 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.3 3.9 4.0 0.0
10/8/1993 0.0 0.0 0.0 0.2 0.0 0.4 2.7 0.0 0.0 0.3 2.8 4.9 5.0 0.0
10/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1993 5.8 0.3 7.1 1.2 0.0 0.0 0.5 0.0 9.9 0.0 0.0 0.0 0.0 10.0
10/14/1993 16.9 10.9 14.2 2.5 23.3 17.5 11.3 8.0 16.8 10.5 13.4 7.5 7.5 16.8
10/15/1993 9.4 13.8 5.5 26.5 13.5 12.7 19.2 7.0 5.8 8.2 13.8 16.8 17.0 5.8
10/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0
10/20/1993 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1993 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1993 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1993 0.0 0.1 0.8 2.6 0.0 0.0 1.1 0.0 21.7 0.0 0.0 0.0 0.0 21.8
10/30/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1993 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
11/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/13/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1993 1.5 5.4 0.0 0.1 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1993 1.6 0.5 1.4 8.5 2.8 1.6 0.0 0.0 0.0 1.9 5.1 2.2 2.2 0.0
11/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1993 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1993 0.0 0.1 0.0 0.3 0.0 0.0 0.1 0.0 2.6 0.0 0.0 0.0 0.0 2.6
12/6/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1993 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1994 0.0 0.8 7.6 1.9 0.0 0.0 0.9 0.0 16.1 0.0 0.0 0.0 0.0 16.2
1/8/1994 4.6 1.2 14.2 1.7 0.0 0.0 0.8 0.0 14.3 0.5 1.1 0.0 0.0 14.4
1/9/1994 17.5 23.3 14.2 24.1 31.9 27.4 21.4 21.0 32.2 20.2 18.5 19.4 19.4 32.2
1/10/1994 9.0 17.3 4.7 13.2 4.5 6.4 5.3 11.0 4.2 17.6 22.2 1.6 1.4 4.1
1/11/1994 10.8 1.1 7.8 28.2 21.2 22.5 2.2 37.0 28.3 32.4 18.0 16.8 16.3 28.3
1/12/1994 2.9 1.9 3.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1994 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1994 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1994 0.0 0.0 0.0 0.0 0.0 3.2 0.0 12.0 4.6 9.0 0.6 0.9 0.6 4.5
1/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/29/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1994 2.7 7.6 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1994 2.5 3.5 3.5 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1994 2.3 1.3 7.1 1.4 7.1 6.6 12.6 2.0 4.5 4.9 9.5 4.2 4.3 4.5
2/3/1994 0.0 0.0 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
2/4/1994 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
2/5/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1994 0.2 0.0 0.0 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1994 2.5 4.1 2.6 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
2/19/1994 4.6 6.0 5.4 0.7 6.1 5.0 4.0 3.0 4.4 2.5 2.4 4.2 4.2 4.4
2/20/1994 5.1 4.4 8.1 4.7 7.7 6.8 6.2 5.0 5.6 5.5 5.5 3.2 3.2 5.6
2/21/1994 3.6 0.8 3.2 5.4 7.9 7.0 4.3 6.5 6.9 5.0 1.5 2.8 2.7 6.9
2/22/1994 0.3 0.0 0.4 0.1 1.2 1.0 1.6 0.0 0.0 0.7 1.6 0.0 0.0 0.0
2/23/1994 0.5 0.7 0.1 0.0 0.3 2.0 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
2/24/1994 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1994 2.7 3.6 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1994 9.8 8.5 10.8 3.4 11.7 9.9 4.7 9.0 11.5 8.2 5.3 4.6 4.5 11.5
2/28/1994 10.7 7.7 10.9 16.1 16.7 15.0 8.0 15.0 12.5 14.7 12.3 10.1 10.0 12.5
3/1/1994 6.5 3.9 8.0 25.8 13.8 12.6 8.9 12.0 14.5 10.6 5.7 4.3 4.1 14.5
3/2/1994 0.8 0.4 0.7 3.6 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1994 3.4 2.6 3.3 0.5 2.4 1.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1994 1.5 0.5 3.7 1.7 4.3 8.1 4.7 19.0 19.0 18.9 16.4 13.3 13.1 19.0
3/5/1994 0.0 0.1 1.2 0.5 0.1 1.0 6.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1994 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1994 5.8 7.0 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1994 3.9 1.6 5.6 1.7 12.2 19.4 10.9 40.0 15.2 29.6 0.0 1.0 0.0 15.1
3/14/1994 3.3 4.8 2.9 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
3/15/1994 2.4 0.8 2.9 0.0 6.8 4.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0
3/16/1994 2.1 4.0 1.1 5.8 0.0 0.0 0.4 0.0 7.0 0.0 0.3 0.6 0.6 7.0
3/17/1994 2.1 0.5 1.9 0.0 4.4 3.6 0.0 4.0 1.5 3.8 2.1 0.6 0.5 1.5
3/18/1994 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1994 2.1 4.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1994 2.6 2.4 3.3 0.0 2.5 1.5 0.0 0.0 0.0 0.3 0.7 0.2 0.2 0.0
3/25/1994 9.3 9.6 8.1 16.6 6.5 9.1 12.2 13.0 8.0 11.2 4.5 2.8 2.5 8.0
3/26/1994 8.3 11.6 7.7 8.5 2.1 3.5 10.1 3.0 5.6 3.9 5.8 5.0 5.0 5.6
3/27/1994 33.3 50.1 23.2 20.4 2.2 3.2 2.4 6.0 7.9 7.1 8.6 6.5 6.5 7.9
3/28/1994 22.1 10.5 29.3 54.8 7.7 23.5 39.1 51.0 59.4 57.9 67.3 52.5 52.5 59.4
3/29/1994 6.2 2.0 8.7 18.8 21.3 18.2 11.2 15.0 13.3 11.6 4.2 7.7 7.5 13.3
3/30/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1994 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1994 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1994 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1994 0.7 0.3 0.2 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0
4/13/1994 0.9 0.2 0.9 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
4/14/1994 6.2 10.0 4.3 1.2 0.0 0.5 3.7 0.0 7.5 0.0 0.1 0.2 0.2 7.6
4/15/1994 4.8 1.3 7.4 9.9 17.8 14.1 4.9 11.0 15.4 9.4 4.3 4.1 3.9 15.4
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/16/1994 0.0 0.1 0.4 0.3 0.1 0.7 4.3 0.0 0.0 0.2 0.5 0.0 0.0 0.0
4/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1994 1.1 1.2 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1994 0.7 0.0 1.0 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1994 3.2 7.7 1.7 1.3 0.0 0.0 0.6 0.0 10.6 0.0 0.0 0.0 0.0 10.6
4/25/1994 2.1 0.8 2.2 9.2 4.5 2.6 0.5 0.0 9.4 0.0 0.0 0.0 0.0 9.4
4/26/1994 2.3 2.1 1.4 3.3 0.0 1.3 0.2 5.0 5.6 4.7 2.3 0.1 0.0 5.6
4/27/1994 4.2 12.1 1.1 9.4 0.0 3.2 0.0 12.0 4.6 9.4 2.0 2.4 2.1 4.5
4/28/1994 3.2 1.9 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1994 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
4/30/1994 7.0 23.4 1.7 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1994 1.2 1.1 2.8 1.2 4.2 4.8 15.9 0.0 0.0 4.0 29.7 48.8 50.0 0.0
5/2/1994 0.0 0.0 0.0 0.0 0.0 23.4 0.0 89.0 33.8 66.0 0.0 2.2 0.0 33.5
5/3/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1994 1.9 0.8 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1994 1.7 0.8 2.1 1.5 4.5 12.2 8.7 31.5 18.9 24.6 4.0 3.6 2.9 18.8
5/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1994 0.2 0.0 0.0 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1994 2.4 4.9 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1994 3.1 2.6 2.7 0.9 4.0 2.6 0.4 1.0 7.8 0.9 0.4 0.0 0.0 7.9
5/11/1994 3.0 1.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 1.2 1.2 0.0
5/12/1994 0.8 0.2 1.1 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/13/1994 3.5 0.5 3.7 15.4 10.0 6.7 1.8 3.0 34.8 3.6 3.2 0.1 0.0 34.9
5/14/1994 0.0 0.1 0.6 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1994 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/18/1994 7.9 12.1 3.6 0.0 0.0 1.8 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
5/19/1994 13.5 3.3 12.7 8.6 24.4 18.9 30.3 0.0 13.2 2.8 12.2 14.0 14.4 13.2
5/20/1994 5.2 14.8 2.8 4.3 5.2 5.7 18.2 0.0 6.8 0.7 5.9 10.2 10.5 6.9
5/21/1994 4.5 6.4 2.9 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1994 5.2 0.9 3.4 6.3 5.9 3.5 0.0 0.0 0.0 2.0 4.5 0.0 0.0 0.0
5/23/1994 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1994 0.1 0.2 0.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1994 0.1 0.1 1.2 2.1 0.0 0.0 0.0 0.0 0.0 1.3 2.8 0.0 0.0 0.0
5/26/1994 3.2 3.6 3.2 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
5/27/1994 2.0 1.6 3.9 5.5 5.9 3.5 0.0 0.0 0.0 3.9 32.6 56.5 57.9 0.0
5/28/1994 0.9 2.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1994 1.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
5/30/1994 3.1 7.8 1.1 1.6 0.0 1.7 2.6 5.0 6.3 3.8 0.7 1.3 1.2 6.3
5/31/1994 5.7 3.7 5.3 7.7 0.0 0.2 1.7 0.0 10.1 1.8 6.6 5.8 5.9 10.1
6/1/1994 3.7 1.5 4.2 1.5 8.9 11.8 10.2 19.0 12.9 17.6 9.8 4.9 4.5 12.9
6/2/1994 2.4 2.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1994 1.5 0.4 2.4 0.0 6.2 3.7 0.0 0.0 0.0 0.9 2.6 1.2 1.2 0.0
6/4/1994 0.0 0.0 0.0 0.1 0.0 12.9 0.0 49.0 19.2 36.3 0.0 1.2 0.0 19.1
6/5/1994 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1994 2.3 3.6 4.7 0.2 0.0 0.5 0.1 2.0 2.0 1.5 0.0 0.1 0.0 2.0
6/7/1994 1.1 0.4 3.3 0.0 4.5 2.6 0.0 0.0 0.0 0.1 1.1 2.0 2.0 0.0
6/8/1994 1.8 2.1 1.8 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
6/9/1994 4.8 2.9 6.2 0.0 4.5 15.2 0.0 48.0 18.2 39.8 16.6 17.9 17.1 18.1
6/10/1994 6.0 6.0 6.4 0.9 13.9 17.2 0.0 34.0 13.5 34.6 26.1 11.8 11.2 13.4
6/11/1994 4.1 8.0 2.7 7.5 4.0 4.9 1.6 9.0 8.6 8.8 9.9 11.9 12.0 8.6
6/12/1994 3.5 8.3 1.2 9.5 2.2 3.3 13.2 0.0 0.0 1.9 6.2 4.5 4.6 0.0
6/13/1994 2.0 2.9 2.1 10.5 0.1 1.6 10.1 0.0 0.0 1.5 12.4 21.5 22.0 0.0
6/14/1994 0.7 1.4 2.3 1.0 0.1 0.7 4.8 0.0 5.7 0.9 2.1 0.0 0.0 5.7
6/15/1994 1.2 3.0 0.2 3.0 0.3 4.0 25.8 0.0 8.7 11.0 49.7 58.5 60.0 8.7
6/16/1994 4.7 8.1 4.9 28.1 0.7 22.1 58.7 49.0 23.1 48.0 33.8 18.3 17.5 22.9
6/17/1994 1.8 5.9 3.8 2.1 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
6/18/1994 2.1 3.4 9.3 1.1 2.7 3.7 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1994 1.5 5.6 8.9 0.0 0.0 3.7 0.0 14.0 5.3 10.4 0.0 0.4 0.0 5.3
6/20/1994 1.7 6.3 4.5 3.5 0.0 0.0 0.2 0.0 4.4 3.7 8.8 0.9 0.9 4.4
6/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1994 1.1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/1994 7.0 0.0 8.0 0.0 24.7 14.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1994 16.0 19.9 17.9 3.3 0.5 6.6 41.8 0.0 0.0 5.8 30.0 40.2 41.2 0.0
6/26/1994 11.9 18.1 15.5 7.1 15.6 23.0 58.6 19.0 7.2 27.1 47.1 41.7 42.3 7.2
6/27/1994 12.0 12.0 17.1 12.6 21.6 31.2 45.4 45.0 41.4 46.0 46.6 43.2 43.2 41.4
6/28/1994 9.2 15.1 10.8 10.5 4.4 12.6 23.9 25.0 34.3 23.9 21.6 22.7 22.6 34.4
6/29/1994 7.5 14.3 12.3 3.0 4.0 2.6 2.2 0.0 16.2 2.3 8.9 8.9 9.1 16.3
6/30/1994 11.5 10.4 16.2 8.1 22.4 19.8 35.4 5.0 9.5 10.0 29.8 36.9 37.7 9.5
7/1/1994 6.0 6.4 3.7 2.5 0.2 2.1 13.5 0.0 5.6 6.1 25.6 28.0 28.7 5.6
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/2/1994 0.4 0.7 3.3 0.9 0.1 1.7 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/1994 4.0 3.1 7.6 1.3 0.2 2.6 16.3 0.0 0.0 1.0 2.2 0.0 0.0 0.0
7/4/1994 3.7 1.1 2.0 1.9 0.0 0.4 2.3 0.0 0.0 4.2 19.2 22.9 23.5 0.0
7/5/1994 0.2 0.1 1.1 4.9 0.1 1.0 6.2 0.0 0.0 9.2 24.4 8.0 8.2 0.0
7/6/1994 0.3 1.0 0.0 1.7 0.3 3.4 21.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/7/1994 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.1 1.2 2.3 0.0 0.1 0.0 1.2
7/8/1994 0.0 0.0 0.0 0.5 0.1 2.0 6.2 4.0 1.5 3.8 2.7 2.1 2.0 1.5
7/9/1994 0.3 0.0 0.5 0.2 0.0 2.8 2.5 9.0 3.4 6.7 0.0 0.2 0.0 3.4
7/10/1994 1.0 1.9 13.1 0.8 0.1 1.6 10.1 0.0 0.0 3.6 8.6 1.0 1.0 0.0
7/11/1994 9.5 13.2 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/12/1994 12.6 12.5 14.6 1.9 5.0 3.2 2.6 0.0 14.4 0.3 0.6 0.0 0.0 14.5
7/13/1994 4.7 4.6 3.8 12.8 6.2 3.7 0.0 0.0 0.0 1.5 4.2 2.0 2.0 0.0
7/14/1994 1.6 2.0 0.4 1.1 0.0 0.6 3.5 0.0 0.0 2.0 4.9 0.7 0.7 0.0
7/15/1994 1.8 2.1 4.6 0.3 0.1 0.6 4.1 0.0 0.0 0.5 1.1 0.0 0.0 0.0
7/16/1994 12.9 30.0 5.1 4.2 2.3 1.3 1.5 0.0 27.9 7.6 30.6 31.7 32.5 28.1
7/17/1994 9.3 13.9 10.2 10.5 4.0 7.2 4.1 16.0 6.1 20.2 46.6 66.2 67.5 6.0
7/18/1994 14.4 17.9 19.3 3.7 0.0 1.8 0.0 7.0 2.7 12.5 16.9 0.7 0.5 2.6
7/19/1994 9.2 8.0 14.9 2.8 1.4 4.5 5.4 11.0 7.3 9.5 5.2 5.2 5.0 7.3
7/20/1994 5.6 3.0 10.2 5.0 3.5 11.8 20.6 25.0 9.5 21.1 9.8 9.8 9.4 9.4
7/21/1994 2.8 2.1 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0
7/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/23/1994 2.5 7.1 0.0 12.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/24/1994 3.7 5.4 8.1 5.8 2.6 5.3 25.3 0.0 0.0 12.5 65.6 88.3 90.5 0.0
7/25/1994 2.3 5.3 6.7 2.5 0.4 5.1 32.4 0.0 0.0 1.8 14.9 25.6 26.2 0.0
7/26/1994 2.2 1.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/27/1994 4.1 4.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/28/1994 11.3 14.4 8.4 3.5 6.4 5.0 9.5 0.0 24.3 1.4 4.7 3.4 3.5 24.5
7/29/1994 6.8 3.8 15.9 22.5 18.2 15.8 34.4 0.0 24.8 0.5 2.5 3.3 3.4 25.0
7/30/1994 2.2 6.1 2.6 14.1 0.0 0.6 4.3 0.0 16.2 0.0 0.0 0.0 0.0 16.3
7/31/1994 0.7 1.8 0.4 1.0 1.0 1.6 1.8 3.0 8.7 2.2 0.0 0.1 0.0 8.7
8/1/1994 0.4 0.9 8.2 0.8 0.0 1.3 2.1 4.0 7.1 3.0 0.0 0.1 0.0 7.1
8/2/1994 0.0 0.8 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/3/1994 0.3 0.3 3.0 2.9 0.0 9.5 0.0 36.0 13.7 26.7 0.0 0.9 0.0 13.6
8/4/1994 2.3 8.5 0.2 0.0 0.0 2.7 0.0 10.1 3.8 7.6 1.3 2.5 2.3 3.8
8/5/1994 12.1 18.1 12.9 2.2 1.4 4.7 6.3 11.1 4.2 8.9 1.5 0.3 0.0 4.2
8/6/1994 15.4 5.8 26.7 4.6 37.3 40.6 37.2 49.0 18.6 47.9 49.4 55.8 56.0 18.4
8/7/1994 11.9 10.0 27.1 26.2 6.5 9.9 19.6 12.0 4.6 13.1 26.0 39.3 40.0 4.5
8/8/1994 16.5 5.9 42.0 8.5 35.0 36.2 92.0 6.0 2.3 11.8 27.6 25.9 26.4 2.3
8/9/1994 10.3 24.8 4.2 12.5 6.5 8.5 28.9 1.0 0.4 4.2 15.3 18.0 18.4 0.4
8/10/1994 6.7 19.1 5.7 0.3 0.0 2.4 3.4 7.0 2.7 5.2 0.0 0.2 0.0 2.6
8/11/1994 0.3 0.1 0.6 0.0 0.0 1.1 0.0 4.0 1.5 3.2 0.6 0.1 0.0 1.5
8/12/1994 1.4 0.4 3.0 2.6 0.0 1.8 0.8 7.0 17.1 5.2 0.0 0.2 0.0 17.1
8/13/1994 6.4 12.4 12.3 12.2 10.6 13.2 24.9 12.0 4.6 17.1 25.5 16.2 16.3 4.5
8/14/1994 1.3 2.2 3.8 0.3 0.0 1.9 3.4 5.0 1.9 3.7 0.0 0.1 0.0 1.9
8/15/1994 1.7 6.2 0.4 0.0 0.0 8.1 0.0 31.0 11.8 23.0 0.0 0.8 0.0 11.7
8/16/1994 0.2 0.0 0.0 0.0 0.0 3.8 0.0 14.5 5.5 10.8 0.0 0.4 0.0 5.5
8/17/1994 0.4 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/18/1994 8.6 18.7 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/1994 4.6 2.1 3.1 3.1 4.1 8.3 39.1 0.0 0.0 13.1 33.8 9.2 9.4 0.0
8/20/1994 1.7 0.8 8.9 1.0 6.9 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/21/1994 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.1 1.1 0.0
8/22/1994 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.9 0.4 0.4 0.0
8/23/1994 2.9 2.3 1.1 0.0 3.4 13.5 0.0 44.0 16.7 32.6 0.0 1.1 0.0 16.6
8/24/1994 0.5 0.0 0.8 3.7 0.0 0.5 1.6 2.0 31.8 2.2 1.5 0.1 0.0 31.9
8/25/1994 1.5 0.0 0.6 0.9 2.0 1.2 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
8/26/1994 4.9 1.1 6.5 0.9 12.2 10.5 11.2 6.0 2.3 6.0 13.2 23.1 23.5 2.3
8/27/1994 9.0 5.8 10.5 15.3 6.0 5.8 4.9 6.0 13.6 8.8 21.9 28.8 29.4 13.6
8/28/1994 6.3 4.9 1.8 2.9 0.1 1.1 8.2 0.0 20.1 5.3 17.9 13.8 14.1 20.1
8/29/1994 1.2 4.5 0.2 1.2 0.2 2.4 14.9 0.0 0.0 0.2 1.2 1.6 1.6 0.0
8/30/1994 0.3 1.0 0.0 0.2 0.0 0.7 2.5 1.0 0.4 0.7 0.0 0.0 0.0 0.4
8/31/1994 0.2 0.1 0.3 2.5 0.4 4.5 28.6 0.0 2.1 0.3 0.8 0.0 0.0 2.1
9/1/1994 13.9 35.0 6.5 5.6 0.4 5.5 36.3 0.0 24.2 2.3 8.0 6.4 6.6 24.3
9/2/1994 21.5 30.7 15.6 13.7 9.0 11.1 38.9 0.0 11.3 8.9 29.8 22.4 23.0 11.4
9/3/1994 18.6 19.5 15.4 33.6 23.6 28.5 35.5 36.0 37.9 34.4 28.3 26.3 26.0 37.9
9/4/1994 5.4 10.2 3.2 7.3 6.0 6.9 5.5 10.0 12.1 10.8 15.4 18.8 19.0 12.1
9/5/1994 15.4 14.9 16.5 7.5 31.7 29.8 53.2 11.9 11.3 14.5 12.9 0.3 0.0 11.3
9/6/1994 8.5 10.4 6.6 10.1 6.5 18.7 13.6 49.0 30.5 42.2 24.7 28.0 27.5 30.4
9/7/1994 5.7 5.7 4.1 9.0 3.5 7.4 14.9 12.0 20.1 10.5 4.6 2.7 2.5 20.2
9/8/1994 4.8 5.3 3.0 9.3 3.1 4.8 11.8 5.0 15.6 6.3 8.1 5.2 5.2 15.6
9/9/1994 10.1 9.7 7.0 1.1 2.1 2.5 7.2 1.0 5.4 2.0 2.8 0.0 0.0 5.4
9/10/1994 7.9 6.9 6.9 9.5 12.8 13.8 25.7 9.0 6.0 8.3 3.8 0.2 0.0 5.9
9/11/1994 4.9 8.1 3.8 5.3 2.3 5.6 22.9 4.0 25.1 3.7 3.2 3.5 3.5 25.2
9/12/1994 9.8 6.1 10.3 8.5 19.4 15.6 15.2 7.0 5.1 5.7 1.4 0.7 0.5 5.1
9/13/1994 2.1 3.9 2.0 2.3 0.3 4.4 7.0 12.0 5.2 11.1 7.2 5.6 5.4 5.1
9/14/1994 3.3 2.4 3.2 14.8 6.1 7.1 14.5 5.0 9.4 10.9 22.3 14.5 14.7 9.4
9/15/1994 6.6 2.9 2.5 1.8 5.0 11.4 2.8 31.0 21.7 47.3 78.8 56.3 56.9 21.7
9/16/1994 2.9 7.7 1.2 0.0 1.3 0.8 0.0 0.0 0.0 0.1 0.6 1.1 1.1 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/17/1994 5.7 8.9 4.9 4.1 1.9 6.4 25.0 6.0 6.0 4.5 0.0 0.2 0.0 6.0
9/18/1994 8.2 3.1 6.2 10.1 10.9 10.2 0.3 14.5 11.3 13.3 11.2 13.4 13.4 11.3
9/19/1994 1.6 4.7 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.2 0.2 0.0
9/20/1994 4.3 1.2 5.6 0.4 0.0 0.4 2.4 0.0 2.0 0.3 0.8 0.0 0.0 2.0
9/21/1994 0.6 1.6 1.4 1.1 0.0 0.5 3.7 0.0 6.8 0.0 0.0 0.0 0.0 6.9
9/22/1994 1.2 3.4 0.5 2.8 0.5 5.7 36.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1994 2.8 5.5 0.4 9.4 0.2 14.3 18.1 44.0 26.6 32.7 0.1 1.1 0.0 26.5
9/24/1994 4.7 15.8 0.4 2.6 1.3 3.0 11.0 2.0 0.8 1.5 0.2 0.3 0.3 0.8
9/25/1994 2.4 1.0 1.2 26.4 2.0 1.2 0.0 0.0 0.0 6.3 17.3 6.7 6.9 0.0
9/26/1994 2.6 3.6 9.6 6.8 0.0 1.6 0.0 6.0 2.3 9.3 15.2 9.9 10.0 2.3
9/27/1994 2.1 5.8 7.2 7.5 1.6 2.5 0.3 6.0 7.2 6.1 4.4 1.6 1.5 7.3
9/28/1994 3.5 1.0 11.7 12.9 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0
9/29/1994 2.2 1.4 8.1 24.7 0.0 0.0 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
9/30/1994 0.6 0.8 6.4 12.0 0.0 0.3 0.0 1.0 1.0 0.7 0.0 0.0 0.0 1.0
10/1/1994 0.0 1.3 12.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1994 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1994 0.2 0.7 7.0 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1994 0.6 2.3 0.0 0.8 0.0 0.0 0.3 0.0 6.3 0.0 0.0 0.0 0.0 6.4
10/5/1994 0.0 0.6 5.6 2.0 0.0 0.0 0.9 0.0 16.8 0.0 0.0 0.0 0.0 16.8
10/6/1994 0.0 0.4 3.9 1.0 0.0 0.0 0.4 0.0 8.2 0.0 0.0 0.0 0.0 8.2
10/7/1994 0.5 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1994 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1994 0.0 0.8 7.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1994 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/3/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1994 0.0 0.0 0.0 0.0 0.0 1.6 0.0 6.2 2.4 4.6 0.0 0.2 0.0 2.3
12/15/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1994 0.0 0.0 0.0 0.0 0.0 9.0 0.0 34.2 13.0 25.4 0.0 0.9 0.0 12.9
12/19/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1994 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1994 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1994 0.0 0.0 0.0 0.0 0.0 1.8 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
1/1/1995 0.0 0.0 0.0 0.0 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
1/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1995 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1995 0.0 0.0 0.0 0.0 0.0 1.4 0.0 5.2 2.0 3.9 0.0 0.1 0.0 2.0
1/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1995 0.0 0.0 0.0 0.0 0.0 10.8 0.0 41.2 15.6 30.5 0.0 1.0 0.0 15.5
1/10/1995 0.0 0.0 0.0 0.0 0.0 11.1 0.0 42.3 16.0 31.4 0.0 1.1 0.0 15.9
1/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1995 2.0 0.1 2.8 0.0 0.0 1.8 0.0 7.0 3.0 5.2 0.0 0.2 0.0 3.0
1/14/1995 4.4 1.6 7.9 2.5 6.7 4.0 0.5 0.0 10.2 0.9 3.7 3.7 3.8 10.2
1/15/1995 3.8 0.8 5.0 2.5 10.0 7.5 10.2 0.0 0.0 1.0 2.2 0.0 0.0 0.0
1/16/1995 0.7 0.0 1.0 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1995 16.3 13.0 17.1 16.0 29.6 17.5 0.7 0.0 13.3 0.8 2.3 1.5 1.5 13.4
1/18/1995 2.3 2.8 7.0 10.3 0.4 5.0 31.9 0.0 7.6 9.2 36.8 37.8 38.8 7.6
1/19/1995 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1995 0.0 0.0 0.0 0.0 0.0 6.0 0.0 23.0 8.7 17.1 0.0 0.6 0.0 8.7
1/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1995 2.9 6.4 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1995 1.2 0.8 3.9 4.7 2.7 1.6 0.0 0.0 0.0 1.7 6.1 5.3 5.4 0.0
2/2/1995 0.0 0.2 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1995 2.4 6.9 1.1 0.5 0.1 1.0 6.0 0.0 0.0 2.0 4.6 0.0 0.0 0.0
2/4/1995 0.8 0.6 1.3 1.9 0.0 0.5 4.0 0.0 13.7 3.5 8.0 0.0 0.0 13.7
2/5/1995 0.0 0.0 0.0 0.0 0.0 1.4 0.0 5.2 2.0 3.9 0.0 0.1 0.0 2.0
2/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1995 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1995 13.9 1.1 17.1 11.9 1.3 11.6 0.0 41.2 15.6 38.1 44.3 65.5 66.1 15.5
2/11/1995 26.3 26.2 27.2 64.9 70.1 61.0 54.8 43.2 24.5 45.4 30.4 1.1 0.0 24.4
2/12/1995 0.0 0.3 2.3 1.8 0.0 0.0 0.8 0.0 14.9 0.0 0.0 0.0 0.0 15.0
2/13/1995 0.3 0.0 0.5 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
2/14/1995 0.1 0.0 0.0 5.4 0.0 1.8 1.3 7.0 26.9 8.8 8.1 0.2 0.0 27.0
2/15/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1995 0.5 0.0 0.7 0.0 2.2 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/18/1995 0.4 1.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.8 0.8 0.0
2/20/1995 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.2 0.0 0.0 0.0 0.0 3.2
2/21/1995 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
2/22/1995 0.0 0.2 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
2/23/1995 6.3 11.8 4.6 0.0 0.0 0.0 0.0 0.0 0.0 6.0 13.7 0.0 0.0 0.0
2/24/1995 4.7 1.6 8.9 0.9 16.2 15.6 0.0 23.0 8.7 18.1 8.7 15.6 15.4 8.7
2/25/1995 1.9 0.0 2.0 9.8 6.1 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1995 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
3/1/1995 0.0 0.0 0.0 0.8 0.0 0.0 0.4 0.0 6.8 0.0 0.0 0.0 0.0 6.9
3/2/1995 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 10.6 0.1 0.7 1.3 1.3 10.7
3/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1995 0.9 0.1 1.3 1.4 0.0 0.0 0.6 0.0 11.9 0.0 0.0 0.0 0.0 12.0
3/6/1995 0.6 0.4 1.0 0.0 2.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1995 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
3/16/1995 1.8 2.4 1.4 4.2 0.0 0.0 0.3 0.0 5.1 0.0 0.0 0.0 0.0 5.1
3/17/1995 1.9 0.0 2.6 0.8 8.1 4.8 0.4 0.0 6.8 0.0 0.0 0.0 0.0 6.9
3/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1995 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1995 0.2 0.0 0.3 0.0 1.0 1.9 0.0 5.0 1.9 4.7 2.3 0.1 0.0 1.9
3/29/1995 1.2 0.0 1.6 0.0 4.9 4.3 0.0 5.2 2.0 4.7 3.9 5.0 5.0 2.0
3/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1995 3.5 4.0 3.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1995 2.6 0.8 3.9 0.6 9.9 7.2 0.3 5.0 7.0 4.7 3.2 2.2 2.1 7.0
4/4/1995 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1995 0.4 1.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1995 0.2 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1995 8.4 7.8 7.2 0.0 11.3 6.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1995 3.4 3.5 1.7 7.8 0.2 2.0 12.7 0.0 0.0 2.7 9.4 7.8 8.0 0.0
4/9/1995 1.8 0.6 3.5 0.1 6.4 4.1 1.8 0.0 0.0 0.7 2.8 2.9 3.0 0.0
4/10/1995 0.3 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1995 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1995 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1995 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1995 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1995 4.6 5.8 2.4 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1995 2.0 1.5 4.3 1.4 4.4 2.8 1.5 0.0 0.0 0.1 0.7 1.2 1.2 0.0
4/18/1995 0.7 0.5 2.2 2.8 2.0 1.7 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1995 0.2 0.1 0.8 0.0 1.0 0.6 0.0 0.0 0.0 1.5 3.5 0.0 0.0 0.0
4/20/1995 0.1 0.3 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1995 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1995 1.8 4.0 0.7 0.0 2.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1995 3.5 1.7 4.3 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1995 3.7 6.5 3.8 0.0 0.0 0.3 0.0 1.1 0.4 1.1 0.5 0.0 0.0 0.4
4/25/1995 1.0 0.3 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.8 2.0 2.0 0.0
4/26/1995 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1995 0.0 0.1 0.4 0.0 0.0 1.4 0.0 5.3 2.0 3.9 0.0 0.1 0.0 2.0
4/28/1995 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1995 1.1 0.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1995 2.6 7.0 0.6 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
5/1/1995 0.8 1.2 0.7 0.0 2.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1995 1.9 0.3 0.6 0.0 1.0 0.6 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
5/3/1995 2.4 8.5 0.2 0.5 0.5 0.3 0.2 0.0 3.8 0.1 0.6 1.0 1.0 3.8
5/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1995 1.3 5.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/6/1995 1.0 0.1 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1995 5.1 2.1 6.5 0.0 7.3 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1995 2.8 6.6 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1995 4.1 0.7 6.1 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1995 8.1 9.6 5.3 6.2 6.3 4.8 7.9 0.0 11.3 0.0 0.0 0.0 0.0 11.4
5/12/1995 2.9 7.5 0.9 3.3 0.2 3.0 19.9 0.0 14.9 2.6 10.7 11.2 11.5 15.0
5/13/1995 0.2 0.1 0.2 5.3 0.1 1.5 9.6 0.0 0.0 1.7 6.5 6.1 6.3 0.0
5/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1995 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1995 0.3 0.3 1.0 0.8 0.0 0.0 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.0
5/18/1995 1.7 0.4 2.2 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1995 5.7 6.8 4.9 4.1 13.0 9.3 10.5 0.0 0.0 0.1 0.1 0.0 0.0 0.0
5/20/1995 1.3 4.9 0.8 0.7 0.2 1.6 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/1995 0.0 0.1 1.1 0.7 0.1 6.2 9.5 18.0 6.8 13.3 0.0 0.5 0.0 6.8
5/22/1995 0.0 0.2 0.3 1.0 0.2 1.9 12.2 0.0 0.0 4.4 18.0 18.7 19.2 0.0
5/23/1995 1.0 2.0 0.3 10.1 0.7 14.3 53.4 22.3 8.5 16.7 0.4 0.6 0.0 8.4
5/24/1995 0.4 0.4 1.1 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1995 1.4 0.2 0.2 13.1 0.0 0.0 0.2 0.0 3.1 1.5 4.9 3.4 3.5 3.1
5/27/1995 5.1 0.0 7.1 1.3 21.0 14.0 10.7 0.0 3.8 2.2 4.9 0.0 0.0 3.8
5/28/1995 1.7 0.2 2.6 2.7 7.1 6.1 13.1 0.0 5.6 1.1 2.4 0.0 0.0 5.6
5/29/1995 0.0 0.0 0.0 6.7 0.2 2.2 15.8 0.0 40.0 3.2 19.8 29.9 30.7 40.2
5/30/1995 0.1 0.1 0.4 1.9 0.0 0.0 0.4 0.0 7.6 0.4 2.9 5.1 5.2 7.6
5/31/1995 1.3 4.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1995 3.0 1.0 3.9 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1995 3.2 1.3 4.8 3.4 11.9 7.0 0.0 0.0 0.0 4.4 11.8 4.2 4.3 0.0
6/3/1995 1.7 0.1 2.1 1.7 6.1 12.3 0.0 33.2 12.6 25.2 1.4 0.8 0.0 12.5
6/4/1995 0.1 0.3 0.0 0.0 0.0 3.3 0.0 12.4 4.7 9.2 0.0 0.3 0.0 4.7
6/5/1995 2.2 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1995 2.2 0.2 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1995 2.0 1.1 1.9 0.0 2.8 1.6 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
6/8/1995 0.7 0.0 1.0 0.0 3.0 1.8 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
6/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1995 1.0 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1995 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1995 2.8 9.4 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1995 2.6 4.3 3.3 7.1 5.0 5.4 3.3 7.3 2.8 11.7 33.9 46.8 47.8 2.8
6/14/1995 0.4 1.3 0.0 0.3 0.0 0.4 2.4 0.0 0.6 0.0 0.0 0.0 0.0 0.6
6/15/1995 2.0 3.5 0.8 1.9 0.3 7.5 0.4 28.0 18.1 20.8 0.0 0.7 0.0 18.1
6/16/1995 1.9 0.3 2.9 0.6 8.0 7.3 8.1 5.0 1.9 3.7 0.0 0.1 0.0 1.9
6/17/1995 0.4 1.4 0.7 0.9 0.1 1.7 10.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1995 3.2 7.8 2.3 1.2 0.2 2.4 15.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1995 4.6 1.1 8.6 4.3 16.8 9.9 0.0 0.0 0.0 0.7 6.0 10.3 10.6 0.0
6/20/1995 0.0 0.1 1.2 3.5 0.5 6.2 39.5 0.0 3.7 0.2 1.5 2.5 2.6 3.7
6/21/1995 0.0 0.1 0.5 0.6 0.1 1.1 7.2 0.0 0.0 1.7 3.9 0.0 0.0 0.0
6/22/1995 0.0 0.3 3.1 3.1 0.5 6.2 39.3 0.0 0.0 17.6 59.6 46.6 47.8 0.0
6/23/1995 0.3 1.2 0.5 2.9 0.4 7.8 34.3 9.0 5.3 8.7 6.4 4.6 4.5 5.3
6/24/1995 0.7 0.8 7.8 10.0 3.3 43.6 64.8 122.5 76.4 98.5 41.3 59.7 58.1 76.2
6/25/1995 1.3 1.4 1.3 5.1 1.2 5.4 32.3 0.0 22.5 1.1 2.5 0.0 0.0 22.6
6/26/1995 0.3 1.3 0.9 1.5 0.1 8.5 10.4 26.2 15.5 30.3 24.8 0.7 0.0 15.5
6/27/1995 9.2 23.0 10.4 1.1 0.2 5.1 13.7 11.3 4.3 8.4 0.0 0.3 0.0 4.3
6/28/1995 4.8 3.6 10.9 10.3 4.8 7.1 3.3 15.2 33.8 19.6 29.5 25.2 25.4 33.9
6/29/1995 5.3 12.7 2.4 4.4 2.8 5.7 0.0 15.3 5.8 12.4 3.8 3.8 3.5 5.8
6/30/1995 3.4 2.5 10.2 0.4 0.1 2.0 5.6 4.4 1.7 3.3 0.0 0.1 0.0 1.7
7/1/1995 2.8 9.1 0.7 0.8 0.1 1.7 10.5 0.0 0.0 3.4 9.0 2.8 2.9 0.0
7/2/1995 0.7 0.3 1.5 1.2 0.2 2.5 15.7 0.0 0.0 1.3 2.8 0.0 0.0 0.0
7/3/1995 0.2 2.6 16.9 1.5 0.2 6.0 19.4 11.2 4.3 9.3 3.2 2.5 2.3 4.2
7/4/1995 7.6 26.7 4.9 1.2 0.2 2.3 14.7 0.0 0.0 1.3 11.0 19.1 19.6 0.0
7/5/1995 13.5 18.2 13.3 1.2 4.3 4.9 15.9 0.0 0.0 4.9 15.7 11.0 11.3 0.0
7/6/1995 14.0 14.8 17.5 8.3 20.5 15.0 19.0 0.0 0.0 1.7 3.8 0.0 0.0 0.0
7/7/1995 2.3 7.2 7.3 2.5 0.2 1.7 10.1 0.0 0.0 4.3 18.3 20.3 20.8 0.0
7/8/1995 2.4 8.7 3.8 0.7 0.1 0.6 3.7 0.0 3.2 0.4 0.9 0.0 0.0 3.2
7/9/1995 1.0 1.9 0.8 2.9 0.4 0.7 3.1 0.0 6.8 0.1 0.9 1.6 1.6 6.9
7/10/1995 1.4 4.7 6.2 0.0 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/11/1995 5.7 5.7 0.6 2.8 0.9 9.9 35.6 15.0 5.7 15.4 16.0 15.0 15.0 5.7
7/12/1995 0.0 0.1 0.5 3.1 0.2 3.0 16.5 2.0 17.0 2.6 9.5 16.5 16.9 17.0
7/13/1995 2.6 1.9 4.4 7.2 7.4 7.1 18.5 0.0 16.9 3.7 8.3 0.0 0.0 17.0
7/14/1995 17.0 43.6 8.2 0.8 0.5 1.9 10.5 0.0 0.1 2.3 12.2 16.5 16.9 0.1
7/15/1995 11.3 8.9 16.0 0.6 1.1 1.8 7.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/16/1995 2.6 6.7 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/17/1995 2.7 3.8 4.2 0.0 1.8 1.1 0.0 0.0 0.0 0.4 0.9 0.0 0.0 0.0
7/18/1995 5.4 3.7 5.9 0.8 4.1 3.9 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/19/1995 2.9 5.2 2.0 1.5 0.3 4.4 19.7 5.0 1.9 5.5 4.6 1.3 1.2 1.9
7/20/1995 13.6 22.4 10.7 6.8 0.1 2.6 0.0 9.5 3.6 7.0 0.0 0.2 0.0 3.6
7/21/1995 24.7 30.6 27.5 6.2 8.6 10.2 18.2 9.3 14.8 11.0 17.6 20.0 20.3 14.9
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/22/1995 11.0 23.3 15.4 1.9 8.5 10.4 4.2 18.3 20.6 16.3 8.9 6.8 6.5 20.6
7/23/1995 5.5 7.4 6.1 7.3 1.4 4.3 15.7 4.3 1.6 4.9 8.2 10.4 10.5 1.6
7/24/1995 5.0 12.1 3.3 3.7 0.7 5.5 15.1 11.1 11.0 15.2 28.3 29.7 30.2 11.0
7/25/1995 6.9 14.6 4.3 4.9 0.1 2.6 7.9 5.0 1.9 4.4 1.5 0.1 0.0 1.9
7/26/1995 9.5 13.5 6.9 6.9 0.0 1.0 4.1 2.0 25.1 1.6 0.4 0.1 0.0 25.2
7/27/1995 13.2 18.3 14.6 3.8 0.3 4.6 24.8 3.0 8.6 2.3 0.2 0.1 0.0 8.6
7/28/1995 14.3 19.9 18.5 4.6 0.7 5.2 26.3 3.0 1.1 2.2 0.0 0.1 0.0 1.1
7/29/1995 17.1 19.9 26.4 5.7 0.9 9.6 28.8 18.0 6.8 18.1 19.0 19.9 19.9 6.8
7/30/1995 7.6 11.9 9.9 4.4 1.8 11.0 34.4 18.2 6.9 14.9 6.7 8.8 8.6 6.9
7/31/1995 3.8 7.3 3.9 0.5 0.9 1.6 5.7 1.0 0.4 0.8 0.2 0.0 0.0 0.4
8/1/1995 8.1 11.8 13.9 1.1 7.3 6.4 13.7 0.0 0.0 5.3 15.5 8.3 8.5 0.0
8/2/1995 6.2 9.5 9.1 1.9 4.8 8.8 2.8 21.0 8.0 24.4 20.0 0.5 0.0 7.9
8/3/1995 4.7 1.4 8.6 6.8 3.1 3.4 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/4/1995 2.5 5.0 3.0 2.5 1.4 7.6 30.4 8.3 4.4 11.0 11.1 0.2 0.0 4.4
8/5/1995 3.4 3.7 3.1 3.9 1.4 8.4 50.5 0.0 0.0 1.3 4.1 2.5 2.6 0.0
8/6/1995 1.2 2.9 2.5 2.7 0.5 5.4 34.1 0.0 0.0 0.0 0.1 0.2 0.2 0.0
8/7/1995 0.2 0.1 0.8 1.7 0.3 3.5 21.9 0.0 0.0 0.8 2.8 2.4 2.5 0.0
8/8/1995 1.9 5.3 4.2 1.5 2.2 6.8 17.6 11.0 4.8 9.6 3.2 0.3 0.0 4.8
8/9/1995 1.2 3.0 2.3 4.2 0.4 8.4 35.1 11.3 17.3 12.3 13.7 11.5 11.5 17.4
8/10/1995 5.4 12.1 6.1 5.9 0.1 1.2 5.1 2.1 26.4 1.8 0.7 0.1 0.0 26.5
8/11/1995 3.4 5.4 8.9 6.5 4.8 10.3 39.3 6.2 9.9 11.4 17.6 5.3 5.3 9.9
8/12/1995 7.6 16.2 7.5 5.8 1.6 5.8 20.6 7.3 22.0 14.1 26.9 17.0 17.2 22.1
8/13/1995 13.8 25.5 19.6 17.1 14.6 17.9 58.7 2.0 6.4 5.7 12.8 7.4 7.5 6.4
8/14/1995 8.6 8.1 11.6 12.2 17.3 21.7 64.8 7.3 27.7 11.2 13.3 0.2 0.0 27.8
8/15/1995 9.8 19.6 9.3 1.4 4.7 5.9 17.6 2.0 0.8 4.0 10.5 11.6 11.8 0.8
8/16/1995 7.2 12.5 8.0 5.5 2.4 16.1 38.1 34.5 34.8 25.6 0.0 0.9 0.0 34.8
8/17/1995 11.9 9.9 14.2 6.2 19.2 24.7 20.1 39.2 14.9 32.0 10.0 9.0 8.2 14.8
8/18/1995 12.4 4.4 12.0 4.4 17.9 13.9 12.8 5.3 2.0 7.4 10.7 7.0 7.0 2.0
8/19/1995 1.7 1.1 1.2 0.0 1.0 7.0 0.0 24.3 9.2 18.1 0.2 0.6 0.0 9.2
8/20/1995 2.5 5.5 5.1 2.2 0.4 8.2 1.0 30.2 30.1 34.4 38.7 27.5 27.4 30.1
8/21/1995 4.1 8.1 7.1 0.5 0.2 5.1 0.2 19.0 11.1 14.8 5.6 10.2 10.0 11.0
8/22/1995 3.9 13.3 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/23/1995 9.9 8.3 12.8 3.4 0.0 2.9 0.0 11.0 4.2 8.6 1.1 0.3 0.0 4.1
8/24/1995 12.5 9.4 11.5 0.9 14.3 16.6 3.1 29.3 16.7 27.6 21.3 19.2 18.9 16.6
8/25/1995 7.5 13.8 11.3 1.7 4.7 6.1 22.2 0.0 0.0 1.9 9.0 11.2 11.5 0.0
8/26/1995 9.2 13.7 8.2 11.1 2.7 17.5 93.7 7.0 2.7 5.2 0.0 0.2 0.0 2.6
8/27/1995 19.2 27.6 16.8 9.1 15.0 17.4 30.4 15.3 16.4 13.8 7.1 3.8 3.5 16.4
8/28/1995 17.1 16.4 22.4 1.9 9.2 10.2 24.8 4.0 1.5 7.1 10.3 2.3 2.3 1.5
8/29/1995 13.0 33.4 15.6 13.7 2.5 7.3 10.5 16.3 6.8 15.0 6.6 0.4 0.0 6.8
8/30/1995 9.3 11.5 12.7 0.4 0.1 6.2 5.3 20.4 7.7 15.1 0.0 0.5 0.0 7.7
8/31/1995 7.7 17.4 4.9 4.1 0.4 8.6 34.7 12.3 16.7 10.2 2.5 0.3 0.0 16.7
9/1/1995 2.8 3.5 3.2 17.2 0.8 7.8 48.6 0.0 0.0 1.1 9.0 15.5 15.9 0.0
9/2/1995 9.2 13.4 6.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/3/1995 6.8 7.6 11.8 1.5 3.7 5.1 19.2 0.0 0.0 0.5 1.1 0.0 0.0 0.0
9/4/1995 4.2 6.3 8.1 1.9 2.0 1.2 0.9 0.0 16.3 0.1 0.5 0.8 0.8 16.3
9/5/1995 3.9 5.7 4.2 9.8 1.0 12.3 79.3 0.0 24.4 5.2 12.9 2.4 2.5 24.5
9/6/1995 6.1 10.3 11.4 1.7 1.5 0.9 0.0 0.0 0.0 7.8 17.8 0.0 0.0 0.0
9/7/1995 15.1 51.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 9.9 16.1 16.5 0.0
9/8/1995 1.3 3.3 0.1 0.4 0.0 0.0 0.2 0.0 3.1 0.6 5.4 9.3 9.5 3.1
9/9/1995 0.9 0.7 1.1 0.4 0.3 1.0 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/1995 0.0 0.4 2.0 6.1 1.0 12.3 78.2 0.0 0.0 1.2 2.7 0.0 0.0 0.0
9/11/1995 0.2 0.2 1.5 1.5 0.0 0.0 0.7 0.0 13.0 0.0 0.0 0.0 0.0 13.1
9/12/1995 0.5 0.1 1.0 5.1 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1995 2.2 1.3 2.8 16.4 4.8 6.5 24.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/14/1995 0.8 3.1 2.0 0.0 0.2 0.1 0.0 0.0 0.0 1.1 8.8 15.1 15.5 0.0
9/15/1995 0.1 0.3 0.4 5.0 0.6 7.7 49.1 0.0 9.9 0.1 0.6 1.0 1.0 10.0
9/16/1995 1.5 6.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.8 1.0 1.0 0.0
9/17/1995 2.2 4.0 2.6 0.0 3.5 2.1 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
9/18/1995 0.6 1.1 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1995 1.8 7.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
9/20/1995 5.2 10.8 2.6 0.4 0.1 0.8 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1995 2.4 0.7 0.6 5.0 0.8 10.1 63.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1995 1.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 5.1 11.5 0.0 0.0 0.0
9/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1995 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1995 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1996 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1996 1.1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1996 0.5 2.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
1/6/1996 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1996 0.1 0.3 0.3 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1996 10.9 0.7 15.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1996 15.6 6.1 31.8 6.1 35.8 34.0 15.6 40.3 31.4 43.5 41.4 25.4 25.0 31.4
1/12/1996 13.4 2.5 22.1 6.6 47.9 30.5 15.0 0.0 16.7 14.1 58.1 61.9 63.5 16.8
1/13/1996 3.0 0.2 4.0 4.5 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.4
1/14/1996 1.6 2.6 6.3 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1996 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1996 0.8 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1996 3.8 0.8 3.4 6.3 6.5 3.9 0.1 0.0 1.4 0.1 0.1 0.0 0.0 1.4
1/18/1996 4.1 0.9 3.4 1.9 3.0 1.8 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
1/19/1996 3.9 0.9 3.6 9.6 8.3 4.9 0.3 0.0 5.2 1.4 3.6 1.1 1.1 5.2
1/20/1996 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1996 0.5 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1996 1.8 0.4 1.6 0.0 3.8 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1996 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1996 2.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1996 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1996 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1996 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1996 2.1 1.9 2.5 0.0 6.9 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1996 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1996 0.8 1.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1996 0.1 0.4 1.8 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1996 0.6 0.1 0.8 1.9 0.0 0.0 0.9 0.0 16.1 0.0 0.0 0.0 0.0 16.2
2/16/1996 4.8 0.3 6.8 1.5 0.0 0.0 0.7 0.0 12.5 0.0 0.3 0.5 0.5 12.6
2/17/1996 14.9 3.7 16.8 40.3 41.8 38.9 23.3 40.4 15.3 42.8 41.0 28.8 28.5 15.2
2/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.2 9.1 9.3 0.0
2/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1996 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
2/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1996 2.3 0.3 2.4 22.1 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.1 1.1 0.0
2/24/1996 5.9 1.7 16.0 1.6 3.0 1.8 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.8
2/25/1996 13.6 12.2 13.1 1.2 33.8 22.3 15.3 0.0 0.0 10.0 34.4 27.8 28.5 0.0
2/26/1996 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/1996 0.3 0.0 0.1 4.4 0.0 0.0 0.1 0.0 1.4 0.0 0.0 0.0 0.0 1.4
2/29/1996 0.4 0.0 0.2 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1996 1.5 0.0 2.1 0.0 6.3 9.0 0.0 20.1 7.6 15.7 1.8 0.5 0.0 7.6
3/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1996 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1996 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1996 1.8 0.1 2.4 2.3 0.1 1.3 8.8 0.0 5.3 0.9 3.1 2.4 2.5 5.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/9/1996 5.7 0.9 7.9 8.5 21.7 16.1 0.0 12.2 4.6 9.1 0.8 1.7 1.4 4.6
3/10/1996 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1996 1.6 5.3 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1996 2.9 10.5 0.1 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1996 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1996 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1996 2.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1996 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1996 0.2 0.0 0.3 0.0 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1996 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1996 1.0 0.1 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1996 6.4 1.0 7.5 10.6 5.4 4.0 5.8 0.0 14.0 0.9 2.9 2.2 2.3 14.1
3/28/1996 5.4 4.9 4.6 6.7 9.7 8.8 20.1 0.0 0.0 4.5 14.8 10.7 11.0 0.0
3/29/1996 1.7 2.9 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1996 6.6 1.2 7.6 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1996 11.2 1.5 9.7 22.2 26.0 18.7 22.1 0.0 0.0 2.2 8.1 7.3 7.5 0.0
4/1/1996 0.3 0.0 0.5 0.0 1.4 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1996 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1996 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1996 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1996 0.7 0.1 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1996 2.9 4.8 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1996 5.5 0.9 6.4 6.8 12.1 8.7 0.0 6.0 2.3 4.5 0.2 0.2 0.0 2.3
4/13/1996 3.7 0.0 1.6 8.4 4.5 2.6 1.3 0.0 25.3 1.7 4.0 0.5 0.5 25.5
4/14/1996 1.8 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1996 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1996 0.5 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1996 0.5 0.8 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1996 0.1 0.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1996 0.3 0.0 0.4 0.0 1.3 0.8 0.0 0.0 0.0 0.6 1.4 0.0 0.0 0.0
4/20/1996 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1996 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1996 0.0 0.4 3.9 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1996 3.1 0.1 3.3 0.0 4.7 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1996 0.9 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0
4/26/1996 0.5 2.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1996 1.2 3.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1996 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1996 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1996 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1996 1.5 2.5 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1996 2.3 3.3 2.3 0.6 6.0 4.8 7.9 0.0 0.0 9.7 33.9 27.9 28.6 0.0
5/11/1996 5.1 0.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1996 0.6 0.7 1.1 1.7 1.2 4.9 0.0 16.0 6.1 11.9 0.0 0.4 0.0 6.0
5/13/1996 1.0 0.2 0.0 1.5 0.2 1.3 7.9 0.0 0.0 0.1 1.1 2.0 2.0 0.0
5/14/1996 0.0 0.0 0.0 0.9 0.2 1.9 12.0 0.0 0.0 5.6 12.7 0.0 0.0 0.0
5/15/1996 0.0 0.0 0.0 1.2 0.2 2.3 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1996 5.7 13.3 0.3 9.8 1.0 0.6 1.3 0.0 23.9 0.6 1.4 0.0 0.0 24.0
5/17/1996 0.0 0.0 0.0 0.6 0.1 2.4 5.4 6.0 3.5 6.2 4.0 0.2 0.0 3.5
5/18/1996 0.1 0.0 0.0 2.6 0.0 7.1 0.0 27.2 10.3 20.2 0.0 0.7 0.0 10.2
5/19/1996 0.6 0.0 0.6 3.8 1.8 2.7 0.0 6.3 2.4 4.7 0.0 0.2 0.0 2.4
5/20/1996 0.1 0.0 0.1 0.0 0.0 1.4 0.0 5.3 2.0 3.9 0.0 0.1 0.0 2.0
5/21/1996 3.1 4.7 2.6 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1996 1.1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1996 0.6 0.1 0.8 0.0 2.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1996 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.3 7.4 7.6 0.0
5/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1996 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1996 0.0 0.0 0.3 0.0 0.0 4.5 0.0 17.3 6.6 12.8 0.0 0.4 0.0 6.5
6/10/1996 2.3 2.9 1.0 0.1 0.2 6.1 1.4 22.0 8.3 16.3 0.0 0.6 0.0 8.3
6/11/1996 6.5 6.2 3.2 35.2 0.7 9.7 0.1 35.3 16.0 26.2 0.0 0.9 0.0 15.9
6/12/1996 6.0 7.3 8.6 3.0 0.5 10.9 11.4 34.5 31.9 25.6 0.0 0.9 0.0 31.9
6/13/1996 6.1 3.1 8.4 11.1 10.8 62.3 39.6 190.4 75.1 145.3 16.6 21.5 17.2 74.5
6/14/1996 0.4 0.4 1.1 2.3 1.5 14.3 27.4 35.3 14.7 33.2 56.7 97.3 98.9 14.6
6/15/1996 2.8 3.7 2.0 0.7 1.2 2.0 0.3 5.0 7.6 7.5 15.7 17.2 17.5 7.6
6/16/1996 5.1 2.7 7.4 5.4 4.7 6.5 21.1 3.0 26.3 3.5 3.0 0.1 0.0 26.4
6/17/1996 1.2 0.8 9.1 0.2 4.9 2.9 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
6/18/1996 15.4 7.4 20.0 9.0 31.5 22.3 24.5 0.0 2.5 0.0 0.0 0.0 0.0 2.5
6/19/1996 8.6 12.4 11.3 2.1 10.9 6.4 0.0 0.0 0.0 3.1 9.6 5.9 6.0 0.0
6/20/1996 10.8 7.6 16.2 19.3 25.6 22.6 49.4 0.0 5.2 14.2 50.2 42.4 43.5 5.2
6/21/1996 5.4 7.5 9.6 14.9 13.2 22.0 59.4 20.0 11.7 17.7 12.6 14.6 14.5 11.6
6/22/1996 2.3 1.0 1.5 2.6 2.3 14.3 25.1 35.2 19.0 26.1 0.0 0.9 0.0 18.9
6/23/1996 3.8 5.7 5.7 3.4 0.4 6.7 34.7 5.0 8.1 5.2 7.8 10.4 10.5 8.1
6/24/1996 8.8 12.1 9.0 15.9 13.4 17.6 48.6 9.2 3.5 12.0 16.3 10.8 10.8 3.5
6/25/1996 4.5 7.6 5.6 11.4 0.5 6.4 25.4 9.0 11.0 11.5 20.1 22.2 22.5 11.0
6/26/1996 3.9 2.2 6.9 0.8 6.4 5.8 10.3 2.0 0.8 1.7 1.7 3.0 3.0 0.8
6/27/1996 8.8 23.1 5.1 1.1 1.2 3.5 13.7 3.0 1.1 2.2 0.0 0.1 0.0 1.1
6/28/1996 5.7 13.2 8.1 8.1 1.6 7.3 34.9 4.1 4.0 4.8 4.1 0.1 0.0 4.0
6/29/1996 0.9 2.9 7.7 1.1 1.5 4.5 13.7 6.0 2.3 9.5 27.9 38.9 39.7 2.3
6/30/1996 3.6 12.7 2.4 0.0 0.0 3.0 0.0 11.3 4.3 8.6 0.4 0.3 0.0 4.3
7/1/1996 1.3 2.6 0.9 0.8 1.3 4.8 10.3 9.3 3.5 6.9 0.0 0.2 0.0 3.5
7/2/1996 4.2 5.6 4.0 5.3 9.1 15.6 67.9 0.1 0.0 0.5 3.4 5.9 6.0 0.0
7/3/1996 2.6 4.8 7.9 4.7 0.7 11.7 58.9 9.1 4.7 8.4 3.8 0.2 0.0 4.7
7/4/1996 6.3 12.2 2.0 3.0 0.5 7.2 38.9 4.0 1.5 3.1 1.3 2.3 2.3 1.5
7/5/1996 2.5 2.7 5.4 2.9 2.4 7.8 37.6 3.0 1.1 2.2 0.0 0.1 0.0 1.1
7/6/1996 2.5 4.2 9.1 10.6 2.6 10.5 35.5 14.0 14.6 12.2 10.4 14.9 14.9 14.6
7/7/1996 7.6 1.9 7.1 1.0 20.3 14.1 10.5 2.0 2.6 1.6 0.9 1.5 1.5 2.6
7/8/1996 4.6 3.8 4.7 4.4 7.9 4.7 0.0 0.1 0.0 0.3 2.0 3.4 3.5 0.0
7/9/1996 7.4 9.5 15.2 1.6 1.3 17.3 20.9 51.0 19.3 39.7 11.7 18.8 18.0 19.2
7/10/1996 4.6 9.4 3.6 1.1 0.4 11.2 14.3 33.4 12.7 25.1 2.5 5.2 4.5 12.6
7/11/1996 5.5 3.2 6.9 15.1 6.6 11.6 24.4 15.3 5.8 19.5 36.0 41.7 42.4 5.8
7/12/1996 7.1 12.5 10.2 0.0 7.3 5.1 0.0 3.0 1.1 2.5 1.2 1.5 1.5 1.1
7/13/1996 5.5 15.7 4.4 0.0 0.0 2.4 0.0 9.0 3.4 10.0 7.6 0.2 0.0 3.4
7/14/1996 6.1 12.8 4.9 1.8 3.0 8.4 0.8 25.3 25.1 19.6 2.3 1.2 0.6 25.1
7/15/1996 14.8 11.3 22.5 0.7 2.8 8.8 0.3 27.4 16.0 20.3 0.3 1.2 0.5 15.9
7/16/1996 7.2 5.7 22.2 21.3 21.5 12.8 0.0 0.0 0.0 7.4 16.8 0.0 0.0 0.0
7/17/1996 1.9 6.5 7.5 2.1 0.3 4.2 26.7 0.0 0.0 0.1 0.9 1.5 1.5 0.0
7/18/1996 6.6 7.5 7.1 1.6 0.3 8.5 20.1 20.2 7.7 15.5 1.2 0.5 0.0 7.6
7/19/1996 8.6 13.9 7.7 10.0 2.2 8.9 29.6 12.0 4.6 16.8 21.9 9.6 9.5 4.5
7/20/1996 5.7 13.2 5.0 3.8 5.2 4.7 5.4 3.0 1.1 2.6 1.0 0.1 0.0 1.1
7/21/1996 6.5 9.2 7.8 1.9 2.4 5.1 24.8 0.0 0.0 1.4 5.8 6.3 6.5 0.0
7/22/1996 22.1 20.8 20.7 1.2 4.3 4.9 15.3 0.0 0.0 4.2 9.6 0.0 0.0 0.0
7/23/1996 11.7 8.8 16.1 5.1 14.1 17.6 0.0 35.0 13.3 31.9 13.5 0.9 0.0 13.2
7/24/1996 12.1 29.5 7.5 0.0 2.4 1.4 0.0 0.0 0.0 1.3 3.0 0.0 0.0 0.0
7/25/1996 1.4 2.0 2.8 0.1 0.5 0.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/26/1996 0.9 1.8 1.4 1.2 0.2 2.4 15.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/27/1996 0.0 0.2 1.5 0.8 0.1 1.6 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/29/1996 0.1 0.7 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/30/1996 10.5 15.0 15.9 0.8 0.3 4.4 10.5 10.0 3.8 7.4 0.0 0.3 0.0 3.8
7/31/1996 4.7 2.8 7.6 3.6 2.2 3.6 15.2 0.0 2.6 0.0 0.0 0.0 0.0 2.6
8/1/1996 2.7 8.2 4.6 10.1 1.1 3.6 19.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/2/1996 8.8 19.3 9.5 11.4 0.9 12.3 15.0 36.3 13.8 33.0 13.8 0.9 0.0 13.7
8/3/1996 7.1 17.9 9.3 7.6 0.5 16.1 11.0 54.3 34.5 40.8 4.3 8.8 7.6 34.4
8/4/1996 7.4 16.1 8.6 8.1 0.5 6.8 25.8 10.3 20.2 13.9 15.5 3.4 3.2 20.3
8/5/1996 6.8 0.5 7.0 15.9 8.3 7.2 16.6 0.0 23.1 3.3 10.8 7.8 8.0 23.2
8/6/1996 3.9 2.7 10.5 1.4 6.5 9.2 18.0 10.3 3.9 8.2 4.6 8.2 8.1 3.9
8/7/1996 9.1 14.6 7.3 2.4 8.2 6.8 9.5 2.0 0.8 2.6 2.6 0.1 0.0 0.8
8/8/1996 10.5 9.3 11.9 28.2 9.1 9.8 12.4 10.0 3.8 13.3 26.9 32.2 32.8 3.8
8/9/1996 12.5 18.9 16.5 16.6 8.7 21.8 27.7 47.3 17.9 36.8 12.5 21.2 20.5 17.8
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/10/1996 7.3 9.2 14.8 2.6 6.2 13.3 21.9 24.0 9.1 18.5 3.3 4.6 4.1 9.0
8/11/1996 4.2 5.2 9.4 5.3 0.4 11.2 34.6 22.0 8.3 18.6 6.2 3.0 2.5 8.3
8/12/1996 5.9 17.1 9.5 7.4 0.4 6.2 29.2 6.0 2.3 7.0 11.2 12.8 13.0 2.3
8/13/1996 19.7 18.2 19.2 16.3 18.2 22.3 34.1 24.3 9.2 20.0 6.6 5.5 5.0 9.2
8/14/1996 15.4 7.7 16.4 30.2 17.0 48.3 49.1 117.4 44.5 93.3 16.9 8.9 6.1 44.2
8/15/1996 11.9 1.6 11.6 15.4 19.0 34.3 50.5 59.0 22.4 59.3 73.6 92.2 93.0 22.2
8/16/1996 2.0 1.0 5.4 0.0 2.6 1.5 0.0 0.0 0.0 4.1 34.5 59.5 61.0 0.0
8/17/1996 2.0 7.9 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/18/1996 7.2 20.3 6.4 1.9 1.1 4.4 24.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/1996 2.0 2.7 11.0 0.9 0.2 1.9 12.0 0.0 0.0 7.8 19.0 2.9 3.0 0.0
8/20/1996 3.9 13.5 8.3 1.3 0.0 17.7 0.1 67.3 27.9 58.9 28.4 20.3 19.1 27.8
8/21/1996 12.5 32.3 10.2 0.1 0.0 0.0 0.0 0.0 0.6 4.1 34.4 59.5 61.0 0.6
8/22/1996 13.8 6.5 12.6 11.9 25.3 22.1 10.5 21.2 8.1 15.7 0.0 0.5 0.0 8.0
8/23/1996 1.8 1.5 3.1 3.8 0.6 7.8 49.1 0.0 0.0 1.9 15.8 27.3 28.0 0.0
8/24/1996 6.1 18.1 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.7 6.3 6.5 0.0
8/25/1996 9.2 7.0 6.1 10.6 4.6 5.1 15.3 0.0 0.0 2.3 7.0 3.9 4.0 0.0
8/26/1996 5.3 6.2 8.4 2.7 2.2 7.9 0.0 25.3 9.6 20.9 4.9 0.6 0.0 9.5
8/27/1996 2.1 5.6 8.1 1.2 0.2 2.4 15.4 0.0 0.0 1.7 5.6 4.4 4.5 0.0
8/28/1996 0.7 3.6 7.6 1.5 0.2 3.0 19.2 0.0 0.0 0.3 0.6 0.0 0.0 0.0
8/29/1996 1.4 5.1 1.9 0.0 0.5 0.3 0.0 0.0 0.0 0.8 1.7 0.0 0.0 0.0
8/30/1996 6.9 13.2 6.4 8.5 0.0 0.0 0.0 0.0 0.0 6.5 14.7 0.0 0.0 0.0
8/31/1996 10.8 6.2 11.9 2.1 18.1 15.7 0.0 19.0 7.2 21.4 22.9 15.1 15.0 7.2
9/1/1996 5.5 6.4 3.0 5.1 0.0 0.0 0.0 0.0 0.0 5.7 17.9 11.6 11.9 0.0
9/2/1996 3.5 7.7 7.3 1.3 0.0 0.0 0.6 0.0 11.3 0.0 0.0 0.0 0.0 11.4
9/3/1996 1.2 0.9 8.0 4.3 0.0 0.0 0.8 0.0 14.5 0.0 0.0 0.0 0.0 14.6
9/4/1996 4.7 1.3 12.5 0.8 6.1 5.2 10.5 0.0 0.0 1.3 5.2 5.4 5.5 0.0
9/5/1996 3.4 7.2 5.5 2.3 2.2 4.0 18.2 0.0 0.0 0.5 2.0 2.0 2.0 0.0
9/6/1996 12.6 15.1 16.9 27.0 2.7 12.4 19.2 30.0 11.4 24.2 4.4 0.7 0.0 11.3
9/7/1996 6.9 14.9 4.1 28.5 1.0 13.5 29.8 32.3 12.3 33.7 38.7 39.8 40.0 12.2
9/8/1996 6.3 6.1 5.4 14.4 3.0 20.6 20.5 60.0 22.8 54.3 37.8 38.1 37.5 22.6
9/9/1996 5.1 9.3 12.9 4.7 3.4 11.0 5.4 31.0 11.8 25.3 9.6 11.0 10.5 11.7
9/10/1996 1.1 1.4 5.9 0.0 0.0 2.6 0.0 10.0 3.8 12.2 14.8 9.6 9.6 3.8
9/11/1996 0.4 0.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1996 0.0 0.2 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1996 0.0 0.3 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.7 1.5 1.5 0.0
9/14/1996 1.4 0.8 8.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/15/1996 0.3 1.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/1996 3.4 10.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 8.7 15.1 15.5 0.0
9/17/1996 2.7 1.7 11.9 26.4 4.9 2.9 0.0 0.0 0.0 1.1 2.5 0.0 0.0 0.0
9/18/1996 2.0 0.0 0.0 2.7 0.4 5.5 34.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1996 1.9 0.0 0.0 1.9 0.3 3.9 24.8 0.0 0.0 2.0 6.7 5.3 5.4 0.0
9/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1996 1.5 0.0 0.0 2.4 0.0 0.0 1.1 0.0 20.5 0.0 0.0 0.0 0.0 20.6
9/24/1996 1.6 0.1 1.1 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.4
9/25/1996 1.6 0.6 1.5 2.5 0.0 0.0 1.1 0.0 21.1 0.0 0.0 0.0 0.0 21.2
9/26/1996 8.0 0.5 4.6 1.3 0.0 0.0 0.6 0.0 11.3 0.0 0.0 0.0 0.0 11.4
9/27/1996 0.3 0.6 0.8 2.2 0.0 0.0 1.0 0.0 18.2 0.0 0.0 0.0 0.0 18.3
9/28/1996 5.7 21.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1996 5.4 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
9/30/1996 0.3 0.6 0.7 0.0 0.0 0.0 0.0 0.0 0.0 7.3 29.5 30.7 31.5 0.0
10/1/1996 0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1996 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1996 0.4 1.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1996 1.1 0.0 1.5 0.0 4.6 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1996 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
10/31/1996 0.0 0.0 0.0 1.4 0.0 0.0 0.6 0.0 11.9 0.0 0.0 0.0 0.0 12.0
11/1/1996 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1996 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1996 3.4 7.4 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1996 32.7 55.3 32.3 13.5 0.3 6.0 19.9 11.0 4.2 8.2 0.0 0.3 0.0 4.1
11/12/1996 18.3 0.1 20.3 36.3 62.5 52.9 18.2 50.3 19.1 48.7 40.6 36.1 35.7 18.9
11/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1996 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1996 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1996 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1996 0.3 0.0 0.4 0.2 1.3 1.1 2.3 0.0 0.0 0.8 3.9 4.9 5.0 0.0
12/25/1996 0.0 0.0 0.0 0.4 0.1 0.9 5.4 0.0 0.0 0.1 0.6 1.0 1.0 0.0
12/26/1996 2.7 7.7 1.0 0.5 0.1 1.0 6.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1996 0.6 0.5 1.1 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1997 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1997 0.2 0.0 0.3 0.1 0.0 0.3 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1997 1.8 2.9 1.4 0.0 2.2 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1997 0.1 0.3 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
1/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1997 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1997 1.5 0.1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1997 3.9 4.4 5.5 4.3 6.9 4.1 0.0 0.0 0.0 1.0 2.3 0.0 0.0 0.0
1/16/1997 13.7 8.9 15.3 15.2 7.0 12.3 8.8 26.0 16.1 22.5 13.0 14.3 14.0 16.0
1/17/1997 8.0 8.2 13.8 18.2 22.9 16.4 11.8 5.0 26.9 8.5 17.4 15.7 16.0 27.0
1/18/1997 6.9 0.5 9.5 14.0 26.4 27.5 0.0 45.3 17.2 40.4 20.4 12.6 11.8 17.1
1/19/1997 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
1/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1997 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1997 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1997 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1997 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1997 0.0 0.0 0.0 2.9 0.0 0.0 1.3 0.0 24.4 0.0 0.0 0.0 0.0 24.5
2/10/1997 4.5 0.3 6.4 0.0 0.0 0.0 0.0 0.0 0.0 1.3 3.0 0.0 0.0 0.0
2/11/1997 11.2 20.0 11.6 12.5 10.3 13.1 18.0 16.4 6.2 20.6 29.4 24.3 24.5 6.2
2/12/1997 5.0 5.5 15.5 4.3 14.1 9.2 5.6 0.0 0.0 2.5 9.7 9.3 9.5 0.0
2/13/1997 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1997 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1997 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
2/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.6 0.6 0.0
2/20/1997 1.1 1.8 0.7 1.7 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1997 0.5 0.0 0.5 3.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1997 0.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1997 3.6 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.7 0.0 0.0 0.0 0.0 5.7
2/24/1997 6.0 10.5 4.6 1.6 0.0 0.0 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.7
2/25/1997 9.2 11.4 13.1 2.7 7.3 4.6 1.5 0.0 0.0 0.2 1.4 2.4 2.5 0.0
2/26/1997 22.3 25.4 25.7 14.0 29.6 30.0 1.3 47.3 43.0 36.7 5.6 5.8 4.7 42.9
2/27/1997 21.3 22.0 29.5 18.4 41.5 31.7 0.2 27.3 14.8 27.1 24.6 21.8 21.7 14.8
2/28/1997 8.4 4.6 18.1 23.9 27.7 16.4 0.8 0.0 14.9 7.6 25.6 19.4 19.9 15.0
3/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1997 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.5 4.4 4.5 0.0
3/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1997 3.0 6.7 1.7 0.5 0.1 0.1 0.2 0.0 4.5 1.5 3.5 0.0 0.0 4.5
3/10/1997 6.2 0.8 4.4 0.0 8.8 6.3 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
3/11/1997 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.8 3.1 3.2 0.0
3/12/1997 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1997 1.3 0.2 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1997 0.1 0.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1997 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.0 5.3 5.4 0.0
3/18/1997 1.0 0.2 1.3 1.4 1.0 0.6 0.6 0.0 11.8 0.0 0.0 0.0 0.0 11.9
3/19/1997 0.7 0.6 1.9 0.9 0.8 0.5 0.4 0.0 7.6 0.0 0.0 0.0 0.0 7.6
3/20/1997 0.1 0.4 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1997 0.0 0.0 0.0 0.0 0.0 1.6 0.0 6.0 2.3 5.1 1.5 0.2 0.0 2.3
3/22/1997 0.0 0.0 0.0 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
3/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1997 5.8 7.2 4.8 11.1 0.0 0.0 0.0 0.0 0.0 0.3 2.3 3.9 4.0 0.0
3/25/1997 5.1 0.0 5.8 1.8 17.8 10.5 0.8 0.0 14.9 1.0 2.3 0.0 0.0 15.0
3/26/1997 0.0 0.0 0.0 2.0 0.0 0.0 0.9 0.0 16.9 0.0 0.0 0.0 0.0 17.0
3/27/1997 3.6 0.5 0.9 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
3/28/1997 0.1 0.0 0.1 0.0 0.3 0.2 0.0 0.0 0.0 1.0 4.3 4.9 5.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1997 0.3 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1997 0.6 0.0 0.5 5.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1997 0.7 0.1 0.4 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.7 0.0 0.0 0.0
4/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1997 0.0 0.0 0.0 2.7 0.0 0.0 1.2 0.0 23.0 0.0 0.0 0.0 0.0 23.1
4/5/1997 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1997 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
4/8/1997 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1997 7.3 14.5 4.7 3.4 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0
4/10/1997 3.5 2.5 9.0 1.7 12.7 19.6 5.6 43.0 20.2 32.6 1.7 1.1 0.0 20.1
4/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1997 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1997 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.7 0.0 0.0 0.0 0.0 2.7
4/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1997 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
4/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
4/19/1997 1.1 3.5 0.3 0.8 0.1 1.6 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1997 2.8 5.2 2.0 0.0 4.0 4.4 0.0 8.0 3.0 7.0 8.6 15.0 15.2 3.0
4/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1997 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1997 4.9 0.0 0.0 2.1 0.0 0.0 1.0 0.0 18.1 0.0 0.0 0.0 0.0 18.2
4/24/1997 0.6 2.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1997 0.9 0.1 1.1 3.1 0.1 1.4 5.7 2.0 2.0 1.9 0.9 0.1 0.0 2.0
4/26/1997 3.9 4.1 5.1 5.0 2.0 1.2 0.3 0.0 5.8 0.8 1.8 0.0 0.0 5.8
4/27/1997 5.0 9.0 8.1 1.2 10.1 8.3 15.3 0.0 0.0 3.6 12.3 9.8 10.0 0.0
4/28/1997 0.3 0.4 1.1 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
4/29/1997 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
4/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1997 0.1 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1997 4.5 9.8 5.3 2.2 0.1 3.2 6.1 9.0 18.3 6.7 0.0 0.2 0.0 18.4
5/3/1997 4.1 1.2 2.4 0.8 0.1 5.5 9.9 15.0 5.7 11.1 0.0 0.4 0.0 5.7
5/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1997 1.2 0.0 1.7 1.7 4.6 2.8 0.8 0.0 14.4 0.0 0.0 0.0 0.0 14.5
5/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1997 0.1 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1997 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.9 0.0 0.0 0.0 0.0 1.9
5/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1997 2.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1997 0.5 0.0 0.4 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1997 1.3 0.8 3.1 0.1 5.0 3.2 1.7 0.0 0.0 1.0 2.2 0.0 0.0 0.0
5/15/1997 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1997 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1997 1.3 2.2 0.8 0.0 0.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1997 4.3 7.6 4.4 0.0 6.6 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1997 0.8 3.1 1.5 0.8 0.1 2.6 9.9 4.0 1.5 5.2 5.1 0.1 0.0 1.5
5/20/1997 2.1 3.6 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.8 6.9 11.9 12.2 0.0
5/21/1997 0.4 0.0 0.5 3.3 0.1 1.6 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1997 0.6 1.2 2.8 1.1 1.9 5.1 13.7 7.3 2.8 6.5 2.5 0.2 0.0 2.8
5/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.8 0.0 0.0 0.0
5/24/1997 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1997 0.6 0.0 0.1 0.0 0.4 0.2 0.0 0.0 0.0 3.5 8.0 0.0 0.0 0.0
5/26/1997 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1997 0.0 0.0 0.0 0.8 0.1 1.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1997 0.2 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1997 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1997 0.7 1.8 0.0 0.0 0.0 1.8 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
6/1/1997 0.9 0.3 1.8 2.5 3.8 4.0 12.3 0.0 13.8 1.2 8.7 14.1 14.5 13.9
6/2/1997 0.0 0.0 0.0 1.0 0.2 2.0 12.5 0.0 0.0 0.8 3.0 2.6 2.7 0.0
6/3/1997 0.2 0.0 0.5 3.1 1.0 23.0 6.5 82.3 53.7 61.6 1.3 2.0 0.0 53.6
6/4/1997 0.4 0.0 0.5 2.9 0.6 0.9 1.3 2.0 25.2 1.5 0.0 0.1 0.0 25.3
6/5/1997 7.1 8.6 3.1 9.2 2.5 4.9 11.3 7.0 23.3 5.5 2.8 5.1 5.0 23.3
6/6/1997 8.6 14.6 8.2 5.3 7.1 6.5 15.7 0.0 11.9 3.7 9.2 2.0 2.0 12.0
6/7/1997 2.9 0.6 6.7 0.0 9.3 5.5 0.0 0.0 0.0 2.9 11.8 12.7 13.0 0.0
6/8/1997 1.2 3.7 0.3 0.0 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1997 0.4 0.1 0.5 1.4 0.2 2.8 17.6 0.0 0.0 3.2 7.3 0.0 0.0 0.0
6/10/1997 6.5 9.4 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1997 2.8 0.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1997 3.1 0.0 0.0 0.2 0.0 0.6 0.1 2.1 2.7 1.6 0.0 0.1 0.0 2.7
6/13/1997 1.3 2.7 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/14/1997 2.2 0.0 0.0 0.0 0.0 2.6 0.0 10.0 3.8 19.0 37.1 25.8 26.2 3.8
6/15/1997 0.8 2.0 6.3 0.0 0.0 1.6 0.0 6.0 2.3 4.6 1.5 2.8 2.7 2.3
6/16/1997 0.3 1.2 0.0 0.0 0.0 9.5 0.0 36.2 13.7 28.5 13.9 25.0 24.7 13.6
6/17/1997 0.3 0.5 0.0 0.8 0.1 1.6 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/1997 0.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/1997 0.0 0.2 1.5 1.6 0.3 3.2 20.1 0.0 0.0 3.5 8.0 0.0 0.0 0.0
6/20/1997 1.7 4.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 1.3 8.6 13.7 14.0 0.0
6/21/1997 5.2 3.7 3.0 2.9 0.5 5.9 37.3 0.1 0.0 0.6 4.6 8.0 8.2 0.0
6/22/1997 3.4 5.1 3.6 4.2 2.7 10.2 53.8 2.0 0.8 2.3 6.7 11.6 11.8 0.8
6/23/1997 0.5 0.0 0.2 4.6 0.8 5.7 34.6 0.0 0.0 0.9 7.4 12.9 13.2 0.0
6/24/1997 3.3 3.7 0.9 3.3 2.3 7.8 5.6 21.2 8.0 17.0 2.9 0.7 0.2 8.0
6/25/1997 5.5 10.4 9.8 3.5 1.8 11.7 44.3 15.0 5.7 11.7 1.3 0.4 0.0 5.7
6/26/1997 3.3 5.8 1.6 0.0 0.0 4.6 0.0 17.4 6.6 14.2 9.4 15.6 15.5 6.6
6/27/1997 3.6 12.3 12.0 0.0 0.0 7.4 0.0 28.2 10.7 22.5 3.9 1.6 0.9 10.6
6/28/1997 2.0 3.1 9.8 1.3 4.2 2.5 0.6 0.0 11.2 1.0 2.7 1.2 1.2 11.2
6/29/1997 3.5 7.6 1.5 0.9 0.7 1.7 0.4 5.0 9.4 3.7 0.0 0.1 0.0 9.4
6/30/1997 2.9 6.8 15.2 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/1/1997 9.6 6.6 8.5 1.8 4.1 8.7 10.5 18.0 6.8 14.2 2.1 0.7 0.3 6.8
7/2/1997 8.7 4.8 13.3 11.5 22.7 13.5 0.0 0.0 0.0 8.6 47.6 66.8 68.5 0.0
7/3/1997 0.5 1.8 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/4/1997 0.4 0.3 1.7 0.0 0.6 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/5/1997 4.5 14.3 1.2 2.9 2.8 7.3 37.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/6/1997 4.7 8.5 4.5 0.0 6.9 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/7/1997 4.2 6.6 5.9 0.0 9.3 5.5 0.0 0.0 0.0 0.7 6.2 10.7 11.0 0.0
7/8/1997 1.9 5.5 6.0 2.9 0.9 6.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/9/1997 4.0 6.1 2.7 0.8 0.1 1.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/10/1997 8.7 3.3 1.6 10.2 2.2 4.5 21.1 0.0 0.0 2.0 7.8 7.8 8.0 0.0
7/11/1997 14.4 19.5 15.8 21.2 14.1 12.3 19.2 5.0 25.5 8.5 11.9 2.8 2.7 25.6
7/12/1997 10.4 9.1 9.0 8.4 9.8 20.1 38.4 33.2 32.5 25.7 3.9 4.2 3.5 32.5
7/13/1997 7.2 15.9 6.6 8.8 0.5 6.5 19.2 13.2 28.1 13.2 14.1 15.4 15.5 28.2
7/14/1997 5.8 11.1 8.2 3.1 3.4 7.9 21.5 10.0 3.8 13.0 18.2 13.2 13.3 3.8
7/15/1997 6.8 15.4 11.9 6.3 1.2 12.0 15.3 34.3 13.0 26.9 4.8 4.0 3.2 12.9
7/16/1997 2.4 2.7 10.6 19.4 3.1 17.9 63.1 25.0 9.5 38.4 86.3 98.1 100.0 9.4
7/17/1997 6.6 18.4 9.9 1.9 3.3 9.1 24.8 13.1 5.0 13.1 11.5 9.3 9.2 4.9
7/18/1997 7.9 17.6 3.8 2.5 1.4 5.6 31.7 0.0 0.0 0.3 1.5 2.1 2.1 0.0
7/19/1997 7.1 9.8 7.1 3.2 0.5 11.4 38.4 20.2 9.7 15.0 0.0 0.5 0.0 9.6
7/20/1997 7.2 23.5 2.4 3.6 0.6 7.4 46.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/21/1997 7.6 19.6 8.3 4.7 0.7 7.3 46.0 0.0 0.0 1.6 13.0 22.4 23.0 0.0
7/22/1997 10.9 36.3 9.7 7.5 1.1 15.9 89.1 7.0 7.9 5.6 3.5 6.0 6.0 7.9
7/23/1997 5.9 11.3 3.5 7.2 0.2 4.3 15.3 7.0 2.7 7.7 9.1 8.5 8.5 2.6
7/24/1997 3.3 7.9 1.8 4.3 0.0 0.0 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
7/25/1997 6.0 20.5 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/26/1997 6.2 12.7 4.1 8.7 2.2 24.7 96.9 34.0 22.8 26.9 6.1 6.2 5.5 22.8
7/27/1997 8.7 26.1 7.3 6.6 3.0 15.6 84.7 4.0 1.5 3.6 1.5 0.1 0.0 1.5
7/28/1997 4.7 9.0 8.8 5.7 2.0 6.6 36.9 0.0 24.3 0.8 1.8 0.0 0.0 24.5
7/29/1997 6.3 12.1 10.0 5.0 0.8 10.1 63.7 0.0 0.0 0.8 1.8 0.0 0.0 0.0
7/30/1997 4.4 8.7 3.2 3.5 0.6 7.0 44.3 0.0 0.0 2.0 4.6 0.0 0.0 0.0
7/31/1997 3.6 2.3 1.9 2.9 0.3 7.2 27.6 11.1 11.0 8.8 2.6 3.4 3.2 11.0
8/1/1997 5.1 7.3 6.6 2.7 0.4 10.1 34.1 18.0 6.8 13.7 0.9 0.5 0.0 6.8
8/2/1997 5.7 17.1 0.6 2.3 0.2 3.5 18.6 2.1 0.8 1.7 0.4 0.1 0.0 0.8
8/3/1997 5.1 9.1 6.2 4.1 0.4 6.2 31.2 5.0 1.9 10.6 39.4 56.3 57.6 1.9
8/4/1997 9.3 6.4 14.4 8.1 6.3 9.1 29.3 4.1 14.7 7.3 10.2 1.3 1.2 14.8
8/5/1997 6.7 2.0 9.2 11.2 11.0 16.6 45.7 12.2 4.6 9.8 1.7 0.3 0.0 4.6
8/6/1997 18.3 13.2 19.7 2.9 2.7 7.2 37.3 0.0 0.0 0.3 2.4 4.1 4.2 0.0
8/7/1997 14.8 12.4 14.9 8.8 16.5 19.2 56.5 3.4 1.3 8.0 16.1 9.1 9.2 1.3
8/8/1997 2.8 2.7 2.9 3.7 3.0 16.9 47.6 30.4 11.5 22.6 0.8 2.1 1.4 11.4
8/9/1997 0.3 0.8 6.8 16.5 1.8 24.6 145.9 6.0 2.3 7.2 6.2 0.2 0.0 2.3
8/10/1997 4.7 5.4 12.5 22.8 0.6 17.9 47.9 40.1 40.0 36.2 31.8 41.5 41.5 40.0
8/11/1997 11.1 7.7 18.9 3.5 0.6 7.1 45.1 0.0 0.0 0.1 1.2 2.1 2.1 0.0
8/12/1997 6.3 5.5 7.6 8.9 2.8 6.9 35.1 0.0 9.3 0.3 2.4 4.2 4.3 9.4
8/13/1997 4.1 11.1 8.6 3.4 1.0 1.1 0.0 2.0 0.8 3.4 8.8 11.0 11.2 0.8
8/14/1997 4.2 7.2 6.8 19.8 2.6 14.5 47.0 22.3 8.5 21.2 32.8 53.3 54.1 8.4
8/15/1997 3.5 5.9 10.0 4.4 3.7 7.6 28.6 4.1 1.6 5.9 6.5 0.1 0.0 1.5
8/16/1997 4.4 11.3 10.0 2.4 0.4 4.8 30.6 0.0 0.0 6.0 19.0 13.0 13.3 0.0
8/17/1997 3.8 9.0 6.4 1.6 0.3 6.1 21.1 10.4 3.9 10.3 10.1 10.2 10.2 3.9
8/18/1997 2.4 5.6 9.1 1.2 2.2 3.6 15.3 0.1 0.0 0.4 2.0 3.1 3.2 0.0
8/19/1997 6.4 16.1 6.2 2.6 4.6 3.5 0.0 3.0 1.1 2.6 3.5 6.1 6.2 1.1
8/20/1997 3.8 6.1 10.9 2.5 0.4 5.1 32.5 0.0 0.0 0.5 2.6 3.4 3.5 0.0
8/21/1997 8.1 6.4 7.6 5.6 2.9 10.5 17.6 23.2 8.8 19.8 7.3 4.0 3.5 8.7
8/22/1997 10.9 8.2 14.2 2.0 0.3 13.3 25.5 35.2 13.4 31.9 17.1 9.9 9.2 13.3
8/23/1997 11.8 12.3 16.8 9.9 10.1 11.8 17.4 12.3 12.1 11.9 12.9 16.2 16.3 12.1
8/24/1997 3.8 7.6 7.3 8.1 0.9 10.1 27.7 20.3 7.7 16.0 2.4 1.0 0.5 7.6
8/25/1997 3.0 7.0 8.4 1.5 1.1 5.1 10.8 11.0 9.9 9.8 3.7 0.3 0.0 9.9
8/26/1997 0.7 0.7 2.0 2.6 1.4 11.1 33.1 20.0 7.6 15.8 2.1 0.5 0.0 7.5
8/27/1997 0.7 0.6 3.0 2.9 0.5 5.8 37.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/28/1997 5.8 0.5 6.2 2.2 0.4 4.4 27.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/1997 10.9 17.1 10.8 2.9 12.3 19.0 37.5 23.0 8.7 17.1 0.0 0.6 0.0 8.7
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/30/1997 5.6 4.7 13.6 12.2 5.3 7.4 25.0 2.0 0.8 14.3 33.0 8.8 9.0 0.8
8/31/1997 3.0 7.2 2.3 2.8 0.4 6.1 35.4 2.0 0.8 1.5 0.0 0.1 0.0 0.8
9/1/1997 5.5 5.7 7.0 7.7 0.6 7.8 44.1 3.0 1.1 2.2 0.0 0.1 0.0 1.1
9/2/1997 5.3 2.7 8.2 4.8 12.2 11.6 28.8 0.0 0.0 3.1 8.5 3.4 3.5 0.0
9/3/1997 1.0 1.7 10.5 9.5 0.4 13.5 35.0 30.4 11.5 30.1 19.4 5.9 5.3 11.4
9/4/1997 8.8 6.3 20.7 4.2 1.4 11.4 54.0 9.2 3.5 16.1 48.9 66.5 68.0 3.5
9/5/1997 9.3 1.1 5.9 7.4 0.7 6.7 28.8 7.5 2.8 7.8 7.9 6.8 6.8 2.8
9/6/1997 5.3 1.4 4.6 9.4 0.3 4.0 21.9 2.0 0.8 2.8 3.2 0.3 0.3 0.8
9/7/1997 5.2 6.1 10.2 6.9 0.2 3.7 13.5 6.0 9.1 5.6 2.7 0.3 0.2 9.1
9/8/1997 4.8 2.3 7.9 10.4 0.4 6.5 34.6 4.0 1.5 18.1 38.6 10.1 10.2 1.5
9/9/1997 7.7 1.8 8.2 15.2 12.2 11.5 25.9 2.0 19.4 1.6 0.3 0.1 0.0 19.5
9/10/1997 2.6 1.9 3.3 10.2 1.5 7.9 40.2 4.2 18.4 4.0 4.1 5.3 5.3 18.4
9/11/1997 2.2 0.8 1.3 4.2 0.4 6.6 28.4 8.3 13.2 7.7 3.5 0.2 0.0 13.2
9/12/1997 3.1 0.1 0.1 23.6 0.6 7.4 47.4 0.0 13.8 0.5 2.4 2.9 3.0 13.9
9/13/1997 0.3 0.0 0.1 9.9 0.7 8.5 54.0 0.0 1.2 0.0 0.0 0.0 0.0 1.3
9/14/1997 1.7 0.1 2.4 5.6 0.4 5.5 35.9 0.0 24.8 3.9 28.3 46.3 47.5 25.0
9/15/1997 4.2 1.2 1.6 19.7 0.6 10.7 45.7 14.3 35.2 11.6 7.8 13.4 13.4 35.3
9/16/1997 3.5 0.1 1.9 3.2 0.2 2.8 18.0 0.0 8.2 0.2 1.7 2.9 3.0 8.2
9/17/1997 2.6 5.7 0.8 3.7 0.1 1.3 8.5 0.0 11.4 0.0 0.0 0.0 0.0 11.4
9/18/1997 3.9 2.5 3.5 0.5 7.9 4.7 0.2 0.0 4.6 3.8 10.9 5.2 5.3 4.6
9/19/1997 7.2 20.2 4.5 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
9/20/1997 13.1 48.5 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1997 3.4 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1997 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1997 2.5 0.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/1997 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1997 0.2 1.1 1.0 0.5 0.0 0.0 0.2 0.0 4.5 0.0 0.0 0.0 0.0 4.5
9/26/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1997 0.0 0.0 0.0 0.4 0.1 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1997 0.3 0.0 0.5 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
9/29/1997 0.8 0.6 1.5 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1997 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1997 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1997 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1997 2.0 0.1 2.8 2.7 0.4 5.5 34.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1997 1.3 0.7 0.7 22.3 0.0 8.1 0.0 31.0 11.8 24.4 8.4 13.0 12.5 11.7
10/5/1997 9.5 0.2 10.7 0.0 17.2 11.5 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
10/6/1997 14.9 0.8 19.5 25.1 6.0 9.7 5.6 20.3 7.7 17.8 11.5 12.7 12.5 7.6
10/7/1997 8.1 5.6 12.3 34.5 18.2 26.6 0.0 60.2 22.8 59.4 38.3 12.6 11.4 22.7
10/8/1997 20.6 1.9 23.3 0.8 66.6 42.3 0.4 11.0 11.0 9.7 11.1 18.0 18.2 11.0
10/9/1997 6.7 0.0 3.3 0.0 10.2 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1997 1.4 5.1 0.0 2.9 0.0 0.0 1.3 0.0 24.4 0.0 0.0 0.0 0.0 24.5
10/11/1997 2.0 3.7 0.0 3.2 0.0 0.0 1.4 0.0 27.3 0.0 0.0 0.0 0.0 27.4
10/12/1997 2.1 7.1 0.0 2.6 0.0 0.0 1.2 0.0 21.9 0.0 0.0 0.0 0.0 22.0
10/13/1997 1.5 3.5 0.0 1.6 0.0 0.0 0.7 0.0 13.2 0.0 0.0 0.0 0.0 13.3
10/14/1997 0.0 0.3 3.1 2.1 0.0 0.0 1.0 0.0 18.1 0.0 0.0 0.0 0.0 18.2
10/15/1997 0.0 0.4 3.4 3.8 0.0 0.0 1.7 0.0 32.3 0.0 0.0 0.0 0.0 32.4
10/16/1997 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1997 1.7 0.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1997 3.0 0.8 4.7 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1997 5.1 1.0 6.5 5.1 6.3 4.3 0.0 2.0 0.8 1.8 0.6 0.1 0.0 0.8
10/29/1997 7.7 1.2 5.4 6.8 6.1 4.7 0.0 4.0 1.5 3.6 3.7 5.2 5.2 1.5
10/30/1997 5.8 1.5 3.5 0.0 6.2 6.3 0.0 10.0 3.8 7.8 0.8 0.3 0.0 3.8
10/31/1997 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1998 6.3 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1998 4.3 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1998 2.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1998 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1998 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1998 14.3 0.9 20.4 0.9 0.2 1.9 12.0 0.0 0.0 7.2 16.3 0.0 0.0 0.0
1/22/1998 12.0 4.5 23.0 23.5 41.8 36.2 25.0 29.4 15.0 35.4 42.5 28.2 28.2 14.9
1/23/1998 2.4 1.6 5.2 0.8 9.0 16.6 10.1 37.3 14.2 27.6 0.0 0.9 0.0 14.0
1/24/1998 0.5 0.0 0.7 1.2 2.2 6.8 15.3 12.3 4.7 10.9 14.7 25.8 26.1 4.6
1/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.0 8.7 8.9 0.0
1/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1998 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1998 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1998 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/31/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1998 0.0 0.0 0.0 0.7 0.1 1.3 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1998 3.9 0.1 5.5 0.8 10.0 7.5 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1998 0.7 1.0 2.7 1.9 0.2 3.7 13.2 6.0 2.3 5.9 4.1 1.8 1.7 2.3
2/6/1998 0.4 0.6 0.5 0.9 0.0 0.8 0.0 3.0 1.1 3.3 2.5 0.1 0.0 1.1
2/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1998 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1998 0.5 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1998 0.8 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1998 0.8 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1998 0.6 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1998 0.3 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1998 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1998 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1998 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.1 0.0 0.0 0.0 0.0 3.1
2/25/1998 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
2/26/1998 1.7 0.1 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/1998 2.5 1.4 4.1 0.4 4.5 5.0 5.0 6.1 2.3 6.1 4.1 1.4 1.3 2.3
2/28/1998 2.6 0.0 3.4 0.0 8.3 6.0 0.0 4.0 1.5 4.9 16.1 27.9 28.5 1.5
3/1/1998 0.9 0.8 1.5 0.0 2.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1998 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1998 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1998 1.6 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1998 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1998 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1998 0.1 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1998 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1998 2.7 0.2 3.2 1.7 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
3/16/1998 1.7 0.2 3.8 0.0 7.1 4.2 0.0 0.0 0.0 1.5 5.4 4.7 4.8 0.0
3/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1998 2.3 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1998 0.6 0.0 0.8 0.0 2.4 3.0 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
3/20/1998 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1998 1.3 2.7 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.0
3/22/1998 0.1 0.1 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1998 2.8 10.0 0.6 0.7 0.3 0.2 0.3 0.0 5.6 0.4 1.0 0.0 0.0 5.6
3/24/1998 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1998 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/1998 0.5 0.1 0.0 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1998 2.0 7.5 0.0 0.8 0.1 1.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1998 1.3 0.2 1.8 1.5 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1998 2.8 0.7 3.7 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1998 2.0 1.3 8.2 3.6 7.3 4.6 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
4/2/1998 0.8 0.0 0.0 0.0 0.1 1.4 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
4/3/1998 2.1 1.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
4/4/1998 0.6 0.0 0.8 0.0 2.6 3.4 0.0 7.0 2.7 5.7 1.5 0.9 0.7 2.6
4/5/1998 4.3 0.3 5.5 6.3 0.0 0.3 0.0 1.0 0.4 2.5 6.0 4.6 4.7 0.4
4/6/1998 6.9 4.5 9.1 0.0 22.7 13.5 0.0 0.0 0.0 6.1 18.2 10.3 10.6 0.0
4/7/1998 1.6 0.1 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1998 2.9 0.4 3.4 0.0 8.9 5.3 0.0 0.0 0.0 0.5 1.6 1.4 1.4 0.0
4/9/1998 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1998 0.2 0.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1998 4.2 3.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.9 0.0 0.0 0.0
4/12/1998 3.4 0.3 4.7 1.2 10.9 11.0 0.5 17.4 16.5 14.1 5.1 5.9 5.6 16.5
4/13/1998 0.1 0.5 0.5 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1998 0.7 1.1 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1998 0.5 0.3 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/18/1998 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.1 0.9 1.5 1.5 0.0
4/19/1998 0.6 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1998 0.4 0.1 0.5 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
4/22/1998 1.3 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1998 2.4 4.6 1.6 0.0 4.4 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1998 2.0 4.0 2.0 1.3 0.0 0.0 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.3
4/25/1998 1.1 4.1 0.4 0.6 0.1 1.2 7.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1998 1.0 3.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1998 1.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1998 0.1 0.2 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1998 0.0 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 1.4 3.5 0.5 0.5 0.0
4/30/1998 2.4 0.0 3.0 0.9 9.2 7.1 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.3 0.0
5/2/1998 0.5 0.0 0.6 0.0 2.0 2.7 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
5/3/1998 0.1 0.1 0.2 0.1 0.0 4.7 0.0 18.0 7.5 13.3 0.0 0.5 0.0 7.4
5/4/1998 1.4 4.3 0.1 2.6 0.0 0.6 0.0 2.1 0.8 1.6 0.0 0.1 0.0 0.8
5/5/1998 2.1 4.6 0.6 1.0 0.0 0.8 0.0 3.0 1.1 6.6 30.1 48.1 49.2 1.1
5/6/1998 3.2 3.9 1.6 3.4 4.2 3.0 0.0 2.0 0.8 3.5 4.7 0.1 0.0 0.8
5/7/1998 1.9 3.8 0.6 0.0 0.0 2.7 0.0 10.3 3.9 7.6 0.0 0.3 0.0 3.9
5/8/1998 1.0 3.4 0.4 0.0 0.0 4.6 0.0 17.4 6.6 15.3 6.9 3.8 3.4 6.6
5/9/1998 1.7 3.8 0.5 6.8 0.0 0.6 0.0 2.1 0.8 1.6 0.0 0.1 0.0 0.8
5/10/1998 2.9 0.8 3.9 0.0 4.7 5.5 0.0 10.3 3.9 8.3 5.9 10.5 10.5 3.9
5/11/1998 0.5 0.8 0.7 1.2 0.2 2.4 14.9 0.0 0.0 3.4 10.8 7.1 7.3 0.0
5/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1998 0.0 0.0 0.0 0.5 0.1 1.0 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/1998 0.0 0.0 0.0 2.7 0.4 5.4 34.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/1998 0.3 0.0 0.0 9.5 0.6 7.0 44.1 0.0 0.6 0.0 0.0 0.0 0.0 0.6
5/21/1998 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1998 1.5 1.7 1.4 0.9 4.4 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1998 0.0 0.0 0.0 3.0 0.5 6.1 38.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1998 2.2 1.7 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1998 4.0 4.5 4.3 2.8 11.9 9.7 1.3 10.2 27.7 11.2 19.6 27.2 27.6 27.8
5/28/1998 2.4 5.4 0.4 12.8 0.0 0.0 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
5/29/1998 2.4 1.3 2.3 2.7 6.8 9.8 30.0 5.0 5.0 4.4 2.8 3.2 3.1 5.0
5/30/1998 3.6 2.2 2.6 1.7 7.0 9.0 20.2 7.0 3.9 5.6 0.8 0.2 0.0 3.9
5/31/1998 2.8 0.5 2.8 3.8 0.5 3.7 15.3 4.1 1.6 5.6 6.5 1.7 1.6 1.5
6/1/1998 7.1 11.7 4.7 0.2 0.1 0.6 0.1 2.0 2.0 1.5 0.0 0.1 0.0 2.0
6/2/1998 0.8 1.2 1.7 0.0 2.0 11.8 0.0 40.5 15.4 32.6 7.4 4.5 3.6 15.2
6/3/1998 1.0 0.1 1.3 0.0 4.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1998 1.1 2.0 0.9 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1998 0.8 1.9 0.5 4.3 0.7 4.0 16.7 5.0 28.2 3.7 0.0 0.1 0.0 28.3
6/6/1998 0.7 2.7 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/7/1998 0.0 0.1 0.0 0.6 0.0 3.2 0.3 12.0 9.5 8.9 0.0 0.3 0.0 9.5
6/8/1998 3.1 3.9 3.2 0.0 6.3 5.3 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
6/9/1998 2.8 8.6 0.2 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
6/10/1998 0.0 0.0 0.0 0.4 0.0 1.6 0.2 6.0 6.0 4.5 0.0 0.2 0.0 6.0
6/11/1998 1.5 0.1 2.1 0.4 6.1 5.3 0.2 6.2 5.6 4.6 0.0 0.2 0.0 5.6
6/12/1998 2.3 0.2 2.9 4.8 4.5 5.1 0.0 9.2 3.5 6.8 0.0 0.2 0.0 3.5
6/13/1998 0.2 0.0 0.0 3.2 0.0 0.0 0.1 0.0 1.9 4.1 17.8 20.0 20.5 1.9
6/14/1998 1.5 2.3 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.8 3.0 3.1 0.0
6/15/1998 0.3 0.1 0.0 1.0 0.0 0.0 0.5 0.0 8.8 0.0 0.0 0.0 0.0 8.9
6/16/1998 0.2 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
6/17/1998 0.9 0.0 1.2 0.7 3.5 2.1 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
6/18/1998 9.3 3.7 8.3 1.4 15.0 8.9 0.6 0.0 11.9 0.0 0.0 0.0 0.0 11.9
6/19/1998 1.9 4.1 0.4 12.8 0.0 5.0 0.0 19.0 7.2 17.4 9.7 5.5 5.2 7.2
6/20/1998 5.1 4.0 5.5 3.5 16.4 17.5 44.3 4.3 1.6 4.3 3.6 2.4 2.3 1.6
6/21/1998 0.0 0.0 0.0 2.2 0.2 5.4 18.2 10.0 10.6 18.6 34.9 22.9 23.2 10.6
6/22/1998 1.0 3.6 0.0 2.4 0.3 6.2 24.8 9.0 7.1 6.9 0.5 0.2 0.0 7.1
6/23/1998 0.8 3.1 0.0 1.1 0.2 4.3 13.7 8.0 3.0 5.9 0.0 0.2 0.0 3.0
6/24/1998 1.8 4.2 1.0 2.9 0.5 5.8 37.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/25/1998 3.8 6.4 2.7 5.2 6.2 27.4 24.6 76.5 34.1 57.5 6.5 13.1 11.5 33.9
6/26/1998 0.8 3.1 0.4 1.1 0.2 2.2 13.7 0.0 0.0 2.8 23.2 40.1 41.1 0.0
6/27/1998 0.3 0.1 0.4 6.3 0.6 9.1 45.4 8.0 26.8 5.9 0.0 0.2 0.0 26.9
6/28/1998 11.3 38.0 1.8 3.7 0.0 3.7 1.3 14.0 29.6 16.9 18.6 9.3 9.2 29.7
6/29/1998 13.2 35.8 3.2 11.8 0.0 5.1 0.6 19.4 19.2 15.5 5.2 6.8 6.5 19.2
6/30/1998 12.1 25.7 4.6 2.2 6.1 3.6 0.5 0.0 10.2 0.0 0.0 0.0 0.0 10.2
7/1/1998 5.2 11.0 4.2 0.0 0.0 1.6 0.0 6.0 2.3 5.8 5.0 4.8 4.8 2.3
7/2/1998 8.4 9.7 7.0 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/1998 2.5 0.8 7.0 0.9 0.1 2.1 10.1 2.0 2.0 4.3 11.5 12.2 12.5 2.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/4/1998 0.0 0.5 4.5 0.4 0.0 0.0 0.2 0.0 3.7 0.4 2.9 5.1 5.2 3.7
7/5/1998 0.0 0.5 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
7/6/1998 0.0 2.3 21.1 1.2 0.2 2.4 15.1 0.0 0.0 19.6 53.0 20.0 20.5 0.0
7/7/1998 0.3 1.9 7.8 1.2 0.2 2.2 14.2 0.0 0.6 0.5 1.2 0.0 0.0 0.6
7/8/1998 2.6 2.2 2.9 1.4 0.2 2.8 17.6 0.0 0.0 1.9 13.3 21.7 22.2 0.0
7/9/1998 1.8 1.0 7.5 1.9 3.5 5.8 24.6 0.0 0.0 0.5 1.1 0.0 0.0 0.0
7/10/1998 7.5 18.7 24.9 0.6 8.4 5.0 0.3 0.0 5.1 0.2 0.4 0.0 0.0 5.1
7/11/1998 6.4 23.3 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
7/12/1998 13.1 20.1 14.8 7.5 0.4 15.5 34.5 38.4 22.7 35.8 25.2 20.9 20.5 22.6
7/13/1998 11.2 19.0 4.8 4.4 11.9 7.8 0.0 3.0 1.1 5.2 24.5 42.5 43.5 1.1
7/14/1998 4.2 14.9 0.7 0.3 0.0 6.3 0.1 24.0 11.6 20.5 6.1 0.6 0.0 11.5
7/15/1998 7.2 26.4 1.8 0.7 0.0 0.0 0.3 0.0 5.7 0.3 0.7 0.0 0.0 5.7
7/16/1998 11.2 16.2 5.5 4.3 0.0 0.0 0.0 0.0 0.0 1.3 10.4 18.0 18.5 0.0
7/17/1998 7.0 23.6 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.7 4.3 6.5 6.7 0.0
7/18/1998 4.6 17.2 2.8 0.0 0.0 0.0 0.0 0.0 0.0 1.3 6.2 7.4 7.6 0.0
7/19/1998 0.9 3.7 1.9 0.0 0.0 0.0 0.0 0.0 0.0 8.5 36.9 41.5 42.5 0.0
7/20/1998 1.3 4.6 2.6 0.0 0.0 0.0 0.0 0.0 0.0 2.0 10.1 13.2 13.5 0.0
7/21/1998 3.4 11.5 4.3 0.0 0.0 4.7 0.0 18.0 6.8 13.3 0.0 0.5 0.0 6.8
7/22/1998 3.5 8.7 6.6 2.7 4.6 13.2 34.2 20.3 7.7 19.3 24.7 36.4 36.8 7.6
7/23/1998 9.4 15.1 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/24/1998 4.6 4.2 5.3 0.0 13.8 16.7 0.0 32.4 12.3 34.2 50.4 65.2 66.0 12.2
7/25/1998 2.6 2.7 6.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/26/1998 9.6 15.3 9.6 0.3 0.0 10.6 0.0 40.3 15.3 39.3 25.4 10.1 9.3 15.2
7/27/1998 12.9 12.7 19.5 2.6 6.5 5.2 0.0 5.0 1.9 13.7 22.7 0.1 0.0 1.9
7/28/1998 15.0 5.5 33.9 4.9 34.3 21.3 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
7/29/1998 6.2 5.0 9.7 1.9 16.0 12.4 0.0 11.0 4.2 12.9 13.0 5.5 5.4 4.1
7/30/1998 2.3 5.5 9.2 0.0 3.0 5.5 0.0 14.3 5.4 13.0 9.7 10.7 10.6 5.4
7/31/1998 10.6 12.8 21.2 1.3 4.3 7.0 0.1 17.0 9.0 13.2 3.6 5.7 5.4 9.0
8/1/1998 5.2 5.4 9.4 6.4 3.3 13.1 38.9 20.3 7.7 15.3 0.6 0.5 0.0 7.6
8/2/1998 4.8 3.8 6.8 0.9 9.4 7.4 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
8/3/1998 9.3 1.6 13.4 6.2 2.4 10.0 35.2 13.0 18.8 12.9 16.7 22.2 22.4 18.9
8/4/1998 4.1 3.6 7.9 5.6 9.9 17.5 28.5 28.3 27.1 23.1 8.5 9.7 9.2 27.1
8/5/1998 3.0 0.8 5.0 21.2 3.0 15.6 45.3 27.0 29.0 39.9 57.0 28.4 28.4 29.0
8/6/1998 7.0 3.6 6.7 2.1 0.3 11.3 26.9 27.0 10.2 23.2 10.0 7.3 6.8 10.2
8/7/1998 4.1 1.2 5.1 2.0 2.6 5.3 25.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/8/1998 5.2 4.4 7.2 2.2 6.7 8.3 28.6 0.0 0.0 1.4 4.7 3.4 3.5 0.0
8/9/1998 7.6 2.3 10.7 5.4 4.7 9.0 37.0 2.3 0.9 1.8 0.9 1.5 1.5 0.9
8/10/1998 1.5 3.3 3.5 7.0 0.6 8.2 46.6 3.0 1.1 3.2 4.0 4.6 4.6 1.1
8/11/1998 0.1 0.3 0.5 2.1 0.3 5.7 27.3 5.3 2.0 4.3 2.9 5.2 5.2 2.0
8/12/1998 2.0 0.2 3.3 2.0 0.3 5.6 25.1 6.4 2.4 5.8 2.3 0.2 0.0 2.4
8/13/1998 4.2 3.2 6.9 2.9 0.5 14.4 37.3 32.3 12.3 25.6 6.7 7.6 7.0 12.2
8/14/1998 12.7 5.1 17.7 2.8 9.1 11.1 36.0 1.0 0.4 6.2 23.3 25.9 26.5 0.4
8/15/1998 3.8 7.7 5.4 16.3 0.4 5.0 31.5 0.0 0.0 2.6 9.3 8.3 8.5 0.0
8/16/1998 4.4 2.2 11.6 0.9 9.2 7.0 10.5 0.0 0.0 1.7 7.1 7.8 8.0 0.0
8/17/1998 0.9 3.1 6.5 5.2 0.6 7.0 44.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/18/1998 0.3 0.0 0.0 5.0 0.8 10.1 63.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/1998 4.4 12.9 7.5 1.5 0.2 3.0 19.0 0.0 0.0 0.3 0.6 0.0 0.0 0.0
8/20/1998 1.4 0.8 5.7 2.1 1.1 4.8 27.3 0.0 0.0 0.5 1.2 0.0 0.0 0.0
8/21/1998 0.1 0.1 0.2 0.2 0.0 0.0 0.1 0.0 1.9 1.6 5.7 4.9 5.0 1.9
8/22/1998 0.5 2.0 0.0 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
8/23/1998 0.5 2.7 8.9 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.6
8/24/1998 2.6 4.9 11.0 0.8 0.1 1.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/25/1998 0.7 2.1 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/26/1998 1.8 4.2 1.4 0.8 2.1 2.7 9.6 0.0 0.0 0.9 2.1 0.0 0.0 0.0
8/27/1998 4.6 9.5 4.8 0.0 8.7 5.2 0.0 0.0 0.0 3.0 7.3 1.0 1.0 0.0
8/28/1998 0.9 0.9 5.7 0.0 2.0 4.1 0.0 11.0 4.2 8.2 0.0 0.3 0.0 4.1
8/29/1998 0.5 0.5 4.7 1.4 0.2 4.2 18.2 5.0 1.9 6.7 9.0 5.3 5.3 1.9
8/30/1998 0.1 0.6 4.3 0.0 0.0 4.2 0.0 16.0 6.1 11.9 0.0 0.4 0.0 6.0
8/31/1998 0.4 1.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/1/1998 2.6 2.9 1.7 18.7 2.3 6.6 0.0 20.0 7.6 19.0 32.7 55.6 56.5 7.5
9/2/1998 1.2 1.1 1.3 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.3 0.7 0.5 3.8
9/3/1998 3.6 2.4 1.8 43.9 4.0 15.2 0.6 49.0 29.9 37.6 4.6 5.1 4.0 29.8
9/4/1998 6.8 6.4 8.2 8.0 8.2 11.2 25.8 10.0 18.9 14.6 35.3 45.2 46.1 18.9
9/5/1998 6.3 3.3 7.4 4.4 19.2 12.1 0.0 3.0 1.1 2.6 0.9 0.1 0.0 1.1
9/6/1998 1.3 1.1 1.9 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/7/1998 1.3 0.7 2.1 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/1998 4.8 1.3 8.2 4.5 8.2 24.3 24.8 60.0 22.8 46.8 12.9 19.7 18.7 22.6
9/9/1998 3.4 7.9 3.6 2.6 2.8 2.0 0.0 1.3 0.5 3.8 6.5 0.0 0.0 0.5
9/10/1998 0.5 0.3 0.7 3.4 0.6 11.2 44.1 16.0 6.1 11.9 0.0 0.4 0.0 6.0
9/11/1998 4.7 5.1 8.7 2.3 0.4 4.7 29.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1998 2.6 1.0 3.9 4.3 6.2 7.6 0.0 15.0 5.7 16.5 16.7 11.3 11.2 5.7
9/13/1998 3.3 6.5 7.1 5.7 0.1 3.5 10.5 7.0 7.0 6.2 4.4 5.3 5.3 7.0
9/14/1998 1.3 2.3 4.5 0.0 0.0 0.0 0.0 0.0 0.0 4.2 20.4 25.7 26.4 0.0
9/15/1998 4.6 10.1 0.1 15.6 0.6 18.9 46.6 44.0 16.7 33.8 4.9 6.3 5.3 16.6
9/16/1998 2.2 3.5 1.5 0.9 0.0 3.9 0.0 15.0 5.7 11.1 0.0 0.4 0.0 5.7
9/17/1998 3.6 13.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/1998 2.3 3.6 2.0 0.0 0.6 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/19/1998 0.3 1.1 0.2 2.7 0.4 5.5 34.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1998 1.7 6.4 0.1 1.9 0.3 3.8 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/21/1998 3.8 7.2 0.4 2.2 0.4 4.4 27.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1998 8.0 18.6 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1998 4.6 10.1 4.4 0.0 4.1 2.4 0.0 0.0 0.0 0.1 0.7 1.3 1.3 0.0
9/24/1998 3.6 13.4 0.7 2.4 0.0 4.6 1.1 17.5 27.1 14.5 6.7 8.0 7.8 27.2
9/25/1998 0.9 2.5 0.5 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.4
9/26/1998 3.6 13.4 0.0 3.7 0.2 2.5 17.0 0.0 21.1 0.0 0.0 0.0 0.0 21.2
9/27/1998 3.0 11.3 0.0 2.2 0.1 1.7 11.1 0.0 11.3 0.0 0.0 0.0 0.0 11.4
9/28/1998 0.5 0.2 0.0 2.2 0.0 0.0 1.0 0.0 18.2 0.0 0.0 0.0 0.0 18.3
9/29/1998 4.1 10.7 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1998 0.4 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1998 1.8 4.3 0.9 0.0 2.8 3.5 0.0 7.1 2.7 5.3 0.0 0.2 0.0 2.7
10/2/1998 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/1998 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 2.5 7.6 5.5 5.6 0.1
10/4/1998 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/1998 0.8 1.7 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.2 0.5 0.5 0.0
10/6/1998 1.8 3.1 1.2 0.0 0.0 1.6 0.0 6.0 2.3 4.5 0.0 0.2 0.0 2.3
10/7/1998 2.4 9.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1998 1.3 4.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1998 0.5 0.0 0.6 0.0 0.0 1.1 0.0 4.0 1.5 3.4 1.1 0.4 0.3 1.5
10/10/1998 3.1 0.6 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1998 1.5 2.7 0.3 3.2 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
10/12/1998 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1998 3.8 1.1 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1998 0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1998 1.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1998 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1998 0.8 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1998 0.4 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1998 0.0 0.0 0.0 0.8 0.1 1.5 9.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1998 0.3 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1998 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1998 1.3 1.6 1.3 0.4 0.1 0.8 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1998 1.6 0.6 2.4 3.2 4.3 8.3 15.3 13.0 4.9 10.1 3.9 7.2 7.0 4.9
10/27/1998 0.5 0.1 0.8 0.0 2.1 1.2 0.0 0.0 0.0 0.7 2.7 2.6 2.7 0.0
10/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1998 1.3 0.1 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1998 2.5 0.8 1.5 1.7 0.0 0.5 0.4 2.0 8.2 1.7 0.5 0.1 0.0 8.2
10/31/1998 0.5 0.0 0.6 1.4 0.0 0.0 0.6 0.0 11.9 0.0 0.0 0.0 0.0 12.0
11/1/1998 0.3 0.7 0.7 2.7 0.0 2.1 0.0 8.0 3.0 7.0 4.4 5.1 5.0 3.0
11/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1998 0.0 0.8 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1998 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1998 0.0 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1998 0.8 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1998 1.2 0.5 4.0 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1998 2.6 0.3 1.2 0.0 3.0 3.6 0.0 7.0 2.7 5.2 0.0 0.2 0.0 2.6
11/13/1998 0.5 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1998 0.0 0.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1998 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1998 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1998 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1998 0.0 0.0 0.0 0.3 0.0 0.5 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1998 0.2 0.0 0.3 0.4 0.1 0.8 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1998 0.5 0.0 0.6 2.0 1.6 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1998 0.5 0.0 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.3 2.7 4.7 4.8 0.0
11/23/1998 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.8 0.0 0.0 0.0 0.0 13.9
11/24/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1998 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1998 7.4 2.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1998 11.8 0.1 10.9 18.0 26.8 17.4 9.9 0.0 0.0 4.7 15.7 11.7 12.0 0.0
11/29/1998 6.5 2.5 6.1 19.0 11.9 12.8 1.3 22.0 33.3 24.5 26.2 18.3 18.2 33.4
11/30/1998 0.0 0.0 0.0 3.3 0.0 4.2 1.5 16.0 34.3 11.9 0.0 0.4 0.0 34.4
12/1/1998 0.0 0.1 1.0 3.1 0.0 0.0 1.4 0.0 26.1 0.0 0.0 0.0 0.0 26.3
12/2/1998 1.2 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1998 10.3 0.3 11.4 33.1 16.2 9.6 0.3 0.0 6.3 8.1 30.2 27.8 28.5 6.4
12/4/1998 11.0 17.1 8.2 0.0 23.7 14.0 0.0 0.0 0.1 1.3 7.0 9.4 9.6 0.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1998 0.0 0.0 0.0 1.2 0.0 0.0 0.5 0.0 9.7 0.0 0.0 0.0 0.0 9.7
12/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1998 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.1 0.0 0.0 0.0 0.0 4.1
12/10/1998 2.0 0.1 2.8 1.8 0.0 0.0 0.8 0.0 14.9 0.0 0.0 0.0 0.0 15.0
12/11/1998 19.1 14.3 19.3 13.6 14.5 18.1 11.0 30.0 11.4 23.4 5.2 6.8 6.2 11.3
12/12/1998 28.8 41.2 24.3 34.0 41.5 25.4 0.0 3.0 1.1 29.9 94.1 74.2 76.0 1.1
12/13/1998 10.2 1.0 13.5 0.3 28.6 21.1 0.1 16.0 8.7 12.6 6.2 11.1 11.0 8.6
12/14/1998 0.0 0.3 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
12/15/1998 7.6 13.1 5.9 0.0 0.0 3.2 0.0 12.0 4.6 8.9 0.2 0.6 0.3 4.5
12/16/1998 5.3 2.3 8.3 0.0 19.4 11.5 0.0 0.0 0.0 5.3 16.3 10.2 10.5 0.0
12/17/1998 0.4 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1998 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.6 0.0 0.0 0.0 0.0 7.6
12/19/1998 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.3 0.0 0.0 0.0 0.0 1.3
12/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1998 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.1 0.0 0.0 0.0 0.0 4.1
12/24/1998 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.2
12/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1
12/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1999 0.0 0.0 0.0 0.4 0.1 0.8 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1999 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 1.3
1/25/1999 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.4 0.0 0.0 0.0 0.0 4.4
1/26/1999 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
1/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1999 1.3 4.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1999 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1999 0.7 0.0 0.8 0.1 0.0 0.1 0.8 0.0 0.0 0.1 0.5 0.8 0.8 0.0
2/1/1999 0.4 0.1 0.6 0.0 1.4 0.9 0.5 0.0 0.0 1.0 2.4 0.5 0.5 0.0
2/2/1999 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1999 0.0 0.0 0.0 0.7 0.1 3.6 9.5 8.0 3.0 5.9 0.1 0.4 0.2 3.0
2/4/1999 2.7 0.1 2.0 4.0 0.1 1.3 7.9 0.0 0.0 0.1 0.5 0.8 0.8 0.0
2/5/1999 1.8 0.8 3.0 1.0 6.9 4.1 0.5 0.0 8.7 1.4 3.1 0.0 0.0 8.7
2/6/1999 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
2/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1999 0.0 0.0 0.0 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1999 0.0 0.5 4.1 1.5 0.0 0.0 0.7 0.0 12.4 0.0 0.0 0.0 0.0 12.5
2/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1999 0.0 0.0 0.0 0.4 0.1 0.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1999 0.1 0.0 0.2 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1999 1.4 0.1 1.9 0.9 6.1 5.2 10.8 0.0 0.0 0.1 0.9 1.5 1.5 0.0
2/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 1.2 1.2 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/20/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/1999 0.8 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
2/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1999 1.6 0.4 3.8 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/1999 0.8 0.1 0.8 0.3 0.1 0.7 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1999 0.9 0.1 1.3 0.6 0.1 1.3 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/1999 12.4 1.2 14.2 25.3 5.3 5.3 0.7 8.0 15.6 7.3 3.5 1.2 1.0 15.7
2/27/1999 19.9 14.2 19.9 32.9 55.3 38.1 1.0 20.2 27.0 25.2 36.7 32.2 32.5 27.1
2/28/1999 0.3 0.5 0.3 0.0 0.6 1.7 0.0 5.0 1.9 5.1 5.4 5.4 5.4 1.9
3/1/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1999 0.8 0.2 1.9 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1999 0.0 0.0 0.0 0.1 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1999 0.0 0.0 0.0 0.3 0.1 0.7 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1999 0.0 0.0 0.0 0.4 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.5 0.5 0.1
3/7/1999 4.7 1.0 7.0 0.8 0.5 0.3 0.4 0.0 6.8 0.0 0.0 0.0 0.0 6.9
3/8/1999 8.6 2.2 10.5 13.6 24.2 18.3 1.2 15.3 28.8 15.5 17.1 18.4 18.5 28.8
3/9/1999 3.4 1.8 2.1 1.7 4.9 2.9 0.0 0.0 0.0 0.7 1.8 0.2 0.2 0.0
3/10/1999 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1999 0.0 0.1 0.8 1.0 0.2 2.0 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1999 5.1 0.1 7.2 0.0 13.9 8.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1999 5.2 0.8 8.0 6.8 10.1 6.0 0.0 0.0 0.0 2.5 8.8 7.5 7.7 0.0
3/15/1999 9.8 11.9 8.8 18.7 17.8 10.5 0.0 0.0 0.0 4.1 20.8 27.3 28.0 0.0
3/16/1999 1.6 6.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/1999 0.1 0.0 0.1 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
3/20/1999 3.9 2.3 4.5 0.5 4.2 2.5 0.2 0.0 4.0 0.0 0.0 0.0 0.0 4.0
3/21/1999 2.1 1.6 1.4 0.0 0.0 0.5 0.0 2.0 0.8 2.1 5.4 9.4 9.6 0.8
3/22/1999 1.3 0.0 0.0 1.2 0.2 2.3 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1999 0.3 0.0 0.0 0.9 0.1 1.7 10.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1999 5.5 0.2 7.5 0.1 10.4 6.3 1.1 0.0 0.0 0.5 1.1 0.0 0.0 0.0
3/25/1999 3.9 13.0 7.8 5.3 0.8 4.9 29.2 0.0 0.0 0.4 3.6 6.1 6.3 0.0
3/26/1999 0.5 0.3 1.2 1.2 1.0 1.0 2.8 0.0 8.8 0.0 0.0 0.0 0.0 8.9
3/27/1999 0.9 2.3 0.0 0.3 0.0 0.0 0.1 0.0 2.2 0.0 0.0 0.0 0.0 2.3
3/28/1999 0.0 0.0 0.0 2.5 0.0 0.0 1.1 0.0 20.9 0.0 0.0 0.0 0.0 21.0
3/29/1999 0.5 1.3 1.5 0.9 0.0 6.6 0.4 25.0 17.1 18.5 0.0 0.6 0.0 17.1
3/30/1999 8.0 2.7 9.2 0.0 6.3 5.7 0.0 7.3 2.8 5.4 0.0 0.2 0.0 2.8
3/31/1999 9.5 11.1 7.3 12.2 0.0 0.0 0.9 0.0 16.9 6.4 21.4 16.3 16.7 17.0
4/1/1999 9.7 17.6 0.0 0.0 0.0 3.9 0.0 15.0 5.7 16.7 14.2 4.0 3.7 5.7
4/2/1999 0.2 0.0 0.0 0.4 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1999 1.9 0.0 0.9 9.8 0.0 0.0 0.1 0.0 2.2 0.0 0.0 0.0 0.0 2.2
4/6/1999 1.9 4.4 1.1 1.7 2.6 2.8 0.0 5.0 1.9 5.0 5.4 6.2 6.2 1.9
4/7/1999 2.0 4.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
4/8/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1999 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/1999 6.0 0.4 7.1 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1999 10.8 12.3 9.3 7.2 18.6 11.0 0.1 0.0 1.9 3.5 9.7 4.4 4.5 1.9
4/12/1999 0.8 0.1 1.8 0.8 3.1 3.3 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1999 0.0 0.0 0.0 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1999 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1999 2.9 0.2 4.1 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
4/22/1999 3.6 0.6 2.1 0.0 6.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1999 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1999 1.0 3.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1999 5.4 4.6 2.3 0.3 2.5 2.1 4.3 0.0 0.0 1.2 2.8 0.0 0.0 0.0
4/27/1999 5.8 0.2 8.3 10.6 17.8 10.5 0.0 0.0 0.0 0.6 5.2 9.0 9.2 0.0
4/28/1999 5.0 8.9 4.2 2.9 0.0 22.3 1.3 85.1 56.5 63.1 0.0 2.1 0.0 56.4
4/29/1999 6.7 14.5 2.6 0.8 0.0 0.0 0.3 0.0 6.3 2.6 14.0 19.3 19.8 6.4
4/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1999 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1999 3.4 4.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1999 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1999 1.4 0.0 1.6 0.4 4.9 3.7 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1999 0.0 0.2 1.9 0.0 0.0 3.4 0.0 13.0 4.9 9.6 0.0 0.3 0.0 4.9
5/7/1999 0.0 0.7 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/8/1999 6.2 19.2 0.9 0.0 0.0 0.0 0.0 0.0 0.0 1.6 13.5 23.4 24.0 0.0
5/9/1999 21.2 12.0 17.1 17.5 24.4 14.4 1.0 0.0 18.1 0.0 0.0 0.0 0.0 18.2
5/10/1999 7.1 21.5 5.2 0.0 0.0 0.0 0.0 0.0 0.0 3.1 7.1 0.0 0.0 0.0
5/11/1999 4.9 2.4 4.2 22.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1999 4.9 8.2 6.4 0.0 6.1 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1999 0.3 0.2 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/1999 0.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.6
5/16/1999 1.6 1.6 3.2 3.6 0.3 4.5 25.7 2.0 14.6 1.5 0.0 0.1 0.0 14.7
5/17/1999 0.4 0.4 0.3 1.0 0.2 2.0 12.8 0.0 0.0 1.4 5.1 4.4 4.5 0.0
5/18/1999 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 1.2 2.7 0.0 0.0 0.0
5/19/1999 1.1 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.0
5/20/1999 0.0 0.0 0.0 0.1 0.0 0.2 1.5 0.0 0.0 0.4 1.4 1.5 1.5 0.0
5/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1999 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1999 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1999 0.0 0.0 0.0 0.2 0.0 0.5 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1999 0.0 0.1 0.8 0.1 0.0 0.2 1.2 0.0 0.0 2.2 6.6 4.0 4.1 0.0
5/28/1999 0.2 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.6 4.6 7.9 8.1 0.0
5/29/1999 0.9 0.0 1.3 0.0 4.0 2.3 0.0 0.0 0.0 1.3 6.8 9.4 9.6 0.0
5/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.6 0.0 0.0 0.0
5/31/1999 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1999 0.0 0.0 0.0 0.9 0.2 1.9 12.0 0.0 0.0 0.2 1.8 3.0 3.1 0.0
6/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/1999 0.0 0.2 0.0 0.3 0.1 0.7 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
6/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/1999 0.0 0.0 0.0 1.4 0.2 2.8 17.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/1999 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/1999 4.0 0.2 5.6 1.0 16.0 10.0 0.4 2.0 8.9 2.4 3.5 3.5 3.5 8.9
6/14/1999 1.5 1.4 0.6 16.8 0.4 7.4 25.5 13.0 15.0 14.5 20.0 21.4 21.6 15.0
6/15/1999 0.9 1.6 1.9 0.9 0.0 4.0 0.4 15.3 13.3 11.7 2.9 5.4 5.1 13.2
6/16/1999 2.8 2.1 2.6 1.6 0.0 0.0 0.7 0.0 13.8 0.0 0.0 0.0 0.0 13.9
6/17/1999 4.5 12.7 2.1 0.0 1.0 0.6 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
6/18/1999 4.0 3.3 6.4 2.7 4.8 10.9 34.3 11.0 4.2 8.3 0.4 0.3 0.0 4.1
6/19/1999 1.5 5.4 0.6 0.0 0.4 0.8 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/20/1999 0.0 0.1 0.8 0.0 0.0 3.0 0.0 11.3 4.3 8.4 0.0 0.3 0.0 4.3
6/21/1999 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/1999 1.1 0.9 8.6 9.4 0.0 3.2 0.0 12.2 4.6 9.3 2.5 4.7 4.5 4.6
6/23/1999 2.8 1.5 14.1 1.0 1.9 3.1 1.2 7.0 2.7 6.7 7.7 10.4 10.5 2.6
6/24/1999 3.6 4.3 3.2 2.8 9.9 9.9 0.4 15.3 13.3 11.3 0.0 0.4 0.0 13.2
6/25/1999 1.7 5.6 1.5 2.0 0.0 0.0 0.0 0.0 0.0 1.5 12.7 21.9 22.5 0.0
6/26/1999 2.0 6.5 6.4 0.0 1.0 3.2 0.0 10.0 3.8 12.5 23.8 29.4 29.9 3.8
6/27/1999 6.7 4.3 15.6 0.7 24.7 16.8 0.3 8.2 8.7 11.4 25.1 31.0 31.6 8.7
6/28/1999 3.5 3.6 7.5 1.6 0.0 0.0 0.3 0.0 6.3 9.3 28.6 17.4 17.8 6.3
6/29/1999 5.6 12.7 1.0 3.7 2.7 7.2 25.3 7.0 2.7 6.3 9.6 16.8 17.0 2.6
6/30/1999 7.7 13.4 14.0 3.2 8.5 11.7 0.0 25.3 9.6 25.2 18.5 9.9 9.5 9.5
7/1/1999 9.9 11.1 18.4 15.8 6.3 6.2 0.3 9.4 9.8 25.9 62.2 45.6 46.5 9.8
7/2/1999 5.7 14.9 8.7 0.9 6.5 3.9 0.4 0.0 7.5 3.1 8.9 4.2 4.3 7.6
7/3/1999 2.1 5.5 8.7 5.2 0.4 7.8 35.7 9.0 24.5 9.2 7.1 3.5 3.4 24.6
7/4/1999 8.0 8.5 15.9 5.1 8.3 4.9 0.0 0.0 0.0 8.1 22.2 8.9 9.1 0.0
7/5/1999 6.2 14.0 10.7 6.8 6.4 3.8 0.0 0.0 0.0 1.9 9.4 12.2 12.5 0.0
7/6/1999 5.9 13.6 5.7 9.4 4.2 5.4 0.0 11.3 4.3 9.4 8.9 15.6 15.7 4.3
7/7/1999 6.2 20.6 9.6 0.5 0.0 0.3 1.7 0.0 0.0 1.4 11.4 19.8 20.3 0.0
7/8/1999 7.4 13.3 8.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/9/1999 8.8 18.0 5.8 0.9 0.2 2.2 0.0 8.0 3.0 8.5 5.9 0.2 0.0 3.0
7/10/1999 5.4 16.3 5.5 1.0 2.0 1.7 0.1 2.0 2.0 1.6 0.3 0.1 0.0 2.0
7/11/1999 5.7 13.7 6.2 0.0 5.9 3.5 0.0 0.0 0.0 3.3 10.9 8.0 8.2 0.0
7/12/1999 1.6 6.6 5.6 2.7 0.4 5.5 34.6 0.0 0.0 5.0 29.6 43.5 44.6 0.0
7/13/1999 1.8 0.5 5.5 1.5 4.4 5.5 19.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/14/1999 6.2 5.7 9.6 5.1 4.9 4.3 0.0 5.2 2.0 7.3 20.8 30.9 31.5 2.0
7/15/1999 7.7 21.8 5.4 0.2 2.7 2.4 0.1 3.0 3.0 3.3 5.8 8.4 8.5 3.0
7/16/1999 11.6 32.3 2.4 12.7 2.0 5.1 0.3 15.0 11.9 14.6 8.0 0.4 0.0 11.9
7/17/1999 9.1 13.2 15.2 9.3 3.6 2.1 1.1 0.0 19.9 0.3 2.8 4.9 5.0 20.0
7/18/1999 12.6 22.8 5.9 8.4 3.1 11.0 53.7 4.0 1.5 8.0 16.3 11.4 11.6 1.5
7/19/1999 7.4 6.3 6.2 9.8 2.5 18.3 21.8 52.4 44.9 44.6 19.9 17.4 16.5 44.9
7/20/1999 8.8 11.8 8.4 5.4 3.5 4.2 0.4 8.0 9.9 14.4 23.6 10.5 10.6 9.9
7/21/1999 6.7 8.9 13.5 6.8 1.9 18.7 10.3 61.4 30.7 54.9 36.3 36.9 36.3 30.6
7/22/1999 7.5 7.1 9.9 4.3 12.2 9.0 1.4 7.0 28.8 9.5 14.5 11.3 11.4 28.9
7/23/1999 1.1 1.9 1.0 0.0 0.0 1.6 0.0 6.0 2.3 10.0 29.5 40.3 41.2 2.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/24/1999 0.0 0.1 0.4 2.2 0.4 4.4 27.9 0.0 0.0 0.9 3.0 2.3 2.4 0.0
7/25/1999 2.5 6.4 2.2 0.7 0.0 0.0 0.3 0.0 5.6 1.5 3.5 0.0 0.0 5.6
7/26/1999 2.3 0.5 1.7 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.6
7/27/1999 3.5 8.1 2.7 1.6 0.0 4.0 0.7 15.2 19.6 11.3 0.0 0.4 0.0 19.6
7/28/1999 0.5 0.1 0.5 3.1 0.5 6.2 39.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/29/1999 1.3 0.1 0.9 1.5 0.2 3.1 19.5 0.0 0.0 2.7 6.2 0.0 0.0 0.0
7/30/1999 2.1 0.6 2.8 0.3 0.0 0.6 3.5 0.0 0.0 1.4 4.7 3.5 3.6 0.0
7/31/1999 0.8 0.4 0.4 0.9 0.1 1.7 10.8 0.0 0.0 0.5 1.1 0.0 0.0 0.0
8/1/1999 2.6 1.1 8.3 0.1 0.0 1.4 0.0 5.2 2.6 6.4 8.2 5.9 5.9 2.6
8/2/1999 3.0 9.3 1.7 3.5 0.6 10.4 44.2 13.0 5.6 13.9 16.7 16.9 17.0 5.6
8/3/1999 7.6 19.5 4.4 3.3 0.6 4.5 27.8 0.0 10.1 6.5 21.5 16.2 16.6 10.2
8/4/1999 3.5 7.5 4.2 1.4 6.1 10.7 15.3 18.2 6.9 19.7 18.2 10.4 10.2 6.9
8/5/1999 5.3 9.6 7.7 6.0 4.2 13.0 0.0 40.2 15.3 33.3 10.9 7.6 6.8 15.1
8/6/1999 7.4 18.2 10.8 1.9 0.2 1.9 12.2 0.0 0.0 13.0 37.2 18.1 18.6 0.0
8/7/1999 6.9 15.7 4.4 2.5 0.2 2.9 18.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/8/1999 9.1 9.1 8.2 4.8 0.8 9.8 62.1 0.0 0.0 5.3 13.6 3.3 3.4 0.0
8/9/1999 3.4 6.5 5.8 3.8 0.4 4.5 29.3 0.0 13.0 13.2 32.8 6.6 6.8 13.1
8/10/1999 9.1 7.3 10.7 2.5 2.5 2.3 6.1 0.0 18.1 0.0 0.0 0.0 0.0 18.2
8/11/1999 9.5 14.6 14.3 1.0 0.2 2.0 12.8 0.0 0.0 4.1 19.7 24.6 25.2 0.0
8/12/1999 11.4 17.7 10.5 16.5 4.7 8.3 36.6 0.0 0.0 11.0 31.1 14.2 14.6 0.0
8/13/1999 9.1 19.6 5.4 18.3 4.2 15.6 0.6 50.0 30.1 37.6 1.1 1.2 0.0 30.0
8/14/1999 3.0 4.4 9.0 6.4 2.8 21.6 44.3 50.3 19.8 40.3 6.8 1.3 0.0 19.6
8/15/1999 5.6 3.5 9.1 5.4 4.8 10.6 25.1 15.3 5.8 11.3 0.0 0.4 0.0 5.8
8/16/1999 10.1 12.2 13.2 6.7 10.0 16.3 26.9 24.0 9.1 18.3 4.2 7.8 7.4 9.0
8/17/1999 11.7 10.8 14.4 10.7 10.4 14.3 11.1 25.2 25.7 32.3 40.2 22.1 22.0 25.7
8/18/1999 8.4 4.7 4.6 3.2 8.4 11.2 18.6 13.0 4.9 9.7 0.5 1.1 0.8 4.9
8/19/1999 5.7 5.0 0.0 0.4 0.1 3.0 5.6 8.0 3.0 5.9 0.0 0.2 0.0 3.0
8/20/1999 6.8 5.7 10.9 4.3 1.3 4.3 11.8 7.0 9.5 7.0 8.1 9.7 9.8 9.5
8/21/1999 9.8 15.4 7.9 1.1 5.7 7.9 14.1 9.0 3.4 7.1 0.9 0.2 0.0 3.4
8/22/1999 3.7 2.0 4.6 0.1 0.0 10.7 1.2 40.0 15.2 31.5 7.3 8.2 7.4 15.1
8/23/1999 7.4 11.5 6.4 0.0 4.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/24/1999 6.1 10.1 4.5 4.1 2.0 15.1 6.7 50.0 50.0 43.3 17.3 8.6 7.5 50.0
8/25/1999 3.0 5.6 5.7 0.0 1.2 3.3 0.0 10.0 3.8 7.5 0.9 1.8 1.6 3.8
8/26/1999 2.8 8.8 17.9 0.8 0.1 13.5 10.3 45.2 17.1 35.1 3.6 1.1 0.0 17.0
8/27/1999 6.5 17.1 8.8 1.1 0.2 3.8 14.1 6.0 2.3 4.9 1.1 0.2 0.0 2.3
8/28/1999 8.7 11.6 15.7 3.6 3.3 6.9 17.3 9.4 15.9 7.1 1.1 2.2 2.0 15.9
8/29/1999 13.2 26.3 17.2 3.9 15.0 15.0 21.0 12.0 24.4 18.6 22.1 0.3 0.0 24.5
8/30/1999 5.1 5.8 5.4 2.8 4.0 3.7 1.3 5.0 25.6 4.6 2.1 0.1 0.0 25.6
8/31/1999 3.1 6.9 2.0 1.4 0.2 14.7 17.6 45.3 17.2 33.6 0.0 1.1 0.0 17.1
9/1/1999 0.4 0.6 5.2 10.6 0.3 4.3 27.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/2/1999 0.2 0.5 4.5 5.3 0.3 3.9 24.8 0.0 0.0 2.1 17.7 30.6 31.4 0.0
9/3/1999 3.0 6.4 8.6 3.4 0.4 7.9 35.0 9.4 9.8 8.8 4.3 0.2 0.0 9.8
9/4/1999 7.6 5.1 10.9 0.8 6.8 6.6 9.9 4.0 1.5 14.5 28.5 5.2 5.2 1.5
9/5/1999 3.6 10.4 3.9 3.1 0.2 6.5 18.4 14.3 19.8 12.6 17.0 29.8 30.2 19.9
9/6/1999 0.0 0.3 2.3 1.6 0.1 2.6 8.4 5.0 10.0 3.7 0.0 0.1 0.0 10.0
9/7/1999 0.0 0.0 0.0 0.9 0.2 6.6 11.8 18.0 6.8 13.3 0.0 0.5 0.0 6.8
9/8/1999 4.7 0.6 9.1 2.0 0.3 3.9 25.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
9/9/1999 4.5 11.0 6.8 4.8 4.4 7.8 35.4 0.0 18.3 0.1 0.1 0.0 0.0 18.3
9/10/1999 1.8 5.8 0.4 2.9 0.5 5.8 37.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/1999 3.7 5.7 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/1999 7.4 2.2 10.8 0.4 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1999 8.0 20.1 3.8 2.4 0.4 4.8 30.2 0.0 0.0 0.5 3.4 5.6 5.7 0.0
9/14/1999 0.7 1.8 0.7 5.0 0.8 10.1 63.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/15/1999 3.8 1.7 6.2 8.2 1.0 13.0 83.2 0.0 15.0 0.0 0.0 0.0 0.0 15.1
9/16/1999 3.3 3.4 3.9 8.3 2.3 12.4 74.6 0.0 21.7 5.4 12.3 0.0 0.0 21.8
9/17/1999 1.9 1.6 6.5 10.3 5.6 12.2 53.1 4.0 25.8 3.1 0.4 0.1 0.0 25.9
9/18/1999 0.8 0.0 0.1 3.7 0.6 7.4 47.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/1999 1.6 0.0 0.0 1.2 0.0 0.0 0.5 0.0 9.9 0.0 0.0 0.0 0.0 10.0
9/20/1999 0.9 2.4 7.2 1.7 0.1 1.3 8.8 0.0 8.8 0.0 0.0 0.0 0.0 8.8
9/21/1999 9.5 13.3 13.3 0.8 14.2 9.9 10.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1999 10.7 4.8 14.4 0.0 13.3 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/1999 9.6 16.1 8.8 2.1 1.8 5.2 27.3 0.0 0.0 4.4 22.0 28.5 29.2 0.0
9/24/1999 0.9 1.0 2.9 0.1 0.0 0.2 1.5 0.0 0.0 0.3 2.2 3.8 3.9 0.0
9/25/1999 9.2 5.4 13.5 0.5 14.6 9.6 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/1999 4.9 1.5 2.3 12.3 1.1 11.1 13.4 32.2 12.2 26.7 15.4 22.3 22.0 12.1
9/27/1999 2.8 0.8 0.8 1.2 0.2 2.3 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/1999 0.0 0.1 1.2 1.4 0.2 2.7 17.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1999 1.8 0.0 0.0 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1999 4.3 1.8 6.7 2.8 0.5 5.6 35.6 0.0 0.0 0.7 5.5 9.6 9.8 0.0
10/1/1999 4.2 5.3 6.6 2.7 4.7 11.1 9.9 26.0 9.9 19.3 0.0 0.7 0.0 9.8
10/2/1999 3.8 6.1 1.4 9.6 0.2 7.0 14.3 18.2 6.9 23.4 23.5 2.8 2.4 6.9
10/3/1999 3.2 7.6 2.2 0.7 0.1 1.5 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/1999 3.0 9.9 3.4 0.0 0.0 0.0 0.0 0.0 0.0 4.0 9.2 0.0 0.0 0.0
10/5/1999 4.6 14.1 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1999 1.1 4.0 2.2 0.0 0.0 5.0 0.0 19.0 7.2 14.4 0.6 0.5 0.0 7.2
10/7/1999 0.5 0.2 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1999 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/1999 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1999 0.1 0.0 0.0 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1999 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1999 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1999 1.5 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1999 7.4 0.7 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1999 27.4 15.3 21.1 3.5 26.0 15.4 0.0 0.0 0.0 8.6 32.9 31.4 32.2 0.0
10/21/1999 16.0 15.1 12.0 0.0 30.0 28.9 0.0 42.3 16.0 33.7 19.5 34.8 34.6 15.9
10/22/1999 1.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1999 0.0 0.1 1.1 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1999 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1999 0.0 0.0 0.0 1.1 0.1 0.6 4.4 0.0 6.4 0.0 0.0 0.0 0.0 6.4
10/28/1999 0.7 2.5 0.5 0.4 0.0 0.0 0.2 0.0 3.2 0.0 0.0 0.0 0.0 3.2
10/29/1999 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1999 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1999 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1999 0.2 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1999 0.8 0.0 0.2 0.0 0.7 0.4 0.0 0.0 0.0 0.4 1.8 2.1 2.1 0.0
11/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1999 1.5 0.1 2.1 0.0 0.0 4.2 0.0 16.0 6.1 11.9 0.0 0.4 0.0 6.0
11/21/1999 17.5 4.7 20.2 3.7 15.1 9.0 0.0 0.0 0.0 3.9 14.3 12.9 13.2 0.0
11/22/1999 20.2 32.3 14.3 0.0 40.0 23.7 0.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
11/23/1999 1.4 0.0 0.2 0.2 0.5 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1999 0.0 0.0 0.0 0.7 0.0 0.3 2.0 0.0 5.0 0.0 0.0 0.0 0.0 5.0
11/28/1999 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 10.6 0.0 0.0 0.0 0.0 10.6
11/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1999 0.0 0.0 0.0 0.4 0.1 0.8 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1999 0.0 0.0 0.0 0.3 0.1 0.6 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1999 0.0 0.0 0.0 0.2 0.0 0.4 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2000 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 13.0 0.0 0.0 0.0 0.0 13.1
1/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2000 1.2 3.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2000 0.3 0.0 0.0 0.2 0.0 0.3 1.9 0.0 0.0 1.2 3.5 2.0 2.0 0.0
1/11/2000 1.6 3.4 0.9 1.3 0.0 0.2 1.0 0.0 0.0 0.1 0.6 1.0 1.0 0.0
1/12/2000 2.3 0.0 2.4 0.0 7.4 4.9 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
1/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2000 0.0 0.0 0.0 0.0 0.0 2.2 0.0 8.2 3.1 6.1 0.0 0.2 0.0 3.1
1/15/2000 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.8 0.0 0.0 0.0 0.0 13.9
1/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2000 0.0 0.0 0.0 1.5 0.0 0.0 0.7 0.0 12.5 0.0 0.0 0.0 0.0 12.6
1/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/2000 0.0 0.1 0.0 0.9 0.0 0.0 0.4 0.0 7.6 0.0 0.0 0.0 0.0 7.7
1/24/2000 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2000 0.0 0.0 0.0 0.4 0.0 0.0 0.2 0.0 3.2 0.0 0.0 0.0 0.0 3.2
1/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2000 3.3 0.2 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2000 8.1 4.1 7.8 1.3 21.8 13.9 6.3 0.0 0.0 3.6 10.8 6.3 6.5 0.0
2/1/2000 1.1 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.6 1.4 0.0 0.0 0.0
2/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2000 0.7 0.0 0.3 0.1 0.0 0.2 1.3 0.0 0.0 0.1 0.7 1.3 1.3 0.0
2/5/2000 0.4 0.0 0.5 3.1 1.5 1.4 1.0 2.0 20.1 1.5 0.0 0.1 0.0 20.2
2/6/2000 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/2000 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2000 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.1
2/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2000 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2000 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.3
2/14/2000 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
2/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2000 0.1 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2000 2.6 0.2 3.7 0.8 0.0 0.0 0.4 0.0 6.8 0.0 0.0 0.0 0.0 6.9
2/26/2000 6.0 9.7 2.6 1.8 6.9 4.6 0.0 2.0 1.4 1.5 0.0 0.1 0.0 1.4
2/27/2000 1.6 0.0 0.7 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2000 1.9 0.1 1.3 0.0 0.0 1.6 0.0 6.2 2.4 4.6 0.0 0.2 0.0 2.3
2/29/2000 2.1 2.8 1.2 8.8 1.4 1.4 3.9 0.0 0.0 0.3 2.3 3.9 4.0 0.0
3/1/2000 1.6 0.4 2.3 0.0 6.3 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2000 0.0 0.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2000 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.3
3/7/2000 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.2 0.0 0.0 0.0 0.0 5.2
3/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2000 0.6 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2000 0.7 1.0 0.5 0.8 1.5 2.5 10.6 0.0 0.0 0.7 6.2 10.7 11.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/11/2000 0.4 1.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2000 0.0 0.0 0.0 1.6 0.0 0.0 0.7 0.0 13.7 0.0 0.0 0.0 0.0 13.7
3/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2000 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 3.9 0.0 0.0 0.0 0.0 3.9
3/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/2000 0.3 0.0 0.5 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
3/26/2000 1.8 0.1 2.4 0.0 6.9 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/2000 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2000 0.3 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.3
3/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2000 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.1 0.0 0.0 0.0 0.0 5.1
4/4/2000 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2000 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/2000 1.7 0.2 3.2 0.1 0.0 6.0 1.6 22.0 8.3 16.3 0.0 0.6 0.0 8.3
4/10/2000 5.3 9.6 0.0 22.1 0.0 0.0 0.0 0.0 0.0 3.5 9.8 4.3 4.4 0.0
4/11/2000 0.1 0.0 0.1 0.0 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/2000 0.0 0.0 0.0 0.8 0.1 1.6 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/2000 0.0 0.0 0.0 0.6 0.1 1.3 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/2000 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.8 0.0 0.0 0.0 0.0 5.9
5/3/2000 0.1 0.0 0.0 0.5 0.1 1.0 6.6 0.0 0.0 0.5 3.8 6.6 6.8 0.0
5/4/2000 0.2 0.0 0.2 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/2000 1.8 0.0 2.0 0.0 6.1 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/2000 0.0 0.0 0.0 1.4 0.0 0.0 0.6 0.0 11.4 0.0 0.0 0.0 0.0 11.5
5/9/2000 0.4 0.0 0.6 1.0 0.0 0.0 0.4 0.0 8.3 0.0 0.0 0.0 0.0 8.4
5/10/2000 4.0 0.5 1.4 7.3 0.0 4.3 2.1 15.2 5.8 11.4 1.2 2.5 2.2 5.7
5/11/2000 0.8 0.1 0.9 0.0 2.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2000 0.5 1.7 0.0 2.4 0.0 17.1 1.1 65.2 45.2 48.3 0.0 1.6 0.0 45.1
5/13/2000 1.0 1.8 1.7 0.0 0.0 6.1 0.0 23.3 8.8 17.3 0.0 0.6 0.0 8.8
5/14/2000 3.7 6.0 4.1 6.3 4.7 8.2 32.8 2.0 0.8 3.8 19.1 33.1 33.9 0.8
5/15/2000 3.2 2.0 2.8 2.9 6.5 6.3 15.9 0.0 0.0 3.4 14.5 16.0 16.4 0.0
5/16/2000 0.1 0.3 0.2 0.0 0.0 0.1 0.2 0.1 0.0 0.1 0.1 0.2 0.2 0.0
5/17/2000 2.3 8.5 0.0 1.2 0.0 0.8 0.5 3.0 11.1 2.2 0.0 0.1 0.0 11.2
5/18/2000 2.4 1.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/2000 1.2 0.7 1.1 7.7 0.0 0.0 0.0 0.0 0.0 2.8 6.4 0.0 0.0 0.0
5/20/2000 1.2 1.6 3.3 1.5 0.1 4.1 7.6 11.0 4.2 8.7 4.5 8.0 7.9 4.1
5/21/2000 4.5 6.8 4.6 0.0 3.5 4.0 0.5 7.2 2.7 5.4 0.3 0.7 0.5 2.7
5/22/2000 3.7 0.5 6.1 6.1 11.1 28.7 1.2 83.5 31.7 62.3 1.5 3.2 1.2 31.4
5/23/2000 0.9 0.1 0.9 18.7 0.0 6.0 0.0 23.0 8.7 17.1 0.0 0.6 0.0 8.7
5/24/2000 1.6 0.5 4.3 1.0 2.0 2.0 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
5/25/2000 0.8 0.2 2.3 1.8 0.3 5.3 23.6 6.0 2.3 6.1 13.8 23.9 24.4 2.3
5/26/2000 0.1 0.1 1.2 0.5 0.1 5.2 6.0 16.2 6.1 12.4 3.5 6.5 6.2 6.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/27/2000 1.5 2.4 2.0 3.4 3.9 4.4 2.8 7.3 30.7 5.5 0.8 1.6 1.4 30.8
5/28/2000 0.0 0.0 0.0 0.8 0.0 0.0 0.4 0.1 6.9 0.1 0.0 0.0 0.0 6.9
5/29/2000 0.1 0.3 2.7 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
5/30/2000 0.7 0.3 0.2 0.0 0.0 0.0 0.0 0.1 0.0 0.6 1.2 0.0 0.0 0.0
5/31/2000 0.3 0.0 0.5 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
6/1/2000 0.7 0.0 1.0 0.0 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/2000 0.0 0.1 0.0 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
6/3/2000 0.1 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/2000 5.5 0.1 4.3 0.6 6.8 4.8 0.3 3.0 6.2 3.1 2.1 0.1 0.0 6.2
6/5/2000 1.9 2.7 0.5 0.4 0.1 1.8 4.8 4.0 1.5 3.7 3.7 5.0 5.0 1.5
6/6/2000 0.2 0.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/2000 0.2 0.1 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/2000 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2000 0.7 2.0 0.0 0.4 0.0 0.0 0.2 0.0 3.7 0.0 0.0 0.0 0.0 3.7
6/10/2000 0.7 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/2000 9.9 10.5 13.4 9.6 12.1 13.6 11.2 18.0 6.8 15.4 9.6 11.8 11.6 6.8
6/12/2000 6.3 13.5 6.5 6.9 7.0 8.0 20.7 3.0 1.1 11.7 30.4 20.9 21.4 1.1
6/13/2000 17.4 3.9 21.8 2.5 7.2 8.7 9.9 11.2 4.3 16.1 21.9 10.2 10.2 4.2
6/14/2000 24.7 10.4 22.7 43.3 50.4 65.1 74.9 91.3 34.6 77.8 54.9 77.7 77.4 34.4
6/15/2000 4.2 4.3 3.8 0.7 11.9 7.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
6/16/2000 0.1 0.6 3.3 2.8 0.0 0.0 1.3 0.0 23.7 0.0 0.0 0.0 0.0 23.8
6/17/2000 0.1 0.3 2.5 3.1 0.0 0.0 1.4 0.0 26.3 0.0 0.0 0.0 0.0 26.4
6/18/2000 3.1 4.7 4.8 3.7 0.1 2.1 9.9 3.0 26.8 13.7 29.8 8.7 8.8 26.9
6/19/2000 4.8 15.3 4.4 2.9 0.8 0.5 1.3 0.0 24.3 0.7 1.7 0.0 0.0 24.4
6/20/2000 6.6 16.1 4.6 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
6/21/2000 2.9 7.3 2.9 0.0 2.6 6.8 0.0 20.2 7.7 18.8 8.6 0.5 0.0 7.6
6/22/2000 4.1 12.3 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/2000 2.5 7.0 1.0 0.5 0.1 0.9 5.8 0.1 0.0 1.1 4.7 5.9 6.0 0.0
6/24/2000 0.9 2.2 2.0 0.6 0.1 1.2 7.8 0.0 0.0 0.6 4.6 7.9 8.1 0.0
6/25/2000 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/26/2000 1.2 2.4 2.7 0.2 0.0 0.3 1.9 0.0 0.0 0.5 2.0 2.0 2.0 0.0
6/27/2000 1.1 0.3 1.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
6/28/2000 5.7 6.4 8.0 9.2 0.1 1.6 7.0 2.0 2.0 6.6 14.7 7.1 7.2 2.0
6/29/2000 8.7 18.8 9.3 14.8 12.2 11.6 14.5 8.2 3.1 8.8 12.3 14.8 15.0 3.1
6/30/2000 2.0 4.4 2.5 14.1 0.8 1.2 5.1 0.0 0.0 0.4 3.0 5.2 5.3 0.0
7/1/2000 1.4 1.8 1.5 6.0 0.0 1.3 0.0 5.0 1.9 4.2 1.2 0.1 0.0 1.9
7/2/2000 6.3 9.8 7.1 10.6 8.6 15.5 40.4 17.2 34.5 13.2 1.1 0.4 0.0 34.5
7/3/2000 5.7 4.6 8.7 7.5 7.8 10.4 11.1 16.0 19.2 12.7 6.9 12.3 12.2 19.2
7/4/2000 6.0 4.6 13.5 20.7 16.0 13.4 5.3 12.2 10.5 13.3 21.8 28.8 29.2 10.5
7/5/2000 3.2 2.0 6.4 0.9 11.5 17.9 0.0 42.3 16.0 33.1 5.6 5.0 4.0 15.9
7/6/2000 2.2 4.5 2.7 4.3 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/7/2000 2.2 8.3 0.0 0.5 0.1 2.1 6.4 4.0 1.5 3.0 0.0 0.1 0.0 1.5
7/8/2000 7.1 4.0 10.7 0.9 0.0 3.2 0.4 12.0 12.0 15.7 21.5 14.7 14.8 12.0
7/9/2000 4.5 11.8 6.8 6.8 6.9 11.1 48.0 0.0 26.7 0.0 0.0 0.0 0.0 26.8
7/10/2000 0.6 0.0 0.0 4.9 0.7 9.0 54.1 2.0 7.0 1.5 0.0 0.1 0.0 7.0
7/11/2000 0.0 0.1 1.3 0.2 0.0 0.5 0.1 2.0 2.0 1.5 0.0 0.1 0.0 2.0
7/12/2000 2.8 10.1 0.0 1.7 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
7/13/2000 3.2 8.4 1.5 3.1 0.7 2.0 0.2 6.2 5.6 5.4 6.9 12.1 12.2 5.6
7/14/2000 0.3 0.0 0.0 5.9 0.9 17.5 64.0 28.3 18.2 21.6 5.0 9.3 8.8 18.1
7/15/2000 1.1 0.1 1.9 4.5 0.4 4.9 31.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/16/2000 6.8 23.8 6.5 10.1 0.8 4.8 18.1 6.0 4.2 5.5 9.1 16.0 16.2 4.2
7/17/2000 3.5 3.1 10.2 4.5 0.2 6.2 12.2 16.2 6.1 15.2 9.9 6.7 6.5 6.1
7/18/2000 9.8 12.3 13.8 5.3 8.1 7.2 0.0 9.0 3.4 12.7 33.0 45.9 46.8 3.4
7/19/2000 14.1 31.2 7.3 0.0 8.6 5.1 0.0 0.0 0.0 10.6 27.3 7.4 7.6 0.0
7/20/2000 3.2 10.1 4.8 3.1 2.9 7.6 39.5 0.0 0.0 4.2 14.2 11.1 11.4 0.0
7/21/2000 7.3 18.1 5.8 5.2 1.3 11.7 66.9 3.0 1.1 3.0 2.0 0.5 0.4 1.1
7/22/2000 4.8 14.4 2.1 1.3 0.7 3.0 17.0 0.0 0.0 7.1 21.9 13.5 13.8 0.0
7/23/2000 3.8 12.8 2.1 0.3 0.0 0.5 0.1 2.0 3.2 2.4 2.0 0.1 0.0 3.3
7/24/2000 4.1 13.7 3.0 0.7 0.0 0.0 0.3 0.0 5.8 11.7 26.6 0.0 0.0 5.8
7/25/2000 5.3 6.6 8.5 0.0 2.4 5.3 0.0 15.0 5.7 12.9 7.2 8.0 7.8 5.7
7/26/2000 4.8 14.2 2.7 1.9 0.3 1.8 3.8 4.0 7.8 5.1 16.4 27.8 28.4 7.8
7/27/2000 5.0 10.1 4.8 4.3 8.5 15.7 20.5 29.2 29.9 22.1 3.5 6.8 6.2 29.9
7/28/2000 14.3 4.8 19.3 5.2 2.9 5.1 12.6 6.3 28.5 6.5 8.3 10.0 10.1 28.6
7/29/2000 13.0 12.3 13.7 15.6 17.0 14.0 1.3 15.0 29.3 15.9 17.5 16.0 16.0 29.4
7/30/2000 7.1 8.4 10.2 5.6 11.7 17.2 0.0 39.3 14.9 34.8 13.0 1.0 0.0 14.8
7/31/2000 17.0 2.1 28.8 6.1 17.0 15.6 0.7 21.2 21.1 20.6 19.8 21.2 21.2 21.1
8/1/2000 8.4 21.8 15.0 5.6 2.8 12.4 0.2 41.0 19.9 33.3 10.2 9.2 8.4 19.8
8/2/2000 7.4 20.4 5.8 1.9 0.3 3.9 24.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/3/2000 3.2 0.3 4.1 3.2 2.4 8.2 30.0 9.0 10.9 6.7 0.0 0.2 0.0 10.9
8/4/2000 5.5 12.7 4.9 3.2 9.6 11.9 41.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/5/2000 0.4 0.2 1.7 3.5 0.6 12.1 44.3 19.4 7.4 14.8 1.0 0.5 0.0 7.3
8/6/2000 10.9 3.3 12.8 3.0 2.0 9.3 19.8 20.0 20.0 16.7 5.8 4.1 3.7 20.0
8/7/2000 12.1 27.1 9.8 11.1 14.6 18.6 29.1 21.4 13.8 20.5 21.6 26.7 26.8 13.7
8/8/2000 3.4 5.1 5.7 15.8 0.2 1.8 6.0 3.2 12.5 2.4 0.0 0.1 0.0 12.6
8/9/2000 2.7 8.0 3.9 0.8 0.1 2.1 10.1 2.0 0.8 1.6 1.0 1.8 1.8 0.8
8/10/2000 7.1 15.8 8.4 4.5 3.1 5.0 16.4 3.0 11.3 5.5 8.2 2.0 2.0 11.3
8/11/2000 4.6 9.7 5.0 7.0 2.9 11.3 21.9 24.0 9.1 19.2 8.9 14.3 14.0 9.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/12/2000 4.9 7.3 4.3 2.9 0.1 6.3 7.4 20.0 27.5 15.3 1.6 1.5 1.0 27.5
8/13/2000 2.7 4.5 5.9 2.6 2.1 17.7 5.5 60.0 42.1 44.6 0.7 2.7 1.2 42.0
8/14/2000 5.5 6.4 8.5 2.9 4.2 2.5 1.3 0.0 24.8 1.3 5.8 6.8 7.0 25.0
8/15/2000 3.0 1.5 8.7 3.0 10.6 15.5 13.3 28.0 28.1 21.4 2.0 2.0 1.3 28.1
8/16/2000 1.2 2.8 5.6 2.7 0.3 3.5 22.5 0.0 8.1 0.0 0.0 0.0 0.0 8.1
8/17/2000 4.3 0.5 3.8 12.8 0.1 3.8 11.3 8.0 19.2 6.0 0.9 1.8 1.6 19.3
8/18/2000 1.6 3.1 4.7 4.6 0.5 6.7 41.5 1.0 12.4 7.0 14.2 0.0 0.0 12.4
8/19/2000 6.3 9.0 8.9 11.4 0.1 8.4 12.2 25.0 23.8 28.6 49.1 63.0 64.0 23.8
8/20/2000 10.3 16.4 6.8 3.1 4.9 4.0 0.5 4.0 10.3 5.3 19.8 34.3 35.1 10.3
8/21/2000 3.0 10.2 6.2 0.0 0.5 1.7 0.0 5.2 2.0 9.7 15.2 4.5 4.5 2.0
8/22/2000 3.7 13.2 2.7 0.1 0.0 0.8 1.5 2.0 0.8 1.5 0.0 0.1 0.0 0.8
8/23/2000 2.0 5.0 3.4 1.9 0.2 9.7 18.0 26.0 9.9 19.3 0.0 0.7 0.0 9.8
8/24/2000 7.1 8.8 7.5 14.1 10.6 16.8 27.7 24.3 9.2 19.6 7.3 9.1 8.7 9.2
8/25/2000 4.3 12.6 1.6 0.8 0.1 2.7 10.5 4.0 1.5 3.0 0.0 0.1 0.0 1.5
8/26/2000 8.5 10.1 12.4 4.7 0.4 4.7 30.8 0.0 19.9 0.5 4.0 6.9 7.1 20.0
8/27/2000 6.5 19.5 8.1 11.0 1.0 9.5 34.4 14.3 5.4 15.8 29.7 43.0 43.7 5.4
8/28/2000 8.4 17.5 12.2 5.1 16.6 23.7 65.4 15.2 5.8 18.4 25.9 23.3 23.5 5.7
8/29/2000 0.0 0.1 0.9 2.7 0.4 6.2 34.1 3.3 1.3 2.5 0.0 0.1 0.0 1.2
8/30/2000 0.5 0.8 7.9 2.1 1.9 6.8 27.3 6.0 2.3 5.2 6.5 11.4 11.5 2.3
8/31/2000 0.2 0.9 7.8 2.3 0.2 3.4 18.6 2.0 8.3 1.5 0.0 0.1 0.0 8.4
9/1/2000 5.3 1.4 9.6 3.2 0.5 7.9 41.2 5.2 2.0 3.9 0.0 0.1 0.0 2.0
9/2/2000 8.9 18.4 9.8 7.7 10.8 13.0 43.7 0.0 0.0 5.5 12.6 0.0 0.0 0.0
9/3/2000 10.3 6.8 16.1 19.3 14.2 12.6 19.3 5.0 8.3 5.3 5.9 5.5 5.5 8.3
9/4/2000 10.5 19.3 12.4 0.7 22.6 20.5 8.5 22.3 8.5 21.9 19.4 17.4 17.3 8.4
9/5/2000 1.8 2.3 3.7 0.9 4.4 5.2 12.0 3.0 1.1 2.4 1.0 1.3 1.3 1.1
9/6/2000 2.3 8.7 1.1 3.3 0.1 1.7 11.4 0.1 21.3 0.1 0.0 0.0 0.0 21.4
9/7/2000 4.4 4.6 6.3 4.3 0.6 14.9 0.0 55.3 21.0 41.4 1.0 1.4 0.0 20.8
9/8/2000 3.2 5.9 4.4 2.1 4.4 8.1 27.5 5.1 1.9 6.0 8.1 7.4 7.5 1.9
9/9/2000 1.4 1.4 3.6 1.2 2.6 5.1 15.0 5.0 1.9 5.6 4.4 0.1 0.0 1.9
9/10/2000 5.8 14.9 5.3 7.3 3.1 12.8 73.7 0.0 13.9 0.6 5.4 9.3 9.5 14.0
9/11/2000 4.5 9.3 5.7 0.0 4.7 2.8 0.0 0.0 0.0 3.3 9.9 5.9 6.0 0.0
9/12/2000 8.1 10.6 9.8 5.1 10.0 5.9 0.0 0.0 0.0 2.1 10.7 14.1 14.5 0.0
9/13/2000 6.6 12.2 4.8 0.1 0.2 0.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.8
9/14/2000 1.8 5.9 2.6 0.0 0.9 1.8 0.0 5.0 1.9 4.0 1.9 3.1 3.0 1.9
9/15/2000 4.2 9.6 4.7 0.2 0.0 2.3 2.3 7.2 2.7 5.5 1.8 3.2 3.1 2.7
9/16/2000 4.5 6.4 2.6 17.0 7.0 5.7 10.5 0.0 0.0 1.8 5.7 4.2 4.3 0.0
9/17/2000 1.3 2.4 1.1 0.0 0.0 0.0 0.0 0.0 0.0 3.1 9.1 5.2 5.3 0.0
9/18/2000 1.6 4.7 1.6 0.0 0.0 1.3 0.0 5.0 1.9 5.1 3.2 0.1 0.0 1.9
9/19/2000 2.0 1.6 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/2000 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.0 1.1 2.8 3.5 5.4 5.5 1.1
9/21/2000 2.5 0.1 3.5 0.7 4.5 3.9 8.3 0.0 0.0 3.1 7.2 0.0 0.0 0.0
9/22/2000 5.2 0.6 7.1 4.5 1.0 4.2 18.2 3.2 1.2 3.2 6.8 11.8 12.0 1.2
9/23/2000 8.3 1.8 10.9 6.5 8.0 6.0 3.7 3.2 26.1 3.7 4.2 3.0 3.0 26.2
9/24/2000 0.6 1.7 1.9 6.4 0.8 14.2 63.7 16.0 18.7 13.3 11.8 20.9 21.0 18.7
9/25/2000 0.2 1.3 3.2 3.0 0.3 4.3 27.7 0.0 7.6 0.1 0.5 0.9 0.9 7.6
9/26/2000 0.0 0.3 2.6 0.8 0.1 1.6 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/2000 0.0 0.0 0.0 2.4 0.0 2.7 1.1 10.2 24.0 11.3 8.5 0.3 0.0 24.1
9/29/2000 0.5 0.9 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2000 3.2 0.9 5.0 0.0 4.7 2.8 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
10/1/2000 1.4 0.8 3.7 2.7 1.3 6.0 34.6 0.0 0.0 0.9 2.0 0.0 0.0 0.0
10/2/2000 1.4 0.5 1.4 1.4 0.4 3.0 18.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2000 4.4 0.6 4.6 1.1 6.3 5.3 10.6 0.0 2.1 0.0 0.0 0.0 0.0 2.1
10/4/2000 10.8 1.1 11.5 0.2 10.8 7.4 0.1 4.0 2.8 7.4 16.7 15.9 16.2 2.8
10/5/2000 5.2 0.4 7.0 2.1 4.4 5.0 0.2 9.2 7.9 9.0 10.8 14.1 14.2 7.9
10/6/2000 4.4 0.3 5.3 8.1 3.3 6.2 10.3 10.2 3.9 8.8 4.6 4.5 4.3 3.8
10/7/2000 12.6 0.6 18.0 7.2 28.0 19.4 0.0 11.0 4.2 8.4 0.6 0.3 0.0 4.1
10/8/2000 11.2 0.1 8.0 41.7 18.2 13.4 0.0 10.1 3.8 41.8 102.8 58.8 60.0 3.8
10/9/2000 3.4 0.0 0.0 0.0 0.0 20.3 0.0 77.3 29.3 57.5 1.8 4.9 3.1 29.1
10/10/2000 0.5 0.0 0.0 0.0 0.0 5.3 0.0 20.0 7.6 14.8 0.0 0.5 0.0 7.5
10/11/2000 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2000 0.0 0.0 0.0 0.5 0.0 0.0 0.2 0.0 4.4 0.0 0.0 0.0 0.0 4.4
10/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2000 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.8
10/18/2000 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0
10/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2000 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2000 0.0 0.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2000 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2000 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2000 0.0 0.2 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2000 0.0 0.0 0.0 0.3 0.0 0.0 0.1 0.0 2.5 0.0 0.0 0.0 0.0 2.5
11/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2000 0.0 0.0 0.0 0.7 0.0 2.4 0.3 9.0 9.0 6.7 0.0 0.2 0.0 9.0
11/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2000 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2000 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2000 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2000 3.6 13.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2000 0.4 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 2.9 10.9 10.2 10.5 0.0
12/10/2000 0.1 0.0 0.1 0.0 0.4 0.2 0.0 0.0 0.0 6.0 22.9 22.0 22.6 0.0
12/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2000 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2000 0.0 0.4 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2000 0.0 0.6 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2000 0.5 2.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2000 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2001 0.8 0.0 0.0 17.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2001 0.7 0.0 0.0 13.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2001 0.0 0.0 0.0 0.1 0.0 0.2 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2001 0.0 0.0 0.0 0.4 0.1 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2001 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2001 1.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/13/2001 8.6 0.4 11.3 2.1 27.7 23.7 0.9 28.0 28.0 25.7 15.7 11.3 10.9 28.0
1/14/2001 3.0 0.1 2.9 2.4 4.2 10.9 1.1 32.2 32.2 24.3 0.9 0.8 0.0 32.2
1/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 2.9 5.1 5.2 0.0
1/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2001 0.0 0.0 0.0 0.1 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/2001 4.5 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2001 1.0 1.7 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/2001 2.9 10.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2001 0.0 0.0 0.0 0.7 0.0 2.4 0.3 9.3 9.3 6.9 0.0 0.2 0.0 9.3
1/26/2001 1.5 0.0 1.5 0.0 4.2 2.5 0.0 0.0 0.0 0.5 1.1 0.0 0.0 0.0
1/27/2001 0.2 0.4 3.6 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2001 0.5 2.2 3.8 0.9 0.0 3.2 0.4 12.0 12.0 8.9 0.0 0.3 0.0 12.0
1/29/2001 5.2 19.4 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2001 0.0 0.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/2001 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/2001 4.3 2.5 6.7 0.0 4.6 2.8 0.0 0.0 0.0 10.8 28.5 9.2 9.4 0.0
2/3/2001 0.6 0.0 0.6 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2001 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2001 5.1 0.1 3.3 2.0 10.3 13.2 0.9 27.0 27.0 23.9 13.0 10.8 10.4 27.0
2/6/2001 6.8 1.8 9.8 0.0 16.6 9.8 0.0 0.0 0.0 7.9 26.5 20.2 20.7 0.0
2/7/2001 0.2 0.0 0.1 2.0 0.0 0.0 0.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
2/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2001 0.0 0.0 0.0 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2001 4.7 0.0 4.7 0.0 14.3 8.5 0.0 0.0 0.0 1.4 3.1 0.0 0.0 0.0
2/12/2001 13.2 3.2 16.4 0.0 15.9 9.4 0.0 0.0 0.0 1.6 13.0 22.4 23.0 0.0
2/13/2001 0.7 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 7.7 17.4 0.0 0.0 0.0
2/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2001 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2001 1.1 0.0 1.3 3.4 4.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2001 0.0 0.0 0.0 0.4 0.1 0.8 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/2001 0.0 0.1 0.4 0.5 0.0 1.9 0.2 7.2 7.2 5.3 0.0 0.2 0.0 7.2
2/21/2001 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2001 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2001 0.6 0.1 0.0 12.0 0.0 3.4 0.4 13.0 13.0 9.6 0.0 0.3 0.0 13.0
2/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2001 1.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2001 1.7 0.5 4.2 19.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2001 0.0 0.5 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2001 0.7 0.0 0.0 2.5 0.1 7.7 11.0 23.0 23.0 17.2 0.4 0.6 0.0 23.0
3/7/2001 0.5 1.7 0.0 0.4 0.1 0.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2001 0.5 0.0 0.7 0.0 2.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/2001 2.5 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2001 2.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2001 0.0 0.1 0.1 1.0 0.2 2.1 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2001 1.6 0.0 1.3 0.0 2.5 1.5 0.0 0.0 0.0 0.3 1.2 1.1 1.1 0.0
3/15/2001 0.1 0.3 2.5 0.0 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2001 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2001 0.0 0.4 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2001 0.0 0.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2001 1.6 0.0 0.0 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2001 4.9 0.4 6.5 2.1 12.3 14.7 0.9 28.2 28.2 21.9 3.5 3.5 2.9 28.2
3/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2001 0.0 0.0 0.0 0.8 0.1 1.6 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2001 0.8 0.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.8 1.7 0.0 0.0 0.0
3/24/2001 4.7 2.0 6.9 0.0 6.9 4.1 0.0 0.0 0.0 6.2 19.4 12.6 12.9 0.0
3/25/2001 16.9 3.7 20.4 0.0 22.8 13.5 0.0 0.0 0.0 0.4 3.4 5.9 6.0 0.0
3/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2001 0.0 0.0 0.0 0.7 0.0 2.4 0.3 9.0 9.0 6.7 0.0 0.2 0.0 9.0
3/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/31/2001 0.2 0.0 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2001 0.4 0.0 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2001 0.7 0.0 0.0 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2001 0.0 0.1 0.0 1.0 0.0 3.5 0.4 13.2 13.2 9.8 0.0 0.3 0.0 13.2
4/4/2001 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2001 0.5 1.8 0.0 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2001 4.3 15.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2001 1.1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2001 0.1 0.5 0.0 0.1 0.0 0.3 0.0 1.0 1.0 0.7 0.0 0.0 0.0 1.0
4/9/2001 2.1 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/2001 0.5 1.8 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/2001 1.3 5.1 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2001 0.3 0.1 0.8 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2001 0.4 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2001 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2001 1.2 2.5 1.9 2.6 2.0 1.2 0.0 0.0 0.0 0.1 0.4 0.7 0.7 0.0
4/16/2001 6.8 10.3 8.7 3.6 8.0 4.7 0.0 0.0 0.0 2.7 10.2 9.8 10.0 0.0
4/17/2001 1.9 2.2 4.8 3.7 2.5 1.5 0.0 0.0 0.0 5.0 26.3 35.6 36.5 0.0
4/18/2001 7.7 1.6 12.7 2.6 14.0 8.3 0.0 0.0 0.0 3.5 10.9 6.9 7.1 0.0
4/19/2001 0.1 0.5 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/2001 2.1 0.9 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/2001 5.1 4.5 6.1 0.9 5.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/2001 3.4 1.3 6.9 4.3 11.1 6.6 0.0 0.0 0.0 5.2 18.7 16.3 16.7 0.0
4/23/2001 5.8 1.2 8.4 8.2 10.3 6.8 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2001 0.6 1.2 3.4 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/2001 2.7 7.5 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/2001 1.5 2.3 3.4 0.0 4.2 2.5 0.0 0.0 0.0 0.6 2.5 2.4 2.5 0.0
4/27/2001 6.3 1.9 13.0 2.1 17.8 17.9 0.9 28.0 28.0 20.9 0.4 0.7 0.0 28.0
4/28/2001 7.4 0.6 4.7 4.8 2.4 11.4 1.3 38.1 38.1 28.2 0.0 1.0 0.0 38.1
4/29/2001 1.2 2.4 4.1 5.0 1.4 6.3 0.7 21.0 21.0 16.2 5.2 9.5 9.2 21.0
4/30/2001 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/2001 0.6 0.8 0.0 1.6 0.0 5.9 0.7 22.3 22.3 20.4 9.5 2.0 1.5 22.3
5/2/2001 0.3 1.0 0.0 2.4 0.0 8.4 1.1 32.0 32.0 23.7 0.0 0.8 0.0 32.0
5/3/2001 2.3 0.9 3.7 0.0 2.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/2001 0.5 1.8 0.0 0.5 0.1 1.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2001 3.7 4.6 2.2 2.9 4.9 13.4 1.3 40.0 40.0 32.0 8.5 8.7 7.9 40.0
5/7/2001 6.2 5.8 7.2 6.1 10.3 9.8 0.5 14.1 14.1 11.9 3.7 1.3 1.0 14.1
5/8/2001 1.7 2.5 0.8 5.8 2.4 2.7 0.2 5.0 5.0 6.7 12.0 12.3 12.5 5.0
5/9/2001 2.6 5.2 0.3 0.7 0.0 2.4 0.3 9.2 9.2 6.8 0.0 0.2 0.0 9.2
5/10/2001 6.0 2.4 8.8 0.5 0.0 1.8 0.2 7.0 7.0 5.2 0.0 0.2 0.0 7.0
5/11/2001 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2001 1.1 3.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/2001 2.3 8.4 0.0 1.0 0.0 3.4 0.4 13.1 13.1 9.7 0.0 0.3 0.0 13.1
5/14/2001 5.8 9.5 8.6 1.2 1.1 3.3 12.3 3.0 3.0 2.9 5.5 9.6 9.8 3.0
5/15/2001 1.1 3.5 0.0 3.2 0.1 1.3 8.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/2001 2.2 0.4 3.3 0.6 7.9 6.8 0.3 8.0 8.0 6.8 2.7 2.1 1.9 8.0
5/18/2001 1.0 2.9 0.4 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/2001 6.8 8.2 5.4 0.0 10.9 6.4 0.0 0.0 0.0 0.4 2.5 4.1 4.2 0.0
5/20/2001 2.2 3.1 3.4 1.5 5.9 5.1 0.2 6.1 6.1 5.2 3.2 4.1 4.0 6.1
5/21/2001 7.5 2.2 11.7 0.0 15.4 9.1 0.0 0.0 0.0 0.3 2.6 4.5 4.6 0.0
5/22/2001 3.3 0.1 3.8 20.4 8.0 4.7 0.0 0.0 0.0 1.1 9.1 15.8 16.2 0.0
5/23/2001 0.1 0.5 1.6 0.0 0.0 0.0 0.0 0.0 0.0 2.2 5.1 0.0 0.0 0.0
5/24/2001 2.1 4.8 1.6 0.0 3.4 2.0 0.0 0.0 0.0 10.3 46.9 55.6 57.0 0.0
5/25/2001 3.3 8.6 4.2 0.9 0.0 3.2 0.4 12.0 12.0 9.0 0.6 1.3 1.0 12.0
5/26/2001 2.6 5.2 1.5 1.9 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/2001 6.6 15.4 5.5 3.4 3.4 2.0 0.0 0.0 0.0 0.2 0.7 0.7 0.7 0.0
5/28/2001 7.9 26.2 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/2001 2.1 5.9 1.1 1.0 0.1 1.3 8.3 0.0 0.0 2.3 5.8 1.5 1.5 0.0
5/30/2001 3.1 5.3 5.1 2.6 0.6 6.4 0.8 23.1 23.1 17.1 0.0 0.6 0.0 23.1
5/31/2001 2.4 1.2 2.4 0.0 1.9 1.1 0.0 0.0 0.0 0.8 3.8 4.6 4.7 0.0
6/1/2001 1.1 0.7 3.0 0.0 2.0 1.2 0.0 0.0 0.0 0.7 3.4 4.2 4.3 0.0
6/2/2001 2.9 8.5 0.4 3.2 0.9 6.8 6.1 21.0 21.0 19.4 13.5 11.9 11.7 21.0
6/3/2001 2.0 6.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/2001 3.3 8.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4 19.6 22.6 23.2 0.0
6/5/2001 1.9 3.6 1.9 0.0 2.4 1.4 0.0 0.0 0.0 0.8 7.0 12.1 12.4 0.0
6/6/2001 4.7 4.7 7.5 1.7 6.1 3.6 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
6/7/2001 10.0 7.4 16.7 5.1 16.0 9.5 0.0 0.0 0.0 2.7 10.1 9.2 9.4 0.0
6/8/2001 7.0 5.3 7.6 21.3 4.7 2.8 0.0 0.0 0.0 4.6 11.4 2.2 2.2 0.0
6/9/2001 14.0 17.0 20.5 15.1 17.9 16.3 10.8 16.0 16.0 34.2 53.7 6.9 6.7 16.0
6/10/2001 28.9 29.0 33.7 20.0 58.7 43.8 13.7 27.1 27.1 46.5 64.8 11.8 11.4 27.1
6/11/2001 8.9 24.9 6.3 5.6 4.1 3.4 6.4 0.0 0.0 0.5 4.5 7.7 7.9 0.0
6/12/2001 9.9 27.1 3.0 52.6 0.3 3.2 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/2001 5.1 16.6 0.0 2.7 0.4 5.5 34.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/2001 2.9 10.0 0.0 0.8 0.0 2.9 0.4 11.0 11.0 8.2 0.0 0.3 0.0 11.0
6/15/2001 0.3 1.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 4.3 36.3 62.8 64.4 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/16/2001 3.7 14.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 5.3 42.2 71.7 73.5 0.0
6/17/2001 14.4 35.9 9.1 0.0 2.6 1.5 0.0 0.0 0.0 0.9 5.1 7.1 7.3 0.0
6/18/2001 3.9 9.4 5.1 0.5 2.5 3.3 0.2 7.0 7.0 5.7 1.3 0.2 0.0 7.0
6/19/2001 6.6 7.9 13.7 12.5 0.8 7.3 0.9 26.1 26.1 19.9 4.6 8.6 8.2 26.1
6/20/2001 5.7 4.0 10.2 0.0 8.3 4.9 0.0 0.0 0.0 2.5 9.9 10.2 10.5 0.0
6/21/2001 14.0 15.4 26.7 0.0 6.3 3.7 0.0 0.0 0.0 6.8 42.6 64.4 66.0 0.0
6/22/2001 2.9 9.7 2.4 3.1 1.0 6.5 39.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/2001 1.3 2.1 2.6 2.6 0.3 6.3 25.3 9.0 9.0 7.1 3.9 7.1 7.0 9.0
6/24/2001 8.0 1.0 14.3 4.0 32.0 28.8 34.1 18.2 18.2 13.7 1.5 3.0 2.6 18.2
6/25/2001 4.9 18.5 2.6 0.1 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/26/2001 3.0 11.5 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/2001 9.8 36.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 1.6 3.5 0.0 0.0 0.0
6/28/2001 3.7 10.4 1.7 0.9 0.1 1.8 11.2 0.0 0.0 2.0 4.5 0.0 0.0 0.0
6/29/2001 11.7 23.6 6.4 1.0 8.2 6.8 13.2 0.0 0.0 2.3 17.6 29.5 30.2 0.0
6/30/2001 11.8 29.1 7.8 0.0 4.0 2.3 0.0 0.0 0.0 3.2 15.4 19.2 19.7 0.0
7/1/2001 6.7 6.0 3.1 5.5 1.0 6.9 0.8 24.0 24.0 20.0 5.0 0.6 0.0 24.0
7/2/2001 4.0 0.3 3.4 1.1 0.2 2.2 14.1 0.0 0.0 1.6 6.3 6.4 6.6 0.0
7/3/2001 2.7 0.3 3.6 3.7 0.0 0.6 3.5 0.0 0.0 2.3 7.0 4.1 4.2 0.0
7/4/2001 3.5 0.2 5.4 12.5 11.9 11.4 6.6 13.0 13.0 9.8 0.4 0.3 0.0 13.0
7/5/2001 0.0 0.1 1.1 2.5 0.2 6.9 18.5 15.3 15.3 11.3 0.0 0.4 0.0 15.3
7/6/2001 0.3 0.1 0.9 7.4 0.7 8.7 22.7 19.0 19.0 14.1 0.0 0.5 0.0 19.0
7/7/2001 0.4 0.4 4.0 9.0 0.5 11.3 7.4 38.3 38.3 28.6 1.6 3.8 2.9 38.3
7/8/2001 0.6 0.3 2.5 6.0 0.6 8.8 1.1 32.0 32.0 37.6 53.1 52.1 52.6 32.0
7/9/2001 5.8 0.9 12.5 10.5 12.2 7.2 0.0 0.0 0.0 1.6 7.3 8.5 8.7 0.0
7/10/2001 4.4 0.4 5.2 0.8 0.5 1.9 10.3 0.0 0.0 0.6 1.7 1.0 1.0 0.0
7/11/2001 3.6 1.4 8.1 9.9 0.6 1.1 5.2 0.0 0.0 0.2 1.3 2.2 2.3 0.0
7/12/2001 2.4 1.0 7.3 0.3 6.0 4.2 4.1 0.0 0.0 1.3 10.8 18.7 19.2 0.0
7/13/2001 9.2 2.2 14.2 0.9 4.7 2.8 0.0 0.0 0.0 2.3 6.4 2.5 2.6 0.0
7/14/2001 8.4 2.8 12.3 5.7 8.4 10.0 24.9 5.0 5.0 6.2 9.6 9.6 9.7 5.0
7/15/2001 4.9 4.0 15.5 1.6 4.6 5.8 20.5 0.0 0.0 10.3 28.5 12.1 12.4 0.0
7/16/2001 3.1 1.6 3.2 2.0 2.3 5.2 25.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/17/2001 2.0 3.0 10.9 0.0 0.4 0.2 0.0 0.0 0.0 0.5 2.8 3.7 3.8 0.0
7/18/2001 2.6 2.6 9.0 3.8 0.8 7.8 0.9 28.0 28.0 27.3 20.5 14.0 13.6 28.0
7/19/2001 2.6 1.4 7.9 7.3 0.5 6.2 39.3 0.0 0.0 1.8 6.5 5.9 6.0 0.0
7/20/2001 7.7 2.1 11.2 3.7 2.9 6.4 31.5 0.0 0.0 1.2 3.0 0.7 0.7 0.0
7/21/2001 3.9 2.0 4.7 33.5 0.8 10.2 4.6 35.0 35.0 33.8 20.0 5.6 4.8 35.0
7/22/2001 4.5 1.8 6.7 27.7 2.1 8.9 1.0 29.1 29.1 28.0 27.4 31.3 31.3 29.1
7/23/2001 22.1 8.0 39.3 9.0 12.2 16.8 9.3 32.0 32.0 34.3 28.0 9.8 9.2 32.0
7/24/2001 3.8 0.6 1.1 12.9 0.5 5.3 33.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/25/2001 3.3 0.6 3.8 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/26/2001 1.6 0.3 4.2 0.1 2.4 1.6 1.0 0.0 0.0 0.1 0.9 1.6 1.6 0.0
7/27/2001 3.0 0.1 1.3 0.1 0.4 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/28/2001 3.0 1.9 7.5 0.0 4.2 2.5 0.0 0.0 0.0 2.2 7.5 6.1 6.2 0.0
7/29/2001 10.8 1.7 15.0 10.3 8.9 20.5 47.7 31.3 31.3 25.4 7.6 6.9 6.3 31.3
7/30/2001 1.8 3.0 11.2 4.8 4.9 16.9 26.0 39.1 39.1 29.0 0.0 1.0 0.0 39.1
7/31/2001 7.0 2.3 9.9 0.8 2.6 3.1 10.3 0.0 0.0 4.0 13.6 10.9 11.2 0.0
8/1/2001 1.2 2.9 10.6 0.1 2.3 1.6 1.8 0.0 0.0 6.2 18.2 9.9 10.1 0.0
8/2/2001 21.2 3.2 28.5 7.9 24.0 17.4 0.4 12.0 12.0 9.9 8.4 14.8 14.9 12.0
8/3/2001 0.2 0.0 0.0 0.6 0.0 2.2 0.3 8.2 8.2 6.5 3.6 6.4 6.4 8.2
8/4/2001 0.0 0.0 0.0 1.0 0.0 3.4 0.4 13.0 13.0 9.6 0.0 0.3 0.0 13.0
8/5/2001 0.0 0.0 0.0 2.7 0.1 5.6 8.9 16.3 16.3 12.1 0.0 0.4 0.0 16.3
8/6/2001 0.0 0.0 0.0 2.8 0.4 5.6 35.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/7/2001 0.0 0.0 0.0 1.6 0.3 3.2 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/8/2001 0.2 0.3 3.0 5.0 0.8 10.0 63.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/9/2001 0.6 0.2 2.4 2.3 2.7 6.1 29.6 0.0 0.0 1.2 4.8 5.1 5.2 0.0
8/10/2001 3.0 0.6 4.8 0.3 0.0 0.5 3.4 0.0 0.0 3.2 18.4 26.2 26.9 0.0
8/11/2001 11.2 3.1 20.0 0.0 22.2 13.2 0.0 0.0 0.0 11.1 35.6 24.6 25.2 0.0
8/12/2001 4.4 1.0 1.8 19.7 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
8/13/2001 8.6 4.2 19.3 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/14/2001 3.1 0.3 2.3 2.9 0.0 4.0 3.9 13.0 13.0 9.7 0.1 0.3 0.0 13.0
8/15/2001 1.2 1.5 5.6 5.0 0.5 6.2 39.5 0.0 0.0 0.1 0.1 0.0 0.0 0.0
8/16/2001 2.4 0.9 9.3 1.6 5.0 6.0 19.9 0.0 0.0 1.3 7.0 9.6 9.8 0.0
8/17/2001 8.2 2.6 14.5 7.3 9.1 9.6 27.7 0.0 0.0 1.2 10.3 17.8 18.2 0.0
8/18/2001 2.9 1.0 3.2 2.7 0.4 5.4 34.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/2001 2.5 1.1 3.7 0.1 2.4 1.6 1.5 0.0 0.0 1.0 3.4 2.8 2.9 0.0
8/20/2001 10.1 3.1 13.6 0.2 10.7 6.7 2.7 0.0 0.0 5.4 15.4 7.6 7.8 0.0
8/21/2001 2.8 1.5 6.1 16.3 0.1 1.8 11.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/22/2001 0.2 0.5 4.5 0.4 1.1 1.3 4.6 0.0 0.0 0.2 1.9 3.3 3.4 0.0
8/23/2001 3.3 1.5 11.1 2.9 6.9 10.7 28.9 9.0 9.0 17.2 30.3 15.1 15.3 9.0
8/24/2001 1.1 0.2 1.8 6.1 0.7 15.0 57.4 23.2 23.2 17.4 0.4 0.6 0.0 23.2
8/25/2001 0.2 0.1 0.7 1.7 0.3 3.5 21.9 0.0 0.0 0.5 1.2 0.0 0.0 0.0
8/26/2001 0.0 0.3 2.3 0.2 0.0 0.4 2.7 0.0 0.0 10.3 75.5 124.0 127.2 0.0
8/27/2001 3.1 1.6 7.4 0.5 0.1 1.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/28/2001 2.8 1.5 5.5 0.3 0.1 0.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2001 5.2 2.1 11.8 2.9 10.9 12.1 37.3 0.0 0.0 8.9 37.0 39.5 40.5 0.0
8/30/2001 2.9 2.9 15.0 3.6 2.0 8.2 46.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/31/2001 1.8 0.7 2.3 2.3 0.4 4.7 29.6 0.0 0.0 1.0 2.7 1.2 1.2 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/1/2001 5.2 5.1 9.6 2.4 2.7 10.2 1.1 33.0 33.0 26.4 5.9 4.2 3.5 33.0
9/2/2001 6.8 2.4 9.8 1.6 2.0 6.9 0.7 22.0 22.0 18.5 9.3 10.7 10.4 22.0
9/3/2001 5.8 2.7 7.8 0.6 5.7 5.5 0.3 8.2 8.2 6.1 0.0 0.2 0.0 8.2
9/4/2001 5.5 1.0 6.4 1.0 6.1 7.0 0.4 13.0 13.0 12.3 10.2 10.1 10.0 13.0
9/5/2001 11.2 2.4 15.1 5.9 2.2 6.3 5.9 16.0 16.0 12.2 2.5 4.7 4.4 16.0
9/6/2001 4.9 3.6 20.8 7.1 4.9 3.5 4.1 0.0 0.0 3.1 15.3 19.7 20.2 0.0
9/7/2001 0.9 2.3 8.1 3.4 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/2001 1.4 1.2 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.9 3.4 3.3 3.4 0.0
9/9/2001 7.2 1.1 10.7 0.0 8.6 5.1 0.0 0.0 0.0 1.2 5.7 7.2 7.4 0.0
9/10/2001 3.1 0.3 4.1 3.7 0.8 0.5 0.0 0.0 0.0 0.4 3.4 5.9 6.0 0.0
9/11/2001 13.7 2.7 17.7 5.2 18.8 11.1 0.0 0.0 0.0 3.6 12.3 9.7 9.9 0.0
9/12/2001 2.1 0.6 3.2 2.8 2.7 10.5 11.0 28.0 28.0 20.8 0.0 0.7 0.0 28.0
9/13/2001 0.9 0.6 2.0 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/14/2001 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.4 0.8 0.0 0.0 0.0
9/15/2001 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/2001 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/2001 0.8 1.5 7.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/2001 5.3 2.4 16.1 0.0 10.9 6.4 0.0 0.0 0.0 2.8 16.4 23.9 24.5 0.0
9/19/2001 3.5 2.4 11.6 1.7 0.0 6.0 0.8 23.0 23.0 27.1 29.3 15.6 15.4 23.0
9/20/2001 3.7 1.1 8.4 0.0 0.0 0.0 0.0 0.0 0.0 2.1 5.5 1.8 1.8 0.0
9/21/2001 1.4 1.3 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.9 0.0 0.0 0.0
9/22/2001 0.9 0.4 1.5 5.1 0.0 0.0 0.0 0.0 0.0 1.5 9.8 15.2 15.6 0.0
9/23/2001 0.4 0.9 7.8 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/2001 0.0 0.5 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/2001 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2001 4.7 1.7 7.6 0.0 3.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2001 1.2 0.9 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2001 0.0 0.0 0.0 0.6 0.0 2.1 0.3 8.0 8.0 5.9 0.0 0.2 0.0 8.0
10/4/2001 0.0 0.0 0.0 0.9 0.0 3.2 0.4 12.0 12.0 8.9 0.0 0.3 0.0 12.0
10/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2001 1.6 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2001 2.1 0.0 2.9 0.0 8.9 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2001 5.1 1.9 5.2 0.7 0.0 2.4 0.3 9.0 9.0 7.3 1.4 0.2 0.0 9.0
11/30/2001 0.3 0.0 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.1 0.0
12/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2001 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2001 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2001 2.1 7.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2001 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2001 2.9 10.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2001 0.0 0.0 0.0 0.2 0.0 0.4 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2002 3.1 0.1 2.3 0.4 2.3 2.1 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2002 9.6 0.2 11.7 0.2 20.1 12.2 2.1 0.0 0.0 7.0 15.9 0.0 0.0 0.0
1/3/2002 8.3 0.2 9.9 0.2 18.7 11.4 2.1 0.0 0.0 5.1 20.0 20.1 20.6 0.0
1/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2002 0.0 0.0 0.0 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2002 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2002 0.1 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2002 0.3 1.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/2002 0.2 0.0 0.0 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.0 8.7 8.9 0.0
1/23/2002 0.3 0.0 0.4 0.2 0.2 0.5 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/2002 1.1 1.5 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2002 0.3 0.0 0.0 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2002 0.7 1.1 1.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2002 3.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/2002 0.4 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/2002 1.0 0.8 0.7 17.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2002 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2002 0.8 2.5 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2002 1.0 1.9 1.7 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2002 9.0 10.1 6.6 0.0 8.4 5.0 0.0 0.0 0.0 0.8 2.6 1.9 1.9 0.0
2/16/2002 6.5 0.2 7.3 0.0 9.9 5.9 0.0 0.0 0.0 1.7 5.6 4.0 4.1 0.0
2/17/2002 2.4 0.0 0.0 0.1 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2002 0.1 0.0 0.2 0.0 0.5 0.3 0.0 0.0 0.0 0.6 1.4 0.0 0.0 0.0
2/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2002 0.0 0.0 0.0 0.5 0.1 1.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2002 3.9 0.1 3.7 0.4 6.5 4.7 5.6 0.0 0.0 3.1 13.3 14.9 15.3 0.0
2/26/2002 13.8 0.3 19.2 0.8 36.5 23.1 10.3 0.0 0.0 1.3 4.0 2.6 2.7 0.0
2/27/2002 0.0 0.0 0.0 1.0 0.2 1.9 12.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2002 0.5 2.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2002 1.4 5.7 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2002 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2002 4.6 17.3 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2002 0.0 0.5 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/2002 0.0 0.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2002 1.2 0.0 0.9 0.0 2.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2002 2.6 0.9 3.3 0.0 3.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2002 1.0 0.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2002 0.8 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2002 3.1 11.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2002 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2002 10.3 1.7 12.1 0.0 16.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2002 2.9 0.8 4.8 0.2 4.5 4.0 3.1 3.2 1.2 2.4 0.0 0.1 0.0 1.2
3/24/2002 0.0 0.7 6.6 0.4 0.1 0.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/2002 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2002 1.6 0.0 0.0 0.0 0.0 1.1 0.0 4.3 1.6 4.6 3.9 1.6 1.5 1.6
3/30/2002 5.6 1.7 7.2 0.0 10.1 6.0 0.0 0.0 0.0 1.2 2.8 0.0 0.0 0.0
3/31/2002 8.2 2.3 10.5 0.5 0.1 1.0 6.4 0.0 0.0 2.2 6.4 3.2 3.3 0.0
4/1/2002 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2002 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2002 1.6 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2002 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2002 0.5 0.0 0.0 0.0 0.0 3.5 0.0 13.4 5.1 9.9 0.0 0.3 0.0 5.0
4/7/2002 0.0 0.0 0.0 0.0 0.0 3.2 0.0 12.0 4.6 8.9 0.0 0.3 0.0 4.5
4/8/2002 0.0 0.0 0.0 0.0 0.0 3.2 0.0 12.2 4.6 9.0 0.0 0.3 0.0 4.6
4/9/2002 0.5 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/2002 1.6 0.0 2.2 0.0 4.1 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2002 0.2 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2002 0.9 2.4 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2002 1.6 5.5 3.2 0.0 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2002 2.2 2.2 15.7 0.0 0.2 0.6 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
4/16/2002 6.4 1.6 15.1 0.0 0.6 0.4 0.0 0.0 0.0 1.5 8.2 11.4 11.7 0.0
4/17/2002 3.4 6.7 6.1 0.0 4.5 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2002 1.2 0.5 5.6 8.5 0.6 9.4 0.0 34.4 13.1 25.8 2.4 5.0 4.2 13.0
4/19/2002 1.7 0.6 5.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/20/2002 1.1 3.2 4.8 6.8 0.0 1.9 0.0 7.3 2.8 5.4 0.0 0.2 0.0 2.8
4/21/2002 0.1 0.7 3.4 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
4/22/2002 0.3 0.3 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/2002 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2002 0.0 0.0 0.0 0.0 0.0 5.6 0.0 21.3 8.1 15.8 0.0 0.5 0.0 8.0
4/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/2002 4.3 8.8 2.5 3.4 4.5 3.5 0.0 3.4 1.3 2.5 0.0 0.1 0.0 1.3
4/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/2002 0.5 0.5 0.5 0.0 0.0 4.0 0.0 15.3 5.8 11.3 0.0 0.4 0.0 5.8
4/29/2002 4.5 4.2 3.2 0.0 8.0 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/2002 3.5 0.0 4.4 0.0 11.9 7.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
5/1/2002 2.3 6.8 0.7 0.0 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/2002 1.1 3.3 0.2 0.5 0.2 1.1 6.4 0.0 0.0 2.8 16.5 24.4 25.0 0.0
5/3/2002 4.7 15.5 0.7 0.5 0.2 1.7 6.6 2.2 0.8 4.7 10.6 8.7 8.9 0.8
5/4/2002 1.2 0.1 0.5 3.6 0.1 2.6 11.2 3.0 1.1 4.4 4.9 0.1 0.0 1.1
5/5/2002 0.9 3.3 0.0 0.4 0.1 14.8 5.2 53.2 20.2 39.4 0.0 1.3 0.0 20.0
5/6/2002 0.7 2.5 0.0 0.7 0.1 1.3 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/2002 4.4 2.2 4.2 0.0 7.9 5.2 0.0 2.0 0.8 3.9 14.0 20.2 20.7 0.8
5/8/2002 0.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
5/9/2002 1.8 3.5 0.7 0.0 0.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/2002 2.6 0.3 4.2 3.6 0.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2002 2.1 1.9 3.5 1.3 0.1 0.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2002 1.4 3.3 0.0 10.2 0.1 4.3 10.3 10.3 3.9 7.6 0.0 0.3 0.0 3.9
5/13/2002 0.3 0.0 0.1 5.1 0.2 2.0 0.0 7.0 2.7 7.0 4.1 0.2 0.0 2.6
5/14/2002 6.3 0.6 8.8 0.0 0.0 4.3 0.0 16.2 6.1 13.4 4.3 2.8 2.5 6.1
5/15/2002 7.3 3.9 6.8 0.0 0.0 8.5 0.0 32.3 12.3 25.5 10.7 17.9 17.5 12.2
5/16/2002 14.8 2.4 15.8 0.0 22.4 35.4 0.0 84.4 32.0 66.0 8.0 2.1 0.0 31.8
5/17/2002 2.7 8.7 3.7 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/2002 0.6 0.0 0.0 11.1 0.0 1.1 0.0 4.0 1.5 3.1 0.4 0.1 0.0 1.5
5/19/2002 0.4 0.2 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.7 6.1 10.5 10.8 0.0
5/20/2002 1.7 1.3 1.8 0.5 4.3 4.6 6.4 4.0 1.5 3.3 0.8 0.1 0.0 1.5
5/21/2002 0.2 0.0 0.3 0.2 0.8 0.8 2.1 0.0 0.0 1.9 4.3 0.0 0.0 0.0
5/22/2002 6.3 16.6 0.9 0.0 0.0 1.7 0.0 6.4 2.4 6.6 4.2 0.2 0.0 2.4
5/23/2002 0.4 1.5 1.9 0.0 0.0 0.6 0.0 2.3 0.9 1.7 0.0 0.1 0.0 0.9
5/24/2002 1.0 3.3 0.1 0.0 0.4 7.6 0.0 28.0 10.6 20.8 0.0 0.7 0.0 10.5
5/25/2002 7.3 2.5 11.7 0.9 10.2 9.0 0.0 11.3 4.3 11.3 10.9 10.2 10.2 4.3
5/26/2002 0.1 0.1 0.0 1.2 0.0 0.0 0.0 0.0 0.0 2.1 6.6 4.4 4.5 0.0
5/27/2002 0.6 0.0 0.0 12.5 0.1 1.3 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2002 0.9 0.1 0.9 0.8 0.6 1.9 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/2002 1.5 5.1 1.1 2.1 0.0 0.4 2.5 0.0 0.0 0.7 2.6 2.3 2.4 0.0
5/30/2002 7.1 11.0 9.2 0.0 0.0 0.0 0.0 0.0 0.0 2.5 8.3 6.1 6.3 0.0
5/31/2002 6.2 8.1 7.2 9.7 12.9 9.9 15.1 0.0 0.0 0.8 1.7 0.0 0.0 0.0
6/1/2002 2.1 6.8 0.1 0.0 0.0 5.3 0.0 20.3 7.7 15.0 0.0 0.5 0.0 7.6
6/2/2002 0.9 3.3 0.0 2.0 0.2 2.4 14.9 0.0 0.0 3.3 7.5 0.0 0.0 0.0
6/3/2002 4.2 15.4 0.0 1.6 0.3 4.1 20.9 3.0 1.1 4.2 7.2 6.4 6.5 1.1
6/4/2002 10.9 3.9 17.5 1.0 18.1 14.4 13.2 6.2 2.4 8.7 9.4 0.2 0.0 2.3
6/5/2002 2.9 4.1 3.5 0.5 0.4 6.8 6.4 21.3 8.1 19.2 28.3 49.2 49.9 8.0
6/6/2002 3.3 3.1 2.1 6.8 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/2002 0.8 3.3 4.1 0.0 0.0 6.1 0.0 23.4 8.9 17.7 0.8 0.6 0.0 8.8
6/8/2002 1.0 3.0 0.5 4.1 0.1 1.3 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2002 1.7 4.4 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/2002 1.3 0.5 3.1 0.8 0.1 4.0 10.3 9.0 3.4 6.7 0.0 0.2 0.0 3.4
6/11/2002 0.8 1.7 0.7 0.5 0.1 8.2 6.4 27.3 10.4 20.2 0.0 0.7 0.0 10.3
6/12/2002 7.9 3.9 9.7 0.0 1.0 13.6 0.0 49.5 18.8 37.4 5.6 11.0 10.0 18.6
6/13/2002 8.1 4.8 11.2 0.9 13.0 11.6 11.8 8.0 3.0 10.4 17.5 17.9 18.1 3.0
6/14/2002 6.9 1.5 10.5 1.1 22.1 20.5 14.1 20.3 7.7 15.0 0.0 0.5 0.0 7.6
6/15/2002 2.1 6.1 3.2 0.8 0.1 2.9 9.9 5.2 2.0 8.1 10.4 2.0 1.9 2.0
6/16/2002 4.7 4.0 5.0 42.0 2.3 14.6 4.1 48.2 18.3 44.6 29.6 23.6 23.0 18.1
6/17/2002 6.0 11.2 9.4 1.4 8.2 7.6 18.2 0.0 0.0 4.8 36.1 60.0 61.5 0.0
6/18/2002 5.0 3.7 6.6 2.0 2.4 5.2 25.0 0.0 0.0 5.8 14.8 3.8 3.9 0.0
6/19/2002 9.0 1.4 11.2 1.6 14.9 13.0 20.9 4.0 1.5 14.6 41.5 35.5 36.3 1.5
6/20/2002 0.9 4.3 7.4 4.7 0.8 13.6 60.6 15.3 5.8 11.3 0.0 0.4 0.0 5.8
6/21/2002 2.9 1.0 3.5 19.8 1.1 11.8 31.7 24.4 9.3 18.1 0.0 0.6 0.0 9.2
6/22/2002 6.5 17.6 4.2 2.0 3.0 6.1 25.3 2.0 0.8 2.3 6.5 11.3 11.5 0.8
6/23/2002 12.1 4.2 17.0 2.2 18.8 16.5 28.6 4.0 1.5 12.4 23.7 5.5 5.5 1.5
6/24/2002 11.6 6.0 15.3 4.9 8.8 10.7 27.5 5.1 1.9 5.4 9.3 13.3 13.5 1.9
6/25/2002 17.3 6.3 25.6 38.5 30.2 30.4 35.4 27.3 10.4 22.3 6.9 5.9 5.4 10.3
6/26/2002 8.0 2.7 13.5 7.7 18.6 25.6 63.3 19.4 7.4 20.5 22.0 19.5 19.5 7.3
6/27/2002 3.8 3.4 11.6 11.2 2.8 6.9 35.0 0.0 0.0 1.1 7.3 11.2 11.5 0.0
6/28/2002 3.1 6.3 12.4 15.8 3.7 6.4 27.7 0.0 0.0 0.1 0.5 0.5 0.5 0.0
6/29/2002 2.8 8.2 10.8 3.0 4.4 8.4 38.3 0.0 0.0 16.4 47.4 24.0 24.6 0.0
6/30/2002 3.4 10.5 8.2 2.1 2.3 5.4 26.7 0.0 0.0 3.5 8.4 1.2 1.2 0.0
7/1/2002 5.8 4.1 8.5 1.8 2.3 4.8 22.8 0.0 0.0 2.5 6.8 2.4 2.5 0.0
7/2/2002 5.9 8.8 3.3 1.6 0.3 3.3 20.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/3/2002 0.2 1.0 9.3 2.4 0.4 7.0 31.2 8.0 3.0 19.0 46.7 40.7 41.5 3.0
7/4/2002 1.8 0.3 4.3 2.7 4.4 18.3 24.0 46.0 17.4 34.1 0.0 1.1 0.0 17.3
7/5/2002 3.8 7.1 2.9 2.3 0.8 8.1 16.1 20.0 7.6 25.0 25.2 5.3 4.9 7.5
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/6/2002 2.8 5.6 2.3 1.6 0.3 3.7 19.9 2.0 0.8 1.5 0.0 0.1 0.0 0.8
7/7/2002 4.2 14.2 2.5 1.0 0.2 3.4 13.2 5.0 1.9 3.7 0.0 0.1 0.0 1.9
7/8/2002 11.7 26.1 7.1 0.0 2.5 1.7 0.0 1.0 0.4 1.1 0.8 0.0 0.0 0.4
7/9/2002 4.6 5.9 10.0 0.5 10.0 7.4 6.4 2.0 0.8 1.6 1.3 2.3 2.3 0.8
7/10/2002 2.9 9.3 3.6 0.4 0.5 0.9 4.5 0.0 0.0 12.1 31.5 9.4 9.6 0.0
7/11/2002 7.3 14.8 7.1 1.6 7.0 10.0 19.9 11.0 4.2 11.3 12.5 13.0 13.0 4.1
7/12/2002 7.9 11.5 12.8 2.9 2.9 7.3 37.0 0.0 0.0 0.8 4.2 6.0 6.1 0.0
7/13/2002 6.7 12.9 5.4 10.4 0.6 8.1 35.6 9.0 3.4 6.7 0.3 0.7 0.5 3.4
7/14/2002 6.5 13.8 3.2 12.6 0.5 7.6 41.4 4.0 1.5 6.9 11.0 4.9 4.9 1.5
7/15/2002 2.1 3.1 9.6 4.3 3.0 13.1 54.6 12.0 4.6 19.2 34.8 27.1 27.5 4.5
7/16/2002 10.5 18.3 14.8 21.2 3.0 12.3 31.3 22.0 8.3 27.8 38.7 30.3 30.5 8.3
7/17/2002 6.5 2.6 9.9 8.1 2.5 12.9 23.8 30.0 11.4 26.8 20.8 25.4 25.3 11.3
7/18/2002 3.4 1.2 3.1 2.0 0.3 7.2 25.7 12.0 4.6 9.6 3.5 4.7 4.5 4.5
7/19/2002 7.8 16.6 5.1 11.6 9.1 12.0 28.3 9.0 3.4 7.1 3.4 6.1 6.0 3.4
7/20/2002 9.7 17.9 12.9 1.7 0.3 3.5 21.9 0.0 0.0 6.7 23.3 19.0 19.5 0.0
7/21/2002 2.8 8.2 4.6 3.0 0.5 9.2 38.3 12.0 4.6 10.3 3.2 0.3 0.0 4.5
7/22/2002 6.3 14.1 5.7 0.6 6.3 4.9 7.9 0.0 0.0 0.6 4.9 8.5 8.7 0.0
7/23/2002 4.5 2.3 8.7 2.7 3.2 7.0 34.1 0.0 0.0 1.0 5.4 7.5 7.7 0.0
7/24/2002 1.8 0.3 3.3 2.9 3.2 7.5 37.3 0.0 0.0 0.3 2.6 4.5 4.6 0.0
7/25/2002 4.7 10.3 1.3 2.5 0.4 6.3 31.5 5.0 1.9 3.7 0.0 0.1 0.0 1.9
7/26/2002 3.5 8.2 10.8 3.8 0.6 10.6 24.4 25.0 9.5 18.5 0.0 0.6 0.0 9.4
7/27/2002 5.5 8.6 9.4 1.2 2.8 4.0 15.9 0.0 0.0 1.1 2.6 0.0 0.0 0.0
7/28/2002 3.0 2.5 6.6 4.1 0.2 12.7 12.2 41.0 15.6 32.7 19.3 34.5 34.3 15.4
7/29/2002 5.6 18.4 6.0 0.7 0.3 1.7 8.5 1.0 0.4 1.7 4.3 5.1 5.2 0.4
7/30/2002 3.7 2.8 9.2 0.0 2.1 7.8 0.0 25.0 9.5 20.2 13.9 24.4 24.4 9.4
7/31/2002 3.0 2.2 4.7 0.2 2.4 10.2 2.5 32.0 12.1 23.7 0.0 0.8 0.0 12.0
8/1/2002 0.9 2.0 3.0 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
8/2/2002 0.8 0.4 3.4 0.7 0.1 3.2 8.3 7.0 2.7 10.4 43.7 75.9 77.6 2.6
8/3/2002 7.5 1.0 15.6 1.5 6.7 6.8 19.0 0.0 0.0 8.7 19.9 0.0 0.0 0.0
8/4/2002 7.8 8.9 6.1 9.8 1.1 3.1 16.1 0.0 0.0 3.7 10.1 4.2 4.3 0.0
8/5/2002 11.6 16.1 11.0 1.8 15.0 12.3 22.8 0.0 0.0 3.3 10.5 7.3 7.5 0.0
8/6/2002 6.0 9.0 6.7 16.1 0.3 1.7 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/7/2002 0.8 2.4 6.2 0.5 0.1 1.0 6.4 0.0 0.0 3.6 15.4 16.9 17.3 0.0
8/8/2002 5.1 6.7 9.7 0.0 0.5 0.3 0.0 0.0 0.0 1.9 5.3 2.2 2.2 0.0
8/9/2002 8.2 6.1 11.6 0.8 6.9 5.6 10.3 0.0 0.0 1.0 2.3 0.0 0.0 0.0
8/10/2002 4.5 1.4 9.1 0.5 0.6 1.3 6.2 0.0 0.0 1.8 12.6 20.1 20.6 0.0
8/11/2002 1.5 1.9 5.3 2.0 0.6 4.1 25.0 0.0 0.0 1.4 11.8 20.5 21.0 0.0
8/12/2002 1.0 2.5 6.9 6.1 0.8 2.3 12.2 0.0 0.0 14.1 46.9 35.3 36.2 0.0
8/13/2002 8.1 6.8 17.7 3.9 10.2 10.4 28.6 0.0 0.0 4.0 9.9 2.2 2.3 0.0
8/14/2002 8.8 1.7 10.2 16.7 1.2 3.4 17.6 0.0 0.0 1.1 2.4 0.0 0.0 0.0
8/15/2002 6.0 5.7 10.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/16/2002 4.1 2.7 7.9 0.5 4.8 3.8 6.4 0.0 0.0 1.9 15.9 27.5 28.2 0.0
8/17/2002 2.4 9.1 2.8 0.4 0.1 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/18/2002 2.3 8.7 0.2 1.0 0.2 1.9 12.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/19/2002 3.1 11.9 1.4 0.0 0.0 5.3 0.0 20.3 7.7 20.7 23.3 25.2 25.3 7.6
8/20/2002 4.0 3.6 5.3 0.0 4.9 4.3 0.0 5.2 2.0 4.4 1.2 0.1 0.0 2.0
8/21/2002 2.2 5.3 4.2 0.8 0.1 1.9 10.3 1.2 0.5 1.6 1.6 0.0 0.0 0.5
8/22/2002 2.0 2.6 4.3 0.7 0.1 1.8 8.3 2.0 0.8 1.5 0.0 0.1 0.0 0.8
8/23/2002 0.6 2.8 3.0 1.2 0.2 5.6 15.1 12.3 4.7 9.1 0.0 0.3 0.0 4.6
8/24/2002 4.3 0.6 6.9 0.5 7.0 5.1 6.4 0.0 0.0 1.6 3.6 0.0 0.0 0.0
8/25/2002 1.2 1.9 2.5 1.4 0.9 4.0 18.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
8/26/2002 0.1 0.8 3.2 1.2 0.2 2.5 15.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/27/2002 0.7 1.7 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/28/2002 2.7 10.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2002 3.6 13.8 2.6 0.1 0.0 0.2 1.5 0.0 0.0 1.7 4.0 0.0 0.0 0.0
8/30/2002 2.2 0.3 2.0 0.2 0.0 4.4 2.5 15.2 5.8 12.4 2.8 0.9 0.5 5.7
8/31/2002 0.0 0.5 4.5 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
9/1/2002 4.7 2.1 8.0 0.6 0.1 9.5 8.1 31.3 11.9 23.2 0.0 0.8 0.0 11.8
9/2/2002 1.2 1.4 8.3 0.2 0.0 0.4 2.3 0.0 0.0 0.7 5.7 9.9 10.1 0.0
9/3/2002 2.4 2.8 11.4 0.0 0.0 0.0 0.0 0.0 0.0 0.4 2.1 2.9 3.0 0.0
9/4/2002 3.8 1.6 10.4 0.0 4.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/5/2002 1.0 2.2 8.4 0.0 0.0 0.0 0.0 0.0 0.0 1.1 2.5 0.0 0.0 0.0
9/6/2002 2.9 1.4 4.7 0.1 0.0 1.6 1.6 5.0 1.9 4.8 2.6 0.1 0.0 1.9
9/7/2002 0.0 0.4 3.3 0.0 0.0 0.6 0.0 2.3 0.9 1.7 0.0 0.1 0.0 0.9
9/8/2002 0.1 0.5 4.2 0.2 0.0 0.4 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/9/2002 0.1 0.5 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/2002 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/2002 2.4 7.7 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/2002 0.2 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/2002 6.6 3.4 10.1 1.8 10.2 9.4 22.4 0.0 0.0 6.4 14.6 0.0 0.0 0.0
9/14/2002 8.3 3.2 17.0 0.1 1.0 0.8 1.6 0.0 0.0 0.3 0.6 0.0 0.0 0.0
9/15/2002 3.9 2.9 9.3 10.2 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/2002 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/17/2002 0.3 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/2002 0.0 0.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/2002 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/2002 0.0 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/23/2002 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/2002 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/2002 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2002 3.0 1.2 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2002 0.8 0.0 1.1 0.0 2.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2002 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2002 0.0 0.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2002 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2002 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2002 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2002 0.0 0.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2002 0.0 0.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2002 0.0 0.7 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2002 3.3 0.0 3.0 0.0 7.9 4.7 0.0 0.0 0.0 0.3 2.1 3.6 3.7 0.0
11/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2002 0.3 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2002 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2003 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2003 1.6 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2003 2.5 9.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2003 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2003 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2003 1.5 0.3 4.4 0.0 6.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2003 5.4 8.3 6.7 0.0 1.6 0.9 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
1/16/2003 25.3 8.2 30.7 2.4 33.8 22.9 19.2 0.0 0.0 9.3 33.7 29.7 30.5 0.0
1/17/2003 1.3 0.3 2.7 12.8 0.0 3.7 0.0 14.2 5.4 10.5 0.0 0.4 0.0 5.3
1/18/2003 6.1 1.0 4.8 36.1 6.1 4.5 0.0 3.4 1.3 3.7 5.7 7.4 7.5 1.3
1/19/2003 5.1 2.0 8.3 2.7 13.5 11.9 17.8 5.0 13.7 15.0 36.1 25.1 25.6 13.7
1/20/2003 0.7 0.0 0.0 5.2 0.1 1.2 7.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2003 2.6 0.6 2.9 0.9 5.0 3.0 0.0 0.0 0.0 1.7 7.1 7.6 7.8 0.0
1/22/2003 0.0 0.0 0.0 0.5 0.1 1.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/2003 0.1 0.0 0.0 1.8 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/2003 0.0 0.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2003 0.9 3.9 4.1 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2003 2.2 9.0 6.0 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.3
1/27/2003 3.7 8.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 4.6 4.5 4.6 0.0
1/28/2003 13.9 2.1 18.8 0.0 33.6 19.9 0.0 0.0 0.0 9.6 33.1 26.7 27.4 0.0
1/29/2003 4.4 0.6 4.2 10.4 2.0 1.6 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2003 11.3 30.7 0.0 28.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/2003 0.0 0.0 0.0 0.4 0.1 0.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/2003 0.0 0.0 0.0 0.8 0.1 1.6 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2003 0.0 0.3 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/2003 1.1 0.3 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
2/7/2003 3.0 0.5 4.0 0.0 3.1 1.8 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
2/8/2003 6.1 5.0 12.4 0.0 6.8 4.0 0.0 0.0 0.0 4.5 10.8 1.5 1.5 0.0
2/9/2003 5.5 0.8 4.5 6.8 6.8 4.0 0.0 0.0 0.0 3.1 6.9 0.0 0.0 0.0
2/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2003 5.3 3.4 3.5 10.2 0.0 0.0 0.0 0.0 0.0 1.0 8.1 14.0 14.4 0.0
2/12/2003 25.2 7.9 36.9 18.7 50.1 29.6 0.0 0.0 0.0 18.5 63.0 49.7 51.0 0.0
2/13/2003 3.2 0.0 0.0 23.8 0.0 0.0 0.0 0.0 0.0 0.8 1.9 0.0 0.0 0.0
2/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2003 0.5 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2003 4.9 18.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.3 2.2 2.3 0.0
2/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2003 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/22/2003 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2003 0.5 0.2 2.2 0.0 0.9 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2003 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2003 2.4 0.6 2.9 0.8 3.3 3.5 10.5 0.0 0.0 3.0 10.6 9.0 9.2 0.0
2/26/2003 0.7 0.7 1.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2003 1.5 0.0 0.0 2.8 0.0 2.4 0.0 9.0 3.4 6.7 0.0 0.2 0.0 3.4
2/28/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2003 3.6 1.9 3.8 0.0 6.5 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2003 11.2 3.7 14.4 0.0 24.9 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2003 9.9 0.5 9.9 18.7 0.0 6.0 0.0 23.0 8.7 25.5 19.3 0.6 0.0 8.7
3/4/2003 0.5 0.0 0.0 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2003 0.6 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2003 0.0 0.0 0.0 0.3 0.1 0.7 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2003 0.0 0.0 0.0 0.7 0.1 1.3 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2003 0.0 0.1 0.0 1.0 0.2 1.9 12.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/2003 3.1 11.7 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2003 0.2 1.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2003 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2003 0.0 0.0 0.0 0.1 0.0 0.3 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2003 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2003 0.8 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2003 0.9 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2003 2.7 10.4 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2003 0.8 3.1 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2003 9.9 1.2 12.0 0.0 14.2 8.4 0.0 0.0 0.0 2.1 6.0 3.1 3.2 0.0
3/23/2003 0.6 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2003 6.8 0.3 7.5 0.0 10.9 7.7 0.0 5.0 1.9 4.1 0.8 0.1 0.0 1.9
3/25/2003 0.5 0.0 0.1 0.1 0.0 0.3 1.7 0.0 0.0 0.4 2.9 5.1 5.2 0.0
3/26/2003 2.8 0.0 0.1 30.6 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
3/27/2003 0.1 0.5 0.5 1.7 0.0 1.3 0.8 5.0 16.2 3.7 0.0 0.1 0.0 16.2
3/28/2003 1.6 6.1 0.7 2.1 0.0 0.0 0.9 0.0 17.4 0.0 0.0 0.0 0.0 17.5
3/29/2003 0.5 1.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 2.1 4.7 0.0 0.0 0.0
3/30/2003 0.4 0.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.7 6.3 6.5 0.0
3/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2003 3.4 0.5 3.9 0.0 7.5 4.4 0.0 0.0 0.0 1.7 4.9 2.4 2.5 0.0
4/2/2003 9.1 11.4 16.9 0.0 9.9 5.9 0.0 0.0 0.0 3.6 12.3 9.9 10.1 0.0
4/3/2003 3.9 0.9 4.3 11.9 3.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2003 0.1 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2003 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2003 1.7 0.2 3.9 0.0 7.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/2003 0.0 0.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/2003 4.8 5.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0 1.6 3.7 0.0 0.0 0.0
4/11/2003 1.0 1.9 0.5 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
4/12/2003 0.5 1.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2003 10.8 40.0 0.0 0.0 0.0 2.1 0.0 8.0 3.0 5.9 0.0 0.2 0.0 3.0
4/14/2003 1.9 7.1 0.0 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
4/15/2003 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2003 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/2003 1.3 5.0 0.0 0.1 0.0 0.2 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2003 0.0 0.0 0.0 0.4 0.1 0.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/2003 0.0 0.0 0.0 2.9 0.0 0.0 1.3 0.0 24.2 0.0 0.0 0.0 0.0 24.3
4/20/2003 0.0 0.0 0.0 2.8 0.0 0.0 1.3 0.0 23.7 0.0 0.0 0.0 0.0 23.8
4/21/2003 0.1 0.6 0.5 2.0 0.0 1.6 0.9 6.0 19.2 4.5 0.0 0.2 0.0 19.3
4/22/2003 0.0 0.0 0.0 2.1 0.0 3.4 1.0 13.0 22.9 9.6 0.0 0.3 0.0 23.0
4/23/2003 2.4 0.2 2.2 1.7 0.0 0.5 0.8 2.0 15.0 1.5 0.0 0.1 0.0 15.1
4/24/2003 2.5 6.0 1.4 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/2003 1.2 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.7 5.1 8.2 8.4 0.0
4/26/2003 21.3 8.5 26.7 0.0 0.0 0.0 0.0 0.0 0.0 9.5 37.5 37.5 38.5 0.0
4/27/2003 26.6 2.8 32.8 0.0 81.7 48.4 0.0 0.0 0.0 1.6 6.9 7.4 7.6 0.0
4/28/2003 2.4 0.8 3.7 1.7 6.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/2003 4.4 0.5 3.5 47.7 2.5 1.5 0.0 0.0 0.0 0.4 0.8 0.0 0.0 0.0
4/30/2003 4.7 2.1 7.9 14.5 6.8 8.5 0.0 17.0 6.5 15.4 9.7 8.5 8.3 6.4
5/1/2003 0.8 2.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/2003 1.3 2.7 2.5 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/2003 1.1 2.0 0.1 9.1 0.0 0.0 0.6 0.0 10.6 1.5 7.3 9.5 9.7 10.6
5/4/2003 0.4 0.0 0.0 1.8 0.0 0.0 0.8 0.0 15.5 0.0 0.0 0.0 0.0 15.6
5/5/2003 1.3 3.2 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2003 0.6 0.3 2.2 0.0 0.0 0.0 0.0 0.0 0.0 1.2 6.5 8.8 9.0 0.0
5/7/2003 1.0 0.5 5.3 0.0 0.0 0.0 0.0 0.0 0.0 3.1 13.8 15.8 16.2 0.0
5/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/10/2003 0.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2003 1.8 0.0 2.6 0.0 7.9 4.7 0.0 0.0 0.0 3.0 18.1 26.7 27.4 0.0
5/12/2003 1.4 3.5 0.0 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/2003 1.5 0.0 0.6 0.0 2.0 2.0 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
5/14/2003 0.7 0.0 0.0 0.2 0.0 0.9 2.5 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/15/2003 2.7 4.3 0.4 0.8 0.1 15.3 10.3 52.0 19.7 38.5 0.0 1.3 0.0 19.6
5/16/2003 1.1 3.1 2.1 1.4 0.2 4.1 17.6 5.0 1.9 8.0 14.0 10.0 10.1 1.9
5/17/2003 2.6 2.5 5.8 1.0 7.9 4.9 0.4 1.0 8.5 8.1 27.5 25.8 26.4 8.5
5/18/2003 0.9 2.3 4.6 2.9 0.1 1.6 9.1 1.0 11.7 2.0 3.5 1.5 1.5 11.7
5/19/2003 1.3 0.5 5.6 1.9 2.3 7.4 24.8 9.0 3.4 6.7 0.0 0.2 0.0 3.4
5/20/2003 0.8 3.0 7.1 1.3 0.2 2.6 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/2003 0.0 0.7 5.3 0.7 0.0 0.0 0.3 0.0 5.8 0.0 0.0 0.0 0.0 5.8
5/22/2003 3.3 12.4 0.7 2.1 0.0 0.0 0.6 0.0 10.6 0.0 0.0 0.0 0.0 10.6
5/23/2003 0.3 0.4 3.4 0.5 0.1 1.5 6.4 2.0 0.8 1.5 0.0 0.1 0.0 0.8
5/24/2003 6.6 0.5 10.2 1.2 6.9 6.5 15.7 0.0 0.0 2.3 13.1 18.9 19.4 0.0
5/25/2003 1.0 0.3 3.3 0.2 0.0 3.6 2.7 12.0 4.6 11.6 11.1 12.0 12.0 4.5
5/26/2003 0.9 0.1 1.3 0.8 0.1 1.9 10.3 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/27/2003 0.8 2.0 1.8 3.4 0.0 0.0 0.0 0.0 0.0 0.8 1.8 0.0 0.0 0.0
5/28/2003 4.3 11.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 8.8 22.0 4.5 4.6 0.0
5/29/2003 4.4 6.2 3.7 0.0 2.3 1.6 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
5/30/2003 2.4 1.6 7.8 1.6 2.3 5.1 7.4 10.0 3.8 7.4 0.0 0.3 0.0 3.8
5/31/2003 3.1 9.1 5.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.8 3.1 3.2 0.0
6/1/2003 0.5 2.5 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/2003 0.5 2.2 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/2003 2.8 8.8 4.9 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/4/2003 0.1 0.8 4.7 0.0 0.0 20.7 0.0 79.0 30.0 58.6 0.0 2.0 0.0 29.7
6/5/2003 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/2003 1.0 0.0 0.0 0.3 0.0 2.9 3.5 9.0 3.4 7.8 6.0 8.2 8.2 3.4
6/7/2003 1.3 4.5 0.1 0.0 0.3 2.3 0.0 8.0 3.0 6.6 1.6 0.2 0.0 3.0
6/8/2003 0.6 0.0 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2003 0.1 0.0 0.2 0.0 0.5 0.3 0.0 0.0 0.0 11.1 51.7 62.6 64.2 0.0
6/10/2003 4.3 8.5 2.0 1.8 4.7 6.2 22.8 0.0 0.0 1.2 2.8 0.0 0.0 0.0
6/11/2003 1.6 1.9 1.6 2.3 0.4 4.6 29.2 0.0 0.0 2.3 9.0 9.0 9.2 0.0
6/12/2003 3.1 10.3 0.0 4.6 0.6 9.6 51.4 6.0 7.9 5.2 1.6 0.2 0.0 7.9
6/13/2003 0.9 3.6 1.0 0.0 0.0 12.3 0.0 47.0 17.8 35.8 2.1 1.2 0.0 17.7
6/14/2003 1.4 4.8 1.4 0.0 0.5 0.6 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
6/15/2003 1.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/2003 2.6 3.8 3.9 0.0 2.8 2.7 0.0 4.0 1.5 3.9 2.1 0.1 0.0 1.5
6/17/2003 0.0 0.7 6.3 0.5 0.0 1.3 0.2 5.0 6.2 3.7 0.0 0.1 0.0 6.3
6/18/2003 0.5 2.6 7.0 0.9 0.0 0.0 0.4 0.0 7.5 0.0 0.0 0.0 0.0 7.5
6/19/2003 0.5 2.6 7.4 1.3 0.0 0.0 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.3
6/20/2003 1.0 4.4 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/21/2003 1.4 3.2 4.5 0.0 0.0 7.1 0.0 27.0 10.2 20.0 0.0 0.7 0.0 10.2
6/22/2003 0.7 2.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/2003 1.6 0.1 2.3 0.0 6.6 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/2003 2.2 0.2 3.2 2.8 0.1 1.6 11.1 0.0 16.9 0.0 0.0 0.0 0.0 17.0
6/25/2003 1.0 0.3 1.1 2.2 1.5 0.9 1.0 0.0 18.2 0.0 0.0 0.0 0.0 18.3
6/26/2003 5.1 1.4 9.1 2.3 13.6 8.1 1.0 0.0 19.2 1.1 9.3 16.1 16.5 19.3
6/27/2003 3.1 2.0 5.1 0.0 10.0 5.9 0.0 0.0 0.0 1.5 3.5 0.0 0.0 0.0
6/28/2003 2.7 1.2 3.6 0.0 3.0 1.8 0.0 0.0 0.0 2.0 9.5 12.0 12.3 0.0
6/29/2003 1.6 1.9 4.8 3.4 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/30/2003 4.8 10.6 6.1 0.0 6.0 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/1/2003 1.1 2.4 5.4 1.9 2.0 1.2 0.0 0.0 0.0 0.6 5.1 8.8 9.0 0.0
7/2/2003 1.3 5.6 6.4 1.0 0.0 0.0 0.4 0.0 8.1 1.0 5.4 7.6 7.8 8.1
7/3/2003 4.6 5.3 7.3 3.4 12.8 8.7 0.0 4.3 1.6 10.2 29.1 31.5 32.2 1.6
7/4/2003 5.7 9.1 8.0 0.0 2.0 1.2 0.0 0.2 0.1 6.5 14.5 0.0 0.0 0.1
7/5/2003 1.7 2.6 1.8 0.0 0.0 0.0 0.0 0.0 0.0 2.0 4.5 0.0 0.0 0.0
7/6/2003 0.9 3.3 0.0 2.4 0.0 0.0 1.1 0.0 19.9 0.0 0.0 0.0 0.0 20.0
7/7/2003 0.0 0.0 0.0 2.3 0.0 0.0 1.0 0.0 19.4 0.0 0.0 0.0 0.0 19.5
7/8/2003 0.0 0.0 0.0 3.1 0.1 1.6 5.5 3.5 25.1 2.6 0.0 0.1 0.0 25.2
7/9/2003 0.4 0.2 1.2 2.0 0.0 0.3 0.9 1.2 17.3 0.9 0.0 0.0 0.0 17.4
7/10/2003 0.3 0.2 1.9 2.6 0.0 0.0 1.1 0.0 21.7 0.0 0.0 0.0 0.0 21.8
7/11/2003 1.1 2.2 3.0 3.9 2.3 1.3 1.3 0.0 24.3 1.1 4.6 5.3 5.4 24.4
7/12/2003 0.3 0.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/13/2003 1.2 4.6 4.5 1.7 0.0 0.0 0.0 0.0 0.0 2.4 20.3 35.2 36.1 0.0
7/14/2003 3.5 12.2 5.2 9.4 0.2 1.9 12.6 0.0 6.8 1.7 14.4 24.9 25.5 6.9
7/15/2003 3.8 3.0 7.0 5.5 12.5 12.0 8.2 13.0 10.6 9.9 0.5 0.3 0.0 10.6
7/16/2003 5.7 9.1 3.1 8.0 0.3 9.2 26.1 20.0 29.9 18.4 29.6 51.7 52.5 30.0
7/17/2003 8.9 14.0 7.1 3.8 0.3 3.5 21.1 1.0 11.7 0.7 0.0 0.0 0.0 11.7
7/18/2003 3.8 12.9 3.9 2.1 0.6 3.5 15.5 3.3 9.3 2.5 0.0 0.1 0.0 9.4
7/19/2003 7.1 14.9 5.9 5.4 6.8 5.7 12.1 0.1 24.4 3.5 29.0 50.2 51.5 24.5
7/20/2003 11.3 9.0 14.8 4.1 16.4 12.4 11.7 4.4 29.6 3.3 0.0 0.1 0.0 29.7
7/21/2003 9.0 9.4 15.9 5.7 22.8 17.4 24.2 1.9 26.8 2.6 10.2 17.7 18.1 26.9
7/22/2003 4.7 6.8 2.5 15.9 2.5 2.5 7.0 0.7 30.1 0.5 0.0 0.0 0.0 30.2
7/23/2003 6.8 21.2 0.2 18.4 0.4 5.0 31.2 1.0 19.6 0.8 0.9 1.5 1.5 19.7
7/24/2003 2.0 1.7 2.6 5.8 7.3 11.2 45.2 0.9 20.3 1.2 4.2 7.3 7.5 20.4
7/25/2003 0.5 1.8 0.0 4.5 0.4 4.7 30.6 0.0 18.2 0.2 1.4 2.4 2.5 18.3
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/26/2003 3.6 13.4 1.0 4.4 0.4 5.2 32.0 1.0 17.3 0.7 0.0 0.0 0.0 17.3
7/27/2003 3.2 11.9 0.8 1.7 0.0 2.4 0.8 9.0 17.7 6.7 0.0 0.2 0.0 17.7
7/28/2003 10.5 39.2 2.1 1.6 0.0 2.6 0.7 10.0 17.5 14.6 16.3 0.3 0.0 17.5
7/29/2003 4.5 16.8 0.0 3.9 0.2 14.7 14.4 48.0 42.4 35.6 0.0 1.2 0.0 42.4
7/30/2003 5.1 12.4 0.0 4.2 0.2 2.9 19.8 0.0 23.0 0.0 0.0 0.0 0.0 23.1
7/31/2003 3.2 9.2 0.6 4.6 0.3 3.4 22.8 0.0 25.0 0.4 1.0 0.0 0.0 25.1
8/1/2003 2.4 5.1 0.3 3.8 1.1 2.2 11.6 0.0 25.5 2.3 6.2 2.2 2.2 25.6
8/2/2003 2.7 4.4 1.1 2.9 1.2 4.6 21.1 2.9 11.8 2.4 0.5 0.1 0.0 11.9
8/3/2003 17.5 3.4 21.1 1.8 14.3 10.5 7.0 4.0 12.7 4.9 4.5 0.1 0.0 12.7
8/4/2003 8.7 17.7 4.4 1.5 7.9 5.4 5.7 0.0 9.3 2.1 6.8 5.1 5.2 9.4
8/5/2003 10.6 21.6 7.5 2.8 8.2 9.2 22.9 3.6 10.2 4.5 4.2 0.1 0.0 10.3
8/6/2003 13.5 17.9 13.7 13.2 26.0 25.4 28.8 22.0 28.9 17.6 8.9 14.7 14.5 28.9
8/7/2003 11.7 36.3 3.2 6.3 2.0 1.4 0.5 0.9 9.0 1.2 3.1 4.5 4.6 9.1
8/8/2003 5.1 10.0 1.1 1.2 1.0 2.1 0.5 5.7 12.1 4.5 2.0 3.7 3.6 12.1
8/9/2003 9.7 12.5 10.7 14.6 7.5 7.6 20.0 0.9 9.8 0.7 0.0 0.0 0.0 9.8
8/10/2003 6.1 9.4 4.9 1.8 1.1 2.3 7.1 2.4 11.5 5.2 10.1 5.5 5.6 11.5
8/11/2003 8.1 11.5 7.5 2.4 8.6 6.9 12.8 0.0 11.8 4.3 21.8 28.8 29.5 11.9
8/12/2003 5.0 3.1 8.8 2.9 7.9 5.0 2.1 0.0 0.0 4.1 15.1 13.8 14.1 0.0
8/13/2003 7.9 9.9 8.3 5.8 12.0 8.3 8.3 0.0 0.0 0.2 0.5 0.0 0.0 0.0
8/14/2003 12.9 12.0 17.5 29.0 4.2 5.3 19.5 0.0 16.8 10.2 49.8 63.4 65.0 16.8
8/15/2003 11.2 11.5 10.2 4.7 14.1 13.7 26.2 6.0 25.9 5.7 6.8 9.4 9.5 26.0
8/16/2003 6.0 6.1 0.3 79.7 0.6 6.2 32.4 4.0 6.7 5.3 17.7 29.7 30.3 6.7
8/17/2003 5.2 14.4 1.5 4.3 0.7 8.4 36.1 10.0 17.0 8.0 5.3 9.4 9.4 17.1
8/18/2003 4.4 11.7 2.0 2.7 0.5 0.5 1.2 0.8 23.3 0.6 0.0 0.0 0.0 23.4
8/19/2003 3.5 8.7 2.8 2.0 0.0 4.7 0.9 18.0 23.6 13.3 0.0 0.5 0.0 23.6
8/20/2003 2.9 6.9 2.4 2.1 0.1 0.1 1.0 0.0 18.1 11.3 46.0 48.3 49.5 18.2
8/21/2003 8.2 11.5 8.5 2.8 9.9 6.1 2.8 0.0 22.9 14.8 59.7 61.9 63.5 23.0
8/22/2003 12.4 12.2 13.9 0.3 13.9 17.2 4.1 32.0 12.1 34.3 34.3 24.8 24.6 12.0
8/23/2003 8.1 7.8 9.8 1.3 4.2 5.0 17.0 0.0 0.0 0.5 3.9 6.8 7.0 0.0
8/24/2003 4.5 7.7 4.3 1.2 3.2 4.1 14.7 0.0 0.0 0.7 1.6 0.0 0.0 0.0
8/25/2003 19.3 9.2 26.4 10.4 4.0 6.1 2.3 13.0 4.9 9.6 0.0 0.3 0.0 4.9
8/26/2003 6.7 5.7 7.8 15.8 1.1 5.0 6.4 13.0 4.9 10.3 1.4 0.3 0.0 4.9
8/27/2003 4.0 2.0 4.0 28.3 3.1 5.3 2.1 12.0 4.6 11.0 4.8 0.3 0.0 4.5
8/28/2003 1.5 0.3 0.6 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2003 3.7 2.0 2.7 12.5 6.0 7.0 0.6 13.0 16.7 11.8 16.5 28.0 28.4 16.7
8/30/2003 7.4 4.7 19.4 4.9 1.3 2.3 10.8 0.0 11.2 8.1 60.3 99.5 102.0 11.2
8/31/2003 1.5 4.9 1.4 1.0 0.2 3.5 13.2 5.4 2.1 7.0 6.7 0.1 0.0 2.0
9/1/2003 7.3 0.7 4.9 1.5 10.1 9.5 19.0 2.5 1.0 3.2 6.2 7.7 7.8 0.9
9/2/2003 2.0 3.9 2.7 7.2 0.3 12.6 26.3 32.0 12.1 30.5 15.5 0.8 0.0 12.0
9/3/2003 1.9 0.3 1.0 8.5 1.7 7.2 41.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/4/2003 2.0 0.1 0.2 5.3 0.2 2.1 13.2 0.1 0.0 0.1 0.0 0.0 0.0 0.0
9/5/2003 9.4 3.2 12.9 0.9 10.2 10.8 10.8 12.0 4.6 16.4 31.0 33.5 34.0 4.5
9/6/2003 4.6 3.2 3.7 1.4 4.0 5.5 6.4 8.3 3.2 18.6 38.5 24.2 24.6 3.1
9/7/2003 6.9 13.5 2.5 19.6 0.3 6.2 0.0 23.0 8.7 20.0 8.2 4.0 3.5 8.7
9/8/2003 2.4 1.0 2.2 22.1 0.3 0.3 0.0 0.5 0.2 0.8 2.7 4.4 4.5 0.2
9/9/2003 6.7 8.9 7.1 2.3 5.3 4.4 7.4 0.6 0.2 5.0 13.0 6.3 6.4 0.2
9/10/2003 5.3 3.6 8.4 9.4 9.2 6.2 5.0 0.1 0.0 2.4 8.0 6.2 6.4 0.0
9/11/2003 3.2 1.3 3.8 12.4 4.9 9.2 4.3 22.0 23.2 20.1 11.6 7.8 7.4 23.3
9/12/2003 3.2 1.1 4.2 0.0 1.0 0.6 0.0 0.0 0.0 0.8 1.9 0.0 0.0 0.0
9/13/2003 2.4 0.7 5.1 0.2 0.1 0.5 2.5 0.1 0.0 0.1 0.0 0.0 0.0 0.0
9/14/2003 0.1 0.8 2.8 2.2 0.4 4.5 28.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/15/2003 0.2 0.8 0.7 0.9 0.1 1.8 11.2 0.1 0.0 0.3 0.5 0.0 0.0 0.0
9/16/2003 3.1 1.4 3.2 0.8 2.1 2.8 9.9 0.1 0.0 0.7 3.4 4.4 4.5 0.0
9/17/2003 2.4 0.0 0.0 38.3 0.0 11.8 0.0 45.0 17.1 36.1 6.2 1.1 0.0 16.9
9/18/2003 2.8 0.0 0.4 37.5 0.4 12.1 0.0 45.0 17.1 33.4 0.0 1.1 0.0 16.9
9/19/2003 1.2 0.5 1.1 0.0 1.3 0.8 0.0 0.0 0.0 2.3 5.2 0.0 0.0 0.0
9/20/2003 4.6 1.1 3.5 0.1 2.3 1.8 1.2 1.0 0.4 0.7 0.0 0.0 0.0 0.4
9/21/2003 1.7 0.1 1.6 2.4 1.4 1.9 6.7 0.5 1.5 0.8 1.0 0.0 0.0 1.5
9/22/2003 3.7 11.6 0.6 5.0 0.1 2.5 10.0 4.0 14.6 3.1 0.4 0.1 0.0 14.6
9/23/2003 9.7 2.4 11.9 17.4 14.0 14.5 16.3 15.0 28.0 15.1 26.3 41.4 42.1 28.1
9/24/2003 2.8 2.2 0.5 42.3 0.4 15.4 18.6 47.0 17.8 34.8 0.0 1.2 0.0 17.7
9/25/2003 1.8 0.0 0.9 8.2 0.4 4.7 28.6 0.6 0.2 0.4 0.0 0.0 0.0 0.2
9/26/2003 0.0 0.0 0.0 0.0 0.0 5.5 0.0 21.0 8.0 15.6 0.0 0.5 0.0 7.9
9/27/2003 0.0 0.0 0.0 0.0 0.0 5.5 0.0 21.0 8.0 15.6 0.0 0.5 0.0 7.9
9/28/2003 1.0 2.5 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
9/29/2003 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2003 0.0 0.0 0.0 0.2 0.0 0.4 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2003 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/6/2003 0.0 0.0 0.0 0.8 0.0 3.4 0.4 13.0 11.8 9.6 0.0 0.3 0.0 11.8
10/7/2003 0.0 0.0 0.0 0.0 0.0 3.7 0.0 14.0 5.3 10.4 0.0 0.4 0.0 5.3
10/8/2003 2.2 0.6 3.4 0.0 4.3 3.8 0.0 4.8 1.8 4.1 1.1 0.1 0.0 1.8
10/9/2003 0.1 0.0 0.2 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.3
10/10/2003 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/11/2003 1.1 0.1 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2003 0.2 0.0 0.2 1.8 0.0 0.4 3.5 0.0 13.0 0.0 0.0 0.0 0.0 13.1
10/16/2003 0.1 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2003 0.9 0.4 4.6 0.0 3.9 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2003 0.8 0.6 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.8 0.0 0.0 0.0
10/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2003 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2003 5.3 19.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2003 0.3 0.0 0.0 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
11/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2003 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2003 1.1 1.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2003 0.0 0.0 0.0 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2003 0.1 0.4 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2003 13.5 0.7 18.0 0.0 21.8 12.9 0.0 0.0 0.0 3.2 13.3 14.4 14.8 0.0
11/14/2003 2.3 0.0 0.0 0.4 0.1 0.7 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2003 0.7 0.0 0.0 13.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2003 0.0 0.0 0.0 0.2 0.0 0.0 0.1 0.0 1.3 0.0 0.0 0.0 0.0 1.3
11/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2003 0.0 0.0 0.0 0.7 0.0 2.1 0.3 7.9 9.2 5.9 0.0 0.2 0.0 9.2
11/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2003 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2003 0.0 0.0 0.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
12/7/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2003 0.0 0.2 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2003 0.0 0.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2003 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2003 0.0 0.1 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2003 1.8 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2003 0.0 0.3 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/27/2003 0.0 0.1 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2003 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2003 1.1 0.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2003 0.0 0.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2003 0.0 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2004 15.5 0.4 21.8 0.0 39.7 23.5 0.0 0.0 0.0 8.5 19.4 0.0 0.0 0.0
1/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2004 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2004 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.0 0.4 0.7 0.0 0.0 0.0 0.4
1/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2004 0.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2004 2.2 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2004 0.1 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2004 0.3 1.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2004 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/2004 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2004 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2004 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/2004 0.3 1.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2004 3.0 0.1 4.2 0.2 8.2 5.3 2.7 0.0 0.0 2.3 10.2 11.7 12.0 0.0
1/29/2004 7.5 0.2 10.6 0.0 18.2 10.8 0.0 0.0 0.0 3.8 8.6 0.0 0.0 0.0
1/30/2004 4.9 0.0 0.0 1.4 0.1 1.0 6.4 0.1 0.0 0.1 0.0 0.0 0.0 0.0
1/31/2004 7.9 0.1 6.8 14.9 16.2 13.5 3.9 13.0 19.2 12.0 7.3 4.7 4.5 19.2
2/1/2004 8.3 0.4 13.2 1.6 22.5 13.3 0.7 0.0 13.1 10.4 39.3 37.3 38.2 13.2
2/2/2004 5.3 0.0 6.6 12.2 20.4 12.2 0.5 0.6 9.5 3.5 11.1 9.9 10.1 9.6
2/3/2004 1.0 1.1 1.0 17.2 0.0 4.7 1.1 18.0 26.8 13.3 0.0 0.5 0.0 26.9
2/4/2004 0.4 0.0 0.0 1.4 0.0 3.4 0.6 13.0 16.7 9.6 0.0 0.3 0.0 16.7
2/5/2004 0.0 0.1 0.0 1.8 0.0 0.0 0.8 0.0 15.0 0.0 0.0 0.0 0.0 15.0
2/6/2004 0.9 3.3 0.0 0.7 0.0 0.0 0.3 0.0 6.2 0.0 0.0 0.0 0.0 6.2
2/7/2004 4.7 11.4 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2004 3.6 13.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2004 0.4 1.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2004 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2004 2.5 0.0 3.4 0.0 10.6 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2004 15.0 3.6 12.8 1.6 34.7 22.4 12.5 0.0 5.6 1.0 4.4 4.9 5.0 5.6
2/19/2004 22.9 5.4 28.0 1.6 56.4 36.4 19.9 0.0 0.0 19.5 62.2 42.1 43.2 0.0
2/20/2004 7.4 0.4 8.3 12.5 0.5 6.5 40.4 0.4 0.2 16.9 63.7 61.6 63.2 0.2
2/21/2004 0.7 0.0 0.0 14.5 0.0 15.0 0.0 57.0 21.6 42.2 0.0 1.4 0.0 21.5
2/22/2004 0.0 0.0 0.0 0.0 0.0 10.5 0.0 40.0 15.2 29.6 0.0 1.0 0.0 15.1
2/23/2004 0.0 0.0 0.0 1.3 0.0 0.0 0.6 0.0 10.7 0.0 0.0 0.0 0.0 10.7
2/24/2004 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2004 1.1 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2004 2.2 8.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2004 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2004 0.4 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/2004 0.3 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2004 4.0 0.0 5.5 0.0 15.8 9.4 0.0 0.0 0.0 3.1 10.7 8.7 8.9 0.0
3/2/2004 4.6 0.2 6.5 0.0 8.9 5.3 0.0 0.0 0.0 1.8 8.0 9.3 9.5 0.0
3/3/2004 1.8 0.2 3.0 19.6 3.4 4.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
3/4/2004 0.1 0.3 3.0 1.0 0.0 0.2 0.0 0.9 0.3 0.7 0.0 0.0 0.0 0.3
3/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2004 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2004 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2004 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2004 0.7 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2004 0.7 1.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/2004 1.2 4.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2004 0.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
3/13/2004 1.1 2.5 0.6 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2004 0.5 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2004 3.5 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2004 0.7 2.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2004 0.0 0.0 0.0 0.8 0.1 1.6 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2004 0.1 0.3 0.2 0.0 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
3/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2004 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2004 2.7 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2004 0.4 2.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2004 0.7 3.2 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2004 4.3 0.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 5.3 33.6 51.1 52.4 0.0
3/25/2004 2.0 0.1 1.6 2.6 0.0 0.0 0.0 0.0 0.0 1.1 2.5 0.0 0.0 0.0
3/26/2004 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.5 0.4 0.0 0.0 0.0 0.5
3/27/2004 0.3 0.1 0.0 7.5 0.0 0.1 0.7 0.4 13.2 0.3 0.0 0.0 0.0 13.3
3/28/2004 0.6 0.4 4.2 1.8 2.7 1.7 0.8 0.5 15.1 0.4 0.0 0.0 0.0 15.2
3/29/2004 6.3 0.3 7.2 0.0 10.5 6.2 0.0 0.0 0.0 2.0 4.5 0.0 0.0 0.0
3/30/2004 2.1 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2004 0.1 0.0 0.0 3.1 0.0 0.2 0.3 0.7 5.2 0.5 0.0 0.0 0.0 5.3
4/1/2004 0.2 0.8 0.0 0.7 0.0 0.0 0.3 0.0 5.7 0.0 0.0 0.0 0.0 5.7
4/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2004 1.2 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2004 8.3 0.2 7.6 0.0 12.1 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2004 3.1 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2004 0.0 0.0 0.0 0.0 0.0 1.1 0.0 4.0 1.5 3.0 0.0 0.1 0.0 1.5
4/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/2004 2.5 0.4 4.9 1.2 0.0 0.0 0.5 0.0 9.9 0.7 1.5 0.0 0.0 10.0
4/11/2004 0.0 0.3 2.7 0.1 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2004 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2004 1.8 1.7 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2004 1.1 3.8 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2004 3.3 0.0 2.6 0.0 8.1 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2004 2.7 1.2 4.0 0.0 0.0 0.0 0.0 0.1 0.0 1.3 2.8 0.0 0.0 0.0
4/17/2004 0.1 0.4 0.2 0.0 0.0 2.9 0.0 11.0 4.2 8.2 0.0 0.3 0.0 4.1
4/18/2004 0.1 0.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/2004 4.9 1.0 6.5 0.0 7.9 4.7 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
4/20/2004 3.7 13.8 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/2004 2.9 0.9 4.3 5.1 2.0 1.4 0.0 0.7 0.3 1.3 1.7 0.0 0.0 0.3
4/22/2004 0.0 0.0 0.0 0.0 0.0 5.5 0.0 21.0 8.0 15.6 0.0 0.5 0.0 7.9
4/23/2004 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2004 0.5 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/2004 0.5 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/2004 4.5 0.3 4.5 1.1 13.4 10.1 14.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/2004 4.2 0.5 6.0 3.4 10.2 6.0 0.0 0.0 0.0 1.8 4.2 0.0 0.0 0.0
4/28/2004 0.9 0.0 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/2004 0.7 0.0 0.3 11.1 0.8 0.5 0.6 0.0 11.2 0.6 1.3 0.0 0.0 11.3
4/30/2004 0.2 0.0 0.3 1.9 0.8 16.2 4.2 58.0 35.7 46.0 8.2 4.7 3.3 35.6
5/1/2004 1.4 0.9 1.7 0.5 2.6 2.5 6.4 0.0 0.0 0.5 1.2 0.0 0.0 0.0
5/2/2004 6.8 0.0 8.5 0.0 26.3 15.6 0.0 0.0 0.0 0.7 4.8 7.7 7.9 0.0
5/3/2004 10.6 0.3 8.2 1.0 5.1 4.9 12.2 0.0 0.0 3.1 12.7 13.4 13.7 0.0
5/4/2004 0.6 0.2 0.4 3.4 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/2004 2.3 4.8 0.6 19.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2004 0.0 0.1 0.0 1.0 0.0 0.0 0.4 0.0 8.1 0.0 0.0 0.0 0.0 8.1
5/7/2004 0.5 2.1 1.0 0.8 0.0 0.8 0.4 3.0 8.0 2.2 0.0 0.1 0.0 8.1
5/8/2004 0.5 2.1 1.9 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
5/9/2004 1.1 4.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/2004 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2004 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 6.4 2.2 2.3 0.0
5/12/2004 0.6 0.5 0.5 0.0 0.0 1.3 0.0 5.0 1.9 3.7 0.0 0.1 0.0 1.9
5/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/2004 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/2004 0.5 0.4 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2004 0.2 0.4 0.5 1.2 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/2004 2.2 0.5 0.7 0.0 0.6 0.4 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
5/18/2004 0.3 1.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/2004 5.3 0.3 8.8 0.0 16.3 9.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/2004 2.0 0.0 2.8 0.0 8.5 5.0 0.0 0.0 0.0 3.7 8.4 0.0 0.0 0.0
5/21/2004 7.0 9.2 7.2 2.7 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/2004 3.2 9.7 0.5 0.0 0.0 0.0 0.0 0.0 0.0 1.6 12.1 20.0 20.5 0.0
5/23/2004 2.2 6.1 1.5 1.7 2.1 14.6 0.0 51.0 19.3 37.8 0.0 1.3 0.0 19.2
5/24/2004 1.0 2.7 0.2 0.0 0.0 7.9 0.0 30.0 11.4 23.3 2.4 0.7 0.0 11.3
5/25/2004 3.1 2.7 3.5 7.3 7.9 22.0 0.6 66.0 36.2 48.9 0.0 1.6 0.0 36.1
5/26/2004 0.6 2.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2004 0.5 0.8 0.7 0.0 0.0 0.8 0.0 3.0 1.1 2.2 0.0 0.1 0.0 1.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
5/29/2004 0.5 2.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/2004 0.3 0.5 0.5 0.0 0.0 11.0 0.0 42.0 15.9 31.1 0.0 1.0 0.0 15.8
5/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/2004 2.5 6.7 1.0 0.0 0.0 0.5 0.0 2.0 0.8 1.5 0.0 0.1 0.0 0.8
6/2/2004 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/2004 2.0 6.8 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/2004 10.8 1.5 15.4 0.4 18.4 11.7 5.0 0.0 0.0 6.4 24.3 23.0 23.6 0.0
6/5/2004 5.4 6.0 4.6 0.5 6.5 4.9 6.8 0.0 0.0 8.1 23.4 11.8 12.1 0.0
6/6/2004 3.5 3.2 2.9 39.8 2.8 8.5 46.5 0.0 26.1 4.6 29.6 45.3 46.4 26.2
6/7/2004 4.1 11.6 1.6 2.4 0.0 0.9 3.3 2.0 19.4 2.0 2.2 2.3 2.3 19.5
6/8/2004 3.0 7.2 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2004 2.2 4.7 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/10/2004 2.9 3.4 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/2004 3.7 12.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/2004 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/2004 0.7 1.8 0.0 1.3 0.0 0.0 0.6 0.0 11.3 0.8 6.5 11.2 11.5 11.4
6/14/2004 2.1 6.7 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 6.9 11.9 12.2 0.0
6/15/2004 2.4 8.9 3.9 0.7 0.1 1.7 9.3 1.0 0.4 5.7 11.4 0.0 0.0 0.4
6/16/2004 2.1 1.0 2.5 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/2004 7.0 23.5 2.3 1.2 0.2 2.4 14.9 0.0 0.0 2.2 5.1 0.0 0.0 0.0
6/18/2004 0.2 0.9 0.7 1.8 0.2 2.4 15.2 0.0 5.0 1.3 3.0 0.0 0.0 5.0
6/19/2004 2.1 5.6 5.4 1.0 0.0 0.8 1.9 2.1 8.3 1.6 0.0 0.1 0.0 8.3
6/20/2004 3.7 14.0 3.1 0.2 0.0 0.3 0.1 1.2 1.7 0.9 0.0 0.0 0.0 1.7
6/21/2004 5.5 8.2 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.9 2.0 0.0 0.0 0.0
6/22/2004 1.9 6.7 5.0 3.0 0.5 6.1 38.9 0.0 0.0 0.1 0.7 1.3 1.3 0.0
6/23/2004 4.8 0.5 7.7 2.5 8.8 10.1 32.5 0.0 0.0 1.8 7.9 9.3 9.5 0.0
6/24/2004 4.3 3.7 7.5 0.3 0.0 0.6 3.5 0.0 0.0 3.0 13.1 15.0 15.4 0.0
6/25/2004 6.6 19.1 8.2 6.6 3.0 3.9 15.0 0.0 10.1 0.1 1.2 2.1 2.1 10.1
6/26/2004 8.3 15.0 12.2 11.4 14.2 11.8 16.4 4.0 15.2 5.3 12.2 16.3 16.6 15.2
6/27/2004 2.6 10.1 1.6 2.9 0.2 3.0 19.6 0.0 11.9 7.0 29.2 31.5 32.3 11.9
6/28/2004 3.5 9.0 2.7 3.9 4.1 4.4 13.6 0.0 8.1 3.8 8.7 0.0 0.0 8.1
6/29/2004 4.6 12.6 0.2 1.8 0.3 3.3 20.9 0.0 0.0 0.5 2.1 2.1 2.1 0.0
6/30/2004 2.2 8.2 4.9 0.7 0.1 1.3 8.5 0.0 0.0 0.5 1.8 1.4 1.4 0.0
7/1/2004 8.6 18.2 8.7 0.9 0.2 2.4 11.8 2.2 0.8 6.2 17.1 15.8 16.1 0.8
7/2/2004 2.7 5.5 3.0 1.4 0.2 5.9 17.6 12.0 4.6 9.3 0.9 0.3 0.0 4.5
7/3/2004 5.9 11.2 2.2 0.6 0.1 3.1 7.9 7.0 2.7 5.2 0.0 0.2 0.0 2.6
7/4/2004 13.8 5.0 19.6 1.3 15.3 13.7 17.0 8.0 3.0 11.7 22.2 21.9 22.2 3.0
7/5/2004 1.3 0.6 5.4 2.5 0.4 6.2 32.3 4.0 1.5 10.2 24.3 18.8 19.2 1.5
7/6/2004 3.5 5.7 6.3 18.7 0.3 3.5 22.1 0.0 0.0 0.0 0.1 0.0 0.0 0.0
7/7/2004 5.6 6.7 11.6 6.8 10.9 13.6 44.5 2.0 15.0 1.5 0.0 0.1 0.0 15.1
7/8/2004 7.1 3.1 9.1 4.5 14.2 10.2 9.3 2.0 18.8 1.6 0.2 0.1 0.0 18.9
7/9/2004 5.4 0.9 6.4 10.0 14.8 8.8 0.6 0.0 11.2 4.6 16.4 14.2 14.6 11.2
7/10/2004 18.0 13.6 15.1 4.7 20.0 14.7 19.6 0.0 12.4 23.5 58.5 12.0 12.3 12.5
7/11/2004 20.2 16.9 22.1 18.7 15.0 12.3 11.6 7.0 24.4 18.2 35.2 13.3 13.5 24.5
7/12/2004 7.1 12.8 7.4 31.8 0.0 1.6 0.5 6.0 12.3 4.8 0.7 0.2 0.0 12.3
7/13/2004 6.5 14.2 7.2 6.4 2.0 1.3 1.0 0.0 8.8 0.0 0.0 0.0 0.0 8.9
7/14/2004 6.4 19.0 5.5 1.3 0.0 0.8 0.6 3.0 11.8 3.5 2.9 0.1 0.0 11.8
7/15/2004 2.8 6.6 2.5 0.0 0.3 0.2 0.0 0.0 0.0 2.2 5.1 0.0 0.0 0.0
7/16/2004 9.6 8.5 12.3 4.5 4.6 15.5 38.6 27.0 23.3 29.8 27.0 11.8 11.4 23.3
7/17/2004 6.9 16.0 10.7 3.6 7.1 9.1 29.5 2.0 12.6 1.6 1.0 1.7 1.7 12.6
7/18/2004 10.8 19.3 9.5 6.5 8.9 9.2 6.0 12.0 11.4 9.7 5.1 8.3 8.2 11.4
7/19/2004 9.1 9.3 14.8 10.0 6.1 6.8 0.3 12.0 9.5 12.2 7.6 0.3 0.0 9.5
7/20/2004 7.2 22.8 4.3 6.0 0.3 4.2 22.3 3.0 8.6 4.0 4.1 0.1 0.0 8.6
7/21/2004 14.5 27.1 12.9 11.8 0.2 2.5 16.9 0.0 16.8 1.4 12.1 20.9 21.4 16.8
7/22/2004 2.4 6.3 7.8 6.3 0.8 9.7 61.8 0.0 13.0 1.4 4.4 3.1 3.2 13.1
7/23/2004 3.1 3.2 3.2 4.7 0.2 2.3 15.9 0.0 30.5 2.2 5.9 2.1 2.1 30.7
7/24/2004 3.6 4.2 0.4 0.0 0.0 0.8 0.0 3.0 1.1 7.0 16.9 14.2 14.5 1.1
7/25/2004 9.8 8.0 8.5 1.2 3.4 4.0 4.6 5.0 1.9 6.2 5.6 0.1 0.0 1.9
7/26/2004 4.5 9.8 2.9 3.5 0.6 7.1 44.7 0.0 0.0 2.9 6.5 0.0 0.0 0.0
7/27/2004 5.4 10.4 6.3 5.2 9.5 10.6 34.3 0.0 22.4 0.6 1.4 0.0 0.0 22.5
7/28/2004 6.1 15.7 5.9 2.5 0.2 2.0 13.4 0.0 12.5 0.0 0.0 0.0 0.0 12.5
7/29/2004 3.0 8.6 7.2 6.1 0.1 5.7 9.9 16.0 14.3 13.3 10.8 18.3 18.4 14.3
7/30/2004 9.5 13.5 13.5 7.7 19.2 25.0 81.1 6.0 14.1 5.2 6.0 10.6 10.7 14.2
7/31/2004 4.4 5.0 9.2 4.9 7.2 14.8 28.0 25.0 33.2 18.7 1.2 2.7 2.1 33.2
8/1/2004 6.2 17.4 6.6 5.2 0.1 6.6 9.0 20.0 16.9 25.9 31.8 15.9 15.8 16.9
8/2/2004 19.0 16.3 16.3 58.8 24.4 32.8 13.0 63.0 38.3 53.0 17.3 8.6 7.2 38.2
8/3/2004 4.0 3.1 9.1 4.3 7.7 16.4 32.5 27.0 25.8 20.2 0.4 0.7 0.0 25.8
8/4/2004 4.0 3.9 3.9 1.5 0.1 5.9 4.6 20.0 17.6 14.8 0.0 0.5 0.0 17.6
8/5/2004 0.8 2.5 7.4 2.9 0.0 0.3 1.3 1.0 25.2 0.7 0.0 0.0 0.0 25.3
8/6/2004 2.6 0.7 7.7 3.2 0.0 11.6 1.4 44.0 43.4 32.7 0.1 1.1 0.0 43.4
8/7/2004 8.4 9.1 10.2 3.2 4.9 15.4 34.7 28.0 15.0 20.8 0.0 0.7 0.0 14.9
8/8/2004 6.6 12.9 3.2 1.8 3.8 2.2 0.8 0.0 15.0 0.0 0.0 0.0 0.0 15.1
8/9/2004 10.2 8.4 10.9 2.7 9.6 12.4 17.7 16.0 17.9 11.9 0.7 1.6 1.2 17.9
8/10/2004 4.1 8.6 2.1 11.7 4.0 7.9 1.1 21.0 27.9 15.6 0.0 0.5 0.0 27.9
8/11/2004 7.4 12.9 5.1 6.4 4.6 15.2 71.2 7.0 10.1 5.2 0.0 0.2 0.0 10.1
8/12/2004 9.9 20.4 5.0 2.2 7.0 13.0 12.4 27.0 21.4 20.5 1.0 0.7 0.0 21.4
8/13/2004 10.4 1.7 14.5 2.3 5.5 4.8 10.9 0.0 12.5 5.1 17.5 13.9 14.2 12.6
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
8/14/2004 4.7 0.5 9.2 6.8 10.0 15.9 66.7 0.0 13.7 2.2 5.5 1.0 1.0 13.7
8/15/2004 7.5 4.5 17.1 8.8 13.1 16.5 32.8 15.0 28.8 15.4 17.7 19.4 19.5 28.9
8/16/2004 6.5 3.2 11.0 2.8 15.9 15.5 5.2 21.0 26.0 15.6 0.0 0.5 0.0 26.0
8/17/2004 6.6 12.4 6.4 17.1 3.3 6.0 28.2 0.0 24.3 2.1 12.4 17.9 18.4 24.5
8/18/2004 7.1 7.6 15.7 7.5 7.1 22.3 77.3 25.0 22.5 30.4 52.0 60.1 61.0 22.5
8/19/2004 8.4 5.5 17.5 13.8 12.5 18.4 30.2 25.0 20.0 26.9 22.1 7.7 7.3 20.0
8/20/2004 6.8 4.3 6.5 14.5 18.9 15.2 27.3 0.0 11.3 3.6 9.0 1.8 1.8 11.4
8/21/2004 7.7 5.8 7.5 3.5 10.6 10.5 19.9 5.0 18.7 10.7 30.6 35.1 35.9 18.8
8/22/2004 12.8 7.0 10.1 3.3 16.1 20.3 23.3 28.0 23.7 28.4 21.2 9.7 9.2 23.6
8/23/2004 4.1 7.5 1.0 19.0 2.6 3.2 12.8 0.0 30.5 2.3 5.2 0.0 0.0 30.7
8/24/2004 4.9 4.3 3.5 18.5 0.1 0.7 4.9 0.0 9.3 2.3 15.1 23.7 24.3 9.4
8/25/2004 10.5 5.0 13.2 4.7 8.8 14.6 31.8 18.0 26.2 16.8 7.8 0.5 0.0 26.2
8/26/2004 4.6 7.0 2.9 2.1 0.0 0.0 0.9 0.0 17.4 0.3 0.6 0.0 0.0 17.5
8/27/2004 3.4 8.2 1.5 5.2 0.3 3.5 22.4 0.0 0.0 0.3 0.8 0.0 0.0 0.0
8/28/2004 4.9 16.5 1.8 4.7 0.2 2.1 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2004 8.0 10.7 5.8 6.1 0.1 1.6 10.3 0.0 0.0 0.3 2.3 4.0 4.1 0.0
8/30/2004 1.1 3.5 3.1 1.2 0.2 4.9 15.9 9.0 3.4 6.7 0.0 0.2 0.0 3.4
8/31/2004 1.4 1.9 3.1 4.0 4.9 13.0 33.2 20.0 20.0 14.8 0.0 0.5 0.0 20.0
9/1/2004 1.9 4.2 2.2 1.6 0.3 11.4 20.7 31.0 11.8 29.5 31.6 40.9 41.1 11.7
9/2/2004 8.4 4.2 5.9 1.0 10.6 8.2 12.8 0.0 0.0 1.1 2.5 0.0 0.0 0.0
9/3/2004 14.7 7.0 16.0 1.5 30.2 19.4 8.3 1.0 0.4 3.3 21.4 37.1 38.0 0.4
9/4/2004 3.8 7.7 1.8 3.3 0.2 3.5 18.6 2.2 0.8 1.6 0.0 0.1 0.0 0.8
9/5/2004 5.4 6.1 4.7 3.3 0.3 4.0 24.1 1.0 5.4 2.1 4.8 3.9 4.0 5.4
9/6/2004 7.3 3.7 8.0 2.9 9.9 7.1 4.9 2.0 8.3 5.4 8.8 0.1 0.0 8.3
9/7/2004 2.4 4.0 1.7 4.8 3.2 3.2 4.0 3.0 17.9 2.2 0.0 0.1 0.0 18.0
9/8/2004 2.9 1.8 1.5 4.0 4.2 3.3 0.6 3.1 13.0 5.0 6.1 0.1 0.0 13.1
9/9/2004 10.5 2.3 9.9 3.3 12.4 9.7 16.2 0.0 17.4 1.6 3.6 0.0 0.0 17.5
9/10/2004 1.6 1.2 2.5 1.3 4.1 3.5 7.8 0.0 5.7 8.0 18.3 0.0 0.0 5.7
9/11/2004 0.5 0.3 0.2 2.8 0.1 1.1 7.8 0.0 19.2 0.0 0.0 0.0 0.0 19.3
9/12/2004 0.4 0.0 0.0 10.9 0.0 2.8 3.8 9.3 27.2 6.9 0.0 0.2 0.0 27.3
9/13/2004 0.8 0.7 3.2 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.3
9/14/2004 11.0 1.1 17.0 3.0 15.2 13.1 27.9 0.0 7.5 0.3 0.8 0.0 0.0 7.5
9/15/2004 5.3 1.5 10.4 1.9 7.0 5.3 8.1 0.0 11.2 9.6 38.0 38.2 39.2 11.2
9/16/2004 12.7 3.6 19.1 12.0 21.7 21.0 43.4 7.0 25.7 13.5 18.8 0.2 0.0 25.8
9/17/2004 9.1 2.1 13.3 6.9 13.5 10.3 3.0 7.2 7.7 9.2 26.5 42.2 43.1 7.7
9/18/2004 3.7 1.8 7.8 26.1 2.5 9.8 7.4 28.0 25.5 21.0 0.6 0.7 0.0 25.5
9/19/2004 0.2 1.1 3.8 4.1 0.0 0.0 1.8 0.0 34.2 0.0 0.0 0.0 0.0 34.4
9/20/2004 0.1 0.6 3.6 2.6 0.1 1.3 8.8 0.0 16.8 0.0 0.0 0.0 0.0 16.8
9/21/2004 0.2 0.0 0.0 2.5 0.0 0.4 3.5 0.0 19.3 8.6 45.8 62.4 64.0 19.4
9/22/2004 5.3 0.2 4.3 3.3 0.3 4.2 27.2 0.0 10.1 0.4 0.8 0.0 0.0 10.1
9/23/2004 4.2 0.1 2.4 3.0 0.1 1.7 5.6 3.0 1.1 14.5 43.3 36.6 37.5 1.1
9/24/2004 3.5 0.1 2.4 4.2 0.1 2.7 10.5 4.0 1.5 12.2 29.7 20.8 21.2 1.5
9/25/2004 1.5 0.0 0.5 0.4 0.1 0.7 4.5 0.0 0.0 2.3 8.7 8.1 8.3 0.0
9/26/2004 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.6 0.0 0.0 0.0 0.0 5.6
9/27/2004 0.0 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.1 0.0 0.0 0.0 0.0 8.1
9/28/2004 0.0 0.0 0.0 1.4 0.0 0.0 0.6 0.0 11.9 0.0 0.0 0.0 0.0 12.0
9/29/2004 0.3 1.5 1.3 1.7 0.0 0.0 0.8 0.0 14.3 0.0 0.0 0.0 0.0 14.3
9/30/2004 0.2 0.8 0.7 1.3 0.0 0.0 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.2
10/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2004 1.7 6.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/2004 0.0 0.0 0.0 0.2 0.0 0.4 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2004 0.0 0.0 0.0 0.5 0.1 1.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2004 0.0 0.0 0.0 0.2 0.0 0.5 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2004 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2004 3.8 0.1 5.4 0.0 8.3 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2004 2.2 0.1 3.1 0.0 5.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2004 0.4 1.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2004 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2004 1.1 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2004 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2004 4.3 14.0 0.7 0.0 2.2 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2004 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
12/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2004 3.7 0.1 4.3 0.0 4.0 2.3 0.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
12/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2005 0.3 1.3 1.2 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
1/15/2005 0.9 3.9 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2005 0.0 0.0 0.0 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2005 0.3 1.1 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2005 1.3 2.0 4.0 0.0 2.0 1.2 0.0 0.0 0.0 0.3 0.6 0.0 0.0 0.0
1/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2005 0.1 1.0 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2005 4.0 0.5 8.7 1.2 7.7 4.6 0.5 0.0 10.1 1.6 6.2 5.9 6.0 10.1
1/22/2005 0.3 0.8 7.4 4.4 0.1 0.7 5.1 0.0 13.0 0.2 1.0 1.0 1.0 13.1
1/23/2005 11.4 0.2 12.3 2.6 28.4 18.7 12.9 0.0 14.3 14.5 61.8 68.5 70.2 14.3
1/24/2005 0.8 0.1 1.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2005 1.7 0.0 0.0 21.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2005 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2005 0.4 1.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2005 0.2 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/2005 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2005 6.7 0.0 5.7 2.4 14.5 8.6 1.1 0.0 19.9 4.2 12.1 6.3 6.5 20.0
1/31/2005 1.7 0.0 2.3 2.8 6.3 3.7 1.3 0.0 23.7 8.6 49.5 71.2 73.0 23.8
2/1/2005 0.7 2.4 2.2 3.7 0.0 0.0 0.5 0.0 9.3 0.0 0.0 0.0 0.0 9.4
2/2/2005 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
2/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2005 0.4 1.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2005 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
2/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2005 0.6 2.8 2.6 0.0 0.0 19.2 0.0 73.0 27.7 54.1 0.0 1.8 0.0 27.5
2/12/2005 0.0 0.0 0.0 0.0 0.0 5.0 0.0 19.0 7.2 14.1 0.0 0.5 0.0 7.2
2/13/2005 0.0 0.0 0.0 0.0 0.0 8.9 0.0 34.0 12.9 25.2 0.0 0.8 0.0 12.8
2/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2005 0.2 0.0 0.0 0.0 0.0 5.0 0.0 19.0 7.2 14.1 0.0 0.5 0.0 7.2
2/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
3/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2005 0.2 0.8 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2005 0.3 1.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2005 0.1 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/2005 0.4 1.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2005 0.4 1.9 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/2/2005 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2005 0.0 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2005 0.0 0.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.7 5.9 10.1 10.4 0.0
4/6/2005 1.4 0.4 4.2 0.0 4.9 2.9 0.0 0.0 0.0 0.8 7.0 12.2 12.5 0.0
4/7/2005 8.1 24.8 0.6 0.3 0.0 0.6 3.5 0.0 0.0 0.4 0.8 0.0 0.0 0.0
4/8/2005 8.7 2.0 11.5 1.7 15.8 9.4 0.0 0.0 0.0 2.6 12.1 14.8 15.2 0.0
4/9/2005 1.2 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.3 0.0 0.0 0.0
4/10/2005 1.6 0.0 2.0 3.7 4.2 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/2005 0.1 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 1.7 1.7 0.0
4/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/2005 0.8 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/2005 2.5 2.6 4.2 0.1 3.3 2.1 1.4 0.0 0.0 0.6 1.4 0.0 0.0 0.0
4/23/2005 5.3 16.0 2.7 0.5 2.4 2.3 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2005 4.1 0.4 8.0 0.9 10.2 7.8 11.8 0.0 0.0 1.0 2.4 0.0 0.0 0.0
4/25/2005 1.5 3.8 0.6 1.0 2.1 3.3 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/2005 3.7 0.9 10.6 1.9 0.0 3.3 2.5 11.0 4.2 9.1 7.5 13.2 13.3 4.1
4/27/2005 3.5 11.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 2.0 16.4 28.4 29.1 0.0
4/28/2005 9.3 0.5 16.3 0.0 33.7 24.4 0.0 17.0 6.5 14.5 4.3 0.4 0.0 6.4
4/29/2005 0.5 1.2 0.3 0.0 1.0 2.7 0.0 8.0 3.0 7.6 3.8 0.2 0.0 3.0
4/30/2005 12.4 37.0 1.4 17.0 0.0 3.2 0.0 12.0 4.6 12.1 7.4 0.3 0.0 4.5
5/1/2005 33.5 0.8 37.9 0.0 65.4 38.7 0.0 0.0 0.0 7.2 16.3 0.0 0.0 0.0
5/2/2005 2.3 0.0 0.0 26.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/2005 0.4 0.0 0.0 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/2005 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/2005 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2005 0.2 0.0 0.3 0.0 1.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2005 0.0 0.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/2005 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/2005 5.0 0.0 3.4 0.0 8.3 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/19/2005 1.2 3.6 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/2005 6.7 10.5 5.5 0.0 6.9 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/2005 10.7 0.3 13.6 7.7 22.7 13.5 0.0 0.0 0.0 15.1 72.9 91.2 93.5 0.0
5/22/2005 3.5 9.4 0.8 8.0 3.4 14.1 80.1 0.0 0.0 2.6 7.4 3.4 3.5 0.0
5/23/2005 7.2 5.1 11.8 13.1 10.9 8.6 14.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/2005 3.4 8.1 4.8 0.0 1.4 0.8 0.0 0.0 0.0 0.7 3.3 3.8 3.9 0.0
5/25/2005 1.1 3.0 0.0 0.3 0.0 0.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/2005 0.7 0.0 0.0 3.1 0.4 7.6 30.2 11.0 11.0 8.2 0.1 0.3 0.0 11.0
5/27/2005 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2005 1.6 0.0 1.2 16.5 3.8 8.1 10.0 17.0 17.0 13.4 3.3 3.9 3.6 17.0
5/29/2005 0.0 0.2 1.5 0.1 0.0 0.2 0.0 0.9 0.9 0.7 0.0 0.0 0.0 0.9
5/30/2005 11.2 36.2 0.0 1.1 0.0 3.6 2.9 12.0 12.0 9.7 1.9 0.3 0.0 12.0
5/31/2005 1.0 0.3 2.2 0.4 0.1 0.8 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/2005 2.0 0.4 5.5 0.3 0.0 0.6 3.5 0.0 0.0 0.9 2.0 0.0 0.0 0.0
6/2/2005 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/2005 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.3 0.0 0.0 0.0
6/4/2005 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/2005 0.6 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/6/2005 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/2005 0.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/2005 0.1 0.4 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2005 0.1 0.0 0.1 0.0 0.4 0.2 0.0 0.0 0.0 3.1 7.1 0.0 0.0 0.0
6/10/2005 1.4 1.2 0.5 0.0 1.7 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/2005 2.4 0.5 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 0.0 0.0 0.0
6/12/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.5 0.4 0.0 0.0 0.0 0.5
6/13/2005 0.9 0.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/2005 14.4 39.2 8.4 3.5 17.1 19.4 25.5 21.0 21.0 30.6 55.2 50.5 51.2 21.0
6/15/2005 3.1 1.9 3.2 2.8 1.4 6.2 35.6 0.0 0.0 2.0 11.2 15.6 16.0 0.0
6/16/2005 7.6 7.4 9.5 3.1 5.4 9.1 39.1 0.0 0.0 0.3 2.1 3.6 3.7 0.0
6/17/2005 10.0 22.3 7.7 2.3 6.9 5.3 7.7 0.0 0.0 6.2 19.3 12.2 12.5 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
6/18/2005 2.6 0.1 2.9 1.6 0.1 1.5 9.5 0.0 0.0 8.3 18.9 0.0 0.0 0.0
6/19/2005 2.3 3.4 3.7 10.1 0.0 5.4 3.3 19.0 19.0 14.1 0.1 0.5 0.0 19.0
6/20/2005 5.0 9.0 4.3 6.1 0.2 1.9 12.2 0.0 0.0 0.1 0.1 0.0 0.0 0.0
6/21/2005 1.2 0.1 1.3 5.4 0.4 15.3 34.7 38.0 38.0 34.8 15.0 0.9 0.0 38.0
6/22/2005 0.0 0.0 0.0 1.3 0.2 2.5 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/23/2005 0.0 0.0 0.0 0.2 0.0 0.4 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/24/2005 0.9 3.2 0.0 0.5 0.1 1.0 6.4 0.0 0.0 0.4 0.9 0.0 0.0 0.0
6/25/2005 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 0.0 0.0
6/26/2005 0.0 0.0 0.0 0.8 0.1 1.7 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/27/2005 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/28/2005 2.4 0.2 3.5 1.3 0.2 2.7 17.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/29/2005 0.1 0.5 4.1 0.7 0.1 1.4 9.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/30/2005 0.6 0.2 1.9 1.0 0.2 1.9 12.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/1/2005 0.7 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/2/2005 3.1 10.8 1.5 1.0 0.2 1.9 12.2 0.0 0.0 6.5 14.9 0.0 0.0 0.0
7/3/2005 3.1 7.9 0.6 2.9 0.5 5.8 36.6 0.0 0.0 10.5 54.7 73.0 74.9 0.0
7/4/2005 7.0 17.1 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/5/2005 2.7 8.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/6/2005 4.9 17.7 0.0 0.6 0.1 1.2 7.5 0.0 0.0 1.9 13.1 20.8 21.3 0.0
7/7/2005 4.4 9.9 3.0 3.7 0.3 10.7 22.0 28.0 28.0 21.5 4.1 6.6 6.1 28.0
7/8/2005 4.9 6.9 2.2 3.1 2.1 10.6 14.1 28.0 28.0 23.1 15.3 24.4 24.3 28.0
7/9/2005 3.8 8.9 0.2 13.2 0.2 5.6 17.4 11.0 11.0 15.1 18.0 5.3 5.1 11.0
7/10/2005 3.6 1.8 8.3 19.7 0.0 17.3 2.2 66.0 66.0 48.9 0.0 1.6 0.0 66.0
7/11/2005 0.6 0.5 4.1 0.0 0.0 0.1 0.0 0.2 0.2 4.3 9.4 0.0 0.0 0.2
7/12/2005 0.6 0.4 3.4 1.8 0.0 6.6 0.8 25.0 25.0 18.5 0.0 0.6 0.0 25.0
7/13/2005 3.5 5.3 5.3 0.0 7.1 4.3 0.0 0.2 0.2 0.2 0.0 0.0 0.0 0.2
7/14/2005 6.1 6.1 7.6 9.6 6.3 4.1 2.5 0.0 0.0 1.0 8.5 14.6 15.0 0.0
7/15/2005 4.6 8.2 5.4 0.7 3.2 4.5 0.3 10.0 10.0 7.4 0.0 0.3 0.0 10.0
7/16/2005 17.2 38.8 9.2 0.7 15.9 10.9 8.3 0.8 0.8 1.7 9.5 16.4 16.8 0.8
7/17/2005 11.2 15.5 9.6 0.2 14.2 8.8 2.7 0.0 0.0 1.1 9.5 16.4 16.8 0.0
7/18/2005 6.2 1.4 13.4 8.9 21.2 29.7 114.0 0.0 0.0 6.5 31.2 39.0 40.0 0.0
7/19/2005 3.3 0.6 6.5 0.0 5.1 3.0 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
7/20/2005 4.3 0.3 8.2 0.4 18.3 10.9 0.0 0.4 0.4 0.3 0.0 0.0 0.0 0.4
7/21/2005 4.2 2.6 2.9 21.3 8.9 11.3 0.8 23.0 23.0 18.9 15.8 27.9 28.0 23.0
7/22/2005 0.8 0.6 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/23/2005 3.6 0.6 3.1 1.0 5.0 3.6 2.7 0.9 0.9 2.1 4.4 2.9 2.9 0.9
7/24/2005 5.1 0.2 6.1 1.1 8.6 6.8 10.5 0.3 0.3 3.0 6.4 0.0 0.0 0.3
7/25/2005 1.3 2.8 0.0 1.4 0.2 2.8 17.8 0.0 0.0 2.6 18.5 30.2 31.0 0.0
7/26/2005 11.6 25.9 8.4 1.0 0.2 2.1 13.4 0.0 0.0 5.4 17.0 11.2 11.5 0.0
7/27/2005 19.5 20.7 18.2 1.5 16.5 12.7 19.2 0.0 0.0 4.7 15.6 11.7 12.0 0.0
7/28/2005 18.9 15.0 17.7 1.0 29.8 19.2 9.9 0.2 0.2 4.5 12.1 5.2 5.3 0.2
7/29/2005 13.6 17.6 11.5 14.4 15.3 14.0 7.5 15.0 15.0 11.1 0.0 0.4 0.0 15.0
7/30/2005 6.5 8.0 7.0 0.0 7.4 4.4 0.0 0.0 0.0 1.6 3.6 0.0 0.0 0.0
7/31/2005 8.7 18.2 5.1 1.0 5.0 4.9 13.2 0.0 0.0 8.8 31.4 27.1 27.8 0.0
8/1/2005 13.8 18.8 6.3 2.8 15.3 14.3 35.2 0.0 0.0 2.6 12.4 15.6 16.0 0.0
8/2/2005 13.8 7.4 11.9 1.0 9.8 7.7 12.2 0.0 0.0 0.1 0.3 0.0 0.0 0.0
8/3/2005 11.3 13.8 9.4 2.3 24.5 18.4 25.0 0.4 0.4 0.3 0.0 0.0 0.0 0.4
8/4/2005 11.3 15.6 9.2 17.6 18.2 20.5 37.1 16.0 16.0 12.5 5.4 9.7 9.5 16.0
8/5/2005 10.3 19.5 7.4 1.2 16.5 11.8 13.4 0.2 0.2 0.7 4.4 7.6 7.8 0.2
8/6/2005 20.4 4.8 23.2 11.9 33.7 24.7 10.7 12.0 12.0 13.4 14.8 11.0 11.0 12.0
8/7/2005 9.9 15.4 11.3 0.8 24.6 15.9 8.3 0.2 0.2 0.3 0.9 1.5 1.5 0.2
8/8/2005 13.0 16.5 9.2 0.4 6.5 4.2 2.1 0.2 0.2 0.5 0.7 0.0 0.0 0.2
8/9/2005 15.8 31.2 13.0 1.2 18.1 12.7 12.2 0.3 0.3 5.7 19.5 16.8 17.2 0.3
8/10/2005 16.5 3.7 19.3 1.2 38.2 23.9 7.4 0.7 0.7 10.4 50.6 66.7 68.4 0.7
8/11/2005 10.8 25.2 9.3 0.0 12.6 7.5 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
8/12/2005 11.8 20.6 14.7 22.2 8.5 11.3 0.8 24.0 24.0 18.7 2.1 0.6 0.0 24.0
8/13/2005 15.7 24.7 11.8 0.1 22.3 13.4 1.6 0.0 0.0 6.9 22.6 16.1 16.5 0.0
8/14/2005 6.1 8.8 5.2 0.2 14.2 8.8 2.7 0.0 0.0 0.4 3.4 5.9 6.0 0.0
8/15/2005 7.4 1.8 14.0 0.8 7.1 5.7 10.5 0.0 0.0 1.0 4.3 4.7 4.8 0.0
8/16/2005 21.7 36.4 17.1 0.0 23.7 14.0 0.0 0.0 0.0 6.5 21.5 16.2 16.6 0.0
8/17/2005 14.2 1.7 15.2 0.0 2.3 1.3 0.0 0.0 0.0 3.4 15.6 18.5 19.0 0.0
8/18/2005 4.6 1.1 4.6 32.4 2.8 10.8 1.1 35.0 35.0 25.9 0.0 0.9 0.0 35.0
8/19/2005 4.3 0.0 5.3 0.2 16.1 9.5 0.0 0.0 0.0 1.5 3.3 0.0 0.0 0.0
8/20/2005 2.8 1.1 6.3 0.4 9.2 6.2 4.7 0.3 0.3 0.2 0.0 0.0 0.0 0.3
8/21/2005 5.1 1.8 6.8 1.9 0.9 7.4 0.9 26.0 26.0 24.0 12.3 4.1 3.5 26.0
8/22/2005 5.4 1.1 8.1 1.7 6.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/23/2005 7.8 1.4 8.7 0.0 11.9 7.0 0.0 0.0 0.0 4.7 10.6 0.0 0.0 0.0
8/24/2005 5.7 1.6 11.0 0.2 3.5 2.1 0.0 0.2 0.2 3.2 6.9 0.0 0.0 0.2
8/25/2005 8.3 0.7 3.1 17.4 5.9 10.3 0.9 26.0 26.0 19.4 0.3 0.7 0.0 26.0
8/26/2005 3.7 0.0 1.5 44.4 4.5 15.2 1.6 48.0 48.0 36.6 2.4 1.2 0.0 48.0
8/27/2005 2.6 0.8 2.6 8.6 0.5 0.5 0.0 0.8 0.8 2.4 4.0 0.0 0.0 0.8
8/28/2005 0.3 0.3 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2005 0.1 0.4 3.4 0.1 0.0 0.2 0.0 0.8 0.8 0.6 0.0 0.0 0.0 0.8
8/30/2005 0.2 0.2 1.6 3.5 0.0 12.3 1.5 47.0 47.0 34.8 0.0 1.2 0.0 47.0
8/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.3 0.0 0.0 0.0
9/1/2005 0.2 0.0 0.0 0.1 0.0 0.2 0.0 0.7 0.7 0.5 0.0 0.0 0.0 0.7
9/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/3/2005 0.0 0.0 0.0 1.2 0.0 4.2 0.5 16.0 16.0 11.9 0.0 0.4 0.0 16.0
9/4/2005 0.0 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/5/2005 0.3 0.4 3.7 1.6 0.0 5.8 0.7 22.0 22.0 16.3 0.0 0.6 0.0 22.0
9/6/2005 0.6 0.5 4.1 0.0 0.0 0.2 0.0 0.6 0.6 0.4 0.0 0.0 0.0 0.6
9/7/2005 0.6 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/2005 0.5 0.3 2.2 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.1
9/9/2005 0.4 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/2005 2.0 1.4 4.3 0.0 2.0 1.3 0.0 0.5 0.5 0.6 0.5 0.0 0.0 0.5
9/11/2005 5.8 0.4 9.5 1.7 11.1 9.9 21.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/12/2005 0.4 0.3 2.7 3.0 0.2 8.7 18.9 22.0 22.0 16.3 0.0 0.6 0.0 22.0
9/13/2005 0.0 0.3 2.2 0.1 0.0 0.2 0.0 0.9 0.9 0.7 0.0 0.0 0.0 0.9
9/14/2005 0.0 0.3 3.0 2.0 0.0 6.6 4.2 23.0 23.0 29.0 54.3 65.2 66.3 23.0
9/15/2005 0.3 0.4 3.8 1.5 0.0 5.5 0.7 21.0 21.0 15.7 0.4 0.5 0.0 21.0
9/16/2005 0.1 0.6 2.3 0.7 0.0 2.6 0.3 10.0 10.0 7.5 0.1 0.3 0.0 10.0
9/17/2005 0.0 0.3 2.2 0.0 0.0 0.1 0.0 0.2 0.2 0.2 0.0 0.0 0.0 0.2
9/18/2005 0.9 0.4 4.4 2.9 0.0 10.5 1.3 40.0 40.0 29.6 0.0 1.0 0.0 40.0
9/19/2005 1.4 5.4 1.9 0.9 0.0 3.2 0.4 12.0 12.0 9.9 2.3 0.3 0.0 12.0
9/20/2005 5.5 3.9 4.1 0.1 0.0 0.2 0.0 0.7 0.7 0.5 0.0 0.0 0.0 0.7
9/21/2005 21.4 16.7 23.8 1.1 57.3 37.5 3.1 12.0 12.0 9.7 1.9 0.3 0.0 12.0
9/22/2005 19.3 12.2 22.5 1.8 17.1 13.7 22.9 0.7 0.7 19.2 42.5 0.0 0.0 0.7
9/23/2005 9.5 0.9 13.8 10.2 24.2 14.3 0.0 0.0 0.0 19.9 45.4 0.0 0.0 0.0
9/24/2005 2.2 0.0 0.0 41.7 0.0 3.2 0.4 12.0 12.0 13.0 34.7 60.3 61.5 12.0
9/25/2005 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/2005 0.2 0.0 0.0 0.9 0.0 3.2 0.4 12.0 12.0 8.9 0.0 0.3 0.0 12.0
9/27/2005 0.1 0.0 0.0 2.0 0.0 7.1 0.9 27.0 27.0 20.0 0.0 0.7 0.0 27.0
9/28/2005 0.5 0.4 3.4 3.1 0.0 11.0 1.4 42.0 42.0 31.1 0.0 1.0 0.0 42.0
9/29/2005 0.4 0.3 3.0 0.0 0.0 0.1 0.0 0.4 0.4 0.3 0.0 0.0 0.0 0.4
9/30/2005 0.4 0.3 2.2 0.1 0.0 0.2 0.0 0.8 0.8 0.6 0.0 0.0 0.0 0.8
10/1/2005 0.0 0.2 1.9 1.5 0.0 5.3 0.7 20.0 20.0 14.8 0.0 0.5 0.0 20.0
10/2/2005 1.9 5.9 1.1 0.7 0.0 2.6 0.3 10.0 10.0 7.7 0.7 0.3 0.0 10.0
10/3/2005 5.4 5.8 7.3 5.3 9.9 24.8 2.4 72.0 72.0 54.4 2.3 1.8 0.0 72.0
10/4/2005 5.2 1.3 5.5 12.8 15.1 33.7 163.1 0.8 0.8 0.6 0.0 0.0 0.0 0.8
10/5/2005 2.1 0.0 0.0 3.5 0.0 8.4 1.1 32.0 32.0 24.5 1.8 0.8 0.0 32.0
10/6/2005 0.2 0.3 2.2 3.4 0.0 0.1 0.0 0.4 0.4 0.3 0.0 0.0 0.0 0.4
10/7/2005 5.2 0.4 10.0 8.2 20.8 16.2 0.5 15.0 15.0 11.6 1.2 0.4 0.0 15.0
10/8/2005 8.8 0.2 13.7 0.0 37.7 22.5 0.0 0.5 0.5 0.4 0.0 0.0 0.0 0.5
10/9/2005 0.0 0.2 1.9 2.1 0.0 7.4 0.9 28.0 28.0 20.8 0.0 0.7 0.0 28.0
10/10/2005 1.6 6.2 1.1 1.1 0.0 3.9 0.5 15.0 15.0 11.1 0.0 0.4 0.0 15.0
10/11/2005 13.6 32.4 4.1 2.3 0.3 5.8 20.3 10.0 10.0 10.9 8.0 0.3 0.0 10.0
10/12/2005 16.5 7.7 14.4 2.3 0.4 4.8 28.9 0.8 0.8 5.3 17.8 17.0 17.4 0.8
10/13/2005 2.2 0.3 2.7 1.1 0.0 3.9 0.5 15.0 15.0 11.9 6.8 12.1 12.0 15.0
10/14/2005 4.6 16.7 3.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2005 2.2 0.0 0.2 5.3 0.0 0.0 0.0 0.0 0.0 1.9 4.2 0.0 0.0 0.0
10/16/2005 0.0 0.3 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2005 0.0 0.3 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2005 0.0 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2005 0.0 0.3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2005 0.1 1.8 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2005 1.4 5.1 0.0 3.5 0.0 12.6 1.6 48.0 48.0 35.6 0.0 1.2 0.0 48.0
10/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2005 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.1
10/29/2005 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.3 0.2 0.0 0.0 0.0 0.3
10/31/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.3 0.2 0.0 0.0 0.0 0.3
11/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2005 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
11/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2005 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.6 0.0 0.0 0.0
11/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2005 1.8 7.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2005 0.0 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.2 0.2 0.0 0.0 0.0 0.2
12/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 4.7 8.1 8.3 0.0
12/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2005 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.2 0.2 0.0 0.0 0.0 0.2
12/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 9.3 16.1 16.5 0.0
12/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.9 3.3 3.4 0.0
12/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2006 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2006 0.9 0.0 0.1 0.1 0.0 0.3 1.7 0.0 0.0 1.1 2.4 0.0 0.0 0.0
1/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2006 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2006 3.2 0.3 4.0 0.2 0.0 0.4 2.7 0.0 0.0 0.2 0.5 0.0 0.0 0.0
1/17/2006 7.2 2.2 14.0 2.6 0.4 5.3 33.5 0.0 0.0 16.8 52.9 35.0 35.9 0.0
1/18/2006 7.5 0.2 8.0 0.7 24.8 16.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2006 0.8 0.0 0.0 0.2 0.0 0.3 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2006 2.0 0.0 0.8 0.8 0.1 1.6 9.9 0.0 0.0 0.9 2.1 0.0 0.0 0.0
1/22/2006 10.2 1.1 16.9 1.6 28.9 20.3 20.1 0.5 0.2 5.8 24.9 29.8 30.5 0.2
1/23/2006 1.2 0.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 4.7 19.2 20.0 20.5 0.0
1/24/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2006 1.2 0.0 1.7 0.0 5.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2006 2.5 0.3 4.8 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2006 1.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 2.4 2.5 0.0
1/29/2006 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2006 0.0 0.0 0.0 0.8 0.1 1.6 9.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2006 8.9 0.3 11.2 3.0 18.3 16.7 38.9 0.0 0.0 9.0 20.6 0.0 0.0 0.0
2/1/2006 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/2006 1.4 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2006 6.2 22.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
2/4/2006 1.6 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2006 1.8 0.0 2.6 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/2006 2.2 0.2 3.0 0.8 0.1 1.6 9.9 0.0 0.0 0.1 0.3 0.0 0.0 0.0
2/7/2006 4.5 4.3 5.3 2.0 0.3 24.9 25.0 80.0 30.3 63.7 14.1 11.7 10.0 30.1
2/8/2006 4.6 8.0 1.7 1.8 0.3 3.6 22.8 0.0 0.0 0.0 0.2 0.4 0.4 0.0
2/9/2006 1.0 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2006 0.7 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
2/12/2006 0.0 0.0 0.0 0.0 0.0 6.6 0.0 25.0 9.5 18.5 0.0 0.6 0.0 9.4
2/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2006 0.5 1.7 0.0 1.0 0.2 2.1 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2006 5.8 0.1 8.1 2.1 16.2 13.7 27.3 0.0 0.0 1.5 3.4 0.0 0.0 0.0
2/16/2006 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.4 0.0 0.0 0.0
2/17/2006 6.2 14.3 1.9 2.2 5.3 7.5 28.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2006 1.5 5.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.9 0.0 0.0 0.0
2/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2006 2.6 0.3 2.6 0.0 0.0 7.4 0.0 28.0 10.6 21.5 1.7 0.7 0.0 10.5
2/22/2006 7.3 0.2 10.3 3.0 20.2 17.8 38.9 0.0 0.0 3.4 7.8 0.0 0.0 0.0
2/23/2006 0.3 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2006 5.2 15.9 0.9 0.0 2.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2006 0.8 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2006 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2006 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2006 0.0 0.0 0.0 0.0 0.0 5.5 0.0 21.0 8.0 15.6 0.0 0.5 0.0 7.9
3/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
3/3/2006 0.8 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2006 0.3 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2006 0.0 0.0 0.0 0.7 0.0 0.0 0.3 0.0 5.7 0.0 0.0 0.0 0.0 5.7
3/7/2006 0.0 0.0 0.0 1.3 0.0 3.2 0.6 12.0 15.1 8.9 0.0 0.3 0.0 15.1
3/8/2006 0.4 0.0 0.0 1.0 0.0 0.0 0.4 0.0 8.1 0.0 0.0 0.0 0.0 8.1
3/9/2006 1.1 0.0 0.5 3.7 0.6 7.6 47.0 0.6 0.2 4.4 9.0 0.0 0.0 0.2
3/10/2006 3.8 8.1 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.0 5.2 5.3 0.0
3/11/2006 0.6 0.0 0.2 0.0 0.0 0.1 0.0 0.2 0.1 2.2 4.7 0.0 0.0 0.1
3/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2006 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
3/16/2006 2.0 0.1 1.5 0.4 0.1 0.9 5.6 0.0 0.0 0.7 1.5 0.0 0.0 0.0
3/17/2006 2.0 0.0 2.8 0.0 8.5 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2006 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 1.4 8.6 13.1 13.4 0.0
3/19/2006 0.3 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2006 0.3 0.0 0.0 0.3 0.0 0.6 3.5 0.0 0.0 4.5 10.3 0.0 0.0 0.0
3/21/2006 5.9 0.4 8.5 1.2 0.2 2.5 15.9 0.0 0.0 1.1 9.2 15.9 16.3 0.0
3/22/2006 5.2 0.0 7.3 0.0 20.0 11.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2006 1.0 0.0 0.2 1.7 0.6 0.4 0.8 0.0 14.4 0.0 0.0 0.0 0.0 14.5
3/24/2006 4.7 0.0 6.2 2.9 19.3 11.4 0.9 0.0 16.9 0.0 0.0 0.0 0.0 17.0
3/25/2006 2.6 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/2006 1.0 3.2 0.0 2.1 0.0 0.0 0.9 0.0 17.5 0.0 0.0 0.0 0.0 17.6
3/27/2006 0.3 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 50.9 88.2 90.4 0.0
3/28/2006 1.0 0.0 0.0 20.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2006 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.8 0.3 0.6 0.0 0.0 0.0 0.3
3/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2006 0.8 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2006 1.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2006 0.6 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2006 5.6 13.9 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2006 2.2 0.2 3.1 0.0 2.1 1.2 0.0 0.0 0.0 2.5 5.7 0.0 0.0 0.0
4/9/2006 3.0 0.0 4.1 0.0 12.6 7.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2006 0.0 0.0 0.0 0.8 0.0 0.0 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.0
4/13/2006 0.0 0.0 0.0 1.2 0.0 0.0 0.5 0.0 10.0 0.0 0.0 0.0 0.0 10.0
4/14/2006 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2006 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2006 2.1 0.0 3.0 0.0 9.2 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/2006 1.3 2.5 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/2006 2.4 0.0 3.4 0.0 10.4 6.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/2006 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
4/22/2006 2.4 0.1 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
4/23/2006 1.1 0.0 1.4 0.0 4.5 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2006 2.0 1.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.4 0.0 0.0 0.0
4/25/2006 5.7 6.4 2.3 0.0 4.9 2.9 0.0 0.0 0.0 0.7 1.6 0.0 0.0 0.0
4/26/2006 2.5 0.1 3.4 0.0 10.5 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/2006 1.1 0.0 1.5 0.0 4.7 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/2006 1.5 0.0 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 9.3 16.1 16.5 0.0
4/30/2006 3.0 0.0 0.9 47.2 2.8 1.6 0.0 0.0 0.0 2.4 5.4 0.0 0.0 0.0
5/1/2006 0.1 0.0 0.1 0.3 0.1 0.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/2006 0.2 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 1.3 2.9 0.0 0.0 0.0
5/3/2006 0.6 0.3 3.4 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/2006 1.7 0.0 1.5 0.0 4.6 2.8 0.0 0.0 0.0 1.1 9.3 16.1 16.5 0.0
5/5/2006 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2006 3.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/2006 6.1 2.8 6.4 0.0 10.5 6.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.0
5/10/2006 2.4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2006 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2006 0.0 0.0 0.0 0.3 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
5/13/2006 1.1 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/2006 0.2 0.0 0.2 0.3 0.0 0.1 0.0 0.4 0.2 0.3 0.0 0.0 0.0 0.2
5/15/2006 0.6 0.0 0.0 11.1 0.0 3.4 0.0 13.0 4.9 9.6 0.0 0.3 0.0 4.9
5/16/2006 5.1 0.1 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/2006 0.3 0.0 0.5 0.0 1.5 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/2006 0.2 0.0 0.3 0.0 0.8 0.5 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
5/19/2006 2.4 6.7 0.8 0.0 2.5 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/20/2006 2.1 1.7 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/21/2006 2.1 0.1 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/2006 0.7 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/2006 1.8 6.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/2006 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/2006 0.2 0.8 0.0 0.2 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
5/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/2006 0.3 0.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/2006 1.5 5.9 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/2006 0.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/2006 0.1 0.2 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/2006 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/2006 3.6 0.1 5.0 0.0 11.9 7.0 0.0 0.0 0.0 3.2 7.3 0.0 0.0 0.0
6/6/2006 1.9 5.8 0.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
6/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/9/2006 0.7 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
6/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/2006 0.8 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/2006 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/18/2006 1.4 5.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/19/2006 1.8 1.8 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/20/2006 1.2 0.3 4.0 0.0 1.9 1.1 0.0 0.0 0.0 2.5 21.0 36.4 37.3 0.0
6/21/2006 3.4 6.8 2.5 2.3 5.6 7.8 29.8 0.0 0.0 3.0 11.8 11.5 11.8 0.0
6/22/2006 3.7 5.2 3.2 1.6 10.0 7.2 8.8 0.0 8.1 3.7 8.5 0.0 0.0 8.2
6/23/2006 0.7 0.0 1.0 2.1 3.0 2.5 4.7 0.6 15.3 0.4 0.0 0.0 0.0 15.3
6/24/2006 0.6 0.0 0.8 2.0 2.5 1.5 0.9 0.0 16.8 0.0 0.0 0.0 0.0 16.9
6/25/2006 1.0 0.0 0.0 20.9 0.1 7.5 6.2 25.0 9.5 19.3 3.5 5.0 4.5 9.4
6/26/2006 1.3 0.0 0.3 0.9 1.0 1.3 4.7 0.0 5.0 5.1 33.1 51.0 52.3 5.1
6/27/2006 1.2 0.0 1.6 1.3 4.9 2.9 0.6 0.0 11.2 0.0 0.0 0.0 0.0 11.2
6/28/2006 2.2 0.0 3.0 0.0 8.1 4.8 0.0 0.0 0.0 0.7 5.8 10.0 10.3 0.0
6/29/2006 1.2 0.0 0.5 0.2 1.5 1.2 2.1 0.0 0.0 3.6 22.8 34.6 35.5 0.0
6/30/2006 2.9 1.2 6.2 1.0 0.7 2.4 13.2 0.0 0.0 1.8 4.1 0.0 0.0 0.0
7/1/2006 5.0 1.3 9.4 1.5 3.2 4.8 19.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0
7/2/2006 7.5 2.1 9.5 1.8 10.6 9.7 23.0 0.0 0.0 4.0 9.0 0.0 0.0 0.0
7/3/2006 8.4 1.9 11.6 1.0 4.6 3.3 4.4 0.0 5.6 1.2 2.8 0.0 0.0 5.6
7/4/2006 12.9 6.3 17.6 1.1 4.2 2.5 0.5 0.0 9.4 4.8 11.0 0.0 0.0 9.4
7/5/2006 7.8 3.0 11.8 0.2 0.0 0.3 2.1 0.0 0.0 1.5 3.4 0.0 0.0 0.0
7/6/2006 1.5 1.9 6.0 3.1 0.5 6.2 39.3 0.0 0.0 2.3 10.0 11.0 11.3 0.0
7/7/2006 7.4 2.5 14.1 2.1 17.7 14.6 27.3 0.0 0.0 6.2 30.6 39.0 40.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
7/8/2006 4.0 3.9 8.5 1.1 12.5 9.5 14.1 0.0 0.0 1.5 3.5 0.0 0.0 0.0
7/9/2006 2.4 0.5 7.2 3.4 8.1 7.7 18.0 0.7 0.3 8.8 33.1 33.7 34.5 0.3
7/10/2006 8.2 1.9 15.9 3.2 19.2 35.1 6.4 87.0 33.0 64.9 3.7 8.5 6.5 32.7
7/11/2006 8.4 1.9 15.2 5.0 7.3 18.5 31.5 36.0 13.7 27.3 5.2 9.9 9.2 13.6
7/12/2006 8.1 6.7 11.6 1.0 2.1 3.3 13.2 0.0 0.0 0.5 4.1 7.1 7.3 0.0
7/13/2006 8.7 3.2 11.8 0.7 7.5 5.7 8.5 0.0 0.0 0.7 5.9 10.1 10.4 0.0
7/14/2006 8.3 10.3 9.8 0.8 4.6 4.3 10.5 0.0 0.0 6.4 14.7 0.0 0.0 0.0
7/15/2006 4.7 13.1 2.3 0.5 0.1 48.2 6.0 180.0 68.3 136.2 6.4 4.5 0.0 67.7
7/16/2006 10.5 6.4 13.1 1.3 11.3 9.1 16.3 0.0 0.0 5.3 16.7 11.2 11.5 0.0
7/17/2006 5.8 19.5 4.7 2.0 0.1 1.6 9.9 0.0 0.0 2.4 10.5 12.0 12.3 0.0
7/18/2006 7.9 17.8 5.4 2.1 4.8 7.0 27.3 0.2 0.1 0.8 1.6 0.0 0.0 0.1
7/19/2006 3.2 7.4 4.5 16.8 0.1 1.8 12.1 0.1 16.9 0.5 1.1 0.0 0.0 17.0
7/20/2006 5.0 11.0 8.6 1.3 0.0 0.3 2.6 0.0 9.3 8.8 30.9 26.0 26.7 9.4
7/21/2006 3.3 9.1 6.3 11.8 0.1 12.3 4.9 44.0 25.4 34.4 11.7 19.1 18.5 25.4
7/22/2006 4.8 6.5 4.7 5.5 0.2 6.6 17.7 15.0 17.5 22.2 25.2 0.4 0.0 17.5
7/23/2006 3.5 10.2 2.6 1.5 0.1 1.4 8.3 0.7 7.8 5.8 16.4 10.3 10.5 7.8
7/24/2006 5.8 6.2 9.9 4.1 7.4 8.4 26.7 0.5 17.7 2.8 9.8 10.5 10.8 17.8
7/25/2006 3.6 0.6 6.2 2.5 0.1 1.8 11.0 0.7 14.6 2.3 4.0 0.0 0.0 14.7
7/26/2006 4.9 5.9 7.8 21.6 0.2 2.8 16.9 0.8 12.1 1.2 4.8 8.3 8.5 12.2
7/27/2006 12.7 10.7 20.6 2.7 18.1 24.9 34.6 34.0 12.9 31.4 14.1 0.8 0.0 12.8
7/28/2006 4.7 11.3 3.8 2.6 0.4 5.3 33.7 0.0 0.0 3.4 12.0 10.2 10.5 0.0
7/29/2006 5.6 6.6 6.5 10.4 0.5 10.5 38.5 17.0 17.6 12.6 0.0 0.4 0.0 17.6
7/30/2006 3.0 7.8 2.9 0.8 0.1 1.8 10.5 0.4 0.2 0.3 0.0 0.0 0.0 0.2
7/31/2006 7.0 17.4 3.9 4.2 0.2 2.7 16.9 0.9 20.8 2.0 3.0 0.0 0.0 20.9
8/1/2006 10.0 2.0 13.0 20.2 0.1 7.0 11.9 20.0 27.0 14.8 0.0 0.5 0.0 27.0
8/2/2006 7.1 13.2 7.2 27.0 2.5 10.3 6.4 30.0 19.5 22.2 0.0 0.7 0.0 19.4
8/3/2006 3.3 1.8 7.8 10.1 4.1 7.0 13.4 10.0 8.1 8.4 8.1 14.3 14.4 8.1
8/4/2006 8.6 6.4 6.9 12.2 8.3 12.2 14.4 20.0 20.8 17.3 9.9 10.7 10.5 20.8
8/5/2006 4.1 2.4 4.5 7.9 13.8 13.8 37.1 0.7 13.9 3.3 6.4 0.0 0.0 14.0
8/6/2006 5.0 4.2 2.3 5.1 4.5 8.9 41.7 0.3 16.3 2.9 18.1 28.8 29.5 16.4
8/7/2006 5.2 2.9 1.6 2.1 0.0 0.1 1.0 0.4 18.2 0.3 0.0 0.0 0.0 18.2
8/8/2006 0.2 0.3 3.0 0.6 0.0 0.0 0.3 0.0 5.0 0.0 0.0 0.0 0.0 5.0
8/9/2006 0.6 0.0 0.0 1.7 0.0 3.4 0.8 13.0 19.3 9.6 0.0 0.3 0.0 19.4
8/10/2006 5.4 19.1 1.0 3.0 0.0 7.4 1.3 28.0 36.1 20.8 0.0 0.7 0.0 36.1
8/11/2006 4.2 14.2 0.0 8.0 1.3 21.7 102.2 21.0 8.0 27.1 34.7 20.5 20.5 7.9
8/12/2006 5.9 19.4 3.4 0.0 0.0 0.1 0.0 0.4 0.2 0.6 2.9 5.0 5.1 0.2
8/13/2006 6.1 21.6 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.6 6.2 6.4 0.0
8/14/2006 2.7 7.1 3.5 2.9 0.5 8.7 36.8 11.0 4.2 20.5 28.1 0.3 0.0 4.1
8/15/2006 12.8 28.9 5.4 1.3 0.2 2.8 16.1 0.8 0.3 0.6 0.0 0.0 0.0 0.3
8/16/2006 8.0 10.1 10.9 7.8 16.3 29.3 99.4 18.0 6.8 14.3 2.3 0.5 0.0 6.8
8/17/2006 6.8 16.1 6.6 0.0 5.1 19.6 0.0 63.0 23.9 46.7 0.0 1.6 0.0 23.7
8/18/2006 6.9 21.2 3.7 0.0 2.3 1.3 0.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
8/19/2006 12.7 15.7 12.2 5.3 15.5 27.7 36.9 50.0 40.1 46.4 35.7 35.4 35.0 40.1
8/20/2006 7.0 1.8 10.1 1.2 16.8 30.9 0.5 80.0 40.3 59.3 0.0 2.0 0.0 40.1
8/21/2006 1.7 4.7 0.0 1.2 0.0 0.0 0.4 0.0 7.0 0.0 0.0 0.0 0.0 7.0
8/22/2006 1.7 4.2 0.0 2.4 0.0 0.2 0.7 0.7 13.3 0.5 0.0 0.0 0.0 13.4
8/23/2006 1.1 0.0 0.0 9.0 0.0 7.4 0.9 28.0 26.8 20.8 0.0 0.7 0.0 26.8
8/24/2006 1.3 0.0 0.6 19.8 0.2 7.4 14.1 20.0 22.0 17.5 12.1 14.6 14.5 22.0
8/25/2006 13.1 46.7 3.0 14.1 0.0 6.0 2.3 22.0 25.8 16.3 0.0 0.6 0.0 25.8
8/26/2006 0.9 3.2 1.9 0.0 0.0 6.3 0.0 24.0 9.1 17.8 0.0 0.6 0.0 9.0
8/27/2006 2.0 6.6 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/28/2006 3.3 12.7 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/29/2006 1.4 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/30/2006 4.5 14.5 0.0 11.2 0.0 8.7 0.0 33.0 12.5 24.5 0.0 0.8 0.0 12.4
8/31/2006 6.6 24.7 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/1/2006 0.8 0.4 0.4 11.1 0.0 21.0 0.0 80.0 30.3 59.3 0.0 2.0 0.0 30.1
9/2/2006 8.8 10.5 4.8 2.7 9.7 7.7 12.2 0.3 0.1 0.2 0.0 0.0 0.0 0.1
9/3/2006 1.3 0.0 0.6 6.3 0.0 13.3 2.5 49.0 18.6 36.3 0.0 1.2 0.0 18.4
9/4/2006 1.8 3.7 0.3 1.7 0.0 0.0 0.0 0.0 0.0 2.0 4.5 0.0 0.0 0.0
9/5/2006 1.9 5.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 1.7 3.9 0.0 0.0 0.0
9/6/2006 0.9 3.8 5.2 0.0 0.0 12.9 0.0 49.0 18.6 36.3 0.0 1.2 0.0 18.4
9/7/2006 1.4 5.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/8/2006 4.3 2.4 4.4 0.0 0.0 2.6 0.0 10.0 3.8 8.0 1.3 0.3 0.0 3.8
9/9/2006 1.6 0.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/10/2006 2.4 1.3 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/2006 6.9 1.2 5.8 4.2 9.2 13.6 53.8 0.2 0.1 6.4 14.3 0.0 0.0 0.1
9/12/2006 2.1 0.0 0.9 0.5 0.1 1.3 6.6 0.8 0.3 0.6 0.0 0.0 0.0 0.3
9/13/2006 0.7 0.1 1.6 0.9 1.4 2.5 11.2 0.0 0.0 0.5 1.1 0.0 0.0 0.0
9/14/2006 1.6 0.3 2.7 2.0 0.3 3.9 25.0 0.0 0.0 0.5 1.2 0.0 0.0 0.0
9/15/2006 6.2 0.1 6.4 2.5 13.1 12.6 32.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/2006 13.6 13.9 8.2 2.4 10.5 10.9 31.2 0.0 0.0 2.5 5.7 0.0 0.0 0.0
9/17/2006 2.5 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/2006 5.5 6.1 8.2 0.0 7.9 4.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/19/2006 2.7 5.0 2.7 0.8 0.1 1.6 10.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/2006 0.0 0.0 0.0 2.0 0.1 1.7 11.3 0.0 9.3 0.0 0.0 0.0 0.0 9.4
9/21/2006 0.0 0.0 0.0 2.6 0.1 1.2 8.3 0.0 17.4 2.2 4.9 0.0 0.0 17.5
9/22/2006 1.9 6.8 0.1 6.3 0.7 13.8 59.6 17.0 20.9 13.6 2.4 0.4 0.0 20.9
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
9/23/2006 0.7 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/24/2006 2.2 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 16.6 42.9 12.0 12.3 0.0
9/25/2006 8.5 1.9 3.4 0.0 0.0 0.0 0.0 0.0 0.0 23.7 53.9 0.0 0.0 0.0
9/26/2006 0.8 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0
9/27/2006 0.3 1.1 0.0 0.0 0.0 3.4 0.0 13.0 4.9 10.7 9.2 16.3 16.4 4.9
9/28/2006 0.1 0.3 0.0 0.0 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
9/29/2006 2.9 10.4 0.0 1.7 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
9/30/2006 1.6 5.4 0.0 3.6 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0
10/1/2006 1.5 5.6 0.0 0.2 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/2/2006 0.4 1.3 0.0 0.0 0.0 4.5 0.0 17.0 6.5 12.6 0.0 0.4 0.0 6.4
10/3/2006 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.6 0.2 0.4 0.0 0.0 0.0 0.2
10/4/2006 0.2 0.8 0.0 0.0 0.0 0.1 0.0 0.2 0.1 1.3 9.3 16.1 16.5 0.1
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
10/5/2006 0.6 2.1 0.0 0.0 0.0 0.1 0.0 0.5 0.2 0.4 0.0 0.0 0.0 0.2
10/6/2006 0.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2006 1.6 5.1 0.3 0.3 0.0 2.6 0.0 10.0 3.8 7.4 0.0 0.3 0.0 3.8
10/8/2006 4.1 14.3 0.0 5.8 0.0 6.0 0.0 23.0 8.7 18.3 10.3 18.4 18.3 8.7
10/9/2006 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.2 0.1 0.2 0.0 0.0 0.0 0.1
10/10/2006 0.0 0.0 0.0 0.3 0.0 0.1 0.0 0.3 0.1 0.2 0.0 0.0 0.0 0.1
10/11/2006 0.6 0.0 0.0 11.1 0.0 5.8 0.0 22.0 8.3 16.3 0.0 0.6 0.0 8.3
10/12/2006 0.6 0.0 0.0 11.9 0.0 13.1 0.0 50.0 19.0 37.1 0.0 1.2 0.0 18.8
10/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2006 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2006 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2006 18.0 0.0 16.5 0.0 47.9 28.4 0.0 0.0 0.0 1.4 3.1 0.0 0.0 0.0
10/20/2006 5.9 14.0 3.0 0.0 3.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2006 0.0 0.0 0.0 2.0 0.0 0.0 0.9 0.0 16.8 0.0 0.0 0.0 0.0 16.8
10/23/2006 0.0 0.0 0.0 2.1 0.0 2.6 0.9 10.0 21.3 9.7 19.2 33.4 34.0 21.4
10/24/2006 0.0 0.0 0.0 1.1 0.0 0.0 0.5 0.0 9.3 0.0 0.0 0.0 0.0 9.4
10/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2006 21.8 80.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2006 2.5 9.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2006 0.5 0.0 0.0 10.2 0.0 5.8 0.0 22.0 8.3 16.3 0.0 0.6 0.0 8.3
11/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2006 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2006 0.0 0.3 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2006 0.0 0.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2006 0.0 0.0 0.0 1.0 0.2 2.0 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2006 0.0 0.0 0.0 1.2 0.2 2.4 15.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2006 0.0 0.0 0.0 0.2 0.0 0.4 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 6.4 11.1 11.4 0.0
12/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.1

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Asaraghat Catchment for daily flow Estimation
Sub-basin
1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
2
Area(km ) 796.65 975.8 792.73 182.66 158.34 222.86 147.25 40.84 134.84 172.31 69.29 77.64 91.38 68.30
12/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2006 3.2 0.1 4.6 0.0 8.0 4.7 0.0 0.0 0.0 5.1 14.0 5.9 6.0 0.0
12/24/2006 2.7 0.1 3.5 0.0 2.6 1.5 0.0 0.0 0.0 0.9 7.4 12.9 13.2 0.0
12/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2006 0.0 0.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2006 0.0 0.3 2.3 0.4 0.1 0.8 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ANNEX 2.2- Daily Weighted Precipitaion (in
mm) Data Using Thiessen Polygon at
Lalighat Catchment for PMF Estimation
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
1/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
1/3/1995 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.1 0.1
1/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1995 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
1/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1995 15.8 14.7 15.8 15.8 0.1 0.0 2.6 6.6 14.1 0.0 10.0 9.4 0.0
1/10/1995 16.0 49.5 16.0 16.0 3.1 4.5 6.4 8.8 16.8 0.0 9.6 10.5 0.0
1/11/1995 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.5 0.7 0.0 3.4 0.3 0.0
1/12/1995 0.0 0.0 0.0 0.0 2.2 3.2 2.6 1.6 0.0 0.0 0.1 0.2 0.0
1/13/1995 8.0 1.3 8.0 8.0 0.8 1.2 2.3 3.4 6.4 0.0 0.0 0.1 0.0
1/14/1995 0.0 0.0 0.0 0.0 5.4 8.1 6.7 4.1 0.0 0.0 0.0 0.4 0.0
1/15/1995 0.0 5.2 0.0 0.0 3.5 3.2 2.7 2.3 1.3 4.2 5.8 8.8 1.7
1/16/1995 11.6 11.7 11.6 11.6 3.4 5.0 6.2 8.3 10.4 0.0 3.3 3.7 0.0
1/17/1995 0.0 10.4 0.0 0.0 4.1 6.1 5.2 4.2 2.2 0.0 9.5 2.6 0.0
1/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.3 0.0 0.0 2.4 4.8 0.0
1/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
1/20/1995 0.0 2.1 0.0 0.0 1.4 2.1 1.8 1.7 0.2 0.0 0.8 1.5 0.0
1/21/1995 0.0 0.1 0.0 0.0 0.2 0.3 0.4 1.4 0.0 0.0 1.3 2.6 0.0
1/22/1995 0.0 0.0 0.0 0.0 3.5 5.2 4.4 4.0 0.0 0.0 1.4 3.2 0.0
1/23/1995 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 0.0
1/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1995 2.4 0.4 2.4 2.4 2.8 4.2 3.8 3.0 1.9 0.0 0.0 0.2 0.0
2/5/1995 0.0 0.0 0.0 0.0 1.4 2.1 1.7 1.1 0.0 0.0 0.1 0.2 0.0
2/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1995 5.0 0.8 5.0 5.0 0.0 0.0 0.8 1.8 4.0 0.0 0.0 0.1 0.0
2/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1995 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 9.3 4.6 7.4 3.7
2/14/1995 15.8 5.5 15.8 15.8 1.4 2.0 4.2 6.6 12.9 0.0 3.6 0.1 0.0
2/15/1995 18.6 61.6 18.6 18.6 0.1 0.0 3.2 9.1 25.3 0.0 32.6 4.6 0.0
2/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1995 2.4 5.4 2.4 2.4 0.0 0.0 0.4 0.9 2.3 0.0 0.1 0.0 0.0
2/19/1995 1.6 0.3 1.6 1.6 0.0 0.0 0.3 0.6 1.3 0.0 0.0 0.0 0.0
2/20/1995 2.4 0.4 2.4 2.4 3.4 5.0 4.5 3.4 1.9 0.0 0.1 0.3 0.0
2/21/1995 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.8 3.5 0.0 16.3 0.3 0.0
2/22/1995 2.0 0.3 2.0 2.0 2.8 4.2 3.8 2.8 1.6 0.0 4.2 0.2 0.0
2/23/1995 0.0 22.3 0.0 0.0 1.3 2.0 1.9 3.2 1.6 0.0 3.1 5.0 0.3
2/24/1995 0.0 0.0 0.0 0.0 1.3 1.9 1.6 1.0 0.0 0.0 0.0 13.5 0.0
2/25/1995 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.5 0.0 0.0 0.0 0.3 0.0
2/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 3.5 0.0 0.0
2/27/1995 2.8 3.6 2.8 2.8 2.8 4.2 3.9 3.1 3.2 0.0 3.3 0.2 0.0
2/28/1995 0.0 0.0 0.0 0.0 3.2 4.8 4.0 2.4 0.0 0.0 0.0 0.3 0.0
3/1/1995 1.8 5.1 1.8 1.8 0.0 0.0 0.3 0.6 1.8 0.0 0.4 0.0 0.0
3/2/1995 0.0 0.0 0.0 0.0 2.0 2.9 2.4 1.5 0.0 0.0 0.0 0.2 0.0
3/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1995 0.0 0.0 0.0 0.0 1.7 2.5 2.1 1.3 0.0 0.0 0.0 0.1 0.0
3/5/1995 0.0 0.0 0.0 0.0 2.0 2.9 2.4 1.5 0.0 0.0 0.0 0.2 0.0
3/6/1995 2.6 0.4 2.6 2.6 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
3/7/1995 8.8 1.4 8.8 8.8 4.4 6.5 6.8 6.4 7.2 0.0 2.3 0.3 0.0
3/8/1995 7.6 3.1 7.6 7.6 0.0 0.0 1.2 2.8 7.6 0.0 6.8 0.0 2.3
3/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0
3/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1995 1.8 0.4 1.8 1.8 0.0 0.0 0.3 0.7 1.9 0.0 1.9 0.2 0.2
3/12/1995 0.0 0.0 0.0 0.0 1.8 2.7 2.2 1.4 0.0 0.0 0.0 0.5 0.3
3/13/1995 0.0 0.0 0.0 0.0 0.4 0.0 0.2 2.2 0.0 1.2 2.2 4.6 0.5
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
3/14/1995 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 8.0 0.0 0.6 3.2
3/15/1995 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 9.3 0.0 1.0 4.0
3/16/1995 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.0 0.0 5.2 0.0 0.4 2.1
3/17/1995 7.8 1.3 7.8 7.8 1.0 0.0 1.2 2.8 6.4 3.1 0.6 0.2 1.2
3/18/1995 2.0 2.3 2.0 2.0 2.7 0.0 0.3 0.7 1.7 8.3 0.0 0.6 3.3
3/19/1995 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 2.3 0.0 0.2 0.9
3/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 1.1 0.0
3/25/1995 0.0 0.0 0.0 0.0 13.5 20.1 16.6 10.1 0.0 0.0 0.0 1.1 0.0
3/26/1995 20.0 8.8 20.0 20.0 8.5 12.5 13.6 14.0 17.8 0.0 11.0 4.9 0.0
3/27/1995 25.8 24.1 25.8 25.8 0.7 0.9 5.0 11.1 23.0 0.0 5.6 3.1 0.1
3/28/1995 3.0 0.6 3.0 3.0 0.0 0.0 0.5 1.2 2.4 0.0 0.1 3.5 0.1
3/29/1995 2.6 7.8 2.6 2.6 0.4 0.6 1.0 2.4 3.5 0.0 5.1 2.4 0.0
3/30/1995 7.8 12.8 7.8 7.8 1.6 2.3 3.5 6.9 10.4 0.0 18.4 12.9 0.0
3/31/1995 2.0 0.6 2.0 2.0 1.4 2.0 2.0 1.7 1.6 0.0 0.0 0.1 0.0
4/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1995 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
4/6/1995 1.8 0.3 1.8 1.8 0.7 0.0 0.3 0.6 1.4 2.0 0.0 0.2 0.8
4/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 1.1 0.0
4/10/1995 0.0 0.0 0.0 0.0 1.7 2.5 2.1 1.3 0.0 0.0 0.0 0.3 0.1
4/11/1995 11.0 5.0 11.0 11.0 6.0 6.8 7.5 8.2 10.2 4.2 6.5 2.5 1.7
4/12/1995 8.2 8.0 8.2 8.2 11.1 12.5 11.8 10.8 7.9 8.3 13.2 9.4 3.3
4/13/1995 0.0 2.0 0.0 0.0 0.7 0.0 0.2 1.5 0.2 2.1 1.6 3.4 0.8
4/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 0.0
4/15/1995 0.0 0.0 0.0 0.0 0.3 0.4 0.3 0.2 0.0 0.0 0.1 2.5 0.0
4/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1995 0.6 0.1 0.6 0.6 0.0 0.0 0.1 0.2 0.5 0.0 0.0 0.0 0.0
4/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1995 2.4 2.9 2.4 2.4 0.0 0.0 0.4 0.9 2.2 0.0 0.4 0.0 0.0
4/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
4/23/1995 4.0 2.2 4.0 4.0 6.8 10.1 9.0 7.2 3.3 0.0 1.0 2.0 0.0
4/24/1995 4.0 1.5 4.0 4.0 0.0 0.0 0.7 2.0 3.3 0.0 0.6 1.2 0.0
4/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.9 0.1
4/27/1995 4.2 0.7 4.2 4.2 0.0 0.0 0.7 1.5 3.4 0.0 0.0 0.0 0.0
4/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/1995 0.6 0.1 0.6 0.6 0.0 0.0 0.1 0.2 0.5 0.0 0.0 0.0 0.0
5/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
5/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
5/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/9/1995 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
5/10/1995 1.0 0.8 1.0 1.0 0.0 0.0 0.5 3.8 0.9 0.0 3.5 7.1 0.0
5/11/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.5 0.0 0.0
5/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.1 0.0 1.4 1.5 0.0
5/13/1995 3.0 12.4 3.0 3.0 0.0 0.0 0.5 1.1 3.3 0.0 0.2 0.0 0.0
5/14/1995 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.1 0.0 0.0
5/15/1995 0.0 0.0 0.0 0.0 6.6 0.0 0.0 0.1 1.1 20.2 12.1 19.0 8.5
5/16/1995 0.0 0.0 0.0 0.0 0.3 0.5 0.4 0.3 0.0 0.0 1.6 0.0 0.0
5/17/1995 3.6 5.9 3.6 3.6 4.2 6.2 5.7 4.4 3.7 0.0 2.4 0.3 0.0
5/18/1995 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.6 4.1 0.0 3.0 0.0 0.0
5/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
5/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
5/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 0.0 0.0 1.4 2.8 0.0
6/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1
6/8/1995 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.5 0.2 0.4 1.8
6/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 0.0 1.8 2.6 0.1
6/10/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.5 0.0 0.0 2.9 3.3 0.2
6/11/1995 0.0 7.2 0.0 0.0 7.3 0.0 0.0 0.0 0.5 22.5 6.0 1.9 9.2
6/12/1995 2.8 11.2 2.8 2.8 0.8 0.0 0.6 2.6 4.3 2.4 11.5 3.4 1.0
6/13/1995 5.2 2.5 5.2 5.2 0.0 0.0 0.8 1.9 4.3 0.0 1.1 0.0 0.0
6/14/1995 9.0 2.3 9.0 9.0 0.0 0.0 1.6 4.6 7.3 0.0 3.3 2.9 0.1
6/15/1995 1.4 1.7 1.4 1.4 14.7 5.4 4.7 3.2 1.4 34.2 8.0 3.0 13.8
6/16/1995 0.0 0.0 0.0 0.0 3.4 4.0 3.3 2.0 0.0 2.2 0.7 0.4 0.9
6/17/1995 9.0 1.5 9.0 9.0 2.7 0.0 1.6 4.6 8.3 8.2 7.6 3.7 3.4
6/18/1995 0.0 3.7 0.0 0.0 8.6 10.2 8.4 5.1 0.6 5.5 1.8 1.4 2.5
6/19/1995 4.6 17.5 4.6 4.6 11.1 15.4 13.4 9.5 7.2 2.4 13.5 3.7 1.1
6/20/1995 8.4 14.6 8.4 8.4 2.2 0.0 1.3 3.1 9.2 6.7 9.2 2.5 2.8
6/21/1995 4.4 0.8 4.4 4.4 3.0 2.0 2.5 3.9 3.6 5.2 3.7 3.3 2.1
6/22/1995 5.0 1.7 5.0 5.0 21.1 25.4 21.9 15.7 4.1 12.4 3.2 5.0 5.1
6/23/1995 9.8 13.0 9.8 9.8 0.0 0.0 1.6 3.6 10.6 0.0 9.6 0.4 1.7
6/24/1995 13.8 5.6 13.8 13.8 6.4 2.0 3.9 6.5 12.7 15.5 9.3 10.6 7.9
6/25/1995 0.6 0.1 0.6 0.6 0.0 0.0 0.2 1.4 0.5 0.0 1.4 8.1 0.0
6/26/1995 0.0 2.2 0.0 0.0 0.7 1.0 0.8 0.5 0.2 0.0 0.1 0.7 0.6
6/27/1995 6.1 5.1 6.1 6.1 1.5 2.2 2.9 4.1 6.0 0.0 5.2 2.2 0.4
6/28/1995 3.5 2.9 3.5 3.5 0.0 0.0 0.6 1.2 3.0 0.0 0.3 0.1 0.1
6/29/1995 0.0 49.0 0.0 0.0 2.0 3.0 2.5 1.5 3.6 0.0 1.1 0.5 0.3
6/30/1995 5.0 16.9 5.0 5.0 7.9 8.8 8.1 6.2 5.2 6.2 1.1 4.6 2.5
7/1/1995 2.0 1.7 2.0 2.0 8.9 13.2 11.3 8.0 1.7 0.0 1.2 2.3 0.1
7/2/1995 5.6 4.1 5.6 5.6 25.9 38.5 32.7 21.8 4.7 0.0 1.3 3.4 0.1
7/3/1995 0.2 3.7 0.2 0.2 6.8 10.1 8.5 6.5 0.4 0.0 1.5 3.7 0.3
7/4/1995 0.0 1.8 0.0 0.0 41.6 61.8 51.0 31.5 0.1 0.0 0.7 6.4 5.8
7/5/1995 6.0 39.2 6.0 6.0 9.7 14.4 12.9 10.1 8.7 0.0 6.7 2.3 0.1
7/6/1995 10.6 4.7 10.6 10.6 1.6 2.3 3.7 5.6 8.7 0.0 1.9 19.0 1.8
7/7/1995 1.4 65.7 1.4 1.4 11.2 16.6 14.1 10.1 6.6 0.0 6.3 4.8 0.1
7/8/1995 2.2 12.2 2.2 2.2 28.9 43.0 35.9 22.7 2.6 0.0 1.6 3.4 0.2
7/9/1995 0.0 38.4 0.0 0.0 14.5 20.5 17.0 10.8 2.8 2.2 3.0 7.3 1.1
7/10/1995 2.0 46.0 2.0 2.0 12.5 18.6 15.7 10.7 7.0 0.0 12.9 6.3 0.1
7/11/1995 2.4 0.4 2.4 2.4 12.5 18.5 15.7 11.1 1.9 0.0 1.9 5.7 0.3
7/12/1995 4.0 3.7 4.0 4.0 1.4 2.1 2.4 2.5 3.4 0.0 2.1 6.5 0.4
7/13/1995 2.2 1.7 2.2 2.2 17.6 26.2 22.0 14.2 1.9 0.0 1.8 5.3 0.3
7/14/1995 0.8 5.0 0.8 0.8 3.3 4.1 3.6 3.4 1.0 1.5 3.8 11.0 0.9
7/15/1995 1.8 21.1 1.8 1.8 8.1 12.1 10.3 6.9 6.3 0.0 16.4 0.9 0.4
7/16/1995 0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 1.2 0.0
7/17/1995 0.0 16.9 0.0 0.0 9.9 8.8 7.4 5.9 1.2 12.4 2.4 6.5 5.5
7/18/1995 0.0 42.0 0.0 0.0 13.8 20.5 17.0 11.3 4.3 0.0 8.0 6.0 0.3
7/19/1995 0.0 3.7 0.0 0.0 51.4 76.5 63.1 38.8 0.8 0.0 3.1 6.4 0.3
7/20/1995 0.0 33.6 0.0 0.0 11.0 16.4 13.5 8.2 2.4 0.0 1.1 4.1 0.2
7/21/1995 2.0 5.0 2.0 2.0 2.8 4.1 4.1 6.3 2.0 0.0 3.9 26.0 9.2
7/22/1995 17.6 32.8 17.6 17.6 17.6 26.0 24.5 21.5 17.2 0.0 7.8 26.6 0.2
7/23/1995 9.0 5.1 9.0 9.0 0.0 0.0 1.5 3.9 7.5 0.0 0.8 8.5 0.7
7/24/1995 0.0 1.3 0.0 0.0 0.0 0.0 0.1 0.6 0.1 0.0 0.6 1.2 0.0
7/25/1995 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.4 0.3 0.0 0.5 0.9 0.0
7/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.6
7/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7/28/1995 0.0 12.4 0.0 0.0 4.4 6.6 5.4 3.3 0.9 0.0 0.4 0.4 0.0
7/29/1995 1.0 15.2 1.0 1.0 1.6 2.3 2.1 1.5 1.9 0.0 0.5 15.9 0.4
7/30/1995 6.2 18.6 6.2 6.2 0.0 0.0 1.3 4.9 6.6 0.0 5.3 10.7 0.0
7/31/1995 0.0 14.2 0.0 0.0 0.0 0.0 0.0 0.1 2.4 0.0 6.9 0.2 1.9
8/1/1995 14.6 36.5 14.6 14.6 8.0 0.0 2.5 6.9 15.8 24.6 10.6 7.4 10.4
8/2/1995 13.6 10.6 13.6 13.6 4.0 0.0 2.3 6.1 12.4 12.2 10.3 6.8 5.4
8/3/1995 22.6 9.4 22.6 22.6 13.1 0.0 3.7 9.1 19.3 40.2 9.4 11.4 16.5
8/4/1995 13.0 6.5 13.0 13.0 5.6 8.2 9.2 11.8 12.7 0.0 18.7 14.6 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
8/5/1995 6.4 3.6 6.4 6.4 7.1 10.5 9.8 8.5 5.3 0.0 1.3 6.6 0.1
8/6/1995 0.0 6.4 0.0 0.0 7.4 11.0 9.2 6.5 0.5 0.0 2.1 8.6 0.4
8/7/1995 1.4 5.4 1.4 1.4 8.6 12.8 10.9 8.1 5.8 0.0 22.1 3.0 0.2
8/8/1995 17.0 7.8 17.0 17.0 0.1 0.0 2.9 7.8 16.3 0.0 13.4 11.5 0.5
8/9/1995 12.0 24.1 12.0 12.0 0.0 0.0 2.1 5.6 11.4 0.0 3.2 4.3 4.3
8/10/1995 4.6 4.9 4.6 4.6 0.0 0.0 0.9 2.9 4.4 0.0 4.2 5.7 0.1
8/11/1995 5.0 0.8 5.0 5.0 14.4 18.2 15.8 10.9 4.0 6.5 0.4 4.9 3.0
8/12/1995 1.0 4.0 1.0 1.0 41.9 62.3 51.9 34.4 3.3 0.0 14.0 22.6 0.5
8/13/1995 19.0 22.5 19.0 19.0 20.4 30.2 28.4 26.2 20.9 0.0 26.4 23.5 3.1
8/14/1995 17.0 28.3 17.0 17.0 3.8 5.6 7.9 13.7 17.4 0.0 15.5 13.3 0.0
8/15/1995 13.4 3.4 13.4 13.4 6.0 8.9 9.5 9.5 10.9 0.0 0.3 11.9 0.0
8/16/1995 1.0 0.2 1.0 1.0 6.7 10.0 8.4 5.4 0.8 0.0 0.0 0.7 0.2
8/17/1995 0.0 0.0 0.0 0.0 5.9 8.7 7.2 4.4 0.0 0.0 0.0 1.0 0.5
8/18/1995 0.2 12.9 0.2 0.2 0.0 0.0 0.0 0.1 1.1 0.0 1.4 2.7 0.0
8/19/1995 4.2 12.4 4.2 4.2 2.1 0.0 0.7 1.8 4.4 6.4 3.0 3.1 2.9
8/20/1995 2.0 11.0 2.0 2.0 0.8 0.0 0.3 0.7 2.4 2.4 0.5 1.1 1.8
8/21/1995 11.8 30.4 11.8 11.8 0.0 0.0 2.3 8.4 13.3 0.0 13.5 15.6 0.2
8/22/1995 9.0 1.5 9.0 9.0 9.0 13.4 12.5 9.9 7.2 0.0 0.1 8.2 0.0
8/23/1995 4.8 2.3 4.8 4.8 8.5 12.6 11.2 8.0 4.0 0.0 0.1 2.1 0.5
8/24/1995 4.0 1.8 4.0 4.0 11.8 17.5 15.5 14.3 4.8 0.0 11.5 10.5 0.1
8/25/1995 12.0 11.8 12.0 12.0 12.1 18.0 16.9 14.8 10.8 0.0 4.5 8.7 9.3
8/26/1995 5.6 20.3 5.6 5.6 12.8 19.0 16.6 11.8 5.9 0.0 0.6 2.8 0.1
8/27/1995 7.0 14.0 7.0 7.0 0.0 0.0 1.1 2.5 6.6 0.0 0.4 0.1 0.1
8/28/1995 4.0 0.9 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.1 0.1 0.1
8/29/1995 14.0 26.9 14.0 14.0 0.0 0.0 2.2 5.1 14.4 0.0 6.8 0.4 0.4
8/30/1995 11.6 9.6 11.6 11.6 4.7 0.0 2.0 5.6 10.2 14.5 4.0 10.3 5.9
8/31/1995 15.6 24.7 15.6 15.6 0.1 0.0 2.7 7.4 15.0 0.0 6.2 10.9 0.1
9/1/1995 4.0 0.9 4.0 4.0 4.1 0.0 0.6 1.4 3.2 12.5 3.2 1.2 7.1
9/2/1995 7.2 1.2 7.2 7.2 9.8 0.0 1.2 2.6 6.2 30.1 6.0 10.6 12.1
9/3/1995 0.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.0
9/4/1995 1.0 3.3 1.0 1.0 0.0 0.0 0.2 0.4 1.2 0.0 0.7 0.2 0.2
9/5/1995 2.4 29.5 2.4 2.4 5.5 8.2 7.1 5.0 4.0 0.0 1.4 4.9 0.4
9/6/1995 23.4 39.5 23.4 23.4 5.1 7.5 9.9 12.3 25.5 0.0 20.4 9.9 0.3
9/7/1995 11.0 26.1 11.0 11.0 7.4 10.9 10.8 9.5 12.6 0.0 10.7 11.7 0.2
9/8/1995 2.0 3.2 2.0 2.0 5.9 8.7 7.5 5.1 2.5 0.0 3.7 3.7 0.2
9/9/1995 15.0 11.3 15.0 15.0 0.1 0.0 2.4 5.3 12.7 0.0 0.5 9.5 0.0
9/10/1995 0.4 0.1 0.4 0.4 0.0 0.0 0.1 0.1 0.3 0.0 0.0 3.9 0.0
9/11/1995 0.0 0.0 0.0 0.0 3.1 4.2 3.5 2.1 0.0 0.8 0.0 0.3 0.3
9/12/1995 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/14/1995 4.6 0.7 4.6 4.6 0.0 0.0 0.7 1.6 3.7 0.0 0.0 0.0 0.0
9/15/1995 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.3 0.3
9/16/1995 3.0 16.1 3.0 3.0 0.0 0.0 0.5 1.3 7.7 0.0 19.8 0.0 0.5
9/17/1995 0.8 0.1 0.8 0.8 2.2 3.2 3.0 3.5 0.7 0.0 1.7 3.6 0.0
9/18/1995 0.0 0.0 0.0 0.0 2.0 2.9 2.6 3.1 0.0 0.0 1.7 3.5 0.0
9/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/20/1995 0.0 0.0 0.0 0.0 5.6 0.0 0.0 0.0 0.0 17.2 0.0 1.3 6.9
9/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/22/1995 0.0 0.0 0.0 0.0 12.4 0.0 0.1 1.3 0.0 38.2 7.2 5.7 15.3
9/23/1995 0.0 8.5 0.0 0.0 5.3 0.0 0.1 0.7 0.6 16.5 5.0 2.8 6.6
9/24/1995 0.0 15.2 0.0 0.0 6.5 0.0 0.0 0.4 1.1 20.0 6.7 5.5 8.0
9/25/1995 2.6 6.3 2.6 2.6 11.1 0.0 0.9 5.0 2.6 34.2 7.7 11.2 13.7
9/26/1995 0.0 9.5 0.0 0.0 3.9 0.0 0.0 0.0 0.7 12.1 5.4 1.0 4.8
9/27/1995 0.0 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.6 0.6
9/28/1995 1.8 0.3 1.8 1.8 0.0 0.0 0.3 0.6 1.4 0.0 0.1 0.6 0.6
9/29/1995 0.2 4.2 0.2 0.2 0.0 0.0 0.0 0.1 0.5 0.0 0.1 0.0 0.0
9/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4
10/3/1995 2.6 0.4 2.6 2.6 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
10/4/1995 1.4 0.2 1.4 1.4 0.0 0.0 0.2 0.5 1.1 0.0 0.0 0.0 0.0
10/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/1995 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 2.2 0.0 0.2 0.9
10/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/1995 0.0 16.2 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.3 0.0 0.0
10/10/1995 2.6 2.1 2.6 2.6 0.0 0.0 0.4 0.9 2.2 0.0 0.1 0.0 0.0
10/11/1995 0.0 0.0 0.0 0.0 2.6 3.8 3.1 1.9 0.0 0.0 0.0 0.2 0.0
10/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/1995 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
10/14/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
10/16/1995 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 6.1 0.0 0.5 2.4
10/17/1995 9.0 1.5 9.0 9.0 0.0 0.0 1.4 3.2 7.7 0.0 2.3 0.0 0.0
10/18/1995 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.1 0.0 0.0
10/19/1995 0.0 0.0 0.0 0.0 2.2 0.0 0.0 0.0 0.0 6.8 0.0 0.5 2.7
10/20/1995 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 0.0
10/21/1995 0.0 0.0 0.0 0.0 2.8 4.1 3.4 2.1 0.0 0.0 0.0 0.2 0.0
10/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1995 0.0 0.0 0.0 0.0 2.2 3.2 2.6 1.6 0.0 0.0 0.0 0.2 0.0
10/27/1995 0.0 0.0 0.0 0.0 8.3 12.4 10.2 6.2 0.0 0.0 0.0 0.7 0.0
10/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0
10/30/1995 0.0 0.0 0.0 0.0 5.3 0.0 0.0 0.0 0.0 16.4 3.4 1.3 6.6
10/31/1995 0.0 0.0 0.0 0.0 6.0 8.9 7.3 4.5 0.0 0.0 0.0 0.5 0.0
11/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1995 0.0 0.0 0.0 0.0 6.7 0.0 0.2 1.7 0.0 20.6 1.7 5.0 8.2
11/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1995 0.0 0.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 4.2 0.0 0.3 1.7
11/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1995 0.0 0.0 0.0 0.0 4.2 6.3 5.2 3.2 0.0 0.0 0.0 0.5 0.2
11/10/1995 0.0 0.0 0.0 0.0 5.0 7.4 6.1 3.8 1.9 0.0 8.9 1.8 2.1
11/11/1995 8.4 32.3 8.4 8.4 0.0 0.0 1.3 3.3 14.5 0.0 27.7 22.0 14.4
11/12/1995 2.8 0.5 2.8 2.8 0.0 0.0 0.4 1.0 2.3 0.0 0.0 0.0 0.0
11/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1995 0.0 0.0 0.0 0.0 6.6 9.5 7.8 4.8 0.0 0.5 0.0 0.5 0.2
11/15/1995 0.0 0.0 0.0 0.0 7.7 11.5 9.5 5.8 0.0 0.0 0.0 0.6 0.0
11/16/1995 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
11/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1995 0.0 0.0 0.0 0.0 5.9 8.7 7.2 4.4 0.0 0.0 0.0 0.5 0.0
11/21/1995 0.0 0.0 0.0 0.0 1.4 2.1 1.7 1.1 0.0 0.0 0.0 0.1 0.0
11/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1995 0.0 0.0 0.0 0.0 2.2 3.2 2.6 1.6 0.0 0.0 0.0 0.2 0.0
11/27/1995 0.0 0.0 0.0 0.0 2.8 4.1 3.4 2.1 0.0 0.0 0.0 0.2 0.0
11/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1995 0.0 0.0 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.0 0.3 0.0
11/30/1995 0.0 0.0 0.0 0.0 2.2 3.2 3.0 4.7 0.0 0.0 3.2 6.7 0.0
12/1/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.5 0.1 0.0 4.6 9.3 0.0
12/2/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1995 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
12/11/1995 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
12/12/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1995 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
12/15/1995 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
12/16/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1995 8.8 3.8 8.8 8.8 0.0 0.0 1.4 3.1 7.2 0.0 0.1 0.0 0.0
12/24/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
12/26/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
12/27/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1995 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1996 0.0 0.0 0.0 0.0 5.5 8.2 6.8 4.1 0.0 0.0 0.0 0.4 0.0
1/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
1/4/1996 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
1/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
1/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3
1/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1996 0.0 0.0 0.0 0.0 2.8 4.1 3.4 2.1 0.0 0.0 0.0 0.2 0.0
1/13/1996 0.0 0.0 0.0 0.0 3.8 5.7 4.7 2.9 0.0 0.0 0.0 0.3 0.0
1/14/1996 4.8 5.0 4.8 4.8 2.2 3.2 3.4 3.3 4.8 0.0 3.4 0.3 0.1
1/15/1996 9.0 10.5 9.0 9.0 0.0 0.0 1.4 3.3 10.1 0.0 12.5 0.3 0.2
1/16/1996 6.8 23.5 6.8 6.8 0.0 0.0 1.1 2.5 9.4 0.0 18.5 0.3 0.1
1/17/1996 19.6 19.1 19.6 19.6 0.1 0.0 3.1 7.1 19.1 0.0 11.6 0.0 0.0
1/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
1/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0
1/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.8 0.0
1/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3
1/31/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.5 4.2 0.1 0.0 4.4 8.8 0.0
2/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0
2/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 0.0
2/9/1996 7.0 1.1 7.0 7.0 0.0 0.0 1.1 2.5 5.6 0.0 0.0 0.0 0.0
2/10/1996 11.8 9.5 11.8 11.8 0.0 0.0 1.9 4.3 11.8 0.0 8.6 4.5 0.5
2/11/1996 3.8 13.2 3.8 3.8 0.0 0.0 0.6 1.4 4.6 0.0 3.5 5.9 0.0
2/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.2 0.0
2/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1996 0.0 0.0 0.0 0.0 3.0 4.5 3.7 2.3 0.0 0.0 0.0 0.3 0.0
2/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0
2/18/1996 0.0 0.0 0.0 0.0 8.9 13.3 11.0 6.7 0.0 0.0 0.0 0.7 0.0
2/19/1996 2.0 0.3 2.0 2.0 8.9 13.2 11.2 7.3 1.9 0.0 1.3 0.8 0.0
2/20/1996 5.0 6.7 5.0 5.0 8.4 12.5 11.1 8.1 4.9 0.0 2.3 0.7 0.0
2/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.8 0.0
2/22/1996 0.0 1.7 0.0 0.0 0.0 0.0 0.3 3.0 0.2 0.0 4.7 6.2 0.0
2/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.3 0.3
2/24/1996 10.0 4.5 10.0 10.0 0.0 0.0 1.6 3.6 8.6 0.0 2.3 0.3 0.9
2/25/1996 11.6 4.8 11.6 11.6 1.9 2.7 4.1 5.6 11.3 0.0 16.7 0.9 0.6
2/26/1996 2.0 25.1 2.0 2.0 0.0 0.0 0.3 0.9 6.2 0.0 16.2 2.8 0.5
2/27/1996 8.8 31.1 8.8 8.8 0.0 0.0 1.4 3.3 12.7 0.0 21.4 0.1 0.0
2/28/1996 0.0 0.0 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.0 0.3 0.4
2/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/1996 0.0 2.5 0.0 0.0 3.4 5.0 4.1 2.5 0.2 0.0 1.3 0.5 0.2
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
3/8/1996 5.0 9.7 5.0 5.0 0.0 0.0 1.1 4.6 4.7 0.0 3.3 12.6 0.6
3/9/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.7 4.5 1.7 0.0 3.9 7.9 0.0
3/10/1996 0.0 0.0 0.0 0.0 1.4 2.1 2.2 4.9 0.1 0.0 3.9 8.0 0.0
3/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0.0
3/17/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 2.2 0.0 0.0
3/18/1996 6.6 6.9 6.6 6.6 0.8 1.2 2.0 2.9 5.7 0.0 0.2 0.1 0.0
3/19/1996 8.0 3.8 8.0 8.0 0.0 0.0 1.3 2.8 6.6 0.0 0.1 0.0 0.0
3/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1996 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.1 1.9 0.0 8.6 0.2 0.2
3/23/1996 15.8 17.6 15.8 15.8 0.1 0.0 2.5 5.6 13.8 0.0 4.8 10.6 15.9
3/24/1996 12.0 2.0 12.0 12.0 0.0 0.0 1.9 4.3 9.6 0.0 4.8 0.0 0.0
3/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.3 0.0 0.0 2.5 4.9 0.0
3/26/1996 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
3/27/1996 7.0 1.1 7.0 7.0 0.0 0.0 1.1 2.5 5.6 0.0 0.0 0.0 0.0
3/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1996 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 3.8 0.0 0.0
3/30/1996 6.0 2.7 6.0 6.0 0.0 0.0 1.0 2.4 4.9 0.0 0.4 0.7 0.0
3/31/1996 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
4/1/1996 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.0 0.0
4/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.6 0.0 0.0
4/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0
4/6/1996 0.0 0.0 0.0 0.0 6.7 10.0 8.2 5.0 0.0 0.0 0.0 0.5 0.0
4/7/1996 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.5 0.5 0.0 2.5 0.7 0.4
4/8/1996 11.8 9.0 11.8 11.8 0.0 0.0 1.9 4.2 10.1 0.0 2.9 0.0 0.0
4/9/1996 20.2 3.3 20.2 20.2 0.1 0.0 3.2 7.2 16.2 0.0 0.0 0.0 0.0
4/10/1996 0.0 0.0 0.0 0.0 1.4 2.1 1.7 1.1 0.0 0.0 0.0 4.6 0.0
4/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0
4/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1996 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 0.0 0.2 1.0
4/14/1996 0.0 0.8 0.0 0.0 0.4 0.0 0.0 0.0 0.1 1.2 0.0 0.1 0.5
4/15/1996 0.0 0.0 0.0 0.0 1.2 0.0 0.0 0.0 0.0 3.7 1.4 0.3 1.5
4/16/1996 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.1 0.0 0.1 0.4
4/17/1996 0.0 0.0 0.0 0.0 8.6 10.0 8.2 5.0 0.0 5.9 0.0 1.1 2.5
4/18/1996 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.1 0.0 0.0 0.2 0.2 0.1
4/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/20/1996 0.0 6.7 0.0 0.0 0.7 1.0 0.8 0.5 0.5 0.0 0.1 0.1 0.0
4/21/1996 9.4 2.5 9.4 9.4 0.7 0.0 2.0 7.4 7.7 2.1 9.5 8.7 0.8
4/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4
4/23/1996 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 1.9 0.0 0.0
4/24/1996 1.8 3.9 1.8 1.8 0.0 0.0 0.3 0.7 2.4 0.0 5.2 0.1 0.8
4/25/1996 1.4 4.7 1.4 1.4 0.0 0.0 0.2 0.5 1.5 0.0 0.4 0.2 0.2
4/26/1996 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.0 0.0
4/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0
4/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.9 0.0 0.0
4/30/1996 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 4.5 0.3 0.2
5/1/1996 0.0 13.7 0.0 0.0 0.0 0.0 0.3 2.9 1.0 0.0 3.4 10.5 0.0
5/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.2 0.0 0.0
5/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.4 0.0 0.0
5/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0
5/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 0.0 0.0 1.1 2.3 0.1
5/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.9 0.0 0.0
5/12/1996 2.0 1.4 2.0 2.0 0.0 0.0 0.3 0.7 1.7 0.0 0.1 0.0 0.0
5/13/1996 8.8 1.4 8.8 8.8 0.0 0.0 1.5 3.7 7.1 0.0 0.6 1.2 0.0
5/14/1996 0.0 0.0 0.0 0.0 4.8 7.2 6.2 6.1 0.0 0.0 2.5 5.5 0.0
5/15/1996 2.0 0.3 2.0 2.0 4.0 5.9 5.2 3.7 1.6 0.0 0.0 2.3 0.1
5/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2
5/17/1996 4.0 1.1 4.0 4.0 4.2 6.3 5.8 4.6 3.2 0.0 0.1 0.4 0.1
5/18/1996 0.0 4.5 0.0 0.0 2.8 4.2 3.5 2.1 0.3 0.0 0.1 0.3 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
5/19/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 2.0 0.0 1.9 0.0 0.0
5/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/21/1996 2.4 3.3 2.4 2.4 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
5/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 5.0 0.0
5/23/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 5.2 0.0
5/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0
5/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1996 0.0 0.0 0.0 0.0 3.8 5.7 4.7 2.9 0.0 0.0 0.0 0.3 3.1
5/27/1996 0.0 0.0 0.0 0.0 3.4 2.1 1.7 1.1 0.0 6.0 0.0 0.6 2.4
5/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/29/1996 0.0 2.2 0.0 0.0 0.6 0.0 0.0 0.0 0.2 2.0 0.1 2.7 0.9
5/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0
5/31/1996 0.0 0.0 0.0 0.0 1.7 2.5 2.1 1.3 0.0 0.0 0.0 0.1 0.0
6/1/1996 0.0 0.0 0.0 0.0 2.9 0.0 0.0 0.0 0.0 9.0 7.6 0.7 3.6
6/2/1996 0.0 0.8 0.0 0.0 0.6 0.0 0.0 0.0 0.1 2.0 7.3 0.2 0.8
6/3/1996 6.0 5.8 6.0 6.0 11.1 12.2 11.3 10.6 5.2 9.0 8.6 6.4 3.8
6/4/1996 20.6 12.1 20.6 20.6 6.9 8.3 10.1 11.5 17.6 4.0 5.8 1.2 2.0
6/5/1996 2.4 4.4 2.4 2.4 4.3 5.4 4.8 3.6 2.2 2.0 0.3 0.5 0.8
6/6/1996 4.6 1.6 4.6 4.6 1.3 0.0 0.7 1.6 3.8 4.0 0.0 1.8 1.7
6/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0
6/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.2 0.0 0.0 2.2 4.8 0.3
6/9/1996 0.0 0.5 0.0 0.0 4.8 7.2 6.2 5.8 0.1 0.0 2.4 5.0 0.0
6/10/1996 0.0 0.0 0.0 0.0 3.6 5.3 4.6 4.9 0.0 0.0 2.3 10.0 0.0
6/11/1996 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 6.6 0.1
6/12/1996 0.0 8.0 0.0 0.0 0.0 0.0 0.2 1.4 0.6 0.0 2.3 9.0 0.0
6/13/1996 0.0 2.8 0.0 0.0 8.3 12.4 10.2 6.2 0.2 0.0 0.2 0.7 0.0
6/14/1996 0.0 2.5 0.0 0.0 9.1 13.5 11.1 6.8 0.2 0.0 0.8 0.8 0.0
6/15/1996 0.0 0.0 0.0 0.0 20.2 30.1 24.8 15.1 0.0 0.0 0.0 3.6 0.0
6/16/1996 6.2 1.0 6.2 6.2 2.2 3.2 3.6 3.8 5.0 0.0 0.0 0.2 0.0
6/17/1996 0.0 13.4 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.2 0.0 0.0
6/18/1996 0.0 0.0 0.0 0.0 6.5 0.0 0.0 0.0 0.0 20.0 0.0 1.7 8.1
6/19/1996 0.0 2.3 0.0 0.0 0.0 0.0 0.3 2.7 0.2 0.0 3.0 5.7 1.9
6/20/1996 4.0 4.0 4.0 4.0 0.0 0.0 0.8 2.8 3.5 0.0 1.6 3.1 0.1
6/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 1.7 0.6 0.0
6/22/1996 4.0 2.2 4.0 4.0 3.8 5.6 5.3 4.3 3.8 0.0 2.8 16.3 0.1
6/23/1996 2.4 13.0 2.4 2.4 5.3 7.8 6.9 5.8 2.9 0.0 1.8 16.6 0.3
6/24/1996 8.4 1.4 8.4 8.4 0.0 0.0 1.4 3.7 6.8 0.0 1.4 11.9 0.2
6/25/1996 14.8 3.9 14.8 14.8 1.0 0.0 2.4 5.3 12.0 3.0 0.5 6.5 1.5
6/26/1996 14.0 2.6 14.0 14.0 1.7 0.0 2.2 5.0 11.3 5.0 3.3 2.4 2.1
6/27/1996 2.8 3.0 2.8 2.8 5.1 4.7 4.3 3.4 2.4 6.0 2.5 15.7 2.6
6/28/1996 4.0 12.4 4.0 4.0 3.3 0.0 0.6 1.5 4.9 10.0 5.0 7.7 4.1
6/29/1996 6.4 1.7 6.4 6.4 0.0 0.0 1.4 5.7 5.4 0.0 4.9 13.6 0.1
6/30/1996 4.2 16.4 4.2 4.2 2.3 0.0 0.8 3.1 6.3 7.1 11.0 3.8 2.9
7/1/1996 40.2 15.4 40.2 40.2 23.2 0.0 6.4 14.3 33.0 71.3 0.4 5.6 28.6
7/2/1996 10.4 1.7 10.4 10.4 1.0 0.0 1.7 3.7 8.4 3.1 0.0 2.8 1.2
7/3/1996 10.4 2.5 10.4 10.4 9.4 8.4 8.6 7.9 8.4 11.5 0.0 3.1 5.0
7/4/1996 0.0 0.0 0.0 0.0 8.6 3.2 2.6 1.6 0.0 20.0 0.1 8.8 8.3
7/5/1996 0.0 1.8 0.0 0.0 3.8 5.7 4.7 2.9 0.1 0.0 0.4 3.4 0.2
7/6/1996 0.0 17.9 0.0 0.0 8.9 13.2 10.9 6.6 1.3 0.0 0.4 5.4 0.1
7/7/1996 2.0 0.3 2.0 2.0 21.2 31.5 26.3 16.5 1.6 0.0 0.0 7.6 0.2
7/8/1996 2.0 60.3 2.0 2.0 5.1 7.5 7.1 10.0 7.4 0.0 12.8 11.8 0.1
7/9/1996 0.0 9.6 0.0 0.0 10.3 15.3 12.6 7.8 3.4 0.0 20.3 1.4 0.5
7/10/1996 0.0 23.3 0.0 0.0 10.4 15.5 13.2 11.3 2.2 0.0 13.1 18.7 0.2
7/11/1996 4.0 41.9 4.0 4.0 1.8 2.7 3.0 3.8 7.0 0.0 12.2 9.2 0.4
7/12/1996 4.8 24.9 4.8 4.8 2.1 3.1 3.3 3.3 5.8 0.0 2.0 16.4 0.3
7/13/1996 2.0 8.7 2.0 2.0 2.9 4.3 3.9 2.9 3.0 0.0 4.6 0.6 0.4
7/14/1996 18.4 26.9 18.4 18.4 0.1 0.0 2.9 6.7 18.8 0.0 12.5 0.0 0.0
7/15/1996 12.0 3.6 12.0 12.0 0.0 0.0 1.9 4.3 9.8 0.0 0.7 10.8 0.5
7/16/1996 20.4 3.3 20.4 20.4 0.1 0.0 3.5 9.7 16.4 0.0 2.6 7.3 0.5
7/17/1996 0.0 12.1 0.0 0.0 0.0 0.0 0.4 4.0 0.9 0.0 5.4 8.5 0.2
7/18/1996 0.0 12.7 0.0 0.0 3.5 5.2 4.3 3.1 0.9 0.0 0.8 4.3 0.7
7/19/1996 2.0 28.7 2.0 2.0 11.7 17.4 14.7 9.4 3.8 0.0 1.7 3.3 0.5
7/20/1996 16.0 2.6 16.0 16.0 17.0 25.2 23.4 18.9 12.9 0.0 2.2 9.2 1.0
7/21/1996 6.0 1.0 6.0 6.0 27.8 41.3 35.2 24.6 4.8 0.0 2.2 9.7 0.3
7/22/1996 6.0 38.8 6.0 6.0 5.9 8.8 8.2 6.6 8.2 0.0 4.1 10.8 0.2
7/23/1996 4.0 3.3 4.0 4.0 23.0 34.2 28.8 18.6 3.4 0.0 0.0 8.3 0.6
7/24/1996 2.0 0.3 2.0 2.0 6.9 10.3 9.0 7.1 1.6 0.0 5.0 3.4 0.3
7/25/1996 0.0 26.5 0.0 0.0 11.8 17.5 14.4 8.8 1.9 0.0 0.7 1.7 0.7
7/26/1996 20.0 18.2 20.0 20.0 12.4 18.3 18.4 17.1 17.2 0.0 8.6 8.8 0.2
7/27/1996 8.9 14.3 8.9 8.9 3.5 5.2 5.7 5.8 8.1 0.0 0.6 6.6 0.3
7/28/1996 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.4 11.7 2.6
7/29/1996 2.0 1.2 2.0 2.0 7.2 10.7 9.4 8.4 1.7 0.0 2.8 5.5 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/30/1996 4.4 38.2 4.4 4.4 3.0 4.5 4.4 3.8 6.3 0.0 1.0 0.4 3.1
7/31/1996 0.0 6.5 0.0 0.0 2.2 3.3 2.7 1.7 0.6 0.0 0.8 11.5 0.5
8/1/1996 0.0 6.5 0.0 0.0 3.4 5.0 4.1 2.5 0.7 0.0 1.6 11.3 0.2
8/2/1996 0.0 0.2 0.0 0.0 2.0 3.0 2.5 1.5 0.7 0.0 7.1 0.3 0.1
8/3/1996 0.0 14.1 0.0 0.0 4.7 7.0 5.8 3.6 2.2 0.0 6.8 6.0 0.1
8/4/1996 7.8 2.2 7.8 7.8 2.7 4.0 5.2 10.2 6.4 0.0 5.7 13.7 0.2
8/5/1996 6.2 43.2 6.2 6.2 20.2 30.0 26.0 19.7 8.8 0.0 7.2 24.4 0.3
8/6/1996 4.4 21.0 4.4 4.4 2.7 4.0 4.1 4.5 5.0 0.0 2.1 7.3 0.1
8/7/1996 4.0 17.6 4.0 4.0 3.5 5.2 4.9 4.0 4.4 0.0 0.7 0.3 0.0
8/8/1996 1.4 16.1 1.4 1.4 5.5 8.2 7.2 6.2 4.8 0.0 14.9 3.6 0.0
8/9/1996 10.2 4.3 10.2 10.2 11.1 16.5 15.2 11.9 8.4 0.0 0.0 6.8 0.1
8/10/1996 9.8 6.6 9.8 9.8 8.4 12.5 11.9 9.8 9.0 0.0 6.6 14.4 0.2
8/11/1996 0.6 2.3 0.6 0.6 32.8 48.8 40.3 24.7 1.2 0.0 2.6 5.1 0.2
8/12/1996 13.0 61.9 13.0 13.0 37.0 55.0 47.4 32.3 17.3 0.0 13.7 3.1 0.1
8/13/1996 19.6 20.9 19.6 19.6 9.7 14.4 15.0 14.2 17.4 0.0 2.9 0.9 0.1
8/14/1996 33.8 7.5 33.8 33.8 11.1 16.3 18.9 20.2 27.3 0.0 0.1 6.3 0.2
8/15/1996 7.0 10.9 7.0 7.0 0.0 0.0 1.2 3.3 6.3 0.0 1.3 2.6 0.2
8/16/1996 0.0 0.0 0.0 0.0 4.2 6.3 5.2 3.2 0.0 0.0 0.1 1.8 0.1
8/17/1996 19.8 12.8 19.8 19.8 20.4 30.3 28.2 22.2 16.6 0.0 1.2 8.7 0.4
8/18/1996 4.2 7.5 4.2 4.2 2.1 3.1 3.2 3.0 3.9 0.0 0.4 5.9 0.1
8/19/1996 9.2 1.5 9.2 9.2 2.9 4.2 5.1 6.6 8.1 0.0 5.3 10.4 0.1
8/20/1996 4.4 25.8 4.4 4.4 3.6 5.3 5.5 8.0 5.4 0.0 5.2 14.7 0.1
8/21/1996 6.4 2.8 6.4 6.4 4.5 6.7 6.6 6.4 6.5 0.0 6.8 4.3 0.3
8/22/1996 10.6 32.2 10.6 10.6 7.0 10.4 10.3 9.6 11.7 0.0 6.2 5.5 0.1
8/23/1996 4.0 10.1 4.0 4.0 7.1 10.6 9.4 6.7 3.9 0.0 2.0 2.8 0.2
8/24/1996 13.0 6.6 13.0 13.0 3.1 4.5 5.8 6.9 10.8 0.0 0.5 4.3 0.0
8/25/1996 2.4 1.1 2.4 2.4 17.1 25.4 21.3 13.6 2.0 0.0 0.0 5.6 0.0
8/26/1996 2.0 0.3 2.0 2.0 1.5 2.2 2.4 4.3 1.6 0.0 2.5 5.2 0.0
8/27/1996 0.0 8.9 0.0 0.0 18.8 28.0 23.1 14.0 0.6 0.0 0.6 8.7 0.5
8/28/1996 8.0 37.1 8.0 8.0 18.9 28.0 24.6 18.6 10.7 0.0 10.0 16.8 6.8
8/29/1996 0.0 11.7 0.0 0.0 2.1 3.1 2.6 2.1 0.9 0.0 1.0 4.3 0.2
8/30/1996 5.0 3.4 5.0 5.0 6.1 9.1 8.4 7.6 4.9 0.0 4.7 6.5 0.1
8/31/1996 16.0 9.0 16.0 16.0 1.7 2.5 4.6 7.0 13.7 0.0 2.8 13.1 0.0
9/1/1996 6.0 8.8 6.0 6.0 14.5 21.5 18.7 13.0 6.5 0.0 6.2 4.3 0.0
9/2/1996 3.2 18.6 3.2 3.2 11.6 17.2 14.8 11.0 3.9 0.0 2.4 7.1 0.0
9/3/1996 22.6 12.6 22.6 22.6 7.1 10.5 12.9 19.3 18.9 0.0 6.7 26.3 0.0
9/4/1996 15.6 10.3 15.6 15.6 7.6 11.2 11.9 13.1 14.3 0.0 8.1 13.6 0.0
9/5/1996 13.0 3.0 13.0 13.0 5.7 8.4 9.1 9.6 11.3 0.0 6.7 7.3 0.1
9/6/1996 9.8 3.0 9.8 9.8 2.9 4.2 5.2 7.0 9.2 0.0 7.3 7.5 5.9
9/7/1996 16.6 3.1 16.6 16.6 0.1 0.0 2.8 7.4 15.1 0.0 15.1 7.0 1.2
9/8/1996 3.0 3.8 3.0 3.0 0.0 0.0 0.5 1.7 3.5 0.0 9.4 2.5 0.0
9/9/1996 18.6 74.5 18.6 18.6 0.1 0.0 3.1 7.6 20.3 0.0 6.4 6.1 0.0
9/10/1996 2.4 1.5 2.4 2.4 0.0 0.0 0.6 2.8 4.9 0.0 19.4 4.8 0.0
9/11/1996 15.0 2.6 15.0 15.0 5.6 8.2 9.2 9.5 12.9 0.0 4.1 0.4 0.0
9/12/1996 6.4 1.0 6.4 6.4 8.7 12.9 11.7 8.7 5.1 0.0 7.1 0.7 0.0
9/13/1996 3.4 27.1 3.4 3.4 9.2 13.7 12.0 9.4 4.7 0.0 11.0 17.4 0.0
9/14/1996 1.2 2.0 1.2 1.2 0.0 0.0 0.4 2.2 1.3 0.0 4.9 3.7 0.0
9/15/1996 16.0 5.2 16.0 16.0 0.1 0.0 2.6 6.3 13.3 0.0 5.1 4.1 0.1
9/16/1996 6.0 9.3 6.0 6.0 0.0 0.0 1.0 2.5 5.4 0.0 2.4 3.6 0.1
9/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.5 0.5
9/18/1996 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.1 1.5 1.4
9/19/1996 1.2 0.2 1.2 1.2 0.0 0.0 0.4 2.3 1.0 0.0 2.0 4.1 0.1
9/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6
9/21/1996 2.0 0.3 2.0 2.0 0.0 0.0 0.5 1.9 1.6 0.0 1.3 7.1 0.0
9/22/1996 0.0 14.1 0.0 0.0 8.3 12.3 10.1 6.2 1.0 0.0 0.2 4.9 0.0
9/23/1996 0.0 0.0 0.0 0.0 8.9 13.2 10.9 6.6 0.0 0.0 1.3 0.7 0.0
9/24/1996 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3
9/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
9/27/1996 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0
9/28/1996 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.9 0.0
9/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/1996 0.0 0.7 0.0 0.0 0.0 0.0 0.1 1.0 0.1 0.0 1.0 2.0 0.0
10/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
10/2/1996 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.2 3.7 0.0 16.9 0.0 0.0
10/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.6 0.0 0.0 2.4 3.4 0.0
10/4/1996 22.4 11.0 22.4 22.4 0.1 0.0 3.6 8.2 22.4 0.0 19.3 0.0 0.0
10/5/1996 40.8 45.3 40.8 40.8 0.1 0.0 6.5 14.8 41.0 0.0 27.5 0.1 0.0
10/6/1996 6.8 6.3 6.8 6.8 0.0 0.0 1.5 5.8 5.9 0.0 4.7 14.0 0.0
10/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.9 0.0 0.0 3.1 16.1 0.0
10/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.2 0.1
10/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.8 10.9 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
10/10/1996 0.0 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 6.4 1.6 0.2
10/11/1996 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 5.7 0.1
10/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.2 0.0 0.0
10/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.3 0.0 0.0
10/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
10/26/1996 1.0 2.3 1.0 1.0 6.9 10.2 8.6 5.5 1.8 0.0 4.0 6.5 0.0
10/27/1996 0.8 2.3 0.8 0.8 5.7 8.4 7.4 7.3 1.9 0.0 8.1 14.5 0.0
10/28/1996 16.0 13.1 16.0 16.0 8.4 12.4 13.1 14.6 13.7 0.0 3.2 13.6 0.0
10/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 0.0
10/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
12/21/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.6
12/27/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.2
12/28/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.4 0.1 0.0 3.5 7.3 0.2
1/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.9 0.0 0.0 2.9 6.0 0.1
1/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.7 0.0 0.0 1.8 3.6 0.1
1/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1997 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 2.9
1/20/1997 7.8 16.3 7.8 7.8 0.0 0.0 1.2 3.0 10.7 0.0 18.4 0.1 0.1
1/21/1997 8.8 29.9 8.8 8.8 0.0 0.0 1.4 3.1 9.1 0.0 1.7 0.0 0.0
1/22/1997 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.7 0.0 0.0
1/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1997 0.2 0.0 0.2 0.2 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0 0.0
1/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0
1/26/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.8 0.0
1/27/1997 2.8 0.5 2.8 2.8 0.0 0.0 0.4 1.0 2.3 0.0 0.0 0.0 0.0
1/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1997 5.6 0.9 5.6 5.6 1.7 2.5 3.0 3.2 4.5 0.0 0.0 0.1 0.0
2/2/1997 0.0 0.0 0.0 0.0 2.2 3.3 2.7 1.7 0.0 0.0 0.1 0.2 0.0
2/3/1997 4.8 2.9 4.8 4.8 0.0 0.0 0.8 1.7 4.1 0.0 0.9 0.0 0.0
2/4/1997 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.7 0.0 0.8 2.2 0.0
2/5/1997 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
2/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1997 2.2 0.4 2.2 2.2 3.5 5.2 4.6 3.4 1.8 0.0 0.0 0.3 0.0
2/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1997 0.0 0.0 0.0 0.0 8.9 13.3 11.0 6.7 0.0 0.0 0.0 0.7 0.0
2/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
2/15/1997 2.2 0.4 2.2 2.2 0.0 0.0 0.4 0.8 1.8 0.0 0.0 0.1 0.1
2/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.0 0.0 0.6 1.3 0.0
2/18/1997 0.0 0.0 0.0 0.0 9.6 14.2 11.7 7.1 0.0 0.0 0.0 5.4 0.0
2/19/1997 0.0 0.0 0.0 0.0 10.1 15.0 12.4 7.5 0.0 0.0 0.0 0.8 0.0
2/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.8 1.7 0.0
2/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1997 3.8 3.0 3.8 3.8 0.0 0.0 0.6 1.4 3.2 0.0 0.9 0.0 0.0
2/23/1997 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0
2/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/1997 1.8 8.0 1.8 1.8 0.0 0.0 0.3 0.8 2.0 0.0 0.5 0.4 0.0
2/26/1997 2.0 0.8 2.0 2.0 0.0 0.0 0.3 0.8 1.6 0.0 0.3 0.4 0.0
2/27/1997 8.8 2.3 8.8 8.8 0.0 0.0 1.4 3.3 7.1 0.0 0.3 0.3 0.0
2/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/1997 0.0 0.0 0.0 0.0 1.5 2.3 1.9 1.2 0.0 0.0 0.0 8.5 0.0
3/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
3/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1997 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.4 0.2
3/6/1997 0.0 0.0 0.0 0.0 2.5 3.7 3.1 1.9 0.0 0.0 0.0 0.2 0.0
3/7/1997 0.0 0.0 0.0 0.0 4.2 6.2 5.1 3.1 0.0 0.0 0.0 0.3 0.0
3/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 1.6 0.6 0.0
3/14/1997 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.1 0.0 0.0
3/15/1997 3.6 0.6 3.6 3.6 9.3 13.8 12.0 8.2 2.9 0.0 0.0 0.7 0.0
3/16/1997 3.8 2.3 3.8 3.8 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.3 0.2
3/17/1997 4.4 2.6 4.4 4.4 0.0 0.0 0.7 1.6 3.7 0.0 0.3 0.0 0.0
3/18/1997 0.0 0.0 0.0 0.0 14.3 21.2 17.5 10.6 0.0 0.0 0.0 1.1 0.0
3/19/1997 1.8 0.3 1.8 1.8 0.0 0.0 0.3 0.9 1.5 0.0 0.3 0.6 0.1
3/20/1997 8.3 4.8 8.3 8.3 0.0 0.0 1.3 3.0 7.1 0.0 0.7 0.0 0.0
3/21/1997 4.4 5.1 4.4 4.4 0.0 0.0 0.7 1.6 3.9 0.0 1.8 0.3 0.3
3/22/1997 3.8 0.6 3.8 3.8 0.0 0.0 0.6 1.4 3.1 0.0 0.1 0.0 0.0
3/23/1997 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 0.1
3/24/1997 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/1997 0.0 0.3 0.0 0.0 0.7 1.0 0.9 0.8 0.5 0.0 2.7 0.6 0.0
3/27/1997 0.0 0.0 0.0 0.0 0.3 0.5 0.4 0.3 0.0 0.0 0.0 0.3 0.2
3/28/1997 0.0 0.0 0.0 0.0 0.8 1.2 1.0 0.6 0.2 0.0 0.8 0.1 0.0
3/29/1997 8.8 2.4 8.8 8.8 0.0 0.0 1.5 3.5 7.2 0.0 0.6 0.8 0.0
3/30/1997 9.6 4.9 9.6 9.6 0.0 0.0 1.5 3.4 8.5 0.0 3.0 0.0 0.0
3/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.9 1.4 0.0
4/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 1.0 1.8 0.1
4/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
4/3/1997 3.8 0.7 3.8 3.8 0.0 0.0 0.6 1.6 4.1 0.0 4.9 0.3 0.0
4/4/1997 8.8 32.4 8.8 8.8 0.0 0.0 1.5 3.5 9.3 0.0 1.4 0.9 0.1
4/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/6/1997 0.0 1.0 0.0 0.0 0.0 0.0 0.1 0.5 0.1 0.0 0.8 1.1 0.0
4/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/9/1997 0.0 4.4 0.0 0.0 0.0 0.0 0.2 1.6 0.3 0.0 1.8 3.5 0.1
4/10/1997 4.2 4.2 4.2 4.2 0.0 0.0 0.7 1.6 3.6 0.0 0.7 0.3 0.0
4/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1997 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0
4/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/15/1997 1.8 2.0 1.8 1.8 0.0 0.0 0.3 0.6 1.6 0.0 0.1 0.0 0.0
4/16/1997 8.8 2.3 8.8 8.8 8.3 12.3 11.6 9.3 7.1 0.0 0.0 0.7 0.0
4/17/1997 2.0 0.3 2.0 2.0 9.6 14.2 12.0 8.0 1.6 0.0 0.2 1.0 0.0
4/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0
4/20/1997 5.8 4.3 5.8 5.8 0.0 0.0 0.9 2.2 4.9 0.0 0.2 0.4 0.1
4/21/1997 0.0 0.0 0.0 0.0 5.6 8.4 6.9 4.2 0.0 0.0 0.1 0.6 0.1
4/22/1997 0.0 8.0 0.0 0.0 20.3 30.2 24.9 15.1 0.6 0.0 3.3 1.7 0.1
4/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/25/1997 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/26/1997 11.8 1.9 11.8 11.8 0.0 0.0 1.9 4.2 9.5 0.0 0.0 0.0 0.0
4/27/1997 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.0 0.0
4/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.3 0.4 0.0
4/29/1997 0.0 0.8 0.0 0.0 2.2 3.2 2.6 1.6 0.1 0.0 0.0 0.2 0.0
4/30/1997 0.0 0.0 0.0 0.0 2.5 3.7 3.1 1.9 0.0 0.0 0.1 0.2 0.0
5/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
5/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1
5/3/1997 0.0 0.0 0.0 0.0 2.2 3.2 2.7 2.0 0.2 0.0 1.2 1.0 0.1
5/4/1997 3.8 0.6 3.8 3.8 0.9 1.3 1.8 2.7 3.6 0.0 3.3 1.6 0.1
5/5/1997 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.4 0.2 0.0 0.6 1.0 0.1
5/6/1997 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.5 0.1 0.1
5/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 0.0 5.0 0.1 0.1
5/8/1997 7.6 1.2 7.6 7.6 0.7 1.0 2.1 3.5 6.1 0.0 1.0 0.7 0.0
5/9/1997 6.0 13.5 6.0 6.0 4.8 7.1 6.8 6.0 5.7 0.0 0.5 0.9 0.0
5/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
5/14/1997 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 3.1 0.0 0.2 1.2
5/15/1997 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.2 0.0 0.1 0.5
5/16/1997 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.1 0.0 0.1 0.4
5/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/18/1997 0.0 0.0 0.0 0.0 2.3 0.0 0.0 0.1 0.9 7.2 4.6 0.6 2.9
5/19/1997 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.3 6.1 1.3 0.5 2.4
5/20/1997 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.1 6.1 0.9 0.5 2.5
5/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1997 2.0 3.8 2.0 2.0 0.0 0.0 0.4 1.1 1.9 0.0 0.7 0.9 0.0
5/25/1997 0.0 3.9 0.0 0.0 4.6 5.2 4.3 2.6 0.3 3.4 7.4 0.7 1.5
5/26/1997 2.2 0.5 2.2 2.2 3.2 2.1 2.1 2.2 3.8 5.5 9.8 1.3 2.3
5/27/1997 3.0 0.5 3.0 3.0 8.2 10.2 8.9 6.5 2.4 4.0 0.5 1.6 1.6
5/28/1997 0.0 10.2 0.0 0.0 5.7 8.5 7.0 4.3 0.7 0.0 0.7 13.1 0.1
5/29/1997 0.0 0.0 0.0 0.0 1.7 2.5 2.1 1.7 0.4 0.0 2.3 5.5 0.0
5/30/1997 22.4 7.4 22.4 22.4 0.9 1.2 4.6 9.0 18.3 0.0 0.5 3.7 0.3
5/31/1997 13.2 2.1 13.2 13.2 0.8 0.0 2.1 4.7 10.6 2.4 0.9 1.4 1.0
6/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
6/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
6/3/1997 5.8 13.5 5.8 5.8 0.0 0.0 0.9 2.1 5.6 0.0 7.8 1.2 0.0
6/4/1997 4.8 5.8 4.8 4.8 1.4 2.0 2.4 2.7 4.2 0.0 0.3 0.2 0.1
6/5/1997 0.0 0.0 0.0 0.0 6.9 10.2 8.4 5.1 0.0 0.0 1.7 0.6 0.0
6/6/1997 0.0 17.4 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.6 0.1 0.1
6/7/1997 0.0 8.9 0.0 0.0 1.5 1.0 0.8 0.6 0.6 2.4 0.4 3.1 1.2
6/8/1997 0.0 0.0 0.0 0.0 1.1 0.0 0.0 0.0 0.0 3.4 0.1 0.3 1.4
6/9/1997 1.8 0.3 1.8 1.8 0.0 0.0 0.3 0.6 1.4 0.0 1.3 0.6 0.0
6/10/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 4.1 0.0 0.0
6/11/1997 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 3.3 0.0 0.0
6/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.1
6/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 2.8 0.0
6/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 1.4 1.3 0.0
6/15/1997 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.1 0.0 0.8 0.5 0.0
6/16/1997 2.8 0.5 2.8 2.8 0.0 0.0 0.7 3.2 2.3 0.0 6.1 4.6 0.1
6/17/1997 0.0 0.1 0.0 0.0 0.8 1.2 1.0 0.7 2.0 0.0 9.7 2.4 0.1
6/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.7 0.1
6/19/1997 6.0 3.7 6.0 6.0 1.4 2.1 2.7 3.2 5.0 0.0 0.5 0.1 0.0
6/20/1997 0.0 0.0 0.0 0.0 1.1 1.6 1.3 0.8 0.0 0.0 1.2 0.2 0.1
6/21/1997 0.0 8.5 0.0 0.0 5.9 8.8 7.3 4.4 0.6 0.0 0.3 0.6 0.1
6/22/1997 0.0 26.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 1.0 0.1 0.1
6/23/1997 4.4 2.0 4.4 4.4 3.0 3.3 3.4 3.4 4.1 2.4 5.0 2.5 1.1
6/24/1997 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1
6/25/1997 2.8 0.5 2.8 2.8 2.2 3.3 3.2 2.6 2.3 0.0 6.9 0.3 0.0
6/26/1997 5.6 24.4 5.6 5.6 0.0 0.0 0.9 2.0 6.3 0.0 8.2 1.1 1.1
6/27/1997 5.2 3.4 5.2 5.2 8.4 12.5 11.3 9.8 6.0 0.0 13.1 10.5 1.0
6/28/1997 11.8 22.3 11.8 11.8 9.5 14.0 13.6 12.9 11.1 0.0 5.9 8.0 0.7
6/29/1997 10.8 1.8 10.8 10.8 3.5 5.2 6.2 8.1 8.7 0.0 1.9 5.6 0.2
6/30/1997 2.0 0.3 2.0 2.0 4.2 6.2 5.6 5.0 1.6 0.0 1.4 7.0 1.2
7/1/1997 33.8 21.7 33.8 33.8 0.1 0.0 5.6 13.9 28.4 0.0 2.3 7.0 0.0
7/2/1997 3.0 3.8 3.0 3.0 8.1 12.0 10.4 7.1 2.7 0.0 1.1 0.6 2.4
7/3/1997 0.0 0.0 0.0 0.0 4.0 6.0 4.9 3.0 0.0 0.0 0.0 0.3 0.0
7/4/1997 0.0 13.4 0.0 0.0 2.8 4.2 3.5 2.1 1.0 0.0 0.3 0.2 0.0
7/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
7/6/1997 3.8 4.1 3.8 3.8 0.0 0.0 0.8 3.1 3.3 0.0 1.9 3.7 0.0
7/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
7/8/1997 5.8 13.2 5.8 5.8 0.0 0.0 0.9 2.1 5.5 0.0 1.9 3.9 0.5
7/9/1997 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.3 0.7 0.0 0.7 2.5 0.6
7/10/1997 0.0 28.6 0.0 0.0 0.8 0.0 0.0 0.0 2.7 2.4 6.3 1.6 1.5
7/11/1997 14.6 7.1 14.6 14.6 15.8 21.0 19.8 16.8 12.8 5.0 4.7 23.9 2.6
7/12/1997 3.6 11.6 3.6 3.6 19.0 23.0 19.5 12.8 3.7 11.0 1.7 4.8 4.8
7/13/1997 0.0 29.6 0.0 0.0 11.3 13.2 10.9 6.6 2.1 7.4 3.0 4.4 4.4
7/14/1997 5.4 54.8 5.4 5.4 7.7 8.2 8.0 9.4 9.0 6.7 7.4 15.1 3.1
7/15/1997 0.0 7.5 0.0 0.0 10.8 16.0 13.2 8.0 0.5 0.0 0.3 10.0 4.1
7/16/1997 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 4.0 0.2 0.8 2.1
7/17/1997 2.0 19.2 2.0 2.0 2.6 0.0 0.3 0.7 3.0 8.0 0.3 0.7 3.3
7/18/1997 0.0 0.0 0.0 0.0 7.5 10.0 8.2 5.0 0.0 2.4 0.6 2.0 1.1
7/19/1997 0.0 0.0 0.0 0.0 7.1 8.2 6.8 4.5 0.0 5.0 1.0 1.9 2.2
7/20/1997 0.0 17.1 0.0 0.0 5.6 7.4 6.1 3.7 1.2 2.0 0.6 0.8 1.0
7/21/1997 0.0 1.0 0.0 0.0 6.5 0.0 0.0 0.3 0.1 20.0 0.7 8.2 8.4
7/22/1997 7.8 31.6 7.8 7.8 3.9 0.0 1.2 2.8 8.5 12.0 1.4 3.9 4.9
7/23/1997 5.4 21.9 5.4 5.4 0.0 0.0 0.9 2.2 5.9 0.0 0.8 2.3 0.0
7/24/1997 15.8 9.6 15.8 15.8 0.1 0.0 2.5 5.6 13.3 0.0 1.2 10.0 0.4
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/25/1997 20.8 11.9 20.8 20.8 3.8 5.5 7.9 10.6 17.7 0.0 2.9 13.6 14.8
7/26/1997 4.4 55.2 4.4 4.4 4.3 6.4 6.1 5.7 8.3 0.0 5.9 7.4 3.1
7/27/1997 1.8 5.1 1.8 1.8 0.0 0.0 0.3 0.7 2.1 0.0 2.2 7.2 0.1
7/28/1997 0.6 16.1 0.6 0.6 0.0 0.0 0.1 0.2 1.6 0.0 0.7 4.8 0.1
7/29/1997 0.0 5.0 0.0 0.0 5.7 8.4 7.0 4.6 0.5 0.0 2.3 4.6 0.3
7/30/1997 21.0 49.6 21.0 21.0 3.6 5.2 7.7 10.1 20.8 0.0 3.5 5.4 0.1
7/31/1997 11.0 2.6 11.0 11.0 4.9 7.2 7.8 8.1 9.0 0.0 1.4 3.3 0.0
8/1/1997 7.8 9.6 7.8 7.8 0.0 0.0 1.3 3.5 7.2 0.0 6.6 4.0 2.1
8/2/1997 26.0 42.7 26.0 26.0 0.1 0.0 4.2 9.3 23.9 0.0 7.9 3.1 0.0
8/3/1997 28.8 68.3 28.8 28.8 0.1 0.0 4.7 10.8 30.2 0.0 19.0 3.0 0.0
8/4/1997 10.0 10.0 10.0 10.0 0.0 0.0 2.0 6.8 8.7 0.0 3.9 11.9 0.0
8/5/1997 12.0 2.4 12.0 12.0 0.0 0.0 2.1 6.2 9.7 0.0 2.9 4.0 0.0
8/6/1997 10.0 6.7 10.0 10.0 0.0 0.0 1.9 5.9 8.4 0.0 3.3 4.9 2.3
8/7/1997 1.6 0.3 1.6 1.6 3.6 5.3 4.6 3.2 1.3 0.0 0.1 4.7 1.2
8/8/1997 3.8 12.3 3.8 3.8 7.9 11.8 10.4 7.4 4.4 0.0 3.0 2.9 0.0
8/9/1997 0.0 0.0 0.0 0.0 6.5 9.7 8.0 4.9 0.0 0.0 0.1 0.5 0.0
8/10/1997 2.8 0.5 2.8 2.8 1.6 2.4 2.4 2.2 2.3 0.0 0.1 0.1 0.0
8/11/1997 6.6 18.7 6.6 6.6 0.0 0.0 1.1 2.3 6.6 0.0 1.2 0.1 0.0
8/12/1997 6.8 31.7 6.8 6.8 0.0 0.0 1.2 3.2 7.7 0.0 1.7 1.8 0.1
8/13/1997 14.4 48.4 14.4 14.4 0.0 0.0 2.4 6.3 17.1 0.0 12.6 2.4 0.1
8/14/1997 8.2 1.4 8.2 8.2 0.0 0.0 1.4 4.0 6.6 0.0 1.5 2.3 0.0
8/15/1997 3.4 6.4 3.4 3.4 0.0 0.0 0.6 1.4 3.4 0.0 1.5 0.4 0.1
8/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 2.9
8/17/1997 0.0 0.8 0.0 0.0 8.9 13.2 10.9 6.6 0.1 0.0 0.0 1.1 3.3
8/18/1997 0.0 6.7 0.0 0.0 9.8 14.5 12.0 7.3 0.5 0.0 0.6 5.1 1.0
8/19/1997 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.0 0.0
8/20/1997 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1
8/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.0
8/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.1
8/23/1997 0.0 16.7 0.0 0.0 2.8 4.2 3.5 2.1 1.2 0.0 0.2 1.0 0.0
8/24/1997 0.0 0.0 0.0 0.0 5.6 8.4 6.9 4.2 0.0 0.0 0.1 1.9 0.1
8/25/1997 5.8 21.0 5.8 5.8 6.1 9.0 8.4 6.6 6.1 0.0 0.4 2.1 0.2
8/26/1997 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.3 0.0 0.0
8/27/1997 5.0 2.3 5.0 5.0 0.0 0.0 0.8 1.8 4.1 0.0 0.1 1.4 0.0
8/28/1997 7.0 15.4 7.0 7.0 0.0 0.0 1.1 2.5 6.7 0.0 0.4 0.0 0.0
8/29/1997 8.0 4.3 8.0 8.0 0.0 0.0 1.3 2.8 6.6 0.0 0.3 0.0 0.0
8/30/1997 2.8 0.5 2.8 2.8 4.3 6.4 5.7 4.4 5.2 0.0 14.4 5.0 0.1
8/31/1997 10.6 51.1 10.6 10.6 0.0 0.0 1.7 3.8 12.1 0.0 1.1 1.8 0.0
9/1/1997 13.2 6.3 13.2 13.2 0.0 0.0 2.1 4.7 10.9 0.0 4.1 0.1 0.1
9/2/1997 5.0 11.7 5.0 5.0 0.0 0.0 0.9 2.5 5.5 0.0 8.6 1.6 0.2
9/3/1997 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 3.7 5.5 0.1
9/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 6.3 0.1 2.2
9/5/1997 0.0 39.4 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0 0.9 4.6 1.0
9/6/1997 0.0 39.8 0.0 0.0 0.0 0.0 0.0 0.0 3.3 0.0 3.7 3.6 2.1
9/7/1997 15.0 5.8 15.0 15.0 0.0 0.0 2.4 5.4 12.7 0.0 2.5 6.1 0.2
9/8/1997 12.6 7.1 12.6 12.6 0.0 0.0 2.0 4.5 10.5 0.0 0.7 5.2 0.0
9/9/1997 4.2 0.7 4.2 4.2 0.0 0.0 0.7 1.9 3.4 0.0 0.4 6.3 0.1
9/10/1997 0.0 26.0 0.0 0.0 0.7 1.1 1.0 1.1 2.6 0.0 4.6 2.4 0.0
9/11/1997 2.0 12.9 2.0 2.0 3.6 5.4 4.8 3.5 3.2 0.0 4.1 0.4 0.1
9/12/1997 14.6 14.5 14.6 14.6 6.9 10.2 10.8 10.3 12.6 0.0 0.6 0.6 0.1
9/13/1997 0.0 2.1 0.0 0.0 0.0 0.0 0.1 0.9 2.0 0.0 10.3 4.9 0.3
9/14/1997 0.0 7.5 0.0 0.0 0.0 0.0 0.1 1.1 0.7 0.0 2.1 2.4 0.1
9/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.4
9/16/1997 0.0 0.0 0.0 0.0 11.7 17.4 14.4 8.7 0.0 0.0 0.0 1.1 0.1
9/17/1997 0.0 21.8 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.6 0.0 0.0
9/18/1997 8.8 3.1 8.8 8.8 0.0 0.0 1.4 3.1 7.2 0.0 0.0 0.2 0.2
9/19/1997 0.0 0.8 0.0 0.0 0.0 0.0 0.1 1.2 0.1 0.0 1.6 4.1 0.2
9/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.5
9/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.2
9/22/1997 10.2 4.9 10.2 10.2 0.0 0.0 1.6 3.6 8.4 0.0 6.2 0.4 0.4
9/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 2.6 0.1
9/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 0.4 0.4
9/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 0.3 0.3
9/26/1997 0.0 0.0 0.0 0.0 5.2 7.8 6.4 3.9 0.0 0.0 5.2 5.0 0.0
9/27/1997 0.0 0.0 0.0 0.0 2.8 4.2 3.6 3.2 0.0 0.0 1.1 2.8 0.3
9/28/1997 0.0 5.7 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.1 0.0 0.0
9/29/1997 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.1 0.1
9/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/1997 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
10/2/1997 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 0.0 0.2 1.0
10/3/1997 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 8.0 0.0 0.7 3.3
10/4/1997 3.0 0.5 3.0 3.0 0.4 0.0 0.5 1.1 2.4 1.1 0.1 1.4 0.5
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
10/5/1997 0.0 0.0 0.0 0.0 6.5 0.0 0.0 0.0 0.0 20.0 0.0 1.8 8.2
10/6/1997 0.0 0.1 0.0 0.0 3.6 0.0 0.0 0.0 0.0 11.0 0.0 1.1 4.5
10/7/1997 7.6 1.2 7.6 7.6 2.3 2.4 3.2 3.9 6.1 2.0 0.1 0.3 0.8
10/8/1997 4.0 3.5 4.0 4.0 3.6 5.3 5.0 4.1 3.4 0.0 0.4 2.5 0.0
10/9/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.6 1.9 0.1
10/10/1997 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/1997 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
10/12/1997 5.0 9.2 5.0 5.0 0.0 0.0 0.8 1.8 4.6 0.0 0.1 0.0 0.0
10/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1997 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 2.0 0.0 0.2 0.8
10/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
10/16/1997 2.0 0.3 2.0 2.0 5.7 8.4 7.2 4.9 1.6 0.0 0.1 0.5 0.0
10/17/1997 0.0 0.0 0.0 0.0 9.1 13.5 11.1 6.8 0.0 0.0 0.0 0.8 0.1
10/18/1997 0.0 0.0 0.0 0.0 11.4 17.0 14.0 8.5 0.0 0.0 0.0 1.0 0.0
10/19/1997 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 2.0 0.0 0.2 0.8
10/20/1997 1.0 0.2 1.0 1.0 1.3 0.0 0.2 0.4 0.8 4.0 0.0 0.3 1.6
10/21/1997 5.0 0.8 5.0 5.0 2.3 0.0 0.8 1.8 4.0 7.1 0.0 0.6 2.9
10/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
10/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
10/24/1997 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 1.8 0.0 0.0
10/25/1997 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
10/26/1997 0.0 0.0 0.0 0.0 5.1 2.3 1.9 1.2 0.0 11.0 0.0 1.0 4.4
10/27/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1997 7.0 6.2 7.0 7.0 0.0 0.0 1.1 2.5 6.1 0.0 3.2 6.1 0.0
10/29/1997 5.0 0.8 5.0 5.0 1.0 0.0 0.8 1.8 4.0 2.9 3.4 0.2 1.2
10/30/1997 0.0 1.7 0.0 0.0 1.1 0.0 0.0 0.0 0.5 3.4 2.1 0.3 1.4
10/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
11/9/1997 0.0 0.0 0.0 0.0 3.0 4.4 3.6 2.3 1.6 0.0 7.5 0.2 0.0
11/10/1997 3.8 5.6 3.8 3.8 3.5 5.2 4.9 4.0 3.4 0.0 0.6 5.1 0.0
11/11/1997 0.0 3.9 0.0 0.0 4.8 7.2 5.9 3.6 0.3 0.0 0.2 1.7 0.0
11/12/1997 0.0 0.0 0.0 0.0 3.0 4.4 3.6 2.2 0.0 0.0 0.0 0.2 0.0
11/13/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1997 8.8 4.8 8.8 8.8 0.0 0.0 1.4 3.1 7.6 0.0 1.7 0.0 0.0
11/20/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1997 0.0 0.0 0.0 0.0 6.0 8.9 7.3 4.5 0.0 0.0 4.0 0.5 0.0
11/22/1997 0.0 0.0 0.0 0.0 3.6 4.4 3.6 2.2 0.0 2.0 0.0 0.4 0.8
11/23/1997 6.0 1.0 6.0 6.0 1.6 0.0 1.0 2.1 4.8 5.0 0.0 2.3 2.0
11/24/1997 2.0 0.3 2.0 2.0 9.4 14.0 11.9 7.7 1.6 0.0 0.0 0.8 0.0
11/25/1997 2.8 0.5 2.8 2.8 0.0 0.0 0.4 1.0 2.3 0.0 0.0 0.1 0.1
11/26/1997 18.0 23.9 18.0 18.0 10.8 16.0 16.1 14.6 18.7 0.0 13.8 9.2 0.0
11/27/1997 15.8 10.1 15.8 15.8 0.1 0.0 2.5 5.8 15.8 0.0 19.7 6.4 0.0
11/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.3 0.0 0.0
11/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.5 0.0 0.0
11/30/1997 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 4.0 0.0 0.3 1.6
12/1/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 5.1 0.0 26.5 3.7 0.0
12/2/1997 19.6 27.5 19.6 19.6 0.1 0.0 3.1 7.0 17.5 0.0 0.9 10.4 0.5
12/3/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1997 0.0 0.0 0.0 0.0 7.0 10.4 8.6 5.2 0.0 0.0 0.0 0.6 0.0
12/5/1997 0.0 0.0 0.0 0.0 10.4 15.5 12.8 7.8 0.0 0.0 2.8 0.8 0.0
12/6/1997 0.0 0.0 0.0 0.0 9.0 13.4 11.1 6.7 0.0 0.0 0.0 0.7 0.0
12/7/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 17.6
12/8/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.3 0.0 17.3
12/9/1997 11.8 1.9 11.8 11.8 7.6 11.2 11.3 11.1 11.5 0.0 11.9 8.7 2.1
12/10/1997 2.0 73.8 2.0 2.0 3.5 5.2 4.8 5.7 12.3 0.0 29.4 10.7 1.0
12/11/1997 9.8 5.1 9.8 9.8 0.0 0.0 1.9 6.2 8.2 0.0 4.2 7.6 0.0
12/12/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1997 3.8 0.6 3.8 3.8 0.0 0.0 0.6 1.4 3.1 0.0 0.2 0.4 0.4
12/14/1997 8.0 10.2 8.0 8.0 12.3 18.2 16.3 12.2 7.1 0.0 0.9 1.5 0.0
12/15/1997 0.0 0.0 0.0 0.0 12.3 17.4 14.4 8.8 1.3 2.0 6.3 1.1 0.8
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
12/16/1997 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 2.2 0.2 1.0
12/17/1997 0.0 0.0 0.0 0.0 13.5 15.2 12.5 7.6 0.0 10.0 0.4 1.6 4.0
12/18/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1997 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 0.0 0.2 1.0
12/21/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0
12/22/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 0.0 0.0
12/23/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1997 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5
1/13/1998 3.2 0.5 3.2 3.2 0.0 0.0 0.5 1.1 2.6 0.0 0.0 0.0 0.0
1/14/1998 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 0.0 0.2 1.0
1/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
1/23/1998 0.0 0.0 0.0 0.0 3.8 5.7 4.7 2.9 0.0 0.0 1.3 0.3 0.0
1/24/1998 0.0 0.0 0.0 0.0 8.9 13.3 11.0 6.7 0.0 0.0 1.4 0.7 0.0
1/25/1998 0.0 0.0 0.0 0.0 11.0 16.4 13.5 8.2 0.0 0.0 0.0 0.9 0.0
1/26/1998 0.0 0.0 0.0 0.0 7.8 11.6 9.6 5.8 0.0 0.0 0.0 0.6 0.0
1/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 0.1
1/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1998 2.6 0.4 2.6 2.6 0.0 0.0 0.4 1.1 2.1 0.0 0.1 0.3 0.0
1/30/1998 0.8 0.5 0.8 0.8 0.0 0.0 0.1 0.3 0.7 0.0 0.0 0.0 1.0
1/31/1998 0.0 0.0 0.0 0.0 4.2 6.2 5.1 3.3 0.0 0.0 0.2 0.8 0.0
2/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.5 0.0 3.6 2.0 0.0
2/3/1998 8.8 14.3 8.8 8.8 4.9 7.2 7.3 6.7 8.0 0.0 2.8 0.4 1.5
2/4/1998 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 1.1 0.0 0.0
2/5/1998 0.0 0.0 0.0 0.0 5.6 8.4 6.9 4.2 0.0 0.0 0.0 0.5 0.0
2/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0
2/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/1998 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
2/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1998 5.0 0.8 5.0 5.0 8.1 12.0 10.7 7.8 4.0 0.0 0.1 0.6 0.0
2/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/18/1998 0.0 0.0 0.0 0.0 1.9 0.0 0.0 0.3 0.0 5.8 0.3 1.0 3.8
2/19/1998 8.8 3.9 8.8 8.8 0.5 0.0 1.5 3.8 7.3 1.4 0.8 1.5 0.6
2/20/1998 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 2.0 0.0 0.2 0.8
2/21/1998 3.0 0.5 3.0 3.0 0.0 0.0 0.6 2.4 2.4 0.0 1.4 2.8 0.0
2/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
2/23/1998 0.0 0.0 0.0 0.0 11.0 16.4 13.5 8.2 0.0 0.0 0.0 0.9 0.0
2/24/1998 18.8 15.1 18.8 18.8 0.1 0.0 3.1 8.1 19.7 0.0 22.8 2.5 0.0
2/25/1998 3.0 32.3 3.0 3.0 0.0 0.0 0.6 2.8 9.6 0.0 31.3 3.5 0.3
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
2/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.1 0.0
2/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
2/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
3/1/1998 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 2.0 0.0 0.2 0.8
3/2/1998 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.0 0.0 5.1 0.0 0.4 2.0
3/3/1998 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.4 0.1 0.1 0.6
3/4/1998 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.2 0.0 0.0
3/5/1998 3.0 0.5 3.0 3.0 4.9 7.2 6.4 4.7 2.4 0.0 2.0 0.4 0.0
3/6/1998 11.8 13.5 11.8 11.8 2.3 3.4 4.8 6.7 12.0 0.0 16.0 6.7 0.0
3/7/1998 7.6 10.1 7.6 7.6 10.4 12.1 11.3 10.1 7.0 7.0 3.0 4.8 2.8
3/8/1998 1.8 1.3 1.8 1.8 1.1 0.0 0.3 0.6 1.5 3.4 0.0 0.3 1.4
3/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
3/12/1998 8.6 8.3 8.6 8.6 0.0 0.0 1.4 3.1 8.5 0.0 5.6 0.0 0.0
3/13/1998 9.6 28.0 9.6 9.6 2.3 3.4 4.3 5.3 12.6 0.0 14.4 0.5 0.3
3/14/1998 0.0 3.3 0.0 0.0 3.6 5.4 4.5 2.7 0.2 0.0 0.0 0.5 0.1
3/15/1998 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.0 0.0 1.0 4.8
3/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0
3/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 1.3 0.3 0.1
3/19/1998 2.6 0.4 2.6 2.6 8.8 13.0 11.3 8.9 2.1 0.0 1.6 3.8 0.0
3/20/1998 0.0 0.0 0.0 0.0 5.0 7.5 6.3 4.8 0.0 0.0 1.1 2.7 0.0
3/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.8 0.0
3/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.2 0.0
3/23/1998 0.0 1.8 0.0 0.0 8.9 13.2 10.9 6.6 0.6 0.0 2.3 4.4 0.3
3/24/1998 2.0 0.3 2.0 2.0 12.4 18.5 15.6 10.0 1.6 0.0 2.5 3.3 0.0
3/25/1998 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.7 2.5 0.1
3/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0
3/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 0.0 0.0
3/28/1998 12.0 2.0 12.0 12.0 0.0 0.0 2.3 7.3 9.7 0.0 3.4 6.2 0.0
3/29/1998 8.0 22.3 8.0 8.0 3.5 5.2 5.7 6.4 9.6 0.0 13.9 2.3 0.3
3/30/1998 3.8 15.4 3.8 3.8 0.0 0.0 1.0 4.7 4.2 0.0 3.9 17.4 0.5
3/31/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0
4/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1998 0.0 0.0 0.0 0.0 2.9 4.3 3.5 2.2 0.0 0.0 0.0 3.0 0.0
4/3/1998 0.0 0.0 0.0 0.0 12.1 18.0 14.9 9.4 1.5 0.0 7.9 7.1 0.0
4/4/1998 6.6 1.1 6.6 6.6 0.0 0.0 1.1 2.3 5.3 0.0 0.1 0.1 0.1
4/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.8 1.8 0.1
4/6/1998 0.0 0.0 0.0 0.0 1.3 1.9 1.6 1.2 0.0 0.0 0.3 0.7 0.0
4/7/1998 0.0 0.0 0.0 0.0 14.3 21.2 17.5 10.6 0.0 0.0 0.0 1.1 0.0
4/8/1998 8.8 8.1 8.8 8.8 0.0 0.0 1.5 3.7 8.4 0.0 4.7 8.7 0.0
4/9/1998 18.8 16.5 18.8 18.8 0.1 0.0 3.3 9.2 17.2 0.0 8.7 5.4 0.3
4/10/1998 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0
4/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9
4/15/1998 0.0 0.0 0.0 0.0 0.7 1.0 0.8 0.5 0.0 0.0 0.0 0.1 0.0
4/16/1998 0.0 0.0 0.0 0.0 11.6 17.2 14.2 8.6 0.0 0.0 0.0 0.9 0.0
4/17/1998 0.0 0.0 0.0 0.0 12.3 18.3 15.1 9.2 0.0 0.0 0.0 1.0 0.0
4/18/1998 0.0 0.0 0.0 0.0 2.8 4.1 3.4 2.1 0.0 0.0 0.0 0.2 0.0
4/19/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/20/1998 0.0 4.2 0.0 0.0 0.0 0.0 0.2 1.6 0.3 0.0 1.8 3.4 0.0
4/21/1998 0.0 0.0 0.0 0.0 5.7 8.5 7.0 4.3 0.0 0.0 0.0 0.5 0.0
4/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.3
4/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
4/24/1998 0.0 13.2 0.0 0.0 12.4 18.4 15.5 12.2 1.0 0.0 3.3 7.3 0.1
4/25/1998 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.1 1.7 0.0 8.3 0.0 0.0
4/26/1998 8.6 4.0 8.6 8.6 0.0 0.0 1.4 3.1 7.1 0.0 8.6 0.3 0.2
4/27/1998 0.0 14.9 0.0 0.0 0.0 0.0 0.2 2.0 1.1 0.0 4.3 9.3 0.4
4/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1998 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
4/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1998 5.0 0.8 5.0 5.0 0.0 0.0 1.0 3.7 4.0 0.0 2.0 4.1 0.1
5/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/1998 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.1 3.1 0.0
5/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
5/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
5/6/1998 0.0 0.0 0.0 0.0 4.7 7.0 5.9 4.3 0.0 0.0 1.2 2.6 0.5
5/7/1998 7.2 3.7 7.2 7.2 0.0 0.0 1.6 6.9 8.4 0.0 21.2 10.8 0.3
5/8/1998 20.8 26.0 20.8 20.8 0.1 0.0 3.3 7.5 18.4 0.0 0.5 14.2 0.5
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
5/9/1998 7.0 3.8 7.0 7.0 0.0 0.0 1.2 3.6 9.3 0.0 17.3 3.3 0.0
5/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2
5/11/1998 0.0 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.1 0.0 0.0
5/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/1998 0.0 0.0 0.0 0.0 1.7 2.5 2.1 1.3 0.0 0.0 2.2 0.1 0.0
5/14/1998 0.0 0.0 0.0 0.0 1.3 2.0 1.6 1.0 0.0 0.0 4.1 0.1 0.0
5/15/1998 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.4 0.0 0.0 0.3 0.8 0.0
5/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/17/1998 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.6
5/18/1998 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
5/19/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9
5/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
5/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.0
5/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/29/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
6/5/1998 2.6 0.4 2.6 2.6 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
6/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/8/1998 0.0 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0 5.0 0.0 0.4 2.0
6/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
6/10/1998 3.6 0.6 3.6 3.6 0.0 0.0 0.6 1.3 2.9 0.0 0.0 0.0 0.0
6/11/1998 3.8 5.2 3.8 3.8 0.0 0.0 0.6 1.4 3.4 0.0 2.7 0.0 0.0
6/12/1998 8.0 4.5 8.0 8.0 0.0 0.0 1.3 3.0 8.8 0.0 13.1 0.0 0.0
6/13/1998 0.0 0.5 0.0 0.0 1.5 2.2 1.8 1.1 0.0 0.0 2.4 2.0 0.0
6/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 4.3 5.0 0.1
6/15/1998 7.8 1.3 7.8 7.8 0.0 0.0 1.2 2.8 6.3 0.0 0.0 0.4 0.3
6/16/1998 7.8 1.3 7.8 7.8 0.0 0.0 1.3 3.5 6.3 0.0 0.9 4.4 0.1
6/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
6/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
6/19/1998 0.0 0.0 0.0 0.0 0.8 1.2 1.0 0.6 0.0 0.0 0.0 0.1 0.0
6/20/1998 0.0 77.0 0.0 0.0 1.5 2.3 1.9 1.2 5.6 0.0 1.3 0.1 0.0
6/21/1998 0.0 12.9 0.0 0.0 0.0 0.0 0.1 0.6 1.1 0.0 1.6 3.9 0.0
6/22/1998 0.0 5.9 0.0 0.0 2.8 4.2 3.5 2.1 0.7 0.0 4.3 0.4 0.1
6/23/1998 0.0 0.0 0.0 0.0 8.4 12.5 10.3 6.3 0.3 0.0 1.6 0.8 0.2
6/24/1998 2.0 1.8 2.0 2.0 11.6 17.2 14.5 9.3 1.7 0.0 0.3 2.5 0.2
6/25/1998 4.8 5.8 4.8 4.8 0.0 0.0 0.8 1.7 4.2 0.0 0.6 0.1 0.1
6/26/1998 12.6 12.9 12.6 12.6 20.3 30.1 26.8 19.6 11.0 0.0 2.8 15.2 0.1
6/27/1998 0.0 5.7 0.0 0.0 0.0 0.0 0.1 0.8 0.7 0.0 2.5 8.1 0.4
6/28/1998 8.8 10.3 8.8 8.8 0.0 0.0 1.4 3.2 8.2 0.0 3.0 1.5 0.3
6/29/1998 2.6 18.0 2.6 2.6 15.9 23.7 20.0 12.9 5.7 0.0 11.9 3.9 0.2
6/30/1998 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 2.5 1.2 0.4
7/1/1998 6.0 2.2 6.0 6.0 4.2 6.2 6.1 5.2 4.9 0.0 6.3 2.3 0.1
7/2/1998 0.0 26.0 0.0 0.0 3.6 5.3 4.5 4.1 2.7 0.0 6.0 4.4 0.1
7/3/1998 0.0 34.1 0.0 0.0 0.0 0.0 0.0 0.1 3.5 0.0 6.4 2.7 0.3
7/4/1998 0.0 4.7 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.0 0.9 5.0 4.4
7/5/1998 18.0 18.0 18.0 18.0 0.1 0.0 2.9 6.4 15.6 0.0 0.5 2.0 0.5
7/6/1998 6.4 15.5 6.4 6.4 0.0 0.0 1.0 2.3 6.2 0.0 0.3 8.6 0.4
7/7/1998 3.2 3.0 3.2 3.2 6.9 10.2 9.2 8.3 2.9 0.0 3.3 8.1 0.5
7/8/1998 2.0 0.3 2.0 2.0 22.5 33.4 27.9 17.4 1.7 0.0 0.7 2.3 0.4
7/9/1998 2.0 41.5 2.0 2.0 27.0 40.2 33.5 20.8 4.6 0.0 0.9 10.1 0.4
7/10/1998 0.0 0.0 0.0 0.0 7.5 11.2 9.2 5.6 0.0 0.0 0.0 0.8 0.2
7/11/1998 0.0 0.2 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.8 1.4 0.0
7/12/1998 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.4 0.2 0.1
7/13/1998 4.4 4.4 4.4 4.4 0.0 0.0 0.8 2.4 3.8 0.0 1.0 2.3 0.6
7/14/1998 2.2 6.7 2.2 2.2 5.3 7.8 6.9 5.6 2.2 0.0 4.3 4.5 0.9
7/15/1998 0.0 0.8 0.0 0.0 11.6 17.2 14.2 9.2 1.2 0.0 11.7 8.3 5.2
7/16/1998 16.2 3.5 16.2 16.2 12.4 18.4 18.1 18.1 13.1 0.0 3.3 16.1 5.2
7/17/1998 5.0 11.2 5.0 5.0 16.4 19.5 17.1 13.4 5.6 10.0 14.0 13.0 4.2
7/18/1998 13.4 17.9 13.4 13.4 9.4 13.9 13.8 13.5 12.7 0.0 7.9 18.9 5.6
7/19/1998 6.6 19.5 6.6 6.6 0.0 0.0 1.1 2.7 7.4 0.0 7.6 5.2 1.9
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/20/1998 8.2 13.9 8.2 8.2 0.0 0.0 1.4 3.5 7.7 0.0 10.0 13.8 6.5
7/21/1998 12.8 35.0 12.8 12.8 0.0 0.0 2.1 4.7 12.7 0.0 0.9 5.9 9.8
7/22/1998 0.0 0.0 0.0 0.0 3.1 4.6 3.8 2.3 0.0 0.0 0.0 0.3 0.0
7/23/1998 0.0 0.9 0.0 0.0 15.1 22.4 18.6 11.9 0.1 0.0 2.3 2.8 0.2
7/24/1998 4.0 18.9 4.0 4.0 12.3 18.3 15.9 12.1 4.6 0.0 4.1 8.6 0.0
7/25/1998 2.8 15.4 2.8 2.8 3.5 5.2 4.8 4.4 3.3 0.0 6.3 7.0 0.2
7/26/1998 0.0 1.2 0.0 0.0 2.2 3.2 2.7 2.0 0.1 0.0 0.9 1.0 0.0
7/27/1998 0.0 20.9 0.0 0.0 0.0 0.0 0.1 1.1 1.5 0.0 1.4 2.3 2.7
7/28/1998 0.0 48.6 0.0 0.0 0.0 0.0 0.2 1.4 3.5 0.0 2.5 2.8 6.1
7/29/1998 7.4 5.4 7.4 7.4 4.5 6.7 6.7 6.3 6.3 0.0 0.4 4.9 0.0
7/30/1998 4.0 0.7 4.0 4.0 20.9 31.1 26.5 19.0 3.2 0.0 2.4 5.9 0.9
7/31/1998 0.0 0.0 0.0 0.0 13.4 17.1 14.1 8.7 0.0 6.0 0.5 1.9 2.7
8/1/1998 0.0 3.2 0.0 0.0 5.7 8.5 7.0 4.5 0.2 0.0 3.5 1.6 0.5
8/2/1998 4.4 9.5 4.4 4.4 0.0 0.0 0.7 1.6 4.2 0.0 0.9 1.6 0.2
8/3/1998 8.4 19.1 8.4 8.4 0.0 0.0 1.5 4.1 9.0 0.0 6.8 3.2 0.3
8/4/1998 12.8 33.9 12.8 12.8 0.0 0.0 2.2 5.9 12.8 0.0 3.3 5.4 1.6
8/5/1998 4.2 0.7 4.2 4.2 14.5 21.5 18.5 13.0 3.5 0.0 1.5 9.8 0.4
8/6/1998 2.8 1.9 2.8 2.8 20.1 22.6 19.4 15.2 2.4 15.0 3.0 10.9 10.6
8/7/1998 8.4 1.4 8.4 8.4 8.4 12.4 11.6 9.7 6.8 0.0 4.6 13.6 0.1
8/8/1998 8.2 16.4 8.2 8.2 0.0 0.0 1.4 3.6 7.7 0.0 6.1 13.5 0.2
8/9/1998 4.0 21.8 4.0 4.0 0.0 0.0 0.7 1.7 4.7 0.0 1.4 5.5 0.4
8/10/1998 0.0 43.9 0.0 0.0 0.0 0.0 0.4 3.5 5.4 0.0 14.7 11.6 0.4
8/11/1998 18.6 9.7 18.6 18.6 9.1 13.5 14.1 13.8 18.1 0.0 17.0 17.5 0.6
8/12/1998 12.4 16.8 12.4 12.4 5.2 7.6 8.3 8.8 11.5 0.0 4.0 9.5 0.1
8/13/1998 2.4 13.3 2.4 2.4 0.0 0.0 0.5 1.6 3.4 0.0 4.9 3.0 0.0
8/14/1998 10.0 13.3 10.0 10.0 0.0 0.0 1.7 4.5 9.6 0.0 5.3 6.3 0.3
8/15/1998 6.4 26.2 6.4 6.4 0.0 0.0 1.1 3.4 8.2 0.0 8.0 5.7 0.2
8/16/1998 14.0 10.3 14.0 14.0 0.1 0.0 2.6 8.1 12.1 0.0 5.4 10.0 5.9
8/17/1998 6.6 17.2 6.6 6.6 3.7 5.4 5.9 8.3 6.5 0.0 3.7 12.9 6.9
8/18/1998 4.0 9.9 4.0 4.0 11.3 7.2 6.7 6.0 4.3 20.0 5.9 8.3 8.1
8/19/1998 12.0 15.0 12.0 12.0 2.9 4.2 5.7 9.5 10.6 0.0 3.6 15.1 0.4
8/20/1998 8.8 10.3 8.8 8.8 4.3 6.4 6.8 7.7 7.7 0.0 2.5 5.0 0.0
8/21/1998 4.0 1.7 4.0 4.0 1.6 2.3 2.5 2.7 3.3 0.0 0.5 6.4 5.8
8/22/1998 7.4 1.2 7.4 7.4 4.0 5.9 6.2 6.7 6.0 0.0 2.1 17.1 0.3
8/23/1998 10.4 1.7 10.4 10.4 1.0 1.5 3.0 5.4 8.4 0.0 1.2 4.9 5.9
8/24/1998 4.4 65.7 4.4 4.4 0.0 0.0 0.7 1.6 8.2 0.0 1.6 0.2 0.2
8/25/1998 2.4 9.8 2.4 2.4 0.0 0.0 0.5 1.5 2.6 0.0 1.4 7.7 0.4
8/26/1998 4.0 15.2 4.0 4.0 7.0 10.4 9.4 8.5 4.4 0.0 6.7 6.7 11.9
8/27/1998 0.0 33.5 0.0 0.0 0.0 0.0 0.2 1.8 2.5 0.0 8.9 7.3 0.7
8/28/1998 9.0 10.0 9.0 9.0 5.5 0.0 1.6 4.3 7.9 17.0 8.3 19.3 7.0
8/29/1998 2.4 7.9 2.4 2.4 0.0 0.0 0.5 1.9 2.5 0.0 2.7 2.5 0.2
8/30/1998 0.0 2.8 0.0 0.0 6.2 9.2 7.6 4.7 1.5 0.0 6.3 0.5 0.0
8/31/1998 4.0 16.4 4.0 4.0 4.5 6.7 6.2 4.8 4.9 0.0 4.1 0.4 0.0
9/1/1998 0.0 0.1 0.0 0.0 7.0 10.4 8.6 5.2 0.0 0.0 0.3 0.7 9.3
9/2/1998 16.0 42.4 16.0 16.0 22.7 33.7 30.4 22.6 15.7 0.0 0.8 3.2 0.1
9/3/1998 6.0 3.2 6.0 6.0 14.1 21.0 18.4 13.3 5.0 0.0 5.1 2.8 0.7
9/4/1998 0.0 0.0 0.0 0.0 8.8 13.1 10.8 6.6 0.0 0.0 2.8 0.8 0.0
9/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
9/6/1998 0.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.4 0.0 0.0
9/7/1998 4.0 47.2 4.0 4.0 0.0 0.0 0.7 1.6 6.6 0.0 6.1 0.6 0.3
9/8/1998 0.0 0.0 0.0 0.0 4.6 6.9 5.7 3.5 0.0 0.0 0.0 0.6 0.2
9/9/1998 0.0 9.0 0.0 0.0 0.0 0.0 0.0 0.4 0.7 0.0 0.6 1.0 0.1
9/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/11/1998 0.0 1.5 0.0 0.0 3.6 5.4 4.6 3.9 0.1 0.0 1.3 3.4 0.6
9/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.4 0.0
9/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.6 0.0 0.0
9/14/1998 4.0 5.8 4.0 4.0 0.0 0.0 0.8 2.8 3.6 0.0 7.8 2.9 0.1
9/15/1998 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.3 0.8 0.0 9.9 0.6 0.0
9/16/1998 14.2 2.3 14.2 14.2 0.0 0.0 2.3 5.7 11.4 0.0 0.7 1.4 0.0
9/17/1998 0.0 0.0 0.0 0.0 4.5 6.7 5.7 4.7 0.0 0.0 4.3 3.2 0.0
9/18/1998 0.0 0.0 0.0 0.0 9.0 13.4 11.1 6.7 0.0 0.0 2.5 4.2 0.5
9/19/1998 10.6 2.1 10.6 10.6 11.8 17.5 16.1 12.5 8.5 0.0 0.5 3.0 0.4
9/20/1998 6.6 5.8 6.6 6.6 13.1 19.4 17.1 12.9 5.7 0.0 1.1 6.1 0.1
9/21/1998 12.0 2.8 12.0 12.0 0.0 0.0 2.3 8.1 9.8 0.0 4.0 10.1 0.3
9/22/1998 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.3 0.0
9/23/1998 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.9 6.4 0.0 0.5 3.4 0.1
9/24/1998 10.0 10.0 10.0 10.0 0.0 0.0 1.8 5.8 10.4 0.0 11.3 13.1 0.0
9/25/1998 6.0 4.3 6.0 6.0 0.0 0.0 1.2 4.0 5.1 0.0 2.1 8.4 0.0
9/26/1998 0.0 0.0 0.0 0.0 5.2 7.8 6.4 3.9 0.0 0.0 0.0 0.4 0.0
9/27/1998 0.0 0.0 0.0 0.0 5.7 8.4 7.1 5.6 0.0 0.0 1.8 5.2 0.0
9/28/1998 0.0 0.0 0.0 0.0 6.5 9.7 8.0 4.9 0.0 0.0 0.0 3.4 0.0
9/29/1998 4.0 3.0 4.0 4.0 2.2 3.2 3.3 3.3 3.7 0.0 2.1 0.8 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/30/1998 2.0 0.3 2.0 2.0 3.8 5.6 5.1 4.6 3.0 0.0 7.6 3.8 0.2
10/1/1998 2.0 0.3 2.0 2.0 0.0 0.0 0.4 1.4 1.6 0.0 0.7 6.4 0.2
10/2/1998 0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.9 0.3
10/3/1998 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.0 0.5 4.3 0.4
10/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.3 0.2 0.1
10/5/1998 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
10/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/1998 0.0 0.0 0.0 0.0 2.3 3.4 2.8 1.7 0.0 0.0 0.0 0.2 0.0
10/9/1998 0.0 0.0 0.0 0.0 21.0 31.2 25.7 15.6 0.0 0.0 0.0 1.7 0.0
10/10/1998 0.0 0.0 0.0 0.0 13.1 19.5 16.1 9.8 0.0 0.0 0.0 2.2 0.0
10/11/1998 0.0 0.0 0.0 0.0 7.7 11.4 9.4 5.7 0.0 0.0 0.0 0.6 0.0
10/12/1998 0.0 0.0 0.0 0.0 8.9 13.2 10.9 6.6 0.0 0.0 0.0 0.7 0.0
10/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
10/16/1998 0.0 0.8 0.0 0.0 0.0 0.0 0.1 0.8 0.1 0.0 1.2 3.6 0.0
10/17/1998 15.0 2.9 15.0 15.0 4.4 6.4 7.8 9.2 12.1 0.0 0.9 3.8 0.0
10/18/1998 13.0 31.6 13.0 13.0 5.7 5.9 7.8 15.6 13.3 5.0 11.6 39.1 2.4
10/19/1998 12.0 6.5 12.0 12.0 2.2 3.2 4.9 8.9 10.0 0.0 4.3 21.1 0.4
10/20/1998 4.0 0.7 4.0 4.0 0.0 0.0 0.7 2.2 3.2 0.0 0.8 2.5 0.0
10/21/1998 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
10/22/1998 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 4.0 0.0 0.3 1.6
10/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1998 0.0 0.0 0.0 0.0 3.2 0.0 0.0 0.0 0.0 10.0 0.0 0.8 4.0
10/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0
10/26/1998 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.9 0.1 0.1
10/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1998 0.0 0.0 0.0 0.0 1.6 2.4 2.0 1.2 0.0 0.0 0.0 0.1 0.0
10/30/1998 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 0.0 0.5 0.0
10/31/1998 0.0 0.0 0.0 0.0 6.5 9.7 8.0 4.9 0.0 0.0 0.0 0.5 0.0
11/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1998 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.0 0.0 0.9 4.8
11/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/1998 3.6 0.6 3.6 3.6 0.0 0.0 0.6 1.8 2.9 0.0 0.6 1.1 0.0
11/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1998 0.0 0.0 0.0 0.0 11.6 17.2 14.2 8.6 0.0 0.0 0.2 0.9 0.0
11/19/1998 18.2 22.6 18.2 18.2 13.1 19.4 19.1 18.3 16.7 0.0 5.7 5.4 0.1
11/20/1998 24.2 3.9 24.2 24.2 0.1 0.0 4.1 10.5 19.5 0.0 2.7 5.0 0.9
11/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.1 0.0
11/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0
11/26/1998 0.0 0.0 0.0 0.0 3.2 0.0 0.0 0.0 0.0 10.0 3.0 0.8 4.0
11/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1998 0.0 0.0 0.0 0.0 2.3 0.0 0.0 0.0 0.0 7.0 0.0 0.5 2.8
12/3/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/1998 0.0 0.0 0.0 0.0 4.9 0.0 0.0 0.0 0.0 15.0 0.0 1.2 6.0
12/9/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
12/11/1998 0.0 0.0 0.0 0.0 2.2 3.3 2.7 1.7 0.0 0.0 0.0 0.2 0.0
12/12/1998 0.0 0.0 0.0 0.0 8.3 12.3 10.1 6.2 0.0 0.0 0.0 0.7 0.0
12/13/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1998 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 0.0 0.0
1/5/1999 0.0 0.0 0.0 0.0 9.0 13.4 11.1 6.7 0.0 0.0 0.0 0.7 0.0
1/6/1999 0.0 0.0 0.0 0.0 4.2 6.2 5.1 3.1 0.0 0.0 0.0 0.3 0.0
1/7/1999 0.0 0.0 0.0 0.0 0.6 0.9 0.7 0.5 0.0 0.0 0.0 0.2 0.1
1/8/1999 5.2 1.7 5.2 5.2 0.0 0.0 0.9 2.1 4.2 0.0 0.3 0.6 0.0
1/9/1999 10.6 1.7 10.6 10.6 1.7 0.0 1.7 3.8 8.7 5.0 0.9 0.5 2.1
1/10/1999 0.0 4.3 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.0 0.7 1.0 0.0
1/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
1/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0
1/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0
1/17/1999 0.0 0.0 0.0 0.0 2.2 3.2 2.6 1.6 0.0 0.0 0.0 0.2 0.0
1/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0
1/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0
1/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/1999 5.0 12.8 5.0 5.0 0.0 0.0 0.9 3.0 5.0 0.0 2.6 7.4 0.1
1/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.5 0.0
1/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.9 0.0
2/3/1999 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 2.1 0.0 6.3 0.0 0.0
2/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0
2/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/1999 2.6 0.4 2.6 2.6 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
2/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0
2/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
2/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0
2/24/1999 18.4 9.9 18.4 18.4 4.4 6.5 8.5 11.2 15.6 0.0 3.2 3.6 0.3
2/25/1999 22.6 10.5 22.6 22.6 9.8 14.4 15.6 16.1 19.2 0.0 3.6 2.5 0.0
2/26/1999 10.4 1.7 10.4 10.4 0.0 0.0 1.8 4.5 8.4 0.0 0.9 1.7 0.0
2/27/1999 13.4 4.0 13.4 13.4 4.4 6.5 7.5 8.2 12.2 0.0 6.5 0.7 0.1
2/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0
3/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0
3/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.2 0.0
3/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.9 0.0 0.0
3/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0
3/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/1999 0.0 0.0 0.0 0.0 2.0 3.0 2.5 1.5 0.0 0.0 2.1 0.2 0.0
3/25/1999 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0
3/26/1999 2.4 0.9 2.4 2.4 0.0 0.0 0.4 0.9 2.0 0.0 0.0 3.5 0.0
3/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 2.7 0.6 0.0
3/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0
4/3/1999 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.0 0.0 0.0
4/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.2 0.0
4/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
4/9/1999 6.0 1.0 6.0 6.0 0.0 0.0 1.1 3.7 8.3 0.0 17.7 3.1 0.3
4/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0
5/2/1999 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.9 0.0
5/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.6 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
5/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.4 0.6 0.0
5/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3 0.0 0.0
5/8/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0
5/9/1999 7.4 3.7 7.4 7.4 0.0 0.0 1.5 5.4 7.3 0.0 8.4 10.1 0.0
5/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0
5/11/1999 1.2 6.9 1.2 1.2 0.0 0.0 0.2 0.4 1.5 0.0 7.0 0.1 0.0
5/12/1999 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.6 3.3 0.0
5/13/1999 15.0 3.8 15.0 15.0 0.0 0.0 2.4 5.4 12.7 0.0 3.0 1.4 0.2
5/14/1999 11.6 7.9 11.6 11.6 0.0 0.0 1.9 4.8 10.0 0.0 2.3 1.5 0.0
5/15/1999 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.1 0.1 0.0
5/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.3 0.2
5/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0
5/18/1999 9.0 9.3 9.0 9.0 1.4 2.0 3.1 4.5 9.0 0.0 6.0 0.7 0.0
5/19/1999 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0 1.4 0.6 0.0
5/20/1999 5.4 0.9 5.4 5.4 3.4 5.0 5.0 5.0 4.3 0.0 0.9 1.6 0.1
5/21/1999 3.2 0.5 3.2 3.2 2.1 3.1 3.1 3.0 3.5 0.0 6.6 6.0 0.0
5/22/1999 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.4 0.0 0.0
5/23/1999 3.0 0.5 3.0 3.0 3.0 4.5 4.3 3.9 2.6 0.0 1.4 1.4 0.0
5/24/1999 1.2 0.2 1.2 1.2 0.0 0.0 0.3 1.0 1.0 0.0 0.9 1.1 0.0
5/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0
5/26/1999 4.0 0.7 4.0 4.0 2.5 3.7 3.7 3.3 3.2 0.0 9.4 0.3 0.1
5/27/1999 0.0 0.0 0.0 0.0 1.2 1.8 1.5 0.9 0.0 0.0 2.0 0.1 0.0
5/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/29/1999 0.0 0.0 0.0 0.0 5.8 8.6 7.2 4.9 0.0 0.0 0.6 1.6 0.0
5/30/1999 1.2 0.7 1.2 1.2 0.0 0.0 0.2 0.4 1.0 0.0 0.1 0.0 0.0
5/31/1999 0.0 0.0 0.0 0.0 5.9 8.8 7.3 4.4 0.0 0.0 0.0 0.5 0.0
6/1/1999 0.0 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0 5.0 0.0 0.4 2.0
6/2/1999 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.0 0.0 1.8 4.8
6/3/1999 0.0 0.0 0.0 0.0 2.4 3.5 3.1 3.8 0.0 0.0 3.7 4.4 0.0
6/4/1999 6.8 5.0 6.8 6.8 0.0 0.0 1.2 3.1 5.8 0.0 0.9 1.5 0.1
6/5/1999 1.2 0.2 1.2 1.2 0.0 0.0 0.2 0.4 1.0 0.0 0.0 0.0 0.0
6/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
6/7/1999 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
6/8/1999 4.4 0.7 4.4 4.4 6.7 10.0 9.0 6.7 3.5 0.0 1.2 0.9 0.1
6/9/1999 0.0 0.0 0.0 0.0 10.8 0.0 0.0 0.0 0.0 33.2 0.2 7.1 13.3
6/10/1999 0.0 6.4 0.0 0.0 0.0 0.0 0.0 0.3 1.8 0.0 7.3 0.7 0.3
6/11/1999 5.2 14.6 5.2 5.2 8.1 12.0 10.7 7.9 6.0 0.0 4.4 1.0 0.3
6/12/1999 12.6 26.2 12.6 12.6 2.9 4.2 5.6 7.8 12.2 0.0 3.3 5.8 0.1
6/13/1999 45.8 23.4 45.8 45.8 0.2 0.0 8.1 23.4 43.9 0.0 36.9 15.6 0.1
6/14/1999 4.4 4.1 4.4 4.4 0.0 0.0 0.7 1.8 3.8 0.0 2.5 0.6 0.1
6/15/1999 0.0 0.0 0.0 0.0 6.4 5.6 4.6 2.8 0.0 8.0 6.9 0.9 3.2
6/16/1999 0.0 48.2 0.0 0.0 5.6 8.4 6.9 4.2 3.5 0.0 8.4 0.5 0.0
6/17/1999 0.0 21.3 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 7.7 0.1 0.1
6/18/1999 6.2 5.4 6.2 6.2 0.0 0.0 1.0 2.3 5.3 0.0 7.3 6.3 0.4
6/19/1999 4.6 20.0 4.6 4.6 0.0 0.0 0.8 2.2 5.1 0.0 1.2 1.7 0.4
6/20/1999 2.8 8.8 2.8 2.8 0.0 0.0 0.5 1.1 2.9 0.0 0.6 2.8 0.2
6/21/1999 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.6 3.5 0.0 0.1 0.4 0.3
6/22/1999 4.6 7.4 4.6 4.6 0.0 0.0 0.8 2.2 4.2 0.0 0.7 1.3 0.2
6/23/1999 0.0 1.4 0.0 0.0 0.8 0.0 0.0 0.3 0.1 2.4 0.4 0.8 1.0
6/24/1999 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.6 3.5 0.0 0.1 0.0 0.0
6/25/1999 0.0 1.8 0.0 0.0 1.0 0.0 0.0 0.3 0.1 3.0 0.3 0.9 1.3
6/26/1999 0.0 47.9 0.0 0.0 0.0 0.0 0.1 0.7 3.5 0.0 3.5 1.9 0.0
6/27/1999 0.0 2.5 0.0 0.0 0.6 0.0 0.0 0.2 1.5 2.0 6.5 0.7 1.0
6/28/1999 2.2 1.2 2.2 2.2 0.0 0.0 0.4 1.0 4.0 0.0 10.7 1.2 0.5
6/29/1999 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.7 2.2 0.0 10.2 0.6 0.1
6/30/1999 0.0 10.0 0.0 0.0 7.4 11.0 9.1 6.1 1.7 0.0 5.2 1.8 0.0
7/1/1999 0.0 41.4 0.0 0.0 7.8 4.9 4.0 2.5 3.7 14.0 12.3 1.6 5.8
7/2/1999 3.2 44.1 3.2 3.2 4.3 5.4 5.0 4.0 6.5 2.0 9.1 0.8 0.9
7/3/1999 12.0 12.3 12.0 12.0 5.6 6.2 7.0 7.5 13.5 4.4 17.1 0.8 1.9
7/4/1999 13.8 4.1 13.8 13.8 0.0 0.0 2.2 4.9 11.4 0.0 1.8 0.1 0.0
7/5/1999 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.3 0.9 0.0 3.7 0.7 0.1
7/6/1999 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 2.0 0.2 0.4 1.0
7/7/1999 4.4 0.7 4.4 4.4 0.7 0.0 0.8 2.1 3.5 2.0 0.7 3.7 0.9
7/8/1999 0.0 6.0 0.0 0.0 1.3 0.0 0.0 0.0 0.4 4.0 7.8 0.6 1.9
7/9/1999 0.0 23.0 0.0 0.0 4.6 4.5 3.8 2.7 1.7 5.0 2.8 1.6 2.0
7/10/1999 0.0 50.2 0.0 0.0 1.4 2.1 1.7 1.1 3.6 0.0 0.8 0.1 0.0
7/11/1999 0.0 12.0 0.0 0.0 8.9 13.2 10.9 6.6 1.1 0.0 1.9 1.0 0.3
7/12/1999 4.2 7.9 4.2 4.2 7.7 11.4 10.1 7.8 4.3 0.0 3.9 2.0 0.2
7/13/1999 0.0 0.0 0.0 0.0 4.9 7.3 6.0 3.8 0.0 0.0 3.1 0.8 0.0
7/14/1999 0.0 0.0 0.0 0.0 15.4 22.0 18.2 11.1 0.3 2.0 1.9 2.4 0.8
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/15/1999 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.6 1.3 0.0 7.2 1.0 0.6
7/16/1999 0.0 38.1 0.0 0.0 0.0 0.0 0.0 0.4 3.3 0.0 4.0 0.8 16.8
7/17/1999 1.4 48.8 1.4 1.4 0.0 0.0 0.2 0.5 5.5 0.0 5.2 0.3 8.3
7/18/1999 7.4 10.7 7.4 7.4 2.2 3.2 4.0 5.5 6.7 0.0 1.7 19.6 11.8
7/19/1999 0.0 11.7 0.0 0.0 1.4 2.1 1.7 1.1 0.8 0.0 0.7 0.4 2.5
7/20/1999 12.8 22.3 12.8 12.8 2.9 4.2 5.6 7.3 11.8 0.0 1.3 7.8 9.4
7/21/1999 19.2 4.0 19.2 19.2 8.1 12.0 13.1 13.6 15.5 0.0 1.2 2.6 0.4
7/22/1999 0.0 0.1 0.0 0.0 20.8 31.0 25.6 15.5 0.0 0.0 1.1 2.0 0.4
7/23/1999 0.0 11.4 0.0 0.0 29.6 44.0 36.3 22.4 0.8 0.0 2.5 3.6 0.4
7/24/1999 2.6 8.6 2.6 2.6 47.1 70.0 58.2 36.0 2.7 0.0 0.5 3.9 0.2
7/25/1999 7.8 13.8 7.8 7.8 23.6 35.0 30.2 21.0 7.3 0.0 3.7 4.0 1.5
7/26/1999 17.6 5.4 17.6 17.6 16.5 24.5 23.0 18.5 14.4 0.0 6.4 6.1 3.1
7/27/1999 1.8 8.4 1.8 1.8 24.5 36.4 30.3 18.9 2.2 0.0 9.0 2.3 5.3
7/28/1999 29.8 23.4 29.8 29.8 7.5 11.0 13.9 17.0 27.3 0.0 18.0 26.5 0.3
7/29/1999 5.8 7.6 5.8 5.8 8.8 13.0 11.8 9.6 6.0 0.0 6.4 2.9 0.2
7/30/1999 12.2 9.9 12.2 12.2 10.2 15.1 14.4 12.2 11.1 0.0 4.6 3.4 0.0
7/31/1999 16.2 30.4 16.2 16.2 11.6 17.1 16.9 16.3 15.9 0.0 8.0 5.4 0.4
8/1/1999 10.0 4.1 10.0 10.0 14.3 21.2 19.2 15.5 8.2 0.0 1.4 9.2 0.5
8/2/1999 0.0 23.6 0.0 0.0 9.0 13.4 11.2 8.3 1.7 0.0 4.3 4.4 0.0
8/3/1999 0.0 0.0 0.0 0.0 12.0 17.9 14.8 9.0 0.0 0.0 0.1 1.3 0.4
8/4/1999 0.0 24.8 0.0 0.0 21.1 31.4 25.9 16.0 1.8 0.0 1.0 2.2 0.0
8/5/1999 3.6 7.8 3.6 3.6 35.9 53.3 44.9 30.8 3.5 0.0 3.7 11.2 0.1
8/6/1999 10.0 44.8 10.0 10.0 49.4 73.4 62.2 40.7 12.5 0.0 9.5 5.3 4.2
8/7/1999 0.0 0.3 0.0 0.0 9.2 13.6 11.3 7.3 2.2 0.0 14.0 12.3 5.3
8/8/1999 9.2 4.0 9.2 9.2 13.1 19.4 17.5 13.0 7.6 0.0 0.1 1.3 4.2
8/9/1999 2.4 5.4 2.4 2.4 14.6 21.7 18.4 12.6 2.6 0.0 5.6 8.6 14.8
8/10/1999 8.4 3.6 8.4 8.4 44.1 65.5 55.4 36.1 7.7 0.0 4.8 9.7 3.1
8/11/1999 2.6 2.4 2.6 2.6 10.1 15.0 13.0 10.3 2.3 0.0 8.2 9.6 0.2
8/12/1999 47.8 26.2 47.8 47.8 7.5 11.0 16.7 22.7 39.8 0.0 7.2 5.5 0.1
8/13/1999 18.6 15.6 18.6 18.6 18.3 27.1 25.5 21.6 15.9 0.0 9.1 9.7 0.2
8/14/1999 7.0 3.0 7.0 7.0 10.7 15.9 14.3 10.7 5.8 0.0 6.0 1.4 0.0
8/15/1999 0.0 0.0 0.0 0.0 4.5 6.7 5.6 3.9 0.0 0.0 3.0 1.5 0.1
8/16/1999 0.0 0.0 0.0 0.0 6.0 8.9 7.6 6.9 1.6 0.0 14.5 5.9 11.2
8/17/1999 0.0 6.2 0.0 0.0 3.6 5.3 4.4 2.7 0.4 0.0 3.7 2.7 0.1
8/18/1999 3.8 24.9 3.8 3.8 2.2 3.2 3.2 3.0 6.2 0.0 11.6 0.4 0.2
8/19/1999 0.0 3.3 0.0 0.0 0.7 1.0 1.1 3.4 0.6 0.0 7.3 6.5 9.7
8/20/1999 6.6 3.6 6.6 6.6 0.0 0.0 1.1 2.6 5.5 0.0 0.4 0.8 0.2
8/21/1999 2.2 3.0 2.2 2.2 0.0 0.0 0.4 0.8 2.0 0.0 0.3 1.0 0.4
8/22/1999 6.8 9.7 6.8 6.8 0.0 0.0 1.1 2.7 6.2 0.0 1.4 2.0 4.2
8/23/1999 6.6 12.3 6.6 6.6 0.0 0.0 1.1 2.5 8.0 0.0 9.8 21.0 0.3
8/24/1999 0.0 5.0 0.0 0.0 0.0 0.0 0.1 0.8 0.4 0.0 1.2 2.1 0.4
8/25/1999 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0 6.5 0.8 0.2
8/26/1999 11.4 8.9 11.4 11.4 4.0 5.9 6.7 7.1 11.0 0.0 6.6 0.9 0.5
8/27/1999 4.4 1.7 4.4 4.4 4.3 6.4 6.0 4.9 3.6 0.0 0.8 1.1 0.5
8/28/1999 0.0 3.3 0.0 0.0 2.2 3.2 2.6 1.6 0.2 0.0 0.1 0.2 0.0
8/29/1999 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.3 0.3 0.0
8/30/1999 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 2.7 0.3 0.0
8/31/1999 0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 9.0 0.0
9/1/1999 0.0 11.9 0.0 0.0 9.6 14.3 11.8 7.2 1.5 0.0 3.5 1.3 0.5
9/2/1999 13.4 3.7 13.4 13.4 7.5 11.1 11.3 10.5 13.6 0.0 15.0 0.7 0.1
9/3/1999 9.2 2.8 9.2 9.2 11.6 17.2 15.7 11.9 7.5 0.0 0.9 1.5 0.5
9/4/1999 1.2 0.6 1.2 1.2 13.0 19.4 16.2 10.4 1.0 0.0 0.5 1.6 0.0
9/5/1999 0.0 1.4 0.0 0.0 13.5 20.1 16.6 10.1 0.1 0.0 6.3 1.3 0.2
9/6/1999 9.4 8.1 9.4 9.4 2.2 3.2 4.1 5.0 8.7 0.0 4.1 0.4 0.1
9/7/1999 5.0 11.5 5.0 5.0 5.0 7.4 7.0 6.1 4.8 0.0 1.2 3.5 0.1
9/8/1999 0.0 0.4 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.4 4.9 0.0
9/9/1999 4.2 16.2 4.2 4.2 4.2 6.2 5.8 4.7 4.5 0.0 4.7 8.0 0.4
9/10/1999 9.0 9.8 9.0 9.0 9.0 13.4 12.5 9.9 7.8 0.0 0.6 2.3 0.2
9/11/1999 3.0 4.7 3.0 3.0 0.0 0.0 0.6 2.5 3.5 0.0 5.7 3.8 0.3
9/12/1999 6.8 2.5 6.8 6.8 0.0 0.0 1.1 2.7 5.6 0.0 0.5 16.1 0.3
9/13/1999 5.4 0.9 5.4 5.4 0.0 0.0 0.9 1.9 4.3 0.0 0.2 0.1 0.1
9/14/1999 6.2 6.9 6.2 6.2 0.0 0.0 1.0 2.2 5.4 0.0 1.3 0.3 5.0
9/15/1999 9.6 13.7 9.6 9.6 0.0 0.0 1.6 3.9 11.1 0.0 12.5 0.9 0.2
9/16/1999 5.6 14.7 5.6 5.6 0.0 0.0 0.9 2.0 5.5 0.0 0.3 0.1 0.1
9/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
9/18/1999 1.0 4.2 1.0 1.0 3.5 5.2 4.5 3.6 1.1 0.0 0.7 1.6 0.0
9/19/1999 0.0 6.5 0.0 0.0 2.8 4.2 3.5 2.1 0.5 0.0 0.1 0.2 0.0
9/20/1999 1.6 0.3 1.6 1.6 4.2 6.2 5.4 3.9 1.3 0.0 0.6 0.9 0.0
9/21/1999 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.2 0.7 0.0 2.6 0.3 0.0
9/22/1999 0.0 4.7 0.0 0.0 0.0 0.0 0.1 0.9 0.9 0.0 10.9 1.9 0.0
9/23/1999 10.8 18.5 10.8 10.8 0.0 0.0 1.7 3.8 9.9 0.0 4.3 0.1 0.0
9/24/1999 8.6 2.4 8.6 8.6 0.0 0.0 1.4 3.1 7.0 0.0 2.3 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/25/1999 5.6 0.9 5.6 5.6 0.0 0.0 0.9 2.0 4.5 0.0 0.0 0.0 0.0
9/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0
9/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/1999 0.2 0.3 0.2 0.2 0.0 0.0 0.1 0.5 0.2 0.0 0.5 0.9 0.0
9/30/1999 1.0 24.3 1.0 1.0 0.0 0.0 0.2 0.5 2.6 0.0 0.5 0.4 0.0
10/1/1999 1.6 21.5 1.6 1.6 2.8 4.2 3.8 3.1 2.8 0.0 0.8 1.2 0.0
10/2/1999 2.8 3.5 2.8 2.8 4.3 6.4 5.8 5.3 2.5 0.0 2.0 3.3 0.0
10/3/1999 13.6 9.7 13.6 13.6 2.2 3.2 5.1 8.9 11.5 0.0 3.4 6.5 0.0
10/4/1999 3.8 2.3 3.8 3.8 0.0 0.0 0.8 2.8 3.4 0.0 4.4 2.9 0.0
10/5/1999 4.4 0.7 4.4 4.4 0.0 0.0 0.9 3.3 4.7 0.0 7.5 3.4 0.0
10/6/1999 3.0 0.5 3.0 3.0 0.0 0.0 0.6 2.2 3.5 0.0 7.4 10.1 0.0
10/7/1999 30.8 34.6 30.8 30.8 0.1 0.0 5.2 14.1 33.5 0.0 35.2 7.1 0.0
10/8/1999 30.0 7.6 30.0 30.0 0.1 0.0 5.1 13.1 24.3 0.0 3.7 10.4 0.0
10/9/1999 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.3 5.9 0.0
10/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0
10/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0
10/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
10/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/1999 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.0 0.0
10/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0
10/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0
11/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/1999 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
11/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/1999 0.0 0.0 0.0 0.0 1.3 2.0 1.6 1.0 0.0 0.0 0.0 0.1 0.0
11/9/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4
11/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
12/6/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
12/8/1999 0.0 12.6 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.5 0.0 0.0
12/9/1999 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/1999 0.0 0.0 0.0 0.0 2.4 3.5 2.9 1.8 0.0 0.0 0.0 0.2 0.0
12/17/1999 0.0 0.0 0.0 0.0 5.0 7.4 6.1 3.7 0.0 0.0 0.0 0.4 0.0
12/18/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
12/29/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/1999 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.7 0.0 12.5 0.0 0.0
1/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.2 0.0 10.1 0.0 0.0
1/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2000 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
1/10/2000 6.0 1.5 6.0 6.0 0.0 0.0 1.0 2.1 4.9 0.0 0.0 0.0 0.0
1/11/2000 3.0 0.5 3.0 3.0 12.7 0.0 0.5 1.6 2.4 39.2 5.6 9.6 15.7
1/12/2000 8.0 5.8 8.0 8.0 0.0 0.0 1.3 3.3 6.8 0.0 6.9 3.5 0.0
1/13/2000 2.0 0.5 2.0 2.0 0.0 0.0 0.4 1.6 1.6 0.0 0.9 1.8 0.0
1/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5
1/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.5 0.1 0.0
1/22/2000 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.3 0.3
1/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0
1/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2000 8.0 5.5 8.0 8.0 0.0 0.0 1.3 3.3 7.3 0.0 3.1 0.8 0.0
1/26/2000 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 2.1 0.0 0.0
1/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
1/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.5
1/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2000 1.0 0.2 1.0 1.0 0.0 0.0 0.2 1.0 0.8 0.0 0.7 2.8 0.0
2/1/2000 10.0 1.6 10.0 10.0 7.9 0.0 1.7 4.0 8.6 24.3 3.9 2.9 9.7
2/2/2000 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.4 0.0 0.0
2/3/2000 7.6 1.2 7.6 7.6 0.0 0.0 1.2 3.0 6.1 0.0 5.1 0.6 0.0
2/4/2000 18.0 2.9 18.0 18.0 0.1 0.0 3.1 8.4 14.5 0.0 2.5 6.7 0.0
2/5/2000 2.0 0.3 2.0 2.0 7.9 0.0 0.4 1.2 1.9 24.3 2.6 2.9 9.7
2/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
2/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2000 30.0 25.0 30.0 30.0 0.1 0.0 4.9 11.4 25.6 0.0 1.5 7.0 0.0
2/11/2000 20.0 52.0 20.0 20.0 0.1 0.0 3.4 9.2 19.6 0.0 3.8 8.3 0.0
2/12/2000 10.0 11.8 10.0 10.0 0.0 0.0 1.7 4.1 8.8 0.0 1.1 1.1 0.0
2/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
2/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.0 2.9 0.8 0.0
2/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0
2/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/20/2000 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
2/21/2000 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
2/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 0.0
2/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/2000 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.2 7.7 0.0 14.4 0.1 0.1
3/1/2000 12.0 3.1 12.0 12.0 0.0 0.0 2.0 4.9 9.7 0.0 0.6 1.2 0.0
3/2/2000 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.0 0.0 0.0
3/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0
3/4/2000 9.0 6.5 9.0 9.0 0.0 0.0 1.5 3.7 7.6 0.0 0.8 1.1 0.0
3/5/2000 8.0 1.6 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.1 0.1 0.0
3/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
3/10/2000 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.3 0.3
3/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2000 34.0 7.4 34.0 34.0 0.1 0.0 5.5 12.6 27.5 0.0 0.7 1.1 0.0
3/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.8 0.0 0.0
3/17/2000 0.0 0.2 0.0 0.0 0.0 0.0 0.1 1.1 0.0 0.0 6.2 2.3 0.0
3/18/2000 5.6 5.9 5.6 5.6 0.0 0.0 0.9 2.0 4.9 0.0 0.4 4.1 0.0
3/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2000 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.1 4.7 0.0 0.0 0.0 0.0
3/21/2000 15.0 2.4 15.0 15.0 0.0 0.0 2.4 5.5 12.1 0.0 0.2 6.1 0.0
3/22/2000 30.0 22.1 30.0 30.0 3.7 0.0 4.8 10.7 25.4 11.1 0.7 7.2 4.4
3/23/2000 15.0 3.4 15.0 15.0 17.9 0.0 2.8 8.5 12.2 55.2 3.9 11.0 22.1
3/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.2
3/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0
3/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 3.1 0.0 0.0
3/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 0.0 5.2 0.0 0.0
3/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.1 0.0 9.6 0.0 0.0
3/31/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0
4/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
4/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5
4/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1
4/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
4/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
4/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.8 0.2 0.1
4/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.9 0.0 0.0
4/13/2000 0.0 0.0 0.0 0.0 6.2 0.0 0.0 0.0 0.6 19.3 2.7 1.6 7.8
4/14/2000 0.0 5.5 0.0 0.0 5.5 0.0 0.0 0.0 1.0 17.1 3.5 2.2 7.1
4/15/2000 1.0 3.0 1.0 1.0 0.0 0.0 0.2 0.6 1.4 0.0 2.4 0.5 0.1
4/16/2000 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.0 1.0 0.2 0.0
4/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2000 0.0 0.0 0.0 0.0 7.2 0.0 0.2 1.7 0.2 22.2 2.4 5.2 8.9
4/19/2000 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.3 0.8 0.0 3.5 0.7 0.1
4/20/2000 0.0 3.3 0.0 0.0 7.2 0.0 0.0 0.1 1.5 22.2 6.5 1.7 8.9
4/21/2000 0.0 0.4 0.0 0.0 4.2 0.0 0.2 1.4 0.1 12.9 1.6 4.0 5.2
4/22/2000 0.0 0.0 0.0 0.0 2.1 0.0 0.0 0.3 0.0 6.5 0.3 1.1 2.6
4/23/2000 0.0 9.2 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.1 0.2 0.2
4/24/2000 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 0.0
4/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.0 9.0 0.2 0.0
4/26/2000 0.0 15.2 0.0 0.0 0.0 0.0 0.4 3.4 1.7 0.0 10.0 17.2 0.0
4/27/2000 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.4 0.1 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0
4/29/2000 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0 6.0 0.6 0.0
4/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.1 0.1
5/4/2000 5.0 12.7 5.0 5.0 22.6 0.0 0.9 2.7 5.7 69.8 8.0 10.9 28.1
5/5/2000 2.8 3.1 2.8 2.8 0.0 0.0 0.5 1.6 3.3 0.0 5.8 1.3 0.1
5/6/2000 2.0 4.2 2.0 2.0 0.0 0.0 0.3 0.9 1.9 0.0 2.1 0.4 0.1
5/7/2000 0.4 0.1 0.4 0.4 0.0 0.0 0.2 1.0 0.3 0.0 2.2 2.0 0.1
5/8/2000 1.6 0.3 1.6 1.6 16.0 0.0 0.3 1.2 1.3 49.3 0.6 5.2 19.7
5/9/2000 0.8 0.2 0.8 0.8 0.0 0.0 0.1 0.3 0.6 0.0 0.0 0.1 0.1
5/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 2.7 0.6 0.1
5/11/2000 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.1 4.7 0.0 0.5 0.3 0.2
5/12/2000 1.0 30.5 1.0 1.0 0.0 0.0 0.3 1.3 3.4 0.0 3.8 2.3 0.2
5/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0
5/15/2000 13.8 17.0 13.8 13.8 0.0 0.0 2.2 5.0 12.9 0.0 3.8 0.1 0.0
5/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/17/2000 3.0 1.5 3.0 3.0 0.0 0.0 0.6 2.0 2.7 0.0 3.1 2.2 0.2
5/18/2000 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.6 3.5 0.0 0.1 0.1 0.0
5/19/2000 1.2 46.9 1.2 1.2 0.0 0.0 0.3 1.4 7.6 0.0 17.1 3.5 0.0
5/20/2000 1.6 20.4 1.6 1.6 0.0 0.0 0.3 0.7 2.7 0.0 1.3 0.3 0.0
5/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
5/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 0.1 0.1
5/23/2000 0.0 7.4 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 1.8 0.2 0.2
5/24/2000 0.0 15.5 0.0 0.0 0.0 0.0 0.1 1.0 1.7 0.0 4.0 2.1 0.1
5/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.4
5/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.8 0.7
5/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.1 0.0 5.2 1.0 0.2
5/28/2000 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.6 3.5 0.0 0.4 0.1 0.1
5/29/2000 1.8 10.0 1.8 1.8 0.0 0.0 0.4 2.1 2.2 0.0 2.1 3.0 0.0
5/30/2000 0.0 7.5 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 4.8 0.0 0.0
5/31/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.6 0.8 0.2
6/1/2000 0.2 0.0 0.2 0.2 0.0 0.0 0.0 0.2 0.2 0.0 0.1 0.4 0.2
6/2/2000 0.0 1.3 0.0 0.0 0.0 0.0 0.1 0.8 0.1 0.0 1.1 2.0 0.3
6/3/2000 2.4 2.4 2.4 2.4 0.0 0.0 0.4 1.0 2.3 0.0 1.5 2.8 0.1
6/4/2000 10.4 8.2 10.4 10.4 0.0 0.0 1.7 3.7 9.6 0.0 4.1 0.1 0.1
6/5/2000 14.8 25.9 14.8 14.8 10.2 0.0 2.4 5.7 16.9 31.3 16.8 15.7 12.7
6/6/2000 14.8 29.6 14.8 14.8 0.0 0.0 2.4 5.4 15.9 0.0 13.8 7.3 0.1
6/7/2000 90.4 80.4 90.4 90.4 23.8 0.0 14.5 32.3 80.1 72.5 20.3 15.9 29.4
6/8/2000 92.8 110.9 92.8 92.8 0.3 0.0 14.9 33.2 82.3 0.0 8.4 6.3 0.7
6/9/2000 26.8 9.4 26.8 26.8 0.1 0.0 4.3 10.3 29.9 0.0 38.2 5.5 0.7
6/10/2000 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.0 2.2 0.7
6/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 2.5 1.6 0.5
6/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.6 0.3
6/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/14/2000 0.0 8.9 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.4 0.4
6/15/2000 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 1.7 6.4 1.0
6/16/2000 2.4 1.1 2.4 2.4 0.0 0.0 0.4 1.1 3.6 0.0 13.1 1.4 0.2
6/17/2000 0.2 21.8 0.2 0.2 4.4 0.0 0.0 0.1 1.7 13.7 0.7 3.1 5.6
6/18/2000 0.0 10.6 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.5 5.2 0.1
6/19/2000 0.0 36.0 0.0 0.0 8.9 0.0 0.0 0.0 2.6 27.4 1.3 11.0 11.2
6/20/2000 5.4 0.9 5.4 5.4 0.0 0.0 0.9 1.9 4.3 0.0 2.0 2.5 4.3
6/21/2000 17.6 9.1 17.6 17.6 0.1 0.0 2.9 6.8 14.6 0.0 4.2 2.9 0.1
6/22/2000 5.6 0.9 5.6 5.6 0.0 0.0 0.9 2.1 4.5 0.0 0.9 0.3 0.0
6/23/2000 5.6 0.9 5.6 5.6 0.0 0.0 0.9 2.0 4.5 0.0 0.5 0.6 3.7
6/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.3
6/25/2000 0.0 9.9 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.3 1.3 1.0
6/26/2000 0.0 5.9 0.0 0.0 0.0 0.0 0.1 0.5 0.4 0.0 1.0 5.8 0.2
6/27/2000 6.8 16.0 6.8 6.8 0.0 0.0 1.3 4.7 6.6 0.0 3.0 10.7 0.6
6/28/2000 2.0 12.0 2.0 2.0 0.0 0.0 0.4 1.7 3.1 0.0 8.8 2.8 0.8
6/29/2000 0.0 3.0 0.0 0.0 0.0 0.0 0.2 2.2 0.3 0.0 2.5 14.9 0.2
6/30/2000 0.0 3.5 0.0 0.0 0.0 0.0 0.3 2.5 0.8 0.0 5.4 10.8 0.0
7/1/2000 8.8 19.4 8.8 8.8 0.0 0.0 1.5 4.1 10.1 0.0 11.8 4.9 0.0
7/2/2000 6.8 3.8 6.8 6.8 0.0 0.0 1.1 2.6 5.7 0.0 3.1 0.3 0.0
7/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 6.5 0.0 0.0
7/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 11.7 0.0 1.3
7/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 8.8 0.0 0.0
7/6/2000 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.2 2.2 0.0 9.2 1.5 0.0
7/7/2000 0.0 0.7 0.0 0.0 0.0 0.0 0.1 1.1 0.1 0.0 2.5 6.3 0.0
7/8/2000 0.0 14.7 0.0 0.0 0.0 0.0 0.2 1.8 2.6 0.0 9.4 6.6 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/9/2000 2.4 18.1 2.4 2.4 0.0 0.0 0.4 1.0 3.2 0.0 1.2 0.3 0.0
7/10/2000 7.0 1.3 7.0 7.0 0.0 0.0 1.1 2.7 5.8 0.0 1.3 2.2 0.0
7/11/2000 0.0 25.0 0.0 0.0 0.0 0.0 0.2 1.5 2.4 0.0 5.9 7.8 4.1
7/12/2000 6.0 2.5 6.0 6.0 0.0 0.0 1.2 4.5 5.0 0.0 2.6 11.5 0.0
7/13/2000 4.8 3.6 4.8 4.8 0.0 0.0 0.8 1.7 4.1 0.0 0.8 4.8 0.0
7/14/2000 0.0 9.2 0.0 0.0 9.3 0.0 0.1 1.1 0.7 28.8 2.3 15.2 11.5
7/15/2000 1.0 14.7 1.0 1.0 0.0 0.0 0.2 0.9 2.1 0.0 7.5 1.1 0.0
7/16/2000 7.0 20.5 7.0 7.0 0.0 0.0 1.1 2.6 7.7 0.0 4.9 12.4 0.0
7/17/2000 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.0 2.1 0.6 0.0
7/18/2000 6.6 3.3 6.6 6.6 5.0 0.0 1.1 2.9 5.5 15.2 7.7 26.1 6.1
7/19/2000 4.8 0.9 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 5.7 0.0 0.0
7/20/2000 0.6 8.1 0.6 0.6 7.4 0.0 0.2 0.8 2.0 22.9 11.3 12.0 14.3
7/21/2000 2.4 38.7 2.4 2.4 7.4 0.0 0.7 3.9 6.4 22.7 12.5 31.4 9.1
7/22/2000 20.4 3.3 20.4 20.4 9.9 0.0 3.5 9.3 16.4 30.2 2.1 10.6 12.1
7/23/2000 7.4 1.2 7.4 7.4 0.0 0.0 1.4 4.7 6.0 0.0 2.1 8.8 0.0
7/24/2000 0.6 8.1 0.6 0.6 4.9 0.0 0.1 0.2 1.1 15.1 0.5 7.3 6.1
7/25/2000 0.0 0.1 0.0 0.0 2.5 0.0 0.2 1.4 0.0 7.6 1.5 9.2 7.6
7/26/2000 0.0 2.5 0.0 0.0 2.2 0.0 0.0 0.4 0.9 6.9 9.6 1.4 5.0
7/27/2000 4.2 13.6 4.2 4.2 5.7 0.0 0.9 3.8 4.3 17.4 10.0 28.8 7.0
7/28/2000 16.6 3.1 16.6 16.6 2.3 0.0 2.7 6.0 13.4 6.9 0.3 2.4 4.5
7/29/2000 0.0 16.8 0.0 0.0 2.2 0.0 0.1 1.0 1.2 6.9 1.7 10.3 5.1
7/30/2000 7.4 6.7 7.4 7.4 8.9 0.0 1.2 2.7 7.4 27.4 8.0 2.2 12.7
7/31/2000 12.0 41.0 12.0 12.0 0.1 0.0 2.6 10.0 12.6 0.0 9.6 30.2 0.0
8/1/2000 18.6 3.0 18.6 18.6 0.1 0.0 3.0 6.8 14.9 0.0 2.6 0.3 0.0
8/2/2000 49.2 10.5 49.2 49.2 0.2 0.0 7.9 17.5 39.9 0.0 3.7 0.0 0.0
8/3/2000 2.6 0.4 2.6 2.6 0.0 0.0 0.4 0.9 2.1 0.0 0.0 0.0 0.0
8/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8/7/2000 0.0 28.7 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 2.0 0.0 0.0
8/8/2000 0.0 3.7 0.0 0.0 11.2 0.0 0.0 0.3 0.3 34.6 1.0 6.1 13.8
8/9/2000 1.0 18.2 1.0 1.0 0.0 0.0 0.4 2.6 5.2 0.0 18.9 6.7 0.0
8/10/2000 20.4 13.9 20.4 20.4 0.1 0.0 3.4 8.5 17.7 0.0 4.8 15.0 15.0
8/11/2000 6.2 16.7 6.2 6.2 0.0 0.0 1.1 3.6 6.4 0.0 5.4 2.9 0.0
8/12/2000 0.0 2.7 0.0 0.0 0.0 0.0 0.2 1.7 0.5 0.0 3.5 14.6 0.0
8/13/2000 2.2 1.5 2.2 2.2 0.0 0.0 0.4 0.8 1.9 0.0 0.1 6.3 0.0
8/14/2000 0.2 7.9 0.2 0.2 8.9 0.0 0.0 0.1 1.5 27.4 4.5 16.3 12.4
8/15/2000 2.4 6.9 2.4 2.4 0.0 0.0 0.5 2.1 2.4 0.0 1.5 4.9 0.0
8/16/2000 5.2 0.8 5.2 5.2 0.0 0.0 1.0 3.3 4.2 0.0 1.6 3.6 0.0
8/17/2000 0.0 4.4 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.0 1.2 1.4 0.0
8/18/2000 0.0 18.0 0.0 0.0 0.0 0.0 0.5 4.3 3.8 0.0 16.6 8.7 0.0
8/19/2000 1.9 50.2 1.9 1.9 0.0 0.0 0.3 0.9 5.1 0.0 1.9 0.6 0.0
8/20/2000 17.8 4.4 17.8 17.8 0.1 0.0 2.8 6.3 14.4 0.0 1.7 0.0 0.0
8/21/2000 6.4 3.9 6.4 6.4 0.0 0.0 1.1 2.8 5.4 0.0 5.0 1.1 0.0
8/22/2000 3.0 13.3 3.0 3.0 0.0 0.0 0.6 2.0 3.4 0.0 1.2 1.9 0.0
8/23/2000 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.0 0.2 0.3 0.0
8/24/2000 0.0 28.5 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.7 0.0 0.0
8/25/2000 0.8 5.8 0.8 0.8 16.4 0.0 0.2 0.6 1.1 50.5 0.5 4.6 20.2
8/26/2000 1.8 2.6 1.8 1.8 16.4 0.0 0.4 1.9 1.6 50.7 1.4 9.3 25.8
8/27/2000 1.0 43.2 1.0 1.0 0.0 0.0 0.2 0.9 3.9 0.0 2.0 1.1 2.9
8/28/2000 0.0 16.1 0.0 0.0 0.0 0.0 0.1 0.6 1.2 0.0 1.2 6.1 2.9
8/29/2000 6.0 7.3 6.0 6.0 0.0 0.0 1.0 2.7 5.3 0.0 6.8 10.5 0.0
8/30/2000 16.8 40.4 16.8 16.8 0.1 0.0 2.8 6.7 16.2 0.0 5.6 8.7 0.0
8/31/2000 11.0 8.8 11.0 11.0 0.0 0.0 1.9 5.1 9.4 0.0 4.4 12.3 0.0
9/1/2000 8.0 1.3 8.0 8.0 0.0 0.0 1.6 5.5 6.5 0.0 5.3 5.5 0.0
9/2/2000 4.0 6.0 4.0 4.0 0.0 0.0 0.8 2.9 4.3 0.0 7.7 3.0 0.0
9/3/2000 5.2 55.9 5.2 5.2 17.6 0.0 1.1 4.2 9.3 54.3 8.8 13.3 21.8
9/4/2000 11.0 14.7 11.0 11.0 15.4 0.0 1.9 4.9 10.3 47.5 5.1 5.7 19.0
9/5/2000 4.4 7.6 4.4 4.4 0.0 0.0 0.7 1.7 4.0 0.0 0.2 0.2 0.0
9/6/2000 0.6 3.6 0.6 0.6 0.0 0.0 0.1 0.2 0.7 0.0 0.3 2.9 0.0
9/7/2000 14.0 44.5 14.0 14.0 0.0 0.0 2.5 7.4 14.9 0.0 6.2 4.9 0.0
9/8/2000 9.0 21.9 9.0 9.0 0.0 0.0 1.5 4.0 9.5 0.0 5.3 8.5 0.0
9/9/2000 7.2 8.0 7.2 7.2 0.0 0.0 1.4 4.7 6.3 0.0 7.6 17.4 0.0
9/10/2000 5.0 5.5 5.0 5.0 0.0 0.0 0.8 1.9 4.4 0.0 0.2 0.6 0.0
9/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
9/12/2000 0.6 0.1 0.6 0.6 0.0 0.0 0.1 0.2 0.5 0.0 0.0 0.0 0.0
9/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
9/14/2000 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.1 0.0 0.0
9/15/2000 0.0 0.5 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 1.1 0.0
9/16/2000 0.8 0.5 0.8 0.8 0.0 0.0 0.2 0.6 0.7 0.0 4.8 0.6 0.0
9/17/2000 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.1 2.4
9/18/2000 1.0 1.8 1.0 1.0 0.0 0.0 0.2 0.4 0.9 0.0 0.5 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/19/2000 5.4 23.6 5.4 5.4 0.0 0.0 1.0 2.8 6.8 0.0 5.3 1.8 0.0
9/20/2000 6.0 15.9 6.0 6.0 0.0 0.0 1.0 2.4 6.4 0.0 3.6 3.0 0.0
9/21/2000 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.5 0.8 0.0 0.2 0.4 0.0
9/22/2000 0.2 0.9 0.2 0.2 0.0 0.0 0.0 0.1 0.4 0.0 0.6 0.0 0.0
9/23/2000 13.0 4.5 13.0 13.0 0.0 0.0 2.1 4.6 10.6 0.0 0.0 0.0 0.0
9/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
9/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
9/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0
10/1/2000 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.0 0.0 7.9 2.1 0.6 3.2
10/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2000 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2000 0.0 0.0 0.0 0.0 3.6 0.0 0.0 0.0 0.0 11.0 0.0 0.9 4.4
10/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2000 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.0 0.0 0.9 4.8
10/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2000 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.5 0.0 0.2 1.0
10/31/2000 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.5 0.0 0.2 1.0
11/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
11/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
11/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0
11/27/2000 12.4 2.0 12.4 12.4 1.9 0.0 2.2 6.2 10.7 5.7 5.1 4.1 2.3
11/28/2000 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.1 0.0 1.8 0.1 0.3 0.7
11/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/30/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
12/15/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
12/16/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
12/18/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.1
12/26/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2000 0.0 0.0 0.0 0.0 4.2 0.0 0.1 1.2 0.0 12.9 1.3 3.6 5.2
12/31/2000 0.0 4.4 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 0.7 0.7 0.0
1/1/2001 13.0 33.9 13.0 13.0 2.2 0.0 2.2 5.7 12.8 6.6 2.6 2.8 2.6
1/2/2001 3.0 11.5 3.0 3.0 0.0 0.0 0.6 2.2 3.2 0.0 1.9 2.3 0.0
1/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0
1/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2001 0.0 6.9 0.0 0.0 4.8 0.0 0.0 0.1 1.6 14.9 5.2 1.2 6.0
1/23/2001 0.0 0.0 0.0 0.0 0.7 0.0 0.1 0.6 0.0 2.2 0.6 1.4 0.9
1/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
1/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2001 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 4.1 0.0 0.3 1.6
1/31/2001 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 2.1 0.0 6.3 0.0 0.0
2/1/2001 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
2/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.3 0.0 6.3 0.0 0.0
2/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.7 0.0 12.5 0.3 0.3
2/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.3 0.0 0.0
2/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.0 0.0 9.4 0.1 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
2/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
2/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2001 0.0 3.7 0.0 0.0 3.6 0.0 0.2 1.4 0.3 11.2 1.6 4.0 4.8
2/15/2001 0.0 3.8 0.0 0.0 6.4 0.0 0.1 1.2 0.3 19.6 1.7 4.0 7.9
2/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.1 0.0
2/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2001 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
2/20/2001 9.8 3.1 9.8 9.8 0.0 0.0 1.6 3.5 8.0 0.0 0.1 0.0 0.0
2/21/2001 2.0 1.2 2.0 2.0 0.0 0.0 0.3 0.7 1.7 0.0 0.1 0.0 0.0
2/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2001 0.0 14.6 0.0 0.0 0.0 0.0 0.1 1.1 1.1 0.0 1.8 2.3 0.0
2/25/2001 0.0 11.6 0.0 0.0 5.2 0.0 0.0 0.0 0.8 16.1 0.8 2.5 6.4
2/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2001 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.1 4.7 0.0 0.1 0.2 0.0
3/1/2001 12.0 2.0 12.0 12.0 0.0 0.0 1.9 4.3 9.6 0.0 0.0 0.2 0.2
3/2/2001 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.0 0.0 0.0
3/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2001 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.0 0.0 0.9 4.8
3/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2001 9.0 1.5 9.0 9.0 0.0 0.0 1.4 3.2 7.2 0.0 0.0 0.0 0.0
3/7/2001 8.0 1.6 8.0 8.0 5.8 0.0 1.3 2.8 6.5 17.8 0.0 1.4 7.2
3/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 1.5 0.5
3/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2001 0.0 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.0 0.0
3/13/2001 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.4 0.2 0.0 0.8 0.8 0.0
3/14/2001 0.0 0.0 0.0 0.0 10.4 0.0 0.1 0.5 0.0 32.2 0.6 3.5 12.9
3/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.8 1.7 0.0
3/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.3
3/18/2001 5.6 0.9 5.6 5.6 0.0 0.0 0.9 2.0 4.5 0.0 0.0 0.0 0.0
3/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2001 5.0 2.7 5.0 5.0 0.0 0.0 0.9 2.5 4.2 0.0 0.8 1.6 0.0
3/21/2001 0.0 10.2 0.0 0.0 5.3 0.0 0.2 1.4 0.8 16.3 2.0 11.6 6.5
3/22/2001 0.0 1.2 0.0 0.0 5.3 0.0 0.1 1.1 0.1 16.3 1.3 3.5 6.5
3/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2001 0.0 0.0 0.0 0.0 1.8 0.0 0.0 0.0 0.0 5.5 0.0 0.4 2.2
3/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
3/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2001 0.0 10.0 0.0 0.0 2.2 0.0 0.2 1.4 0.7 6.7 1.7 3.3 2.7
3/29/2001 0.0 4.2 0.0 0.0 4.3 0.0 0.0 0.1 0.3 13.3 0.6 13.0 5.4
3/30/2001 0.0 10.0 0.0 0.0 6.5 0.0 0.0 0.0 0.7 20.0 0.4 19.2 8.0
3/31/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.4 0.1
4/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
4/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 0.0
4/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 0.0
4/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/10/2001 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
4/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.2 0.3 0.0
4/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2001 0.0 4.2 0.0 0.0 9.5 0.0 0.0 0.0 0.3 29.3 0.2 2.4 11.9
4/14/2001 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.0 0.0
4/15/2001 0.0 1.1 0.0 0.0 0.0 0.0 0.2 1.5 1.4 0.0 8.4 3.0 0.0
4/16/2001 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 1.0 0.2 0.2
4/17/2001 0.0 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.0 0.0
4/18/2001 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 0.3 12.6 0.0
4/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/20/2001 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
4/21/2001 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
4/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/25/2001 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.3 0.2
4/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
4/27/2001 4.8 0.8 4.8 4.8 0.0 0.0 0.8 2.0 3.9 0.0 0.3 0.6 0.0
4/28/2001 0.0 2.3 0.0 0.0 9.1 0.0 0.1 1.0 0.2 28.2 1.2 4.3 11.4
4/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.5 0.6 0.0
4/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.2
5/1/2001 0.0 2.3 0.0 0.0 10.5 0.0 0.0 0.0 0.6 32.6 2.1 2.6 13.1
5/2/2001 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.4
5/3/2001 0.0 20.1 0.0 0.0 10.5 0.0 0.1 0.9 1.5 32.6 1.3 4.3 13.0
5/4/2001 3.6 0.6 3.6 3.6 0.0 0.0 0.6 1.3 2.9 0.0 0.0 0.1 0.1
5/5/2001 1.4 0.2 1.4 1.4 0.0 0.0 0.2 0.5 1.1 0.0 0.0 0.1 0.1
5/6/2001 0.0 6.5 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.0 0.7 6.9 0.1
5/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.6 0.1 0.1
5/8/2001 0.0 0.0 0.0 0.0 17.6 0.0 0.0 0.3 0.1 54.4 1.0 5.0 21.9
5/9/2001 0.8 0.1 0.8 0.8 0.0 0.0 0.2 1.2 0.7 0.0 1.4 1.9 0.0
5/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
5/11/2001 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.1 4.7 0.0 0.0 0.1 0.1
5/12/2001 1.0 1.0 1.0 1.0 0.0 0.0 0.2 0.4 0.9 0.0 0.2 0.0 0.0
5/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.9 0.0 0.0 2.4 4.1 0.0
5/14/2001 0.0 0.8 0.0 0.0 0.0 0.0 0.4 3.6 1.4 0.0 10.0 10.4 0.1
5/15/2001 13.8 22.2 13.8 13.8 0.1 0.0 2.6 8.4 14.3 0.0 12.9 20.6 0.1
5/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.3 0.2
5/17/2001 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
5/18/2001 4.4 0.7 4.4 4.4 0.0 0.0 0.7 1.8 3.5 0.0 0.3 0.6 0.0
5/19/2001 1.2 1.6 1.2 1.2 0.0 0.0 0.2 0.4 1.1 0.0 0.2 1.2 0.0
5/20/2001 1.6 2.8 1.6 1.6 0.0 0.0 0.3 0.6 1.5 0.0 0.0 0.0 0.0
5/21/2001 0.0 8.9 0.0 0.0 0.0 0.0 0.1 0.7 0.7 0.0 1.2 6.3 0.5
5/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.7 0.0 0.0
5/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 1.0 0.1 0.1
5/24/2001 0.0 2.5 0.0 0.0 0.0 0.0 0.2 1.5 2.1 0.0 10.6 7.9 0.0
5/25/2001 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.0 0.0
5/26/2001 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.4 0.0 0.0
5/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.8 1.5 0.0
5/28/2001 4.4 2.3 4.4 4.4 0.0 0.0 0.7 1.7 5.0 0.0 7.0 0.3 0.1
5/29/2001 1.8 9.2 1.8 1.8 0.0 0.0 0.3 0.9 2.1 0.0 0.6 2.3 0.2
5/30/2001 14.0 9.5 14.0 14.0 0.0 0.0 2.3 5.5 11.9 0.0 1.8 1.3 0.2
5/31/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.2 0.6 0.2
6/1/2001 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.1 0.1
6/2/2001 0.0 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 1.3 0.5 0.4
6/3/2001 0.0 25.6 0.0 0.0 0.0 0.0 0.0 0.1 2.9 0.0 6.3 0.1 0.0
6/4/2001 0.0 4.0 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.0 0.7 13.9 0.1
6/5/2001 0.0 0.0 0.0 0.0 1.8 0.0 0.0 0.0 0.5 5.6 2.6 17.9 2.3
6/6/2001 0.0 4.9 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.2 0.1 0.1
6/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
6/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.1
6/9/2001 26.8 4.4 26.8 26.8 0.1 0.0 4.4 10.2 21.5 0.0 0.8 1.4 0.0
6/10/2001 2.4 0.4 2.4 2.4 3.4 0.0 0.4 1.0 1.9 10.5 0.1 1.2 4.3
6/11/2001 0.0 21.2 0.0 0.0 3.2 0.0 0.0 0.3 1.5 10.0 0.6 1.5 4.1
6/12/2001 0.0 46.4 0.0 0.0 1.8 0.0 0.0 0.1 3.4 5.5 2.3 23.0 2.2
6/13/2001 0.0 14.4 0.0 0.0 1.8 0.0 0.0 0.0 1.0 5.7 0.6 0.5 2.3
6/14/2001 0.0 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.2 6.7 0.1
6/15/2001 13.8 21.0 13.8 13.8 0.0 0.0 2.2 4.9 12.5 0.0 0.6 0.1 0.1
6/16/2001 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.6 3.2 0.2
6/17/2001 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.4 2.4 0.0 0.3 28.6 0.0
6/18/2001 4.4 4.5 4.4 4.4 2.2 0.0 0.9 3.5 6.6 6.8 15.5 4.2 2.7
6/19/2001 1.2 0.2 1.2 1.2 0.0 0.0 0.2 0.4 1.0 0.0 0.0 0.0 0.0
6/20/2001 1.6 0.3 1.6 1.6 0.0 0.0 0.3 0.9 1.3 0.0 0.5 0.7 0.0
6/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.0 3.4 1.0 0.5
6/22/2001 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.3 5.9 0.0 27.1 14.5 0.0
6/23/2001 0.0 27.6 0.0 0.0 6.4 0.0 0.1 0.7 2.4 19.6 3.7 10.9 8.0
6/24/2001 0.0 7.5 0.0 0.0 0.0 0.0 0.1 0.6 1.9 0.0 7.5 6.7 0.0
6/25/2001 0.0 12.1 0.0 0.0 1.7 0.0 0.1 0.9 3.0 5.1 11.4 8.4 2.0
6/26/2001 0.0 11.3 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.6 9.4 0.0
6/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 1.4 0.7 0.0
6/28/2001 4.4 13.3 4.4 4.4 0.0 0.0 0.7 1.6 4.4 0.0 0.9 0.2 0.1
6/29/2001 1.8 4.5 1.8 1.8 0.0 0.0 0.3 0.6 1.8 0.0 0.6 0.3 0.2
6/30/2001 14.6 9.2 14.6 14.6 3.8 0.0 2.5 6.6 12.3 11.5 2.3 13.4 4.7
7/1/2001 0.0 7.2 0.0 0.0 0.0 0.0 0.2 1.9 0.7 0.0 3.2 19.0 0.3
7/2/2001 0.0 5.7 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 1.2 1.9 0.0
7/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.8 1.4 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
7/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.5 0.0 0.0 1.5 3.3 0.2
7/5/2001 0.0 0.0 0.0 0.0 8.2 0.0 0.0 0.4 0.0 25.4 0.4 12.9 10.3
7/6/2001 0.0 1.5 0.0 0.0 8.1 0.0 0.0 0.0 0.1 25.1 0.1 2.4 10.5
7/7/2001 0.0 3.6 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 0.4 7.4 0.7
7/8/2001 0.0 10.6 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 1.2 1.9 0.1
7/9/2001 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 2.8 11.2
7/10/2001 0.0 10.9 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 1.1 9.2 4.4
7/11/2001 0.0 29.5 0.0 0.0 13.0 0.0 0.0 0.1 3.6 40.0 7.9 8.1 17.4
7/12/2001 0.0 34.1 0.0 0.0 4.3 0.0 0.1 1.2 2.5 13.3 2.6 7.2 8.0
7/13/2001 0.0 28.8 0.0 0.0 0.0 0.0 0.2 1.4 2.1 0.0 2.1 10.5 0.4
7/14/2001 0.0 22.9 0.0 0.0 0.0 0.0 0.0 0.5 2.6 0.0 6.5 4.9 6.1
7/15/2001 0.0 14.1 0.0 0.0 0.0 0.0 0.1 0.7 1.0 0.0 1.5 7.5 5.6
7/16/2001 0.0 1.0 0.0 0.0 0.0 0.0 0.3 3.1 1.6 0.0 10.8 12.7 0.0
7/17/2001 0.0 7.5 0.0 0.0 0.0 0.0 0.2 1.8 0.6 0.0 1.9 11.4 0.0
7/18/2001 0.0 13.9 0.0 0.0 0.0 0.0 0.1 0.6 1.0 0.0 1.2 4.3 0.4
7/19/2001 0.0 1.8 0.0 0.0 9.5 0.0 0.0 0.0 0.1 29.2 0.7 7.3 12.2
7/20/2001 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.0 0.7 0.8 0.2
7/21/2001 0.0 17.8 0.0 0.0 0.0 0.0 0.1 0.8 1.3 0.0 1.3 2.2 0.4
7/22/2001 0.0 5.7 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.0 1.1 3.8 0.0
7/23/2001 0.0 1.2 0.0 0.0 0.0 0.0 0.1 1.0 0.4 0.0 3.8 2.0 0.0
7/24/2001 0.0 32.0 0.0 0.0 0.0 0.0 0.1 1.2 2.3 0.0 2.0 8.6 0.3
7/25/2001 0.0 27.0 0.0 0.0 0.0 0.0 0.0 0.3 2.5 0.0 3.8 5.7 0.2
7/26/2001 0.0 20.4 0.0 0.0 8.6 0.0 0.2 1.5 1.5 26.6 2.4 14.1 10.8
7/27/2001 0.0 0.8 0.0 0.0 0.0 0.0 0.1 1.1 0.1 0.0 1.8 5.3 0.1
7/28/2001 0.0 13.6 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 1.2 3.7 0.5
7/29/2001 0.0 2.5 0.0 0.0 0.0 0.0 0.2 2.2 0.2 0.0 2.6 5.7 0.1
7/30/2001 0.0 3.5 0.0 0.0 0.0 0.0 0.1 0.5 0.3 0.0 0.9 2.4 0.1
7/31/2001 13.0 3.1 13.0 13.0 0.0 0.0 2.1 5.0 10.5 0.0 0.6 0.8 0.0
8/1/2001 18.0 2.9 18.0 18.0 0.1 0.0 3.0 7.2 15.8 0.0 7.0 1.4 0.0
8/2/2001 13.5 38.2 13.5 13.5 14.4 0.0 2.2 4.8 13.5 44.3 1.7 4.9 17.7
8/3/2001 2.6 8.3 2.6 2.6 0.0 0.0 0.6 2.5 5.1 0.0 13.7 13.3 16.9
8/4/2001 0.0 4.0 0.0 0.0 3.6 0.0 0.1 0.8 0.3 11.1 1.3 5.4 11.5
8/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 3.7 0.2
8/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 1.3 0.0
8/7/2001 0.0 2.2 0.0 0.0 4.2 0.0 0.1 0.5 0.2 13.1 1.3 5.2 5.4
8/8/2001 3.0 3.8 3.0 3.0 4.3 0.0 0.6 1.7 2.7 13.1 1.1 2.6 5.4
8/9/2001 1.0 10.9 1.0 1.0 0.0 0.0 0.2 0.7 2.4 0.0 4.7 0.7 0.0
8/10/2001 0.0 0.2 0.0 0.0 0.0 0.0 0.1 0.6 0.3 0.0 2.4 3.1 0.0
8/11/2001 6.2 23.4 6.2 6.2 3.4 0.0 1.0 2.4 9.0 10.5 12.5 1.0 14.7
8/12/2001 0.0 27.2 0.0 0.0 11.9 0.0 0.0 0.3 2.0 36.8 1.5 10.4 17.7
8/13/2001 2.2 2.9 2.2 2.2 8.9 0.0 0.8 5.1 2.0 27.6 5.0 22.5 12.2
8/14/2001 0.2 5.6 0.2 0.2 0.0 0.0 0.3 2.4 0.6 0.0 2.6 14.7 0.1
8/15/2001 2.4 7.4 2.4 2.4 0.0 0.0 0.4 1.1 2.4 0.0 0.7 3.2 0.0
8/16/2001 5.2 2.0 5.2 5.2 0.0 0.0 0.8 1.9 4.3 0.0 0.2 0.3 0.2
8/17/2001 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.5 0.3 7.7
8/18/2001 0.0 25.1 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.5 0.3 0.3
8/19/2001 4.9 16.9 4.9 4.9 0.0 0.0 0.8 1.7 5.1 0.0 0.5 20.4 0.1
8/20/2001 7.8 8.3 7.8 7.8 0.0 0.0 1.3 3.3 6.8 0.0 0.8 1.3 5.9
8/21/2001 8.4 11.0 8.4 8.4 0.0 0.0 1.4 3.9 7.5 0.0 1.1 6.6 0.0
8/22/2001 4.3 0.8 4.3 4.3 0.0 0.0 0.7 1.5 3.5 0.0 0.0 0.1 0.0
8/23/2001 3.0 1.5 3.0 3.0 0.0 0.0 0.5 1.7 2.5 0.0 0.9 2.7 0.0
8/24/2001 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.4 0.3 0.0
8/25/2001 0.8 0.1 0.8 0.8 0.0 0.0 0.1 0.3 0.6 0.0 0.1 0.0 0.0
8/26/2001 4.8 36.8 4.8 4.8 0.0 0.0 0.8 2.0 6.5 0.0 0.9 0.7 0.0
8/27/2001 2.2 0.4 2.2 2.2 0.0 0.0 0.4 0.8 1.8 0.0 0.1 0.3 0.3
8/28/2001 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.4
8/29/2001 6.4 2.0 6.4 6.4 0.0 0.0 1.2 4.1 5.2 0.0 1.9 3.7 0.0
8/30/2001 16.5 5.7 16.5 16.5 0.1 0.0 2.6 5.9 13.5 0.0 0.2 0.0 0.0
8/31/2001 11.0 1.8 11.0 11.0 0.0 0.0 2.1 7.3 8.9 0.0 3.6 7.1 0.0
9/1/2001 8.0 4.0 8.0 8.0 0.0 0.0 1.3 2.8 6.6 0.0 0.1 11.4 0.0
9/2/2001 4.0 22.1 4.0 4.0 7.6 0.0 0.6 1.5 4.8 23.5 0.5 1.9 9.4
9/3/2001 5.2 0.8 5.2 5.2 0.0 0.0 1.0 2.9 4.2 0.0 1.3 5.2 0.0
9/4/2001 4.0 1.3 4.0 4.0 0.0 0.0 0.7 1.6 3.3 0.0 0.2 0.3 0.0
9/5/2001 4.4 1.2 4.4 4.4 0.0 0.0 0.8 2.4 3.6 0.0 0.9 9.5 0.0
9/6/2001 0.6 0.1 0.6 0.6 0.0 0.0 0.1 0.2 0.5 0.0 0.0 0.0 0.0
9/7/2001 14.0 2.3 14.0 14.0 0.0 0.0 2.2 5.0 11.3 0.0 0.1 0.1 0.0
9/8/2001 9.0 1.5 9.0 9.0 0.0 0.0 1.4 3.2 7.2 0.0 0.0 0.0 0.0
9/9/2001 7.2 1.2 7.2 7.2 0.0 0.0 1.2 2.6 5.8 0.0 0.0 0.0 0.0
9/10/2001 5.0 0.8 5.0 5.0 0.0 0.0 0.8 1.8 4.0 0.0 0.0 4.5 0.2
9/11/2001 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 2.7 0.0
9/12/2001 0.6 3.9 0.6 0.6 0.0 0.0 0.3 2.1 2.4 0.0 10.0 3.7 0.0
9/13/2001 0.0 17.2 0.0 0.0 0.0 0.0 0.2 1.6 1.3 0.0 2.2 19.7 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/14/2001 0.0 0.0 0.0 0.0 7.1 0.0 0.0 0.0 0.0 21.9 0.2 2.4 8.8
9/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/16/2001 0.8 0.1 0.8 0.8 2.3 0.0 0.2 0.6 0.6 7.1 0.3 1.1 2.8
9/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/18/2001 1.0 0.2 1.0 1.0 4.6 0.0 0.2 0.4 0.8 14.1 0.0 1.1 5.7
9/19/2001 5.4 0.9 5.4 5.4 0.0 0.0 0.9 1.9 4.3 0.0 0.0 0.0 0.0
9/20/2001 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
9/21/2001 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
9/22/2001 6.2 1.0 6.2 6.2 0.0 0.0 1.1 2.9 5.0 0.0 0.7 1.4 0.0
9/23/2001 13.0 2.1 13.0 13.0 0.0 0.0 2.2 6.0 10.5 0.0 1.4 2.8 0.0
9/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/26/2001 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.7 0.0 0.4 1.9
9/27/2001 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.7 0.0 0.4 1.9
9/28/2001 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.7 0.0 1.8 1.9
9/29/2001 0.0 0.0 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.7 0.0 0.4 1.9
9/30/2001 0.0 0.6 0.0 0.0 1.5 0.0 0.0 0.0 0.0 4.7 0.2 0.4 1.9
10/1/2001 0.0 11.7 0.0 0.0 1.9 0.0 0.0 0.0 0.8 5.8 0.2 0.5 2.3
10/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2001 0.0 0.0 0.0 0.0 2.7 0.0 0.0 0.0 0.0 8.2 0.0 0.6 3.3
10/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2001 0.0 0.0 0.0 0.0 3.8 0.0 0.0 0.0 0.0 11.6 0.0 0.9 4.7
10/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2001 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.3 0.0 0.2 0.9
10/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2001 0.0 0.0 0.0 0.0 5.1 0.0 0.0 0.0 0.0 15.8 0.1 1.2 6.3
11/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2001 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 2.4 0.0 0.2 1.0
11/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2001 0.0 2.2 0.0 0.0 1.4 0.0 0.1 0.9 1.1 4.3 5.4 4.2 1.7
11/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.5 1.0 0.0
12/16/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2001 0.0 0.0 0.0 0.0 7.8 0.0 0.0 0.0 0.0 24.0 0.0 1.9 9.6
12/27/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2001 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.0 0.0
1/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
1/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
1/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2002 0.0 0.0 0.0 0.0 11.8 0.0 0.0 0.0 0.0 36.3 0.0 2.8 14.5
1/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.7 0.0 0.0
1/14/2002 0.0 2.7 0.0 0.0 2.8 0.0 0.0 0.4 0.2 8.5 0.6 1.7 11.6
1/15/2002 0.0 32.0 0.0 0.0 24.2 0.0 0.4 3.7 8.0 74.5 31.2 29.9 32.8
1/16/2002 0.0 0.0 0.0 0.0 4.8 0.0 0.1 0.5 0.0 14.7 4.5 2.3 5.9
1/17/2002 0.0 1.3 0.0 0.0 0.0 0.0 0.2 2.3 0.9 0.0 5.8 4.7 0.0
1/18/2002 0.0 22.3 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 1.3 0.0 0.0
1/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.8 1.9 0.0
1/20/2002 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.4 0.3 0.0 1.9 3.2 0.0
1/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0
1/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
1/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.2
1/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 1.6 0.0 8.9 3.1 0.2
1/27/2002 0.0 22.6 0.0 0.0 0.0 0.0 0.2 2.1 6.1 0.0 23.6 4.0 0.0
1/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 0.0 0.0 2.1 11.3 0.0
1/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 0.0 0.0 1.4 3.8 0.9
1/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.2
2/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
2/5/2002 0.0 0.5 0.0 0.0 0.0 0.0 0.1 1.0 0.1 0.0 1.8 2.0 0.0
2/6/2002 0.0 3.0 0.0 0.0 0.0 0.0 0.1 1.4 1.3 0.0 6.4 2.7 0.0
2/7/2002 0.0 17.4 0.0 0.0 0.0 0.0 0.2 1.4 1.3 0.0 1.9 2.8 0.0
2/8/2002 0.0 21.6 0.0 0.0 0.0 0.0 0.2 2.0 3.2 0.0 9.9 4.0 0.0
2/9/2002 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.2 3.0 0.0 13.8 0.0 0.0
2/10/2002 0.0 0.0 0.0 0.0 5.3 0.0 0.4 3.6 3.8 16.4 21.0 8.4 6.6
2/11/2002 0.0 56.8 0.0 0.0 16.7 0.0 0.2 1.4 4.1 51.6 4.1 7.0 20.7
2/12/2002 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.8 22.6 0.0
2/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
2/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.5
2/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3
2/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.6
2/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
2/23/2002 0.0 1.7 0.0 0.0 2.4 0.0 0.1 0.6 0.5 7.5 2.2 5.1 3.0
2/24/2002 0.0 6.9 0.0 0.0 0.0 0.0 0.0 0.4 0.9 0.0 2.7 2.2 0.0
2/25/2002 0.0 0.0 0.0 0.0 8.3 0.0 0.0 0.0 0.0 25.7 0.0 2.0 10.3
2/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 0.0 1.2 2.4 0.0
2/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.1
2/28/2002 10.0 1.6 10.0 10.0 0.0 0.0 1.8 5.0 8.1 0.0 1.6 3.0 0.0
3/1/2002 0.0 19.8 0.0 0.0 4.8 0.0 0.2 1.7 3.1 14.7 9.9 10.1 5.9
3/2/2002 0.0 9.4 0.0 0.0 14.3 0.0 0.2 1.9 2.6 44.2 10.9 7.2 17.7
3/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
3/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
3/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2002 0.0 0.0 0.0 0.0 8.7 0.0 0.0 0.0 0.0 26.8 0.0 2.1 10.7
3/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 1.4
3/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/21/2002 0.0 7.4 0.0 0.0 18.0 0.0 0.1 0.7 0.5 55.5 1.0 16.6 22.2
3/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
3/23/2002 2.0 3.2 2.0 2.0 0.0 0.0 0.6 3.2 6.7 0.0 25.0 4.5 0.0
3/24/2002 2.4 3.2 2.4 2.4 0.0 0.0 0.4 1.3 2.1 0.0 4.7 0.8 0.0
3/25/2002 0.0 1.0 0.0 0.0 0.0 0.0 0.1 1.0 0.1 0.0 6.1 2.1 0.0
3/26/2002 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
3/28/2002 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
3/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.1 0.0
3/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2002 0.0 4.9 0.0 0.0 0.0 0.0 0.1 0.7 2.2 0.0 9.6 1.3 0.0
4/1/2002 0.0 6.9 0.0 0.0 0.0 0.0 0.2 1.4 0.5 0.0 1.7 5.6 0.0
4/2/2002 0.0 1.7 0.0 0.0 0.0 0.0 0.1 0.6 0.5 0.0 2.5 1.1 0.0
4/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/5/2002 0.0 0.0 0.0 0.0 5.9 0.0 0.0 0.0 0.0 18.1 0.0 1.4 7.3
4/6/2002 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.1 0.0 7.9 0.1 0.8 3.2
4/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/8/2002 0.0 0.0 0.0 0.0 2.9 0.0 0.0 0.0 0.0 9.0 0.1 0.7 3.6
4/9/2002 0.0 0.1 0.0 0.0 2.6 0.0 0.1 0.7 0.0 7.9 0.7 2.2 3.3
4/10/2002 0.0 7.8 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.3 1.3 0.1
4/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0
4/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 1.1
4/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
4/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.1 0.0
4/16/2002 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 7.0 0.2 0.1
4/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0
4/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.2 0.0 0.0
4/20/2002 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 18.6 4.1 1.4 7.4
4/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/22/2002 0.0 1.4 0.0 0.0 0.0 0.0 0.1 0.7 0.1 0.0 0.7 2.9 0.0
4/23/2002 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 0.2
4/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.0 0.0 0.8 4.1 0.0
4/25/2002 0.0 43.5 0.0 0.0 0.0 0.0 0.4 3.4 3.5 0.0 6.0 25.6 0.0
4/26/2002 0.0 0.9 0.0 0.0 0.0 0.0 0.4 3.8 7.6 0.0 40.4 10.1 0.0
4/27/2002 5.0 2.3 5.0 5.0 0.0 0.0 0.8 1.8 4.1 0.0 0.1 0.0 0.0
4/28/2002 0.0 5.4 0.0 0.0 0.0 0.0 0.1 0.7 0.4 0.0 0.8 1.4 0.0
4/29/2002 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.9 0.0 0.0
4/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 8.8 1.5 0.0
5/1/2002 2.0 0.3 2.0 2.0 2.3 0.0 0.4 1.1 1.6 7.1 5.1 4.2 2.9
5/2/2002 0.0 0.3 0.0 0.0 2.4 0.0 0.0 0.0 0.0 7.3 0.0 2.4 3.0
5/3/2002 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.0 0.0 5.2 0.1 4.8 2.1
5/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 5.3 0.1
5/5/2002 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 0.0
5/6/2002 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.1 0.0 6.1 0.1 0.8 2.4
5/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/2002 8.4 1.4 8.4 8.4 0.0 0.0 1.3 3.0 6.8 0.0 0.1 0.0 0.0
5/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.6 0.0 8.1 1.1 0.0
5/10/2002 2.0 5.4 2.0 2.0 0.0 0.0 0.3 0.7 2.0 0.0 0.3 0.0 0.0
5/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/12/2002 13.0 2.1 13.0 13.0 0.0 0.0 2.2 5.5 10.5 0.0 0.9 1.8 0.0
5/13/2002 11.6 4.6 11.6 11.6 2.6 0.0 1.9 4.7 9.5 7.9 0.6 1.7 3.2
5/14/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.6 2.2 2.4 0.0 3.4 2.4 0.1
5/15/2002 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0 4.1 0.6 0.1
5/16/2002 0.0 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.5 0.1 0.1
5/17/2002 9.0 8.2 9.0 9.0 0.0 0.0 1.4 3.2 7.7 0.0 0.2 0.1 0.1
5/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0
5/19/2002 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 3.7 0.0 0.0
5/20/2002 3.2 0.5 3.2 3.2 0.0 0.0 0.5 1.1 2.6 0.0 0.0 0.0 0.0
5/21/2002 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.0 0.4 0.3
5/22/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.3 2.4 0.0 0.5 0.6 0.0
5/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 1.1 1.7 0.0
5/24/2002 0.0 17.1 0.0 0.0 1.7 0.0 0.1 0.6 1.8 5.2 3.6 1.5 2.1
5/25/2002 0.0 1.5 0.0 0.0 3.2 0.0 0.0 0.0 0.1 10.0 0.5 0.8 4.0
5/26/2002 0.0 0.0 0.0 0.0 6.7 0.0 0.0 0.0 0.0 20.7 0.0 4.0 8.3
5/27/2002 0.0 1.0 0.0 0.0 0.0 0.0 0.1 0.8 0.2 0.0 1.7 2.0 0.3
5/28/2002 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.0 0.4 0.8 0.2
5/29/2002 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.0
5/30/2002 0.0 1.1 0.0 0.0 0.0 0.0 0.1 0.5 0.1 0.0 0.8 2.1 0.2
5/31/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.1 0.1
6/1/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.1 0.1 0.0
6/2/2002 5.0 0.8 5.0 5.0 0.0 0.0 0.8 1.8 4.0 0.0 0.0 0.3 0.2
6/3/2002 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.2 0.0 0.0
6/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
6/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 1.1 1.7 0.0
6/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
6/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0
6/8/2002 2.0 3.8 2.0 2.0 0.0 0.0 0.3 0.7 1.9 0.0 0.1 0.0 0.0
6/9/2002 1.2 0.2 1.2 1.2 12.7 0.0 0.3 1.0 1.0 39.3 2.4 4.4 16.0
6/10/2002 1.0 5.0 1.0 1.0 12.7 0.0 0.2 0.4 1.2 39.3 0.7 3.1 15.8
6/11/2002 5.0 5.3 5.0 5.0 0.0 0.0 0.8 2.1 4.4 0.0 0.6 0.9 0.3
6/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.1 0.1
6/13/2002 1.8 0.3 1.8 1.8 0.0 0.0 0.3 0.6 1.4 0.0 0.7 0.1 0.1
6/14/2002 10.0 12.8 10.0 10.0 0.0 0.0 1.6 3.6 8.8 0.0 1.5 0.1 0.1
6/15/2002 2.0 7.0 2.0 2.0 0.0 0.0 0.4 1.5 2.1 0.0 3.1 1.8 0.1
6/16/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 3.3 0.0 0.0
6/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
6/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
6/19/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.1 0.1
6/20/2002 1.0 2.9 1.0 1.0 0.0 0.0 0.2 0.9 1.0 0.0 0.6 1.2 0.1
6/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.2 0.1 0.0
6/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 0.0
6/23/2002 1.2 70.2 1.2 1.2 0.0 0.0 0.2 0.4 6.0 0.0 7.1 0.0 0.0
6/24/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.3 2.4 0.0 0.7 0.6 0.0
6/25/2002 2.0 10.2 2.0 2.0 0.0 0.0 0.3 0.7 2.3 0.0 0.5 0.0 0.0
6/26/2002 3.0 2.0 3.0 3.0 0.0 0.0 0.5 1.1 3.1 0.0 2.8 0.1 0.1
6/27/2002 1.0 7.7 1.0 1.0 0.0 0.0 0.3 1.2 1.4 0.0 1.1 1.7 0.0
6/28/2002 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.0 2.0 0.6 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
6/29/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.4 1.3 1.6 0.0 3.0 1.4 0.3
6/30/2002 1.0 1.2 1.0 1.0 0.0 0.0 0.2 0.4 1.4 0.0 2.6 0.1 0.0
7/1/2002 2.0 1.2 2.0 2.0 0.0 0.0 0.3 0.7 1.7 0.0 0.3 0.1 0.1
7/2/2002 1.0 18.2 1.0 1.0 13.0 0.0 0.2 0.4 2.1 40.1 1.7 3.3 16.2
7/3/2002 8.0 5.5 8.0 8.0 0.0 0.0 1.4 3.5 6.7 0.0 7.7 1.6 0.2
7/4/2002 4.0 28.3 4.0 4.0 0.0 0.0 0.7 1.6 5.2 0.0 6.9 0.3 0.1
7/5/2002 1.0 2.8 1.0 1.0 0.0 0.0 0.2 0.4 1.0 0.0 7.1 0.1 0.1
7/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0
7/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.2 0.0 0.0
7/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.0 8.1 0.7 0.0
7/9/2002 0.0 25.9 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.6 0.0 0.0
7/10/2002 0.0 15.2 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 1.7 0.1 0.1
7/11/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.4 1.1 2.8 0.0 8.1 0.6 0.0
7/12/2002 1.0 0.8 1.0 1.0 0.0 0.0 0.2 0.4 1.5 0.0 4.8 0.1 0.1
7/13/2002 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 9.5 0.4 0.3
7/14/2002 0.0 53.6 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 5.2 0.1 0.1
7/15/2002 3.0 2.8 3.0 3.0 22.5 0.0 0.6 2.1 2.6 69.4 3.9 24.9 28.0
7/16/2002 4.0 2.5 4.0 4.0 0.0 0.0 0.9 3.7 3.6 0.0 10.7 9.5 0.3
7/17/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.5 0.8 0.0 8.2 2.6 0.4
7/18/2002 0.0 44.7 0.0 0.0 0.0 0.0 0.0 0.4 3.4 0.0 9.3 8.5 0.4
7/19/2002 0.0 17.1 0.0 0.0 0.0 0.0 0.1 0.6 3.1 0.0 18.7 7.7 0.2
7/20/2002 3.0 13.9 3.0 3.0 0.0 0.0 0.5 1.3 5.5 0.0 17.4 8.0 0.2
7/21/2002 4.0 1.7 4.0 4.0 0.0 0.0 0.7 2.4 3.3 0.0 7.4 9.2 0.1
7/22/2002 2.0 2.5 2.0 2.0 0.0 0.0 0.4 1.1 1.8 0.0 6.0 1.3 0.6
7/23/2002 0.0 11.4 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 5.3 0.1 0.0
7/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4 0.1 0.1
7/25/2002 0.0 38.7 0.0 0.0 0.0 0.0 0.0 0.0 2.8 0.0 4.5 0.4 0.4
7/26/2002 0.0 13.2 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 8.9 0.4 0.3
7/27/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 7.0 1.2 1.1
7/28/2002 3.0 19.9 3.0 3.0 0.0 0.0 0.5 1.1 3.8 0.0 7.5 0.5 0.5
7/29/2002 0.0 1.0 0.0 0.0 0.0 0.0 0.2 1.4 0.1 0.0 8.8 4.5 0.4
7/30/2002 0.0 16.2 0.0 0.0 0.0 0.0 0.0 0.3 1.2 0.0 3.9 0.8 0.3
7/31/2002 1.0 4.8 1.0 1.0 0.0 0.0 0.2 1.0 1.1 0.0 4.2 1.6 0.1
8/1/2002 2.0 6.5 2.0 2.0 6.0 0.0 0.4 1.5 2.1 18.6 4.5 3.1 7.6
8/2/2002 1.0 27.8 1.0 1.0 7.5 0.0 0.2 0.5 2.8 23.2 4.1 27.4 9.4
8/3/2002 8.0 19.2 8.0 8.0 3.0 0.0 1.4 4.3 9.1 9.3 14.9 4.1 4.2
8/4/2002 10.0 14.4 10.0 10.0 0.0 0.0 1.7 4.5 9.8 0.0 8.5 8.4 0.5
8/5/2002 8.0 6.2 8.0 8.0 3.0 0.0 1.3 3.1 6.8 9.3 4.0 2.7 4.2
8/6/2002 5.0 28.1 5.0 5.0 0.0 0.0 0.9 2.4 7.9 0.0 12.6 4.1 1.0
8/7/2002 4.2 2.0 4.2 4.2 0.0 0.0 0.8 2.9 3.5 0.0 5.3 3.1 0.3
8/8/2002 2.0 5.5 2.0 2.0 0.0 0.0 0.4 1.0 2.0 0.0 3.9 0.9 0.3
8/9/2002 3.0 35.7 3.0 3.0 2.6 0.0 0.5 1.4 5.4 8.1 3.1 1.5 3.5
8/10/2002 2.0 10.0 2.0 2.0 7.9 0.0 0.4 1.4 3.1 24.2 5.6 3.6 10.0
8/11/2002 0.0 0.7 0.0 0.0 4.7 0.0 0.0 0.3 4.1 14.6 24.4 1.3 5.9
8/12/2002 0.0 5.7 0.0 0.0 2.4 0.0 0.0 0.3 0.4 7.3 7.5 4.1 3.2
8/13/2002 2.0 6.7 2.0 2.0 4.7 0.0 0.5 3.4 14.1 14.6 60.3 13.2 6.1
8/14/2002 6.0 1.2 6.0 6.0 4.7 0.0 1.1 3.5 4.9 14.6 5.5 8.8 6.1
8/15/2002 4.0 5.8 4.0 4.0 4.7 0.0 0.7 1.6 3.6 14.6 7.1 6.0 6.0
8/16/2002 8.0 16.8 8.0 8.0 0.0 0.0 1.3 2.8 7.6 0.0 5.2 9.4 0.4
8/17/2002 2.0 0.3 2.0 2.0 9.0 0.0 0.3 0.8 1.6 27.7 5.4 8.1 11.4
8/18/2002 5.0 13.2 5.0 5.0 0.0 0.0 0.8 1.8 4.9 0.0 6.8 5.1 0.2
8/19/2002 6.0 65.0 6.0 6.0 0.0 0.0 1.0 2.8 9.5 0.0 1.7 3.7 0.1
8/20/2002 8.0 57.4 8.0 8.0 0.0 0.0 1.3 3.4 10.5 0.0 2.1 6.0 0.3
8/21/2002 18.0 20.0 18.0 18.0 0.1 0.0 3.0 7.1 15.7 0.0 2.2 11.3 0.2
8/22/2002 16.0 15.4 16.0 16.0 7.7 0.0 2.6 5.8 15.4 23.7 7.9 10.9 9.6
8/23/2002 20.0 14.1 20.0 20.0 0.1 0.0 3.2 7.4 19.3 0.0 11.8 6.2 0.2
8/24/2002 15.0 2.4 15.0 15.0 6.8 0.0 2.6 6.9 16.5 20.7 22.3 8.7 8.4
8/25/2002 14.0 3.4 14.0 14.0 0.0 0.0 2.2 5.0 11.9 0.0 2.7 5.5 0.1
8/26/2002 10.0 20.6 10.0 10.0 0.0 0.0 1.6 3.8 9.4 0.0 4.3 2.5 0.0
8/27/2002 9.0 19.6 9.0 9.0 0.0 0.0 1.4 3.2 9.0 0.0 5.8 11.0 0.0
8/28/2002 6.0 18.6 6.0 6.0 11.0 0.0 1.0 2.7 6.1 33.8 1.2 8.6 13.6
8/29/2002 4.0 19.2 4.0 4.0 5.5 0.0 0.6 1.4 4.6 16.9 0.9 5.2 6.8
8/30/2002 2.0 19.0 2.0 2.0 0.0 0.0 0.3 0.8 3.8 0.0 4.2 2.4 0.1
8/31/2002 8.0 8.0 8.0 8.0 0.0 0.0 1.6 5.7 7.8 0.0 7.4 13.0 0.0
9/1/2002 6.0 16.2 6.0 6.0 0.0 0.0 1.0 2.2 6.6 0.0 3.9 2.0 0.1
9/2/2002 4.0 5.2 4.0 4.0 0.0 0.0 0.7 2.3 3.6 0.0 1.2 1.8 0.0
9/3/2002 6.0 3.2 6.0 6.0 0.0 0.0 1.1 3.0 5.1 0.0 2.3 9.2 0.0
9/4/2002 20.0 26.2 20.0 20.0 4.1 0.0 3.2 7.6 20.8 12.5 16.2 13.2 5.0
9/5/2002 18.0 76.9 18.0 18.0 2.8 0.0 3.0 7.3 23.3 8.4 19.3 16.6 3.4
9/6/2002 19.0 20.0 19.0 19.0 0.1 0.0 3.1 6.9 16.8 0.0 2.9 12.0 0.4
9/7/2002 8.0 2.6 8.0 8.0 1.3 0.0 1.3 2.9 7.9 4.1 6.9 1.7 1.6
9/8/2002 4.2 14.9 4.2 4.2 0.0 0.0 0.7 1.6 6.0 0.0 12.3 4.4 0.2
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/9/2002 9.0 9.0 9.0 9.0 0.0 0.0 1.4 3.2 7.8 0.0 0.5 3.5 0.0
9/10/2002 3.0 17.4 3.0 3.0 7.5 0.0 0.5 1.1 3.6 23.2 0.4 7.5 9.3
9/11/2002 6.8 12.7 6.8 6.8 3.6 0.0 1.3 4.5 6.3 11.2 2.6 5.2 4.5
9/12/2002 5.4 2.4 5.4 5.4 0.0 0.0 1.0 3.0 4.5 0.0 1.2 2.3 0.0
9/13/2002 6.2 1.3 6.2 6.2 2.6 0.0 1.0 2.2 5.0 7.9 0.0 0.6 3.2
9/14/2002 0.6 0.1 0.6 0.6 1.3 0.0 0.1 0.2 0.5 4.0 0.1 0.3 1.6
9/15/2002 5.6 20.8 5.6 5.6 0.0 0.0 1.0 2.9 6.0 0.0 1.3 4.4 0.0
9/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 0.0
9/17/2002 1.0 8.7 1.0 1.0 2.3 0.0 0.2 1.0 1.4 7.0 0.8 1.8 2.8
9/18/2002 0.0 3.2 0.0 0.0 0.0 0.0 0.1 0.6 0.5 0.0 2.3 1.1 0.0
9/19/2002 1.6 2.1 1.6 1.6 0.0 0.0 0.5 2.8 1.9 0.0 8.2 4.6 0.0
9/20/2002 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.4 0.0 5.2 6.9 1.3 2.1
9/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.3
9/22/2002 10.8 11.5 10.8 10.8 0.0 0.0 1.9 5.7 10.3 0.0 6.7 3.7 0.0
9/23/2002 8.6 1.4 8.6 8.6 0.0 0.0 1.4 3.2 6.9 0.0 0.5 0.3 0.1
9/24/2002 5.6 2.6 5.6 5.6 5.0 0.0 1.0 2.7 4.6 15.4 0.7 2.6 6.1
9/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
9/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.1
9/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
10/1/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
10/2/2002 1.0 0.4 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
10/3/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
10/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0
10/7/2002 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0
10/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2002 0.0 0.0 0.0 0.0 6.4 0.0 0.0 0.0 0.0 19.7 0.2 1.5 7.9
10/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2002 0.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
10/12/2002 0.0 0.0 0.0 0.0 4.1 0.0 0.0 0.0 0.0 12.6 3.8 1.0 5.1
10/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2002 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
10/16/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.1 0.0 0.0
10/17/2002 2.0 4.8 2.0 2.0 0.0 0.0 0.3 0.7 1.9 0.0 0.1 0.0 0.0
10/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/19/2002 0.0 0.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 4.4 0.0 0.3 1.8
10/20/2002 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 2.2 0.0 0.2 0.9
10/21/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
10/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2002 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
10/24/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
10/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.6
10/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2002 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
10/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2002 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.6 0.0 0.1 0.6
11/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
11/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.0 0.0 1.0 2.0 0.0
11/7/2002 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.0 0.0 7.6 0.0 0.6 3.1
11/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 1.1 0.0
11/9/2002 0.2 0.0 0.2 0.2 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0 0.0
11/10/2002 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
11/11/2002 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.0 0.0
11/12/2002 0.0 3.1 0.0 0.0 0.0 0.0 0.2 2.2 2.4 0.0 12.5 4.3 0.0
11/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.9 0.0 0.0 2.3 4.0 0.0
11/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2002 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
11/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0
12/4/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
12/16/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2002 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.0 0.0 1.0 2.0 0.0
12/29/2002 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
12/30/2002 15.0 2.4 15.0 15.0 0.0 0.0 2.4 5.3 12.1 0.0 0.0 0.0 0.0
12/31/2002 0.0 20.9 0.0 0.0 9.6 0.0 0.0 0.0 1.5 29.7 1.1 2.4 11.9
1/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.9 0.0
1/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2003 0.0 0.0 0.0 0.0 7.4 11.0 9.1 5.5 0.0 0.0 0.0 0.6 0.1
1/14/2003 0.0 0.0 0.0 0.0 11.6 17.2 14.2 8.6 0.0 0.0 0.0 1.2 0.2
1/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/18/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
1/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/21/2003 0.0 0.0 0.0 0.0 10.2 15.2 12.5 7.6 0.0 0.0 0.0 0.8 0.0
1/22/2003 0.0 0.0 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.0 0.3 0.0
1/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/25/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/26/2003 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
1/27/2003 5.0 3.2 5.0 5.0 3.8 0.0 0.8 1.8 4.3 11.6 0.8 0.9 4.6
1/28/2003 8.0 8.2 8.0 8.0 11.3 0.0 1.3 3.0 9.0 34.8 14.3 2.7 13.9
1/29/2003 9.6 1.6 9.6 9.6 0.0 0.0 2.0 7.5 7.8 0.0 8.0 8.5 0.0
1/30/2003 1.0 10.5 1.0 1.0 0.0 0.0 0.4 2.5 3.3 0.0 13.5 4.2 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
1/31/2003 3.0 13.9 3.0 3.0 11.3 0.0 0.5 1.2 5.7 34.8 17.4 2.7 13.9
2/1/2003 8.0 8.8 8.0 8.0 0.0 0.0 1.3 2.8 7.0 0.0 4.3 0.0 0.0
2/2/2003 0.0 0.0 0.0 0.0 7.5 11.2 9.2 5.6 0.0 0.0 4.3 0.6 0.0
2/3/2003 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 1.8 5.2 0.0
2/4/2003 0.0 0.0 0.0 0.0 0.6 0.9 0.7 0.5 0.0 0.0 0.0 0.1 0.0
2/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
2/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 0.0 0.0 1.4 3.1 0.3
2/7/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4
2/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2003 0.0 0.0 0.0 0.0 10.1 15.0 12.4 7.5 0.0 0.0 0.0 0.8 0.0
2/11/2003 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 0.0 0.5 0.0
2/12/2003 0.0 0.0 0.0 0.0 4.8 7.1 5.9 3.6 0.0 0.0 0.0 0.4 0.0
2/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3
2/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0
2/15/2003 0.2 0.0 0.2 0.2 0.0 0.0 0.0 0.1 0.2 0.0 1.6 0.0 0.0
2/16/2003 10.4 1.7 10.4 10.4 0.0 0.0 1.7 3.7 8.4 0.0 0.2 0.0 0.0
2/17/2003 20.0 13.8 20.0 20.0 2.7 0.0 3.7 11.3 18.4 8.3 11.8 9.2 3.4
2/18/2003 25.0 44.6 25.0 25.0 10.8 0.0 4.2 10.4 25.3 33.0 13.7 5.6 13.4
2/19/2003 15.0 26.9 15.0 15.0 9.2 0.0 2.5 6.3 13.8 28.3 2.8 4.2 11.3
2/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0
2/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2003 0.0 1.8 0.0 0.0 0.0 0.0 0.2 1.4 0.2 0.0 1.4 8.9 0.0
2/24/2003 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 10.3 0.0
2/25/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.2 0.3 0.2
2/26/2003 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
2/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0
2/28/2003 4.6 0.7 4.6 4.6 0.0 0.0 0.7 1.6 3.7 0.0 0.2 0.0 0.0
3/1/2003 4.0 18.9 4.0 4.0 0.0 0.0 0.6 1.6 7.6 0.0 15.2 0.0 0.0
3/2/2003 5.0 8.9 5.0 5.0 0.0 0.0 0.8 1.8 4.8 0.0 1.1 0.0 0.0
3/3/2003 0.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.3 0.0 0.0
3/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 0.0 1.3 2.5 0.0
3/7/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
3/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2003 0.0 1.3 0.0 0.0 8.3 0.0 0.0 0.0 0.1 25.8 0.0 2.0 10.3
3/10/2003 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.1 0.0
3/11/2003 3.4 0.7 3.4 3.4 5.9 0.0 0.5 1.2 2.7 18.3 0.0 1.6 7.4
3/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.6
3/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/15/2003 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.4 0.4
3/16/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
3/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/18/2003 5.6 0.9 5.6 5.6 0.0 0.0 0.9 2.0 4.5 0.0 0.0 0.0 0.0
3/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2003 5.8 0.9 5.8 5.8 0.0 0.0 0.9 2.1 4.7 0.0 0.0 0.0 0.0
3/21/2003 1.5 0.2 1.5 1.5 0.0 0.0 0.2 0.5 1.2 0.0 0.0 5.9 0.2
3/22/2003 30.0 4.9 30.0 30.0 0.1 0.0 4.8 10.7 24.1 0.0 0.0 0.0 0.0
3/23/2003 15.0 2.4 15.0 15.0 6.3 0.0 2.4 5.4 12.5 19.4 1.9 1.5 7.7
3/24/2003 0.0 3.3 0.0 0.0 5.5 0.0 0.1 1.1 0.3 16.9 1.3 3.6 6.8
3/25/2003 0.0 5.9 0.0 0.0 5.5 0.0 0.1 0.7 1.4 16.9 9.0 2.7 6.8
3/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.3 0.0 0.0
3/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/28/2003 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.4 0.0 4.6 2.1 0.0
3/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 2.1 12.4 0.0
3/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2003 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.1 0.1
4/4/2003 0.0 9.0 0.0 0.0 5.4 0.0 0.3 2.4 0.7 16.6 2.9 6.4 6.6
4/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.3
4/7/2003 0.0 0.0 0.0 0.0 8.1 12.0 9.9 6.0 0.0 0.0 0.0 0.6 0.0
4/8/2003 0.0 0.0 0.0 0.0 8.2 12.2 10.1 6.1 0.0 0.0 2.9 0.7 0.0
4/9/2003 0.0 0.0 0.0 0.0 5.3 7.9 6.5 4.0 0.0 0.0 0.0 0.4 0.0
4/10/2003 0.0 0.3 0.0 0.0 5.1 0.0 0.1 0.7 0.0 15.7 0.8 5.9 6.3
4/11/2003 0.0 0.0 0.0 0.0 0.2 0.3 0.2 0.2 0.0 0.0 0.0 0.0 0.0
4/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/13/2003 0.0 0.0 0.0 0.0 4.5 0.0 0.1 0.5 0.0 13.9 0.6 2.3 5.6
4/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/15/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.5 1.9 1.6 0.0 1.9 2.5 0.0
4/16/2003 2.4 0.4 2.4 2.4 0.9 0.0 0.4 0.9 1.9 2.6 0.0 3.9 1.0
4/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2003 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 3.0 0.0 0.2 1.2
4/19/2003 0.0 1.0 0.0 0.0 3.4 0.0 0.0 0.0 0.9 10.4 3.9 7.8 4.2
4/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4
4/21/2003 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0
4/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
4/25/2003 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.2 0.5 8.0 2.7 0.9 3.2
4/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 0.0 0.0 1.4 2.4 0.0
4/27/2003 4.8 9.0 4.8 4.8 0.0 0.0 0.8 1.8 6.0 0.0 10.9 0.0 0.0
4/28/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 4.3 0.6 0.0
4/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.5 0.9 0.0
5/2/2003 0.0 0.8 0.0 0.0 2.5 0.0 0.1 0.6 0.6 7.7 3.6 1.7 3.1
5/3/2003 0.0 17.6 0.0 0.0 7.7 0.0 0.5 4.2 4.4 23.8 19.0 10.4 9.5
5/4/2003 5.0 0.8 5.0 5.0 1.7 0.0 0.8 1.8 4.0 5.3 2.3 2.3 2.1
5/5/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 2.0 1.3 0.1
5/6/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
5/7/2003 0.4 0.1 0.4 0.4 0.0 0.0 0.1 0.1 0.3 0.0 0.5 0.0 0.0
5/8/2003 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
5/9/2003 0.8 0.1 0.8 0.8 1.5 0.0 0.1 0.3 0.6 4.6 0.0 0.5 1.9
5/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2003 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.0 0.0 7.9 1.3 1.4 3.2
5/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.9 0.0
5/13/2003 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
5/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.0 1.2 0.6 0.0
5/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
5/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.6 0.0 0.0 1.9 3.4 0.0
5/18/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0
5/19/2003 0.0 0.1 0.0 0.0 2.2 0.0 0.0 0.0 0.4 6.8 2.5 2.6 2.7
5/20/2003 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0
5/21/2003 9.0 2.6 9.0 9.0 0.0 0.0 1.5 4.0 7.6 0.0 2.2 2.0 0.5
5/22/2003 6.0 11.4 6.0 6.0 0.0 0.0 1.0 2.7 5.6 0.0 0.9 1.4 0.3
5/23/2003 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.5 4.1 0.0 7.6 0.2 0.1
5/24/2003 2.0 2.0 2.0 2.0 0.0 0.0 0.3 0.8 1.7 0.0 0.2 0.4 0.1
5/25/2003 2.4 0.4 2.4 2.4 0.0 0.0 0.4 1.1 1.9 0.0 0.4 0.6 0.3
5/26/2003 2.0 1.3 2.0 2.0 2.9 0.0 0.3 0.7 1.7 9.0 0.0 0.7 3.6
5/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 0.0
5/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.2
5/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.5 0.2 0.2
6/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 8.1 0.0
6/3/2003 0.0 0.0 0.0 0.0 3.0 4.5 3.7 2.3 0.0 0.0 0.0 0.4 0.2
6/4/2003 6.0 13.2 6.0 6.0 3.9 5.7 5.7 5.3 10.9 0.0 32.9 4.0 0.0
6/5/2003 0.0 19.3 0.0 0.0 0.0 0.0 0.1 0.8 1.4 0.0 6.6 8.5 0.1
6/6/2003 0.0 23.4 0.0 0.0 6.2 9.2 7.6 4.6 1.7 0.0 0.4 0.6 0.0
6/7/2003 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.5 7.8 0.3
6/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 13.8 0.1
6/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.5 0.0 3.1 1.3 0.1
6/10/2003 0.0 0.0 0.0 0.0 1.9 2.8 2.3 1.4 0.0 0.0 0.3 22.8 0.1
6/11/2003 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 3.2 1.7 0.4
6/12/2003 8.0 1.3 8.0 8.0 12.8 19.0 17.0 12.5 6.4 0.0 0.1 6.6 0.0
6/13/2003 0.0 6.3 0.0 0.0 14.1 21.0 17.3 10.5 0.5 0.0 0.1 3.5 0.1
6/14/2003 0.0 0.0 0.0 0.0 7.5 11.2 9.3 5.8 0.4 0.0 2.3 3.4 0.2
6/15/2003 4.0 4.2 4.0 4.0 6.9 10.2 9.1 6.5 3.5 0.0 0.5 2.5 0.2
6/16/2003 10.0 10.2 10.0 10.0 4.9 7.2 7.6 7.4 8.7 0.0 1.8 12.1 0.0
6/17/2003 0.2 0.0 0.2 0.2 3.4 5.1 4.3 2.8 0.2 0.0 2.3 1.2 0.6
6/18/2003 0.2 0.0 0.2 0.2 10.7 0.0 0.0 0.1 0.2 33.1 0.1 2.6 13.2
6/19/2003 8.0 1.3 8.0 8.0 0.0 0.0 1.3 3.4 6.4 0.0 0.6 1.1 0.0
6/20/2003 12.0 15.5 12.0 12.0 0.0 0.0 1.9 4.3 10.6 0.0 0.2 0.4 0.4
6/21/2003 15.4 4.8 15.4 15.4 0.1 0.0 2.6 6.6 12.6 0.0 1.2 14.9 0.2
6/22/2003 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.0 0.2 0.2
6/23/2003 8.0 19.7 8.0 8.0 0.0 0.0 1.3 2.9 8.4 0.0 6.4 10.1 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
6/24/2003 7.6 25.5 7.6 7.6 0.0 0.0 1.2 3.1 9.2 0.0 11.7 7.3 0.1
6/25/2003 6.0 1.1 6.0 6.0 0.0 0.0 1.0 2.4 4.8 0.0 4.2 1.0 0.5
6/26/2003 4.0 17.1 4.0 4.0 20.8 11.0 9.7 7.2 4.7 41.5 5.1 4.8 17.0
6/27/2003 0.0 25.5 0.0 0.0 6.1 9.0 7.4 4.5 1.9 0.0 1.3 0.7 0.2
6/28/2003 0.0 24.1 0.0 0.0 3.5 5.2 4.3 2.6 1.7 0.0 1.1 0.5 0.2
6/29/2003 4.0 6.3 4.0 4.0 5.1 7.6 7.0 5.8 3.6 0.0 0.9 5.8 0.4
6/30/2003 8.0 1.3 8.0 8.0 2.8 4.2 4.8 5.1 6.4 0.0 0.3 0.7 0.2
7/1/2003 0.0 13.8 0.0 0.0 1.6 2.4 2.2 2.8 1.0 0.0 2.1 4.1 0.5
7/2/2003 0.0 48.1 0.0 0.0 0.0 0.0 0.1 0.5 3.5 0.0 1.9 8.0 0.2
7/3/2003 3.0 3.8 3.0 3.0 0.0 0.0 0.8 3.5 2.7 0.0 2.7 5.4 0.3
7/4/2003 4.0 30.8 4.0 4.0 16.8 10.0 9.0 7.4 8.1 31.0 14.7 8.5 12.5
7/5/2003 4.2 3.2 4.2 4.2 49.1 73.0 60.9 38.3 3.6 0.0 4.5 11.2 0.0
7/6/2003 4.0 10.2 4.0 4.0 37.0 55.0 46.1 30.1 3.9 0.0 6.9 5.4 0.1
7/7/2003 2.0 4.5 2.0 2.0 0.0 0.0 0.4 1.1 3.3 0.0 10.9 7.7 0.2
7/8/2003 4.0 7.7 4.0 4.0 0.0 0.0 0.7 2.3 4.0 0.0 6.5 15.5 0.1
7/9/2003 3.2 5.9 3.2 3.2 13.6 0.0 0.6 1.8 5.4 41.9 19.2 4.4 16.8
7/10/2003 1.2 27.4 1.2 1.2 0.0 0.0 0.6 4.2 7.8 0.0 30.3 30.4 0.4
7/11/2003 2.4 31.4 2.4 2.4 0.0 0.0 0.9 5.5 5.1 0.0 13.0 10.9 0.4
7/12/2003 4.6 3.1 4.6 4.6 0.0 0.0 0.8 2.5 3.9 0.0 4.0 7.3 0.3
7/13/2003 3.4 3.4 3.4 3.4 0.0 0.0 0.7 2.8 3.0 0.0 1.8 6.0 0.3
7/14/2003 4.2 14.6 4.2 4.2 0.0 0.0 0.7 2.1 4.4 0.0 5.0 4.0 0.5
7/15/2003 4.0 15.1 4.0 4.0 7.5 11.2 9.9 7.5 4.3 0.0 4.1 3.4 0.1
7/16/2003 3.4 1.4 3.4 3.4 6.9 10.2 9.3 9.4 3.7 0.0 7.5 18.1 0.2
7/17/2003 6.0 10.5 6.0 6.0 4.9 7.2 6.9 5.7 5.5 0.0 1.8 0.8 0.4
7/18/2003 9.0 6.2 9.0 9.0 3.5 5.1 5.8 7.3 8.1 0.0 6.6 4.0 0.5
7/19/2003 8.0 7.5 8.0 8.0 10.3 0.0 1.5 5.0 8.3 31.8 13.5 6.9 12.9
7/20/2003 10.0 1.6 10.0 10.0 0.0 0.0 1.6 4.0 8.0 0.0 4.5 1.5 0.6
7/21/2003 0.0 2.3 0.0 0.0 0.0 0.0 0.3 2.6 0.2 0.0 11.5 18.4 0.6
7/22/2003 2.4 22.3 2.4 2.4 0.0 0.0 0.4 1.1 3.5 0.0 0.7 0.7 0.1
7/23/2003 2.6 40.6 2.6 2.6 0.0 0.0 0.5 1.9 5.2 0.0 2.3 12.1 0.1
7/24/2003 3.8 0.6 3.8 3.8 6.1 0.0 0.8 2.7 3.1 18.9 1.4 11.1 7.7
7/25/2003 5.6 0.9 5.6 5.6 0.0 0.0 1.1 3.5 4.5 0.0 8.3 3.4 0.2
7/26/2003 2.4 10.6 2.4 2.4 0.0 0.0 0.5 1.5 2.7 0.0 4.4 1.7 0.2
7/27/2003 8.0 13.7 8.0 8.0 7.4 11.0 10.4 8.7 8.0 0.0 6.4 1.4 0.3
7/28/2003 8.4 3.0 8.4 8.4 6.1 9.0 8.9 8.4 6.9 0.0 4.5 2.9 0.4
7/29/2003 8.2 3.7 8.2 8.2 3.5 5.2 5.6 5.8 6.8 0.0 7.9 4.9 0.2
7/30/2003 12.4 15.1 12.4 12.4 5.1 7.6 8.3 8.8 11.5 0.0 6.5 1.9 0.3
7/31/2003 10.0 3.8 10.0 10.0 2.9 4.2 5.2 6.5 8.2 0.0 5.8 2.0 0.1
8/1/2003 0.0 7.0 0.0 0.0 1.6 2.4 2.0 1.5 0.5 0.0 5.5 4.6 0.5
8/2/2003 3.0 13.4 3.0 3.0 0.0 0.0 0.6 2.2 3.4 0.0 6.0 11.2 0.5
8/3/2003 0.0 0.2 0.0 0.0 4.2 0.0 0.0 0.3 0.0 13.0 9.0 1.8 5.3
8/4/2003 3.6 10.0 3.6 3.6 4.2 0.0 0.8 3.6 3.6 13.0 10.6 5.9 5.3
8/5/2003 10.0 76.8 10.0 10.0 6.8 10.0 9.9 8.8 13.5 0.0 3.0 1.2 0.0
8/6/2003 0.0 2.8 0.0 0.0 49.1 73.0 60.3 37.1 0.2 0.0 5.5 13.2 0.0
8/7/2003 9.2 1.5 9.2 9.2 37.0 55.0 46.9 31.6 7.4 0.0 4.5 4.9 0.2
8/8/2003 4.4 0.7 4.4 4.4 0.0 0.0 0.9 3.0 5.0 0.0 14.5 9.4 0.4
8/9/2003 8.4 42.6 8.4 8.4 0.0 0.0 1.5 4.5 9.8 0.0 4.9 3.3 0.2
8/10/2003 2.6 0.4 2.6 2.6 0.0 0.0 0.5 1.3 2.1 0.0 4.4 1.1 0.2
8/11/2003 4.8 0.8 4.8 4.8 0.0 0.0 1.0 3.6 3.9 0.0 6.1 4.3 0.3
8/12/2003 18.6 8.0 18.6 18.6 0.1 0.0 3.0 6.9 15.3 0.0 4.6 7.2 0.6
8/13/2003 7.9 7.3 7.9 7.9 0.0 0.0 1.3 3.4 7.4 0.0 10.3 1.2 0.0
8/14/2003 2.6 17.8 2.6 2.6 0.0 0.0 0.4 0.9 3.4 0.0 5.9 0.1 0.0
8/15/2003 4.0 18.7 4.0 4.0 0.0 0.0 0.7 2.2 6.4 0.0 17.4 1.5 0.0
8/16/2003 3.0 4.5 3.0 3.0 0.0 0.0 0.6 2.4 2.7 0.0 5.8 8.7 0.1
8/17/2003 7.8 31.7 7.8 7.8 12.1 0.0 1.3 3.0 10.1 37.2 11.8 7.0 15.2
8/18/2003 0.0 28.8 0.0 0.0 0.0 0.0 0.1 0.9 3.8 0.0 13.2 7.0 0.1
8/19/2003 6.6 11.8 6.6 6.6 0.0 0.0 1.1 2.6 6.1 0.0 5.6 0.7 0.1
8/20/2003 2.2 22.6 2.2 2.2 0.0 0.0 0.4 1.2 3.4 0.0 4.9 1.0 0.1
8/21/2003 6.8 24.9 6.8 6.8 0.0 0.0 1.2 3.5 9.5 0.0 21.1 3.6 0.1
8/22/2003 6.6 13.6 6.6 6.6 6.5 0.0 1.4 5.5 8.9 20.0 18.9 10.5 8.2
8/23/2003 0.0 1.5 0.0 0.0 3.7 5.5 4.6 3.3 0.1 0.0 6.7 2.3 0.2
8/24/2003 0.0 0.8 0.0 0.0 5.2 7.8 6.5 4.3 0.1 0.0 5.6 1.4 0.1
8/25/2003 2.4 0.6 2.4 2.4 19.1 9.2 8.0 6.1 2.5 39.9 3.3 5.0 16.1
8/26/2003 1.0 7.0 1.0 1.0 9.2 13.7 11.6 8.5 1.9 0.0 4.3 3.5 0.2
8/27/2003 0.0 22.0 0.0 0.0 12.0 17.8 14.7 9.2 2.4 0.0 5.5 8.9 0.2
8/28/2003 2.0 29.1 2.0 2.0 0.0 0.0 0.3 0.8 3.7 0.0 1.4 0.6 0.4
8/29/2003 0.0 6.5 0.0 0.0 0.0 0.0 0.1 0.7 0.5 0.0 1.7 6.2 0.3
8/30/2003 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.6 3.1 0.0
8/31/2003 0.0 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.2 0.0 0.0
9/1/2003 6.0 7.7 6.0 6.0 0.0 0.0 1.0 2.4 5.4 0.0 1.8 6.5 0.1
9/2/2003 2.0 10.2 2.0 2.0 0.0 0.0 0.6 3.4 2.7 0.0 4.6 10.5 0.1
9/3/2003 0.0 1.5 0.0 0.0 1.8 0.0 0.2 1.4 0.3 5.5 4.2 13.6 2.3
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
9/4/2003 4.0 6.2 4.0 4.0 10.9 11.2 10.0 8.1 3.9 10.3 4.7 7.7 4.3
9/5/2003 6.0 9.2 6.0 6.0 16.9 21.2 18.6 14.0 5.8 8.0 8.1 5.2 3.3
9/6/2003 4.0 4.8 4.0 4.0 25.4 33.4 28.3 19.3 3.9 8.9 6.8 4.9 3.7
9/7/2003 2.2 0.4 2.2 2.2 3.5 5.2 4.7 3.7 1.8 0.0 5.4 1.0 0.1
9/8/2003 7.0 5.3 7.0 7.0 4.6 6.8 6.7 6.0 5.9 0.0 1.9 11.7 0.1
9/9/2003 8.0 8.4 8.0 8.0 6.1 9.0 9.1 11.0 7.0 0.0 9.7 8.1 0.0
9/10/2003 3.4 11.4 3.4 3.4 0.0 0.0 0.6 1.6 4.8 0.0 13.2 0.6 0.0
9/11/2003 2.6 0.4 2.6 2.6 0.0 0.0 0.5 1.3 2.1 0.0 4.5 0.8 0.0
9/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0
9/13/2003 0.4 20.7 0.4 0.4 0.0 0.0 0.1 0.7 1.8 0.0 4.1 1.2 0.0
9/14/2003 12.0 60.3 12.0 12.0 0.0 0.0 2.1 6.1 14.8 0.0 14.0 3.7 0.0
9/15/2003 6.0 10.5 6.0 6.0 5.3 0.0 1.0 2.9 6.5 16.3 7.1 12.3 6.5
9/16/2003 10.0 15.2 10.0 10.0 0.0 0.0 1.9 6.8 12.8 0.0 25.5 13.3 0.0
9/17/2003 2.8 23.4 2.8 2.8 2.0 0.0 0.7 3.4 3.9 6.1 13.2 10.8 2.5
9/18/2003 0.0 0.2 0.0 0.0 2.4 0.0 0.1 1.0 0.0 7.4 6.0 2.6 3.0
9/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0.0
9/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0 0.0
9/21/2003 0.0 10.4 0.0 0.0 2.7 0.0 0.0 0.2 1.2 8.3 2.2 0.9 3.3
9/22/2003 2.0 1.3 2.0 2.0 2.6 0.0 0.5 2.4 2.2 7.8 4.2 8.0 3.1
9/23/2003 7.2 36.3 7.2 7.2 9.0 5.4 5.8 6.9 8.4 16.6 2.3 9.7 6.6
9/24/2003 6.8 22.4 6.8 6.8 4.2 6.2 6.3 6.6 7.0 0.0 3.9 6.6 0.0
9/25/2003 4.0 5.7 4.0 4.0 5.3 7.8 7.2 6.1 3.6 0.0 3.3 5.0 0.0
9/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0.0
9/27/2003 0.0 7.4 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 4.2 0.0 0.0
9/28/2003 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 3.2 0.5 0.0
9/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/4/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2003 0.0 0.0 0.0 0.0 2.2 0.0 0.0 0.0 0.0 6.7 0.0 0.5 2.7
10/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2003 0.0 0.0 0.0 0.0 9.4 14.0 11.5 7.0 0.0 0.0 0.0 0.9 0.2
10/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/12/2003 0.0 0.0 0.0 0.0 12.1 18.0 14.8 9.0 0.0 0.0 0.0 1.0 0.0
10/13/2003 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
10/14/2003 0.0 0.0 0.0 0.0 4.5 6.7 5.5 3.4 0.0 0.0 0.0 0.4 0.0
10/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2003 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 8.1 0.0 0.6 3.3
10/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2003 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.6 0.0 0.1 0.7
10/25/2003 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.4 0.0 1.6 0.4 1.0 0.7
10/26/2003 0.0 0.0 0.0 0.0 6.8 0.0 0.0 0.0 0.0 20.9 0.1 1.6 8.4
10/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
10/28/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2003 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
11/5/2003 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
11/6/2003 1.0 0.2 1.0 1.0 0.5 0.7 0.7 0.7 0.8 0.0 0.0 0.0 0.0
11/7/2003 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0
11/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2003 0.0 0.0 0.0 0.0 1.2 0.0 0.0 0.0 0.0 3.6 0.0 0.3 1.4
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/15/2003 2.0 0.3 2.0 2.0 1.2 0.0 0.3 0.7 1.6 3.6 0.0 0.3 1.4
11/16/2003 3.0 1.5 3.0 3.0 0.0 0.0 0.5 1.1 2.5 0.0 0.0 0.0 0.0
11/17/2003 1.0 2.0 1.0 1.0 0.0 0.0 0.2 0.4 0.9 0.0 0.1 0.0 0.0
11/18/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2003 0.0 0.0 0.0 0.0 5.2 7.8 6.4 3.9 0.0 0.0 0.0 0.4 0.0
11/23/2003 0.0 0.0 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.0 0.3 0.0
11/24/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2003 0.0 0.0 0.0 0.0 5.2 7.8 6.4 3.9 0.0 0.0 0.0 0.4 0.0
11/29/2003 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
11/30/2003 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 0.0 0.5 0.0
12/1/2003 0.0 0.0 0.0 0.0 12.0 17.8 14.7 8.9 0.0 0.0 0.0 1.0 0.0
12/2/2003 0.0 0.0 0.0 0.0 15.6 23.2 19.1 11.6 0.0 0.0 0.0 1.2 0.0
12/3/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2003 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
12/5/2003 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
12/6/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
12/7/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4
12/9/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2003 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.1 0.1 0.1
12/17/2003 2.0 0.3 2.0 2.0 4.6 6.8 5.9 4.1 1.6 0.0 0.0 0.4 0.0
12/18/2003 1.0 0.2 1.0 1.0 6.3 9.4 7.9 5.1 0.8 0.0 0.0 0.5 0.0
12/19/2003 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
12/20/2003 0.0 0.0 0.0 0.0 4.6 6.8 5.6 3.4 0.0 0.0 0.0 0.4 0.0
12/21/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2003 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
12/24/2003 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
12/25/2003 0.0 0.0 0.0 0.0 0.3 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0
12/26/2003 0.0 0.0 0.0 0.0 10.4 15.5 12.8 7.8 0.0 0.0 0.0 0.8 0.0
12/27/2003 0.0 0.0 0.0 0.0 20.8 6.8 5.7 3.9 0.0 50.1 0.6 5.4 20.1
12/28/2003 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
12/29/2003 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
12/30/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/4/2004 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
1/5/2004 4.0 0.7 4.0 4.0 7.3 0.0 0.6 1.4 3.2 22.6 0.0 1.8 9.1
1/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2004 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
1/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2004 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.9 0.0
1/18/2004 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.4 4.8 0.0 0.3 0.6 0.0
1/19/2004 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 3.0 0.0 0.0
1/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 5.6 0.0 0.0
1/21/2004 10.0 4.3 10.0 10.0 6.6 0.0 1.6 3.6 8.2 20.3 4.3 1.6 8.1
1/22/2004 8.0 2.3 8.0 8.0 0.0 0.0 1.3 2.9 6.8 0.0 1.3 2.1 0.0
1/23/2004 0.0 42.0 0.0 0.0 11.0 0.0 0.2 2.4 6.4 33.9 18.9 7.2 13.6
1/24/2004 0.0 0.0 0.0 0.0 4.4 0.0 0.0 0.0 0.0 13.6 0.5 1.1 5.4
1/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.0 0.0 0.6 1.2 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
1/26/2004 0.0 0.0 0.0 0.0 0.3 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0
1/27/2004 0.0 0.0 0.0 0.0 7.4 11.0 9.1 5.5 0.0 0.0 0.0 0.6 0.0
1/28/2004 6.0 1.0 6.0 6.0 10.2 15.2 13.5 9.7 4.8 0.0 5.7 2.4 0.0
1/29/2004 10.0 1.6 10.0 10.0 0.0 0.0 1.7 4.1 8.0 0.0 7.4 9.7 0.0
1/30/2004 11.0 12.7 11.0 11.0 6.0 0.0 2.0 6.2 10.1 18.3 7.4 6.1 7.3
1/31/2004 4.0 2.3 4.0 4.0 0.0 0.0 0.6 1.4 3.6 0.0 1.6 0.0 0.0
2/1/2004 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 2.3 0.1 0.2 0.9
2/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/5/2004 0.0 0.0 0.0 0.0 11.5 17.1 14.1 8.6 0.0 0.0 0.0 0.9 0.0
2/6/2004 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 0.0 0.5 0.0
2/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2004 0.0 3.2 0.0 0.0 2.5 0.0 0.0 0.1 0.2 7.8 0.2 0.9 3.1
2/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
2/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
2/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2004 0.0 0.0 0.0 0.0 9.3 0.0 0.0 0.0 0.0 28.9 0.0 2.2 11.6
3/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/10/2004 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
3/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2004 0.0 0.0 0.0 0.0 6.5 0.0 0.0 0.0 0.0 20.2 0.0 1.6 8.1
3/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
3/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
3/26/2004 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.1 0.3 0.0
3/27/2004 0.0 0.0 0.0 0.0 6.0 8.9 7.3 4.5 0.0 0.0 0.5 0.5 0.0
3/28/2004 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
3/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2004 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
4/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/4/2004 0.0 0.0 0.0 0.0 2.1 0.0 0.0 0.0 0.0 6.4 0.0 0.5 2.6
4/5/2004 0.0 4.2 0.0 0.0 8.3 0.0 0.0 0.0 0.6 25.7 1.5 2.0 10.3
4/6/2004 8.0 1.3 8.0 8.0 6.8 0.0 1.3 2.8 6.4 21.0 0.0 13.9 9.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/7/2004 2.0 3.8 2.0 2.0 4.5 0.0 0.3 0.7 2.5 14.0 3.2 1.2 5.7
4/8/2004 1.2 3.5 1.2 1.2 0.0 0.0 0.2 0.4 1.5 0.0 1.3 0.0 0.0
4/9/2004 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
4/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2004 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
4/19/2004 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
4/20/2004 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.1 0.1
4/21/2004 4.0 7.2 4.0 4.0 8.6 0.0 0.6 1.4 3.7 26.6 0.1 2.2 10.7
4/22/2004 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.2 0.5 0.5
4/23/2004 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 1.5 0.0 0.0
4/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/25/2004 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.0 3.5 0.0
4/26/2004 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 6.1 0.3
4/27/2004 2.0 5.3 2.0 2.0 0.0 0.0 0.3 0.9 4.6 0.0 13.9 0.9 0.0
4/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/29/2004 0.0 11.7 0.0 0.0 0.0 0.0 0.0 0.2 5.0 0.0 19.8 7.1 1.1
4/30/2004 0.0 41.9 0.0 0.0 4.3 0.0 0.5 5.0 4.3 13.3 12.7 20.1 5.3
5/1/2004 0.0 1.5 0.0 0.0 9.1 0.0 0.0 0.4 0.1 27.9 0.5 8.3 11.2
5/2/2004 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
5/3/2004 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
5/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 0.0
5/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
5/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2004 0.0 0.0 0.0 0.0 3.0 4.4 3.6 2.2 0.0 0.0 0.2 0.3 0.0
5/17/2004 0.0 12.6 0.0 0.0 3.8 5.6 4.8 4.8 0.9 0.0 2.4 6.4 0.0
5/18/2004 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.8 1.2 0.0 5.6 3.8 0.1
5/19/2004 6.0 1.3 6.0 6.0 5.3 7.8 7.5 7.0 5.1 0.0 2.3 2.7 0.3
5/20/2004 2.0 1.4 2.0 2.0 2.6 0.0 0.4 1.4 3.6 8.1 9.7 1.8 3.3
5/21/2004 1.0 3.2 1.0 1.0 0.0 0.0 0.2 0.4 1.0 0.0 0.2 4.3 0.3
5/22/2004 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 0.2 0.1
5/23/2004 0.0 1.1 0.0 0.0 9.4 11.2 9.3 6.3 0.1 5.8 0.7 2.7 2.5
5/24/2004 0.0 0.0 0.0 0.0 1.9 0.0 0.0 0.0 0.0 5.7 0.0 3.4 2.4
5/25/2004 2.4 0.4 2.4 2.4 0.0 0.0 0.4 1.4 1.9 0.0 1.2 1.1 0.0
5/26/2004 2.0 6.2 2.0 2.0 1.7 0.0 0.4 1.0 2.0 5.3 0.4 5.3 2.1
5/27/2004 0.0 0.0 0.0 0.0 2.8 0.0 0.0 0.0 0.0 8.6 0.1 0.7 3.4
5/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 17.2 1.0
5/30/2004 0.0 0.0 0.0 0.0 1.5 0.0 0.1 0.8 0.0 4.7 0.8 2.1 1.9
5/31/2004 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.2 0.0 0.0
6/1/2004 6.6 1.9 6.6 6.6 11.5 17.0 15.1 10.9 5.4 0.0 0.1 3.3 0.0
6/2/2004 0.0 0.0 0.0 0.0 12.1 18.0 14.8 9.0 0.0 0.0 0.4 5.9 0.0
6/3/2004 0.0 0.0 0.0 0.0 20.4 30.4 25.1 15.9 0.0 0.0 1.2 3.0 0.0
6/4/2004 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.7 0.1
6/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 4.4 0.0
6/6/2004 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 7.5 0.0
6/7/2004 21.0 3.4 21.0 21.0 0.1 0.0 3.4 7.5 16.9 0.0 0.1 0.0 0.0
6/8/2004 10.0 2.6 10.0 10.0 0.0 0.0 1.6 3.6 8.1 0.0 0.2 0.0 0.0
6/9/2004 0.0 0.0 0.0 0.0 3.6 5.4 4.5 3.2 0.0 0.0 0.6 1.5 0.0
6/10/2004 0.0 0.5 0.0 0.0 4.6 6.9 5.9 5.5 0.1 0.0 2.1 4.6 0.0
6/11/2004 0.0 0.0 0.0 0.0 47.8 71.1 58.6 35.6 0.0 0.0 0.0 3.8 0.0
6/12/2004 0.0 0.0 0.0 0.0 47.8 71.1 58.7 36.3 0.0 0.0 0.7 6.2 0.0
6/13/2004 10.2 13.2 10.2 10.2 12.1 18.0 16.5 12.6 9.0 0.0 0.7 2.1 1.1
6/14/2004 8.0 53.7 8.0 8.0 12.7 18.9 16.9 12.5 10.5 0.0 2.2 3.6 0.1
6/15/2004 0.0 3.0 0.0 0.0 14.4 21.4 17.7 10.7 0.4 0.0 0.9 6.1 0.2
6/16/2004 0.0 11.7 0.0 0.0 29.5 0.2 0.2 0.2 2.2 90.5 6.5 8.9 36.9
6/17/2004 9.2 1.5 9.2 9.2 0.0 0.0 1.5 3.3 8.2 0.0 3.9 5.9 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
6/18/2004 6.0 1.1 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 7.2 0.1
6/19/2004 0.0 17.2 0.0 0.0 0.0 0.0 0.2 1.4 1.3 0.0 1.8 4.5 0.2
6/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.6 0.0
6/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
6/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
6/24/2004 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.0 0.0
6/25/2004 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.0 0.0 0.0
6/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.9 0.0 0.0 2.9 5.9 0.0
6/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0
6/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 3.5 0.0
6/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 4.5 0.0
7/1/2004 2.0 13.2 2.0 2.0 0.0 0.0 0.3 0.7 2.5 0.0 1.6 3.3 0.3
7/2/2004 0.0 25.5 0.0 0.0 0.0 0.0 0.0 0.1 1.9 0.0 1.1 5.9 0.2
7/3/2004 0.0 2.7 0.0 0.0 0.0 0.0 0.1 0.8 0.2 0.0 0.9 4.0 0.5
7/4/2004 0.0 24.1 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.4 0.3 0.2
7/5/2004 0.0 14.1 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.2 1.7 0.5
7/6/2004 6.0 19.4 6.0 6.0 0.0 0.0 1.0 3.0 7.9 0.0 9.2 6.0 0.3
7/7/2004 2.0 47.5 2.0 2.0 0.0 0.0 0.4 1.7 7.4 0.0 12.5 9.0 0.2
7/8/2004 0.0 10.6 0.0 0.0 10.1 15.0 12.4 7.8 0.8 0.0 1.6 5.5 0.3
7/9/2004 0.0 1.3 0.0 0.0 11.4 17.0 14.1 9.5 0.1 0.0 1.0 9.0 0.0
7/10/2004 0.0 0.0 0.0 0.0 12.8 19.0 15.7 9.8 0.0 0.0 0.8 4.7 0.0
7/11/2004 0.0 1.5 0.0 0.0 14.1 21.0 17.3 10.6 1.6 0.0 6.9 7.4 0.0
7/12/2004 0.0 8.0 0.0 0.0 8.1 12.0 9.9 6.0 0.6 0.0 0.2 5.6 0.1
7/13/2004 8.0 5.8 8.0 8.0 9.4 13.9 12.9 11.2 6.8 0.0 2.1 7.3 0.2
7/14/2004 6.0 11.2 6.0 6.0 0.0 0.0 1.0 2.7 5.6 0.0 0.8 2.5 0.2
7/15/2004 15.0 5.1 15.0 15.0 49.1 73.0 62.8 43.3 12.3 0.0 1.7 10.0 1.1
7/16/2004 10.0 1.6 10.0 10.0 29.6 44.0 38.1 27.9 8.1 0.0 2.6 7.6 0.4
7/17/2004 8.0 6.2 8.0 8.0 7.4 11.0 10.4 8.4 6.8 0.0 0.4 4.0 0.0
7/18/2004 6.0 23.1 6.0 6.0 0.3 0.4 1.4 3.2 6.4 0.0 1.2 8.7 0.0
7/19/2004 0.0 8.0 0.0 0.0 7.8 0.0 0.0 0.0 0.6 24.0 0.4 1.9 9.6
7/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 5.7 0.1
7/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0
7/22/2004 0.0 7.9 0.0 0.0 0.0 0.0 0.1 1.0 0.6 0.0 1.2 6.8 0.0
7/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.4 4.9 0.0
7/24/2004 0.0 2.7 0.0 0.0 0.0 0.0 0.0 0.4 0.2 0.0 0.5 1.0 2.8
7/25/2004 0.0 28.8 0.0 0.0 10.4 0.0 0.2 1.4 2.1 31.9 2.2 6.1 13.5
7/26/2004 15.0 28.1 15.0 15.0 14.3 5.2 6.9 10.0 13.9 33.3 3.2 9.0 13.9
7/27/2004 30.0 21.5 30.0 30.0 7.6 3.2 7.8 15.7 25.4 16.7 5.0 9.6 8.8
7/28/2004 15.4 7.2 15.4 15.4 10.7 7.8 9.1 11.4 12.7 16.7 2.5 7.9 7.1
7/29/2004 18.4 6.8 18.4 18.4 6.4 9.5 10.9 12.4 15.1 0.0 1.4 3.0 0.2
7/30/2004 27.2 39.6 27.2 27.2 2.9 4.2 8.0 13.7 24.4 0.0 3.1 4.7 0.5
7/31/2004 10.4 28.7 10.4 10.4 3.9 5.7 6.7 10.0 10.4 0.0 4.1 16.4 0.5
8/1/2004 10.0 10.0 10.0 10.0 0.0 0.0 1.9 6.4 8.7 0.0 3.3 8.0 0.2
8/2/2004 2.0 2.2 2.0 2.0 0.0 0.0 0.4 1.7 1.8 0.0 1.8 7.0 0.4
8/3/2004 0.0 2.5 0.0 0.0 2.1 0.0 0.1 0.5 0.2 6.6 0.9 2.8 3.0
8/4/2004 0.0 1.5 0.0 0.0 4.2 0.0 0.0 0.3 0.1 13.1 0.6 2.2 5.8
8/5/2004 6.8 21.0 6.8 6.8 10.7 0.0 1.5 6.1 7.0 32.8 5.4 10.4 13.2
8/6/2004 10.0 19.0 10.0 10.0 0.0 0.0 1.6 3.7 9.3 0.0 0.8 0.7 0.4
8/7/2004 2.0 15.2 2.0 2.0 7.5 0.0 0.7 4.2 2.7 23.0 4.1 9.6 9.6
8/8/2004 0.0 9.5 0.0 0.0 0.0 0.0 0.1 1.1 0.7 0.0 1.9 3.2 0.8
8/9/2004 0.0 0.3 0.0 0.0 7.5 11.2 9.5 8.1 0.1 0.0 3.3 5.8 0.1
8/10/2004 0.0 0.0 0.0 0.0 10.6 15.7 12.9 7.9 0.0 0.0 0.5 1.6 0.7
8/11/2004 0.0 3.5 0.0 0.0 13.2 19.7 16.3 10.4 0.3 0.0 0.7 2.8 0.5
8/12/2004 0.0 0.4 0.0 0.0 13.5 20.0 16.6 10.7 0.0 0.0 1.9 7.4 0.7
8/13/2004 8.5 3.6 8.5 8.5 21.9 21.0 18.7 13.6 7.0 24.0 0.3 5.7 9.8
8/14/2004 6.2 11.1 6.2 6.2 2.7 4.0 4.4 5.0 5.7 0.0 1.2 6.8 0.0
8/15/2004 4.8 26.4 4.8 4.8 7.8 0.0 1.2 5.5 5.8 24.0 5.0 11.5 10.6
8/16/2004 6.0 12.4 6.0 6.0 10.4 0.0 1.3 5.5 5.7 32.0 4.3 9.7 12.8
8/17/2004 4.0 5.4 4.0 4.0 6.7 10.0 8.9 6.7 3.6 0.0 0.7 1.1 0.0
8/18/2004 0.0 1.0 0.0 0.0 5.6 8.3 6.9 4.6 0.1 0.0 1.0 1.3 0.0
8/19/2004 0.0 5.4 0.0 0.0 3.2 4.7 3.9 2.5 0.7 0.0 1.7 0.5 0.0
8/20/2004 0.0 17.4 0.0 0.0 0.0 0.0 0.3 2.7 1.3 0.0 3.8 5.7 0.0
8/21/2004 0.0 20.9 0.0 0.0 0.0 0.0 0.2 2.2 1.6 0.0 2.7 4.6 0.0
8/22/2004 3.4 8.9 3.4 3.4 0.0 0.0 0.9 4.9 5.8 0.0 15.4 7.3 0.0
8/23/2004 0.4 8.3 0.4 0.4 0.0 0.0 0.2 1.6 0.9 0.0 1.8 3.1 0.0
8/24/2004 0.0 7.5 0.0 0.0 0.0 0.0 0.5 4.8 2.0 0.0 11.4 9.9 0.0
8/25/2004 0.0 0.7 0.0 0.0 3.6 5.4 4.5 2.8 0.1 0.0 0.5 5.4 0.0
8/26/2004 0.0 7.2 0.0 0.0 1.2 1.8 1.6 2.0 0.5 0.0 1.5 9.2 0.0
8/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0
8/28/2004 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.0 1.6 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
8/29/2004 10.2 1.8 10.2 10.2 7.0 10.4 10.2 8.8 8.2 0.0 0.0 2.3 0.0
8/30/2004 6.0 1.0 6.0 6.0 2.2 3.2 3.6 3.7 4.8 0.0 0.0 0.2 0.0
8/31/2004 0.0 0.0 0.0 0.0 5.2 7.8 6.4 4.0 0.0 0.0 0.1 0.7 0.0
9/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0
9/5/2004 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 6.2 0.0
9/6/2004 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 6.0 0.0
9/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0
9/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0
9/9/2004 10.0 49.1 10.0 10.0 0.0 0.0 1.6 3.6 11.5 0.0 0.7 3.6 0.0
9/10/2004 3.8 0.6 3.8 3.8 0.0 0.0 0.6 1.4 3.1 0.0 0.6 0.9 0.0
9/11/2004 4.0 3.0 4.0 4.0 0.0 0.0 0.6 1.4 3.4 0.0 0.0 4.9 0.0
9/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
9/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0
9/15/2004 19.2 3.1 19.2 19.2 0.1 0.0 3.1 6.8 15.4 0.0 0.3 0.0 0.0
9/16/2004 10.6 1.7 10.6 10.6 0.0 0.0 1.7 3.8 8.5 0.0 0.0 0.0 0.0
9/17/2004 6.8 1.1 6.8 6.8 0.0 0.0 1.1 2.4 5.5 0.0 0.0 0.0 0.0
9/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1
9/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.8 0.1 0.0 4.0 8.0 0.1
9/20/2004 0.0 2.0 0.0 0.0 2.9 4.3 3.8 5.0 1.8 0.0 11.2 8.7 0.5
9/21/2004 8.8 63.4 8.8 8.8 4.9 7.2 7.5 8.9 18.0 0.0 33.7 5.7 0.3
9/22/2004 6.6 44.0 6.6 6.6 44.8 8.9 8.4 6.9 8.4 119.9 1.3 11.0 48.0
9/23/2004 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 1.8 0.0
9/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 0.0
9/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0
9/26/2004 0.0 0.0 0.0 0.0 0.5 0.8 0.7 0.4 0.0 0.0 0.0 1.6 0.0
9/27/2004 0.0 0.0 0.0 0.0 1.3 2.0 1.6 1.0 0.0 0.0 0.0 6.0 0.0
9/28/2004 2.0 3.8 2.0 2.0 4.8 7.2 6.3 4.3 1.9 0.0 0.1 5.0 0.0
9/29/2004 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 3.8 0.0
9/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2004 0.0 22.6 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.3 3.4 0.2
10/2/2004 3.0 2.7 3.0 3.0 0.0 0.0 0.5 1.5 2.7 0.0 1.6 3.6 0.1
10/3/2004 1.0 0.2 1.0 1.0 0.0 0.0 0.2 1.1 1.3 0.0 3.4 2.9 0.0
10/4/2004 0.0 11.6 0.0 0.0 1.4 0.0 0.2 1.4 2.0 4.2 7.4 7.7 1.7
10/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
10/7/2004 0.8 0.1 0.8 0.8 3.6 5.4 4.6 3.0 0.6 0.0 0.6 0.3 0.0
10/8/2004 0.0 0.0 0.0 0.0 3.4 3.2 2.6 1.6 0.0 3.9 0.3 0.5 1.5
10/9/2004 2.0 0.3 2.0 2.0 0.5 0.7 0.9 1.1 1.6 0.0 0.3 0.2 0.2
10/10/2004 10.0 12.0 10.0 10.0 0.0 0.0 1.8 5.6 8.8 0.0 2.5 5.2 0.9
10/11/2004 30.0 15.6 30.0 30.0 4.2 0.0 5.5 16.8 25.6 12.7 9.3 13.9 5.2
10/12/2004 8.4 1.4 8.4 8.4 4.6 0.0 1.5 4.8 7.6 14.0 5.7 4.8 5.6
10/13/2004 4.8 0.8 4.8 4.8 0.0 0.0 0.8 1.7 3.9 0.0 0.0 0.5 0.5
10/14/2004 0.0 7.5 0.0 0.0 0.0 0.0 0.2 1.5 0.6 0.0 1.9 3.1 0.0
10/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
10/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2
10/20/2004 0.0 0.0 0.0 0.0 2.3 3.4 2.8 1.7 0.0 0.0 0.0 0.2 1.0
10/21/2004 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 1.4
10/22/2004 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
10/23/2004 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.5 0.0 0.0 0.0 1.0 0.0
10/24/2004 0.0 0.0 0.0 0.0 5.7 6.0 4.9 3.0 0.0 5.3 0.3 0.7 2.1
10/25/2004 0.0 0.0 0.0 0.0 4.7 7.0 5.8 3.5 0.0 0.0 0.9 0.5 0.1
10/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2004 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 7.9 0.0 0.6 3.2
10/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2004 4.0 0.7 4.0 4.0 0.0 0.0 0.6 1.4 3.2 0.0 0.0 0.0 0.0
10/30/2004 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
10/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/3/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
11/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2004 0.0 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 2.7 0.0 0.2 1.1
11/19/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2004 0.0 13.4 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.2 0.0 0.0
11/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2004 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
11/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2004 10.2 1.7 10.2 10.2 1.5 0.0 1.6 3.6 8.2 4.4 0.0 0.3 1.8
11/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2004 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
12/2/2004 0.0 0.0 0.0 0.0 0.5 0.7 0.6 0.4 0.0 0.0 0.0 0.0 0.0
12/3/2004 0.0 0.0 0.0 0.0 2.0 3.0 2.5 1.5 0.0 0.0 0.0 0.2 0.0
12/4/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
12/6/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
12/8/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
12/9/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/11/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/12/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
12/15/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2004 0.0 0.0 0.0 0.0 8.1 7.2 5.9 3.6 0.0 10.2 0.0 1.2 4.1
12/20/2004 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
12/21/2004 0.0 0.0 0.0 0.0 2.0 3.0 2.5 1.5 0.0 0.0 0.0 0.2 0.0
12/22/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/24/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/25/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
12/26/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/28/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2004 6.0 1.0 6.0 6.0 1.2 0.0 1.0 2.1 4.8 3.7 0.0 0.3 1.5
12/31/2004 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.0
1/1/2005 0.0 0.0 0.0 0.0 16.6 0.0 0.0 0.3 0.0 51.3 0.3 4.6 20.5
1/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/3/2005 10.0 1.6 10.0 10.0 0.0 0.0 1.7 4.2 8.0 0.0 0.7 1.4 0.0
1/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2005 18.8 3.1 18.8 18.8 0.1 0.0 3.0 6.7 15.1 0.0 0.0 0.0 0.0
1/15/2005 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.8 8.0 0.0 0.3 0.6 0.0
1/16/2005 3.8 11.8 3.8 3.8 4.3 6.4 6.0 5.9 3.9 0.0 1.6 4.8 0.0
1/17/2005 2.0 44.0 2.0 2.0 21.0 5.3 4.8 4.7 4.8 53.9 3.2 12.2 21.6
1/18/2005 0.0 0.0 0.0 0.0 4.4 0.0 0.1 1.0 0.0 13.5 1.4 9.9 5.4
1/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
1/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 3.3 0.0
1/21/2005 6.0 5.0 6.0 6.0 3.3 0.0 1.1 3.0 5.1 10.2 1.2 8.4 4.1
1/22/2005 7.2 33.3 7.2 7.2 3.3 0.0 1.3 3.5 8.1 10.2 2.6 5.0 4.1
1/23/2005 3.0 8.2 3.0 3.0 6.6 0.0 0.6 1.7 3.0 20.5 0.9 3.0 8.2
1/24/2005 0.0 0.0 0.0 0.0 3.3 0.0 0.0 0.0 0.0 10.2 0.0 0.8 4.1
1/25/2005 0.0 0.0 0.0 0.0 6.6 0.0 0.0 0.0 0.0 20.5 0.1 1.6 8.2
1/26/2005 18.0 2.9 18.0 18.0 0.1 0.0 2.9 6.4 14.5 0.0 0.0 0.0 0.0
1/27/2005 11.0 1.8 11.0 11.0 0.0 0.0 1.8 4.2 8.8 0.0 0.5 3.9 0.0
1/28/2005 6.4 1.0 6.4 6.4 11.8 0.0 1.1 2.7 5.1 36.3 0.4 3.7 14.5
1/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/31/2005 0.0 23.1 0.0 0.0 7.8 0.0 0.1 0.8 1.7 24.2 2.1 3.6 9.7
2/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 9.6 0.0
2/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.8 1.6 0.1
2/3/2005 8.8 1.4 8.8 8.8 0.0 0.0 1.4 3.1 7.1 0.0 0.1 0.7 0.7
2/4/2005 7.2 1.2 7.2 7.2 0.0 0.0 1.3 3.6 5.8 0.0 1.1 2.3 0.0
2/5/2005 13.8 2.2 13.8 13.8 0.0 0.0 2.2 4.9 11.1 0.0 0.1 0.0 0.0
2/6/2005 20.2 11.7 20.2 20.2 1.5 0.0 3.3 7.9 16.9 4.3 1.2 2.6 1.7
2/7/2005 25.2 6.9 25.2 25.2 8.4 0.0 4.2 10.1 20.5 25.8 2.5 4.4 10.4
2/8/2005 8.0 5.8 8.0 8.0 2.8 0.0 1.4 4.0 6.8 8.6 1.3 3.2 3.7
2/9/2005 3.8 0.6 3.8 3.8 0.0 0.0 0.6 1.4 3.1 0.0 0.0 0.1 0.1
2/10/2005 10.8 1.8 10.8 10.8 0.0 0.0 1.7 3.8 8.7 0.0 0.0 0.0 0.0
2/11/2005 0.0 1.3 0.0 0.0 0.0 0.0 0.1 0.6 0.1 0.0 0.6 1.2 0.0
2/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2005 10.0 1.6 10.0 10.0 3.2 0.0 1.6 3.6 8.0 9.9 0.0 0.8 4.0
2/15/2005 8.4 10.4 8.4 8.4 3.2 0.0 1.3 3.0 7.4 9.9 0.5 0.8 4.0
2/16/2005 4.0 0.7 4.0 4.0 0.0 0.0 0.8 2.6 3.2 0.0 1.3 2.5 0.0
2/17/2005 2.8 4.0 2.8 2.8 0.0 0.0 0.5 1.7 2.5 0.0 0.9 3.2 0.4
2/18/2005 4.2 0.7 4.2 4.2 0.0 0.0 0.7 1.5 3.4 0.0 0.1 0.2 0.2
2/19/2005 0.6 5.0 0.6 0.6 0.0 0.0 0.1 0.2 0.8 0.0 0.1 0.0 0.0
2/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/21/2005 0.0 2.2 0.0 0.0 3.5 0.0 0.2 2.2 0.2 10.7 2.3 5.3 4.3
2/22/2005 0.0 5.7 0.0 0.0 3.5 0.0 0.0 0.0 0.4 10.7 0.4 0.9 4.3
2/23/2005 0.0 0.0 0.0 0.0 6.8 10.1 8.3 5.1 0.0 0.0 0.0 0.6 0.0
2/24/2005 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 3.7 0.5
2/25/2005 0.0 0.0 0.0 0.0 4.2 6.2 5.1 3.1 0.0 0.0 0.0 0.4 0.1
2/26/2005 8.0 1.3 8.0 8.0 2.2 3.2 3.9 4.4 6.4 0.0 0.0 1.0 0.0
2/27/2005 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
2/28/2005 2.8 0.5 2.8 2.8 0.0 0.0 0.4 1.0 2.3 0.0 0.0 0.0 0.0
3/1/2005 0.0 0.0 0.0 0.0 4.3 6.4 5.3 3.2 0.0 0.0 0.0 0.3 0.0
3/2/2005 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.6 0.0 0.0 0.0 0.3 0.0
3/3/2005 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 1.6 0.6 0.1
3/4/2005 2.0 0.3 2.0 2.0 3.7 0.0 0.3 0.7 1.6 11.4 3.0 0.9 4.5
3/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 0.0
3/6/2005 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
3/7/2005 2.8 0.5 2.8 2.8 5.2 0.0 0.4 1.0 2.3 16.0 0.0 1.2 6.4
3/8/2005 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 8.0 0.0 5.1 3.2
3/9/2005 3.0 0.5 3.0 3.0 5.2 0.0 0.5 1.6 2.4 16.0 0.7 3.1 6.4
3/10/2005 0.0 0.0 0.0 0.0 2.6 0.0 0.1 1.0 0.0 8.0 1.0 2.8 3.4
3/11/2005 0.0 0.0 0.0 0.0 7.0 0.0 0.0 0.4 0.0 21.5 0.4 2.5 8.6
3/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/14/2005 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
3/15/2005 0.0 0.0 0.0 0.0 7.1 10.5 8.7 5.3 0.0 0.0 0.0 0.6 0.0
3/16/2005 0.0 7.7 0.0 0.0 4.8 7.1 5.9 4.4 0.6 0.0 1.1 2.1 0.0
3/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/18/2005 5.6 0.9 5.6 5.6 4.9 0.0 0.9 2.0 4.5 15.2 0.3 1.2 6.1
3/19/2005 0.0 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.0
3/20/2005 5.8 0.9 5.8 5.8 0.0 0.0 1.0 2.3 4.7 0.0 4.6 0.6 0.0
3/21/2005 15.0 5.6 15.0 15.0 0.0 0.0 2.4 5.3 12.4 0.0 5.8 0.1 0.0
3/22/2005 30.0 4.9 30.0 30.0 0.1 0.0 4.8 10.7 24.1 0.0 0.3 0.0 0.0
3/23/2005 15.0 2.4 15.0 15.0 6.7 0.0 2.5 6.0 12.1 20.4 5.8 3.0 8.2
3/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.0 0.0
3/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.6 3.2 0.0 16.4 3.0 0.1
3/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.1
3/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/1/2005 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
4/2/2005 0.0 0.0 0.0 0.0 4.6 0.0 0.0 0.0 0.0 14.2 0.0 1.2 5.8
4/3/2005 0.0 0.0 0.0 0.0 6.1 9.0 7.4 4.5 0.0 0.0 0.0 0.5 0.0
4/4/2005 4.0 0.7 4.0 4.0 8.2 12.1 10.7 8.3 3.2 0.0 0.9 2.4 0.0
4/5/2005 2.0 0.3 2.0 2.0 8.7 13.0 11.0 7.2 1.6 0.0 0.0 0.8 0.1
4/6/2005 14.0 2.3 14.0 14.0 3.9 5.7 6.9 7.8 11.3 0.0 0.0 0.3 0.0
4/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.0 0.0 1.0 2.4 0.4
4/8/2005 0.0 1.3 0.0 0.0 6.1 0.0 0.0 0.0 0.1 18.9 0.2 1.5 7.6
4/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0
4/10/2005 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 2.9 0.0 0.0
4/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/13/2005 0.0 0.0 0.0 0.0 0.6 0.9 0.7 0.5 0.0 0.0 0.0 0.0 0.0
4/14/2005 10.0 1.6 10.0 10.0 0.8 1.2 2.6 4.4 8.0 0.0 0.3 0.6 0.0
4/15/2005 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
4/16/2005 5.0 0.8 5.0 5.0 0.0 0.0 0.8 1.8 4.0 0.0 0.0 1.5 0.0
4/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
4/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0
4/22/2005 0.0 0.0 0.0 0.0 3.0 0.0 0.1 0.8 0.0 9.4 0.9 4.0 3.7
4/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0
4/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.9 5.5 0.0
4/25/2005 4.0 3.0 4.0 4.0 1.5 0.0 0.8 3.3 3.4 4.7 2.1 6.6 2.1
4/26/2005 11.4 1.9 11.4 11.4 0.0 0.0 1.8 4.1 9.2 0.0 0.2 0.0 0.0
4/27/2005 12.2 2.0 12.2 12.2 0.0 0.0 2.0 4.8 17.2 0.0 34.7 0.0 0.0
4/28/2005 0.0 1.3 0.0 0.0 3.4 0.0 0.1 0.7 0.1 10.5 0.9 2.4 4.2
4/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/2005 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.2 0.1 0.0
5/1/2005 0.0 0.0 0.0 0.0 1.9 0.0 0.0 0.0 0.0 6.0 0.0 0.5 2.4
5/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/3/2005 0.0 10.7 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.2 0.0 0.0
5/4/2005 4.0 0.7 4.0 4.0 0.0 0.0 0.7 1.8 3.2 0.0 0.6 2.2 0.0
5/5/2005 6.0 7.0 6.0 6.0 12.1 18.0 15.8 11.2 5.3 0.0 0.2 1.6 0.0
5/6/2005 0.0 0.0 0.0 0.0 10.5 12.3 10.2 7.0 0.0 6.9 1.0 23.0 2.8
5/7/2005 0.0 0.0 0.0 0.0 2.7 4.0 3.3 2.0 0.0 0.0 0.0 0.2 0.0
5/8/2005 0.0 21.8 0.0 0.0 0.0 0.0 0.1 0.7 1.6 0.0 1.2 1.5 0.1
5/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.2 0.0 0.0 1.3 2.7 0.1
5/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/13/2005 0.0 0.0 0.0 0.0 3.6 0.0 0.1 0.5 0.0 11.1 0.6 2.0 4.4
5/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
5/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.3 2.3 0.0 0.0 2.4 9.9 0.0
5/17/2005 0.0 0.0 0.0 0.0 3.6 0.9 0.7 0.5 0.0 9.4 0.0 0.8 3.8
5/18/2005 0.0 0.0 0.0 0.0 6.3 4.0 3.3 2.0 0.0 11.2 0.0 1.1 4.5
5/19/2005 0.0 0.0 0.0 0.0 4.0 6.0 4.9 3.0 0.0 0.0 0.0 0.5 0.2
5/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.1 0.0 0.0 1.1 3.0 0.0
5/21/2005 0.0 0.1 0.0 0.0 2.7 0.0 0.0 0.4 0.0 8.4 0.4 1.5 3.3
5/22/2005 0.0 0.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 12.1 0.0 1.0 4.9
5/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
5/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/28/2005 0.0 0.0 0.0 0.0 3.0 4.5 3.7 2.3 0.0 0.0 0.0 0.2 0.0
5/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.6 1.5
6/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
6/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
6/5/2005 0.0 0.0 0.0 0.0 3.2 0.0 0.0 0.0 0.0 9.8 0.2 0.8 3.9
6/6/2005 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.3 0.0 7.8 0.4 1.3 3.3
6/7/2005 0.0 0.0 0.0 0.0 7.1 8.0 6.6 4.0 0.0 5.4 0.1 0.9 2.2
6/8/2005 2.0 0.3 2.0 2.0 2.7 4.0 3.6 2.7 1.6 0.0 0.0 0.2 0.0
6/9/2005 8.4 1.4 8.4 8.4 3.4 5.0 5.5 6.0 6.8 0.0 0.6 1.4 0.0
6/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/11/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/12/2005 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.1 0.1
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
6/13/2005 0.0 0.0 0.0 0.0 13.1 19.5 16.1 9.8 0.0 0.0 0.0 1.0 0.0
6/14/2005 0.0 0.0 0.0 0.0 7.1 10.5 8.7 5.5 0.0 0.0 0.3 1.1 0.0
6/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6/17/2005 0.0 0.0 0.0 0.0 4.9 7.3 6.0 3.7 0.0 0.0 0.0 0.4 0.0
6/18/2005 0.0 0.0 0.0 0.0 3.0 4.5 3.7 2.3 0.0 0.0 0.0 0.4 0.1
6/19/2005 0.0 0.0 0.0 0.0 4.5 6.7 5.5 3.4 0.0 0.0 2.3 0.4 0.0
6/20/2005 0.0 5.4 0.0 0.0 6.0 8.9 7.3 4.5 0.4 0.0 4.4 0.5 0.0
6/21/2005 14.0 8.5 14.0 14.0 6.9 10.2 10.7 10.4 11.7 0.0 5.7 2.2 0.2
6/22/2005 10.4 29.8 10.4 10.4 15.5 23.0 20.6 15.2 10.4 0.0 1.4 1.4 0.1
6/23/2005 0.0 0.0 0.0 0.0 6.5 3.0 2.5 1.5 0.0 13.8 1.6 1.2 5.5
6/24/2005 0.0 0.0 0.0 0.0 1.3 2.0 1.6 1.0 0.0 0.0 3.3 0.1 0.0
6/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
6/26/2005 6.4 13.3 6.4 6.4 0.0 0.0 1.1 3.2 6.0 0.0 1.1 1.8 0.0
6/27/2005 8.0 6.3 8.0 8.0 6.1 9.0 8.7 7.4 6.8 0.0 0.2 0.5 0.0
6/28/2005 2.6 13.7 2.6 2.6 6.4 5.4 4.9 3.7 3.0 8.6 1.3 1.0 3.7
6/29/2005 3.8 23.2 3.8 3.8 7.1 3.4 3.5 3.7 4.7 14.9 1.4 2.8 6.0
6/30/2005 2.4 18.0 2.4 2.4 7.2 8.0 7.0 5.1 3.2 5.7 2.3 2.9 2.3
7/1/2005 2.0 26.6 2.0 2.0 7.7 11.5 9.9 7.4 3.5 0.0 4.8 7.5 0.0
7/2/2005 0.0 19.8 0.0 0.0 11.7 17.4 14.4 8.7 1.4 0.0 0.7 7.2 0.0
7/3/2005 0.0 13.7 0.0 0.0 0.4 0.6 0.5 0.3 1.0 0.0 0.3 6.0 0.0
7/4/2005 2.2 20.9 2.2 2.2 0.0 0.0 0.4 1.2 3.3 0.0 1.3 8.5 0.1
7/5/2005 4.6 7.1 4.6 4.6 0.0 0.0 0.7 1.6 4.2 0.0 0.3 5.1 0.1
7/6/2005 7.0 10.3 7.0 7.0 0.0 0.0 1.1 2.5 6.6 0.0 1.6 8.8 0.0
7/7/2005 4.0 5.5 4.0 4.0 1.6 2.3 2.7 3.7 4.0 0.0 3.6 10.4 0.0
7/8/2005 0.0 15.1 0.0 0.0 18.2 27.0 22.3 13.7 1.5 0.0 2.9 1.8 0.1
7/9/2005 0.0 5.0 0.0 0.0 40.6 43.0 35.5 21.5 0.4 36.1 0.5 8.5 14.5
7/10/2005 0.0 28.9 0.0 0.0 34.6 51.4 42.4 25.7 2.1 0.0 0.7 5.2 0.0
7/11/2005 0.0 3.9 0.0 0.0 47.8 71.1 58.6 35.6 0.3 0.0 0.2 10.7 0.0
7/12/2005 0.0 0.0 0.0 0.0 3.4 5.0 4.1 2.5 0.0 0.0 0.0 7.9 0.2
7/13/2005 0.0 0.0 0.0 0.0 19.9 17.9 14.8 9.4 0.0 24.2 0.5 18.2 9.8
7/14/2005 7.4 3.2 7.4 7.4 13.5 8.4 8.2 7.4 6.3 24.2 1.5 13.3 9.9
7/15/2005 2.2 2.0 2.2 2.2 12.0 6.2 5.5 3.9 1.9 24.2 0.2 10.2 10.1
7/16/2005 8.2 43.2 8.2 8.2 8.4 12.4 11.5 9.3 11.8 0.0 16.7 12.2 0.2
7/17/2005 10.0 20.0 10.0 10.0 8.2 12.2 11.7 9.8 9.4 0.0 3.2 2.8 0.5
7/18/2005 4.6 8.6 4.6 4.6 4.2 6.2 5.9 5.1 5.9 0.0 10.6 3.1 0.5
7/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 0.4 0.0 6.0 1.3 0.2
7/20/2005 2.4 25.6 2.4 2.4 0.0 0.0 0.4 0.9 3.8 0.0 2.7 0.3 0.3
7/21/2005 8.2 1.3 8.2 8.2 0.0 0.0 1.4 3.3 6.6 0.0 5.5 1.1 0.2
7/22/2005 9.4 10.4 9.4 9.4 0.0 0.0 1.7 4.7 8.2 0.0 6.3 3.0 0.2
7/23/2005 0.0 6.9 0.0 0.0 10.4 15.4 12.7 8.0 3.5 0.0 17.5 6.2 0.3
7/24/2005 0.0 0.0 0.0 0.0 9.3 13.8 11.4 6.9 0.0 0.0 0.2 7.5 0.1
7/25/2005 8.4 13.9 8.4 8.4 30.6 31.1 27.2 20.3 7.7 29.8 2.0 13.7 11.9
7/26/2005 2.4 5.2 2.4 2.4 17.4 11.4 9.8 7.2 3.3 29.9 5.1 7.9 12.1
7/27/2005 4.0 19.6 4.0 4.0 10.6 15.8 13.8 10.2 4.6 0.0 1.7 2.9 0.3
7/28/2005 2.0 16.4 2.0 2.0 11.7 17.4 14.8 10.4 2.8 0.0 8.0 4.1 0.3
7/29/2005 7.8 5.0 7.8 7.8 0.0 0.0 1.4 3.9 6.6 0.0 6.9 4.3 0.2
7/30/2005 10.2 4.8 10.2 10.2 5.9 4.0 4.9 5.6 8.4 10.0 2.6 6.7 4.5
7/31/2005 0.0 0.0 0.0 0.0 7.0 5.6 4.8 4.8 0.0 10.0 3.3 5.8 4.4
8/1/2005 0.0 0.0 0.0 0.0 15.7 11.4 9.6 7.4 1.5 24.8 12.6 6.0 10.7
8/2/2005 0.0 9.2 0.0 0.0 4.3 6.4 5.3 3.4 1.2 0.0 6.9 1.0 0.3
8/3/2005 0.0 1.7 0.0 0.0 7.2 2.8 2.4 2.1 0.1 16.6 5.9 2.9 6.6
8/4/2005 0.0 1.5 0.0 0.0 2.7 0.0 0.1 1.2 0.1 8.3 7.2 4.8 3.5
8/5/2005 0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 1.7 0.7 0.1
8/6/2005 0.0 51.1 0.0 0.0 0.0 0.0 0.2 1.4 3.7 0.0 6.5 10.5 0.1
8/7/2005 0.0 10.6 0.0 0.0 0.0 0.0 0.3 2.7 0.8 0.0 10.5 7.3 0.1
8/8/2005 0.0 0.0 0.0 0.0 5.6 8.4 6.9 4.2 0.0 0.0 0.0 2.4 1.6
8/9/2005 0.0 0.0 0.0 0.0 27.9 41.5 34.2 20.8 0.0 0.0 0.0 8.9 0.0
8/10/2005 0.0 0.0 0.0 0.0 44.0 65.5 54.0 32.8 0.0 0.0 0.0 7.1 0.5
8/11/2005 0.0 19.7 0.0 0.0 7.0 10.4 8.6 5.3 1.4 0.0 0.4 3.7 0.4
8/12/2005 0.0 27.3 0.0 0.0 6.1 9.0 7.5 5.2 2.0 0.0 1.2 2.5 1.4
8/13/2005 0.0 1.3 0.0 0.0 17.6 21.2 17.5 10.6 0.1 10.3 0.1 2.6 4.7
8/14/2005 0.0 7.2 0.0 0.0 21.7 22.4 18.5 11.5 0.5 20.6 1.2 3.6 8.4
8/15/2005 0.0 10.0 0.0 0.0 20.2 15.2 12.9 10.9 0.8 30.8 3.7 10.9 13.2
8/16/2005 0.0 8.8 0.0 0.0 16.2 12.6 10.5 7.0 0.6 24.0 7.3 4.2 9.9
8/17/2005 0.0 2.1 0.0 0.0 34.1 33.4 27.6 17.0 0.2 36.0 3.3 5.6 14.8
8/18/2005 0.0 4.2 0.0 0.0 16.5 24.5 20.3 12.7 0.4 0.0 2.9 6.0 0.6
8/19/2005 0.0 35.2 0.0 0.0 5.5 8.2 7.0 6.2 2.7 0.0 7.4 9.1 0.4
8/20/2005 0.0 4.0 0.0 0.0 6.8 10.1 8.4 5.9 1.4 0.0 10.9 9.3 0.0
8/21/2005 0.0 56.9 0.0 0.0 4.0 6.0 5.0 3.1 4.1 0.0 5.1 3.1 0.1
8/22/2005 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.2 2.2 0.0 14.1 3.9 0.1
8/23/2005 0.0 24.4 0.0 0.0 0.0 0.0 0.0 0.3 1.8 0.0 0.8 5.3 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
8/24/2005 0.0 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.4 0.8 0.0
8/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.4 1.3
8/26/2005 0.0 0.0 0.0 0.0 8.6 12.8 10.6 6.4 0.0 0.0 0.1 2.3 0.1
8/27/2005 0.0 0.0 0.0 0.0 12.9 19.2 15.8 9.7 1.8 0.0 8.3 4.5 0.2
8/28/2005 0.0 0.0 0.0 0.0 9.0 13.4 11.1 6.7 0.0 0.0 0.1 1.1 0.6
8/29/2005 0.0 0.0 0.0 0.0 9.8 14.5 12.0 7.4 1.7 0.0 8.2 5.3 0.1
8/30/2005 0.0 0.0 0.0 0.0 5.8 8.6 7.1 4.3 0.3 0.0 1.3 0.9 0.4
8/31/2005 0.0 2.5 0.0 0.0 3.6 5.4 4.5 2.8 1.1 0.0 4.6 1.0 2.2
9/1/2005 0.0 13.4 0.0 0.0 7.3 3.2 2.6 1.6 1.2 15.9 1.4 3.0 6.4
9/2/2005 0.0 0.0 0.0 0.0 19.0 13.0 10.9 8.3 0.0 31.8 2.2 11.6 13.0
9/3/2005 0.0 17.6 0.0 0.0 0.0 0.0 0.0 0.4 1.3 0.0 0.8 1.6 0.0
9/4/2005 0.0 4.2 0.0 0.0 10.3 0.0 0.0 0.1 0.3 31.8 0.4 7.4 12.8
9/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 4.1 0.1
9/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 2.1
9/7/2005 0.0 0.0 0.0 0.0 12.4 18.4 15.2 9.2 0.0 0.0 0.0 1.8 0.1
9/8/2005 0.0 10.0 0.0 0.0 13.6 20.2 16.8 11.3 0.7 0.0 1.5 3.7 0.1
9/9/2005 0.0 0.8 0.0 0.0 17.1 25.4 21.1 13.7 0.1 0.0 1.0 6.6 0.0
9/10/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 3.0 0.0
9/11/2005 0.0 12.2 0.0 0.0 21.9 32.5 27.0 18.3 0.9 0.0 2.5 6.7 0.0
9/12/2005 0.0 1.0 0.0 0.0 4.3 6.4 5.4 4.3 0.1 0.0 1.2 4.5 0.0
9/13/2005 0.0 0.8 0.0 0.0 2.0 3.0 2.5 1.5 0.1 0.0 0.1 1.6 0.0
9/14/2005 0.0 3.3 0.0 0.0 0.0 0.0 0.1 0.7 0.3 0.0 0.9 3.6 0.0
9/15/2005 0.0 2.5 0.0 0.0 0.0 0.0 0.1 1.0 0.2 0.0 1.4 7.1 0.0
9/16/2005 0.0 14.2 0.0 0.0 25.2 13.4 11.4 10.1 1.1 49.9 4.1 12.1 20.4
9/17/2005 0.0 0.2 0.0 0.0 10.1 15.0 12.5 8.6 0.0 0.0 3.8 3.1 0.0
9/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 5.3 0.5 0.2
9/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 4.8 1.6 0.1
9/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
9/21/2005 0.0 26.4 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.9 0.0 0.0
9/22/2005 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
9/23/2005 0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.1 0.1 0.1
9/24/2005 0.0 74.5 0.0 0.0 0.0 0.0 0.2 1.6 5.4 0.0 5.5 3.4 0.0
9/25/2005 0.0 32.8 0.0 0.0 12.5 18.5 15.8 13.9 2.4 0.0 5.6 12.0 0.1
9/26/2005 0.0 0.0 0.0 0.0 12.8 19.0 15.7 9.5 0.3 0.0 1.3 2.2 0.1
9/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 2.7 0.0 0.0
9/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
9/30/2005 0.0 0.1 0.0 0.0 11.4 17.0 14.0 8.5 0.0 0.0 0.0 1.1 0.2
10/1/2005 0.0 0.0 0.0 0.0 11.8 17.6 14.5 8.8 0.0 0.0 0.0 1.1 0.2
10/2/2005 0.0 0.0 0.0 0.0 8.9 13.3 11.0 6.7 0.0 0.0 0.0 0.8 0.0
10/3/2005 0.0 0.0 0.0 0.0 0.6 0.9 0.7 0.5 0.0 0.0 0.0 0.0 0.0
10/4/2005 0.0 0.0 0.0 0.0 4.3 6.4 5.3 3.2 0.0 0.0 0.2 0.4 0.0
10/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 0.0 4.3 0.1 0.1
10/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
10/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.3 0.2 2.0
10/8/2005 0.0 0.0 0.0 0.0 8.9 13.2 10.9 6.7 1.7 0.0 8.2 1.1 0.4
10/9/2005 0.0 8.0 0.0 0.0 3.6 5.4 4.5 2.8 2.5 0.0 9.1 0.3 0.0
10/10/2005 0.0 0.0 0.0 0.0 4.2 6.2 5.1 3.1 0.0 0.0 0.0 0.3 0.0
10/11/2005 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 0.0
10/12/2005 0.0 0.0 0.0 0.0 15.6 23.2 19.1 11.6 0.0 0.0 0.0 1.2 0.0
10/13/2005 0.0 0.0 0.0 0.0 13.6 20.2 16.7 10.1 0.0 0.0 0.0 1.1 0.0
10/14/2005 0.0 0.0 0.0 0.0 6.3 9.4 7.8 4.7 0.0 0.0 0.0 0.5 0.0
10/15/2005 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 3.2 0.0
10/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0
10/19/2005 0.0 0.0 0.0 0.0 12.5 0.0 0.6 5.2 0.1 38.6 10.9 13.8 15.4
10/20/2005 0.0 0.0 0.0 0.0 12.5 0.0 0.0 0.0 0.0 38.6 5.1 3.4 15.8
10/21/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0
10/22/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/23/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/1/2005 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 2.3
11/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.6 0.0 7.5 0.3 0.3
11/3/2005 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 4.0 0.0 0.3 1.6
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
11/4/2005 0.0 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 2.7 0.0 0.2 1.1
11/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/8/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/9/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/10/2005 0.0 0.0 0.0 0.0 3.1 4.6 3.8 2.3 0.0 0.0 0.0 0.2 0.0
11/11/2005 0.0 0.0 0.0 0.0 5.0 7.5 6.2 3.8 0.0 0.0 0.0 0.4 0.0
11/12/2005 0.0 0.0 0.0 0.0 2.4 3.5 2.9 1.8 0.0 0.0 0.0 0.2 0.0
11/13/2005 0.0 0.0 0.0 0.0 3.6 5.4 4.5 2.7 0.0 0.0 0.0 0.3 0.0
11/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/21/2005 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 0.0 0.5 0.0
11/22/2005 0.0 0.0 0.0 0.0 7.0 10.4 8.6 5.2 0.0 0.0 0.0 0.6 0.0
11/23/2005 0.0 0.0 0.0 0.0 2.0 3.0 2.5 1.5 0.0 0.0 0.0 0.2 0.0
11/24/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/27/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/5/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2005 0.0 0.0 0.0 0.0 8.1 12.0 9.9 6.0 0.0 0.0 0.0 0.6 0.0
12/9/2005 0.0 0.0 0.0 0.0 8.7 12.9 10.6 6.5 0.0 0.0 0.0 0.7 0.0
12/10/2005 0.0 0.0 0.0 0.0 3.2 4.7 3.9 2.4 0.0 0.0 0.0 0.3 0.0
12/11/2005 0.0 0.0 0.0 0.0 2.6 3.9 3.2 2.0 0.0 0.0 0.0 0.2 0.0
12/12/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/13/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/14/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/15/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/16/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/17/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2005 0.0 0.0 0.0 0.0 10.1 15.0 12.4 7.5 0.0 0.0 0.0 0.8 0.0
12/20/2005 0.0 0.0 0.0 0.0 10.6 14.0 11.5 7.0 0.0 3.8 0.0 1.0 1.5
12/21/2005 0.0 0.0 0.0 0.0 8.7 13.0 10.7 6.5 0.0 0.0 0.0 0.7 0.0
12/22/2005 0.0 0.0 0.0 0.0 4.6 6.9 5.7 3.5 0.0 0.0 0.0 0.4 0.0
12/23/2005 2.5 22.5 2.5 2.5 4.1 0.0 0.4 0.9 3.6 12.7 0.9 1.0 5.1
12/24/2005 6.0 1.4 6.0 6.0 0.0 0.0 1.0 2.1 4.9 0.0 0.0 2.1 0.0
12/25/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/26/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/27/2005 0.0 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0 4.9 0.0 0.4 2.0
12/28/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/29/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2005 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/1/2006 0.0 0.0 0.0 0.0 4.1 0.0 0.0 0.0 0.0 12.6 0.0 1.0 5.0
1/2/2006 0.0 0.0 0.0 0.0 9.5 0.0 0.0 0.0 0.0 29.4 0.2 2.3 11.8
1/3/2006 0.0 0.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 4.2 0.0 0.3 1.7
1/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
1/5/2006 10.0 1.6 10.0 10.0 0.0 0.0 1.6 3.6 8.0 0.0 0.0 0.0 0.0
1/6/2006 30.0 4.9 30.0 30.0 4.7 6.9 10.5 14.1 24.1 0.0 0.0 0.4 0.0
1/7/2006 10.2 1.7 10.2 10.2 10.5 15.5 14.4 11.4 8.2 0.0 0.0 0.8 0.0
1/8/2006 10.4 1.7 10.4 10.4 11.7 17.4 16.0 12.4 8.4 0.0 0.0 0.9 0.0
1/9/2006 2.8 0.5 2.8 2.8 2.6 3.8 3.6 2.9 2.3 0.0 0.0 0.2 0.0
1/10/2006 3.8 0.6 3.8 3.8 0.0 0.0 0.6 1.4 3.1 0.0 0.0 0.0 0.0
1/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
1/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
1/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.1 0.0
1/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/17/2006 0.0 0.0 0.0 0.0 11.7 12.0 9.9 6.0 0.0 11.4 0.0 1.5 4.5
1/18/2006 0.0 0.0 0.0 0.0 8.7 13.0 10.7 6.5 0.0 0.0 0.0 0.7 0.0
1/19/2006 0.0 0.0 0.0 0.0 14.5 21.6 17.8 10.8 0.0 0.0 0.2 1.2 0.0
1/20/2006 0.0 0.0 0.0 0.0 14.1 21.0 17.3 10.5 0.0 0.0 0.2 1.1 0.0
1/21/2006 0.0 0.0 0.0 0.0 3.6 5.3 4.4 2.7 0.0 0.0 0.0 0.3 0.0
1/22/2006 0.0 0.0 0.0 0.0 2.2 3.3 2.7 1.7 0.0 0.0 0.0 0.2 0.0
1/23/2006 11.2 1.8 11.2 11.2 5.0 7.4 7.9 7.7 9.0 0.0 0.0 0.4 0.0
1/24/2006 18.0 2.9 18.0 18.0 0.1 0.0 2.9 6.4 14.5 0.0 0.0 0.0 0.0
1/25/2006 10.2 1.7 10.2 10.2 0.0 0.0 1.6 3.6 8.2 0.0 0.0 0.0 0.0
1/26/2006 21.2 3.4 21.2 21.2 0.1 0.0 3.4 7.5 17.0 0.0 0.0 0.0 0.0
1/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
1/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
1/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.0 0.6 1.1 0.0
2/1/2006 0.0 0.0 0.0 0.0 2.4 0.0 0.0 0.4 0.0 7.3 0.4 1.4 2.9
2/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.8 1.6 0.0
2/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 0.0 0.0 1.0 2.0 0.0
2/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
2/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.0 0.0 0.8 1.6 0.0
2/6/2006 14.2 2.3 14.2 14.2 0.0 0.0 2.3 5.1 11.4 0.0 0.0 0.0 0.0
2/7/2006 30.0 4.9 30.0 30.0 0.1 0.0 4.8 10.7 24.1 0.0 0.0 0.0 0.0
2/8/2006 8.0 1.3 8.0 8.0 0.0 0.0 1.3 2.8 6.4 0.0 0.0 0.0 0.0
2/9/2006 1.0 0.2 1.0 1.0 3.6 5.4 4.6 3.1 0.8 0.0 0.0 0.3 0.0
2/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/14/2006 0.0 0.0 0.0 0.0 2.1 0.0 0.0 0.0 0.0 6.6 0.0 0.5 2.6
2/15/2006 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.2 0.0 0.0
2/16/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/18/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/19/2006 0.8 0.1 0.8 0.8 8.8 13.1 10.9 6.8 0.6 0.0 0.0 0.7 0.0
2/20/2006 2.0 0.3 2.0 2.0 3.0 4.5 4.0 3.0 1.6 0.0 0.0 0.2 0.0
2/21/2006 3.2 0.5 3.2 3.2 3.5 5.2 4.8 3.7 2.6 0.0 0.0 0.3 0.0
2/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2/24/2006 30.2 4.9 30.2 30.2 0.1 0.0 4.8 10.7 24.3 0.0 0.0 0.0 0.0
2/25/2006 15.6 2.5 15.6 15.6 0.0 0.0 2.5 5.6 12.5 0.0 0.0 0.0 0.0
2/26/2006 8.2 1.3 8.2 8.2 0.0 0.0 1.3 2.9 6.6 0.0 0.0 0.0 0.0
2/27/2006 6.0 1.0 6.0 6.0 0.0 0.0 1.0 2.1 4.8 0.0 0.0 0.0 0.0
2/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/7/2006 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 0.1 0.5 0.0
3/8/2006 0.0 0.0 0.0 0.0 10.3 11.4 9.4 5.7 0.0 8.1 0.6 1.2 3.2
3/9/2006 0.0 0.0 0.0 0.0 10.2 15.2 12.5 7.6 0.0 0.0 0.0 0.8 0.0
3/10/2006 0.0 24.4 0.0 0.0 15.5 3.1 2.8 4.0 1.8 41.5 3.4 22.9 16.6
3/11/2006 0.0 6.4 0.0 0.0 22.1 0.0 0.0 0.0 0.5 68.3 0.3 14.4 27.3
3/12/2006 20.8 3.4 20.8 20.8 0.1 0.0 3.3 7.4 16.7 0.0 0.0 0.0 0.0
3/13/2006 30.0 27.0 30.0 30.0 0.1 0.0 4.8 10.7 25.7 0.0 0.4 0.0 0.0
3/14/2006 10.6 13.9 10.6 10.6 0.0 0.0 1.7 3.8 9.4 0.0 0.4 2.3 0.0
3/15/2006 8.0 15.4 8.0 8.0 0.0 0.0 1.3 2.8 7.4 0.0 0.5 2.2 0.0
3/16/2006 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 4.4 0.0
3/17/2006 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
3/18/2006 0.2 0.0 0.2 0.2 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0 0.0
3/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 0.4 0.1
3/21/2006 0.0 0.0 0.0 0.0 4.3 6.4 5.3 3.2 0.0 0.0 0.1 2.1 0.0
3/22/2006 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 0.0
3/23/2006 0.0 0.0 0.0 0.0 11.7 17.4 14.4 9.0 0.0 0.0 0.3 1.5 0.0
3/24/2006 0.0 0.0 0.0 0.0 2.2 3.2 2.7 1.7 0.0 0.0 0.1 0.5 0.0
3/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5
3/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.3
3/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
3/28/2006 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 0.0 10.8 0.0 0.9 4.3
3/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.7
3/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
3/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/1/2006 0.0 42.2 0.0 0.0 8.4 0.0 0.0 0.0 3.1 25.9 0.6 2.0 10.4
4/2/2006 0.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 4.4 0.0
4/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.8 4.6 0.0
4/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.3 0.0 6.3 0.0 0.0
4/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
4/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
4/9/2006 0.0 6.5 0.0 0.0 2.6 0.0 0.0 0.0 0.6 8.1 1.5 0.7 3.3
4/10/2006 0.0 6.5 0.0 0.0 5.3 0.0 0.0 0.0 1.1 16.2 3.3 3.9 6.5
4/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.1
4/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 2.5 0.0 0.0
4/13/2006 0.0 0.0 0.0 0.0 0.8 1.2 1.0 0.6 0.0 0.0 0.0 0.1 0.0
4/14/2006 2.0 0.3 2.0 2.0 4.6 6.8 5.9 4.1 1.6 0.0 0.0 0.4 0.0
4/15/2006 3.0 0.5 3.0 3.0 6.2 9.2 8.1 5.7 2.4 0.0 0.3 0.5 0.0
4/16/2006 2.4 0.4 2.4 2.4 4.8 7.2 6.3 4.5 1.9 0.0 0.6 0.4 0.0
4/17/2006 0.0 6.0 0.0 0.0 14.3 11.9 9.9 6.6 0.4 19.3 1.4 3.6 7.7
4/18/2006 0.0 14.6 0.0 0.0 3.1 0.0 0.1 0.8 1.1 9.7 1.5 2.5 3.9
4/19/2006 0.0 6.9 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.0 0.7 3.3 0.0
4/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
4/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0
4/22/2006 0.0 34.3 0.0 0.0 0.0 0.0 0.2 1.4 2.5 0.0 1.9 2.8 0.0
4/23/2006 0.0 2.5 0.0 0.0 4.7 0.0 0.0 0.4 0.2 14.5 0.7 2.0 5.8
4/24/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.1
4/25/2006 0.0 1.8 0.0 0.0 11.4 13.4 11.1 7.4 0.3 7.3 1.4 2.7 2.9
4/26/2006 0.0 0.0 0.0 0.0 11.4 17.0 14.0 8.6 1.3 0.0 6.3 1.0 0.0
4/27/2006 0.0 0.0 0.0 0.0 2.5 3.7 3.1 1.9 0.8 0.0 3.8 0.4 0.2
4/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.9 0.0 8.8 0.0 0.0
4/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4/30/2006 0.0 0.0 0.0 0.0 3.8 0.0 0.1 0.8 0.0 11.7 0.9 2.6 4.7
5/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.5 1.6 0.0
5/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 0.4 0.1
5/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
5/4/2006 0.0 0.0 0.0 0.0 3.0 4.5 3.7 2.3 0.0 0.0 0.0 0.6 0.4
5/5/2006 0.0 0.0 0.0 0.0 17.6 2.1 1.7 1.1 0.0 50.1 0.1 4.1 20.1
5/6/2006 0.0 0.0 0.0 0.0 17.8 7.2 5.9 3.7 0.8 40.1 3.8 3.5 16.1
5/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.5 0.6 0.0
5/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.8 4.6 0.2
5/10/2006 0.0 9.0 0.0 0.0 9.0 13.4 11.1 7.3 0.8 0.0 1.8 1.9 0.0
5/11/2006 0.0 3.5 0.0 0.0 8.2 12.2 10.2 7.2 0.3 0.0 1.4 3.1 0.1
5/12/2006 0.0 0.2 0.0 0.0 2.2 3.2 2.8 3.3 3.8 0.0 19.4 3.3 0.0
5/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5/14/2006 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.2 0.0 0.0
5/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.1 0.0
5/16/2006 10.0 1.6 10.0 10.0 8.6 0.0 1.6 3.7 8.0 26.3 0.2 25.0 10.6
5/17/2006 8.4 1.4 8.4 8.4 0.0 0.0 1.4 3.4 6.8 0.0 0.5 0.8 0.0
5/18/2006 6.2 6.5 6.2 6.2 0.0 0.0 1.0 2.2 5.4 0.0 0.5 0.2 0.1
5/19/2006 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.2 0.0 0.0
5/20/2006 0.0 6.5 0.0 0.0 3.5 5.2 4.3 2.6 0.5 0.0 0.2 0.3 0.0
5/21/2006 0.0 25.0 0.0 0.0 2.5 3.7 3.1 1.9 1.8 0.0 0.4 3.2 0.0
5/22/2006 0.0 0.0 0.0 0.0 6.2 9.2 7.6 4.6 0.0 0.0 0.2 2.6 0.0
5/23/2006 0.0 0.0 0.0 0.0 12.0 17.8 14.7 8.9 0.0 0.0 0.1 2.7 0.1
5/24/2006 0.0 0.0 0.0 0.0 14.3 21.2 17.5 10.6 0.0 0.0 0.1 1.1 0.0
5/25/2006 0.0 0.0 0.0 0.0 2.4 3.5 2.9 1.8 0.0 0.0 0.3 0.3 0.1
5/26/2006 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.0 0.5 0.9 0.1
5/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 4.6 0.1
5/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
5/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
5/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.3 0.0
5/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0
6/1/2006 0.0 0.0 0.0 0.0 17.6 12.0 9.9 6.0 0.0 29.5 0.2 2.9 11.8
6/2/2006 0.0 16.7 0.0 0.0 22.8 33.9 28.0 17.0 1.2 0.0 0.6 1.9 0.1
6/3/2006 0.0 15.7 0.0 0.0 23.2 20.3 16.7 10.2 1.1 29.5 0.7 3.5 11.9
6/4/2006 0.0 6.7 0.0 0.0 11.7 17.4 14.4 9.0 0.5 0.0 0.5 1.6 0.1
6/5/2006 0.0 0.0 0.0 0.0 4.6 6.9 5.7 3.5 0.0 0.0 0.0 0.5 0.1
6/6/2006 0.0 14.4 0.0 0.0 13.8 5.4 4.5 2.7 1.0 31.4 0.3 2.9 12.7
6/7/2006 28.2 4.6 28.2 28.2 5.0 7.3 10.5 13.7 22.7 0.0 0.2 0.4 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
6/8/2006 34.2 5.6 34.2 34.2 0.1 0.0 5.5 12.3 27.5 0.0 0.2 0.3 0.0
6/9/2006 21.6 3.6 21.6 21.6 0.1 0.0 3.5 7.7 17.9 0.0 2.6 0.0 0.0
6/10/2006 12.4 2.0 12.4 12.4 0.0 0.0 2.0 4.7 10.0 0.0 0.4 0.6 0.0
6/11/2006 10.6 1.7 10.6 10.6 0.0 0.0 1.7 3.8 8.5 0.0 0.0 0.0 0.0
6/12/2006 8.2 1.3 8.2 8.2 0.0 0.0 1.3 2.9 6.6 0.0 0.0 0.1 0.1
6/13/2006 2.4 0.4 2.4 2.4 0.0 0.0 0.4 0.9 1.9 0.0 0.0 0.0 0.0
6/14/2006 0.0 0.0 0.0 0.0 7.0 10.4 8.6 5.2 0.3 0.0 1.3 0.6 0.0
6/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.8 1.3
6/16/2006 0.0 0.0 0.0 0.0 9.0 13.4 11.1 6.7 0.0 0.0 0.0 0.7 1.0
6/17/2006 0.0 0.0 0.0 0.0 11.6 17.2 14.2 8.6 0.0 0.0 0.0 0.9 0.0
6/18/2006 0.0 0.0 0.0 0.0 10.4 15.4 12.7 7.7 0.0 0.0 0.1 0.8 0.0
6/19/2006 0.0 0.0 0.0 0.0 34.4 51.2 42.3 25.9 0.0 0.0 0.3 3.7 0.4
6/20/2006 0.0 0.6 0.0 0.0 18.4 27.3 22.5 13.7 0.0 0.0 0.2 1.5 0.1
6/21/2006 0.0 0.0 0.0 0.0 19.8 29.4 24.2 14.9 3.2 0.0 15.1 1.6 0.0
6/22/2006 0.0 0.0 0.0 0.0 8.3 12.4 10.2 6.2 0.0 0.0 0.1 0.7 0.0
6/23/2006 11.2 10.5 11.2 11.2 14.6 21.7 19.7 14.9 11.1 0.0 7.2 1.2 0.0
6/24/2006 10.2 1.7 10.2 10.2 15.0 22.2 19.9 14.8 8.9 0.0 3.6 1.3 0.1
6/25/2006 8.6 26.0 8.6 8.6 6.7 9.9 9.5 8.1 9.7 0.0 5.0 0.6 0.1
6/26/2006 4.2 0.7 4.2 4.2 7.0 10.4 9.3 6.9 4.6 0.0 6.1 0.8 0.0
6/27/2006 0.0 18.1 0.0 0.0 10.3 15.3 12.6 7.8 4.4 0.0 14.9 0.8 0.0
6/28/2006 0.0 0.2 0.0 0.0 18.4 27.4 22.6 13.7 0.0 0.0 0.1 1.5 0.0
6/29/2006 0.0 0.0 0.0 0.0 18.4 27.3 22.5 13.7 0.7 0.0 3.7 1.5 0.0
6/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 1.1 0.2
7/1/2006 0.0 28.0 0.0 0.0 14.4 21.4 17.7 10.8 3.3 0.0 6.6 1.3 0.1
7/2/2006 0.0 0.0 0.0 0.0 29.0 43.2 35.6 21.8 0.0 0.0 0.5 2.6 0.0
7/3/2006 0.0 25.1 0.0 0.0 9.1 13.6 11.3 7.5 1.8 0.0 1.1 2.1 0.0
7/4/2006 0.0 13.4 0.0 0.0 13.1 19.5 16.1 10.3 2.6 0.0 8.7 1.9 0.0
7/5/2006 0.0 9.2 0.0 0.0 22.3 33.2 27.4 16.8 1.2 0.0 3.4 2.1 0.0
7/6/2006 0.0 7.0 0.0 0.0 6.3 9.4 7.8 4.7 0.8 0.0 1.4 0.5 0.0
7/7/2006 0.0 12.9 0.0 0.0 6.7 9.9 8.2 5.0 1.3 0.0 2.1 0.5 0.0
7/8/2006 0.0 21.9 0.0 0.0 14.6 21.7 17.9 10.9 1.7 0.0 1.3 1.2 0.0
7/9/2006 0.0 18.6 0.0 0.0 31.7 22.8 18.8 11.8 3.2 50.4 9.6 5.8 20.2
7/10/2006 0.0 1.8 0.0 0.0 21.0 31.2 26.0 18.4 0.4 0.0 4.3 7.4 0.1
7/11/2006 0.0 10.0 0.0 0.0 4.3 6.4 5.5 5.3 2.4 0.0 10.4 4.6 0.0
7/12/2006 0.0 3.0 0.0 0.0 7.4 11.0 9.2 6.9 1.3 0.0 7.0 3.4 2.5
7/13/2006 0.0 17.6 0.0 0.0 10.1 15.0 12.5 9.0 1.3 0.0 2.4 4.0 0.1
7/14/2006 21.4 13.7 21.4 21.4 21.8 32.3 30.2 25.3 18.0 0.0 2.2 4.9 0.0
7/15/2006 12.0 9.5 12.0 12.0 22.5 33.4 29.6 22.2 12.6 0.0 13.4 4.1 0.0
7/16/2006 15.4 11.7 15.4 15.4 46.8 59.5 51.6 36.1 13.9 20.7 5.0 6.7 8.4
7/17/2006 8.8 11.5 8.8 8.8 15.6 13.2 12.4 10.3 8.3 20.7 3.6 3.5 8.3
7/18/2006 2.6 5.7 2.6 2.6 2.4 3.6 3.5 3.7 3.3 0.0 4.9 2.3 0.1
7/19/2006 1.0 9.0 1.0 1.0 6.3 9.4 8.0 5.9 1.7 0.0 2.5 2.5 0.3
7/20/2006 0.4 17.1 0.4 0.4 10.2 15.2 12.7 8.5 2.0 0.0 3.4 2.3 0.0
7/21/2006 0.0 3.3 0.0 0.0 19.8 16.4 13.6 9.2 0.4 26.9 1.8 5.1 10.8
7/22/2006 0.0 14.9 0.0 0.0 17.9 20.2 16.7 10.7 1.2 13.5 2.1 3.3 5.4
7/23/2006 0.0 1.0 0.0 0.0 24.0 29.2 24.2 16.0 0.9 13.5 5.5 5.7 5.6
7/24/2006 0.0 0.0 0.0 0.0 18.4 27.4 22.7 14.3 0.0 0.0 1.1 2.8 0.2
7/25/2006 0.0 21.1 0.0 0.0 21.5 31.9 26.4 16.5 1.5 0.0 1.5 3.2 0.3
7/26/2006 0.0 15.7 0.0 0.0 26.4 31.8 26.3 16.9 1.2 15.6 1.9 5.0 6.3
7/27/2006 0.0 3.5 0.0 0.0 8.5 12.7 10.6 7.2 0.3 0.0 1.1 2.5 0.1
7/28/2006 0.0 20.9 0.0 0.0 9.3 13.8 11.8 10.3 2.1 0.0 6.9 8.2 0.3
7/29/2006 0.0 0.0 0.0 0.0 34.4 39.9 33.0 20.4 0.8 23.4 4.6 5.0 9.5
7/30/2006 0.0 32.3 0.0 0.0 23.1 23.0 19.0 11.5 2.3 23.4 0.7 3.6 9.9
7/31/2006 0.0 0.4 0.0 0.0 27.2 29.2 24.2 15.3 0.0 23.4 1.0 5.1 10.9
8/1/2006 0.0 2.5 0.0 0.0 16.0 12.8 10.9 9.1 0.2 22.7 3.2 8.6 10.9
8/2/2006 0.0 11.7 0.0 0.0 16.6 17.4 14.7 12.2 1.7 15.1 8.2 9.5 6.3
8/3/2006 0.0 8.0 0.0 0.0 15.6 23.2 19.4 13.7 0.6 0.0 2.5 6.0 0.4
8/4/2006 0.0 20.1 0.0 0.0 9.3 6.5 5.5 4.6 1.5 15.1 2.1 4.8 6.4
8/5/2006 0.0 28.1 0.0 0.0 19.6 29.2 24.2 15.7 2.1 0.0 2.1 4.1 0.3
8/6/2006 0.0 0.2 0.0 0.0 28.3 33.4 27.8 18.8 0.0 18.0 2.8 8.2 7.9
8/7/2006 0.0 8.9 0.0 0.0 25.0 25.6 21.4 15.5 0.7 24.0 3.1 9.1 9.7
8/8/2006 0.0 8.4 0.0 0.0 10.2 12.2 10.5 10.4 3.9 6.0 19.3 10.2 3.0
8/9/2006 0.0 4.6 0.0 0.0 2.3 3.4 3.0 3.2 3.3 0.0 15.5 3.3 0.3
8/10/2006 8.2 3.8 8.2 8.2 14.8 21.9 19.4 14.4 8.1 0.0 7.9 2.3 0.2
8/11/2006 6.8 1.1 6.8 6.8 8.9 13.2 12.0 9.3 6.0 0.0 3.1 1.7 0.4
8/12/2006 5.4 0.9 5.4 5.4 18.4 27.3 23.4 15.8 5.3 0.0 4.5 2.0 0.3
8/13/2006 2.8 17.6 2.8 2.8 10.4 15.4 13.3 9.8 6.2 0.0 13.8 2.9 0.1
8/14/2006 1.2 6.9 1.2 1.2 6.7 9.9 8.4 6.2 1.5 0.0 1.2 2.2 0.0
8/15/2006 0.0 7.0 0.0 0.0 6.2 9.2 7.6 5.0 0.5 0.0 0.5 1.8 0.4
8/16/2006 0.0 0.0 0.0 0.0 4.9 7.3 6.1 4.6 0.0 0.0 1.3 2.9 0.4
8/17/2006 0.0 0.0 0.0 0.0 9.7 14.4 11.9 7.2 0.0 0.0 0.1 1.4 0.5
8/18/2006 0.0 20.9 0.0 0.0 10.4 15.4 12.7 7.7 1.5 0.0 0.9 1.1 0.3
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
8/19/2006 31.2 5.1 31.2 31.2 10.9 0.0 5.0 11.1 25.1 33.5 0.3 3.0 13.8
8/20/2006 28.4 13.2 28.4 28.4 0.1 0.0 4.6 10.4 23.4 0.0 0.4 1.2 1.5
8/21/2006 12.0 2.0 12.0 12.0 0.0 0.0 1.9 4.4 9.6 0.0 0.7 0.5 0.2
8/22/2006 6.8 1.4 6.8 6.8 0.0 0.0 1.1 2.4 5.5 0.0 0.2 0.1 0.0
8/23/2006 2.8 4.5 2.8 2.8 5.1 0.0 0.5 1.7 2.6 15.7 1.4 2.8 6.4
8/24/2006 2.0 12.2 2.0 2.0 5.1 0.0 0.5 2.7 2.5 15.7 2.7 5.5 6.3
8/25/2006 1.0 4.3 1.0 1.0 0.0 0.0 0.4 2.7 1.1 0.0 3.6 5.1 0.2
8/26/2006 0.6 22.9 0.6 0.6 0.0 0.0 0.2 0.8 2.1 0.0 1.8 1.3 0.1
8/27/2006 0.2 18.0 0.2 0.2 0.0 0.0 0.3 2.4 1.5 0.0 2.7 5.0 1.5
8/28/2006 0.0 35.8 0.0 0.0 0.0 0.0 0.2 1.9 2.6 0.0 2.6 4.3 0.2
8/29/2006 0.0 14.9 0.0 0.0 0.0 0.0 0.4 3.4 1.1 0.0 4.4 7.3 0.2
8/30/2006 0.0 4.5 0.0 0.0 0.0 0.0 0.2 1.6 0.4 0.0 2.1 3.5 0.1
8/31/2006 0.0 1.3 0.0 0.0 0.0 0.0 0.1 0.7 0.1 0.0 0.9 1.6 0.1
9/1/2006 0.0 0.0 0.0 0.0 3.5 5.2 4.3 2.7 0.0 0.0 0.3 0.6 0.0
9/2/2006 0.0 0.0 0.0 0.0 4.3 6.4 5.3 3.2 0.0 0.0 0.1 0.7 0.4
9/3/2006 0.0 0.0 0.0 0.0 8.9 13.2 10.9 6.7 0.0 0.0 0.2 1.3 0.3
9/4/2006 0.0 21.3 0.0 0.0 0.0 0.0 0.1 0.8 1.6 0.0 1.6 2.0 0.3
9/5/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1
9/6/2006 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.1
9/7/2006 8.4 17.4 8.4 8.4 0.0 0.0 1.3 3.0 7.9 0.0 0.3 0.2 0.2
9/8/2006 3.8 1.8 3.8 3.8 6.3 9.4 8.4 6.1 3.1 0.0 0.0 0.8 0.3
9/9/2006 4.0 31.6 4.0 4.0 10.3 15.3 13.3 9.1 5.5 0.0 0.5 1.2 0.3
9/10/2006 3.8 3.1 3.8 3.8 13.0 0.0 0.7 2.3 3.3 40.2 1.3 5.2 16.2
9/11/2006 4.2 2.7 4.2 4.2 0.0 0.0 0.7 2.2 3.5 0.0 2.4 1.8 0.3
9/12/2006 0.0 29.3 0.0 0.0 0.0 0.0 0.1 1.1 2.1 0.0 1.6 2.7 0.4
9/13/2006 0.0 6.5 0.0 0.0 0.0 0.0 0.1 1.2 0.5 0.0 1.5 3.1 0.5
9/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.4
9/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
9/16/2006 0.0 0.0 0.0 0.0 11.6 17.2 14.2 8.6 0.0 0.0 0.0 0.9 0.0
9/17/2006 0.0 0.0 0.0 0.0 8.9 13.2 10.9 6.6 0.0 0.0 0.0 0.7 0.0
9/18/2006 0.0 29.6 0.0 0.0 33.6 21.6 17.9 11.8 2.2 58.7 1.5 7.8 23.5
9/19/2006 18.4 3.0 18.4 18.4 2.2 3.2 5.6 8.6 14.8 0.0 0.4 1.0 0.0
9/20/2006 17.0 17.8 17.0 17.0 0.1 0.0 2.7 6.0 14.8 0.0 0.4 0.0 0.0
9/21/2006 15.6 2.5 15.6 15.6 0.0 0.0 2.5 5.6 12.5 0.0 0.1 0.0 0.0
9/22/2006 8.4 3.9 8.4 8.4 0.0 0.0 1.3 3.0 6.9 0.0 0.0 0.0 0.0
9/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3
9/24/2006 0.0 0.0 0.0 0.0 2.2 3.2 2.6 1.6 0.0 0.0 0.2 0.2 0.0
9/25/2006 0.0 4.2 0.0 0.0 2.8 4.2 3.5 2.1 0.3 0.0 0.1 0.2 0.0
9/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/27/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 3.8 0.1 0.1
9/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0
9/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.6 0.0 0.0
10/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/5/2006 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0
10/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.0
10/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0
10/10/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/11/2006 0.0 15.7 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.2 0.0 0.0
10/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/13/2006 0.0 13.4 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.2 0.0 0.0
10/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/15/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/16/2006 8.4 1.4 8.4 8.4 0.0 0.0 1.3 3.0 6.8 0.0 0.0 0.0 0.0
10/17/2006 7.2 1.2 7.2 7.2 0.0 0.0 1.2 2.6 5.8 0.0 0.0 0.0 0.0
10/18/2006 6.4 8.4 6.4 6.4 12.6 0.0 1.0 2.3 5.7 38.9 0.2 3.0 15.6
10/19/2006 3.8 0.6 3.8 3.8 0.0 0.0 0.7 2.0 3.1 0.0 0.7 1.4 0.0
10/20/2006 2.6 0.4 2.6 2.6 0.0 0.0 0.4 1.2 2.1 0.0 0.4 0.6 0.0
10/21/2006 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.5 0.8 0.0 0.3 0.3 0.0
10/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.0 0.0 0.7 1.4 0.0
10/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.3 0.0
10/24/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/25/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/26/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/27/2006 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0
10/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6
10/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Annex A 2.2

Daily Weighted Precipitation (in mm) data using Thiessen Polygon at Lalighat Catchment for PMF Estimation
Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin Sub-basin
Sub-basin Name
1 2 3 4 5 6 7 8 9 10 11 12 13
Date/Area(km2) 1150.73 3156.34 1306.66 1370.18 1310.74 448.94 298.15 91.09 822.02 774.28 1629.07 1055.63 3548.21
10/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10/31/2006 0.0 0.0 0.0 0.0 9.3 0.0 0.1 1.1 0.0 28.6 1.1 4.5 11.4
11/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/2/2006 0.0 3.5 0.0 0.0 0.0 0.0 0.0 0.4 0.3 0.0 0.6 1.0 0.1
11/3/2006 0.0 9.7 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.2 0.1 0.1
11/4/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1
11/5/2006 11.2 1.8 11.2 11.2 0.0 0.0 1.8 4.0 9.0 0.0 0.0 0.0 0.0
11/6/2006 11.0 1.8 11.0 11.0 0.0 0.0 1.8 3.9 8.8 0.0 0.0 0.0 0.0
11/7/2006 6.8 1.1 6.8 6.8 1.7 0.0 1.1 2.8 5.5 5.2 0.4 1.3 2.1
11/8/2006 4.2 0.7 4.2 4.2 1.7 0.0 0.8 2.3 3.4 5.2 0.9 2.1 2.1
11/9/2006 3.0 0.5 3.0 3.0 0.0 0.0 0.5 1.1 2.4 0.0 0.0 0.0 0.0
11/10/2006 3.2 0.5 3.2 3.2 0.0 0.0 0.5 1.1 2.6 0.0 0.0 0.0 0.0
11/11/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/12/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/13/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/14/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4
11/15/2006 0.0 0.0 0.0 0.0 8.9 13.3 11.0 6.7 0.0 0.0 0.0 0.8 0.1
11/16/2006 0.0 0.0 0.0 0.0 4.8 7.2 5.9 3.6 0.0 0.0 0.0 0.4 0.0
11/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/18/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
11/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/24/2006 8.0 1.3 8.0 8.0 0.0 0.0 1.3 3.0 9.5 0.0 14.4 0.0 0.0
11/25/2006 7.6 1.2 7.6 7.6 0.0 0.0 1.2 2.7 6.8 0.0 3.1 0.0 0.0
11/26/2006 8.6 1.4 8.6 8.6 0.0 0.0 1.4 3.1 6.9 0.0 0.0 0.0 0.0
11/27/2006 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
11/28/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/1/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/2/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/3/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/4/2006 0.0 0.0 0.0 0.0 6.1 0.0 0.0 0.0 0.8 18.8 3.8 1.5 7.5
12/5/2006 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/6/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/7/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/8/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/9/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/10/2006 0.0 9.4 0.0 0.0 4.5 0.0 0.0 0.0 0.7 13.9 0.5 1.1 5.6
12/11/2006 0.0 6.7 0.0 0.0 4.2 6.3 5.2 3.2 0.5 0.0 0.3 0.4 0.0
12/12/2006 0.0 0.0 0.0 0.0 2.8 4.2 3.5 2.1 0.0 0.0 0.0 0.2 0.0
12/13/2006 2.0 0.3 2.0 2.0 6.1 9.0 7.7 5.2 1.6 0.0 0.0 0.5 0.0
12/14/2006 1.0 0.2 1.0 1.0 0.0 0.0 0.2 0.4 0.8 0.0 0.0 0.0 0.0
12/15/2006 2.0 0.3 2.0 2.0 0.0 0.0 0.3 0.7 1.6 0.0 0.0 0.0 0.0
12/16/2006 3.6 0.6 3.6 3.6 0.0 0.0 0.6 1.3 2.9 0.0 0.0 0.0 0.0
12/17/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/18/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/19/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/20/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/21/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/22/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/23/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1
12/24/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2
12/25/2006 2.8 0.5 2.8 2.8 0.0 0.0 0.4 1.0 2.3 0.0 0.0 0.0 0.0
12/26/2006 10.4 1.7 10.4 10.4 0.0 0.0 1.7 3.7 8.4 0.0 0.0 0.0 0.0
12/27/2006 12.4 2.0 12.4 12.4 0.0 0.0 2.0 4.4 10.0 0.0 0.0 0.0 0.0
12/28/2006 11.4 1.9 11.4 11.4 0.0 0.0 1.8 4.1 9.2 0.0 0.0 0.0 0.0
12/29/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/30/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12/31/2006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ANNEX-3: Plot of observed and estimated
discharges at Asaraghat
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1977-1978

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1977 2/1/1977 3/1/1977 4/1/1977 5/1/1977 6/1/1977 7/1/1977 8/1/1977 9/1/1977 10/1/1977 11/1/1977 12/1/1977 1/1/1978 2/1/1978 3/1/1978 4/1/1978 5/1/1978 6/1/1978 7/1/1978 8/1/1978 9/1/1978 10/1/1978 11/1/1978 12/1/1978

Date

Plot of observed and estimated discharges at Asaraghat station for year 1979-1980

3500.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

3000.0

2500.0
Discharge(m3/sec)

2000.0

1500.0

1000.0

500.0

0.0
1/1/1979 2/1/1979 3/1/1979 4/1/1979 5/1/1979 6/1/1979 7/1/1979 8/1/1979 9/1/1979 10/1/1979 11/1/1979 12/1/1979 1/1/1980 2/1/1980 3/1/1980 4/1/1980 5/1/1980 6/1/1980 7/1/1980 8/1/1980 9/1/1980 10/1/1980 11/1/1980 12/1/1980

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1981-1982

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1981 2/1/1981 3/1/1981 4/1/1981 5/1/1981 6/1/1981 7/1/1981 8/1/1981 9/1/1981 10/1/1981 11/1/1981 12/1/1981 1/1/1982 2/1/1982 3/1/1982 4/1/1982 5/1/1982 6/1/1982 7/1/1982 8/1/1982 9/1/1982 10/1/1982 11/1/1982 12/1/1982

Date

Plot of observed and estimated discharges at Asaraghat station for year 1983-1984

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1983 2/1/1983 3/1/1983 4/1/1983 5/1/1983 6/1/1983 7/1/1983 8/1/1983 9/1/1983 10/1/1983 11/1/1983 12/1/1983 1/1/1984 2/1/1984 3/1/1984 4/1/1984 5/1/1984 6/1/1984 7/1/1984 8/1/1984 9/1/1984 10/1/1984 11/1/1984 12/1/1984

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1985-1986

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1985 2/1/1985 3/1/1985 4/1/1985 5/1/1985 6/1/1985 7/1/1985 8/1/1985 9/1/1985 10/1/1985 11/1/1985 12/1/1985 1/1/1986 2/1/1986 3/1/1986 4/1/1986 5/1/1986 6/1/1986 7/1/1986 8/1/1986 9/1/1986 10/1/1986 11/1/1986 12/1/1986

Date

Plot of observed and estimated discharges at Asaraghat station for year 1987-1988

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1987 2/1/1987 3/1/1987 4/1/1987 5/1/1987 6/1/1987 7/1/1987 8/1/1987 9/1/1987 10/1/1987 11/1/1987 12/1/1987 1/1/1988 2/1/1988 3/1/1988 4/1/1988 5/1/1988 6/1/1988 7/1/1988 8/1/1988 9/1/1988 10/1/1988 11/1/1988 12/1/1988

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1989-1990

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1989 2/1/1989 3/1/1989 4/1/1989 5/1/1989 6/1/1989 7/1/1989 8/1/1989 9/1/1989 10/1/1989 11/1/1989 12/1/1989 1/1/1990 2/1/1990 3/1/1990 4/1/1990 5/1/1990 6/1/1990 7/1/1990 8/1/1990 9/1/1990 10/1/1990 11/1/1990 12/1/1990

Date

Plot of observed and estimated discharges at Asaraghat station for year 1991-1992

2000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed
1800.0

1600.0

1400.0
Discharge(m3/sec)

1200.0

1000.0

800.0

600.0

400.0

200.0

0.0
1/1/1991 2/1/1991 3/1/1991 4/1/1991 5/1/1991 6/1/1991 7/1/1991 8/1/1991 9/1/1991 10/1/1991 11/1/1991 12/1/1991 1/1/1992 2/1/1992 3/1/1992 4/1/1992 5/1/1992 6/1/1992 7/1/1992 8/1/1992 9/1/1992 10/1/1992 11/1/1992 12/1/1992

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1993-1994

2000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed
1800.0

1600.0

1400.0
Discharge(m3/sec)

1200.0

1000.0

800.0

600.0

400.0

200.0

0.0
1/1/1993 2/1/1993 3/1/1993 4/1/1993 5/1/1993 6/1/1993 7/1/1993 8/1/1993 9/1/1993 10/1/1993 11/1/1993 12/1/1993 1/1/1994 2/1/1994 3/1/1994 4/1/1994 5/1/1994 6/1/1994 7/1/1994 8/1/1994 9/1/1994 10/1/1994 11/1/1994 12/1/1994

Date

Plot of observed and estimated discharges at Asaraghat station for year 1995-1996

2500.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1995 2/1/1995 3/1/1995 4/1/1995 5/1/1995 6/1/1995 7/1/1995 8/1/1995 9/1/1995 10/1/1995 11/1/1995 12/1/1995 1/1/1996 2/1/1996 3/1/1996 4/1/1996 5/1/1996 6/1/1996 7/1/1996 8/1/1996 9/1/1996 10/1/1996 11/1/1996 12/1/1996

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 1997-1998

2500.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1997 2/1/1997 3/1/1997 4/1/1997 5/1/1997 6/1/1997 7/1/1997 8/1/1997 9/1/1997 10/1/1997 11/1/1997 12/1/1997 1/1/1998 2/1/1998 3/1/1998 4/1/1998 5/1/1998 6/1/1998 7/1/1998 8/1/1998 9/1/1998 10/1/1998 11/1/1998 12/1/1998

Date

Plot of observed and estimated discharges at Asaraghat station for year 1999-2000

3000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2500.0

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/1999 2/1/1999 3/1/1999 4/1/1999 5/1/1999 6/1/1999 7/1/1999 8/1/1999 9/1/1999 10/1/1999 11/1/1999 12/1/1999 1/1/2000 2/1/2000 3/1/2000 4/1/2000 5/1/2000 6/1/2000 7/1/2000 8/1/2000 9/1/2000 10/1/2000 11/1/2000 12/1/2000

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 2001-2002

2500.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/2001 2/1/2001 3/1/2001 4/1/2001 5/1/2001 6/1/2001 7/1/2001 8/1/2001 9/1/2001 10/1/2001 11/1/2001 12/1/2001 1/1/2002 2/1/2002 3/1/2002 4/1/2002 5/1/2002 6/1/2002 7/1/2002 8/1/2002 9/1/2002 10/1/2002 11/1/2002 12/1/2002

Date

Plot of observed and estimated discharges at Asaraghat station for year 2003-2004

2000.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed
1800.0

1600.0

1400.0
Discharge(m3/sec)

1200.0

1000.0

800.0

600.0

400.0

200.0

0.0
1/1/2003 2/1/2003 3/1/2003 4/1/2003 5/1/2003 6/1/2003 7/1/2003 8/1/2003 9/1/2003 10/1/2003 11/1/2003 12/1/2003 1/1/2004 2/1/2004 3/1/2004 4/1/2004 5/1/2004 6/1/2004 7/1/2004 8/1/2004 9/1/2004 10/1/2004 11/1/2004 12/1/2004

Date
Annex A 3

Plot of observed and estimated discharges at Asaraghat station for year 2005-2006

2500.0
Asaraghat_observed Asaraghat_observed_filtered Asaraghat_estimated Lalighat_observed

2000.0
Discharge(m3/sec)

1500.0

1000.0

500.0

0.0
1/1/2005 2/1/2005 3/1/2005 4/1/2005 5/1/2005 6/1/2005 7/1/2005 8/1/2005 9/1/2005 10/1/2005 11/1/2005 12/1/2005 1/1/2006 2/1/2006 3/1/2006 4/1/2006 5/1/2006 6/1/2006 7/1/2006 8/1/2006 9/1/2006 10/1/2006 11/1/2006 12/1/2006

Date
ANNEX-4: Daily Estimated Discharge at
Phukot Headworks site(m3/sec)
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
1 102.2 89.7 90.1 103.8 90.4 129.8 104.8 108.8 74.5 114.8 98.8 91.4 93.8 96.0 96.8
2 88.5 89.6 90.6 106.2 94.8 129.2 106.2 108.2 75.7 115.2 99.2 91.8 94.2 95.3 92.6
3 88.5 89.0 90.6 110.2 94.8 127.2 104.2 108.2 77.8 108.3 97.6 91.8 92.8 95.3 94.9
4 88.4 88.4 90.2 108.1 94.8 124.1 102.0 107.1 80.7 104.8 96.3 90.5 92.7 94.0 92.9
5 88.4 88.9 89.5 104.0 94.8 130.1 100.9 107.1 84.6 107.6 95.2 90.5 92.7 93.9 90.5
6 86.2 88.3 86.5 102.0 94.8 130.0 101.0 107.0 88.4 106.0 93.9 90.3 101.0 92.7 90.4
7 86.2 87.2 87.2 102.0 94.8 128.0 100.0 105.0 92.1 103.0 93.9 89.2 95.4 92.8 90.4
8 85.0 87.1 85.0 100.9 94.7 126.9 99.9 104.9 99.8 100.9 92.7 89.2 146.9 91.5 90.3
9 85.1 85.6 85.1 101.0 93.0 128.9 97.9 104.0 98.0 101.0 90.4 88.3 84.5 89.5 91.2
10 85.2 86.3 85.2 101.1 91.3 131.0 96.8 104.1 95.5 100.1 90.5 88.4 88.1 73.7 89.1
11 85.3 85.3 84.2 99.2 89.5 128.2 96.1 102.2 92.8 100.2 90.6 87.4 85.5 69.7 87.1
12 86.5 82.2 84.2 99.3 87.8 126.3 95.7 102.3 90.1 100.3 89.7 86.5 111.3 83.8 86.1
13 85.4 85.4 84.3 97.0 86.0 124.3 94.3 102.3 92.0 98.3 89.7 85.3 101.2 89.5 85.0
14 84.2 85.3 84.2 96.9 84.1 122.2 92.8 101.2 98.2 98.2 88.5 88.0 101.1 89.6 84.2
15 84.1 85.2 84.1 96.8 82.2 121.1 91.3 101.1 95.0 98.1 88.4 86.2 104.0 89.5 85.2
16 83.0 80.9 84.1 94.9 80.3 119.1 91.3 101.1 96.8 96.9 90.5 84.9 107.0 88.4 85.2
17 82.0 80.4 84.1 114.1 78.5 116.1 89.9 102.1 96.6 96.9 111.1 83.6 100.1 88.4 85.2
18 81.0 79.9 84.2 114.1 76.8 115.2 88.5 102.2 97.3 97.0 100.2 82.8 94.6 87.4 84.2
19 79.9 80.0 85.4 93.2 76.9 115.3 87.2 101.3 97.1 95.7 96.5 82.2 92.8 87.5 84.3
20 79.7 79.4 83.1 93.2 75.1 113.2 86.4 100.2 97.0 95.6 96.4 82.0 91.9 86.4 84.2
21 79.7 78.8 83.0 91.3 73.3 113.1 85.9 100.1 95.5 94.1 96.3 80.7 90.9 86.3 83.0
22 79.8 78.3 81.3 89.4 71.6 110.1 87.1 98.1 92.3 94.1 94.0 80.7 88.5 85.2 83.0
23 79.8 78.8 80.2 87.6 71.6 112.1 87.1 98.1 91.3 92.7 94.0 79.7 89.9 85.2 82.0
24 79.9 77.9 79.8 85.9 70.0 113.2 87.2 97.0 91.4 91.4 93.0 79.3 90.0 85.3 82.1
25 82.1 77.9 79.8 84.1 68.4 116.2 86.0 97.0 90.0 90.0 93.0 78.9 90.0 85.3 81.0
26 84.1 73.6 79.8 82.2 68.3 119.1 85.0 95.5 88.5 88.5 92.1 77.8 88.5 83.0 80.9
27 85.2 74.0 78.8 82.2 66.6 120.9 84.5 95.5 88.5 87.1 90.5 76.8 88.5 83.0 79.8
28 79.8 76.7 78.8 82.2 66.6 114.9 88.1 94.0 87.1 87.1 90.5 75.8 87.1 82.5 80.9
29 79.8 76.7 78.2 80.3 64.9 117.0 95.8 94.0 87.0 85.9 87.3 74.8 87.1 81.5 80.9
30 81.4 76.8 77.8 80.3 63.2 118.1 91.7 88.1 85.9 85.9 88.8 73.8 87.1 83.0 79.8
31 84.2 76.9 77.9 78.4 61.6 120.2 86.8 87.0 86.0 84.7 87.3 73.9 87.2 83.1 79.8
32 82.2 76.0 78.0 76.7 61.7 121.3 90.0 90.1 84.8 84.8 86.4 73.0 86.1 83.2 80.0
33 82.2 76.6 78.6 77.5 60.6 117.9 87.9 89.3 85.4 84.1 86.0 73.6 86.7 82.8 79.6
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
34 81.7 75.6 78.6 78.7 60.6 118.7 87.9 87.9 84.1 82.8 84.9 72.6 86.6 82.8 79.6
35 81.7 76.1 78.6 83.6 60.5 116.7 87.1 87.9 84.1 82.8 84.9 72.6 87.9 82.8 80.6
36 84.9 74.6 78.6 79.3 59.0 115.9 86.2 84.1 82.0 81.4 83.8 72.6 90.7 81.7 78.6
37 81.7 75.6 78.6 79.3 59.1 115.9 85.4 80.3 81.5 80.2 82.6 70.7 90.7 81.5 77.6
38 79.6 72.9 77.6 77.5 57.5 113.9 85.3 75.2 81.5 79.0 81.5 70.7 86.7 80.2 77.6
39 79.6 73.9 77.6 77.5 57.5 111.9 85.3 71.5 79.7 77.7 80.6 71.5 86.7 83.6 77.6
40 79.6 76.6 74.4 77.4 57.5 112.8 84.0 69.5 78.4 76.4 78.3 76.9 85.4 82.7 76.6
41 79.6 76.1 74.3 75.6 55.9 110.8 84.0 65.9 77.3 84.9 76.9 71.6 85.4 82.8 76.6
42 80.6 79.1 77.5 75.7 55.9 116.9 82.7 62.0 76.4 79.4 77.6 79.4 82.8 84.9 85.5
43 79.7 77.7 76.7 75.9 56.0 116.0 82.8 62.5 75.2 76.5 77.7 79.5 81.6 83.9 83.2
44 79.7 76.2 75.7 77.6 56.0 114.0 84.5 60.6 74.0 75.2 77.7 76.7 81.6 83.2 80.7
45 81.3 77.2 75.6 77.6 54.5 112.0 88.0 59.2 72.0 74.8 76.7 78.7 80.4 93.4 80.7
46 80.6 76.6 75.5 84.8 57.5 108.9 84.9 58.0 70.3 73.5 76.6 80.5 80.3 86.0 79.6
47 80.6 77.6 75.5 88.4 60.6 110.9 82.8 56.5 68.3 72.7 88.5 76.2 80.3 83.8 79.5
48 80.4 74.6 75.6 81.1 60.6 112.9 81.5 56.1 66.7 70.3 117.9 74.3 79.0 84.9 78.5
49 79.7 92.0 75.5 77.6 60.7 111.0 81.5 57.7 66.0 69.1 111.0 72.7 79.0 86.1 78.4
50 79.4 80.7 76.5 77.6 60.5 108.0 81.5 57.7 63.8 68.0 101.0 72.7 79.1 84.7 76.2
51 78.4 75.7 87.7 75.9 60.6 109.0 80.4 58.8 62.2 66.8 85.7 75.4 77.8 82.7 76.3
52 78.9 91.4 75.5 72.3 59.2 108.0 80.3 64.4 59.8 65.6 83.6 74.0 77.8 80.4 78.6
53 76.6 80.7 78.6 73.9 59.2 108.0 80.3 58.4 59.9 64.4 81.8 80.1 75.1 79.6 78.6
54 76.7 74.7 78.7 77.4 59.2 108.9 79.0 55.1 59.9 65.6 81.8 85.0 75.1 79.7 78.7
55 76.6 77.6 75.6 77.4 59.1 107.8 78.0 55.4 58.7 64.3 82.8 82.8 75.0 80.2 78.6
56 77.6 79.6 75.6 75.8 57.5 107.9 76.2 67.9 60.9 64.3 83.8 80.5 77.4 80.5 78.6
57 76.0 78.1 76.6 75.8 57.5 107.9 75.1 66.2 60.9 64.3 82.8 78.2 80.1 80.3 78.5
58 75.4 77.6 75.6 74.1 57.5 108.9 75.0 71.9 63.1 64.3 84.2 83.8 80.3 79.6 78.5
59 75.6 78.7 74.7 84.9 56.0 113.0 73.8 85.0 63.6 63.2 83.1 93.4 81.6 80.7 78.6
60 76.7 79.2 74.7 92.1 64.1 119.0 74.0 93.5 65.6 63.2 82.1 83.5 81.4 90.0 78.6
61 77.8 78.8 74.8 101.0 56.0 118.1 75.8 99.0 67.3 63.3 81.9 81.8 81.6 81.9 74.0
62 78.8 78.3 74.1 88.6 55.7 116.9 85.4 94.6 66.0 62.2 80.8 84.4 83.0 87.3 73.8
63 78.8 86.2 77.6 85.0 54.4 99.9 81.1 99.1 66.9 62.2 80.8 82.6 83.0 86.0 78.5
64 78.8 80.3 78.6 86.8 57.7 138.1 78.1 97.3 67.7 63.3 80.8 85.1 83.0 86.3 78.6
65 79.3 78.8 79.7 94.0 60.8 135.1 76.1 100.1 69.3 65.7 80.8 86.3 84.3 83.7 78.8
66 79.8 78.3 88.3 118.0 60.8 131.0 79.9 102.1 68.9 66.9 83.0 86.7 84.2 84.8 80.8
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
67 78.8 81.9 80.8 115.1 69.2 123.9 86.7 100.1 67.3 68.1 83.0 86.5 84.1 85.5 89.4
68 81.9 81.4 72.8 100.9 70.7 119.0 100.8 97.0 64.5 69.3 81.9 85.8 81.6 85.5 92.0
69 83.0 75.8 72.8 94.5 62.4 114.1 101.9 94.6 65.7 72.1 81.9 102.1 81.6 86.2 88.3
70 83.9 86.7 72.8 88.6 60.8 116.1 88.1 102.1 66.5 75.8 80.8 96.9 82.8 85.1 87.2
71 83.8 89.3 80.7 88.6 57.1 116.0 88.0 103.1 64.8 73.2 80.6 97.3 82.8 82.9 85.9
72 80.7 80.8 97.0 86.7 54.0 114.9 82.1 101.0 65.6 70.8 80.6 131.0 84.2 82.9 83.8
73 80.8 80.8 85.3 84.9 52.5 117.0 80.9 100.0 64.9 69.3 80.7 109.0 84.2 85.8 92.7
74 79.8 83.0 82.3 85.0 52.5 136.1 88.1 98.8 62.6 75.8 80.8 97.5 82.9 91.2 95.4
75 79.8 80.8 91.4 86.8 57.2 142.1 102.1 102.1 61.9 81.7 81.9 94.8 83.0 97.7 96.9
76 79.8 79.8 91.4 92.3 59.3 164.1 88.1 111.1 61.1 82.9 82.9 92.7 83.0 112.1 92.8
77 79.8 89.4 103.0 94.1 59.3 156.1 90.5 115.0 59.6 85.9 86.0 95.4 84.3 108.1 89.8
78 75.7 142.0 94.7 92.3 60.2 146.0 88.5 123.0 58.8 89.4 83.8 94.2 85.5 104.0 110.0
79 74.7 133.0 86.2 92.2 65.8 150.0 105.9 116.0 58.1 90.8 82.3 96.8 87.9 101.0 111.0
80 77.6 104.0 86.4 95.8 87.9 153.0 88.9 106.9 57.7 82.5 83.4 93.8 102.0 97.6 107.9
81 76.7 97.3 92.6 109.0 87.4 164.1 79.6 89.7 58.9 80.5 81.9 93.0 102.0 106.1 104.1
82 76.7 93.2 97.2 125.1 54.5 165.0 76.1 102.1 58.7 79.1 82.5 95.8 105.9 122.0 88.9
83 82.3 96.1 97.2 132.0 51.9 174.9 84.2 116.9 69.1 77.8 83.6 98.0 96.9 108.0 113.0
84 85.0 96.6 98.4 129.0 48.8 177.9 108.0 129.9 78.6 76.5 86.1 103.0 101.9 106.0 109.1
85 85.1 93.3 96.2 115.0 45.8 164.1 97.4 145.0 70.1 75.3 93.5 116.0 94.5 103.1 104.2
86 85.1 92.1 92.7 109.1 44.8 153.0 101.1 152.1 70.9 81.3 91.6 122.1 90.5 101.1 114.1
87 87.3 109.1 97.3 115.1 47.4 143.7 100.0 138.1 74.1 91.9 85.8 118.1 103.1 104.1 135.1
88 82.0 93.8 103.1 107.1 51.5 163.7 95.9 125.1 78.3 91.4 87.3 113.1 101.1 117.1 147.1
89 76.7 93.2 110.1 112.1 63.6 197.1 100.1 117.1 77.0 92.8 100.1 109.1 95.1 109.9 161.0
90 75.7 90.4 113.0 120.1 83.1 223.9 98.7 150.1 74.8 94.5 109.0 115.1 92.7 115.7 157.7
91 86.0 88.2 113.0 115.0 74.6 263.9 97.8 146.0 68.4 92.7 114.0 121.0 94.1 114.9 162.7
92 95.1 86.3 118.5 113.0 64.7 260.6 103.5 147.0 67.4 75.5 108.6 119.0 108.6 111.6 150.3
93 95.7 95.2 124.5 119.6 58.8 253.6 100.5 143.6 66.2 74.7 105.6 109.6 104.6 111.6 148.5
94 94.5 100.5 124.5 124.6 66.0 274.5 107.5 134.6 70.1 82.3 102.5 112.6 102.5 106.5 141.5
95 104.5 100.5 120.5 126.5 62.6 246.5 107.5 121.5 61.8 80.1 96.1 114.5 102.5 116.5 134.5
96 107.4 110.4 114.2 124.5 58.6 233.4 117.4 118.5 61.6 83.4 99.4 126.5 100.4 119.4 128.3
97 102.4 113.2 109.2 123.4 56.5 221.4 119.4 107.4 62.7 82.2 110.3 132.3 105.4 129.4 132.4
98 82.9 112.0 108.4 151.2 77.3 211.4 134.4 100.4 63.9 84.7 123.3 149.2 116.4 125.4 128.3
99 78.0 113.2 128.4 156.1 85.7 203.4 119.4 100.4 65.1 88.7 136.4 172.3 125.4 132.3 144.3
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
100 77.6 121.4 145.4 167.3 98.4 202.4 115.4 105.4 107.4 100.3 121.4 183.4 131.4 140.3 141.4
101 81.9 153.4 137.5 175.2 108.5 223.5 117.5 108.4 81.8 122.5 110.5 187.3 119.5 162.5 128.5
102 75.7 155.5 149.5 187.4 134.5 229.5 100.4 103.5 83.3 157.4 101.5 192.3 103.5 177.5 130.5
103 76.2 162.4 154.5 207.5 161.5 235.5 103.4 96.8 102.3 160.4 93.7 232.3 106.5 184.5 125.5
104 78.2 187.4 163.5 165.5 181.5 253.5 102.5 92.9 94.0 153.5 90.3 231.3 101.5 167.5 187.5
105 80.7 211.4 171.4 157.5 237.4 243.4 100.4 103.4 97.4 165.4 89.8 223.5 113.4 149.4 177.4
106 76.1 217.4 165.4 170.4 197.4 256.4 114.4 126.4 90.2 176.4 94.9 193.4 110.4 154.4 171.4
107 75.6 224.4 150.4 176.4 199.4 253.4 139.4 155.2 95.3 195.4 97.3 188.4 110.4 161.4 166.4
108 81.3 175.2 153.2 173.4 167.4 237.3 176.4 146.1 105.4 171.4 103.3 190.4 111.4 169.4 173.4
109 88.8 153.3 175.2 185.4 135.4 242.3 155.3 157.1 115.4 151.4 107.4 180.4 111.4 196.4 159.2
110 81.8 146.4 177.1 226.4 123.4 225.2 137.2 155.5 125.4 160.4 114.4 187.4 113.4 186.4 166.2
111 78.6 143.4 174.1 243.3 160.4 235.3 133.3 148.7 141.4 178.4 146.4 184.4 114.3 185.4 161.4
112 84.9 155.3 175.3 315.2 185.3 239.3 138.3 141.4 149.3 203.3 210.3 189.4 115.2 192.3 184.3
113 88.7 155.3 165.2 357.2 206.3 269.3 139.3 132.3 158.3 212.3 171.3 184.3 122.3 195.3 171.3
114 87.5 139.3 169.2 309.3 162.3 306.3 145.3 121.3 181.3 229.3 169.3 181.3 124.3 204.3 157.3
115 85.4 157.3 179.3 315.3 153.2 326.3 162.1 95.6 173.3 269.3 177.3 186.2 127.3 224.3 164.3
116 91.0 172.4 205.2 325.3 151.3 313.4 170.1 120.3 160.4 235.4 140.4 214.2 116.4 237.4 177.4
117 101.3 185.3 244.2 380.4 182.4 319.4 216.2 178.4 99.4 186.4 132.2 200.4 116.3 240.4 203.3
118 109.1 189.2 295.3 363.4 207.3 292.3 217.2 195.4 100.3 164.3 139.1 181.4 123.1 220.3 238.2
119 109.2 197.3 333.2 366.3 253.3 279.3 224.3 186.3 102.3 146.3 182.2 226.3 117.1 189.3 260.3
120 118.4 217.4 323.3 366.3 227.4 264.4 233.4 183.3 122.2 132.4 214.4 246.3 119.3 182.4 282.4
121 111.1 240.2 300.3 339.3 212.3 262.4 217.2 170.3 159.1 178.2 234.3 284.4 124.3 169.3 306.2
122 93.0 247.0 313.2 337.2 248.2 294.3 205.9 156.1 164.2 168.0 263.2 355.7 124.1 147.2 261.2
123 97.0 285.8 329.0 435.2 282.0 340.9 178.2 145.0 152.0 180.8 242.0 367.7 119.9 154.0 248.0
124 83.2 303.9 339.0 588.0 342.0 337.9 209.0 160.8 139.0 180.9 209.0 326.7 126.9 165.0 245.9
125 86.9 354.8 287.7 660.0 359.7 365.8 272.8 186.9 126.8 175.7 197.8 260.2 131.6 159.8 243.7
126 88.9 401.5 255.4 640.8 373.2 440.3 265.3 251.8 120.5 178.5 209.5 245.0 130.4 155.5 301.3
127 99.0 399.9 220.9 510.5 259.9 454.8 281.7 307.5 114.0 173.0 206.0 219.3 143.9 163.0 294.7
128 97.5 409.4 238.3 565.0 243.5 435.5 358.3 360.0 111.5 224.5 194.5 234.0 168.5 202.5 315.2
129 96.1 414.0 290.9 557.5 266.1 358.0 367.1 327.5 183.6 304.1 178.1 249.4 163.1 290.1 335.9
130 158.0 423.0 276.9 516.1 254.1 397.9 336.0 356.1 235.5 366.1 187.1 274.8 174.1 348.1 310.0
131 129.8 444.9 274.7 484.1 271.8 362.6 455.8 381.1 234.8 316.9 160.9 306.9 212.8 403.9 251.9
132 118.2 422.2 344.0 429.9 236.0 354.1 360.1 351.9 201.0 278.2 158.1 348.9 173.2 402.2 281.2
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
133 119.1 413.3 363.0 408.2 216.0 346.2 320.0 375.2 187.0 322.5 169.0 291.2 172.2 415.2 429.2
134 130.8 489.9 379.8 474.2 311.8 551.8 346.7 490.2 176.9 359.4 163.8 314.2 170.9 590.9 491.9
135 126.7 525.8 441.5 573.9 442.8 481.7 421.6 571.9 169.8 299.4 163.7 329.9 193.8 601.6 491.8
136 98.4 506.5 1198.4 715.8 406.4 365.6 447.5 616.8 166.6 299.6 171.5 359.8 261.6 589.4 558.6
137 120.7 596.8 466.9 668.7 285.7 337.8 439.9 654.6 168.9 287.9 186.7 414.6 339.8 603.9 602.9
138 121.1 677.1 366.3 593.9 342.1 326.0 448.2 581.9 174.2 282.2 186.9 462.9 429.1 592.2 512.2
139 131.0 721.0 327.0 650.8 394.1 317.0 465.1 606.1 187.1 289.1 199.0 480.2 485.0 440.1 461.1
140 141.5 562.4 323.5 795.0 474.5 323.5 461.5 668.0 198.5 336.5 225.5 370.1 466.4 407.3 489.4
141 174.0 561.5 299.5 675.4 370.4 317.4 586.5 650.3 211.5 320.5 253.0 398.5 429.5 371.1 553.3
142 169.9 571.6 290.6 677.5 330.4 303.5 501.6 536.4 234.6 295.6 302.9 372.5 459.6 335.0 633.5
143 174.3 449.6 288.5 630.5 267.4 312.5 435.5 483.6 250.4 250.5 318.3 475.6 519.4 313.0 513.5
144 210.2 491.4 263.4 549.4 280.4 321.3 375.4 496.4 266.3 218.4 298.4 454.5 515.2 353.4 476.4
145 238.5 696.6 217.6 606.4 384.6 374.5 327.6 677.4 353.6 213.6 250.5 426.4 518.6 405.2 510.6
146 219.7 580.6 213.5 637.6 505.6 463.7 312.7 810.6 425.7 237.7 229.6 365.5 530.7 471.3 612.6
147 237.8 611.8 225.7 563.6 564.8 501.9 356.9 833.7 448.9 338.9 232.9 416.6 568.9 578.9 689.7
148 298.5 540.8 210.6 497.8 419.6 558.8 474.8 905.9 418.6 326.8 295.8 536.9 644.8 453.6 653.4
149 333.2 397.3 197.2 535.8 387.3 514.1 513.2 1017.8 377.2 260.3 353.3 588.8 361.3 573.2 835.2
150 466.4 449.4 188.2 595.3 326.3 475.1 517.3 1008.3 330.9 246.4 371.2 512.3 373.4 871.4 778.4
151 387.7 502.7 183.6 653.4 325.6 548.7 475.6 961.3 300.6 200.7 522.5 519.4 382.7 942.6 556.2
152 385.9 485.9 183.9 590.7 385.9 524.9 542.9 920.6 262.6 246.9 567.8 603.7 340.9 899.8 489.4
153 358.2 568.1 185.0 871.9 444.1 484.2 767.2 808.8 248.2 242.2 722.0 482.9 288.2 1133.2 408.1
154 358.8 480.0 206.7 838.2 409.7 470.8 801.8 804.2 240.8 260.8 813.8 594.2 401.8 1103.7 506.8
155 287.9 648.0 231.8 1033.8 457.0 508.0 798.0 971.8 237.0 283.9 889.0 439.8 544.9 1075.0 569.0
156 293.0 736.1 249.9 856.0 357.9 551.1 763.1 1025.0 263.1 308.0 716.1 384.9 513.0 1176.0 645.1
157 302.3 824.3 303.3 845.1 255.1 705.4 679.4 1066.0 317.2 361.3 843.4 372.9 339.4 726.3 728.4
158 276.5 775.6 309.7 761.4 261.6 1105.7 733.7 986.3 297.5 404.7 807.7 347.2 300.7 698.6 849.6
159 274.0 919.3 325.4 793.7 382.5 1145.5 648.5 938.7 276.3 460.4 804.5 310.7 303.5 722.5 712.4
160 228.0 1025.0 370.0 768.5 448.1 1305.1 545.0 745.5 259.0 493.0 822.0 291.5 241.1 753.1 901.0
161 211.9 845.9 455.9 833.1 435.9 1204.9 508.8 794.0 246.9 598.9 962.9 282.9 314.9 734.9 1084.8
162 213.1 750.1 545.0 790.8 517.1 1185.1 428.1 852.8 256.0 803.1 901.1 338.0 472.1 741.1 831.0
163 205.5 415.5 528.2 899.0 544.4 1225.5 371.5 919.0 265.8 1015.5 525.5 365.5 409.5 737.5 1215.4
164 209.8 397.2 523.6 1055.5 496.2 1244.2 333.2 1015.4 366.2 1054.2 579.2 417.5 527.2 730.2 710.2
165 211.3 436.6 497.5 869.2 544.5 1364.6 354.6 978.2 393.6 1094.6 586.5 449.2 599.6 797.6 726.5
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
166 218.6 500.8 490.7 788.6 593.7 1164.8 409.8 781.6 411.7 1164.8 780.7 474.6 443.8 796.8 689.7
167 210.1 520.2 408.1 726.8 644.2 1264.2 611.2 762.8 429.1 1194.1 799.1 396.8 387.2 871.0 743.1
168 176.4 589.5 449.4 794.2 580.5 1333.5 507.5 736.0 455.3 1273.2 793.5 369.2 373.5 838.3 715.5
169 206.2 611.3 568.3 682.5 571.3 1163.3 508.3 751.3 491.0 1423.0 759.2 335.5 320.2 817.3 645.3
170 336.2 647.3 793.3 667.3 582.3 1013.3 515.3 759.3 512.0 1643.1 566.2 309.3 289.2 827.2 515.3
171 347.0 687.2 856.2 914.3 645.2 792.0 521.2 714.3 529.0 1603.0 493.1 287.3 272.2 1102.5 511.2
172 465.4 778.5 823.3 1033.2 768.5 848.2 622.5 678.2 516.3 1582.4 485.4 336.2 281.5 1061.8 493.5
173 538.3 719.3 900.1 1132.5 753.3 1042.2 661.3 652.5 531.2 1812.2 514.1 371.5 289.3 1182.2 616.3
174 536.3 765.3 1003.2 1092.3 673.3 1183.3 771.3 604.3 549.3 1823.3 595.1 476.3 334.3 1173.1 660.3
175 858.4 810.2 1193.3 1093.3 801.2 1133.4 782.4 572.3 554.4 2103.4 562.2 523.3 377.2 1193.1 655.4
176 785.4 969.2 1183.3 1263.3 894.3 1053.4 758.4 614.4 542.4 1850.3 559.3 601.3 480.1 1143.2 692.3
177 726.0 1063.9 1113.8 1483.4 933.0 969.0 602.0 672.4 546.0 1751.1 635.1 593.3 529.8 1124.0 675.9
178 709.2 872.1 1273.0 1454.0 885.2 983.1 819.1 600.9 536.2 1673.0 698.1 628.0 464.1 1583.1 514.2
179 992.4 870.3 1272.2 1643.1 964.4 1122.2 878.1 614.1 522.4 1522.2 801.0 660.2 535.3 1532.3 587.3
180 1142.3 872.4 1362.1 1390.9 1092.4 1232.3 858.0 593.3 618.3 1282.4 833.3 778.4 659.4 1822.4 572.3
181 1202.1 798.2 1581.8 1220.8 1162.2 1092.1 1020.4 663.2 617.0 1162.0 808.9 750.4 830.2 1992.2 549.1
182 1192.7 803.7 1652.6 1472.0 1342.7 1282.7 1211.2 705.1 558.5 1102.4 784.6 717.2 716.7 2042.7 591.7
183 1374.2 1054.3 1624.1 1632.1 1494.2 1484.2 1494.3 647.7 572.1 984.1 689.2 689.7 684.1 1174.3 627.2
184 940.9 968.9 1330.5 1461.3 1233.3 1494.4 1334.5 651.3 576.5 891.5 692.4 710.3 683.1 1114.5 654.5
185 774.2 821.7 1126.6 1682.0 965.9 1614.9 1632.1 750.5 605.3 1015.3 714.2 690.5 649.9 1355.3 667.2
186 1094.9 794.0 1020.1 1675.2 846.8 1634.5 1121.9 844.2 634.1 1275.1 666.1 707.0 619.0 1175.0 683.0
187 1093.3 752.8 963.8 1745.1 851.6 1514.6 852.9 787.9 682.8 1384.9 663.9 842.9 575.5 906.8 615.9
188 1171.8 719.3 1093.4 2044.9 1103.3 1353.2 758.4 788.9 759.4 1411.4 622.5 911.8 719.4 957.5 613.4
189 1393.8 710.8 1223.8 2183.5 948.8 1283.7 637.8 815.5 807.8 1375.0 561.9 838.0 739.7 865.9 572.1
190 1113.9 937.8 1373.8 1703.9 1023.7 1213.6 595.9 1153.9 868.8 1440.1 759.7 688.7 692.8 808.9 497.9
191 1413.4 809.2 1323.3 1613.9 859.1 1129.3 693.4 1183.9 937.3 1474.9 748.1 683.5 654.0 1153.3 510.3
192 1353.6 837.4 1283.6 1493.4 887.5 1078.5 695.7 1073.4 972.2 1822.0 661.4 704.0 627.4 1153.6 466.8
193 1273.9 800.7 1403.9 1583.7 926.9 1042.7 668.0 952.6 927.6 1274.0 879.7 1046.9 602.7 1103.9 469.8
194 1753.9 858.8 1663.9 1574.0 1230.8 1084.0 759.0 724.9 967.7 1113.9 906.8 1230.5 665.6 1043.7 501.2
195 1433.2 755.0 1663.2 1473.9 1250.0 1263.3 819.4 637.0 1003.1 1391.5 946.2 1260.9 772.0 1323.4 470.3
196 1392.9 715.4 1583.0 1353.3 1062.9 1152.3 900.1 651.4 1033.0 1431.1 877.8 1092.9 777.7 1103.1 486.8
197 1209.8 675.1 1412.6 1842.9 1022.6 1297.2 982.6 588.1 1072.6 1572.4 837.0 1073.0 786.1 1112.5 480.4
198 1199.0 901.5 1311.7 1612.5 1251.6 1456.9 1071.5 534.6 1171.8 1931.5 681.2 1042.6 883.1 1298.2 527.4
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
199 1206.2 804.1 1242.3 1691.8 1332.0 1522.4 972.2 440.8 1362.4 2142.1 604.3 1091.6 809.2 1276.3 630.1
200 1145.5 860.7 1211.7 1652.4 1381.5 1490.7 961.9 757.2 1521.9 2265.7 606.4 1112.3 851.8 1328.9 832.5
201 982.0 939.9 1632.0 1691.9 1322.0 1456.6 965.2 891.7 1322.2 2016.1 600.9 1121.8 812.9 1352.2 871.9
202 1002.4 835.1 1612.2 1612.2 1252.4 1527.7 982.3 949.0 1082.5 1902.2 649.5 960.1 724.1 1332.4 1022.2
203 1191.9 787.8 1661.7 1672.5 1321.9 1611.5 729.7 972.2 991.9 1661.7 682.9 1312.4 693.8 1231.8 1011.8
204 1231.5 923.8 1671.7 1592.0 1630.2 1541.4 778.6 1131.8 924.7 1721.5 840.1 1571.9 657.7 1171.5 991.6
205 1362.5 925.6 1852.6 1721.7 1751.0 1532.5 827.4 1361.7 972.5 1602.3 912.1 1391.8 622.5 1152.3 942.6
206 1225.9 956.2 1781.2 2052.5 1590.6 1521.1 900.1 1282.7 1001.0 1891.0 1231.2 1262.6 571.2 1247.5 853.2
207 1423.8 1100.2 1440.3 1981.1 1339.8 1670.2 1120.3 1091.1 961.1 1909.4 1420.2 1151.0 726.2 996.6 759.2
208 1190.2 1215.0 1251.2 2000.3 1691.1 1521.2 1691.1 1000.2 971.0 2076.3 1011.0 1250.1 789.1 781.2 765.0
209 1221.4 1055.0 1171.1 1751.3 1691.3 1521.3 1471.0 1001.3 1001.3 1757.1 822.1 1308.3 752.2 810.3 697.9
210 1251.8 1131.6 1059.0 1611.4 1771.7 1511.6 1281.4 1071.4 916.6 1431.5 765.7 1838.3 807.3 1001.5 758.6
211 1442.1 1022.0 1009.6 1871.8 1722.2 1402.0 1162.0 1091.7 779.6 1311.9 793.1 1391.7 1094.7 852.0 749.1
212 1361.5 1031.4 1040.0 1752.2 1891.5 1378.8 1091.5 932.1 762.9 1621.4 728.5 1171.6 1131.4 664.5 723.5
213 1350.4 1370.3 1078.2 1771.4 1850.9 1277.8 1010.4 818.6 724.4 1750.4 715.2 1079.1 1230.5 688.2 660.4
214 1621.5 2053.8 1172.8 2420.1 1744.7 1273.8 993.9 842.4 749.0 1613.8 756.7 1228.7 1063.8 783.2 825.8
215 2108.6 1784.2 1043.2 2182.1 1804.3 1294.1 1004.3 923.8 768.4 1364.2 687.1 1173.9 891.1 812.7 871.1
216 2101.7 1584.9 984.7 2482.6 2216.8 1234.8 994.7 814.1 742.9 1214.9 633.7 1114.3 750.4 645.7 826.7
217 1616.2 1755.8 937.0 2604.9 1798.3 1155.9 1006.0 739.8 810.1 1106.2 640.9 1064.9 661.8 661.2 763.0
218 1185.5 1575.1 971.5 2476.2 1745.3 1125.2 1015.5 750.2 855.6 1045.5 655.4 1006.1 636.6 745.4 800.5
219 1144.9 1534.8 984.9 2165.6 1614.8 1104.8 1055.0 760.5 840.1 1064.8 758.0 853.6 601.9 667.9 783.5
220 1244.6 1324.6 1134.5 1775.1 1554.6 1254.6 973.6 703.0 803.8 993.6 723.7 863.0 592.5 667.7 757.1
221 1324.2 1434.3 1014.1 1734.7 1794.4 1244.3 1144.3 670.8 913.5 1113.2 755.5 1444.7 581.2 619.3 929.8
222 1313.8 1394.1 1093.9 1854.3 1604.1 1513.8 1113.9 636.0 1104.2 1043.9 735.1 1604.5 619.7 650.9 939.4
223 1164.3 1494.5 1164.5 1754.1 1474.5 1454.4 1434.5 677.6 1324.6 939.4 725.5 1414.1 662.3 512.5 690.5
224 1133.6 1673.6 1233.0 1674.6 1303.7 1413.8 1323.6 704.4 1423.8 1041.6 1233.7 1354.3 700.7 587.8 627.6
225 1522.8 1732.8 1241.0 1893.8 1412.6 1472.9 1072.8 650.5 1252.9 1240.8 1012.8 1333.4 912.5 617.7 579.7
226 1654.7 1504.7 1144.4 1862.8 1481.4 1574.8 942.8 730.5 1074.8 1124.7 736.5 1220.2 796.4 662.7 542.6
227 1615.5 1235.3 1205.2 1604.6 1832.3 1275.3 899.5 777.0 960.5 885.4 700.2 1218.9 736.3 589.5 580.2
228 1234.2 1115.6 1254.0 1545.4 1514.3 1352.6 906.4 751.0 879.3 831.2 725.2 1271.8 686.1 608.4 730.1
229 1113.9 1055.4 1443.8 1512.5 1274.2 1258.2 897.3 695.3 1034.2 964.0 767.2 1384.3 621.1 1114.3 415.1
230 1089.4 993.7 1373.8 1422.5 1154.0 1209.5 1184.1 681.6 1934.1 1163.7 757.9 1354.3 651.2 1173.3 413.0
231 839.5 908.0 1264.1 1244.1 1094.2 1143.9 1564.0 888.9 2204.0 1393.9 724.8 1294.0 726.5 1353.4 361.1
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
232 766.7 833.0 1383.9 1074.2 1054.0 1613.8 1341.5 843.2 2013.7 1270.7 673.3 1284.0 714.6 1193.9 343.5
233 730.2 784.4 1234.3 984.0 1104.4 1714.3 1132.1 777.0 2004.1 1231.3 655.8 1313.9 711.9 1294.3 349.1
234 758.9 858.2 1163.9 924.3 1104.2 1414.0 1054.1 756.4 1584.0 1127.6 563.9 1244.4 818.7 1354.1 335.2
235 907.5 889.6 1023.3 972.1 1133.6 1380.1 1283.5 710.2 1613.5 1066.8 650.4 1214.2 818.5 1093.4 327.6
236 890.1 1144.3 905.2 730.6 1214.3 1360.8 1294.3 693.4 1394.1 1034.3 699.1 1313.6 769.1 1046.7 324.2
237 857.6 1201.0 850.8 698.3 963.8 1307.0 1063.9 648.1 1093.7 1163.9 709.7 1084.1 915.1 1156.3 318.8
238 764.7 1211.0 815.6 1083.9 894.8 1447.3 1223.9 653.8 937.8 983.9 722.8 1193.7 838.3 1233.7 313.7
239 735.9 1114.1 803.0 1253.9 832.1 1524.2 1194.1 871.8 886.2 882.1 786.2 1283.9 745.0 1094.0 310.1
240 871.2 1163.3 783.3 1354.2 892.7 1923.4 1153.0 1324.1 839.4 820.4 938.4 1094.1 793.3 1213.0 285.4
241 1003.6 1003.7 739.8 1113.4 896.7 1803.7 1228.2 1243.1 859.6 788.8 923.8 851.2 963.8 1293.5 277.8
242 943.6 896.7 751.7 1083.8 789.4 1433.7 1378.2 1113.4 926.5 765.8 819.8 853.9 883.8 1273.5 284.8
243 858.2 856.2 784.1 1013.8 751.2 1464.3 1164.0 1063.3 1013.8 720.3 769.3 761.1 829.3 1333.1 262.2
244 809.5 840.5 824.5 957.3 731.5 1273.6 1103.5 890.1 1153.3 691.5 801.5 771.3 792.6 1372.5 253.5
245 878.0 824.1 816.0 1003.6 802.0 1107.1 1077.0 845.6 1066.9 684.0 806.0 683.6 856.1 1165.7 262.9
246 859.1 1067.3 865.2 1427.1 673.1 957.2 997.2 1057.1 994.1 686.4 783.3 658.1 800.3 973.3 259.2
247 813.6 882.8 833.6 959.3 632.6 872.8 1046.5 997.2 923.6 667.8 763.7 619.3 762.8 775.0 252.6
248 715.2 922.4 753.1 958.8 600.4 870.2 1126.1 936.7 840.3 664.4 735.4 592.7 720.4 759.2 254.1
249 662.9 959.1 651.8 899.4 585.2 882.9 1145.9 1060.1 775.6 657.2 663.2 558.3 665.2 920.1 253.8
250 856.3 986.4 643.2 1126.2 582.3 851.3 1016.3 1292.0 663.3 640.4 635.4 535.2 590.5 802.5 251.3
251 838.6 861.7 628.5 1096.5 564.9 837.7 959.7 1199.1 619.1 580.7 611.7 517.5 514.8 829.8 242.6
252 705.7 742.0 618.5 1076.8 870.9 786.7 870.8 1086.6 601.7 569.8 738.8 498.8 487.7 996.8 226.2
253 679.3 724.7 608.4 1046.8 1216.4 755.3 982.5 925.3 588.4 537.5 773.5 575.8 467.3 1166.5 218.8
254 876.9 756.4 599.4 1006.5 898.4 851.0 2366.3 880.3 582.4 543.4 740.3 576.4 448.0 1186.4 224.4
255 916.4 719.7 556.7 900.4 745.7 992.0 1806.6 810.2 700.7 598.7 601.6 561.3 432.3 1226.7 218.7
256 867.2 710.0 520.9 844.6 666.2 931.8 1257.0 720.5 821.2 729.2 536.0 552.7 418.1 1187.0 209.1
257 706.3 679.0 492.7 818.1 633.1 979.2 1027.0 690.2 955.1 680.9 479.6 544.2 422.1 1306.9 195.1
258 826.5 827.1 463.1 791.2 606.2 871.3 958.1 672.9 929.2 632.0 461.7 513.2 489.2 1787.2 189.3
259 415.4 648.3 452.4 748.3 576.5 764.5 1027.2 632.9 876.5 550.0 446.2 481.3 478.5 1197.3 186.5
260 559.5 580.4 437.4 724.5 554.5 714.5 946.3 593.2 904.5 486.9 428.4 447.5 471.5 602.3 185.5
261 499.3 538.2 441.3 695.5 549.2 666.3 884.3 581.5 853.3 426.2 411.3 427.5 472.3 633.1 185.3
262 516.9 540.9 414.9 628.3 498.9 632.9 963.9 561.3 864.9 394.4 394.9 408.3 464.8 528.6 184.9
263 481.7 593.7 412.7 748.8 474.7 593.7 1007.7 529.9 884.6 361.2 412.7 385.9 446.6 453.4 183.7
264 437.9 517.9 409.8 781.6 456.7 562.9 953.9 504.7 797.8 418.9 393.9 406.7 429.8 469.2 181.6
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
265 439.2 546.1 397.9 849.9 446.8 534.2 866.2 464.8 705.2 397.0 417.2 516.9 423.1 573.6 180.8
266 410.4 525.3 385.2 629.2 431.0 513.4 850.4 417.0 678.4 373.2 411.4 511.2 418.2 439.2 178.2
267 387.1 491.0 368.1 624.4 417.0 498.1 1148.1 391.2 734.1 359.8 389.9 538.4 409.8 602.1 175.9
268 380.0 455.9 364.0 613.1 432.0 487.0 1228.0 372.0 630.0 352.8 364.8 549.1 393.8 650.0 171.9
269 352.5 429.4 349.5 601.0 416.5 454.5 1208.5 342.1 576.5 345.4 347.5 540.0 380.5 440.5 170.0
270 346.8 405.8 335.9 578.5 445.9 429.9 1148.9 312.8 558.9 334.0 333.9 490.5 368.9 454.9 163.9
271 350.9 395.0 329.0 558.9 534.0 412.0 734.0 299.2 552.0 325.2 324.8 478.9 360.0 426.9 163.5
272 341.6 406.6 295.6 567.0 799.6 389.5 676.6 298.0 546.6 319.6 314.3 462.0 348.6 613.4 164.6
273 330.9 381.9 292.9 560.6 1098.9 358.2 664.9 292.6 539.9 329.9 308.7 440.6 338.9 617.6 158.9
274 311.2 381.3 293.9 563.9 862.3 353.8 588.1 283.9 533.3 325.3 306.2 419.9 329.3 472.1 155.3
275 362.0 370.1 291.6 557.3 663.1 344.0 561.9 278.1 529.1 318.1 306.9 401.3 318.1 255.0 155.1
276 307.8 354.9 322.9 552.1 603.9 336.9 541.9 273.9 513.9 312.9 304.7 389.1 305.9 314.9 152.9
277 302.5 330.3 315.5 541.9 573.5 321.5 522.5 271.8 492.5 309.5 302.5 372.9 302.5 333.5 150.5
278 291.3 318.8 292.3 534.3 530.3 316.3 511.1 267.5 471.3 300.3 300.3 351.5 300.3 359.3 149.2
279 296.7 316.7 281.7 590.1 490.7 312.6 493.5 263.3 447.7 294.6 298.7 325.3 289.7 313.7 147.6
280 291.7 311.7 274.7 584.7 482.7 306.6 457.7 260.6 432.7 283.9 296.7 307.7 276.6 276.6 146.7
281 263.7 303.7 268.7 577.7 469.7 300.7 419.7 259.6 471.7 278.7 294.7 290.7 260.6 293.6 143.7
282 259.7 291.7 263.7 568.7 443.7 295.7 394.7 256.6 534.7 271.2 293.7 281.7 252.7 254.7 141.7
283 254.9 287.9 296.9 578.7 409.9 291.9 390.9 254.7 807.9 262.4 289.9 271.7 247.9 260.9 139.9
284 243.8 283.8 315.8 530.9 388.7 283.8 472.8 252.9 916.8 256.6 278.8 261.9 245.8 227.8 138.8
285 238.6 272.6 293.6 508.8 380.4 273.6 818.6 249.8 1131.6 251.2 263.6 250.8 243.6 256.6 139.6
286 239.1 267.1 275.1 487.6 365.9 270.1 655.1 246.6 1592.1 252.8 244.1 245.6 242.1 241.1 138.1
287 238.5 259.5 271.5 467.1 350.5 264.5 533.5 244.0 1382.5 249.3 220.4 242.1 241.5 230.5 134.4
288 233.8 251.8 248.8 457.4 345.7 259.8 510.6 240.4 1112.8 253.7 199.5 234.5 237.8 233.8 133.6
289 230.6 247.6 238.6 444.7 329.5 254.6 489.5 237.8 803.6 273.5 191.5 226.8 233.6 211.6 131.6
290 214.5 244.5 231.5 427.6 328.5 250.5 463.5 243.6 669.3 282.4 184.4 220.6 223.5 206.5 131.5
291 212.4 237.3 225.4 415.5 318.4 248.4 427.4 242.4 634.2 275.4 NA 216.5 217.4 206.4 142.4
292 210.5 231.4 222.5 402.4 310.5 243.5 393.5 239.4 598.5 263.4 NA 212.4 212.5 199.5 139.5
293 204.6 225.6 217.6 392.5 302.6 238.6 373.5 236.5 574.6 255.5 NA 209.5 205.6 203.6 136.6
294 194.9 217.9 211.9 386.6 288.9 232.9 356.9 231.6 553.9 247.0 NA 194.0 200.9 199.9 131.9
295 192.1 216.1 209.1 368.9 284.1 229.1 347.2 225.9 538.1 241.5 NA 193.6 197.1 179.1 129.1
296 192.1 208.1 207.1 346.1 281.1 224.1 342.0 220.1 509.1 240.1 NA 201.0 195.1 165.1 125.1
297 188.9 208.9 202.9 320.1 275.9 213.9 368.6 211.0 488.9 235.9 NA 199.1 191.9 173.9 121.9
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
298 181.8 204.8 197.8 301.9 275.8 204.8 355.5 202.8 471.8 230.8 NA 196.9 187.8 156.8 120.8
299 175.9 200.9 194.9 287.8 272.8 197.9 343.9 196.8 449.9 225.9 NA 194.8 185.9 178.9 119.9
300 176.0 198.0 193.0 274.9 269.0 192.0 326.0 193.9 430.0 222.0 NA 192.9 182.0 187.0 119.0
301 173.0 190.0 191.0 259.0 264.0 198.0 308.0 189.0 421.0 216.0 NA 191.0 179.0 157.0 119.0
302 173.1 186.1 187.1 249.0 261.1 192.1 294.1 184.0 418.1 209.1 NA 186.0 177.1 157.1 117.1
303 171.1 179.1 185.1 242.1 257.1 189.1 279.1 178.1 414.1 205.1 NA 180.1 175.1 171.1 116.1
304 169.2 189.2 185.2 234.1 253.2 189.2 274.2 175.1 409.2 202.2 NA 176.1 170.2 149.2 115.2
305 165.3 182.3 182.3 228.2 247.3 186.3 276.3 174.2 402.3 199.3 NA 173.2 163.3 149.3 114.3
306 165.0 183.0 184.0 217.3 247.0 186.0 272.0 174.3 394.0 201.0 NA 169.3 161.0 141.0 117.0
307 164.8 178.8 181.8 210.0 242.8 179.8 264.8 177.0 373.8 198.8 NA 171.0 154.8 150.8 114.8
308 168.2 174.2 178.2 203.8 278.2 179.2 256.2 176.8 355.2 195.2 NA 169.8 151.2 156.2 114.2
309 166.7 171.7 174.7 198.2 253.7 176.7 251.7 176.2 336.7 192.7 NA 167.2 145.7 144.7 112.7
310 157.8 167.8 171.8 194.7 243.8 175.8 249.8 173.7 317.8 188.8 NA 164.7 143.8 144.8 110.8
311 152.1 166.1 169.1 191.8 232.1 173.1 246.1 173.8 302.1 187.1 NA 162.8 144.1 139.1 110.1
312 151.9 163.9 168.9 188.1 221.9 170.9 243.9 172.1 288.9 183.9 NA 160.1 141.9 137.8 109.9
313 144.9 162.9 164.9 190.9 207.9 173.9 239.9 171.8 275.9 179.9 NA 155.9 141.9 137.8 108.9
314 144.0 151.0 162.8 195.9 201.0 176.8 236.0 171.7 242.0 177.0 NA 153.9 142.0 136.0 111.0
315 142.9 145.9 157.8 191.0 194.9 172.7 233.9 169.7 225.9 174.9 NA 151.0 140.9 139.9 108.9
316 141.0 145.0 154.0 187.9 189.0 168.9 232.0 168.8 216.0 171.0 NA 145.9 141.0 132.0 108.0
317 140.2 144.2 152.2 187.0 196.2 167.2 229.2 169.0 213.2 166.2 NA 142.0 141.2 134.2 108.2
318 135.2 143.2 147.2 185.2 205.2 164.2 226.2 167.2 209.2 162.2 NA 140.2 139.2 130.2 107.1
319 135.2 139.2 145.2 183.2 213.2 162.2 222.2 167.2 206.2 158.2 NA 139.2 139.2 130.1 106.1
320 133.0 137.0 143.0 180.2 214.0 160.9 218.0 165.2 204.0 156.0 NA 137.2 138.0 126.9 106.0
321 132.1 135.1 143.1 177.0 210.1 158.0 226.1 164.9 202.1 154.1 117.1 135.0 138.1 128.1 104.1
322 130.1 133.1 141.1 174.1 208.1 156.1 211.1 164.0 200.1 152.1 116.1 134.1 137.1 132.1 104.1
323 129.1 132.1 141.1 170.1 206.1 156.1 208.1 164.1 198.1 150.1 116.1 132.1 135.1 128.1 103.1
324 128.1 130.1 139.1 167.1 204.1 153.1 206.1 162.1 198.1 146.1 115.1 131.1 134.1 127.1 103.1
325 125.1 128.1 136.1 164.1 202.1 151.1 203.1 160.1 196.1 144.1 115.1 129.1 133.1 127.1 102.1
326 124.1 126.1 134.1 161.1 200.1 147.1 199.0 159.1 194.1 142.1 115.1 127.1 133.1 127.1 102.1
327 124.1 145.1 133.1 158.1 197.1 145.1 193.9 157.1 193.1 140.1 113.1 121.1 132.1 126.1 103.1
328 121.2 138.2 131.2 156.1 195.2 142.2 188.0 155.1 188.2 138.2 114.2 121.1 132.2 125.2 101.2
329 121.2 125.2 121.0 154.2 190.2 138.2 182.2 154.2 187.2 138.2 113.2 119.2 133.2 125.2 104.2
330 119.3 125.3 121.0 152.2 187.3 136.3 178.3 152.2 185.3 136.3 112.2 119.2 130.3 124.3 103.3
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
331 118.3 125.3 128.1 150.3 184.3 133.3 174.3 150.3 183.3 134.3 112.3 118.3 129.3 120.2 101.3
332 117.3 124.3 128.3 147.3 182.3 130.2 172.3 148.3 181.3 131.3 112.3 117.3 128.3 122.2 101.3
333 117.3 122.3 128.3 145.3 180.3 126.2 168.3 147.3 179.3 125.3 111.3 116.3 126.3 117.3 100.3
334 116.3 120.3 128.3 140.3 184.3 124.3 167.3 145.3 179.3 128.3 111.3 116.3 125.3 116.3 99.3
335 113.2 118.2 128.2 138.3 175.2 122.2 164.2 143.3 177.2 125.2 110.2 115.3 125.2 116.2 98.2
336 113.7 126.7 127.7 134.2 173.7 123.7 165.7 159.2 177.7 123.7 110.7 115.2 125.7 111.6 98.7
337 108.6 125.6 125.4 132.6 170.6 120.6 163.6 141.7 175.6 121.6 109.6 114.7 123.6 112.5 96.9
338 107.5 119.5 125.3 130.6 168.5 119.5 161.5 140.6 173.5 119.5 108.5 114.6 122.5 110.5 96.5
339 107.5 117.5 123.4 127.5 166.5 118.5 159.5 138.5 171.5 117.5 108.5 113.5 119.5 109.5 95.4
340 107.5 119.5 119.4 125.5 164.5 116.5 155.5 136.5 170.5 116.5 107.5 113.5 117.5 107.5 94.4
341 106.5 115.5 115.5 122.5 161.5 114.5 149.5 135.5 168.5 114.5 106.5 111.5 113.5 107.5 94.4
342 103.5 114.5 115.5 120.5 162.5 114.3 145.5 133.5 166.5 113.5 106.4 111.5 113.5 106.5 94.4
343 103.5 111.5 113.5 118.5 162.5 117.3 143.5 132.5 163.5 110.5 105.4 110.5 113.5 106.5 94.4
344 102.5 109.5 113.5 116.5 159.5 120.4 141.5 130.5 161.5 109.5 105.5 110.5 112.5 103.5 93.4
345 101.5 109.5 105.5 113.5 157.5 120.5 140.5 128.4 157.5 107.5 107.5 108.5 112.5 103.5 93.4
346 101.6 107.6 111.6 112.5 156.6 119.6 138.6 127.4 151.6 106.6 113.6 108.5 111.6 102.6 93.5
347 100.6 106.6 109.6 109.6 155.6 117.6 137.6 125.6 146.6 107.6 106.6 107.6 111.6 100.6 92.5
348 100.7 106.7 107.7 108.5 153.7 116.7 135.7 124.6 143.7 108.7 103.7 107.0 108.7 98.7 95.3
349 98.7 105.7 107.7 107.6 152.7 115.7 135.7 124.7 140.7 108.7 101.6 106.0 107.7 102.7 94.6
350 93.5 105.6 107.6 106.7 149.6 114.6 133.6 122.7 138.6 108.6 101.4 104.7 107.6 97.0 107.6
351 93.5 103.6 105.6 105.6 146.6 114.6 132.6 120.6 136.5 111.6 100.4 103.6 106.6 97.6 105.6
352 92.4 103.6 105.6 103.6 145.6 113.6 130.6 119.6 135.6 111.6 100.6 100.6 106.6 95.8 105.6
353 92.4 101.6 105.6 103.6 143.6 113.6 129.6 117.6 133.6 109.6 99.5 100.6 105.6 95.1 104.6
354 90.0 101.6 105.6 101.6 141.6 112.6 128.6 116.6 130.6 108.6 98.5 99.6 105.6 95.1 104.6
355 90.0 100.6 103.6 100.6 145.6 109.6 122.6 114.6 128.6 108.6 98.6 99.6 103.6 94.7 103.6
356 90.0 99.6 103.6 100.6 145.6 107.6 122.6 111.6 126.6 107.6 97.0 97.6 102.6 93.9 103.6
357 90.1 98.7 103.7 98.6 143.7 106.7 120.7 108.6 121.7 106.7 95.9 97.6 102.7 94.4 104.7
358 107.7 95.9 103.7 98.7 142.7 106.7 119.7 104.7 120.7 105.7 94.8 96.5 101.7 91.7 102.7
359 107.6 95.8 103.6 100.7 140.6 106.6 117.6 100.7 119.6 103.6 94.7 96.5 101.6 90.8 105.6
360 103.6 94.7 101.6 100.6 139.6 104.6 116.6 93.6 123.4 102.6 93.5 112.6 100.5 91.2 104.6
361 92.5 93.6 101.7 98.6 137.7 104.6 114.7 89.4 126.4 101.7 93.4 108.6 99.4 90.4 102.7
362 92.6 88.4 101.8 98.7 136.8 104.7 113.7 85.5 120.7 100.8 93.5 95.1 90.8 90.2 102.8
363 92.7 87.5 105.9 96.5 134.9 103.9 112.8 81.6 117.9 100.7 92.7 95.2 91.5 90.3 101.9
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991
364 92.1 91.4 113.9 96.6 133.9 103.9 110.9 78.7 116.9 99.8 92.7 93.9 97.3 98.9 100.9
365 91.5 90.1 110.9 96.6 131.9 104.9 108.9 75.4 114.9 99.9 92.7 95.3 96.1 91.5 99.9
366 92.7 75.4 97.9
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
1 98.6 74.2 76.0 87.4 86.6 92.7 85.6 95.7 90.6 100.8 84.6 76.3 84.6 74.2 85.5
2 97.2 75.5 75.5 88.9 87.0 92.1 86.0 92.1 91.0 104.2 84.1 76.7 84.1 73.7 86.8
3 97.0 75.8 74.6 88.4 86.3 92.1 85.0 92.1 90.0 102.2 84.1 76.7 83.1 72.8 86.8
4 95.9 76.6 74.5 87.6 86.2 90.6 84.0 90.9 88.9 98.1 83.0 76.6 82.1 71.7 86.7
5 94.9 77.6 73.6 87.6 85.5 90.3 84.0 90.9 88.9 87.7 83.0 74.5 81.1 70.8 87.5
6 94.9 79.1 73.5 87.3 84.7 88.5 85.8 89.8 87.6 91.9 82.6 74.7 80.0 69.8 87.4
7 94.9 80.0 73.3 86.8 84.7 85.8 84.8 88.8 86.6 91.9 83.9 74.7 79.1 68.9 87.4
8 93.6 80.9 72.1 86.2 86.0 84.7 82.8 88.7 86.7 91.8 82.8 75.2 78.0 67.9 87.3
9 93.7 82.0 66.9 91.4 86.1 84.8 83.9 87.8 86.8 90.5 82.0 74.4 77.2 67.1 88.3
10 94.0 83.0 66.6 93.4 87.6 83.7 82.1 87.9 87.6 89.9 82.1 73.6 76.3 66.3 88.4
11 93.1 84.4 68.4 91.2 83.4 83.4 81.2 85.0 86.0 90.0 81.2 73.4 75.5 65.6 88.5
12 93.2 86.0 70.0 89.0 82.7 83.2 81.3 85.1 86.1 90.1 81.3 73.2 74.7 64.6 88.6
13 96.2 81.1 75.0 88.3 86.9 82.3 81.3 86.1 90.1 86.9 80.3 72.6 73.8 63.7 87.7
14 95.1 81.5 71.8 87.3 85.6 81.2 79.3 85.0 88.0 80.4 80.2 71.2 72.8 62.8 87.6
15 95.0 85.9 70.8 86.8 85.5 80.1 78.2 83.0 85.7 82.7 82.4 70.2 71.7 62.1 87.5
16 94.9 85.9 75.1 92.6 85.5 79.9 78.2 83.0 85.7 87.9 76.3 69.9 70.8 61.5 87.5
17 93.9 86.6 71.7 91.0 84.1 74.8 76.3 83.0 84.3 86.9 76.3 69.8 69.9 63.5 86.7
18 94.0 86.7 71.8 88.8 84.2 75.1 76.1 81.2 83.9 89.0 79.3 69.9 69.1 64.5 86.8
19 93.1 85.1 70.9 89.1 84.2 78.2 73.8 80.3 84.0 95.2 75.6 69.3 68.3 65.1 86.9
20 92.1 83.1 70.8 88.4 83.4 85.7 72.8 80.2 84.1 86.0 75.5 68.9 68.2 66.4 86.2
21 92.0 82.7 69.9 89.0 83.4 84.0 71.7 78.2 82.7 85.9 72.7 68.7 67.2 66.8 85.8
22 90.9 81.7 69.0 88.3 82.7 81.4 72.5 81.1 84.0 84.9 72.7 67.5 66.3 66.9 85.8
23 89.9 83.0 68.1 86.8 84.8 81.1 70.5 80.1 82.9 84.0 71.7 66.3 68.1 65.3 85.8
24 89.0 83.8 67.3 86.9 84.9 81.8 70.7 80.2 82.1 84.1 71.8 65.6 76.4 64.6 84.8
25 88.0 81.8 67.3 88.4 86.3 80.9 71.7 79.2 81.2 84.0 71.8 65.0 74.6 64.5 84.8
26 86.9 82.4 67.2 87.6 86.2 79.8 69.9 79.1 80.1 83.9 70.8 63.6 74.2 63.8 84.7
27 85.9 83.7 70.8 86.9 86.2 79.8 71.7 78.1 82.1 83.0 73.6 63.3 72.4 63.2 84.5
28 91.3 82.7 71.7 89.0 88.3 79.8 71.7 77.3 82.1 82.8 76.3 62.9 71.4 62.7 84.2
29 92.0 81.4 70.8 88.3 88.3 79.2 70.2 78.2 82.4 82.9 73.6 68.1 69.3 61.8 84.2
30 116.1 83.3 69.9 87.6 90.5 79.5 70.2 77.3 80.1 82.1 71.7 67.2 68.1 61.1 84.2
31 110.1 81.6 67.3 87.0 90.6 78.6 70.0 78.3 78.3 84.1 70.9 67.3 67.0 58.2 84.3
32 100.3 78.7 67.4 86.4 71.0 76.5 71.0 76.5 76.5 83.2 70.1 72.9 66.1 57.0 84.4
33 93.1 78.2 67.1 87.7 71.6 77.1 72.5 77.1 84.5 81.9 70.7 70.4 66.1 61.2 85.0
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
34 91.7 81.3 66.2 88.4 71.0 77.1 74.1 77.1 80.9 80.9 69.8 69.8 63.2 62.9 85.0
35 90.7 81.6 65.5 85.4 69.5 77.7 69.8 77.1 80.0 79.0 69.8 69.5 62.2 63.7 85.0
36 89.7 81.9 64.6 84.7 68.3 76.2 68.9 76.1 83.2 75.0 69.8 68.0 64.2 64.6 84.2
37 88.7 81.6 64.6 84.9 69.8 76.2 68.0 76.0 83.2 74.0 68.9 68.0 63.4 72.5 84.2
38 89.6 86.4 63.7 85.6 69.8 75.3 68.0 75.3 80.9 77.1 72.5 68.0 63.6 73.5 79.2
39 88.6 90.0 63.7 87.0 69.8 75.3 67.1 75.3 79.3 79.0 77.1 67.1 62.9 73.5 79.3
40 87.7 89.4 63.7 85.6 69.8 73.2 66.6 75.3 78.9 79.0 75.3 67.1 62.9 72.5 83.4
41 87.7 90.7 62.9 86.5 69.8 73.2 67.4 76.2 77.6 78.1 73.5 67.1 62.1 71.6 83.4
42 86.7 91.4 62.9 82.7 71.0 74.3 66.6 74.4 81.9 77.1 73.5 66.3 62.1 67.6 83.4
43 86.8 89.5 63.0 83.5 71.1 74.4 67.0 73.4 83.3 77.2 86.8 66.4 61.3 66.7 82.6
44 87.7 86.8 69.9 86.9 70.2 74.5 67.8 72.4 80.6 76.3 79.1 65.6 61.3 68.8 82.6
45 91.7 85.8 69.0 82.8 69.3 74.5 68.1 73.6 80.3 76.3 76.3 65.6 60.4 67.9 82.7
46 90.5 83.5 68.0 82.0 68.4 73.8 69.2 71.6 80.0 77.4 75.3 65.5 60.3 77.1 83.4
47 89.5 86.7 68.0 84.9 67.0 72.5 67.4 71.6 80.9 81.9 80.9 64.6 59.5 77.1 82.6
48 88.7 84.1 66.3 87.5 66.1 72.5 66.9 71.3 80.0 80.0 80.0 64.6 59.5 80.0 82.6
49 85.8 82.2 68.1 85.7 66.8 72.0 66.1 70.8 77.2 79.1 81.0 65.0 59.5 81.9 82.7
50 85.8 82.4 66.6 85.0 66.7 70.8 67.0 69.9 77.2 78.8 77.2 85.5 58.7 80.9 81.9
51 84.9 80.1 65.5 87.8 69.3 70.8 65.6 69.9 76.3 77.1 75.4 80.1 58.8 80.4 81.9
52 83.9 78.8 65.4 87.0 67.2 69.9 65.6 68.7 76.3 77.1 73.6 65.0 57.1 80.1 81.8
53 82.6 77.2 65.5 85.6 66.1 69.9 64.7 68.1 76.3 77.2 74.5 77.6 56.9 79.1 81.8
54 82.0 77.2 64.7 87.7 66.4 69.8 64.7 67.2 75.1 76.3 73.6 72.0 56.9 79.1 81.9
55 80.9 79.7 64.6 86.9 74.1 69.7 64.6 73.5 74.4 76.1 81.3 72.5 57.0 78.1 81.2
56 80.9 82.2 66.6 85.5 84.3 73.3 79.0 78.7 74.3 79.1 77.1 75.3 57.1 78.1 81.0
57 80.0 84.8 66.9 84.9 83.5 65.2 69.8 72.0 74.3 81.6 74.7 70.7 56.3 78.1 81.0
58 79.0 86.4 66.5 84.9 78.7 62.9 71.0 72.2 74.1 79.0 71.6 78.1 56.3 76.2 81.0
59 78.1 82.6 66.9 85.6 79.2 70.4 71.7 70.7 74.2 78.2 69.9 80.1 55.6 76.3 80.7
60 80.7 82.0 66.1 86.9 82.9 69.7 72.6 72.6 74.1 77.2 69.9 77.2 55.5 67.2 80.1
61 81.8 83.1 64.7 85.7 78.5 72.7 71.5 71.8 78.2 76.4 83.1 83.4 55.6 67.1 80.3
62 83.1 83.1 66.5 85.7 75.5 71.5 70.0 71.8 78.6 76.1 85.0 85.8 54.8 63.1 80.3
63 84.0 82.1 68.0 87.9 82.0 70.0 70.9 73.7 77.0 76.4 84.3 80.5 54.8 69.4 80.3
64 84.3 82.1 66.3 85.7 78.3 69.1 72.7 75.5 75.8 76.4 82.1 74.6 55.8 70.9 80.3
65 81.7 80.2 64.8 89.2 75.8 69.1 77.3 75.5 75.5 73.0 80.2 73.4 56.7 74.6 80.2
66 78.1 82.1 68.2 85.1 76.4 70.9 78.0 76.3 76.3 72.9 85.9 70.0 57.3 77.3 80.0
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
67 77.2 83.1 66.5 85.1 76.7 71.5 71.2 68.8 75.3 75.5 85.3 65.7 57.5 76.4 80.0
68 80.7 82.7 64.8 83.7 77.5 73.0 72.7 68.1 75.4 74.6 84.0 76.4 58.1 74.9 80.2
69 80.2 83.1 62.3 85.1 75.7 71.4 73.1 70.9 73.7 73.7 83.4 74.0 58.3 76.4 79.5
70 85.0 83.1 63.9 83.7 81.7 73.7 71.8 69.1 73.7 72.7 86.9 72.7 58.9 78.6 79.5
71 83.7 80.1 66.4 82.9 88.6 74.2 76.0 70.8 74.6 72.6 89.8 68.1 58.9 79.4 79.4
72 80.1 83.9 67.9 84.3 96.2 71.7 79.1 68.1 75.4 74.2 91.8 69.9 59.3 79.8 79.4
73 78.9 82.4 77.1 85.1 94.9 70.3 77.3 65.9 74.3 74.9 91.9 78.3 59.6 80.8 79.5
74 84.5 85.9 77.0 85.8 91.9 69.7 78.6 64.8 73.5 75.5 93.3 77.0 59.7 83.4 79.5
75 84.9 82.7 72.6 85.0 104.1 70.0 75.5 66.5 72.7 73.7 95.0 74.3 60.0 86.3 78.7
76 86.4 84.0 71.7 87.1 91.6 70.0 76.7 67.3 74.6 72.7 96.0 72.4 62.0 92.3 78.7
77 88.5 84.0 77.3 92.1 88.9 69.0 76.1 66.5 73.7 72.7 97.1 69.1 63.4 100.1 78.7
78 89.9 80.1 83.0 92.1 84.0 69.1 75.1 66.3 74.6 73.6 97.6 71.4 65.1 106.0 78.6
79 88.1 79.1 84.6 94.2 81.7 68.6 74.5 65.5 79.1 68.9 101.0 73.3 69.6 101.0 77.9
80 90.2 77.2 83.0 95.7 78.2 72.0 81.0 65.5 76.0 69.0 98.3 81.0 73.9 94.5 77.9
81 94.5 77.6 76.7 95.0 74.2 69.0 88.9 65.7 75.4 79.2 107.1 82.1 74.5 93.6 78.0
82 97.0 82.0 72.6 99.0 77.9 68.1 91.1 65.6 75.5 77.2 106.0 89.8 72.7 90.8 77.7
83 94.5 87.6 70.5 102.0 81.0 65.8 84.8 64.7 80.1 79.1 102.0 102.0 70.5 85.2 77.5
84 92.3 97.5 77.1 103.0 80.1 64.5 79.8 67.0 77.3 80.1 101.0 106.0 67.8 83.3 77.7
85 97.1 114.0 80.6 103.1 79.4 64.4 77.9 68.1 80.9 79.2 105.1 109.1 65.6 81.5 77.8
86 94.9 96.5 74.2 105.1 81.5 67.7 79.5 67.3 79.1 81.1 99.1 98.0 62.3 83.7 77.9
87 100.0 96.4 54.2 105.1 89.2 67.1 89.6 64.0 78.6 82.1 96.7 103.8 58.8 79.2 78.7
88 102.1 104.1 66.8 106.1 93.5 72.1 107.1 63.7 80.7 83.9 95.3 118.9 57.2 77.9 78.7
89 101.1 102.1 86.1 107.1 93.6 85.0 106.1 68.0 84.6 87.5 103.1 124.1 55.7 77.6 78.7
90 98.3 101.0 100.0 108.0 106.1 77.2 100.0 73.4 93.6 94.9 104.0 110.0 54.8 77.5 79.4
91 99.9 96.9 97.3 107.0 100.0 75.4 95.6 76.3 105.0 88.8 106.0 113.0 53.8 77.5 79.7
92 89.5 91.5 85.4 101.6 92.9 72.8 104.6 74.8 114.0 85.4 113.6 106.6 53.8 76.1 78.8
93 85.4 90.1 80.6 92.0 87.8 71.2 116.6 71.6 112.6 73.5 115.6 107.6 51.6 77.1 78.8
94 83.2 91.4 75.7 92.6 90.4 71.7 125.5 66.6 115.5 84.1 111.5 105.5 51.7 77.9 80.4
95 88.0 94.1 78.9 92.0 89.3 70.2 123.5 67.2 115.4 85.3 112.5 105.5 50.8 82.1 80.4
96 95.4 97.4 89.6 90.5 98.5 71.0 134.4 70.3 114.5 85.2 114.3 99.4 50.8 95.7 81.6
97 101.4 102.4 78.5 89.8 101.4 68.0 132.4 73.8 114.4 84.2 135.3 95.3 58.0 102.4 84.0
98 100.4 101.4 75.6 97.4 99.4 70.1 145.4 75.4 115.4 83.3 114.3 96.4 59.7 103.4 88.2
99 101.4 98.4 71.0 101.4 103.4 71.7 140.4 85.5 119.4 89.2 127.3 104.4 60.6 105.4 93.9
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
100 116.4 98.4 68.6 109.4 98.4 77.2 136.4 80.7 121.3 93.3 121.4 109.4 61.4 107.4 106.4
101 110.3 107.5 66.6 114.5 97.4 76.4 126.5 84.7 114.3 94.7 123.5 121.5 63.9 110.5 96.4
102 107.3 111.5 66.0 113.5 99.5 80.5 125.3 98.5 107.5 94.4 105.5 131.5 66.5 113.5 89.1
103 104.4 118.5 65.7 111.5 100.5 82.1 128.3 112.5 114.5 95.1 118.5 139.5 65.7 117.5 88.4
104 110.5 118.5 65.6 109.5 103.8 88.7 123.5 114.5 122.5 91.7 138.5 146.4 64.9 120.5 88.5
105 117.5 128.4 61.9 104.4 103.7 94.0 126.4 110.4 137.5 99.4 163.4 136.4 64.1 122.4 88.5
106 114.4 145.4 63.8 103.4 116.4 91.6 128.4 99.4 136.4 104.4 194.4 135.4 64.0 125.4 87.7
107 111.4 155.4 68.6 102.4 140.4 86.5 128.4 95.7 128.4 104.4 218.4 133.4 64.8 127.4 87.7
108 114.4 154.4 69.8 104.4 153.4 77.4 138.4 103.4 118.4 105.4 203.2 136.4 66.4 132.4 87.7
109 119.4 150.4 68.3 108.4 140.4 74.7 157.4 104.4 125.4 102.4 187.2 137.0 69.1 135.4 86.5
110 120.4 158.4 68.3 117.4 177.4 75.6 177.4 112.4 175.4 97.4 186.4 139.9 73.8 141.4 86.0
111 118.2 150.4 69.2 109.4 200.4 73.8 167.3 125.4 180.4 100.4 191.3 136.0 85.2 147.4 85.1
112 131.2 172.3 67.3 114.3 175.4 80.6 180.2 153.3 183.4 100.3 181.3 143.2 90.2 153.3 84.8
113 144.3 187.3 66.4 118.3 166.3 85.5 191.3 156.3 172.3 105.3 197.3 195.2 91.1 163.3 86.4
114 138.3 208.3 75.4 126.3 152.3 97.1 215.2 164.3 158.3 116.3 201.2 233.1 93.1 168.3 95.9
115 122.3 201.3 73.4 125.3 156.3 111.3 239.2 158.3 147.3 123.3 200.2 241.3 91.2 172.3 94.7
116 115.3 204.4 70.8 134.4 145.3 123.3 278.4 157.4 181.3 120.4 221.4 232.4 89.1 175.3 102.4
117 117.4 222.4 71.9 140.4 137.4 128.3 268.4 158.4 190.4 117.6 193.4 193.4 85.2 178.3 111.4
118 125.4 292.3 73.6 149.3 141.4 137.3 239.3 144.5 169.4 111.2 172.2 168.3 82.3 180.2 204.3
119 145.3 319.3 78.1 163.3 187.3 141.2 242.3 149.4 161.3 118.2 153.2 147.3 78.4 182.2 263.3
120 177.3 370.4 80.4 183.4 290.3 136.3 255.4 169.3 157.3 146.4 147.4 152.3 68.1 186.3 277.4
121 193.4 406.3 86.1 170.3 294.4 131.3 253.3 166.3 159.4 149.8 160.3 190.2 63.8 189.2 284.3
122 178.3 401.8 74.1 146.2 282.3 120.0 264.2 133.2 169.3 176.0 140.2 178.2 65.1 183.2 283.2
123 154.2 392.6 78.7 144.0 277.2 115.7 302.9 121.0 188.1 191.7 145.0 185.9 90.2 191.0 302.0
124 144.0 373.8 91.0 147.0 317.0 121.9 340.9 136.0 250.9 179.0 181.0 150.8 78.8 196.0 307.0
125 136.8 368.7 113.7 144.8 294.0 123.7 357.8 137.8 211.0 166.8 240.3 142.7 80.8 200.8 307.8
126 140.7 341.5 138.3 156.5 265.8 117.3 335.5 149.4 172.8 193.0 274.9 132.5 83.7 201.5 307.5
127 132.5 387.8 148.0 164.0 250.5 121.0 339.9 163.9 165.5 255.1 266.0 127.0 77.2 194.0 317.0
128 129.0 395.3 130.5 182.5 298.0 130.5 317.4 174.5 175.0 290.3 326.5 123.5 84.7 252.5 324.5
129 145.5 315.1 125.1 215.1 344.5 129.1 245.0 155.9 195.4 336.9 403.1 125.1 85.3 268.1 328.1
130 182.1 275.1 131.0 245.1 367.1 108.1 219.0 133.9 242.9 328.9 463.1 150.1 75.9 290.1 327.1
131 168.1 268.9 208.8 356.8 316.1 103.9 199.9 128.9 302.9 313.8 475.9 154.9 96.1 301.9 328.9
132 178.9 230.2 193.2 414.9 280.9 104.2 191.2 123.2 372.8 308.2 476.2 194.2 98.9 314.2 336.2
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
133 215.2 209.2 128.4 501.0 232.1 106.2 201.2 123.2 320.7 350.0 526.1 198.2 103.2 323.2 339.2
134 262.2 190.9 122.4 505.9 203.1 106.9 225.9 131.9 346.7 326.7 624.8 201.9 109.2 279.9 341.9
135 340.9 191.8 122.8 533.8 184.9 100.8 242.8 116.7 391.8 388.8 679.6 221.4 110.9 264.8 349.7
136 313.8 218.6 130.6 640.6 203.8 98.6 297.6 110.3 380.8 300.6 749.5 234.2 114.8 270.6 376.5
137 306.6 222.9 129.9 717.8 195.6 94.9 338.9 123.7 438.6 240.8 674.1 252.8 133.6 259.9 404.9
138 285.9 216.2 126.2 662.1 193.9 99.2 399.2 151.2 393.8 192.1 721.2 258.9 192.9 248.2 443.2
139 258.9 196.8 131.0 642.1 195.0 115.1 380.1 140.1 426.1 183.1 548.1 248.0 239.2 235.1 424.1
140 239.9 180.9 139.2 717.5 198.0 120.5 418.5 131.5 345.1 201.4 431.5 240.5 260.1 220.5 336.5
141 212.4 184.5 164.4 657.4 187.4 127.5 509.5 166.5 369.4 188.4 400.5 259.4 202.5 211.5 343.5
142 173.5 193.6 208.6 557.5 191.5 133.6 595.6 173.6 393.4 198.6 385.6 367.4 187.5 218.6 344.6
143 150.3 230.5 304.5 467.4 259.6 146.5 577.5 193.5 428.8 186.5 377.5 395.4 180.6 217.5 334.5
144 162.1 263.4 395.4 431.3 258.5 154.4 539.4 209.4 436.5 215.4 361.3 293.4 169.3 240.4 346.4
145 210.3 259.6 388.6 430.6 350.4 133.6 570.6 225.6 441.3 258.4 326.4 261.5 161.0 268.6 355.6
146 192.5 353.6 421.7 442.7 451.6 118.7 635.7 233.7 401.6 235.5 310.6 342.6 130.4 312.6 367.7
147 176.6 465.7 372.9 469.8 562.7 162.9 602.2 256.9 377.6 214.9 283.9 307.9 121.6 294.8 355.9
148 202.8 472.4 356.8 510.6 590.9 199.8 620.1 262.8 349.9 217.8 265.8 394.8 122.9 236.5 344.8
149 246.8 469.2 315.3 408.0 603.8 192.3 621.2 266.3 348.8 276.3 274.3 374.3 117.8 243.1 343.3
150 295.3 555.4 339.3 408.1 440.3 184.4 549.3 232.4 307.2 247.6 272.4 408.3 118.3 287.2 340.4
151 318.4 411.7 418.6 428.6 543.4 162.7 490.6 194.7 302.4 222.1 262.7 444.7 115.2 230.6 348.7
152 269.7 460.9 409.7 438.9 319.7 144.8 553.9 170.9 295.7 247.9 256.8 518.9 116.6 233.9 348.9
153 231.9 381.2 391.0 432.2 375.9 159.0 561.0 147.2 283.9 314.3 272.1 493.2 137.9 243.2 349.2
154 217.2 395.8 337.8 490.7 417.2 154.4 596.7 133.8 248.2 387.0 270.8 531.8 124.2 259.8 363.8
155 267.8 392.0 370.8 503.8 337.8 151.3 559.0 132.0 274.8 431.0 284.0 578.3 133.8 281.0 355.0
156 298.0 354.1 322.9 457.0 311.0 161.6 427.2 127.1 275.9 338.1 322.0 515.7 116.0 303.1 350.1
157 284.1 376.4 315.4 526.4 292.1 192.8 395.5 120.4 285.0 310.4 297.3 371.4 115.1 327.4 364.4
158 299.3 426.7 248.7 522.7 247.4 225.6 431.6 117.7 305.4 273.7 289.6 405.6 111.1 309.7 372.7
159 360.5 441.5 221.5 541.5 228.7 219.5 465.5 126.5 335.7 259.5 353.5 440.5 109.0 302.5 377.5
160 319.2 401.9 242.0 555.1 240.5 230.1 510.0 144.1 810.5 266.0 560.1 544.1 107.2 290.1 382.1
161 337.0 416.8 299.6 553.9 307.0 249.9 488.8 172.9 1225.1 279.9 569.9 607.9 105.1 329.9 384.9
162 264.9 433.1 468.9 631.1 388.7 222.1 440.0 178.1 675.9 338.3 599.9 517.1 111.9 364.1 366.1
163 254.0 448.5 482.4 575.5 493.9 231.5 396.4 236.5 523.0 441.5 532.2 439.4 109.1 385.5 351.5
164 289.6 469.2 443.2 597.2 668.2 216.2 415.2 609.2 429.4 589.2 478.0 406.0 106.5 426.2 342.2
165 340.3 590.5 350.5 542.6 667.3 185.6 355.6 345.3 384.2 540.5 473.5 401.4 104.2 509.8 337.6
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
166 201.2 498.8 406.6 508.6 668.5 216.7 329.7 278.5 284.2 512.7 461.7 427.8 130.5 534.1 332.8
167 423.7 475.2 288.6 485.9 650.6 291.0 323.1 252.9 484.5 481.2 445.9 482.2 142.8 505.2 324.2
168 408.1 495.5 308.9 444.5 528.4 302.3 377.5 298.3 547.4 551.5 441.3 484.4 242.2 592.5 318.5
169 440.4 471.3 357.3 477.3 557.7 274.3 448.1 349.2 506.8 588.2 437.3 468.1 281.5 459.3 315.3
170 474.6 367.3 429.2 438.3 596.2 317.3 534.1 423.2 521.5 580.5 433.3 430.1 337.2 464.1 295.3
171 434.5 350.2 424.1 456.2 662.3 258.2 639.1 485.1 649.1 468.4 422.1 505.1 362.1 475.0 276.2
172 473.2 337.5 471.4 477.5 696.1 306.5 636.3 453.4 974.0 431.5 385.3 491.4 333.1 516.0 251.5
173 544.5 365.3 498.3 366.3 771.3 410.3 683.1 433.2 959.4 530.3 365.2 531.2 369.5 565.8 230.2
174 471.3 529.2 542.3 318.2 791.9 453.3 642.2 376.2 1012.2 806.2 372.3 540.3 359.3 480.3 202.0
175 519.3 605.2 557.4 263.4 848.0 504.3 693.4 336.2 782.3 684.2 382.4 571.2 267.3 565.4 187.1
176 451.4 531.1 592.4 299.0 892.3 441.2 615.9 306.2 623.4 676.2 411.2 537.0 206.4 512.4 187.1
177 415.4 551.9 548.9 299.4 800.2 538.8 730.7 331.0 543.4 689.0 439.8 516.6 173.3 511.0 192.8
178 399.0 503.4 497.7 289.0 733.9 598.0 763.1 349.0 488.0 628.2 470.1 583.9 140.7 557.2 191.0
179 370.2 480.4 649.6 425.5 683.2 522.1 745.0 370.2 522.1 520.4 501.4 587.4 126.9 567.4 192.3
180 362.3 452.1 580.1 413.4 734.3 464.1 687.9 330.3 585.3 534.4 524.4 549.4 139.1 614.4 195.4
181 345.3 605.0 533.9 388.1 695.3 496.1 691.8 373.0 543.3 477.2 526.2 587.2 156.3 750.2 196.2
182 335.2 538.7 460.6 774.7 982.1 575.7 707.6 397.6 551.2 494.7 488.7 512.7 170.2 765.7 199.7
183 326.6 483.3 452.2 664.3 683.7 443.2 676.3 417.1 560.7 505.3 456.3 466.2 183.7 789.3 191.3
184 311.0 444.5 496.5 618.5 515.3 440.5 658.5 736.3 552.5 515.5 472.5 444.5 244.2 800.5 193.5
185 297.5 431.2 633.3 609.2 483.5 444.3 786.2 569.2 569.6 506.2 442.1 503.3 255.5 798.3 199.2
186 284.2 409.0 671.1 477.1 503.2 490.1 907.1 473.1 506.0 503.8 539.9 682.1 302.2 810.1 200.0
187 310.9 477.8 535.9 439.9 475.1 575.9 880.9 378.8 461.9 466.6 563.8 615.5 335.0 787.9 200.9
188 316.9 496.4 502.5 580.5 451.7 532.5 933.5 365.4 500.7 515.0 531.5 554.7 408.9 761.0 205.5
189 322.7 527.9 487.9 797.9 430.3 583.9 818.9 360.9 526.5 609.7 451.9 674.2 439.3 731.1 217.9
190 364.5 540.9 530.8 699.8 433.9 564.9 700.9 364.9 495.8 637.9 436.9 571.3 548.6 688.2 241.9
191 378.8 558.4 507.4 792.3 493.7 541.4 639.3 405.3 582.7 563.4 443.4 756.0 552.5 646.5 261.1
192 402.3 549.7 501.7 963.6 534.0 540.1 604.6 422.7 629.3 676.7 434.6 801.3 540.1 681.1 291.2
193 379.7 529.5 482.8 1093.7 689.5 551.3 602.5 426.0 566.6 942.0 442.9 887.8 459.3 768.6 322.8
194 394.0 496.4 444.8 983.6 725.9 538.4 600.5 393.0 574.0 961.0 444.0 614.0 416.6 778.7 344.0
195 420.9 688.2 446.4 826.2 798.9 645.8 623.2 366.4 701.9 905.3 403.3 683.3 384.7 733.4 367.4
196 548.3 701.7 418.1 646.1 1030.9 657.9 646.9 388.0 670.1 983.0 386.0 679.9 327.1 1023.0 372.5
197 540.1 690.5 424.0 588.6 980.4 661.4 753.6 425.5 709.9 1052.6 421.5 751.2 327.0 1052.6 422.7
198 517.6 741.7 446.0 562.8 917.5 650.6 753.8 459.1 794.6 1181.8 499.6 755.2 344.9 1001.8 492.8
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
199 536.7 825.2 456.3 552.4 637.8 508.3 764.4 579.8 961.7 978.8 430.2 782.1 366.8 1102.4 545.4
200 575.2 699.5 442.8 528.9 721.3 482.8 840.9 558.5 793.3 781.2 438.8 767.5 417.1 828.9 602.7
201 538.7 588.9 430.0 650.1 853.7 475.1 954.2 601.8 882.9 744.2 514.2 748.6 578.6 742.2 647.9
202 489.1 547.3 439.4 665.3 824.1 466.5 1052.4 629.6 820.2 736.1 668.4 656.9 418.0 680.8 658.7
203 773.2 583.8 472.0 587.0 715.5 496.9 769.8 526.2 850.5 689.4 711.9 604.1 432.2 563.3 674.1
204 758.8 525.6 636.8 619.0 739.0 544.7 650.7 540.7 1412.0 749.4 548.8 573.8 358.6 548.8 696.5
205 676.6 459.4 709.7 793.5 746.6 604.7 625.5 567.7 946.8 690.5 453.7 571.5 363.9 638.7 726.4
206 673.5 435.9 660.3 747.1 721.5 941.3 602.1 797.2 751.6 770.3 427.3 494.3 326.0 767.3 760.9
207 668.2 418.0 564.4 698.6 809.3 809.7 547.2 838.2 703.2 884.4 399.3 579.0 387.3 823.4 784.1
208 740.2 454.1 633.3 650.6 852.4 802.6 540.1 784.8 751.2 921.3 395.2 588.9 508.4 1071.3 809.0
209 677.0 436.2 922.0 715.3 761.3 679.0 538.4 1131.0 773.6 971.4 384.2 565.0 837.8 862.4 818.2
210 576.2 556.7 916.0 679.7 770.4 671.5 576.7 1081.8 1032.8 903.8 375.6 609.2 839.7 1091.6 768.6
211 563.8 547.1 891.6 641.0 769.8 917.2 537.1 1012.2 928.6 867.3 347.1 563.1 783.5 982.0 711.0
212 588.1 505.4 777.3 586.5 679.2 724.5 533.4 1151.6 1097.8 869.4 350.3 623.2 956.9 969.6 603.7
213 539.5 494.6 647.3 628.5 625.5 660.3 601.3 864.5 1470.4 685.5 339.3 595.9 917.5 958.5 575.1
214 766.3 473.2 771.9 667.9 616.5 672.9 688.9 695.9 1699.0 638.8 394.9 691.0 838.2 933.0 690.3
215 737.9 502.4 695.2 645.3 616.8 1044.4 804.1 685.2 1393.5 738.1 1004.4 870.1 758.8 912.4 682.0
216 673.4 543.9 647.8 638.9 691.8 803.8 947.4 616.8 968.3 807.7 735.0 926.7 726.5 1164.8 867.0
217 752.8 517.9 634.1 716.1 735.1 709.0 697.2 671.9 898.9 747.8 640.2 813.0 723.0 1476.0 898.3
218 843.8 711.3 619.3 686.6 938.8 682.5 671.5 943.4 683.1 665.4 699.6 852.5 772.4 1425.4 788.2
219 648.3 647.9 595.8 639.1 856.7 618.1 848.0 873.1 640.0 644.1 632.1 697.9 801.3 1534.9 811.7
220 787.8 598.6 683.7 557.7 737.0 607.6 913.8 824.8 615.4 661.8 589.8 668.5 1095.1 1034.8 935.5
221 664.5 579.4 679.5 571.2 929.7 605.3 879.5 774.3 618.5 658.5 621.5 680.2 1084.4 994.5 847.1
222 636.6 548.9 885.2 536.7 851.2 574.4 1164.2 946.7 640.3 643.2 619.2 792.8 1074.1 974.2 775.7
223 638.3 524.1 848.5 454.4 1003.8 610.0 1154.6 958.4 770.9 638.6 692.6 590.3 1120.1 947.6 719.5
224 591.4 478.0 785.6 475.3 1124.4 679.7 1183.7 1143.8 684.3 638.8 597.8 579.7 1100.7 898.6 669.7
225 530.8 408.3 780.6 454.3 1253.7 1032.8 1042.7 1068.1 672.1 771.9 587.9 552.9 1072.6 921.7 646.9
226 688.9 425.7 701.7 435.1 1252.8 689.7 961.6 1029.9 683.2 798.6 644.8 586.6 1051.5 950.8 616.7
227 648.8 421.2 915.3 415.0 1144.6 559.4 886.5 702.0 656.1 849.3 675.5 611.5 1104.5 822.5 612.4
228 731.4 416.0 1174.2 392.9 1124.3 484.4 1014.4 691.2 773.4 843.4 801.4 708.4 1121.4 785.4 646.3
229 688.3 479.9 1124.2 387.5 1113.0 469.3 974.3 527.3 742.4 801.3 832.3 609.0 1097.3 864.3 593.2
230 716.2 438.9 656.1 390.9 1054.3 479.1 894.1 605.1 702.9 698.1 716.1 698.0 1149.0 977.4 513.1
231 817.9 469.1 577.2 388.1 1024.1 447.2 946.2 688.1 705.7 690.2 678.1 1040.2 1010.1 1007.5 464.4
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
232 906.0 529.7 574.0 381.2 974.2 441.0 870.0 749.8 741.9 694.0 626.9 1101.7 965.0 1094.0 469.3
233 792.9 420.0 628.4 361.6 990.2 401.3 788.4 726.2 671.7 762.4 721.4 1152.4 910.3 1031.5 614.6
234 1014.2 409.0 755.2 348.1 837.7 388.9 902.2 760.0 651.2 868.2 689.2 1012.2 860.0 788.2 638.9
235 1034.0 394.4 831.4 356.5 770.1 376.3 813.6 1023.4 678.2 657.5 890.5 722.4 767.9 710.6 682.0
236 1063.6 444.1 879.6 331.0 756.5 359.1 942.3 867.5 613.5 581.3 1084.2 718.3 736.4 569.3 560.5
237 1014.2 532.7 1158.3 317.7 716.3 362.7 838.9 705.8 561.1 535.0 955.9 649.8 659.2 559.9 652.5
238 1033.7 444.7 1143.8 302.9 654.9 334.7 851.9 900.6 538.8 503.9 920.9 653.8 635.7 520.8 649.8
239 1133.7 397.9 1124.0 285.0 610.8 341.1 774.2 972.0 578.3 557.2 838.2 818.1 601.6 465.2 826.1
240 1103.9 406.2 992.6 282.2 594.1 348.4 827.3 668.2 620.5 460.4 815.4 806.3 545.0 448.4 729.4
241 929.7 397.7 957.2 269.7 675.4 335.7 760.7 586.2 684.3 433.8 735.8 790.6 474.4 411.8 668.8
242 1110.3 417.6 960.8 256.6 599.8 327.7 711.7 534.5 713.7 436.8 820.7 785.4 449.8 380.1 708.6
243 1023.7 439.4 939.3 246.0 653.8 354.3 628.2 477.2 733.8 416.3 713.2 906.1 429.8 387.7 659.1
244 726.1 561.7 860.1 241.3 705.2 408.6 601.5 486.3 904.2 393.5 777.3 795.6 407.6 393.6 582.8
245 684.3 481.1 811.5 252.1 758.5 411.1 745.0 542.1 973.5 398.5 742.0 744.9 386.8 408.1 532.2
246 763.9 520.2 737.0 249.3 751.0 402.2 575.5 533.2 905.1 438.8 698.3 676.1 373.0 405.1 470.1
247 704.8 603.7 669.3 246.6 958.0 383.6 529.7 488.7 798.2 512.5 671.8 1016.8 356.3 409.6 427.6
248 600.4 714.2 649.1 241.6 919.6 403.3 511.1 464.9 764.6 460.0 737.4 885.3 375.8 394.0 425.4
249 563.1 774.9 751.6 240.5 1076.4 442.2 494.2 474.5 772.3 436.9 941.2 840.1 345.3 375.7 398.9
250 554.9 649.4 714.6 241.5 1016.1 614.4 489.5 473.3 761.9 392.5 783.5 729.4 338.9 365.5 390.3
251 591.3 602.8 697.9 240.8 1016.2 714.7 476.0 448.7 674.3 365.8 650.8 627.7 372.2 374.8 375.8
252 520.6 606.8 686.5 239.8 961.9 522.3 454.0 473.6 744.8 351.8 642.8 598.8 358.4 376.8 374.8
253 501.5 597.4 670.4 238.5 984.9 473.8 437.4 492.3 813.8 345.5 611.5 620.5 389.3 385.5 369.5
254 466.3 604.2 645.3 236.2 807.3 473.9 416.3 499.4 918.3 333.4 684.4 565.3 383.2 339.4 386.4
255 475.4 592.3 628.7 235.4 588.4 642.3 422.6 514.7 799.2 317.6 630.7 523.7 370.9 359.2 419.7
256 457.7 555.9 607.1 235.2 547.7 522.0 406.0 501.2 691.7 339.3 576.2 501.2 322.6 358.7 409.2
257 438.2 521.1 556.0 233.2 564.2 460.5 397.1 526.2 615.2 379.2 566.2 517.2 285.4 316.4 375.2
258 580.2 503.2 445.9 232.2 544.2 408.7 399.1 614.1 572.2 351.3 523.3 619.3 268.9 331.5 340.3
259 667.3 482.9 435.3 231.4 583.3 378.5 376.2 596.9 529.2 324.5 497.5 613.5 316.1 354.4 325.5
260 654.5 461.1 427.4 230.5 552.5 450.3 386.4 518.4 506.5 309.5 470.5 640.3 283.4 423.4 315.5
261 629.5 447.0 417.1 229.3 525.5 407.1 358.3 505.5 491.5 294.3 445.3 669.9 261.7 387.0 306.3
262 412.3 437.7 406.8 227.9 487.3 368.8 356.9 470.8 486.3 280.2 413.9 575.7 254.6 339.2 295.9
263 408.9 428.6 400.7 225.7 421.9 356.7 372.7 444.5 464.9 268.0 407.7 515.7 242.8 307.5 292.6
264 402.7 419.9 397.8 224.9 408.7 350.9 481.9 416.8 456.7 263.9 384.9 478.9 237.2 288.7 285.6
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
265 412.9 408.2 395.1 224.2 390.9 362.2 403.2 414.2 427.9 260.2 359.2 472.0 279.4 290.0 278.1
266 352.2 398.4 379.4 221.4 380.2 326.4 428.4 428.4 399.2 251.4 349.4 457.6 375.8 287.4 269.5
267 324.4 415.1 369.1 215.1 361.6 299.1 510.8 409.1 384.5 244.1 331.1 565.2 352.3 283.9 260.1
268 280.1 401.0 362.0 211.0 351.1 293.9 414.4 383.0 366.0 242.0 320.0 588.8 315.1 443.8 254.0
269 342.0 393.5 348.5 201.5 340.8 279.4 381.4 369.3 337.7 238.5 310.5 551.4 276.0 522.3 250.5
270 330.5 400.9 337.8 193.9 333.4 270.9 363.8 359.7 327.4 226.9 308.9 484.7 263.4 417.6 237.8
271 303.9 392.0 330.9 188.0 316.5 262.0 353.6 343.0 319.9 219.0 295.0 440.9 254.7 347.4 227.9
272 293.0 385.6 318.6 179.6 334.8 246.6 370.4 318.6 303.9 214.6 277.6 410.6 244.7 315.7 216.5
273 288.6 379.9 285.9 171.9 299.6 235.9 403.9 319.9 295.5 211.9 265.9 391.9 297.3 318.9 208.9
274 277.9 372.3 281.3 168.3 290.9 227.3 375.3 316.2 285.9 206.3 260.3 378.3 274.6 310.8 205.3
275 271.3 366.1 279.1 170.1 286.3 223.1 363.1 327.9 274.3 206.1 256.1 352.1 265.2 307.5 203.0
276 270.1 345.9 277.9 166.9 285.1 216.9 344.9 350.8 266.1 203.8 247.9 336.9 261.1 273.9 198.8
277 268.9 325.5 276.4 162.5 280.9 213.4 336.5 356.5 259.9 198.3 241.5 325.5 279.9 256.7 193.5
278 266.5 300.3 274.0 160.3 491.5 208.1 327.3 358.3 257.4 193.1 234.3 316.3 277.5 259.1 188.3
279 266.3 269.7 273.4 157.7 546.3 202.6 309.7 378.6 256.2 189.7 229.7 307.6 255.3 254.8 185.7
280 264.7 254.7 271.6 162.7 502.7 199.1 288.7 618.6 248.6 185.7 225.7 291.5 238.7 253.5 183.7
281 263.7 243.7 268.7 150.7 369.7 199.1 311.7 504.7 245.6 183.7 221.7 271.6 225.7 249.5 182.5
282 261.7 235.7 266.7 147.7 325.7 198.6 267.7 426.7 242.6 181.7 219.7 259.6 206.7 239.3 180.6
283 259.7 229.9 263.9 142.9 291.7 188.8 276.9 391.9 232.9 181.9 212.9 257.7 221.7 232.3 179.9
284 257.9 224.8 262.8 150.8 282.9 182.5 253.8 328.8 230.1 180.8 203.8 242.8 271.9 232.5 177.7
285 256.8 221.6 260.6 147.6 276.8 179.1 242.6 309.6 226.7 175.6 200.6 236.6 279.8 226.5 176.3
286 254.6 216.0 260.1 145.1 272.6 176.8 237.1 299.1 220.6 172.1 199.1 234.1 267.6 221.9 174.9
287 253.1 209.3 258.5 139.5 263.1 175.2 232.5 286.5 212.0 171.5 195.5 226.5 264.1 217.4 174.5
288 252.5 211.5 257.8 136.8 251.5 165.2 228.8 274.8 208.4 162.8 189.8 218.6 249.5 210.8 172.8
289 249.8 212.5 256.6 135.6 244.8 162.1 224.6 261.6 204.8 162.6 186.6 211.5 197.8 207.6 170.6
290 244.6 206.5 254.5 133.5 234.6 163.5 237.5 252.5 201.6 159.5 182.5 206.5 186.6 202.5 167.5
291 227.5 203.4 253.4 131.4 224.5 160.4 366.4 249.4 197.5 153.4 179.4 198.4 181.5 196.4 163.4
292 226.4 199.5 251.5 126.5 219.4 157.5 331.5 243.5 195.4 151.5 179.5 194.5 179.4 192.5 159.5
293 216.5 197.6 250.6 122.6 214.5 156.6 269.6 236.6 195.5 148.6 174.6 194.6 175.5 188.6 154.6
294 211.6 186.9 249.9 121.9 206.6 158.9 255.9 230.7 193.6 146.9 169.9 189.9 171.6 186.9 152.9
295 199.9 183.1 248.1 121.1 202.9 153.1 241.1 224.9 192.9 145.1 166.1 184.1 168.9 184.1 147.9
296 195.1 182.1 247.1 120.1 201.1 150.1 236.1 219.1 190.1 136.1 162.1 181.1 165.1 178.1 144.1
297 191.1 179.9 245.9 116.9 200.1 148.9 228.9 214.9 187.1 135.9 158.9 177.9 162.1 174.9 143.9
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
298 189.9 178.8 244.8 113.8 196.9 143.8 221.8 205.8 183.9 134.8 154.8 173.8 160.9 168.8 142.7
299 185.8 175.9 242.9 111.9 195.8 142.9 218.8 201.9 175.8 134.9 153.9 170.9 158.8 155.7 141.9
300 180.9 169.0 242.0 111.0 197.9 141.0 211.9 196.9 175.9 134.0 152.0 168.0 154.9 152.9 141.0
301 176.0 165.0 241.0 110.0 204.0 145.0 204.0 194.9 173.0 134.0 149.0 166.0 153.0 156.0 139.0
302 169.0 161.1 239.1 109.1 215.0 144.1 199.1 190.1 170.0 131.1 146.1 164.1 147.0 149.1 138.1
303 159.1 160.1 225.1 107.1 198.1 145.1 196.1 189.1 167.1 131.1 145.1 162.1 143.1 142.1 137.1
304 154.1 159.2 222.2 106.2 189.1 137.2 191.0 183.2 166.1 130.2 142.2 157.2 139.1 136.2 136.2
305 153.2 158.3 219.3 106.3 184.1 135.3 187.2 182.3 163.2 124.3 139.3 152.3 136.2 132.3 135.3
306 152.3 159.0 215.0 110.0 179.2 137.0 187.0 183.0 162.3 128.0 141.0 153.0 134.3 133.0 138.0
307 154.0 157.8 206.8 108.8 180.0 133.8 180.8 178.8 165.0 126.8 138.8 149.8 136.0 130.8 135.8
308 152.8 156.2 199.2 107.2 178.8 129.2 179.2 178.2 162.7 121.2 136.2 146.2 134.8 127.2 132.2
309 151.2 138.7 193.7 106.7 174.2 128.7 174.7 175.7 160.1 119.7 134.7 141.7 133.2 119.7 129.6
310 147.7 136.8 187.8 105.8 168.7 126.8 173.8 167.8 158.7 118.8 132.8 140.8 131.7 116.8 127.7
311 143.8 133.1 180.1 106.1 167.8 125.1 172.1 162.1 156.8 119.1 133.1 141.1 130.8 116.1 127.1
312 139.1 132.9 176.9 104.9 165.1 124.9 169.9 157.9 156.1 119.9 130.9 138.9 129.1 113.9 125.9
313 138.9 131.9 174.9 104.9 160.9 122.9 167.9 157.9 152.9 119.9 127.9 135.9 127.9 112.9 123.9
314 134.9 127.0 172.0 104.0 157.9 130.0 166.0 155.0 149.9 119.0 127.0 134.0 126.9 111.0 123.0
315 135.0 125.9 168.9 104.9 157.0 125.9 160.9 151.9 146.0 117.9 123.9 130.9 126.0 108.9 122.9
316 132.9 125.0 165.0 102.0 155.8 123.0 158.0 150.0 144.9 116.0 129.0 127.0 124.9 107.0 122.0
317 131.0 124.2 161.2 103.2 154.7 120.2 156.2 149.2 144.0 115.2 133.2 126.2 124.0 107.2 121.2
318 129.2 123.2 156.2 103.2 152.0 118.2 152.2 149.2 143.2 114.2 129.2 127.2 123.2 105.2 121.2
319 129.2 123.2 153.2 102.2 152.2 118.2 152.2 147.2 141.2 111.2 124.2 128.2 122.2 101.2 120.2
320 128.2 122.0 150.0 101.0 146.2 117.0 151.0 146.0 138.2 110.0 128.0 127.0 120.2 101.0 119.0
321 128.0 119.1 147.1 100.1 146.0 116.1 148.1 142.1 138.0 109.1 130.1 124.1 119.0 100.1 118.1
322 127.1 118.1 144.1 99.1 143.1 114.1 147.1 141.1 136.1 108.1 125.1 123.1 118.1 98.1 117.1
323 127.1 117.1 141.1 99.1 141.1 115.1 172.1 139.1 135.1 107.1 121.1 122.1 116.1 96.1 116.1
324 126.1 116.1 137.1 99.1 138.1 115.1 158.1 138.0 133.1 104.1 117.1 120.1 115.1 94.1 114.1
325 126.1 114.1 135.1 99.1 137.1 112.1 152.1 137.0 130.1 104.1 114.1 118.1 114.1 92.3 116.1
326 125.1 113.1 133.1 98.1 135.1 109.1 148.1 134.1 129.1 103.1 113.1 117.1 113.1 91.2 115.1
327 124.1 110.1 130.1 97.1 132.1 108.1 142.9 132.1 129.1 102.1 112.1 116.1 111.1 90.6 114.1
328 122.1 109.2 127.2 96.2 130.1 109.2 139.0 130.2 127.1 101.2 111.2 115.2 110.1 90.2 114.2
329 120.2 108.2 125.2 95.8 129.2 107.2 137.2 132.2 126.2 100.2 110.2 114.2 109.2 88.5 113.2
330 119.2 107.3 121.3 95.1 129.2 122.3 136.3 127.3 124.2 99.3 109.3 113.3 108.2 88.3 112.3
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
331 118.3 104.3 117.3 94.4 126.3 116.3 134.3 126.2 122.3 98.3 108.3 111.3 107.3 88.3 101.3
332 118.3 104.3 114.3 93.7 125.3 113.3 132.3 125.1 120.3 98.3 107.3 109.2 106.3 86.6 101.3
333 116.3 103.3 110.3 93.0 124.3 109.3 125.9 124.2 127.3 97.2 104.3 106.2 104.3 84.9 100.3
334 115.3 102.3 109.3 92.2 122.3 108.3 117.0 122.3 122.3 96.2 103.3 104.3 103.3 84.0 99.3
335 114.3 101.2 108.2 91.4 120.3 119.2 118.5 122.2 120.3 95.2 102.2 103.2 102.3 82.3 98.2
336 111.2 101.7 108.7 92.2 118.2 107.7 123.9 121.7 119.2 95.6 101.7 103.7 101.2 83.0 98.7
337 111.7 100.6 107.6 92.1 119.7 109.6 124.5 120.6 118.7 94.5 99.6 102.6 101.7 82.9 98.6
338 111.6 99.5 106.5 91.3 117.6 107.5 124.4 119.5 116.6 94.4 98.5 101.5 100.6 82.8 97.5
339 110.5 98.5 105.5 94.2 117.5 105.5 123.5 119.5 116.5 93.4 97.5 99.5 99.5 81.4 97.2
340 109.5 97.5 103.5 93.4 115.5 102.5 122.5 118.5 115.5 92.4 96.1 99.4 98.5 80.9 96.9
341 108.5 97.5 104.5 91.3 112.5 101.5 122.4 116.5 114.5 91.4 93.7 98.4 97.5 80.4 96.4
342 105.5 96.5 104.5 91.3 110.5 100.5 120.4 114.5 114.5 90.3 92.4 97.5 96.5 79.8 96.4
343 104.5 94.4 102.5 89.1 109.5 104.5 118.4 112.5 112.5 90.3 91.7 98.5 95.4 79.6 95.5
344 103.5 93.4 101.5 89.9 109.5 131.5 117.3 111.5 111.5 89.3 91.4 97.5 94.4 79.0 95.2
345 102.5 92.4 100.5 89.1 107.5 112.5 115.2 110.5 110.5 88.3 91.4 95.4 94.4 79.8 94.6
346 101.5 91.5 98.6 88.5 105.5 111.6 114.4 109.6 110.5 87.4 90.8 94.5 93.4 80.7 94.4
347 100.6 90.4 97.6 87.8 105.6 111.6 111.5 108.6 110.6 87.4 89.8 93.5 93.5 81.5 93.8
348 99.6 89.5 97.7 89.3 104.6 114.7 110.6 108.7 109.6 88.5 89.5 92.6 92.5 82.2 93.9
349 99.7 85.5 97.3 95.1 104.7 108.7 109.6 107.7 108.7 89.5 89.5 91.6 91.6 83.0 93.4
350 98.7 84.4 96.4 97.2 104.7 103.6 109.6 105.6 107.7 86.4 88.8 90.4 90.5 83.2 93.0
351 97.6 84.4 95.0 90.2 104.6 107.6 109.6 104.6 106.6 85.4 88.4 89.4 89.4 84.0 92.1
352 97.6 83.5 94.8 92.1 102.6 102.6 108.5 103.6 105.6 84.4 87.8 88.4 88.4 84.5 92.1
353 96.6 83.5 95.5 91.4 102.6 98.6 105.5 101.6 105.6 83.5 87.1 87.4 87.4 82.4 91.3
354 95.5 82.5 95.0 90.7 101.6 99.6 104.6 103.6 103.6 81.6 85.7 86.4 86.4 84.5 90.4
355 95.5 81.6 94.3 90.0 100.6 99.6 104.6 101.6 101.6 80.6 84.4 85.4 85.4 82.6 90.4
356 94.5 80.6 93.5 89.2 99.6 98.6 104.6 99.6 101.6 79.6 83.5 84.4 84.4 81.0 89.6
357 94.5 79.7 92.9 89.3 98.6 97.7 103.6 101.7 100.6 78.8 82.3 83.6 83.5 79.8 89.1
358 93.6 78.8 92.4 88.6 98.7 96.7 102.5 98.7 100.7 77.8 81.7 82.6 82.6 80.0 88.3
359 93.6 78.7 92.1 87.8 97.7 95.5 101.5 99.6 100.7 76.8 80.9 81.6 81.7 80.5 87.3
360 92.5 78.7 93.5 87.8 97.6 94.5 100.6 97.6 99.6 76.8 79.6 80.6 80.6 80.7 86.7
361 91.5 78.8 92.9 87.9 97.6 93.6 100.7 96.7 99.6 76.9 79.7 79.7 79.6 81.6 86.0
362 90.5 77.9 91.8 87.3 96.7 92.7 99.8 96.8 97.7 76.0 78.9 78.9 78.8 82.3 85.5
363 89.6 78.0 91.2 87.4 96.8 91.8 98.9 95.8 94.7 76.1 78.0 78.0 77.9 83.2 84.8
Annex A 4

Daily Estimated Discharge at Phukot Headworks site(m3/sec)


Day/Year 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
364 88.7 77.1 90.7 86.7 94.8 90.7 97.9 94.8 94.5 84.7 77.4 77.1 77.1 84.3 84.5
365 87.7 77.1 88.1 86.7 93.8 86.7 97.9 92.8 92.8 84.7 76.4 76.1 76.1 85.1 84.3
366 87.7 92.8 92.8 75.2
ANNEX: 5.1: Calculation for Peak of Snyder's
UH for Sub-basins
Annex A 5.1

Calculation for Peak of Snyder's UH for Sub-basins


Centroidal
Longest Standard
Area<5000m Flow tp= Ct
Basin Name Flow duration(tr Adopt (tR),hr tp' hr Adopted tp' Qp tb
(Sq.km) Length (L*Lca)
Length (L) )
(Lca)
Sub-basin 1 406.21 84871.86 28482.8 23.9 4.35 3 23.6 24 24.00 144.0
Sub-basin 2 1859.40 133224.50 54762.5 30.7 5.58 3 30.1 30 83.22 162.0
Sub-basin 3 709.52 71453.02 32569.5 25.6 4.65 3 25.2 24 39.70 144.0
Sub-basin 4 1095.18 74868.38 32153.8 25.6 4.66 3 25.2 24 60.89 144.0
Sub-basin 5 1006.91 67716.58 32587.5 25.3 4.60 3 24.9 24 52.25 144.0
Sub-basin 6 448.94 44296.34 25581.2 20.6 3.75 3 20.4 21 24.37 135.0
Sub-basin 7 298.15 37444.41 14256.1 18.8 3.41 3 18.7 18 18.88 126.0
Sub-basin 8 91.09 17395.46 6242.2 11.6 2.11 3 11.9 12 8.44 108.0
Sub-basin 9 768.50 65055.39 23254.4 22.0 4.01 3 21.8 21 44.76 135.0
Sub-basin 10 537.66 57492.27 27816.4 22.9 4.16 3 22.6 24 29.89 144.0
Sub-basin 11 1391.07 95386.25 36326.9 33.4 6.08 3 32.7 33 43.36 171.0
Sub-basin 12 1041.06 85987.46 44028.8 31.7 5.77 3 31.0 30 39.55 162.0
Sub-basin 13 2121.12 166471.47 80687.5 36.9 6.71 3 36.0 36 83.54 180.0

tb (Taylor Slope Slope


3 Depth Qp Base
Basin Name and q, m /s W50 W75 Total Area Volume before after
(cm) (Adjusted) Flow
Schwart), hr peak Peak

Sub-basin 1 127.5 0.06 45.43 25.90 1471.65 5297941.21 1.30 18.40 0.77 0.18 5.37
Sub-basin 2 157.5 0.04 61.30 34.95 6584.68 23704858.07 1.27 65.28 2.18 0.51 14.74
Sub-basin 3 127.5 0.06 48.17 27.46 2505.16 9018577.09 1.27 31.23 1.30 0.30 6.10
Sub-basin 4 127.5 0.06 48.50 27.65 3855.70 13880526.59 1.27 48.04 2.00 0.46 6.40
Sub-basin 5 127.5 0.05 52.25 29.79 3435.70 12368521.39 1.23 42.54 1.77 0.41 6.12
Sub-basin 6 112.5 0.05 49.78 28.38 1471.74 5298279.88 1.18 20.65 0.98 0.23 2.10
Sub-basin 7 97.5 0.06 42.14 24.03 976.06 3513822.93 1.18 16.02 0.89 0.20 1.39
Sub-basin 8 67.5 0.09 27.93 15.93 295.34 1063211.75 1.17 7.23 0.60 0.13 0.43
Sub-basin 9 112.5 0.06 46.12 26.29 2597.59 9351330.62 1.22 36.79 1.75 0.40 3.84
Sub-basin 10 127.5 0.06 48.50 27.65 1892.88 6814378.60 1.27 23.59 0.98 0.23 3.62
Sub-basin 11 172.5 0.03 90.61 51.66 4417.19 15901869.66 1.14 37.93 1.15 0.27 7.61
Sub-basin 12 157.5 0.04 73.17 41.71 3433.85 12361858.04 1.19 33.31 1.11 0.26 4.93
Sub-basin 13 187.5 0.04 70.38 40.13 7727.96 27820672.91 1.31 63.69 1.77 0.42 16.57
ANNEX 5.2: Sub-basin Unit Hydrograph at
Lalighat station
Annex A 5.2

Sub-basin Unit Hydrograph at Lalighat station


Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates
Time
Sub-basin 1 Sub-basin 2 Sub-basin 3 Sub-basin 4 Sub-basin 5 Sub-basin 6 Sub-basin 7 Sub-basin 8 Sub-basin 9 Sub-basin 10 Sub-basin 11 Sub-basin 12 Sub-basin 13
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 2.3 6.5 3.9 6.0 5.3 2.9 2.7 1.8 5.3 2.9 3.4 3.3 5.3
6 4.6 13.1 7.8 12.0 10.6 5.9 5.3 3.6 10.5 5.9 6.9 6.7 10.6
9 6.9 19.6 11.7 18.0 16.0 8.8 8.0 5.4 15.8 8.8 10.3 10.0 15.9
12 9.2 26.1 15.6 24.0 21.3 11.8 10.7 6.8 21.0 11.8 13.8 13.3 21.2
15 11.5 32.6 19.5 30.0 26.6 14.7 13.3 6.5 26.3 14.7 17.2 16.7 26.5
18 13.8 39.2 23.4 36.0 31.9 17.7 16.0 6.1 31.5 17.7 20.7 20.0 31.8
21 16.1 45.7 27.3 42.0 37.2 20.6 15.4 5.7 36.8 20.6 24.1 23.3 37.2
24 18.4 52.2 31.2 48.0 42.5 20.0 14.8 5.3 35.6 23.6 27.6 26.6 42.5
27 17.9 58.8 30.3 46.7 41.3 19.3 14.2 4.9 34.4 22.9 31.0 30.0 47.8
30 17.3 65.3 29.4 45.3 40.1 18.6 13.6 4.5 33.2 22.2 34.5 33.3 53.1
33 16.8 63.7 28.5 43.9 38.8 17.9 13.0 4.1 32.0 21.5 37.9 32.5 58.4
36 16.3 62.2 27.6 42.5 37.6 17.3 12.4 3.7 30.8 20.9 37.1 31.7 63.7
39 15.7 60.7 26.7 41.1 36.4 16.6 11.8 3.3 29.6 20.2 36.3 31.0 62.4
42 15.2 59.1 25.8 39.7 35.1 15.9 11.2 2.9 28.3 19.5 35.5 30.2 61.2
45 14.7 57.6 24.9 38.3 33.9 15.2 10.6 2.5 27.1 18.8 34.7 29.4 59.9
48 14.1 56.1 24.0 36.9 32.7 14.6 10.0 2.2 25.9 18.1 33.9 28.6 58.6
51 13.6 54.5 23.1 35.5 31.4 13.9 9.4 1.8 24.7 17.4 33.0 27.8 57.4
54 13.1 53.0 22.2 34.1 30.2 13.2 8.8 1.4 23.5 16.7 32.2 27.0 56.1
57 12.5 51.5 21.3 32.7 29.0 12.5 8.2 1.0 22.3 16.1 31.4 26.3 54.9
60 12.0 49.9 20.4 31.3 27.7 11.8 7.6 0.6 21.1 15.4 30.6 25.5 53.6
63 11.5 48.4 19.5 29.9 26.5 11.2 7.0 0.2 19.9 14.7 29.8 24.7 52.3
66 10.9 46.8 18.6 28.5 25.3 10.5 6.3 0.0 18.7 14.0 29.0 23.9 51.1
69 10.4 45.3 17.7 27.2 24.0 9.8 5.7 0.0 17.5 13.3 28.1 23.1 49.8
72 9.9 43.8 16.7 25.8 22.8 9.1 5.1 0.0 16.3 12.6 27.3 22.3 48.6
75 9.3 42.2 15.8 24.4 21.6 8.5 4.5 0.0 15.1 12.0 26.5 21.6 47.3
78 8.8 40.7 14.9 23.0 20.3 7.8 3.9 0.0 13.9 11.3 25.7 20.8 46.0
81 8.3 39.2 14.0 21.6 19.1 7.1 3.3 0.0 12.7 10.6 24.9 20.0 44.8
84 7.7 37.6 13.1 20.2 17.9 6.4 2.7 0.0 11.5 9.9 24.1 19.2 43.5
87 7.2 36.1 12.2 18.8 16.6 5.8 2.1 0.0 10.3 9.2 23.2 18.4 42.3
90 6.7 34.6 11.3 17.4 15.4 5.1 1.5 0.0 9.0 8.5 22.4 17.6 41.0
93 6.1 33.0 10.4 16.0 14.2 4.4 0.9 0.0 7.8 7.9 21.6 16.9 39.7
96 5.6 31.5 9.5 14.6 12.9 3.7 0.3 0.0 6.6 7.2 20.8 16.1 38.5
99 5.1 30.0 8.6 13.2 11.7 3.0 0.0 0.0 5.4 6.5 20.0 15.3 37.2
102 4.5 28.4 7.7 11.8 10.5 2.4 0.0 0.0 4.2 5.8 19.2 14.5 35.9
105 4.0 26.9 6.8 10.4 9.2 1.7 0.0 0.0 3.0 5.1 18.4 13.7 34.7
108 3.5 25.3 5.9 9.1 8.0 1.0 0.0 0.0 1.8 4.4 17.5 12.9 33.4
111 2.9 23.8 5.0 7.7 6.8 0.3 0.0 0.0 0.6 3.8 16.7 12.1 32.2
114 2.4 22.3 4.1 6.3 5.5 0.0 0.0 0.0 0.0 3.1 15.9 11.4 30.9
117 1.9 20.7 3.2 4.9 4.3 0.0 0.0 0.0 0.0 2.4 15.1 10.6 29.6
120 1.3 19.2 2.3 3.5 3.1 0.0 0.0 0.0 0.0 1.7 14.3 9.8 28.4
123 0.8 17.7 1.4 2.1 1.8 0.0 0.0 0.0 0.0 1.0 13.5 9.0 27.1
126 0.3 16.1 0.5 0.7 0.6 0.0 0.0 0.0 0.0 0.3 12.6 8.2 25.9
129 0.0 14.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.8 7.4 24.6
132 0.0 13.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.0 6.7 23.3
135 0.0 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.2 5.9 22.1
138 0.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.4 5.1 20.8
141 0.0 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.6 4.3 19.5
144 0.0 6.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.7 3.5 18.3
147 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.9 2.7 17.0
150 0.0 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 2.0 15.8
153 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.3 1.2 14.5
156 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.5 0.4 13.2
159 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 0.0 12.0
162 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0 10.7
165 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 9.5
168 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 8.2
171 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 6.9
174 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.7
177 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4
180 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2
183 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9
186 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6
Annex A 5.2

Sub-basin Direct Runoff Hydrograph at Lalighat station for Statistical Method


Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates
Time
Sub-basin 1 Sub-basin 2 Sub-basin 3 Sub-basin 4 Sub-basin 5 Sub-basin 6 Sub-basin 7 Sub-basin 8 Sub-basin 9 Sub-basin 10 Sub-basin 11 Sub-basin 12 Sub-basin 13
0 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
3 78.3 261.6 127.7 196.7 282.1 111.9 116.8 73.6 174.0 197.1 139.4 111.1 247.8
6 151.2 508.4 249.2 387.0 558.2 221.7 232.1 146.7 344.2 390.6 271.2 217.2 479.1
9 224.1 755.2 370.8 577.3 834.2 331.4 347.5 219.8 514.3 584.1 403.0 323.3 710.3
12 297.0 1002.0 492.3 767.7 1110.2 441.2 462.9 277.2 684.5 777.6 534.8 429.4 941.6
15 369.9 1248.9 613.9 958.0 1386.2 551.0 578.2 261.4 854.7 971.1 666.6 535.6 1172.8
18 442.8 1495.7 735.5 1148.3 1662.2 660.8 693.6 245.5 1024.8 1164.6 798.3 641.7 1404.1
21 515.7 1742.5 857.0 1338.6 1938.2 770.6 667.5 229.7 1195.0 1358.1 930.1 747.8 1635.3
24 588.6 1989.3 978.6 1528.9 2214.3 745.4 641.3 213.9 1156.0 1551.6 1061.9 853.9 1866.6
27 571.7 2236.1 950.4 1484.8 2150.3 720.2 615.2 198.1 1116.9 1506.7 1193.7 960.1 2097.8
30 554.8 2483.0 922.2 1440.7 2086.3 695.0 589.1 182.3 1077.8 1461.9 1325.5 1066.2 2329.1
33 537.9 2424.9 894.0 1396.5 2022.2 669.8 563.0 166.5 1038.8 1417.0 1457.3 1041.2 2560.3
36 521.0 2366.8 865.8 1352.4 1958.2 644.6 536.9 150.7 999.7 1372.1 1426.1 1016.2 2791.6
39 504.1 2308.7 837.7 1308.3 1894.2 619.4 510.7 134.8 960.7 1327.3 1394.9 991.3 2736.6
42 487.2 2250.7 809.5 1264.1 1830.2 594.2 484.6 119.0 921.6 1282.4 1363.8 966.3 2681.7
45 470.3 2192.6 781.3 1220.0 1766.2 569.0 458.5 103.2 882.6 1237.5 1332.6 941.3 2626.7
48 453.4 2134.5 753.1 1175.9 1702.2 543.8 432.4 87.4 843.5 1192.6 1301.4 916.4 2571.8
51 436.5 2076.4 724.9 1131.7 1638.2 518.6 406.3 71.6 804.5 1147.8 1270.2 891.4 2516.8
54 419.5 2018.4 696.7 1087.6 1574.2 493.4 380.1 55.8 765.4 1102.9 1239.1 866.4 2461.9
57 402.6 1960.3 668.5 1043.5 1510.2 468.2 354.0 40.0 726.4 1058.0 1207.9 841.5 2406.9
60 385.7 1902.2 640.3 999.4 1446.2 443.0 327.9 24.1 687.3 1013.2 1176.7 816.5 2352.0
63 368.8 1844.1 612.1 955.2 1382.2 417.8 301.8 8.3 648.2 968.3 1145.5 791.5 2297.0
66 351.9 1786.1 584.0 911.1 1318.2 392.6 275.7 0.4 609.2 923.4 1114.4 766.5 2242.1
69 335.0 1728.0 555.8 867.0 1254.2 367.4 249.5 0.4 570.1 878.6 1083.2 741.6 2187.1
72 318.1 1669.9 527.6 822.8 1190.2 342.2 223.4 0.4 531.1 833.7 1052.0 716.6 2132.2
75 301.2 1611.8 499.4 778.7 1126.2 317.0 197.3 0.4 492.0 788.8 1020.8 691.6 2077.2
78 284.3 1553.8 471.2 734.6 1062.2 291.9 171.2 0.4 453.0 744.0 989.6 666.7 2022.3
81 267.4 1495.7 443.0 690.4 998.2 266.7 145.1 0.4 413.9 699.1 958.5 641.7 1967.3
84 250.5 1437.6 414.8 646.3 934.2 241.5 118.9 0.4 374.9 654.2 927.3 616.7 1912.4
87 233.6 1379.5 386.6 602.2 870.2 216.3 92.8 0.4 335.8 609.3 896.1 591.7 1857.4
90 216.7 1321.4 358.5 558.0 806.2 191.1 66.7 0.4 296.7 564.5 864.9 566.8 1802.5
93 199.8 1263.4 330.3 513.9 742.2 165.9 40.6 0.4 257.7 519.6 833.8 541.8 1747.5
96 182.9 1205.3 302.1 469.8 678.2 140.7 14.5 0.4 218.6 474.7 802.6 516.8 1692.6
99 166.0 1147.2 273.9 425.6 614.2 115.5 1.4 0.4 179.6 429.9 771.4 491.9 1637.6
102 149.1 1089.1 245.7 381.5 550.2 90.3 1.4 0.4 140.5 385.0 740.2 466.9 1582.7
105 132.2 1031.1 217.5 337.4 486.2 65.1 1.4 0.4 101.5 340.1 709.1 441.9 1527.7
108 115.3 973.0 189.3 293.3 422.1 39.9 1.4 0.4 62.4 295.3 677.9 416.9 1472.8
111 98.4 914.9 161.1 249.1 358.1 14.7 1.4 0.4 23.4 250.4 646.7 392.0 1417.8
114 81.4 856.8 132.9 205.0 294.1 2.1 1.4 0.4 3.8 205.5 615.5 367.0 1362.9
117 64.5 798.8 104.8 160.9 230.1 2.1 1.4 0.4 3.8 160.7 584.4 342.0 1307.9
120 47.6 740.7 76.6 116.7 166.1 2.1 1.4 0.4 3.8 115.8 553.2 317.1 1253.0
123 30.7 682.6 48.4 72.6 102.1 2.1 1.4 0.4 3.8 70.9 522.0 292.1 1198.0
126 13.8 624.5 20.2 28.5 38.1 2.1 1.4 0.4 3.8 26.0 490.8 267.1 1143.1
129 5.4 566.5 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 459.7 242.2 1088.1
132 5.4 508.4 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 428.5 217.2 1033.2
135 5.4 450.3 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 397.3 192.2 978.2
138 5.4 392.2 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 366.1 167.2 923.3
141 5.4 334.2 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 335.0 142.3 868.3
144 5.4 276.1 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 303.8 117.3 813.3
147 5.4 218.0 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 272.6 92.3 758.4
150 5.4 159.9 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 241.4 67.4 703.4
153 5.4 101.9 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 210.3 42.4 648.5
156 5.4 43.8 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 179.1 17.4 593.5
159 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 147.9 4.9 538.6
162 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 116.7 4.9 483.6
165 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 85.5 4.9 428.7
168 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 54.4 4.9 373.7
171 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 23.2 4.9 318.8
174 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 263.8
177 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 208.9
180 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 153.9
183 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 99.0
186 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 44.0
187 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
188 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
189 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
190 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
Annex A 5.2

Sub-basin Direct Runoff Hydrograph at Lalighat station for Hydro-meteorological method


Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates Ordinates
Time
Sub-basin 1 Sub-basin 2 Sub-basin 3 Sub-basin 4 Sub-basin 5 Sub-basin 6 Sub-basin 7 Sub-basin 8 Sub-basin 9 Sub-basin 10 Sub-basin 11 Sub-basin 12 Sub-basin 13
0 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
3 106.6 302.0 177.9 270.7 240.1 131.9 118.9 80.0 235.1 133.4 159.4 151.5 250.2
6 207.8 589.3 349.7 535.0 474.1 261.7 236.4 159.6 466.4 263.1 311.1 298.1 483.7
9 309.0 876.6 521.5 799.3 708.2 391.5 353.9 239.2 697.7 392.9 462.9 444.7 717.3
12 410.2 1163.9 693.3 1063.6 942.2 521.3 471.4 301.5 929.0 522.6 614.6 591.3 950.9
15 511.5 1451.2 865.1 1327.9 1176.2 651.2 588.9 284.3 1160.3 652.4 766.4 737.9 1184.5
18 612.7 1738.5 1036.9 1592.2 1410.2 781.0 706.4 267.1 1391.6 782.1 918.1 884.5 1418.1
21 713.9 2025.8 1208.7 1856.5 1644.2 910.8 679.8 249.9 1622.8 911.9 1069.9 1031.1 1651.7
24 815.1 2313.1 1380.5 2120.8 1878.2 881.0 653.2 232.7 1569.8 1041.7 1221.6 1177.7 1885.2
27 791.6 2600.4 1340.7 2059.5 1823.9 851.2 626.6 215.5 1516.7 1011.6 1373.4 1324.3 2118.8
30 768.2 2887.7 1300.8 1998.3 1769.7 821.4 600.0 198.3 1463.6 981.5 1525.1 1470.9 2352.4
33 744.7 2820.1 1261.0 1937.0 1715.4 791.6 573.4 181.1 1410.5 951.4 1676.9 1436.4 2586.0
36 721.2 2752.5 1221.2 1875.7 1661.2 761.8 546.8 163.9 1357.4 921.3 1641.0 1401.9 2819.6
39 697.8 2684.9 1181.3 1814.4 1606.9 732.0 520.2 146.7 1304.4 891.2 1605.1 1367.4 2764.1
42 674.3 2617.3 1141.5 1753.1 1552.6 702.2 493.6 129.5 1251.3 861.1 1569.2 1332.9 2708.6
45 650.8 2549.7 1101.7 1691.8 1498.4 672.4 467.0 112.3 1198.2 831.0 1533.3 1298.4 2653.1
48 627.3 2482.1 1061.8 1630.5 1444.1 642.6 440.4 95.1 1145.1 801.0 1497.4 1263.9 2597.6
51 603.9 2414.5 1022.0 1569.2 1389.8 612.8 413.8 77.9 1092.0 770.9 1461.5 1229.5 2542.1
54 580.4 2346.9 982.1 1508.0 1335.6 583.1 387.2 60.6 1038.9 740.8 1425.6 1195.0 2486.6
57 556.9 2279.3 942.3 1446.7 1281.3 553.3 360.5 43.4 985.9 710.7 1389.7 1160.5 2431.1
60 533.5 2211.7 902.5 1385.4 1227.0 523.5 333.9 26.2 932.8 680.6 1353.8 1126.0 2375.5
63 510.0 2144.1 862.6 1324.1 1172.8 493.7 307.3 9.0 879.7 650.5 1317.9 1091.5 2320.0
66 486.5 2076.5 822.8 1262.8 1118.5 463.9 280.7 0.4 826.6 620.4 1282.0 1057.0 2264.5
69 463.1 2008.9 782.9 1201.5 1064.3 434.1 254.1 0.4 773.5 590.3 1246.1 1022.5 2209.0
72 439.6 1941.3 743.1 1140.2 1010.0 404.3 227.5 0.4 720.4 560.2 1210.2 988.0 2153.5
75 416.1 1873.7 703.3 1078.9 955.7 374.5 200.9 0.4 667.4 530.2 1174.3 953.5 2098.0
78 392.6 1806.1 663.4 1017.7 901.5 344.7 174.3 0.4 614.3 500.1 1138.4 919.0 2042.5
81 369.2 1738.5 623.6 956.4 847.2 314.9 147.7 0.4 561.2 470.0 1102.5 884.5 1987.0
84 345.7 1670.9 583.8 895.1 792.9 285.1 121.1 0.4 508.1 439.9 1066.6 850.0 1931.5
87 322.2 1603.3 543.9 833.8 738.7 255.3 94.5 0.4 455.0 409.8 1030.7 815.5 1876.0
90 298.8 1535.7 504.1 772.5 684.4 225.5 67.9 0.4 402.0 379.7 994.8 781.0 1820.5
93 275.3 1468.1 464.2 711.2 630.2 195.7 41.3 0.4 348.9 349.6 958.9 746.5 1765.0
96 251.8 1400.5 424.4 649.9 575.9 166.0 14.7 0.4 295.8 319.5 923.0 712.0 1709.5
99 228.3 1332.9 384.6 588.6 521.6 136.2 1.4 0.4 242.7 289.5 887.1 677.6 1654.0
102 204.9 1265.3 344.7 527.3 467.4 106.4 1.4 0.4 189.6 259.4 851.2 643.1 1598.5
105 181.4 1197.7 304.9 466.1 413.1 76.6 1.4 0.4 136.5 229.3 815.3 608.6 1543.0
108 157.9 1130.1 265.0 404.8 358.8 46.8 1.4 0.4 83.5 199.2 779.4 574.1 1487.5
111 134.5 1062.5 225.2 343.5 304.6 17.0 1.4 0.4 30.4 169.1 743.5 539.6 1432.0
114 111.0 994.9 185.4 282.2 250.3 2.1 1.4 0.4 3.8 139.0 707.6 505.1 1376.4
117 87.5 927.3 145.5 220.9 196.0 2.1 1.4 0.4 3.8 108.9 671.7 470.6 1320.9
120 64.0 859.7 105.7 159.6 141.8 2.1 1.4 0.4 3.8 78.8 635.8 436.1 1265.4
123 40.6 792.1 65.9 98.3 87.5 2.1 1.4 0.4 3.8 48.7 599.9 401.6 1209.9
126 17.1 724.5 26.0 37.0 33.3 2.1 1.4 0.4 3.8 18.7 564.0 367.1 1154.4
129 5.4 656.9 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 528.1 332.6 1098.9
132 5.4 589.3 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 492.2 298.1 1043.4
135 5.4 521.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 456.3 263.6 987.9
138 5.4 454.1 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 420.4 229.1 932.4
141 5.4 386.5 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 384.5 194.6 876.9
144 5.4 318.9 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 348.6 160.2 821.4
147 5.4 251.3 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 312.7 125.7 765.9
150 5.4 183.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 276.8 91.2 710.4
153 5.4 116.1 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 240.9 56.7 654.9
156 5.4 48.5 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 205.1 22.2 599.4
159 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 169.2 4.9 543.9
162 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 133.3 4.9 488.4
165 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 97.4 4.9 432.9
168 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 61.5 4.9 377.4
171 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 25.6 4.9 321.8
174 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 266.3
177 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 210.8
180 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 155.3
183 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 99.8
186 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 44.3
187 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
188 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
189 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
190 5.4 14.7 6.1 6.4 6.1 2.1 1.4 0.4 3.8 3.6 7.6 4.9 16.6
ANNEX 5.3- Gauge Height Record and
Computation of Discharge
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2074


Location : Month: Poush
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg. Daily
S.No. Date (A.D.) Date (B.S) Total Total Total Discharge,
Gauge Discharge, Gauge Discharge, Gauge Discharg m3/s
M Cm Ht.,m m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s
1 9/1/2074
2 9/2/2074
3 9/3/2074
4 9/4/2074
5 9/5/2074
6 9/6/2074
7 9/7/2074
8 9/8/2074
9 9/9/2074
10 9/10/2074
11 9/11/2074
12 9/12/2074
13 9/13/2074
14 9/14/2074
15 9/15/2074
16 9/16/2074
17 9/17/2074
18 9/18/2074
19 9/19/2074
20 1/4/2018 9/20/2074 2 90 2.9 90.01 2 91 2.91 90.78 2 90 2.9 90.01 90.27
21 1/5/2018 9/21/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 91 2.91 90.78 90.27
22 1/6/2018 9/22/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
23 1/7/2018 9/23/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
24 1/8/2018 9/24/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
25 1/9/2018 9/25/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
26 1/10/2018 9/26/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
27 1/11/2018 9/27/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
28 1/12/2018 9/28/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
29 1/13/2018 9/29/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
30 1/14/2018 9/30/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
31
Average Monthly Discharge,m3/s 90.06
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2074


Location : Month: Magh
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Daily
Gauge Discharg Total Gauge Discharge, Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s e, m3/s
1 1/15/2018 10/1/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
2 1/16/2018 10/2/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
3 1/17/2018 10/3/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
4 1/18/2018 10/4/2074 2 87 2.87 87.72 2 89 2.89 89.25 2 90 2.9 90.01 88.99
5 1/19/2018 10/5/2074 2 88 2.88 88.48 2 89 2.89 89.25 2 90 2.9 90.01 89.25
6 1/20/2018 10/6/2074 2 89 2.89 89.25 2 90 2.9 90.01 2 90 2.9 90.01 89.76
7 1/21/2018 10/7/2074 2 86 2.86 86.97 2 84 2.84 85.47 2 88 2.88 88.48 86.97
8 1/22/2018 10/8/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
9 1/23/2018 10/9/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 84 2.84 85.47 83.50
10 1/24/2018 10/10/2074 2 82 2.82 83.99 2 82 2.82 83.99 2 82 2.82 83.99 83.99
11 1/25/2018 10/11/2074 2 85 2.85 86.22 2 86 2.86 86.97 2 86 2.86 86.97 86.72
12 1/26/2018 10/12/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
13 1/27/2018 10/13/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
14 1/28/2018 10/14/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
15 1/29/2018 10/15/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
16 1/30/2018 10/16/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
17 1/31/2018 10/17/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
18 2/1/2018 10/18/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
19 2/2/2018 10/19/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
20 2/3/2018 10/20/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
21 2/4/2018 10/21/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 79 2.79 81.80 81.80
22 2/5/2018 10/22/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 79 2.79 81.80 81.80
23 2/6/2018 10/23/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 79 2.79 81.80 81.80
24 2/7/2018 10/24/2074 2 85 2.85 86.22 2 80 2.8 82.52 2 80 2.8 82.52 83.75
25 2/8/2018 10/25/2074 2 80 2.8 82.52 2 80 2.8 82.52 2 80 2.8 82.52 82.52
26 2/9/2018 10/26/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 80 2.8 82.52 82.04
27 2/10/2018 10/27/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 90 2.9 90.01 84.54
28 2/11/2018 10/28/2074 2 89 2.89 89.25 2 73 2.73 77.52 2 82 2.82 83.99 83.59
29 2/12/2018 10/29/2074 2 89 2.89 89.25 2 98 2.98 96.30 2 99 2.99 97.11 94.22
30
31
Average Monthly Discharge,m3/s 84.84
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2074


Location : Month: Falgun
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Daily
Gauge Discharg Total Gauge Discharge, Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s e, m3/s
1 2/13/2018 11/1/2074 2 98 2.98 96.30 2 99 2.99 97.11 2 99 2.99 97.11 96.84
2 2/14/2018 11/2/2074 2 85 2.85 86.22 2 85 2.85 86.22 2 85 2.85 86.22 86.22
3 2/15/2018 11/3/2074 2 85 2.85 86.22 2 85 2.85 86.22 2 88 2.88 88.48 86.97
4 2/16/2018 11/4/2074 2 89 2.89 89.25 2 91 2.91 90.78 2 90 2.9 90.01 90.01
5 2/17/2018 11/5/2074 2 82 2.82 83.99 2 86 2.86 86.97 2 89 2.89 89.25 86.73
6 2/18/2018 11/6/2074 2 85 2.85 86.22 2 87 2.87 87.72 2 87 2.87 87.72 87.22
7 2/19/2018 11/7/2074 2 88 2.88 88.48 2 79 2.79 81.80 2 79 2.79 81.80 84.02
8 2/20/2018 11/8/2074 2 75 2.75 78.93 2 78 2.78 81.07 2 78 2.78 81.07 80.36
9 2/21/2018 11/9/2074 2 76 2.76 79.64 2 79 2.79 81.80 2 79 2.79 81.80 81.08
10 2/22/2018 11/10/2074 2 77 2.77 80.36 2 78 2.78 81.07 2 79 2.79 81.80 81.08
11 2/23/2018 11/11/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 79 2.79 81.80 81.80
12 2/24/2018 11/12/2074 2 79 2.79 81.80 2 79 2.79 81.80 2 80 2.8 82.52 82.04
13 2/25/2018 11/13/2074 2 85 2.85 86.22 2 87 2.87 87.72 2 87 2.87 87.72 87.22
14 2/26/2018 11/14/2074 2 89 2.89 89.25 2 82 2.82 83.99 2 85 2.85 86.22 86.48
15 2/27/2018 11/15/2074 2 90 2.9 90.01 2 83 2.83 84.73 2 93 2.93 92.34 89.03
16 2/28/2018 11/16/2074 2 90 2.9 90.01 2 92 2.92 91.56 2 91 2.91 90.78 90.79
17 3/1/2018 11/17/2074 2 91 2.91 90.78 2 92 2.92 91.56 2 90 2.9 90.01 90.79
18 3/2/2018 11/18/2074 2 90 2.9 90.01 2 91 2.91 90.78 2 90 2.9 90.01 90.27
19 3/3/2018 11/19/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 92 2.92 91.56 90.53
20 3/4/2018 11/20/2074 2 91 2.91 90.78 2 91 2.91 90.78 2 90 2.9 90.01 90.53
21 3/5/2018 11/21/2074 2 95 2.95 93.91 2 95 2.95 93.91 2 90 2.9 90.01 92.61
22 3/6/2018 11/22/2074 2 98 2.98 96.30 2 98 2.98 96.30 2 99 2.99 97.11 96.57
23 3/7/2018 11/23/2074 2 98 2.98 96.30 2 94 2.94 93.13 2 94 2.94 93.13 94.19
24 3/8/2018 11/24/2074 2 98 2.98 96.30 2 99 2.99 97.11 2 92 2.92 91.56 94.99
25 3/9/2018 11/25/2074 2 95 2.95 93.91 2 92 2.92 91.56 2 95 2.95 93.91 93.13
26 3/10/2018 11/26/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 92 2.92 91.56 90.53
27 3/11/2018 11/27/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
28 3/12/2018 11/28/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
29 3/13/2018 11/29/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
30 3/14/2018 11/30/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
31
Average Monthly Discharge,m3/s 88.74
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2074


Location : Month: Chaitra
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharge, Gauge Dischar Dischar
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m ge, m3/s ge, m3/s
1 3/15/2018 12/1/2074 2 89 2.89 89.25 2 90 2.9 90.01 2 95 2.95 93.91 91.06
2 3/16/2018 12/2/2074 2 98 2.98 96.30 2 98 2.98 96.30 2 99 2.99 97.11 96.57
3 3/17/2018 12/3/2074 3 10 3.1 106.26 3 10 3.1 106.26 3 10 3.1 106.26 106.26
4 3/18/2018 12/4/2074 3 10 3.1 106.26 2 95 2.95 93.91 2 98 2.98 96.30 98.82
5 3/19/2018 12/5/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
6 3/20/2018 12/6/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
7 3/21/2018 12/7/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 88 2.88 88.48 89.50
8 3/22/2018 12/8/2074 2 87 2.87 87.72 2 90 2.9 90.01 2 92 2.92 91.56 89.77
9 3/23/2018 12/9/2074 2 94 2.94 93.13 2 94 2.94 93.13 2 95 2.95 93.91 93.39
10 3/24/2018 12/10/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
11 3/25/2018 12/11/2074 2 94 2.94 93.13 2 94 2.94 93.13 2 94 2.94 93.13 93.13
12 3/26/2018 12/12/2074 2 98 2.98 96.30 2 98 2.98 96.30 2 98 2.98 96.30 96.30
13 3/27/2018 12/13/2074 2 87 2.87 87.72 2 87 2.87 87.72 2 88 2.88 88.48 87.98
14 3/28/2018 12/14/2074 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
15 3/29/2018 12/15/2074 2 94 2.94 93.13 2 95 2.95 93.91 2 95 2.95 93.91 93.65
16 3/30/2018 12/16/2074 2 98 2.98 96.30 2 98 2.98 96.30 2 98 2.98 96.30 96.30
17 3/31/2018 12/17/2074 2 98 2.98 96.30 2 98 2.98 96.30 2 98 2.98 96.30 96.30
18 4/1/2018 12/18/2074 2 96 2.96 94.71 2 96 2.96 94.71 2 96 2.96 94.71 94.71
19 4/2/2018 12/19/2074 2 94 2.94 93.13 2 94 2.94 93.13 2 94 2.94 93.13 93.13
20 4/3/2018 12/20/2074 2 98 2.98 96.30 3 10 3.1 106.26 3 10 3.1 106.26 102.94
21 4/4/2018 12/21/2074 3 4 3.04 101.20 3 8 3.08 104.55 3 8 3.08 104.55 103.44
22 4/5/2018 12/22/2074 3 8 3.08 104.55 3 8 3.08 104.55 3 8 3.08 104.55 104.55
23 4/6/2018 12/23/2074 3 8 3.08 104.55 3 12 3.12 107.97 3 12 3.12 107.97 106.83
24 4/7/2018 12/24/2074 3 16 3.16 111.47 3 18 3.18 113.24 3 28 3.28 122.36 115.69
25 4/8/2018 12/25/2074 3 19 3.19 114.13 3 19 3.19 114.13 3 20 3.2 115.03 114.43
26 4/9/2018 12/26/2074 3 8 3.08 104.55 3 15 3.15 110.59 3 12 3.12 107.97 107.70
27 4/10/2018 12/27/2074 3 8 3.08 104.55 3 6 3.06 102.87 3 6 3.06 102.87 103.43
28 4/11/2018 12/28/2074 3 8 3.08 104.55 3 22 3.22 116.83 3 28 3.28 122.36 114.58
29 4/12/2018 12/29/2074 3 28 3.28 122.36 3 29 3.29 123.30 3 30 3.3 124.24 123.30
30 4/13/2018 12/30/2074 3 27 3.27 121.43 3 30 3.3 124.24 3 29 3.29 123.30 122.99
31
Average Monthly Discharge,m3/s 99.89
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Baishak
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Daily
Gauge Discharg Total Gauge Discharge, Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s e, m3/s
1 4/14/2018 1/1/2075 3 11 3.11 107.11 3 13 3.13 108.84 3 19 3.19 114.13 110.03
2 4/15/2018 1/2/2075 3 8 3.08 104.55 3 9 3.09 105.40 3 10 3.1 106.26 105.40
3 4/16/2018 1/3/2075 3 6 3.06 102.87 3 8 3.08 104.55 3 8 3.08 104.55 103.99
4 4/17/2018 1/4/2075 3 6 3.06 102.87 3 7 3.07 103.71 3 7 3.07 103.71 103.43
5 4/18/2018 1/5/2075 3 5 3.05 102.03 3 11 3.11 107.11 3 18 3.18 113.24 107.46
6 4/19/2018 1/6/2075 3 12 3.12 107.97 3 17 3.17 112.35 3 18 3.18 113.24 111.19
7 4/20/2018 1/7/2075 3 14 3.14 109.71 3 19 3.19 114.13 3 20 3.2 115.03 112.96
8 4/21/2018 1/8/2075 3 21 3.21 115.93 3 22 3.22 116.83 3 22 3.22 116.83 116.53
9 4/22/2018 1/9/2075 3 22 3.22 116.83 3 28 3.28 122.36 3 28 3.28 122.36 120.52
10 4/23/2018 1/10/2075 3 10 3.1 106.26 3 10 3.1 106.26 3 16 3.16 111.47 107.99
11 4/24/2018 1/11/2075 3 2 3.02 99.55 3 4 3.04 101.20 3 4 3.04 101.20 100.65
12 4/25/2018 1/12/2075 3 4 3.04 101.20 3 15 3.15 110.59 3 15 3.15 110.59 107.46
13 4/26/2018 1/13/2075 3 13 3.13 108.84 3 14 3.14 109.71 3 19 3.19 114.13 110.89
14 4/27/2018 1/14/2075 3 21 3.21 115.93 3 21 3.21 115.93 3 24 3.24 118.66 116.84
15 4/28/2018 1/15/2075 3 20 3.2 115.03 3 20 3.2 115.03 3 21 3.21 115.93 115.33
16 4/29/2018 1/16/2075 3 22 3.22 116.83 3 33 3.33 127.10 3 39 3.39 132.93 125.62
17 4/30/2018 1/17/2075 3 41 3.41 134.91 3 43 3.43 136.91 3 43 3.43 136.91 136.24
18 5/1/2018 1/18/2075 3 38 3.38 131.95 3 39 3.39 132.93 3 43 3.43 136.91 133.93
19 5/2/2018 1/19/2075 3 35 3.35 129.02 3 40 3.4 133.92 3 45 3.45 138.93 133.96
20 5/3/2018 1/20/2075 3 37 3.37 130.97 3 38 3.38 131.95 3 38 3.38 131.95 131.62
21 5/4/2018 1/21/2075 3 44 3.44 137.92 3 49 3.49 143.02 3 53 3.53 147.19 142.71
22 5/5/2018 1/22/2075 3 39 3.39 132.93 3 41 3.41 134.91 3 41 3.41 134.91 134.25
23 5/6/2018 1/23/2075 3 40 3.4 133.92 3 42 3.42 135.91 3 42 3.42 135.91 135.24
24 5/7/2018 1/24/2075 3 41 3.41 134.91 3 43 3.43 136.91 3 47 3.47 140.97 137.60
25 5/8/2018 1/25/2075 3 46 3.46 139.94 3 48 3.48 141.99 3 48 3.48 141.99 141.31
26 5/9/2018 1/26/2075 3 51 3.51 145.10 3 53 3.53 147.19 3 54 3.54 148.24 146.84
27 5/10/2018 1/27/2075 3 55 3.55 149.30 3 56 3.56 150.37 3 57 3.57 151.43 150.37
28 5/11/2018 1/28/2075 3 55 3.55 149.30 3 56 3.56 150.37 3 58 3.58 152.51 150.73
29 5/12/2018 1/29/2075 3 56 3.56 150.37 3 57 3.57 151.43 3 61 3.61 155.76 152.52
30 5/13/2018 1/30/2075 3 69 3.69 164.63 3 77 3.77 173.82 3 80 3.8 177.35 171.93
31 5/14/2018 1/31/2075 3 80 3.8 177.35 3 81 3.81 178.54 3 82 3.82 179.73 178.54
Average Monthly Discharge,m3/s 127.55
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Jestha
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Avg. Daily
Gauge Discharg Total Gauge Discharge, Gauge Discharg Discharge,
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s m3/s
1 5/15/2018 2/1/2075 3 72 3.72 168.04 3 72 3.72 168.04 3 70 3.7 165.76 167.28
2 5/16/2018 2/2/2075 3 68 3.68 163.51 3 70 3.7 165.76 3 71 3.71 166.90 165.39
3 5/17/2018 2/3/2075 3 74 3.74 170.34 3 78 3.78 174.99 3 79 3.79 176.17 173.83
4 5/18/2018 2/4/2075 3 90 3.9 189.44 3 92 3.92 191.92 4 20 4.2 228.80 203.39
5 5/19/2018 2/5/2075 4 12 4.12 217.84 4 18 4.18 226.03 4 19 4.19 227.41 223.76
6 5/20/2018 2/6/2075 4 15 4.15 221.91 4 17 4.17 224.65 4 18 4.18 226.03 224.20
7 5/21/2018 2/7/2075 4 30 4.3 242.99 4 40 4.4 257.72 4 51 4.51 274.56 258.42
8 5/22/2018 2/8/2075 4 80 4.8 322.26 4 90 4.9 339.85 4 90 4.9 339.85 333.98
9 5/23/2018 2/9/2075 5 10 5.1 376.82 5 15 5.15 386.44 4 16 4.16 223.28 328.85
10 5/24/2018 2/10/2075 5 13 5.13 382.58 5 15 5.15 386.44 4 90 4.9 339.85 369.62
11 5/25/2018 2/11/2075 4 98 4.98 354.35 4 70 4.7 305.26 4 85 4.85 330.98 330.20
12 5/26/2018 2/12/2075 4 80 4.8 322.26 4 80 4.8 322.26 4 82 4.82 325.73 323.42
13 5/27/2018 2/13/2075 4 76 4.76 315.39 4 70 4.7 305.26 4 68 4.68 301.93 307.53
14 5/28/2018 2/14/2075 4 55 4.55 280.85 4 29 4.29 241.54 4 28 4.28 240.11 254.17
15 5/29/2018 2/15/2075 4 15 4.15 221.91 4 20 4.2 228.80 4 24 4.24 234.41 228.38
16 5/30/2018 2/16/2075 4 7 4.07 211.17 4 6 4.06 209.85 4 6 4.06 209.85 210.29
17 5/31/2018 2/17/2075 3 97 3.97 198.20 3 98 3.98 199.48 3 99 3.99 200.76 199.48
18 6/1/2018 2/18/2075 4 50 4.5 273.00 4 55 4.55 280.85 4 55 4.55 280.85 278.23
19 6/2/2018 2/19/2075 4 56 4.56 282.44 4 55 4.55 280.85 4 57 4.57 284.03 282.44
20 6/3/2018 2/20/2075 4 30 4.3 242.99 4 34 4.34 248.81 4 36 4.36 251.76 247.85
21 6/4/2018 2/21/2075 4 74 4.74 311.99 4 76 4.76 315.39 4 78 4.78 318.81 315.40
22 6/5/2018 2/22/2075 4 99 4.99 356.18 5 6 5.06 369.23 5 11 5.11 378.73 368.05
23 6/6/2018 2/23/2075 5 50 5.5 458.20 5 53 5.53 464.72 5 46 5.46 449.61 457.51
24 6/7/2018 2/24/2075 5 10 5.1 376.82 4 98 4.98 354.35 4 99 4.99 356.18 362.45
25 6/8/2018 2/25/2075 5 55 5.55 469.09 5 53 5.53 464.72 5 52 5.52 462.54 465.45
26 6/9/2018 2/26/2075 5 38 5.38 432.72 5 34 5.34 424.44 5 28 5.28 412.19 423.12
27 6/10/2018 2/27/2075 5 74 5.74 511.97 5 78 5.78 521.30 5 82 5.82 530.74 521.33
28 6/11/2018 2/28/2075 5 55 5.55 469.09 5 53 5.53 464.72 5 50 5.5 458.20 464.00
29 6/12/2018 2/29/2075 5 51 5.51 460.37 5 50 5.5 458.20 5 53 5.53 464.72 461.09
30 6/13/2018 2/30/2075 5 60 5.6 480.14 5 50 5.5 458.20 5 50 5.5 458.20 465.51
31 6/14/2018 2/31/2075 5 30 5.3 416.25 5 20 5.2 396.22 5 22 5.22 400.18 404.22
Average Monthly Discharge,m3/s 316.74
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Ashad
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Total Avg. Daily
Gauge Discharg Gauge Discharge, Gauge Discharg Discharge,
M Cm Ht.,m e, m3/s M Cm Ht.,m m3/s M Cm Ht.,m e, m3/s m3/s
1 6/15/2018 3/1/2075 5 34 5.34 424.44 5 28 5.28 412.19 5 22 5.22 400.18 412.27
2 6/16/2018 3/2/2075 5 40 5.4 436.91 5 55 5.55 469.09 5 62 5.62 484.61 463.54
3 6/17/2018 3/3/2075 5 41 5.41 439.01 5 33 5.33 422.38 5 15 5.15 386.44 415.94
4 6/18/2018 3/4/2075 4 85 4.85 330.98 4 84 4.84 329.22 5 80 5.8 526.00 395.40
5 6/19/2018 3/5/2075 4 80 4.8 322.26 4 76 4.76 315.39 5 79 5.79 523.65 387.10
6 6/20/2018 3/6/2075 4 77 4.77 317.10 4 78 4.78 318.81 4 76 4.76 315.39 317.10
7 6/21/2018 3/7/2075 4 80 4.8 322.26 4 80 4.8 322.26 4 77 4.77 317.10 320.54
8 6/22/2018 3/8/2075 4 79 4.79 320.53 4 80 4.8 322.26 4 82 4.82 325.73 322.84
9 6/23/2018 3/9/2075 4 90 4.9 339.85 4 85 4.85 330.98 4 85 4.85 330.98 333.94
10 6/24/2018 3/10/2075 5 10 5.1 376.82 5 11 5.11 378.73 5 12 5.12 380.65 378.73
11 6/25/2018 3/11/2075 5 10 5.1 376.82 5 15 5.15 386.44 5 5 5.05 367.35 376.87
12 6/26/2018 3/12/2075 5 35 5.35 426.50 5 37 5.37 430.64 5 34 5.34 424.44 427.19
13 6/27/2018 3/13/2075 5 33 5.33 422.38 5 38 5.38 432.72 5 38 5.38 432.72 429.28
14 6/28/2018 3/14/2075 5 40 5.4 436.91 5 40 5.4 436.91 5 42 5.42 441.11 438.31
15 6/29/2018 3/15/2075 5 48 5.48 453.89 5 52 5.52 462.54 5 65 5.65 491.36 469.26
16 6/30/2018 3/16/2075 5 82 5.82 530.74 5 85 5.85 537.88 5 86 5.86 540.28 536.30
17 7/1/2018 3/17/2075 6 12 6.12 604.99 6 30 6.3 652.55 6 40 6.4 679.96 645.83
18 7/2/2018 3/18/2075 6 68 6.68 760.57 6 87 6.87 818.57 7 36 7.36 980.88 853.34
19 7/3/2018 3/19/2075 7 56 7.56 1052.56 7 50 7.5 1030.72 7 48 7.48 1023.50 1035.59
20 7/4/2018 3/20/2075 7 38 7.38 987.90 6 97 6.97 850.19 6 86 6.86 815.45 884.51
21 7/5/2018 3/21/2075 5 52 5.52 462.54 5 48 5.48 453.89 5 38 5.38 432.72 449.72
22 7/6/2018 3/22/2075 5 47 5.47 451.74 5 36 5.36 428.57 5 39 5.39 434.81 438.37
23 7/7/2018 3/23/2075 5 52 5.52 462.54 5 50 5.5 458.20 5 48 5.48 453.89 458.21
24 7/8/2018 3/24/2075 5 65 5.65 491.36 5 74 5.74 511.97 5 78 5.78 521.30 508.21
25 7/9/2018 3/25/2075 6 32 6.32 657.97 6 18 6.18 620.59 6 10 6.1 599.85 626.14
26 7/10/2018 3/26/2075 6 62 6.62 742.81 6 70 6.7 766.55 6 98 6.98 853.39 787.58
27 7/11/2018 3/27/2075 7 18 7.18 919.09 7 22 7.22 932.60 7 20 7.2 925.83 925.84
28 7/12/2018 3/28/2075 6 98 6.98 853.39 7 12 7.12 899.05 7 18 7.18 919.09 890.51
29 7/13/2018 3/29/2075 6 90 6.9 827.97 7 15 7.15 909.03 7 25 7.25 942.81 893.27
30 7/14/2018 3/30/2075 7 10 7.1 892.44 7 8 7.08 885.85 7 15 7.15 909.03 895.77
31 7/15/2018 3/31/2075 6 88 6.88 821.69 6 85 6.85 812.33 6 80 6.8 796.88 810.30
Average Monthly Discharge,m3/s 565.41
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Shrawan
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Total Avg. Daily
Gauge Discharg Gauge Discharg Gauge Discharg Discharge,
M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s m3/s
1 7/17/2018 4/1/2075 7 28 7.28 953.10 7 35 7.35 977.38 7 42 7.42 1002.05 977.51
2 7/18/2018 4/2/2075 7 32 7.32 966.93 7 20 7.2 925.83 7 20 7.2 925.83 939.53
3 7/19/2018 4/3/2075 6 80 6.8 796.88 6 75 6.75 781.62 7 40 7.4 994.96 857.82
4 7/20/2018 4/4/2075 7 30 7.3 960.00 7 20 7.2 925.83 7 10 7.1 892.44 926.09
5 7/21/2018 4/5/2075 6 95 6.95 843.80 6 98 6.98 853.39 7 0 7 859.82 852.34
6 7/22/2018 4/6/2075 7 55 7.55 1048.90 7 75 7.75 1123.65 7 80 7.8 1142.85 1105.13
7 7/23/2018 4/7/2075 8 0 8 1221.73 8 0 8 1221.73 8 0 8 1221.73 1221.73
8 7/24/2018 4/8/2075 8 0 8 1221.73 8 0 8 1221.73 8 0 8 1221.73 1221.73
9 7/25/2018 4/9/2075 7 90 7.9 1181.88 7 80 7.8 1142.85 7 72 7.72 1112.23 1145.65
10 7/26/2018 4/10/2075 8 0 8 1221.73 8 0 8 1221.73 8 0 8 1221.73 1221.73
11 7/27/2018 4/11/2075 8 0 8 1221.73 8 0 8 1221.73 8 0 8 1221.73 1221.73
12 7/28/2018 4/12/2075 7 99 7.99 1217.71 7 99 7.99 1217.71 7 98 7.98 1213.70 1216.37
13 7/29/2018 4/13/2075 7 98 7.98 1213.70 7 95 7.95 1201.70 7 90 7.9 1181.88 1199.09
14 7/30/2018 4/14/2075 7 74 7.74 1119.84 7 70 7.7 1104.66 7 65 7.65 1085.87 1103.45
15 7/31/2018 4/15/2075 7 75 7.75 1123.65 7 76 7.76 1127.47 7 78 7.78 1135.15 1128.76
16 8/1/2018 4/16/2075 7 79 7.79 1138.99 7 70 7.7 1104.66 7 60 7.6 1067.28 1103.64
17 8/2/2018 4/17/2075 7 98 7.98 1213.70 8 0 8 1221.73 8 0 8 1221.73 1219.05
18 8/3/2018 4/18/2075 7 78 7.78 1135.15 7 75 7.75 1123.65 7 70 7.7 1104.66 1121.15
19 8/4/2018 4/19/2075 7 92 7.92 1189.78 7 80 7.8 1142.85 7 85 7.85 1162.26 1164.96
20 8/5/2018 4/20/2075 7 99 7.99 1217.71 8 0 8 1221.73 7 10 7.1 892.44 1110.63
21 8/6/2018 4/21/2075 7 9 7.09 889.14 7 5 7.05 876.03 7 5 7.05 876.03 880.40
22 8/7/2018 4/22/2075 8 10 8.1 1262.44 8 20 8.2 1303.99 8 20 8.2 1303.99 1290.14
23 8/8/2018 4/23/2075 8 20 8.2 1303.99 8 20 8.2 1303.99 8 20 8.2 1303.99 1303.99
24 8/9/2018 4/24/2075 7 65 7.65 1085.87 7 62 7.62 1074.69 7 62 7.62 1074.69 1078.41
25 8/10/2018 4/25/2075 7 20 7.2 925.83 7 25 7.25 942.81 7 25 7.25 942.81 937.15
26 8/11/2018 4/26/2075 7 30 7.3 960.00 7 28 7.28 953.10 7 30 7.3 960.00 957.70
27 8/12/2018 4/27/2075 7 90 7.9 1181.88 7 85 7.85 1162.26 7 85 7.85 1162.26 1168.80
28 8/13/2018 4/28/2075 8 25 8.25 1325.08 8 20 8.2 1303.99 8 0 8 1221.73 1283.60
29 8/14/2018 4/29/2075 7 85 7.85 1162.26 7 80 7.8 1142.85 7 75 7.75 1123.65 1142.92
30 8/15/2018 4/30/2075 7 40 7.4 994.96 7 5 7.05 876.03 7 5 7.05 876.03 915.67
31 43328 4/31/2075 7 45 7.45 1012.74 7 10 7.1 892.44 7 5 7.05 876.03 927.07
32 0 0.14 0 0.14
Average Monthly Discharge,m3/s 1094.97
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Bhadra
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Total Avg. Daily
Gauge Discharg Gauge Discharg Gauge Discharg Discharge,
M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s m3/s
1 8/17/2018 5/1/2075 8 5 8.05 1241.98 7 99 7.99 1217.71 7 95 7.95 1201.70 1220.46
2 8/18/2018 5/2/2075 8 30 8.3 1346.40 7 70 7.7 1104.66 8 45 8.45 1411.63 1287.56
3 8/19/2018 5/3/2075 7 90 7.9 1181.88 7 90 7.9 1181.88 8 10 8.1 1262.44 1208.73
4 8/20/2018 5/4/2075 7 45 7.45 1012.74 7 40 7.4 994.96 7 38 7.38 987.90 998.53
5 8/21/2018 5/5/2075 8 5 8.05 1241.98 7 90 7.9 1181.88 7 85 7.85 1162.26 1195.37
6 8/22/2018 5/6/2075 8 20 8.2 1303.99 7 80 7.8 1142.85 8 0 8 1221.73 1222.86
7 8/23/2018 5/7/2075 8 15 8.15 1283.10 8 10 8.1 1262.44 8 10 8.1 1262.44 1269.33
8 8/24/2018 5/8/2075 8 80 8.8 1571.56 8 75 8.75 1548.05 8 73 8.73 1538.71 1552.77
9 8/25/2018 5/9/2075 8 50 8.5 1433.82 8 40 8.4 1389.67 8 20 8.2 1303.99 1375.83
10 8/26/2018 5/10/2075 8 55 8.55 1456.22 8 50 8.5 1433.82 8 40 8.4 1389.67 1426.57
11 8/27/2018 5/11/2075 8 10 8.1 1262.44 8 0 8 1221.73 8 0 8 1221.73 1235.30
12 8/28/2018 5/12/2075 7 80 7.8 1142.85 7 40 7.4 994.96 7 35 7.35 977.38 1038.40
13 8/29/2018 5/13/2075 7 70 7.7 1104.66 7 61 7.61 1070.98 7 70 7.7 1104.66 1093.43
14 8/30/2018 5/14/2075 7 50 7.5 1030.72 7 40 7.4 994.96 7 40 7.4 994.96 1006.88
15 8/31/2018 5/15/2075 7 40 7.4 994.96 7 40 7.4 994.96 7 30 7.3 960.00 983.30
16 9/1/2018 5/16/2075 7 50 7.5 1030.72 7 40 7.4 994.96 7 30 7.3 960.00 995.22
17 9/2/2018 5/17/2075 7 50 7.5 1030.72 7 30 7.3 960.00 7 20 7.2 925.83 972.18
18 9/3/2018 5/18/2075 7 70 7.7 1104.66 7 30 7.3 960.00 7 20 7.2 925.83 996.83
19 9/4/2018 5/19/2075 7 20 7.2 925.83 7 10 7.1 892.44 7 10 7.1 892.44 903.57
20 9/5/2018 5/20/2075 7 30 7.3 960.00 7 10 7.1 892.44 7 95 7.95 1201.70 1018.04
21 9/6/2018 5/21/2075 8 0 8 1221.73 7 95 7.95 1201.70 7 90 7.9 1181.88 1201.77
22 9/7/2018 5/22/2075 7 60 7.6 1067.28 7 50 7.5 1030.72 7 40 7.4 994.96 1030.98
23 9/8/2018 5/23/2075 7 20 7.2 925.83 7 15 7.15 909.03 7 10 7.1 892.44 909.10
24 9/9/2018 5/24/2075 7 18 7.18 919.09 7 20 7.2 925.83 7 22 7.22 932.60 925.84
25 9/10/2018 5/25/2075 7 10 7.1 892.44 7 12 7.12 899.05 7 9 7.09 889.14 893.54
26 9/11/2018 5/26/2075 6 98 6.98 853.39 6 95 6.95 843.80 6 90 6.9 827.97 841.72
27 9/12/2018 5/27/2075 6 90 6.9 827.97 6 80 6.8 796.88 6 75 6.75 781.62 802.16
28 9/13/2018 5/28/2075 6 45 6.45 693.93 6 38 6.38 674.42 6 40 6.4 679.96 682.77
29 9/14/2018 5/29/2075 6 38 6.38 674.42 6 80 6.8 796.88 6 35 6.35 666.16 712.49
30 9/15/2018 5/30/2075 6 28 6.28 647.15 6 25 6.25 639.11 6 20 6.2 625.85 637.37
31 43359 4/31/2075 6 12 6.12 604.99 6 8 6.08 594.73 6 8 6.08 594.73 598.15
32
Average Monthly Discharge,m3/s 1039.90
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Ashwin
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Total Avg. Daily
Gauge Dischar Gauge Dischar Gauge Dischar Discharge,
M Cm Ht.,m ge, m3/s M Cm Ht.,m ge, m3/s M Cm Ht.,m ge, m3/s m3/s
1 9/17/2018 6/1/2075 6 6 6.06 589.65 6 6 6.06 589.65 6 7 6.07 592.19 590.49
2 9/18/2018 6/2/2075 6 5 6.05 587.11 6 3 6.03 582.07 6 2 6.02 579.55 582.91
3 9/19/2018 6/3/2075 6 1 6.01 577.05 5 99 5.99 572.06 5 98 5.98 569.57 572.89
4 9/20/2018 6/4/2075 5 98 5.98 569.57 5 95 5.95 562.16 5 85 5.85 537.88 556.54
5 9/21/2018 6/5/2075 5 82 5.82 530.74 5 85 5.85 537.88 5 88 5.88 545.10 537.91
6 9/22/2018 6/6/2075 5 85 5.85 537.88 5 87 5.87 542.68 5 86 5.86 540.28 540.28
7 9/23/2018 6/7/2075 5 83 5.83 533.11 5 85 5.85 537.88 5 85 5.85 537.88 536.29
8 9/24/2018 6/8/2075 5 80 5.8 526.00 5 78 5.78 521.30 5 79 5.79 523.65 523.65
9 9/25/2018 6/9/2075 5 76 5.76 516.62 5 80 5.8 526.00 5 78 5.78 521.30 521.31
10 9/26/2018 6/10/2075 5 80 5.8 526.00 5 78 5.78 521.30 5 65 5.65 491.36 512.89
11 9/27/2018 6/11/2075 5 65 5.65 491.36 5 63 5.63 486.85 5 60 5.6 480.14 486.12
12 9/28/2018 6/12/2075 5 60 5.6 480.14 5 58 5.58 475.70 5 57 5.57 473.49 476.45
13 9/29/2018 6/13/2075 5 56 5.56 471.29 5 56 5.56 471.29 5 55 5.55 469.09 470.56
14 9/30/2018 6/14/2075 5 50 5.5 458.20 5 48 5.48 453.89 5 47 5.47 451.74 454.61
15 10/1/2018 6/15/2075 5 45 5.45 447.47 5 40 5.4 436.91 5 38 5.38 432.72 439.03
16 10/2/2018 6/16/2075 5 36 5.36 428.57 5 35 5.35 426.50 5 33 5.33 422.38 425.81
17 10/3/2018 6/17/2075 5 30 5.3 416.25 5 28 5.28 412.19 5 28 5.28 412.19 413.55
18 10/4/2018 6/18/2075 5 25 5.25 406.16 5 25 5.25 406.16 5 22 5.22 400.18 404.16
19 10/5/2018 6/19/2075 5 20 5.2 396.22 5 20 5.2 396.22 5 19 5.19 394.26 395.57
20 10/6/2018 6/20/2075 5 18 5.18 392.29 5 15 5.15 386.44 5 14 5.14 384.51 387.75
21 10/7/2018 6/21/2075 5 10 5.1 376.82 5 8 5.08 373.01 5 10 5.1 376.82 375.55
22 10/8/2018 6/22/2075 5 12 5.12 380.65 5 6 5.06 369.23 5 5 5.05 367.35 372.41
23 10/9/2018 6/23/2075 5 4 5.04 365.47 5 3 5.03 363.60 4 98 4.98 354.35 361.14
24 10/10/2018 6/24/2075 4 95 4.95 348.86 4 94 4.94 347.05 4 94 4.94 347.05 347.65
25 10/11/2018 6/25/2075 4 97 4.97 352.51 4 98 4.98 354.35 4 90 4.9 339.85 348.90
26 10/12/2018 6/26/2075 4 90 4.9 339.85 4 92 4.92 343.44 4 91 4.91 341.64 341.64
27 10/13/2018 6/27/2075 4 85 4.85 330.98 4 83 4.83 327.47 4 80 4.8 322.26 326.90
28 10/14/2018 6/28/2075 4 73 4.73 310.30 4 68 4.68 301.93 4 65 4.65 296.98 303.07
29 10/15/2018 6/29/2075 4 60 4.6 288.84 4 55 4.55 280.85 4 50 4.5 273.00 280.90
30 10/16/2018 6/30/2075 4 50 4.5 273.00 4 47 4.47 268.35 4 43 4.43 262.24 267.86
31 43390 4/31/2075 4 40 4.4 257.72 4 39 4.39 256.22 4 36 4.36 251.76 255.23
32
Average Monthly Discharge,m3/s 432.58
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Kartik
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharg Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s e, m3/s
1 10/18/2018 7/1/2075 4 32 4.32 245.89 4 30 4.3 242.99 4 28 4.28 240.11 242.99
2 10/19/2018 7/2/2075 4 25 4.25 235.83 4 23 4.23 233.00 4 20 4.2 228.80 232.54
3 10/20/2018 7/3/2075 4 18 4.18 226.03 4 16 4.16 223.28 4 14 4.14 220.55 223.29
4 10/21/2018 7/4/2075 4 13 4.13 219.19 4 10 4.1 215.16 4 9 4.09 213.82 216.06
5 10/22/2018 7/5/2075 4 8 4.08 212.49 4 7 4.07 211.17 4 5 4.05 208.53 210.73
6 10/23/2018 7/6/2075 4 3 4.03 205.92 4 1 4.01 203.33 3 98 3.98 199.48 202.91
7 10/24/2018 7/7/2075 3 95 3.95 195.67 3 94 3.94 194.42 3 92 3.92 191.92 194.00
8 10/25/2018 7/8/2075 3 91 3.91 190.68 3 90 3.9 189.44 3 90 3.9 189.44 189.85
9 10/26/2018 7/9/2075 3 91 3.91 190.68 3 90 3.9 189.44 3 90 3.9 189.44 189.85
10 10/27/2018 7/10/2075 3 92 3.92 191.92 3 92 3.92 191.92 3 90 3.9 189.44 191.09
11 10/28/2018 7/11/2075 3 89 3.89 188.21 3 89 3.89 188.21 3 90 3.9 189.44 188.62
12 10/29/2018 7/12/2075 3 89 3.89 188.21 3 89 3.89 188.21 3 88 3.88 186.98 187.80
13 10/30/2018 7/13/2075 3 87 3.87 185.76 3 87 3.87 185.76 3 86 3.86 184.54 185.35
14 10/31/2018 7/14/2075 3 85 3.85 183.33 3 84 3.84 182.13 3 83 3.83 180.92 182.13
15 11/1/2018 7/15/2075 3 83 3.83 180.92 3 85 3.85 183.33 3 85 3.85 183.33 182.53
16 11/2/2018 7/16/2075 3 80 3.8 177.35 3 82 3.82 179.73 3 80 3.8 177.35 178.14
17 11/3/2018 7/17/2075 3 80 3.8 177.35 3 80 3.8 177.35 3 80 3.8 177.35 177.35
18 11/4/2018 7/18/2075 3 80 3.8 177.35 3 78 3.78 174.99 3 78 3.78 174.99 175.78
19 11/5/2018 7/19/2075 3 77 3.77 173.82 3 76 3.76 172.66 3 76 3.76 172.66 173.04
20 11/6/2018 7/20/2075 3 70 3.7 165.76 3 68 3.68 163.51 3 68 3.68 163.51 164.26
21 11/7/2018 7/21/2075 3 66 3.66 161.27 3 66 3.66 161.27 3 64 3.64 159.05 160.53
22 11/8/2018 7/22/2075 3 64 3.64 159.05 3 62 3.62 156.85 3 60 3.6 154.67 156.85
23 11/9/2018 7/23/2075 3 60 3.6 154.67 3 60 3.6 154.67 3 60 3.6 154.67 154.67
24 11/10/2018 7/24/2075 3 60 3.6 154.67 3 60 3.6 154.67 3 60 3.6 154.67 154.67
25 11/11/2018 7/25/2075 3 59 3.59 153.59 3 58 3.58 152.51 3 58 3.58 152.51 152.87
26 11/12/2018 7/26/2075 3 58 3.58 152.51 3 58 3.58 152.51 3 58 3.58 152.51 152.51
27 11/13/2018 7/27/2075 3 57 3.57 151.43 3 57 3.57 151.43 3 57 3.57 151.43 151.43
28 11/14/2018 7/28/2075 3 56 3.56 150.37 3 56 3.56 150.37 3 56 3.56 150.37 150.37
29 11/15/2018 7/29/2075 3 56 3.56 150.37 3 56 3.56 150.37 3 56 3.56 150.37 150.37
30 11/16/2018 7/30/2075 3 54 3.54 148.24 3 54 3.54 148.24 3 53 3.53 147.19 147.89
31
32
Average Monthly Discharge,m3/s 180.68
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Mangsir
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharg Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s e, m3/s
1 11/17/2018 8/1/2075 3 52 3.52 146.14 3 52 3.52 146.14 3 50 3.5 144.06 145.45
2 11/18/2018 8/2/2075 3 52 3.52 146.14 3 50 3.5 144.06 3 50 3.5 144.06 144.75
3 11/19/2018 8/3/2075 3 49 3.49 143.02 3 48 3.48 141.99 3 48 3.48 141.99 142.33
4 11/20/2018 8/4/2075 3 47 3.47 140.97 3 46 3.46 139.94 3 47 3.47 140.97 140.62
5 11/21/2018 8/5/2075 3 46 3.46 139.94 3 45 3.45 138.93 3 45 3.45 138.93 139.27
6 11/22/2018 8/6/2075 3 44 3.44 137.92 3 44 3.44 137.92 3 43 3.43 136.91 137.58
7 11/23/2018 8/7/2075 3 42 3.42 135.91 3 41 3.41 134.91 3 40 3.4 133.92 134.91
8 11/24/2018 8/8/2075 3 39 3.39 132.93 3 38 3.38 131.95 3 38 3.38 131.95 132.27
9 11/25/2018 8/9/2075 3 37 3.37 130.97 3 37 3.37 130.97 3 36 3.36 129.99 130.64
10 11/26/2018 8/10/2075 3 36 3.36 129.99 3 35 3.35 129.02 3 35 3.35 129.02 129.35
11 11/27/2018 8/11/2075 3 34 3.34 128.06 3 33 3.33 127.10 3 33 3.33 127.10 127.42
12 11/28/2018 8/12/2075 3 32 3.32 126.14 3 32 3.32 126.14 3 31 3.31 125.19 125.83
13 11/29/2018 8/13/2075 3 30 3.3 124.24 3 30 3.3 124.24 3 29 3.29 123.30 123.93
14 11/30/2018 8/14/2075 3 29 3.29 123.30 3 29 3.29 123.30 3 29 3.29 123.30 123.30
15 12/1/2018 8/15/2075 3 28 3.28 122.36 3 27 3.27 121.43 3 26 3.26 120.50 121.43
16 12/2/2018 8/16/2075 3 25 3.25 119.58 3 25 3.25 119.58 3 24 3.24 118.66 119.27
17 12/3/2018 8/17/2075 3 24 3.24 118.66 3 23 3.23 117.74 3 23 3.23 117.74 118.05
18 12/4/2018 8/18/2075 3 22 3.22 116.83 3 22 3.22 116.83 3 22 3.22 116.83 116.83
19 12/5/2018 8/19/2075 3 21 3.21 115.93 3 21 3.21 115.93 3 21 3.21 115.93 115.93
20 12/6/2018 8/20/2075 3 21 3.21 115.93 3 21 3.21 115.93 3 21 3.21 115.93 115.93
21 12/7/2018 8/21/2075 3 20 3.2 115.03 3 20 3.2 115.03 3 20 3.2 115.03 115.03
22 12/8/2018 8/22/2075 3 20 3.2 115.03 3 19 3.19 114.13 3 19 3.19 114.13 114.43
23 12/9/2018 8/23/2075 3 19 3.19 114.13 3 19 3.19 114.13 3 19 3.19 114.13 114.13
24 12/10/2018 8/24/2075 3 18 3.18 113.24 3 18 3.18 113.24 3 18 3.18 113.24 113.24
25 12/11/2018 8/25/2075 3 18 3.18 113.24 3 18 3.18 113.24 3 18 3.18 113.24 113.24
26 12/12/2018 8/26/2075 3 16 3.16 111.47 3 15 3.15 110.59 3 14 3.14 109.71 110.59
27 12/13/2018 8/27/2075 3 14 3.14 109.71 3 13 3.13 108.84 3 13 3.13 108.84 109.13
28 12/14/2018 8/28/2075 3 11 3.11 107.11 3 10 3.1 106.26 3 10 3.1 106.26 106.54
29 12/15/2018 8/29/2075 3 9 3.09 105.40 3 9 3.09 105.40 3 8 3.08 104.55 105.12
30
31
32
Average Monthly Discharge,m3/s 123.67
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Poush
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharg Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s M Cm Ht.,m e, m3/s e, m3/s
1 12/16/2018 9/1/2075 3 8 3.08 104.55 3 8 3.08 104.55 3 7 3.07 103.71 104.27
2 12/17/2018 9/2/2075 3 7 3.07 103.71 3 7 3.07 103.71 3 7 3.07 103.71 103.71
3 12/18/2018 9/3/2075 3 6 3.06 102.87 3 6 3.06 102.87 3 6 3.06 102.87 102.87
4 12/19/2018 9/4/2075 3 6 3.06 102.87 3 6 3.06 102.87 3 6 3.06 102.87 102.87
5 12/20/2018 9/5/2075 3 5 3.05 102.03 3 5 3.05 102.03 3 4 3.04 101.20 101.76
6 12/21/2018 9/6/2075 3 4 3.04 101.20 3 4 3.04 101.20 3 4 3.04 101.20 101.20
7 12/22/2018 9/7/2075 3 4 3.04 101.20 3 4 3.04 101.20 3 4 3.04 101.20 101.20
8 12/23/2018 9/8/2075 3 3 3.03 100.38 3 3 3.03 100.38 3 3 3.03 100.38 100.38
9 12/24/2018 9/9/2075 3 3 3.03 100.38 3 3 3.03 100.38 3 3 3.03 100.38 100.38
10 12/25/2018 9/10/2075 3 3 3.03 100.38 3 3 3.03 100.38 3 3 3.03 100.38 100.38
11 12/26/2018 9/11/2075 3 2 3.02 99.55 3 2 3.02 99.55 3 1 3.01 98.73 99.28
12 12/27/2018 9/12/2075 3 1 3.01 98.73 2 99 2.99 97.11 2 99 2.99 97.11 97.65
13 12/28/2018 9/13/2075 2 98 2.98 96.30 2 98 2.98 96.30 3 98 3.98 199.48 130.70
14 12/29/2018 9/14/2075 2 98 2.98 96.30 2 98 2.98 96.30 3 98 3.98 199.48 130.70
15 12/30/2018 9/15/2075 2 98 2.98 96.30 2 98 2.98 96.30 3 97 3.97 198.20 130.27
16 12/31/2018 9/16/2075 2 97 2.97 95.50 2 97 2.97 95.50 3 97 3.97 198.20 129.74
17 1/1/2019 9/17/2075 2 97 2.97 95.50 2 97 2.97 95.50 3 97 3.97 198.20 129.74
18 1/2/2019 9/18/2075 2 97 2.97 95.50 2 96 2.96 94.71 3 96 3.96 196.94 129.05
19 1/3/2019 9/19/2075 2 96 2.96 94.71 2 96 2.96 94.71 3 96 3.96 196.94 128.78
20 1/4/2019 9/20/2075 2 95 2.95 93.91 2 95 2.95 93.91 3 95 3.95 195.67 127.83
21 1/5/2019 9/21/2075 2 95 2.95 93.91 2 95 2.95 93.91 3 95 3.95 195.67 127.83
22 1/6/2019 9/22/2075 2 95 2.95 93.91 2 95 2.95 93.91 3 94 3.94 194.42 127.41
23 1/7/2019 9/23/2075 2 94 2.94 93.13 2 94 2.94 93.13 3 94 3.94 194.42 126.89
24 1/8/2019 9/24/2075 2 93 2.93 92.34 2 93 2.93 92.34 3 93 3.93 193.17 125.95
25 1/9/2019 9/25/2075 2 92 2.92 91.56 2 92 2.92 91.56 3 92 3.92 191.92 125.01
26 1/10/2019 9/26/2075 2 92 2.92 91.56 2 92 2.92 91.56 3 92 3.92 191.92 125.01
27 1/11/2019 9/27/2075 2 91 2.91 90.78 2 91 2.91 90.78 3 90 3.9 189.44 123.67
28 1/12/2019 9/28/2075 2 90 2.9 90.01 2 90 2.9 90.01 3 90 3.9 189.44 123.16
29 1/13/2019 9/29/2075 2 90 2.9 90.01 2 90 2.9 90.01 3 90 3.9 189.44 123.16
30 1/14/2019 9/30/2075 2 90 2.9 90.01 2 90 2.9 90.01 3 90 3.9 189.44 123.16
31
32
Average Monthly Discharge,m3/s 116.80
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Magh
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharge Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m , m3/s M Cm Ht.,m e, m3/s e, m3/s
1 1/15/2019 10/1/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
2 1/16/2019 10/2/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
3 1/17/2019 10/3/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
4 1/18/2019 10/4/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
5 1/19/2019 10/5/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
6 1/20/2019 10/6/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
7 1/21/2019 10/7/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
8 1/22/2019 10/8/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
9 1/23/2019 10/9/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
10 1/24/2019 10/10/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
11 1/25/2019 10/11/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 92 2.92 91.56 91.04
12 1/26/2019 10/12/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
13 1/27/2019 10/13/2075 2 91 2.91 90.78 2 92 2.92 91.56 2 92 2.92 91.56 91.30
14 1/28/2019 10/14/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
15 1/29/2019 10/15/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
16 1/30/2019 10/16/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
17 1/31/2019 10/17/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
18 2/1/2019 10/18/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
19 2/2/2019 10/19/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
20 2/3/2019 10/20/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
21 2/4/2019 10/21/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
22 2/5/2019 10/22/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
23 2/6/2019 10/23/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
24 2/7/2019 10/24/2075 2 91 2.91 90.78 2 90 2.9 90.01 2 91 2.91 90.78 90.53
25 2/8/2019 10/25/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
26 2/9/2019 10/26/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
27 2/10/2019 10/27/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
28 2/11/2019 10/28/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
29 2/12/2019 10/29/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
30
31
32
Average Monthly Discharge,m3/s 90.67
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Falgun
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharge Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m , m3/s M Cm Ht.,m e, m3/s e, m3/s
1 2/13/2019 11/1/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
2 2/14/2019 11/2/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
3 2/15/2019 11/3/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
4 2/16/2019 11/4/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
5 2/17/2019 11/5/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
6 2/18/2019 11/6/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
7 2/19/2019 11/7/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
8 2/20/2019 11/8/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
9 2/21/2019 11/9/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
10 2/22/2019 11/10/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
11 2/23/2019 11/11/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
12 2/24/2019 11/12/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
13 2/25/2019 11/13/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
14 2/26/2019 11/14/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 91 2.91 90.78 90.78
15 2/27/2019 11/15/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
16 2/28/2019 11/16/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
17 3/1/2019 11/17/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
18 3/2/2019 11/18/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
19 3/3/2019 11/19/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
20 3/4/2019 11/20/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
21 3/5/2019 11/21/2075 2 93 2.93 92.34 2 92 2.92 91.56 2 92 2.92 91.56 91.82
22 3/6/2019 11/22/2075 2 93 2.93 92.34 2 92 2.92 91.56 2 93 2.93 92.34 92.08
23 3/7/2019 11/23/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
24 3/8/2019 11/24/2075 2 94 2.94 93.13 2 93 2.93 92.34 2 94 2.94 93.13 92.86
25 3/9/2019 11/25/2075 2 93 2.93 92.34 2 94 2.94 93.13 2 93 2.93 92.34 92.60
26 3/10/2019 11/26/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
27 3/11/2019 11/27/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
28 3/12/2019 11/28/2075 2 93 2.93 92.34 2 93 2.93 92.34 2 93 2.93 92.34 92.34
29 3/13/2019 11/29/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
30 3/14/2019 11/30/2075 2 92 2.92 91.56 2 92 2.92 91.56 2 92 2.92 91.56 91.56
31
32
Average Monthly Discharge,m3/s 91.46
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2075


Location : Month: Chaitra
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Discharg Gauge Discharge Gauge Discharg Discharg
M Cm Ht.,m e, m3/s M Cm Ht.,m , m3/s M Cm Ht.,m e, m3/s e, m3/s
1 3/15/2019 12/1/2075 2 90 2.9 90.01 2 91 2.91 90.78 2 91 2.91 90.78 90.53
2 3/16/2019 12/2/2075 2 91 2.91 90.78 2 91 2.91 90.78 2 90 2.9 90.01 90.53
3 3/17/2019 12/3/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
4 3/18/2019 12/4/2075 2 90 2.9 90.01 2 91 2.91 90.78 2 91 2.91 90.78 90.53
5 3/19/2019 12/5/2075 2 90 2.9 90.01 2 90 2.9 90.01 2 90 2.9 90.01 90.01
6 3/20/2019 12/6/2075 2 90 2.9 90.01 2 91 2.91 90.78 2 92 2.92 91.56 90.79
7 3/21/2019 12/7/2075 2 95 2.95 93.91 2 98 2.98 96.30 2 99 2.99 97.11 95.78
8 3/22/2019 12/8/2075 3 3 3.03 100.38 3 5 3.05 102.03 3 4 3.04 101.20 101.20
9 3/23/2019 12/9/2075 3 5 3.05 102.03 3 5 3.05 102.03 3 5 3.05 102.03 102.03
10 3/24/2019 12/10/2075 3 12 3.12 107.97 3 17 3.17 112.35 3 13 3.13 108.84 109.72
11 3/25/2019 12/11/2075 3 20 3.2 115.03 3 21 3.21 115.93 3 22 3.22 116.83 115.93
12 3/26/2019 12/12/2075 3 33 3.33 127.10 3 35 3.35 129.02 3 36 3.36 129.99 128.71
13 3/27/2019 12/13/2075 3 29 3.29 123.30 3 27 3.27 121.43 3 26 3.26 120.50 121.75
14 3/28/2019 12/14/2075 3 22 3.22 116.83 3 23 3.23 117.74 3 24 3.24 118.66 117.75
15 3/29/2019 12/15/2075 3 29 3.65 160.15 3 37 3.37 130.97 3 42 3.42 135.91 142.34
16 3/30/2019 12/16/2075 3 65 3.8 177.35 3 72 3.72 168.04 3 75 3.75 171.49 172.30
17 3/31/2019 12/17/2075 3 80 3.79 176.17 3 80 3.8 177.35 3 81 3.81 178.54 177.35
18 4/1/2019 12/18/2075 3 79 3.56 150.37 3 75 3.75 171.49 3 76 3.76 172.66 164.84
19 4/2/2019 12/19/2075 3 56 3.77 173.82 3 48 3.48 141.99 3 42 3.42 135.91 150.57
20 4/3/2019 12/20/2075 3 40 3.9 189.44 3 39 3.39 132.93 3 38 3.38 131.95 151.44
21 4/4/2019 12/21/2075 3 77 3.99 200.76 3 76 3.76 172.66 3 75 3.75 171.49 181.64
22 4/5/2019 12/22/2075 3 90 3.05 102.03 3 93 3.93 193.17 3 96 3.96 196.94 164.05
23 4/6/2019 12/23/2075 3 99 3.09 105.40 3 99 3.99 200.76 4 1 4.01 203.33 169.83
24 4/7/2019 12/24/2075 4 5 4.11 216.50 4 6 4.06 209.85 4 5 4.05 208.53 211.63
25 4/8/2019 12/25/2075 4 9 4.12 217.84 4 10 4.1 215.16 4 10 4.1 215.16 216.05
26 4/9/2019 12/26/2075 4 11 4.42 260.73 4 10 4.1 215.16 4 10 4.1 215.16 230.35
27 4/10/2019 12/27/2075 4 12 4.48 269.90 4 25 4.25 235.83 4 35 4.35 250.28 252.00
28 4/11/2019 12/28/2075 4 42 4.61 290.46 4 45 4.45 265.29 4 50 4.5 273.00 276.25
29 4/12/2019 12/29/2075 4 48 4 202.04 4 52 4.52 276.12 4 58 4.58 285.63 254.60
30 4/13/2019 12/30/2075 4 61 4 202.04 4 62 4.62 292.08 4 63 4.63 293.71 262.61
31
32
Average Monthly Discharge,m3/s 153.77
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2076


Location : Month: Baishakh
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM
S.No. Date (A.D.) Date (B.S) Total Total Total Avg. Daily
Gauge Discharg Gauge Discharge Gauge Discharg Discharge,
M Cm Ht.,m e, m3/s M Cm Ht.,m , m3/s M Cm Ht.,m e, m3/s m3/s
1 4/14/2019 1/1/2076 4 68 4.68 301.93 4 72 4.72 308.62 4 77 4.77 317.10 309.22
2 4/15/2019 1/2/2076 4 89 4.89 338.06 4 95 4.95 348.86 4 98 4.98 354.35 347.09
3 4/16/2019 1/3/2076 4 99 4.99 356.18 4 99 4.99 356.18 4 8 4.08 212.49 308.29
4 4/17/2019 1/4/2076 5 19 5.19 394.26 5 25 5.25 406.16 5 25 5.25 406.16 402.19
5 4/18/2019 1/5/2076 5 28 5.28 412.19 5 27 5.27 410.18 5 20 5.2 396.22 406.20
6 4/19/2019 1/6/2076 4 95 4.95 348.86 4 89 4.89 338.06 4 80 4.8 322.26 336.39
7 4/20/2019 1/7/2076 4 71 4.71 306.94 4 65 4.65 296.98 4 42 4.42 260.73 288.21
8 4/21/2019 1/8/2076 4 31 4.31 244.43 4 22 4.22 231.60 4 12 4.12 217.84 231.29
9 4/22/2019 1/9/2076 4 10 4.1 215.16 4 9 4.09 213.82 4 9 4.09 213.82 214.27
10 4/23/2019 1/10/2076 4 15 4.15 221.91 4 25 4.25 235.83 4 38 4.38 254.73 237.49
11 4/24/2019 1/11/2076 4 58 4.58 285.63 4 78 4.78 318.81 4 98 4.98 354.35 319.60
12 4/25/2019 1/12/2076 5 38 5.38 432.72 5 56 5.56 471.29 5 67 5.67 495.89 466.63
13 4/26/2019 1/13/2076 5 70 5.7 502.74 5 77 5.77 518.95 5 78 5.78 521.30 514.33
14 4/27/2019 1/14/2076 5 81 5.81 528.37 5 82 5.82 530.74 5 88 5.88 545.10 534.73
15 4/28/2019 1/15/2076 5 87 5.87 542.68 5 88 5.88 545.10 5 89 5.89 547.51 545.10
16 4/29/2019 1/16/2076 5 86 5.86 540.28 5 80 5.8 526.00 5 77 5.77 518.95 528.41
17 4/30/2019 1/17/2076 5 87 5.87 542.68 5 88 5.88 545.10 5 89 5.89 547.51 545.10
18 5/1/2019 1/18/2076 5 65 5.65 491.36 5 65 5.65 491.36 5 68 5.68 498.17 493.63
19 5/2/2019 1/19/2076 5 12 5.12 380.65 5 5 5.05 367.35 5 8 5.08 373.01 373.67
20 5/3/2019 1/20/2076 5 8 5.08 373.01 5 8 5.08 373.01 5 9 5.09 374.91 373.65
21 5/4/2019 1/21/2076 4 95 4.95 348.86 4 92 4.92 343.44 4 85 4.85 330.98 341.09
22 5/5/2019 1/22/2076 4 96 4.96 350.68 4 90 4.9 339.85 4 96 4.96 350.68 347.07
23 5/6/2019 1/23/2076 4 7 4.07 211.17 4 25 4.25 235.83 4 8 4.08 212.49 219.83
24 5/7/2019 1/24/2076 5 20 5.2 396.22 5 25 5.25 406.16 5 30 5.3 416.25 406.21
25 5/8/2019 1/25/2076 5 50 5.5 458.20 5 57 5.57 473.49 5 58 5.58 475.70 469.13
26 5/9/2019 1/26/2076 5 79 5.79 523.65 5 73 5.73 509.65 5 74 5.74 511.97 515.09
27 5/10/2019 1/27/2076 6 5 6.05 587.11 6 6 6.06 589.65 6 7 6.07 592.19 589.65
28 5/11/2019 1/28/2076 5 98 5.98 569.57 5 98 5.98 569.57 5 68 5.68 498.17 545.77
29 5/12/2019 1/29/2076 5 65 5.65 491.36 5 57 5.57 473.49 5 54 5.54 466.90 477.25
30 5/13/2019 1/30/2076 5 43 5.43 443.23 5 38 5.38 432.72 5 39 5.39 434.81 436.92
31 5/14/2019 1/31/2076 5 39 5.39 434.81 5 34 5.34 424.44 5 48 5.48 453.89 437.71
32
Average Monthly Discharge,m3/s 405.20
A5.3: Gauge Height Record and Computation of Discharge
Staff Gauge Reading at Phukot Karnali at Bhartadi

Project: PKHEP Year: 2076


Location : Month: Jestha
Gauge Reading
8:00 AM 12:00 Noon 16:00 PM Avg.
S.No. Date (A.D.) Date (B.S) Total Total Total Daily
Gauge Dischar Gauge Discharge Gauge Dischar Discharg
M Cm Ht.,m ge, m3/s M Cm Ht.,m , m3/s M Cm Ht.,m ge, m3/s e, m3/s
1 5/15/2019 2/1/2076 5 35 5.35 426.50 5 33 5.33 422.38 5 31 5.31 418.29 422.39
2 5/16/2019 2/2/2076 5 26 5.26 408.16 5 28 5.28 412.19 5 29 5.29 414.22 411.53
3 5/17/2019 2/3/2076 5 38 5.38 432.72 5 32 5.32 420.33 5 35 5.35 426.50 426.52
4 5/18/2019 2/4/2076 5 38 5.38 432.72 5 40 5.4 436.91 5 45 5.45 447.47 439.03
5 5/19/2019 2/5/2076 5 46 5.46 449.61 5 48 5.48 453.89 5 51 5.51 460.37 454.62
6 5/20/2019 2/6/2076 5 50 5.5 458.20 5 55 5.55 469.09 5 57 5.57 473.49 466.93
7 5/21/2019 2/7/2076 5 62 5.62 484.61 5 69 5.69 500.45 5 68 5.68 498.17 494.41
8 5/22/2019 2/8/2076 5 76 5.76 516.62 5 75 5.75 514.29 5 87 5.87 542.68 524.53
9 5/23/2019 2/9/2076 6 18 6.18 620.59 6 20 6.2 625.85 6 22 6.22 631.13 625.86
10 5/24/2019 2/10/2076 5 98 5.98 569.57 5 99 5.99 572.06 5 99 5.99 572.06 571.23
11 5/25/2019 2/11/2076 5 97 5.97 567.09 5 96 5.96 564.62 5 95 5.95 562.16 564.62
12 5/26/2019 2/12/2076 5 72 5.72 507.34 5 96 5.96 564.62 5 95 5.95 562.16 544.71
13 5/27/2019 2/13/2076 5 69 5.69 500.45 5 72 5.72 507.34 5 75 5.75 514.29 507.36
14 5/28/2019 2/14/2076 5 93 5.93 557.25 5 87 5.87 542.68 5 80 5.8 526.00 541.98
15 5/29/2019 2/15/2076 6 12 6.12 604.99 6 13 6.13 607.58 6 15 6.15 612.76 608.44
16 5/30/2019 2/16/2076 6 18 6.18 620.59 6 20 6.2 625.85 6 22 6.22 631.13 625.86
17 5/31/2019 2/17/2076 6 17 6.17 617.97 6 25 6.25 639.11 6 27 6.27 644.46 633.85
18 6/1/2019 2/18/2076 6 38 6.38 674.42 6 46 6.46 696.75 6 57 6.57 728.22 699.80
19 6/2/2019 2/19/2076 6 58 6.58 731.12 6 59 6.59 734.03 6 60 6.6 736.95 734.03
20 6/3/2019 2/20/2076 6 52 6.52 713.80 6 48 6.48 702.41 6 32 6.32 657.97 691.39
21 6/4/2019 2/21/2076 6 28 6.28 647.15 6 37 6.37 671.66 6 48 6.48 702.41 673.74
22 6/5/2019 2/22/2076 6 58 6.58 731.12 6 66 6.66 754.62 6 72 6.72 772.55 752.76
23 6/6/2019 2/23/2076 6 89 6.89 824.83 6 92 6.92 834.28 7 5 7.05 876.03 845.05
24 6/7/2019 2/24/2076 7 8 7.08 885.85 7 9 7.09 889.14 7 10 7.1 892.44 889.14
25 6/8/2019 2/25/2076 6 82 6.82 803.04 6 74 6.74 778.59 6 65 6.65 751.66 777.76
26 6/9/2019 2/26/2076 6 56 6.56 725.32 6 51 6.51 710.94 6 50 6.5 708.09 714.78
27 6/10/2019 2/27/2076 6 55 6.55 722.43 6 54 6.54 719.55 6 54 6.54 719.55 720.51
28 6/11/2019 2/28/2076 6 88 6.88 821.69 6 90 6.9 827.97 6 98 6.98 853.39 834.35
29 6/12/2019 2/29/2076 7 10 7.1 892.44 7 8 7.08 885.85 7 4 7.04 872.77 883.69
30 6/13/2019 2/30/2076 6 97 6.97 850.19 6 95 6.95 843.80 6 92 6.92 834.28 842.76
31 6/14/2019 2/31/2076 6 99 6.99 856.60 7 8 7.08 885.85 7 15 7.15 909.03 883.83
32 6/15/2019 2/32/2076 7 28 7.28 953.10 7 30 7.3 960.00 7 38 7.38 987.90 967.00
Average Monthly Discharge,m3/s 649.20
ANNEX 5.4- Automatic Gauge Height Record
and Computation of Discharge
Annex-A 5.4
Automatic Gauge Height Record and Computation of Discharge

Discharge Discharge
Month Date G.H (m) Month Date G.H (m)
(m3/s) (m3/s)
5/27/2018 2.68 269.62 6/1/2018 2.66 266.57
5/28/2018 2.57 248.71 6/2/2018 2.72 278.50
May 5/29/2018 2.48 232.04 6/3/2018 2.63 259.34
5/30/2018 2.42 219.63 6/4/2018 2.83 299.80
5/31/2018 2.38 213.40 6/5/2018 3.05 348.33
6/6/2018 3.43 440.06
6/7/2018 3.19 381.79
6/8/2018 3.53 466.85
6/9/2018 3.44 443.28
6/10/2018 3.73 522.51
6/11/2018 3.56 475.54
6/12/2018 3.53 468.19
6/13/2018 3.52 464.77
6/14/2018 3.32 412.18
6/15/2018 3.34 418.58
June
6/16/2018 3.54 470.18
6/17/2018 3.35 420.90
6/18/2018 3.01 340.20
6/19/2018 2.93 322.23
6/20/2018 2.99 335.09
6/21/2018 2.91 318.48
6/22/2018 2.98 332.71
6/23/2018 2.98 332.11
6/24/2018 3.11 361.74
6/25/2018 3.12 365.57
6/26/2018 3.28 402.82
6/27/2018 3.34 418.56
6/28/2018 3.32 412.87
6/29/2018 3.61 487.94
6/30/2018 3.85 556.47
Annex-A 5.4
Automatic Gauge Height Record and Computation of Discharge

Discharge Discharge
Month Date G.H (m) Month Date G.H (m)
(m3/s) (m3/s)
7/1/2018 4.14 646.20 8/1/2018 5.50 1154.15
7/2/2018 4.75 855.04 8/2/2018 5.58 1187.31
7/3/2018 5.14 1003.82 8/3/2018 5.48 1144.94
7/4/2018 4.08 626.62 8/4/2018 5.60 1198.02
7/5/2018 3.62 490.74 8/5/2018 5.90 1333.80
7/6/2018 3.48 454.99 8/6/2018 6.08 1419.27
7/7/2018 3.53 467.21 8/7/2018 6.67 1714.33
7/8/2018 3.65 501.45 8/8/2018 6.61 1685.15
7/9/2018 4.00 600.96 8/9/2018 6.22 1485.89
7/10/2018 4.60 801.09 8/10/2018 5.85 1309.55
7/11/2018 4.87 898.68 8/11/2018 6.05 1400.74
7/12/2018 4.69 833.80 8/12/2018 6.53 1640.81
7/13/2018 4.87 898.67 8/13/2018 6.81 1793.84
7/14/2018 5.10 988.38 8/14/2018 6.44 1594.57
7/15/2018 4.56 786.00 8/15/2018 5.90 1331.66
July 7/16/2018 4.70 834.25 August 8/16/2018 6.07 1412.31
7/17/2018 5.17 1014.43 8/17/2018 6.45 1603.52
7/18/2018 4.87 898.62 8/18/2018 6.89 1836.90
7/19/2018 4.64 812.75 8/19/2018 6.56 1659.22
7/20/2018 4.84 889.01 8/20/2018 6.39 1567.95
7/21/2018 4.72 843.39 8/21/2018 6.50 1625.26
7/22/2018 5.17 1014.79 8/22/2018 6.67 1717.49
7/23/2018 5.83 1301.70 8/23/2018 7.15 1983.75
7/24/2018 5.92 1342.14 8/24/2018 7.18 1997.68
7/25/2018 5.56 1177.35 8/25/2018 7.05 1923.20
7/26/2018 6.23 1488.98 8/26/2018 7.06 1930.35
7/27/2018 6.17 1461.70 8/27/2018 6.68 1720.78
7/28/2018 5.83 1298.23 8/28/2018 6.24 1496.94
7/29/2018 5.75 1261.20 8/29/2018 6.29 1521.54
7/30/2018 5.41 1114.67 8/30/2018 6.15 1449.38
7/31/2018 5.44 1125.84 8/31/2018 6.15 1449.07
Annex-A 5.4
Automatic Gauge Height Record and Computation of Discharge

Discharge Discharge
Month Date G.H (m) Month Date G.H (m)
(m3/s) (m3/s)
9/1/2018 6.18 1464.46 10/1/2018 3.04 346.08
9/2/2018 6.06 1408.87 10/2/2018 2.99 334.94
9/3/2018 6.08 1417.14 10/3/2018 2.94 324.93
9/4/2018 5.84 1306.54 10/4/2018 2.90 315.58
9/5/2018 5.82 1297.11 10/5/2018 2.85 305.03
9/6/2018 5.47 1140.33 10/6/2018 2.81 296.88
9/7/2018 5.29 1062.77 10/7/2018 2.77 288.47
9/8/2018 5.04 965.86 10/8/2018 2.74 281.21
9/9/2018 4.84 886.88 10/9/2018 2.71 275.35
9/10/2018 4.66 821.89 10/10/2018 2.68 269.31
9/11/2018 4.67 825.41 10/11/2018 2.65 263.48
9/12/2018 4.65 818.41 10/12/2018 2.64 260.73
9/13/2018 4.36 716.30 10/13/2018 2.60 253.97
9/14/2018 4.27 687.89 10/14/2018 2.56 246.82
9/15/2018 4.09 628.98 10/15/2018 2.54 241.70
September
9/16/2018 3.93 581.98 October 10/16/2018 2.51 236.41
9/17/2018 3.81 543.97 10/17/2018 2.48 231.87
9/18/2018 3.69 511.99 10/18/2018 2.46 227.64
9/19/2018 3.61 487.95 10/19/2018 2.43 222.99
9/20/2018 3.53 467.81 10/20/2018 2.41 218.03
9/21/2018 3.49 455.80 10/21/2018 2.38 213.68
9/22/2018 3.48 455.39 10/22/2018 2.36 209.60
9/23/2018 3.57 477.68 10/23/2018 2.34 205.56
9/24/2018 3.58 482.07 10/24/2018 2.31 201.82
9/25/2018 3.42 438.78 10/25/2018 2.30 198.88
9/26/2018 3.32 413.39 10/26/2018 2.28 196.40
9/27/2018 3.24 394.32 10/27/2018 2.26 192.72
9/28/2018 3.19 382.23 10/28/2018 2.24 189.60
9/29/2018 3.14 369.57 10/29/2018 2.22 186.40
9/30/2018 3.09 357.55 10/30/2018 2.20 183.36
10/31/2018 2.19 181.94
Annex-A 5.4
Automatic Gauge Height Record and Computation of Discharge

Discharge Discharge
Month Date G.H (m) Month Date G.H (m)
(m3/s) (m3/s)
11/1/2018 2.18 180.06 12/1/2018 1.82 127.18
11/2/2018 2.17 177.64 12/2/2018 1.81 125.60
11/3/2018 2.15 174.25 12/3/2018 1.81 124.95
11/4/2018 2.14 173.30 12/4/2018 1.80 123.91
11/5/2018 2.13 171.11 12/5/2018 1.80 123.84
11/6/2018 2.10 167.15 12/6/2018 1.79 122.78
11/7/2018 2.08 164.43 12/7/2018 1.78 121.01
11/8/2018 2.07 163.12 12/8/2018 1.76 118.56
11/9/2018 2.07 162.39 12/9/2018 1.75 116.93
11/10/2018 2.06 161.33 12/10/2018 1.74 116.31
11/11/2018 2.05 159.48 12/11/2018 1.73 114.77
11/12/2018 2.04 157.75 12/12/2018 1.71 113.02
11/13/2018 2.03 156.26 12/13/2018 1.71 111.98
11/14/2018 2.02 155.01 12/14/2018 1.72 113.07
11/15/2018 2.01 152.85 12/15/2018 1.70 111.28
November
11/16/2018 1.98 149.61 December 12/16/2018 1.68 108.98
11/17/2018 1.97 148.27 12/17/2018 1.68 108.71
11/18/2018 1.96 146.50 12/18/2018 1.68 108.94
11/19/2018 1.95 145.28 12/19/2018 1.69 109.47
11/20/2018 1.94 143.18 12/20/2018 1.68 108.50
11/21/2018 1.92 140.56 12/21/2018 1.67 107.88
11/22/2018 1.91 138.65 12/22/2018 1.66 105.95
11/23/2018 1.91 138.36 12/23/2018 1.65 104.91
11/24/2018 1.90 136.91 12/24/2018 1.64 104.20
11/25/2018 1.88 135.38 12/25/2018 1.57 95.76
11/26/2018 1.88 134.95 12/26/2018 1.62 100.98
11/27/2018 1.87 133.36 12/27/2018 1.60 99.35
11/28/2018 1.86 131.97 12/28/2018 1.58 96.94
11/29/2018 1.86 131.65 12/29/2018 1.58 96.97
11/30/2018 1.84 129.53 12/30/2018 1.58 96.39
12/31/2018 1.58 96.90
Annex-A 5.4
Automatic Gauge Height Record and Computation of Discharge

Discharge Discharge
Month Date G.H (m) Month Date G.H (m)
(m3/s) (m3/s)
1/1/2019 1.59 97.69 2/1/2019 1.54 92.59
1/2/2019 1.59 97.35 2/2/2019 1.52 89.42
1/3/2019 1.59 97.36 2/3/2019 1.51 88.95
1/4/2019 1.57 95.99 2/4/2019 1.51 88.43
1/5/2019 1.57 95.48 2/4/2019 1.51 88.49
1/6/2019 1.58 96.70 2/5/2019 1.51 89.07
1/7/2019 1.58 97.33 2/6/2019 1.52 89.62
1/8/2019 1.57 96.08 2/7/2019 1.53 91.55
1/9/2019 1.57 95.15 2/8/2019 1.61 99.94
1/10/2019 1.57 95.27 2/9/2019 1.48 86.10
1/11/2019 1.56 94.21 2/10/2019 1.51 89.08
1/12/2019 1.55 93.62 2/11/2019 1.54 92.24
1/13/2019 1.55 92.85 2/12/2019 1.54 92.14
1/14/2019 1.54 92.60 February 2/13/2019 1.54 92.14
1/15/2019 1.53 91.29 2/14/2019 1.54 92.47
January 1/16/2019 1.52 90.09 2/15/2019 1.57 96.11
1/17/2019 1.53 90.69 2/16/2019 1.56 95.03
1/18/2019 1.53 90.61 2/17/2019 1.56 94.84
1/19/2019 1.51 88.89 2/18/2019 1.53 91.60
1/20/2019 1.51 88.58 2/19/2019 1.58 96.80
1/21/2019 1.51 88.46 2/20/2019 1.56 94.89
1/22/2019 1.56 94.20 2/21/2019 1.58 96.22
1/23/2019 1.54 91.65 2/22/2019 1.64 103.44
1/24/2019 1.51 88.48 2/23/2019 1.60 98.65
1/25/2019 1.55 92.99 2/24/2019 1.58 96.34
1/26/2019 1.55 92.91 2/25/2019 1.56 94.88
1/27/2019 1.55 92.99 2/26/2019 1.57 95.19
1/28/2019 1.55 93.83
1/29/2019 1.53 91.27
1/30/2019 1.52 89.53
1/31/2019 1.52 89.87
ANNEX 6.1: Data used for Particle Size
Distribution Analysis of Sampled Sediment
PARTICLE SIZE DISTRIBUTION DATA
PHUKOT KARNALI HYDROELECTRIC PROJECT Analysis date: 16/09/2018
File ID: PKHEP PKHEP PKHEP PKHEP
Sample no. 03 Sample no. 13 Sample no. 17 Sample no. 26
Sample ID:
(1-3) (1-3) (1-3) (1-3)

Comment 1: 06/01/2018 06/06/2018 06/08/2018 06/12/2018


Cumulative < Volume %
Diameter, micron
Percent finer Percent finer Percent finer Percent finer
0.393112 0 0 0 0

0.431541 0.0202706 0.0190519 0.0106179 0.0106544

0.47373 0.056481 0.0530053 0.0296028 0.0295759


0.520044 0.110042 0.103245 0.0577567 0.0577154
0.570884 0.186541 0.175258 0.0980909 0.0985923
0.626698 0.281866 0.265643 0.148564 0.151019
0.687967 0.393809 0.372552 0.208208 0.214398
0.755224 0.520799 0.494795 0.276409 0.288502
0.829053 0.662285 0.632239 0.353094 0.373702
0.9101 0.815364 0.782808 0.436905 0.469442
0.999088 0.977134 0.944183 0.526595 0.574652
1.09676 1.14501 1.11429 0.621077 0.688139
1.20394 1.31688 1.29152 0.719489 0.808623
1.32166 1.49092 1.47465 0.820942 0.934855
1.45087 1.66496 1.66202 0.924379 1.065
1.59272 1.8377 1.85256 1.02908 1.19732
1.74845 2.00846 2.04574 1.13463 1.33017
1.91936 2.17803 2.24247 1.24111 1.46254
2.10701 2.34728 2.44391 1.34856 1.59354
2.31298 2.51804 2.65203 1.45734 1.72273
2.53909 2.69305 2.86962 1.56821 1.85027
2.78732 2.87653 3.10096 1.68253 1.97726
3.05982 3.07345 3.35141 1.80182 2.1056
3.35895 3.28975 3.62739 1.92788 2.2377
3.68734 3.53228 3.93623 2.06293 2.37654
4.04785 3.80871 4.28599 2.20949 2.52552
4.44357 4.12737 4.68563 2.37025 2.68876
4.87799 4.49705 5.14472 2.54799 2.8705
5.35488 4.92693 5.67317 2.74562 3.07497
5.87836 5.42612 6.2805 2.96613 3.30605
6.45303 6.00348 6.97569 3.21232 3.56778
7.08389 6.66753 7.76723 3.48688 3.86433
7.77644 7.42649 8.6631 3.79219 4.19956
8.53671 8.28858 9.67053 4.13086 4.57661
9.37131 9.26191 10.7953 4.50526 4.99741
10.2877 10.3545 12.0418 4.91782 5.46346
11.2932 11.574 13.4124 5.37035 5.97513
PARTICLE SIZE DISTRIBUTION DATA
PHUKOT KARNALI HYDROELECTRIC PROJECT Analysis date: 16/09/2018
File ID: PKHEP PKHEP PKHEP PKHEP
Sample no. 03 Sample no. 13 Sample no. 17 Sample no. 26
Sample ID:
(1-3) (1-3) (1-3) (1-3)

Comment 1: 06/01/2018 06/06/2018 06/08/2018 06/12/2018


Cumulative < Volume %
Diameter, micron
Percent finer Percent finer Percent finer Percent finer
12.397 12.9276 14.9071 5.86478 6.5314
13.6092 14.4214 16.5221 6.40265 7.12801
14.9398 16.06 18.2492 6.98536 7.7596
16.4002 17.8467 20.0773 7.61411 8.42382
18.0034 19.7855 21.9968 8.29098 9.1266
19.7635 21.8822 24.0025 9.02047 9.88378
21.6959 24.1436 26.0932 9.81004 10.7162
23.8171 26.5748 28.2685 10.6708 11.6437
26.1451 29.174 30.5236 11.6166 12.6787
28.7008 31.9314 32.8492 12.6652 13.8275
31.5067 34.8306 35.2358 13.8395 15.0972
34.5874 37.8529 37.679 15.1694 16.503
37.9687 40.981 40.1822 16.6922 18.0701
41.6802 44.1968 42.7509 18.4502 19.8284
45.7552 47.4768 45.3841 20.4867 21.8018
50.2284 50.7866 48.0658 22.8401 23.9986
55.1385 54.0813 50.7649 25.539 26.4067
60.5292 57.3119 53.4443 28.5986 28.9979
66.4467 60.4355 56.0733 32.0186 31.7354
72.9427 63.4224 58.6362 35.7812 34.5817
80.0739 66.2562 61.131 39.8502 37.5023
87.9024 68.9279 63.5604 44.1708 40.4653
96.4946 71.4299 65.922 48.6723 43.4384
105.93 73.7557 68.2049 53.275 46.3909
116.289 75.9051 70.3961 57.8985 49.2997
127.656 77.8915 72.4927 62.469 52.1616
140.133 79.7412 74.5088 66.9208 54.9976
153.833 81.4835 76.4691 71.1907 57.8414
168.871 83.1344 78.3894 75.2086 60.707
185.378 84.6821 80.2542 78.8901 63.5497
203.504 86.0864 82.0059 82.14 66.2452
223.402 87.2944 83.5608 84.869 68.6169
245.243 88.2684 84.8487 87.0234 70.5181
269.217 89.0133 85.8601 88.6166 71.932
295.534 89.5856 86.6621 89.745 73.004
324.427 90.0709 87.3729 90.5669 73.9772
356.148 90.5558 88.1232 91.2544 75.1214
390.965 91.0998 89.0213 91.954 76.678
429.183 91.7141 90.1162 92.7642 78.7639
471.138 92.3492 91.3699 93.7104 81.2874
PARTICLE SIZE DISTRIBUTION DATA
PHUKOT KARNALI HYDROELECTRIC PROJECT Analysis date: 16/09/2018
File ID: PKHEP PKHEP PKHEP PKHEP
Sample no. 03 Sample no. 13 Sample no. 17 Sample no. 26
Sample ID:
(1-3) (1-3) (1-3) (1-3)

Comment 1: 06/01/2018 06/06/2018 06/08/2018 06/12/2018


Cumulative < Volume %
Diameter, micron
Percent finer Percent finer Percent finer Percent finer
517.197 92.9221 92.6779 94.7365 83.9938
567.762 93.3722 93.926 95.7405 86.6027
623.267 93.7215 95.0442 96.6321 88.9395
684.201 94.0397 96.0305 97.3673 90.9921
751.093 94.446 96.921 97.9482 92.8577
824.518 95.0536 97.7514 98.3927 94.6387
905.125 95.9311 98.519 98.7234 96.3556
993.59 97.0277 99.1678 98.9536 97.8958
1090.71 98.2683 99.6202 99.102 99.0675
1197.4 99.28 99.8656 99.1971 99.7211
1314.47 99.8467 99.9636 99.2678 99.9564
1442.93 99.9849 99.9942 99.3416 99.9974
1583.98 100 99.9995 99.4361 100
1738.86 100 100 99.575 100
1908.87 100 100 99.7565 100
2000 100 100 100 100
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP
Sample ID: SM-32.1, SM-33.1 to SM-50.1,50.2 SM-55.1 to SM-66.1, SM-70.1, SM-79.1, SM-82.1, SM-99.1, SM-101.1 to SM-106.1, SM-109.1,
32.2 & 32.3 34.3 & 50.3 56.3 66.2 & 66.3 70.2 & 70.3 79.2, & 79.3 82.2 & 82.3 99.2 & 99.3 102.3 106.2 & 109.2 &
106.3 109.3
Comment 1: 17/06/2018 18/06/2018 24/06/2018 27/06/2018 02/07/2018 04/07/2018 09/07/2018 10/07/2018 19/07/2018 21/07/2018 24/07/2018 26/07/2018
(PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP)

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.00039 0 0 0 0 0 0 0 0 0 0 0 0
0.00043 0.00719054 0.0125805 0.0152838 0.0202049 0.0144352 0.0196919 0.0331843 0.030359 0.00886448 0.013463 0.0320921 0.0184937
0.00047 0.0199579 0.0349413 0.0425211 0.0561469 0.0401291 0.0546816 0.0921209 0.0842545 0.0246754 0.037399 0.0891222 0.0513951
0.00052 0.039028 0.0680785 0.0828292 0.109436 0.0781625 0.106556 0.179586 0.164338 0.048099 0.0728493 0.173589 0.100138
0.00057 0.0676276 0.115823 0.140624 0.18625 0.132771 0.181405 0.3061 0.280517 0.081697 0.123871 0.295235 0.17028
0.00063 0.106812 0.176283 0.213222 0.283579 0.201519 0.276437 0.467412 0.429399 0.123888 0.18838 0.449225 0.258906
0.00069 0.158007 0.248409 0.299186 0.399868 0.283049 0.39016 0.661434 0.609512 0.173864 0.265221 0.632878 0.364434
0.00076 0.223061 0.331634 0.397625 0.534321 0.37653 0.521851 0.887432 0.82067 0.231133 0.35375 0.844751 0.485957
0.00083 0.304188 0.426103 0.508491 0.687324 0.481924 0.671952 1.14673 1.06461 0.295677 0.454097 1.08528 0.623621
0.00091 0.402695 0.53081 0.630242 0.857383 0.597786 0.839155 1.43784 1.34064 0.36653 0.565144 1.35202 0.775813
0.001 0.518865 0.644332 0.761152 1.0425 0.722337 1.02152 1.75827 1.64714 0.442669 0.685383 1.64155 0.940437
0.0011 0.651776 0.765326 0.899746 1.2408 0.85394 1.21722 2.10572 1.98262 0.523193 0.813407 1.95071 1.11552
0.0012 0.799082 0.892607 1.04494 1.45072 0.991205 1.42471 2.47841 2.34599 0.607377 0.948014 2.27692 1.29936
0.00132 0.95718 1.02522 1.19606 1.67101 1.13302 1.64275 2.87508 2.73651 0.694587 1.08824 2.61826 1.4906
0.00145 1.12112 1.16164 1.35214 1.8996 1.27778 1.86925 3.29296 3.15192 0.783955 1.23256 2.97154 1.68713
0.00159 1.2853 1.30058 1.51273 2.13475 1.42419 2.10236 3.72958 3.59006 0.874852 1.37969 3.33415 1.88722
0.00175 1.44391 1.44097 1.67787 2.37502 1.57127 2.34055 4.18299 4.04913 0.966846 1.52855 3.7042 2.08946
0.00192 1.59197 1.58261 1.84893 2.6203 1.71905 2.58357 4.65337 4.52901 1.06003 1.67894 4.08208 2.2937
0.00211 1.72599 1.72535 2.02756 2.87054 1.86763 2.83125 5.14102 5.02951 1.15446 1.8307 4.46844 2.49988
0.00231 1.84503 1.86943 2.21627 3.12629 2.01756 3.08395 5.64715 5.55111 1.25045 1.98401 4.86498 2.70856
0.00254 1.95139 2.0156 2.41834 3.38881 2.16996 3.34273 6.17423 6.09532 1.34863 2.13949 5.27474 2.92096
0.00279 2.05077 2.16556 2.63845 3.66085 2.32694 3.61015 6.72736 6.66596 1.4501 2.29868 5.70332 3.13969
0.00306 2.15121 2.32184 2.88244 3.94637 2.49145 3.88998 7.31399 7.26877 1.55629 2.4639 6.15847 3.36847
0.00336 2.26236 2.48756 3.15727 4.25035 2.6671 4.1869 7.94331 7.91084 1.66887 2.63798 6.64952 3.61197
0.00369 2.39482 2.6664 3.47094 4.57872 2.85817 4.50646 8.62619 8.60064 1.78983 2.82428 7.18729 3.8757
0.00405 2.55743 2.86254 3.83224 4.93829 3.06943 4.85493 9.3752 9.3482 1.92138 3.02659 7.78396 4.16593
0.00444 2.75526 3.08103 4.25101 5.33713 3.30648 5.23991 10.2055 10.1658 2.06601 3.24949 8.45379 4.49003
0.00488 2.98866 3.32737 4.73781 5.78414 3.57543 5.66961 11.1338 11.0669 2.22634 3.49794 9.21215 4.8561
0.00535 3.25487 3.60728 5.30375 6.28875 3.88278 6.15251 12.1772 12.0649 2.40508 3.77708 10.0746 5.27266
0.00588 3.55092 3.92623 5.95973 6.86012 4.23475 6.6965 13.3521 13.1724 2.60487 4.09173 11.0557 5.74792
0.00645 3.87775 4.28966 6.71622 7.50725 4.63743 7.30918 14.6745 14.4018 2.82819 4.44653 12.1694 6.28983
0.00708 4.24239 4.70309 7.58335 8.23901 5.0968 7.99796 16.1602 15.7654 3.07741 4.84604 13.4289 6.90615
0.00778 4.65792 5.17176 8.57079 9.06386 5.61859 8.76954 17.8234 17.2735 3.35467 5.29439 14.8459 7.60422
0.00854 5.1415 5.70044 9.68771 9.98948 6.20815 9.62915 19.6752 18.9327 3.66201 5.79505 16.4294 8.39062
0.00937 5.70985 6.29281 10.9421 11.022 6.86988 10.5797 21.7218 20.7446 4.00108 6.35021 18.1841 9.27046
0.01029 6.37276 6.95231 12.3411 12.1666 7.60761 11.6221 23.9654 22.7066 4.37327 6.96124 20.1107 10.2476
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP
Sample ID: SM-32.1, SM-33.1 to SM-50.1,50.2 SM-55.1 to SM-66.1, SM-70.1, SM-79.1, SM-82.1, SM-99.1, SM-101.1 to SM-106.1, SM-109.1,
32.2 & 32.3 34.3 & 50.3 56.3 66.2 & 66.3 70.2 & 70.3 79.2, & 79.3 82.2 & 82.3 99.2 & 99.3 102.3 106.2 & 109.2 &
106.3 109.3
Comment 1: 17/06/2018 18/06/2018 24/06/2018 27/06/2018 02/07/2018 04/07/2018 09/07/2018 10/07/2018 19/07/2018 21/07/2018 24/07/2018 26/07/2018
(PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP)

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.01129 7.12725 7.68158 13.8903 13.4264 8.42418 12.755 26.4028 24.8106 4.77933 7.62819 22.2056 11.3244
0.0124 7.959 8.48256 15.5932 14.8027 9.32157 13.974 29.0226 27.04 5.21969 8.3498 24.4584 12.5011
0.01361 8.84698 9.35464 17.45 16.2921 10.2993 15.269 31.8005 29.3659 5.69378 9.12199 26.8489 13.7741
0.01494 9.7716 10.2958 19.4566 17.8873 11.3546 16.6259 34.7014 31.7507 6.20033 9.93875 29.3486 15.1362
0.0164 10.7246 11.305 21.6068 19.5796 12.4844 18.0308 37.6888 34.1598 6.73751 10.7943 31.929 16.579
0.018 11.7194 12.3862 23.8962 21.3634 13.6882 19.477 40.7382 36.5763 7.30414 11.6867 34.5719 18.097
0.01976 12.7936 13.55 26.3254 23.2398 14.971 20.9681 43.8433 39.005 7.90083 12.6206 37.2747 19.6906
0.0217 14.0012 14.8105 28.8992 25.2139 16.3417 22.5149 47.0075 41.4615 8.52994 13.605 40.0439 21.3644
0.02382 15.3974 16.1823 31.6234 27.2911 17.8114 24.1282 50.2274 43.9529 9.19541 14.6505 42.8817 23.1224
0.02615 17.0154 17.6761 34.5002 29.4704 19.3891 25.8114 53.4791 46.4624 9.90124 15.7649 45.7746 24.963
0.0287 18.8509 19.3002 37.5282 31.7449 21.0825 27.5606 56.7195 48.9523 10.6517 16.953 48.6935 26.8789
0.03151 20.8661 21.0645 40.7043 34.1057 22.9002 29.3705 59.9011 51.3815 11.4516 18.2183 51.6057 28.8616
0.03459 23.0389 22.9832 44.0269 36.5459 24.8546 31.2423 62.991 53.7273 12.3072 19.5661 54.4897 30.9079
0.03797 25.4204 25.0731 47.4947 39.0625 26.9611 33.1855 65.9773 55.9922 13.2263 21.0031 57.3405 33.0212
0.04168 28.1221 27.3458 51.0985 41.6496 29.2323 35.212 68.8585 58.1922 14.2158 22.5338 60.1621 35.2071
0.04576 31.2408 29.7987 54.8118 44.2917 31.6705 37.3259 71.6245 60.3368 15.2803 24.1552 62.9527 37.4654
0.05023 34.7424 32.4109 58.5843 46.9587 34.2627 39.5161 74.2445 62.4128 16.4202 25.8537 65.6939 39.7842
0.05514 38.39 35.1478 62.3474 49.6117 36.9832 41.7587 76.673 64.3886 17.6336 27.609 68.3535 42.1414
0.06053 41.9384 37.9734 66.0296 52.2156 39.8021 44.0287 78.8736 66.235 18.9191 29.4023 70.9018 44.5147
0.06645 45.4236 40.8643 69.5754 54.7535 42.6967 46.3145 80.8446 67.9511 20.28 31.2248 73.3291 46.8929
0.07294 49.0586 43.8144 72.9564 57.2315 45.6571 48.6255 82.6275 69.575 21.7272 33.082 75.6518 49.2826
0.08007 52.8857 46.8293 76.1681 59.6735 48.6849 50.9886 84.2915 71.1724 23.281 34.9915 77.9024 51.7041
0.0879 56.6921 49.9133 79.2149 62.107 51.7837 53.4343 85.9041 72.8106 24.9718 36.9769 80.1077 54.1801
0.09649 60.3642 53.0544 82.0938 64.5486 54.9504 55.9814 87.5039 74.5299 26.8399 39.0617 82.2714 56.7232
0.10593 63.9919 56.219 84.7886 66.9985 58.1704 58.6288 89.0904 76.3272 28.936 41.2679 84.372 59.3303
0.11629 67.6197 59.3599 87.2844 69.4472 61.4224 61.3615 90.6399 78.162 31.3213 43.6209 86.3828 61.9885
0.12766 71.1461 62.4373 89.5805 71.8898 64.6894 64.1674 92.134 79.987 34.0655 46.1598 88.3035 64.6899
0.14013 74.4831 65.4371 91.6928 74.3359 67.9659 67.0527 93.5747 81.7806 37.2398 48.9438 90.1642 67.4432
0.15383 77.6392 68.3726 93.6313 76.8008 71.2515 70.0374 94.9734 83.558 40.9005 52.0449 92.0107 70.2674
0.16887 80.6456 71.2607 95.3678 79.28 74.5277 73.1258 96.3195 85.3504 45.0651 55.5201 93.8563 73.1667
0.18538 83.5886 74.0821 96.8308 81.7183 77.7296 76.2652 97.5555 87.1629 49.686 59.3683 95.64 76.0958
0.2035 86.5753 76.7514 97.9363 83.9972 80.7315 79.3198 98.5939 88.9361 54.6373 63.4938 97.2354 78.9417
0.2234 89.4231 79.1235 98.6477 85.9612 83.3693 82.092 99.3564 90.542 59.7254 67.7037 98.4868 81.5428
0.24524 91.5125 81.0529 98.9983 87.4825 85.5014 84.3967 99.7908 91.8318 64.729 71.757 99.244 83.7513
0.26922 92.4307 82.4846 99.1163 88.538 87.0857 86.157 99.9632 92.7236 69.454 75.448 99.5591 85.5088
0.29553 92.6424 83.5109 99.1366 89.2396 88.2202 87.4546 99.9972 93.2776 73.7815 78.6821 99.6234 86.8835
0.32443 92.6994 84.3311 99.1385 89.7732 89.1009 88.4856 100 93.6537 77.6848 81.4983 99.6304 88.0375
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP
Sample ID: SM-32.1, SM-33.1 to SM-50.1,50.2 SM-55.1 to SM-66.1, SM-70.1, SM-79.1, SM-82.1, SM-99.1, SM-101.1 to SM-106.1, SM-109.1,
32.2 & 32.3 34.3 & 50.3 56.3 66.2 & 66.3 70.2 & 70.3 79.2, & 79.3 82.2 & 82.3 99.2 & 99.3 102.3 106.2 & 109.2 &
106.3 109.3
Comment 1: 17/06/2018 18/06/2018 24/06/2018 27/06/2018 02/07/2018 04/07/2018 09/07/2018 10/07/2018 19/07/2018 21/07/2018 24/07/2018 26/07/2018
(PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP) (PKHEP)

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.35615 92.7818 85.1723 99.1401 90.3277 89.9445 89.4739 100 94.0272 81.211 84.0288 99.6339 89.1598
0.39097 93.1272 86.2393 99.1505 91.0651 90.9356 90.6068 100 94.5539 84.4359 86.4257 99.651 90.4065
0.42918 94.3363 87.6519 99.185 92.0793 92.1793 91.9795 100 95.3358 87.4169 88.79 99.6927 91.849
0.47114 96.4751 89.3727 99.2559 93.3377 93.6473 93.5467 100 96.3432 90.1616 91.1267 99.7573 93.4368
0.5172 98.1235 91.2177 99.3606 94.6949 95.1838 95.1412 100 97.4128 92.6264 93.3437 99.8284 95.0197
0.56776 98.9248 92.9639 99.4811 95.9768 96.5906 96.567 100 98.3447 94.7441 95.3019 99.8884 96.4282
0.62327 99.3349 94.4607 99.5949 97.062 97.7258 97.6977 100 99.0214 96.4653 96.8897 99.9284 97.5595
0.6842 99.5459 95.6861 99.6891 97.9204 98.5542 98.5168 100 99.4413 97.7825 98.0733 99.9503 98.4042
0.75109 99.7169 96.7078 99.7635 98.5856 99.1237 99.0848 100 99.6972 98.7301 98.8933 99.9635 99.0163
0.82452 99.8623 97.6112 99.8255 99.1088 99.511 99.4808 100 99.8541 99.365 99.429 99.9755 99.4582
0.90513 99.9665 98.4367 99.881 99.5179 99.7721 99.7555 100 99.9485 99.7455 99.7566 99.9877 99.7591
0.99359 99.9959 99.1469 99.9294 99.7986 99.9226 99.9169 100 99.9894 99.9281 99.9242 99.9968 99.9255
1.09071 100 99.6518 99.966 99.9449 99.9858 99.9848 100 99.999 99.9889 99.987 99.9996 99.9875
1.1974 100 99.9082 99.9876 99.9918 99.9989 99.9988 100 100 99.9993 99.999 100 99.9992
1.31447 100 99.9875 99.997 99.9995 100 100 100 100 100 100 100 100
1.44293 100 99.9994 99.9996 100 100 100 100 100 100 100 100 100
1.58398 100 100 100 100 100 100 100 100 100 100 100 100
1.73886 100 100 100 100 100 100 100 100 100 100 100 100
1.90887 100 100 100 100 100 100 100 100 100 100 100 100
2 100 100 100 100 100 100 100 100 100 100 100 100
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP

Sample ID: SM-124 (1-3) SM-130 (1-3) SM-134 (1-3) SN-139 (1-3) SN-146 (1-3) SN-150 (1-3) SN-155 (1-3) SN-166 (1-3) SN- 180 (1-3) SN- 184 (1-3) SN- 194 (1-3) SN- 199 (1-3)

Comment 1: 08/04/2018 08/07/2018 08/09/2018 08/12/2018 16/08/2018 18/08/2018 22/08/2018 27/08/2018 09/03/2018 09/05/2018 09/11/2018 14/09/2018

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in
Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.00039 0 0 0 0 0 0 0 0 0 0 0 0
0.00043 0.0304216 0.0240899 0.0236858 0.0164659 0.00527993 0.0189158 0.0250414 0.0195003 0.0220666 0.0221002 0.0140725 0.0096336
0.00047 0.0844313 0.066855 0.0657375 0.0457193 0.0154145 0.052524 0.0694996 0.0541182 0.0612719 0.061381 0.039097 0.0267711
0.00052 0.164613 0.130359 0.128118 0.0891167 0.0326946 0.102363 0.13551 0.105549 0.119403 0.119571 0.0761824 0.0521564
0.00057 0.280784 0.22241 0.218359 0.151821 0.0570242 0.174314 0.231135 0.18017 0.203319 0.203386 0.129608 0.0886815
0.00063 0.429399 0.340256 0.333521 0.231621 0.0884551 0.265741 0.353399 0.275832 0.30996 0.309497 0.197254 0.134835
0.00069 0.608742 0.482627 0.472122 0.327394 0.127031 0.375267 0.500892 0.391569 0.437734 0.436056 0.277991 0.189812
0.00076 0.818305 0.649244 0.633637 0.438678 0.172765 0.502259 0.673234 0.527201 0.585925 0.582053 0.371225 0.253174
0.00083 1.0594 0.841303 0.818964 0.566004 0.22559 0.647219 0.871582 0.68374 0.755154 0.747752 0.477179 0.325039
0.00091 1.33088 1.05809 1.02708 0.708482 0.285338 0.808992 1.09506 0.860656 0.944109 0.931402 0.594785 0.404625
0.001 1.63056 1.2981 1.25616 0.864712 0.351698 0.985828 1.34195 1.05673 1.15082 1.13056 0.722592 0.490925
0.0011 1.95624 1.5599 1.50446 1.03338 0.424197 1.1761 1.61063 1.27075 1.37348 1.3429 0.859256 0.583028
0.0012 2.30597 1.84227 1.77049 1.2134 0.502172 1.37845 1.89974 1.50161 1.61062 1.56645 1.00364 0.680197
0.00132 2.67803 2.14424 2.05303 1.40393 0.58483 1.59188 2.20819 1.74836 1.86117 1.79958 1.15486 0.781858
0.00145 3.06926 2.46365 2.34974 1.60338 0.671287 1.81456 2.53364 2.00902 2.12311 2.03976 1.31146 0.887068
0.00159 3.47665 2.79845 2.65843 1.8103 0.760616 2.04492 2.87388 2.28164 2.39467 2.28479 1.47218 0.99505
0.00175 3.89752 3.14682 2.97714 2.02343 0.851904 2.28169 3.22691 2.56441 2.67447 2.53289 1.63601 1.10519
0.00192 4.33082 3.5082 3.3052 2.24258 0.944327 2.52494 3.59216 2.85648 2.96251 2.78374 1.80285 1.21746
0.00211 4.77549 3.88206 3.64192 2.46754 1.03722 2.77484 3.96898 3.15693 3.25889 3.03711 1.97263 1.33184
0.00231 5.23133 4.2684 3.98712 2.69854 1.13017 3.0322 4.35729 3.46529 3.56423 3.2934 2.14568 1.44852
0.00254 5.69941 4.66823 4.34149 2.93636 1.22303 3.29856 4.75793 3.78183 3.87988 3.55387 2.32278 1.56796
0.00279 6.18318 5.08439 4.70739 3.18301 1.31604 3.57704 5.17361 4.10824 4.20878 3.82138 2.5057 1.69123
0.00306 6.68809 5.52141 5.08868 3.44159 1.40976 3.87216 5.60872 4.44753 4.55512 4.10017 2.69704 1.81982
0.00336 7.22105 5.98504 5.49026 3.71606 1.50516 4.18956 6.06887 4.80361 4.92397 4.39547 2.90001 1.95556
0.00369 7.79072 6.48247 5.91823 4.01123 1.60352 4.53594 6.56102 5.18156 5.32114 4.71343 3.11844 2.10058
0.00405 8.40761 7.02252 6.37999 4.33267 1.70646 4.91895 7.09355 5.58762 5.75315 5.06108 3.35665 2.25726
0.00444 9.08465 7.61616 6.88481 4.68726 1.81592 5.3478 7.677 6.0297 6.22772 5.44679 3.61981 2.42841
0.00488 9.83586 8.2755 7.44291 5.08267 1.9341 5.83266 8.32306 6.51654 6.75307 5.87964 3.91356 2.61709
0.00535 10.6754 9.01307 8.06486 5.52705 2.06349 6.38419 9.04388 7.05726 7.33742 6.36895 4.24387 2.82645
0.00588 11.617 9.84115 8.76094 6.0283 2.2068 7.01265 9.85128 7.66073 7.98808 6.9235 4.61641 3.05944
0.00645 12.6742 10.7723 9.5417 6.5943 2.36691 7.72813 10.7573 8.33612 8.71193 7.55173 5.03672 3.31885
0.00708 13.8606 11.8189 10.4177 7.23295 2.54671 8.54053 11.7739 9.09258 9.51543 8.26186 5.51026 3.60746
0.00778 15.1875 12.9922 11.3985 7.9517 2.74878 9.4591 12.9121 9.93822 10.4041 9.06132 6.04213 3.92779
0.00854 16.6621 14.3 12.4911 8.75709 2.97511 10.4917 14.1801 10.879 11.3813 9.95607 6.6369 4.28204
0.00937 18.2865 15.7466 13.6994 9.65392 3.22649 11.6439 15.5829 11.9179 12.4479 10.9497 7.29791 4.67165
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP

Sample ID: SM-124 (1-3) SM-130 (1-3) SM-134 (1-3) SN-139 (1-3) SN-146 (1-3) SN-150 (1-3) SN-155 (1-3) SN-166 (1-3) SN- 180 (1-3) SN- 184 (1-3) SN- 194 (1-3) SN- 199 (1-3)

Comment 1: 08/04/2018 08/07/2018 08/09/2018 08/12/2018 16/08/2018 18/08/2018 22/08/2018 27/08/2018 09/03/2018 09/05/2018 09/11/2018 14/09/2018

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in
Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.01029 20.0585 17.3331 15.0252 10.6458 3.50165 12.9193 17.1223 13.056 13.6018 12.0441 8.02771 5.09761
0.01129 21.9702 19.056 16.4662 11.7347 3.79667 14.319 18.7967 14.2906 14.838 13.2383 8.82745 5.56017
0.0124 24.0037 20.9042 18.0149 12.9203 4.10486 15.8404 20.5976 15.6137 16.1481 14.5286 9.697 6.05897
0.01361 26.1272 22.8552 19.6543 14.1978 4.41745 17.4745 22.507 17.0088 17.5176 15.9053 10.6332 6.59212
0.01494 28.3 24.8781 21.3611 15.5588 4.7253 19.2066 24.4991 18.4537 18.9285 17.355 11.6306 7.15674
0.0164 30.4874 26.9445 23.1148 16.9951 5.02193 21.0205 26.55 19.9284 20.3639 18.8638 12.6829 7.75002
0.018 32.6759 29.0408 24.9079 18.5047 5.30672 22.9057 28.6491 21.4245 21.816 20.4245 13.7868 8.37142
0.01976 34.8775 31.1724 26.7502 20.0951 5.587 24.8614 30.8034 22.9481 23.2888 22.0397 14.9446 9.0241
0.0217 37.1155 33.3534 28.6592 21.7806 5.87602 26.8938 33.0284 24.5123 24.7939 23.7178 16.162 9.71393
0.02382 39.4042 35.5911 30.6462 23.5755 6.18643 29.0078 35.3337 26.1251 26.3415 25.4663 17.4457 10.4478
0.02615 41.7323 37.8735 32.7027 25.4868 6.52108 31.2002 37.7094 27.7793 27.9319 27.2841 18.7984 11.2307
0.0287 44.0669 40.1732 34.8011 27.5129 6.86695 33.4588 40.1282 29.455 29.5564 29.1625 20.2197 12.0663
0.03151 46.374 42.4633 36.9075 29.647 7.20123 35.7702 42.5596 31.1309 31.2039 31.0904 21.7089 12.9575
0.03459 48.6409 44.7345 38.9973 31.8836 7.50948 38.1277 44.9865 32.7976 32.8712 33.0625 23.2691 13.9082
0.03797 50.8839 47.0005 41.0635 34.2199 7.80137 40.5348 47.4125 34.4625 34.5655 35.0812 24.9084 14.9238
0.04168 53.1347 49.286 43.1108 36.652 8.10811 42.9984 49.8525 36.1418 36.2992 37.1508 26.636 16.0077
0.04576 55.4179 51.6088 45.1422 39.1666 8.46217 45.5188 52.3164 37.8481 38.0787 39.2677 28.4566 17.1583
0.05023 57.7314 53.9648 47.1489 41.7373 8.87486 48.0814 54.7963 39.58 39.8963 41.4139 30.3665 18.367
0.05514 60.0456 56.3294 49.1121 44.3289 9.33137 50.6592 57.2664 41.3233 41.732 43.5597 32.3556 19.6206
0.06053 62.3214 58.6743 51.0153 46.9103 9.81413 53.2253 59.6989 43.0634 43.5658 45.6759 34.4138 20.9075
0.06645 64.5367 60.9879 52.8605 49.467 10.3394 55.7676 62.0818 44.8002 45.3914 47.7479 36.5393 22.223
0.07294 66.7012 63.2855 54.6742 52.0074 10.972 58.2955 64.4286 46.5556 47.2243 49.7836 38.7415 23.5729
0.08007 68.8518 65.6021 56.4999 54.5551 11.8092 60.8342 66.7707 48.3682 49.0956 51.8088 41.037 24.9713
0.0879 71.0305 67.9723 58.3811 57.1344 12.9609 63.4102 69.1385 50.2796 51.038 53.8544 43.442 26.4359
0.09649 73.2595 70.4101 60.3429 59.7544 14.5516 66.0355 71.5412 52.3175 53.0695 55.9423 45.9637 27.9837
0.10593 75.5264 72.899 62.3841 62.404 16.7195 68.7013 73.9587 54.4873 55.1859 58.0786 48.599 29.6285
0.11629 77.7914 75.4022 64.4863 65.0605 19.6029 71.386 76.3529 56.7778 57.3687 60.2595 51.3409 31.3848
0.12766 80.0159 77.8895 66.6367 67.7106 23.3333 74.0728 78.6936 59.1795 59.6053 62.4877 54.1909 33.274
0.14013 82.1904 80.3562 68.8489 70.3658 28.0224 76.7629 80.9814 61.7049 61.9066 64.7841 57.1652 35.3281
0.15383 84.34 82.8227 71.1623 73.0568 33.7257 79.469 83.2456 64.3901 64.3061 67.1832 60.2844 37.5831
0.16887 86.496 85.3007 73.6137 75.8038 40.4012 82.1876 85.5139 67.2713 66.8349 69.707 63.5444 40.0611
0.18538 88.6479 87.7472 76.1911 78.5744 47.8654 84.8618 87.7655 70.3405 69.4834 72.3294 66.8818 42.7463
0.2035 90.7047 90.0389 78.7964 81.2578 55.7551 87.3606 89.8977 73.5067 72.1742 74.954 70.1575 45.5723
0.2234 92.4957 91.9815 81.2523 83.6817 63.5303 89.5002 91.7354 76.5943 74.7715 77.4326 73.1831 48.4362
0.24524 93.8314 93.3829 83.3692 85.6816 70.5547 91.1105 93.0983 79.3995 77.1366 79.6255 75.7896 51.2393
0.26922 94.5813 94.1417 85.0447 87.19 76.2719 92.1278 93.8957 81.7839 79.2014 81.4751 77.9081 53.9374
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP

Sample ID: SM-124 (1-3) SM-130 (1-3) SM-134 (1-3) SN-139 (1-3) SN-146 (1-3) SN-150 (1-3) SN-155 (1-3) SN-166 (1-3) SN- 180 (1-3) SN- 184 (1-3) SN- 194 (1-3) SN- 199 (1-3)

Comment 1: 08/04/2018 08/07/2018 08/09/2018 08/12/2018 16/08/2018 18/08/2018 22/08/2018 27/08/2018 09/03/2018 09/05/2018 09/11/2018 14/09/2018

PSD: 1 2 3 4 5 6 7 8 9 10 11 12
Diameter in
Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.29553 94.8632 94.4143 86.3275 88.2846 80.4305 92.6743 94.262 83.7464 81.0093 83.0403 79.6078 56.5695
0.32443 94.945 94.4951 87.3877 89.1467 83.2375 92.983 94.4369 85.4193 82.6975 84.4691 81.0629 59.2485
0.35615 95.0171 94.5774 88.4377 89.9817 85.2794 93.2703 94.6247 87.0001 84.4403 85.938 82.4822 62.1214
0.39097 95.2343 94.8413 89.6636 90.9644 87.2216 93.7202 95.0041 88.6713 86.3816 87.5885 84.0437 65.3123
0.42918 95.7597 95.4742 91.1581 92.1891 89.5342 94.4721 95.7212 90.5272 88.5692 89.4657 85.8372 68.8655
0.47114 96.5852 96.4627 92.8626 93.6205 92.2643 95.5212 96.7332 92.5222 90.915 91.4831 87.8251 72.7135
0.5172 97.5082 97.57 94.584 95.1066 94.9812 96.6986 97.8233 94.4825 93.2213 93.4544 89.8607 76.6904
0.56776 98.3208 98.553 96.0958 96.4619 97.1049 97.7867 98.7536 96.1922 95.2674 95.1828 91.7653 80.5869
0.62327 98.8872 99.2416 97.2506 97.5562 98.3792 98.6264 99.3708 97.5023 96.9071 96.5535 93.4144 84.2171
0.6842 99.2004 99.5995 98.0366 98.3573 99.029 99.175 99.6775 98.3943 98.1075 97.5746 94.7791 87.4619
0.75109 99.3533 99.7308 98.5471 98.9109 99.4297 99.4918 99.7938 98.9593 98.9303 98.3312 95.9045 90.2747
0.82452 99.4472 99.7693 98.9001 99.2895 99.7602 99.6704 99.8417 99.3219 99.4684 98.9194 96.8547 92.6569
0.90513 99.5439 99.7937 99.1836 99.5534 99.9534 99.7828 99.8822 99.5772 99.7882 99.391 97.6695 94.6273
0.99359 99.6666 99.8311 99.435 99.7355 99.9976 99.8619 99.9292 99.7676 99.9425 99.7326 98.3428 96.2087
1.09071 99.8099 99.8915 99.6548 99.8544 100 99.9189 99.971 99.8954 99.9915 99.9221 98.8446 97.4292
1.1974 99.9242 99.9518 99.8279 99.9303 100 99.9591 99.993 99.9638 99.9995 99.9878 99.1638 98.3335
1.31447 99.9845 99.9893 99.9362 99.9733 100 99.9838 99.9992 99.99 100 99.9993 99.3421 98.9799
1.44293 99.9986 99.9989 99.987 99.9943 100 99.9965 100 99.9983 100 100 99.4476 99.4221
1.58398 100 100 99.9987 99.9994 100 99.9996 100 99.9998 100 100 99.5416 99.7109
1.73886 100 100 100 100 100 100 100 100 100 100 99.6626 99.8765
1.90887 100 100 100 100 100 100 100 100 100 100 99.817 99.9699
2 100 100 100 100 100 100 100 100 100 100 100 100
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP
Sample ID: SN - 201 & SN - 205 & SN - 219 & SN - 221 & SN - 233 & SN - 256 to SN - 265 to SN - 274 to
202 (1-3) 206 (1-3) 220 (1-3) 222 (1-3) 234 (1-3) 258 (1-3) 268 (1-3) 276 (1-3)

Comment 1: 15/09/2018 17/09/2018 24/09/2018 25/09/2018 10/01/2018


23- 1-3/11/2018 10-12/11/2018
25/10/2018
PSD: 1 2 3 4 5 6 7 8
Diameter in Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.00039 0 0 0 0 0 0 0 0
0.00043 0.0136813 0.0134046 0.00500878 0.00465427 0.00502767 0.00362151 0.00413938 0.0044842
0.00047 0.0379811 0.0372683 0.0139779 0.0129726 0.0139993 0.0100717 0.0115355 0.0124986
0.00052 0.0740625 0.0725867 0.0272861 0.0253078 0.0272871 0.0196188 0.0224991 0.0243844
0.00057 0.126333 0.123262 0.0463296 0.0429789 0.0463086 0.0333096 0.0381948 0.0414137
0.00063 0.193135 0.186977 0.07008 0.065098 0.0701184 0.0505091 0.0578212 0.0627342
0.00069 0.273604 0.262423 0.0980603 0.0912301 0.0982155 0.0708639 0.080976 0.087931
0.00076 0.367359 0.348775 0.129947 0.121098 0.130282 0.0941541 0.107401 0.116743
0.00083 0.474779 0.445929 0.165661 0.15465 0.16624 0.120349 0.137034 0.149124
0.00091 0.595079 0.552446 0.204452 0.191285 0.205469 0.149063 0.16933 0.184503
0.001 0.726891 0.666568 0.245669 0.230423 0.247318 0.179838 0.203753 0.222329
0.0011 0.868759 0.786674 0.288721 0.271548 0.291223 0.212268 0.239829 0.262114
0.0012 1.01919 0.911351 0.333121 0.314222 0.336705 0.246013 0.27716 0.303447
0.00132 1.17677 1.03943 0.378302 0.358002 0.38335 0.280816 0.315348 0.345907
0.00145 1.33941 1.16923 0.423643 0.402356 0.43063 0.316314 0.353915 0.388994
0.00159 1.50515 1.29943 0.468682 0.446895 0.478187 0.352253 0.39251 0.432337
0.00175 1.6722 1.42895 0.513107 0.491347 0.525797 0.38847 0.430893 0.475684
0.00192 1.83956 1.5576 0.556792 0.535668 0.573543 0.425073 0.469031 0.518993
0.00211 2.0063 1.68519 0.599557 0.579795 0.62152 0.462212 0.506868 0.562203
0.00231 2.17207 1.81194 0.641362 0.623804 0.669993 0.500176 0.544464 0.605384
0.00254 2.33724 1.9385 0.682372 0.667967 0.719455 0.539416 0.58205 0.648793
0.00279 2.5034 2.06639 0.72298 0.712794 0.770678 0.580645 0.620061 0.692912
0.00306 2.67308 2.19777 0.763607 0.758918 0.824638 0.6248 0.659035 0.73833
0.00336 2.84955 2.33524 0.804776 0.807098 0.882454 0.672989 0.699595 0.785755
0.00369 3.03693 2.48191 0.847183 0.858305 0.945503 0.726516 0.74254 0.836098
0.00405 3.24019 2.64118 0.891679 0.91365 1.01528 0.786792 0.788767 0.890397
0.00444 3.46538 2.81713 0.93914 0.974365 1.09344 0.855432 0.839273 0.949799
0.00488 3.71892 3.0141 0.990488 1.04176 1.18172 0.934151 0.895096 1.01551
0.00535 4.0074 3.23669 1.04667 1.11726 1.28194 1.02476 0.957334 1.08884
0.00588 4.33728 3.48921 1.10874 1.20232 1.39592 1.12901 1.02712 1.17113
0.00645 4.71542 3.77588 1.17766 1.2984 1.52537 1.24855 1.10551 1.2637
0.00708 5.14879 4.10092 1.25442 1.40694 1.67195 1.38499 1.1936 1.36785
0.00778 5.6438 4.46833 1.33981 1.52931 1.83714 1.53985 1.29234 1.48478
0.00854 6.20566 4.88199 1.43487 1.66706 2.02254 1.7146 1.40285 1.61586
0.00937 6.83833 5.34502 1.54051 1.82173 2.22947 1.91041 1.52609 1.76241
0.01029 7.54546 5.86054 1.65787 1.99506 2.4593 2.12836 1.66324 1.92595
0.01129 8.3296 6.43118 1.78784 2.18876 2.71292 2.36914 1.81527 2.10784
0.0124 9.191 7.05971 1.93173 2.40487 2.99117 2.6333 1.98342 2.30979
0.01361 10.1256 7.74778 2.09093 2.64551 3.29435 2.92067 2.16881 2.53356
0.01494 11.1278 8.49672 2.2673 2.9131 3.62233 3.23051 2.37281 2.78122
0.0164 12.1962 9.30882 2.46318 3.21036 3.97443 3.56164 2.5969 3.0551
0.018 13.3388 10.1901 2.68211 3.54086 4.34997 3.91321 2.84323 3.35838
0.01976 14.5727 11.1522 2.92975 3.90971 4.74912 4.28543 3.11512 3.69574
0.0217 15.9154 12.211 3.2144 4.32354 5.17283 4.67919 3.41706 4.07341
0.02382 17.3768 13.3856 3.54797 4.79095 5.6233 5.0957 3.75502 4.49947
0.02615 18.953 14.6949 3.94587 5.3218 6.10325 5.53556 4.1358 4.98302
0.0287 20.6325 16.1585 4.42815 5.92788 6.61709 5.99929 4.56762 5.5346
0.03151 22.4073 17.7977 5.01944 6.62287 7.17176 6.48826 5.05999 6.1663
0.03459 24.2813 19.6356 5.74904 7.42263 7.77821 7.00592 5.62416 6.89238
0.03797 26.2702 21.6951 6.64901 8.34411 8.45184 7.55794 6.27251 7.72897
0.04168 28.3886 23.9913 7.75095 9.40315 9.21166 8.15052 7.01707 8.6926
0.04576 30.6352 26.5253 9.08257 10.6121 10.0797 8.78848 7.86846 9.79842
PKHEP PSD DATA
File ID: PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP PKHEP
Sample ID: SN - 201 & SN - 205 & SN - 219 & SN - 221 & SN - 233 & SN - 256 to SN - 265 to SN - 274 to
202 (1-3) 206 (1-3) 220 (1-3) 222 (1-3) 234 (1-3) 258 (1-3) 268 (1-3) 276 (1-3)

Comment 1: 15/09/2018 17/09/2018 24/09/2018 25/09/2018 10/01/2018


23- 1-3/11/2018 10-12/11/2018
25/10/2018
PSD: 1 2 3 4 5 6 7 8
Diameter in Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer Percent finer
mm

0.05023 32.9829 29.2799 10.6642 11.9775 11.08 9.4735 8.8348 11.0581


0.05514 35.3831 32.2237 12.508 13.5005 12.2391 10.2046 9.92256 12.479
0.06053 37.7838 35.3212 14.6183 15.1777 13.5858 10.9805 11.1381 14.0651
0.06645 40.1513 38.5441 16.9942 17.0047 15.151 11.8019 12.4897 15.8182
0.07294 42.4814 41.8772 19.6333 18.978 16.9645 12.6739 13.99 17.7403
0.08007 44.7947 45.3163 22.5335 21.0968 19.0497 13.6051 15.6568 19.8346
0.0879 47.117 48.8586 25.6941 23.3624 21.4188 14.6069 17.5129 22.1061
0.09649 49.4569 52.4913 29.114 25.7769 24.0685 15.6921 19.5852 24.5601
0.10593 51.7927 56.1857 32.7889 28.3416 26.9799 16.875 21.9023 27.201
0.11629 54.0836 59.903 36.7078 31.0565 30.1225 18.1746 24.4912 30.0305
0.12766 56.304 63.6076 40.8486 33.9184 33.4593 19.6186 27.3741 33.046
0.14013 58.477 67.278 45.1732 36.9192 36.9495 21.2449 30.5623 36.2371
0.15383 60.6754 70.9011 49.6213 40.0393 40.5447 23.098 34.0486 39.5806
0.16887 62.9813 74.447 54.1053 43.241 44.1822 25.2169 37.7989 43.0337
0.18538 65.4183 77.8389 58.5116 46.4634 47.7803 27.6204 41.7467 46.5298
0.2035 67.8931 80.9411 62.7118 49.6274 51.2469 30.2975 45.7966 49.9825
0.2234 70.2024 83.5885 66.585 52.6511 54.503 33.2118 49.8397 53.3019
0.24524 72.1339 85.6564 70.046 55.4766 57.5158 36.3207 53.7798 56.4198
0.26922 73.6111 87.1406 73.0698 58.0937 60.322 39.6004 57.5594 59.3169
0.29553 74.7561 88.1832 75.6999 60.5508 63.0284 43.0621 61.176 62.0342
0.32443 75.8199 89.0085 78.035 62.9454 65.7863 46.7495 64.6778 64.6647
0.35615 77.0951 89.8429 80.1995 65.3974 68.7495 50.7177 68.1409 67.3257
0.39097 78.8376 90.8687 82.3074 68.0134 72.0238 55 71.6348 70.1209
0.42918 81.1426 92.1712 84.4311 70.8516 75.621 59.5776 75.1885 73.1047
0.47114 83.8539 93.684 86.5823 73.8985 79.441 64.3657 78.7705 76.2579
0.5172 86.6368 95.2166 88.7143 77.0704 83.2942 69.2249 82.2925 79.4919
0.56776 89.1574 96.5591 90.7464 80.2419 86.9585 73.9933 85.6367 82.679
0.62327 91.2441 97.5864 92.6013 83.2881 90.244 78.5239 88.6937 85.6949
0.6842 92.9454 98.3057 94.2291 86.1138 93.0339 82.7078 91.3883 88.4496
0.75109 94.4326 98.8079 95.6128 88.663 95.2902 86.477 93.6852 90.895
0.82452 95.8728 99.1944 96.7529 90.9058 97.0276 89.7879 95.5771 93.0136
0.90513 97.3135 99.5217 97.6605 92.8296 98.2916 92.6093 97.0751 94.7997
0.99359 98.6225 99.778 98.3516 94.4332 99.1395 94.921 98.2026 96.2577
1.09071 99.5137 99.9314 98.853 95.7331 99.6399 96.7248 98.9992 97.4037
1.1974 99.9098 99.9885 99.2036 96.7652 99.8832 98.0554 99.521 98.2734
1.31447 99.9932 99.9992 99.4414 97.5834 99.9723 98.9739 99.8188 98.9164
1.44293 100 100 99.6034 98.2415 99.996 99.5537 99.9535 99.3774
1.58398 100 100 99.7157 98.7829 99.9997 99.8557 99.9934 99.6863
1.73886 100 100 99.8081 99.2375 100 99.9713 99.9997 99.8637
1.90887 100 100 99.8973 99.6361 100 99.9975 100 99.9613
2 100 100 100 100 100 100 100 100
ANNEX 6.2: Mineralogical Analysis of
Sampled Sediment and Sediment
Concentration
Mineralogical Analysis Data
Table 1: 01/06/2018 ( S. No. 3-1,2,3) Table 2: 06/06/2018 (S. No. 13 - 1,2,3)

Table 3: 08/06/2018 (S. No. 17 - 1,2,3) Table 4: 12/06/2018 (S. No. 26 - 1,2,3)

Table 5: Mineral contents of sample number 32

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 53 47 57 66 55.75 7
Feldspar 8 10 9 10 9.25 6
Mica 18 27 17 10 18 2.5 - 3
A 12 8 6 6 8 ≥5
Other B 9 8 11 8 9 <5
Table 6: Mineral contents of sample number 33

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 50 46 50 51 49.25 7
Feldspar 8 8 9 13 9.5 6
Mica 19 19 17 15 17.5 2.5 - 3
A 14 17 13 16 15 ≥5
Other B 9 10 11 5 8.75 <5

Table 7: Mineral contents of sample number 50

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 62 51 63 63 59.75 7
Feldspar 7 7 7 9 7.5 6
Mica 14 24 16 13 16.75 2.5 - 3
A 9 7 7 7 7.5 ≥5
Other B 8 11 7 8 8.5 <5

Table 8: Mineral contents of sample number 55

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 61 54 61 59 58.75 7
Feldspar 10 12 7 9 9.5 6
Mica 8 14 10 10 10.5 2.5 - 3
A 13 12 14 14 13.25 ≥5
Other B 8 8 8 8 8 <5
Table 9: Mineral contents of sample number 66

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 55 47 61 65 57 7
Feldspar 7 8 7 5 6.75 6
Mica 18 25 17 14 18.5 2.5 - 3
A 10 10 7 9 9 ≥5
Other B 10 10 8 7 8.75 <5
Table 10: Mineral contents of sample number 70

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 61 64 61 64 62.5 7
Feldspar 11 16 10 12 12.25 6
Mica 11 5 8 5 7.25 2.5 - 3
A 11 12 8 11 10.5 ≥5
Other B 6 3 13 8 7.5 <5

Table 11: Mineral contents of sample number 79

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 66 66 58 63 63.25 7
Feldspar 7 8 5 7 6.75 6
Mica 10 10 18 15 13.25 2.5 - 3
A 5 6 7 4 5.5 ≥5
Other B 12 10 12 11 11.25 <5

Table 11: Mineral contents of sample number 82

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 62 58 54 50 56 7
Feldspar 9 11 12 7 9.75 6
Mica 15 10 17 26 17 2.5 - 3
A 8 5 7 6 6.5 ≥5
Other B 6 16 10 11 10.75 <5
Table 12: Mineral contents of sample number 99

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 52 54 56 60 55.5 7
Feldspar 13 11 14 13 12.75 6
Mica 18 15 12 9 13.5 2.5 - 3
A 11 13 13 12 12.25 ≥5
Other B 6 7 5 6 6 <5
Table 13: Mineral contents of sample number 101

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 61 74 66 61 65.5 7
Feldspar 12 7 12 7 9.5 6
Mica 14 9 9 13 11.25 2.5 - 3
A 4 4 7 6 5.25 ≥5
Other B 9 6 6 13 8.5 <5

Table 14: Mineral contents of sample number 106

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 57 54 52 39 50.5 7
Feldspar 9 6 10 5 7.5 6
Mica 9 8 10 15 10.5 2.5 - 3
A 4 6 5 5 5 ≥5
Other B 21 26 23 36 26.5 <5

Table 15: Mineral contents of sample number 109

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 62 55 53 68 59.5 7
Feldspar 9 7 9 8 8.25 6
Mica 8 12 16 12 12 2.5 - 3
A 5 6 7 6 6 ≥5
Other B 16 20 15 6 14.25 <5
Table 16: Mineral contents of sample number 124

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 54 58 59 61 58 7
Feldspar 11 12 9 10 10.5 6
Mica 11 11 11 9 10.5 2.5 - 3
A 17 12 15 8 13 ≥5
Other B 7 7 6 12 8 <5
Table 17: Mineral contents of sample number 130

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 40 31 46 50 41.75 7
Feldspar 17 13 10 7 11.75 6
Mica 15 27 16 8 16.5 2.5 - 3
A 9 6 7 13 8.75 ≥5
Other B 19 23 21 22 21.25 <5

Table 18: Mineral contents of sample number 134

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 60 55 44 40 49.75 7
Feldspar 9 12 13 12 11.5 6
Mica 6 4 11 16 9.25 2.5 - 3
A 5 7 7 4 5.75 ≥5
Other B 20 22 25 28 23.75 <5

Table 9: Mineral contents of sample number 139

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 53 57 50 58 54.5 7
Feldspar 10 8 9 8 8.75 6
Mica 10 11 13 10 11 2.5 - 3
A 10 6 9 6 7.75 ≥5
Other B 17 18 19 18 18 <5
Table 10: Mineral contents of sample number 150

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 42 48 39 47 44 7
Feldspar 8 12 12 13 11.25 6
Mica 18 8 9 15 12.5 2.5 - 3
A 4 12 5 8 7.25 ≥5
Other B 28 20 35 17 25 <5
Table 11: Mineral contents of sample number 155

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 40 33 49 39 40.25 7
Feldspar 7 16 11 13 11.75 6
Mica 18 12 18 14 15.5 2.5 - 3
A 13 12 7 9 10.25 ≥5
Other B 22 27 15 25 22.25 <5

Table 12: Mineral contents of sample number 166

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 55 53 39 34 45.25 7
Feldspar 9 6 8 7 7.5 6
Mica 10 10 17 19 14 2.5 - 3
A 7 5 6 9 6.75 ≥5
Other B 19 26 30 31 26.5 <5
Table 13: Mineral contents of sample number 180

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 39 45 40 48 43 7
Feldspar 9 9 10 9 9.25 6
Mica 19 24 19 19 20.25 2.5 - 3
A 7 4 8 5 6 ≥5
Other B 26 18 23 19 21.5 <5
Table 14: Mineral contents of sample number 184

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 48 41 51 45 46.25 7
Feldspar 16 15 10 13 13.5 6
Mica 14 20 12 12 14.5 2.5 - 3
A 7 8 9 5 7.25 ≥5
Other B 15 16 18 25 18.5 <5
Table 15: Mineral contents of sample number 194

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 52 52 47 53 51 7
Feldspar 8 10 13 11 10.5 6
Mica 16 16 18 9 14.75 2.5 - 3
A 7 7 5 9 7 ≥5
Other B 17 15 17 18 16.75 <5
Table 16: Mineral contents of sample number 199

Percentage of various mineral grains Mohs


Mineral
Sample 1 Sample 2 Sample 3 Sample 4 Average Hardness
Quartz 55 55 46 54 52.5 7
Feldspar 10 9 11 14 11 6
Mica 17 11 25 12 16.25 2.5 - 3
A 12 13 10 12 11.75 ≥5
Other B 6 12 8 8 8.5 <5
Table 28: Mineral contents of sample number 201 to 202

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 56 47 32 55 47.5 7
Feldspar 16 13 22 12 15.75 6
Mica 19 23 25 17 21 2.5 - 3
A 3 4 6 4 4.25 ≥5
Other B 6 13 15 12 11.5 <5

Table 29: Mineral contents of sample number 205 to 206

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 54 47 53 47 50.25 7
Feldspar 16 13 14 12 13.75 6
Mica 18 23 17 18 19 2.5 - 3
A 4 6 3 6 4.75 ≥5
Other B 8 11 13 17 12.25 <5
Table 30: Mineral contents of sample number 219 to 220

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 57 57 57 59 57.5 7
Feldspar 16 12 11 14 13.25 6
Mica 10 9 16 13 12 2.5 - 3
A 4 4 5 3 4 ≥5
Other B 13 18 11 11 13.25 <5
Table 31: Mineral contents of sample number 221 to222

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 51 57 56 56 55 7
Feldspar 18 11 10 14 13.25 6
Mica 12 16 16 11 13.75 2.5 - 3
A 6 5 4 6 5.25 ≥5
Other B 13 11 14 13 12.75 <5
Table 32: Mineral contents of sample number 233 to 234

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 64 55 52 57 57 7
Feldspar 11 14 18 19 15.5 6
Mica 9 11 10 6 9 2.5 - 3
A 3 4 2 4 3.25 ≥5
Other B 13 16 18 14 15.25 <5

Table 33: Mineral contents of sample number 256 to 258

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 55 49 48 50 50.5 7
Feldspar 15 10 16 14 13.75 6
Mica 15 18 20 15 17 2.5 - 3
A 1 5 4 6 4 ≥5
Other B 14 18 12 15 14.75 <5
Table 34: Mineral contents of sample number 265 to 268

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 63 41 51 52 51.75 7
Feldspar 10 15 13 11 12.25 6
Mica 17 28 19 16 20 2.5 - 3
A 4 5 4 6 4.75 ≥5
Other B 6 11 13 15 11.25 <5
Table 35: Mineral contents of sample number 274 to 276

Percentage of various mineral grains


Mohs
Mineral Observation Observation Observation Observation
Average Hardness
1 2 3 4
Quartz 50 57 56 57 55 7
Feldspar 16 13 14 11 13.5 6
Mica 22 11 16 16 16.25 2.5 - 3
A 4 4 4 5 4.25 ≥5
Other B 8 15 10 11 11 <5
Sediment Concentration Data
Measurement Date Temp Gauge Water Rainfall Sediment
Time
No: (dd-mm-yy) (°C) Height Color Condition Concentration
1.1 31-May-18 7:58 AM 20°C 3.97 Clear No (ppm)
17
1.2 31-May-18 8:35 AM 20°C 3.97 Clear No 8
1.3 31-May-18 9:15 AM 20°C 3.97 Clear No 99
2.1 31-May-18 4:02 PM 17°C 3.98 Clear No 16
2.2 31-May-18 4:24 PM 17°C 3.98 Clear No 46
2.3 31-May-18 4:53 PM 17°C 3.98 Clear No 17
3.1 1-Jun-18 9:01 AM 23°C 4.5 Turbid No 169
3.2 1-Jun-18 9:18 AM 23°C 4.5 Turbid No 165
3.3 1-Jun-18 9:37 AM 23°C 4.5 Turbid No 171
4.1 1-Jun-18 6:03 PM 18°C 4.55 Highly Turbid No 92
4.2 1-Jun-18 6:17 PM 18°C 4.55 Highly Turbid No 32
4.3 1-Jun-18 6:34 PM 18°C 4.55 Highly Turbid No 58
5.1 2-Jun-18 9:03 AM 16°C 4.56 Clear No 130
5.2 2-Jun-18 9:19 AM 16°C 4.56 Clear No 17
5.3 2-Jun-18 9:39 AM 16°C 4.56 Clear No 18
6.1 2-Jun-18 5:39 PM 17°C 4.57 Clear No 24
6.2 2-Jun-18 5:42 PM 17°C 4.57 Clear No 36
6.3 2-Jun-18 5:59 PM 17°C 4.57 Clear No 15
7.1 3-Jun-18 8:50 AM 16°C 4.3 Clear No 20
7.2 3-Jun-18 9:06 AM 16°C 4.3 Clear No 9
7.3 3-Jun-18 9:24 AM 16°C 4.31 Clear No 23
8.1 3-Jun-18 5:47 PM 18°C 4.36 Clear No 51
8.2 3-Jun-18 5:53 PM 18°C 4.36 Clear No 36
8.3 3-Jun-18 6:00 PM 18°C 4.36 Clear No 76
9.1 4-Jun-18 8:56 AM 18°C 4.74 Clear No 66
9.2 4-Jun-18 9:11 AM 18°C 4.74 Clear No 125
9.3 4-Jun-18 9:23 AM 18°C 4.74 Clear No 83
10.1 4-Jun-18 5:04 PM 18°C 4.78 Clear No 41
10.2 4-Jun-18 5:21 PM 18°C 4.78 Clear No 28
10.3 4-Jun-18 5:39 PM 18°C 4.78 Clear No 77
11.1 5-Jun-18 8:37 AM 19°C 4.99 Clear No 113
11.2 5-Jun-18 8:53 AM 19°C 4.99 Clear No 151
11.3 5-Jun-18 9:18 AM 19°C 4.99 Clear No 99
12.1 5-Jun-18 5:33 PM 19°C 5.1 Clear No 108
12.2 5-Jun-18 5:44 PM 19°C 5.1 Clear No 135
12.3 5-Jun-18 5:55 PM 19°C 5.1 Clear No 142
13.1 6-Jun-18 7:18 AM 18°C 5.5 Turbid No 405
13.2 6-Jun-18 7:33 AM 18°C 5.48 Turbid No 682
13.3 6-Jun-18 7:52 AM 18°C 5.46 Turbid No 509
14.1 6-Jun-18 4:44 PM 18°C 5.46 Turbid No 343
14.2 6-Jun-18 4:54 PM 18°C 5.46 Turbid No 321
14.3 6-Jun-18 6:11 PM 18°C 5.46 Turbid No 505
15.1 7-Jun-18 7:25 AM 18°C 5.1 Clear No 176
15.2 7-Jun-18 7:42 AM 18°C 5.1 Clear No 227
15.3 7-Jun-18 7:58 AM 18°C 5.1 Clear No 158
16.1 7-Jun-18 4:18 PM 17°C 4.99 Clear No 128
16.2 7-Jun-18 4:34 PM 17°C 4.99 Clear No 303
16.3 7-Jun-18 4:54 PM 17°C 4.99 Clear No 158
17.1 8-Jun-18 7:40 AM 18°C 5.55 Turbid Low 1318
17.2 8-Jun-18 7:57 AM 18°C 5.55 Turbid Low 1015
17.3 8-Jun-18 8:13 AM 18°C 5.56 Turbid Low 1573
18.1 8-Jun-18 4:30 PM 19°C 5.53 Clear No 260
18.2 8-Jun-18 4:46 PM 19°C 5.53 Clear No 398
18.3 8-Jun-18 5:04 PM 19°C 5.53 Clear No 323
19.1 9-Jun-18 7:15 AM 17°C 5.39 Clear No 310
19.2 9-Jun-18 7:31 AM 17°C 5.38 Clear No 238
19.3 9-Jun-18 7:53 AM 17°C 5.38 Clear No 337
20.1 9-Jun-18 4:05 PM 17°C 5.28 Clear No 137
20.2 9-Jun-18 4:22 PM 17°C 5.28 Clear No 238
20.3 9-Jun-18 4:39 PM 17°C 5.18 Clear No 378
21.1 10-Jun-18 7:15 AM 17°C 5.74 Clear No 181
21.2 10-Jun-18 7:31 AM 17°C 5.74 Clear No 182
21.3 10-Jun-18 7:49 AM 17°C 5.75 Clear No 168
22.1 10-Jun-18 5:11 PM 18°C 5.82 Clear No 217
22.2 10-Jun-18 5:34 PM 18°C 5.82 Clear No 85
22.3 10-Jun-18 5:37 PM 18°C 5.82 Clear No 424
23.1 11-Jun-18 7:38 AM 17°C 5.56 Clear No 135
23.2 11-Jun-18 7:54 AM 17°C 5.55 Clear No 199
23.3 11-Jun-18 8:18 AM 17°C 5.55 Clear No 207
24.1 11-Jun-18 4:20 PM 18°C 5.5 Clear No 124
24.2 11-Jun-18 4:39 PM 18°C 5.5 Clear No 307
24.3 11-Jun-18 4:57 PM 18°C 5.5 Clear No 276
25.1 12-Jun-18 7:02 AM 18°C 5.5 Clear No 183
25.2 12-Jun-18 7:20 AM 18°C 5.5 Clear No 218
25.3 12-Jun-18 7:42 AM 18°C 5.51 Clear No 585
26.1 12-Jun-18 4:18 PM 18°C 5.52 Clear No 230
26.2 12-Jun-18 4:36 PM 18°C 5.53 Clear No 960
26.3 12-Jun-18 4:53 PM 18°C 5.53 Clear No 224
27.1 13-Jun-18 7:24 AM 17°C 5.6 Turbid No 751
27.2 13-Jun-18 7:42 AM 17°C 5.6 Turbid No 97
27.3 13-Jun-18 8:03 AM 17°C 5.6 Turbid No 194
28.1 13-Jun-18 4:46 PM 17°C 5.5 Turbid No 130
28.2 13-Jun-18 5:08 PM 17°C 5.5 Turbid No 61
28.3 13-Jun-18 5:27 PM 17°C 5.5 Turbid No 219
29.1 14-Jun-18 8:06 AM 18°C 5.35 Turbid No 117
29.2 14-Jun-18 8:19 AM 18°C 5.35 Turbid No 81
29.3 14-Jun-18 8:37 AM 18°C 5.33 Turbid No 96
30.1 14-Jun-18 4:15 PM 17°C 5.32 Clear No 96
30.2 14-Jun-18 4:33 PM 17°C 5.32 Clear No 101
30.3 14-Jun-18 4:45 PM 17°C 5.32 Clear No 93
31.1 15-Jun-18 7:13 AM 18°C 5.35 Clear No 46
31.2 15-Jun-18 7:24 AM 18°C 5.34 Clear No 78
31.3 15-Jun-18 7:37 AM 18°C 5.34 Clear No 82
32.1 15-Jun-18 4:15 PM 18°C 5.22 Clear No 102
32.2 15-Jun-18 4:32 PM 18°C 5.22 Clear No 163
32.3 15-Jun-18 4:46 PM 18°C 5.22 Clear No 93
33.1 16-Jun-18 7:05 AM 17°C 5.5 Clear No 770
33.2 16-Jun-18 7:17 AM 17°C 5.51 Clear No 145
33.3 16-Jun-18 7:30 AM 17°C 5.51 Clear No 133
34.1 16-Jun-18 5:25 PM 17°C 5.6 Clear No 259
34.2 16-Jun-18 5:36 PM 17°C 5.6 Clear No 101
34.3 16-Jun-18 5:45 PM 17°C 5.6 Clear No 171
35.1 17-Jun-18 7:14 AM 18°C 5.41 Clear No 56
35.2 17-Jun-18 7:29 AM 18°C 5.41 Clear No 14
35.3 17-Jun-18 7:50 AM 18°C 5.41 Clear No 27
36.1 17-Jun-18 4:36 PM 18°C 5.17 Clear No 14
36.2 17-Jun-18 4:54 PM 18°C 5.18 Clear No 28
36.3 17-Jun-18 5:13 PM 18°C 5.18 Clear No 54
37.1 18-Jun-18 7:30 AM 17°C 4.85 Clear No 75
37.2 18-Jun-18 7:45 AM 17°C 4.85 Clear No 76
37.3 18-Jun-18 7:58 AM 17°C 4.85 Clear No 60
38.1 18-Jun-18 4:12 PM 17°C 4.83 Clear No 44
38.2 18-Jun-18 4:24 PM 17°C 4.83 Clear No 58
38.3 18-Jun-18 4:36 PM 17°C 4.82 Clear No 4
39.1 19-Jun-18 8:43 AM 18°C 4.8 Clear No 9
39.2 19-Jun-18 8:59 AM 18°C 4.8 Clear No 29
39.3 19-Jun-18 9:17 AM 18°C 4.8 Clear No 35
40.1 19-Jun-18 4:37 PM 17°C 5.78 Clear No 26
40.2 19-Jun-18 4:54 PM 17°C 5.78 Clear No 31
40.3 19-Jun-18 5:13 PM 17°C 5.79 Clear No 38
41.1 20-Jun-18 7:06 AM 18°C 4.77 Clear No 31
41.2 20-Jun-18 7:19 AM 18°C 4.77 Clear No 57
41.3 20-Jun-18 7:36 AM 18°C 4.76 Clear No 53
42.1 20-Jun-18 4:26 PM 18°C 4.75 Clear No 24
42.2 20-Jun-18 4:46 PM 18°C 4.76 Clear No 20
42.3 20-Jun-18 5:09 PM 18°C 4.76 Clear No 40
43.1 21-Jun-18 7:56 AM 17°C 4.73 Clear No 37
43.2 21-Jun-18 8:20 AM 17°C 4.8 Clear No 59
43.3 21-Jun-18 8:39 AM 17°C 4.8 Clear No 37
44.1 21-Jun-18 5:14 PM 17°C 4.77 Clear No 32
44.2 21-Jun-18 5:29 PM 17°C 4.77 Clear No 41
44.3 21-Jun-18 5:42 PM 17°C 4.77 Clear No 62
45.1 22-Jun-18 7:15 AM 18°C 4.79 Clear No 66
45.2 22-Jun-18 7:39 AM 18°C 4.79 Clear No 154
45.3 22-Jun-18 7:52 AM 18°C 4.79 Clear No 52
46.1 22-Jun-18 4:36 PM 17°C 4.82 Clear No 16
46.2 22-Jun-18 4:56 PM 17°C 4.82 Clear No 279
46.3 22-Jun-18 5:14 PM 17°C 4.82 Clear No 134
47.1 23-Jun-18 7:18 AM 17°C 4.31 Clear No 56
47.2 23-Jun-18 7:33 AM 17°C 4.91 Clear No 101
47.3 23-Jun-18 7:49 AM 17°C 4.3 Clear No 68
48.1 23-Jun-18 4:47 PM 17°C 4.56 Clear No 70
48.2 23-Jun-18 5:03 PM 17°C 4.89 Clear No 54
48.3 23-Jun-18 5:23 PM 17°C 4.85 Clear No 44
49.1 24-Jun-18 7:02 AM 18°C 5.09 Turbid No 35
49.2 24-Jun-18 7:19 AM 18°C 5.1 Turbid No 58
49.3 24-Jun-18 7:42 AM 18°C 5.1 Turbid No 137
50.1 24-Jun-18 4:13 PM 18°C 5.12 Highly Turbid No 330
50.2 24-Jun-18 4:29 PM 18°C 5.12 Highly Turbid No 636
50.3 24-Jun-18 4:48 PM 18°C 5.11 Highly Turbid No 438
51.1 25-Jun-18 7:05 AM 17°C 5.11 Turbid No 66
51.2 25-Jun-18 7:17 AM 17°C 5.11 Turbid No 127
51.3 25-Jun-18 7:34 AM 17°C 5.1 Turbid No 128
52.1 25-Jun-18 4:56 PM 18°C 5.06 Highly Turbid No 220
52.2 25-Jun-18 5:17 PM 18°C 5.08 Highly Turbid No 191
52.3 25-Jun-18 5:37 PM 18°C 5.09 Highly Turbid No 195
53.1 26-Jun-18 9:08 AM 18°C 5.35 Turbid No 156
53.2 26-Jun-18 9:19 AM 18°C 5.35 Turbid No 238
53.3 26-Jun-18 9:36 AM 18°C 5.35 Turbid No 252
54.1 26-Jun-18 4:54 PM 18°C 5.36 Highly Turbid No 155
54.2 26-Jun-18 5:16 PM 18°C 5.36 Highly Turbid No 43
54.3 26-Jun-18 5:30 PM 18°C 5.34 Highly Turbid No 218
55.1 27-Jun-18 7:05 AM 19°C 5.3 Turbid No 155
55.2 27-Jun-18 7:22 AM 19°C 5.33 Turbid No 223
55.3 27-Jun-18 7:38 AM 19°C 5.36 Turbid No 158
56.1 27-Jun-18 4:35 PM 19°C 5.35 Turbid No 144
56.2 27-Jun-18 4:53 PM 19°C 5.37 Turbid No 163
56.3 27-Jun-18 5:17 PM 19°C 5.37 Turbid No 226
57.1 28-Jun-18 7:14 AM 19°C 5.4 Turbid No 123
57.2 28-Jun-18 7:33 AM 19°C 5.41 Turbid No 160
57.3 28-Jun-18 7:52 AM 19°C 5.44 Turbid No 139
58.1 28-Jun-18 4:45 PM 18°C 5.45 Turbid No 101
58.2 28-Jun-18 5:03 PM 18°C 5.45 Turbid No 87
58.3 28-Jun-18 5:22 PM 18°C 5.43 Turbid No 170
59.1 29-Jun-18 7:11 AM 17°C 5.5 Turbid No 192
59.2 29-Jun-18 7:24 AM 17°C 5.5 Turbid No 172
59.3 29-Jun-18 7:40 AM 17°C 5.52 Turbid No 212
60.1 29-Jun-18 4:19 PM 17°C 5.55 Turbid No 310
60.2 29-Jun-18 4:29 PM 17°C 5.55 Turbid No 222
60.3 29-Jun-18 4:45 PM 17°C 5.56 Turbid No 413
63.1 1-Jul-18 7:00 AM 18 6.12 Turbid No 269
63.2 1-Jul-18 7:15 AM 18 6.12 Turbid No 341
63.3 1-Jul-18 7:32 AM 18 6.13 Turbid No 682
64.1 1-Jul-18 4:36 PM 17 6.39 Turbid Low 549
64.2 1-Jul-18 4:52 PM 17 6.39 Turbid Low 421
64.3 1-Jul-18 5:09 PM 17 6.41 Turbid Low 472
65.1 2-Jul-18 7:45 AM 16 6.66 Highly Turbid High 931
65.2 2-Jul-18 7:59 AM 16 6.68 Highly Turbid High 406
65.3 2-Jul-18 8:14 AM 16 6.88 Highly Turbid High 971
66.1 2-Jul-18 4:03 PM 17 7.3 Highly Turbid High 1025
66.2 2-Jul-18 4:22 PM 17 7.33 Highly Turbid High 902
66.3 2-Jul-18 4:39 PM 17 7.35 Highly Turbid High 1423
67.1 3-Jul-18 7:13 AM 17 7.58 Highly Turbid Low 1171
67.2 3-Jul-18 7:29 AM 17 7.57 Highly Turbid Low 1847
67.3 3-Jul-18 7:44 AM 17 7.57 Highly Turbid Low 1678
68.1 3-Jul-18 4:29 PM 18 7.48 Turbid Low 1616
68.2 3-Jul-18 4:46 PM 18 7.48 Turbid Low 1406
68.3 3-Jul-18 5:06 PM 18 7.57 Turbid Low 1792
69.1 4-Jul-18 7:15 AM 17 7.38 Highly Turbid Low 428
69.2 4-Jul-18 7:28 AM 17 7.38 Highly Turbid Low 1048
69.3 4-Jul-18 7:42 AM 17 7.39 Highly Turbid Low 453
70.1 4-Jul-18 3:57 PM 17 6.86 Highly Turbid Low 763
70.2 4-Jul-18 4:17 PM 17 6.85 Highly Turbid Low 1096
70.3 4-Jul-18 4:33 PM 17 6.85 Highly Turbid Low 951
71.1 5-Jul-18 7:21 AM 14 5.52 Turbid No 73
71.2 5-Jul-18 7:38 AM 14 5.52 Turbid No 232
71.3 5-Jul-18 7:55 AM 14 5.52 Turbid No 187
72.1 5-Jul-18 3:54 PM 17 5.39 Turbid No 331
72.2 5-Jul-18 4:12 PM 17 5.4 Turbid No 297
72.3 5-Jul-18 4:27 PM 17 5.4 Turbid No 345
73.1 6-Jul-18 7:49 AM 18 ` Turbid No 395
73.2 6-Jul-18 8:02 AM 18 5.48 Turbid No 385
73.3 6-Jul-18 8:21 AM 18 5.52 Turbid No 316
74.1 6-Jul-18 4:14 PM 18 5.53 Turbid No 66
74.2 6-Jul-18 4:27 PM 18 5.52 Turbid No 249
74.3 6-Jul-18 4:44 PM 18 5.48 Turbid No 123
75.1 7-Jul-18 7:07 AM 18 5.48 Turbid No 109
75.2 7-Jul-18 7:20 AM 18 5.48 Turbid No 172
75.3 7-Jul-18 7:34 AM 18 5.5 Turbid No 137
76.1 7-Jul-18 4:12 PM 18 5.5 Turbid No 183
76.2 7-Jul-18 4:29 PM 18 5.53 Turbid No 227
76.3 7-Jul-18 4:42 PM 18 5.65 Turbid No 260
77.1 8-Jul-18 8:03 AM 19 5.65 Turbid No 343
77.2 8-Jul-18 8:22 AM 19 5.66 Turbid No 554
77.3 8-Jul-18 8:40 AM 19 5.56 Turbid No 159
78.1 8-Jul-18 4:55 PM 18 5.59 Turbid No 352
78.2 8-Jul-18 5:14 PM 18 5.63 Turbid No 355
78.3 8-Jul-18 5:31 PM 18 6.35 Turbid No 488
79.1 9-Jul-18 7:15 AM 18 6.33 Turbid Low 910
79.2 9-Jul-18 7:28 AM 18 6.33 Turbid Low 782
79.3 9-Jul-18 7:44 AM 18 6.21 Turbid Low 584
80.1 9-Jul-18 4:44 PM 18 6.16 Turbid Low 372
80.2 9-Jul-18 5:07 PM 18 6.13 Turbid Low 743
80.3 9-Jul-18 5:24 PM 18 6.13 Turbid Low 606
81.1 10-Jul-18 9:03 AM 17 6.64 Highly Turbid Low 1510
81.2 10-Jul-18 9:18 AM 17 6.64 Highly Turbid Low 1429
81.3 10-Jul-18 9:59 AM 17 6.67 Highly Turbid Low 1149
82.1 10-Jul-18 4:49 PM 17 6.88 Highly Turbid Low 741
82.2 10-Jul-18 5:04 PM 17 6.91 Highly Turbid Low 1617
82.3 10-Jul-18 5:03 PM 17 6.96 Highly Turbid Low 1379
83.1 11-Jul-18 7:07 AM 18 7.15 Highly Turbid Low 961
83.2 11-Jul-18 7:23 AM 18 7.15 Highly Turbid Low 534
83.3 11-Jul-18 7:39 AM 18 7.17 Highly Turbid Low 965
84.1 11-Jul-18 4:32 PM 18 7.23 Highly Turbid No 715
84.2 11-Jul-18 4:47 PM 18 7.19 Highly Turbid No 854
84.3 11-Jul-18 4:59 PM 18 7.19 Highly Turbid No 916
85.1 12-Jul-18 8:07 AM 17 6.99 Turbid Low 379
85.2 12-Jul-18 8:23 AM 17 6.99 Turbid Low 1011
85.3 12-Jul-18 8:37 AM 17 6.99 Turbid Low 618
86.1 12-Jul-18 5:00 PM 18 7.17 Turbid No 681
86.2 12-Jul-18 5:16 PM 18 7.19 Turbid No 800
86.3 12-Jul-18 5:34 PM 18 7.19 Turbid No 786
87.1 13-Jul-18 7:40 AM 17 6.89 Turbid Low 799
87.2 13-Jul-18 7:58 AM 17 6.91 Turbid Low 776
87.3 13-Jul-18 8:15 AM 17 6.91 Turbid Low 916
88.1 13-Jul-18 4:28 PM 17 7.22 Turbid No 697
88.2 13-Jul-18 4:41 PM 17 7.22 Turbid No 645
88.3 13-Jul-18 4:53 PM 17 7.19 Turbid No 436
89.1 14-Jul-18 7:12 AM 18 7.08 Highly Turbid High 716
89.2 14-Jul-18 7:27 AM 18 7.08 Highly Turbid High 879
89.3 14-Jul-18 7:40 AM 18 7.09 Highly Turbid High 1064
90.1 14-Jul-18 4:30 PM 18 7.16 Highly Turbid No 625
90.2 14-Jul-18 4:43 PM 18 7.16 Highly Turbid No 740
90.3 14-Jul-18 4:59 PM 18 7.14 Highly Turbid No 1069
91.1 15-Jul-18 7:28 AM 17 6.87 Turbid Low 466
91.2 15-Jul-18 7:41 AM 17 6.86 Turbid Low 499
91.3 15-Jul-18 7:57 AM 17 6.86 Turbid Low 555
92.1 15-Jul-18 4:05 PM 18 6.79 Turbid No 496
92.2 15-Jul-18 4:18 PM 18 6.79 Turbid No 598
92.3 15-Jul-18 4:33 PM 18 6.79 Turbid No 534
93.1 16-Jul-18 7:45 AM 18 7.74 Turbid No 670
93.2 16-Jul-18 7:59 AM 18 7.74 Turbid No 800
93.3 16-Jul-18 8:17 AM 18 7.75 Turbid No 559
94.1 16-Jul-18 4:12 PM 18 6.97 Turbid No 390
94.2 16-Jul-18 4:24 PM 18 6.97 Turbid No 298
94.3 16-Jul-18 4:38 PM 18 6.8 Turbid No 761
95.1 17-Jul-18 8:10 AM 18 7.26 Turbid No 599
95.2 17-Jul-18 8:26 AM 18 7.29 Turbid No 555
95.3 17-Jul-18 8:42 AM 18 7.29 Turbid No 801
96.1 17-Jul-18 5:13 PM 18 7.4 Turbid No 683
96.2 17-Jul-18 5:30 PM 18 7.4 Turbid No 663
96.3 17-Jul-18 5:47 PM 18 7.38 Turbid No 761
97.1 18-Jul-18 7:40 AM 17 7.28 Turbid No 615
97.2 18-Jul-18 7:57 AM 17 7.28 Turbid No 466
97.3 18-Jul-18 8:14 AM 17 7.28 Turbid No 468
98.1 18-Jul-18 4:00 PM 17 7.18 Turbid No 776
98.2 18-Jul-18 4:18 PM 17 7.18 Turbid No 829
98.3 18-Jul-18 4:33 PM 17 7.16 Turbid No 668
99.1 19-Jul-18 8:10 AM 18 6.82 Highly Turbid No 706
99.2 19-Jul-18 8:23 AM 18 6.8 Highly Turbid No 1742
99.3 19-Jul-18 8:39 AM 18 6.8 Highly Turbid No 1137
100.1 19-Jul-18 4:20 PM 18 7.73 Highly Turbid Low 1531
100.2 19-Jul-18 4:34 PM 18 7.7 Highly Turbid Low 1548
100.3 19-Jul-18 4:50 PM 18 7.7 Highly Turbid Low 1442
100.4 20-Jul-18 7:45 AM 18 7.3 Highly Turbid Low 1470
100.5 20-Jul-18 7:55 AM 18 7.3 Highly Turbid Low 1520
100.6 20-Jul-18 8:15 AM 18 7.3 Highly Turbid Low 1533
100.7 20-Jul-18 4:00 PM 18 7.1 Highly Turbid Low 1475
100.8 20-Jul-18 4:15 PM 18 7.1 Highly Turbid Low 1465
100.9 20-Jul-18 4:30 PM 18 7.1 Highly Turbid Low 1480
101.1 21-Jul-18 7:25 AM 18 6.93 Highly Turbid Low 195
101.2 21-Jul-18 7:38 AM 18 6.93 Highly Turbid Low 468
101.3 21-Jul-18 7:54 AM 18 6.93 Highly Turbid Low 240
102.1 21-Jul-18 5:16 PM 18 7.02 Highly Turbid Low 976
102.2 21-Jul-18 5:28 PM 18 7.02 Highly Turbid Low 439
102.3 21-Jul-18 5:41 PM 18 7.05 Highly Turbid Low 515
103.1 22-Jul-18 7:03 AM 19 7.53 Highly Turbid Low 547
103.2 22-Jul-18 7:43 AM 19 7.54 Highly Turbid Low 424
103.3 22-Jul-18 7:57 AM 19 7.55 Highly Turbid Low 552
104.1 22-Jul-18 4:42 PM 19 7.78 Highly Turbid Low 674
104.2 22-Jul-18 5:04 PM 19 7.8 Highly Turbid Low 654
104.3 22-Jul-18 5:25 PM 19 7.82 Highly Turbid Low 742
104.4 23-Jul-18 8:04 AM 18 8 Turbid Low 945
104.5 23-Jul-18 8:22 AM 18 8 Turbid Low 936
104.6 23-Jul-18 8:38 AM 18 8 Turbid Low 932
104.7 23-Jul-18 5:05 PM 18 8 Turbid Low 1054
104.8 23-Jul-18 5:15 PM 18 8 Turbid Low 1035
104.9 23-Jul-18 5:35 PM 18 8 Turbid Low 1021
105.1 24-Jul-18 7:21 AM 17 7.97 Highly Low 1397
105.2 24-Jul-18 7:36 AM 17 7.97 Highly Low 988
105.3 24-Jul-18 7:57 AM 17 7.99 Highly Low 1257
106.1 24-Jul-18 4:05 PM 17 7.96 Highly Low 954
106.2 24-Jul-18 4:21 PM 17 7.96 Highly Low 1317
106.3 24-Jul-18 4:41 PM 17 7.95 Highly Low 1665
107.1 25-Jul-18 7:50 AM 18 7.92 Highly Turbid Low 981
107.2 25-Jul-18 8:05 AM 18 7.93 Highly Turbid Low 769
107.3 25-Jul-18 8:24 AM 18 7.89 Highly Turbid Low 716
108.1 25-Jul-18 4:20 PM 18 7.75 Highly Turbid Low 1016
108.2 25-Jul-18 4:36 PM 18 7.76 Highly Turbid Low 1097
108.3 25-Jul-18 4:57 PM 18 7.73 Highly Turbid Low 1033
109.1 26-Jul-18 8:05 AM 16 7.1 Highly Turbid No 2144
109.2 26-Jul-18 8:21 AM 16 7.1 Highly Turbid No 3280
109.3 26-Jul-18 8:38 AM 16 7.1 Highly Turbid No 1707
110.1 26-Jul-18 4:15 PM 17 7.1 Highly Turbid No 1706
110.2 26-Jul-18 4:38 PM 17 7.1 Highly Turbid No 1754
110.3 26-Jul-18 4:55 PM 17 7.1 Highly Turbid No 1968
110.4 27-Jul-18 7:43 AM 17 8 Turbid No 1746
110.5 27-Jul-18 8:05 AM 17 8 Turbid No 1742
110.6 27-Jul-18 8:22 AM 17 8 Turbid No 1723
110.7 27-Jul-18 3:35 PM 17 8 Turbid No 1704
110.8 27-Jul-18 3:52 PM 17 8 Turbid No 1756
110.9 27-Jul-18 4:30 PM 17 8 Turbid No 1745
111.1 28-Jul-18 7:35 AM 17 7.99 Turbid No 768
111.2 28-Jul-18 7:52 AM 17 7.99 Turbid No 780
111.3 28-Jul-18 8:09 AM 17 7.99 Turbid No 471
112.1 28-Jul-18 3:55 PM 17 7.98 Turbid Low 1006
112.2 28-Jul-18 4:12 PM 17 7.97 Turbid Low 810
112.3 28-Jul-18 4:34 PM 17 7.97 Turbid Low 887
113.1 29-Jul-18 7:49 AM 17 7.98 Turbid No 432
113.2 29-Jul-18 8:08 AM 17 7.98 Turbid No 774
113.3 29-Jul-18 8:26 AM 17 7.97 Turbid No 1007
114.1 29-Jul-18 3:36 PM 18 7.9 Turbid No 1802
114.2 29-Jul-18 3:53 PM 18 7.9 Turbid No 1151
114.3 29-Jul-18 4:31 PM 18 7.9 Turbid No 1009
115.1 30-Jul-18 8:45 AM 16 7.75 Turbid Low 886
115.2 30-Jul-18 9:03 AM 16 7.75 Turbid Low 841
115.3 30-Jul-18 9:26 AM 16 7.75 Turbid Low 641
116.1 30-Jul-18 4:05 PM 16 7.65 Turbid Low 226
116.2 30-Jul-18 4:18 PM 16 7.65 Turbid Low 286
116.3 30-Jul-18 4:34 PM 16 7.65 Turbid Low 355
117.1 31-Jul-18 7:50 AM 17 7.75 Turbid No 373
117.2 31-Jul-18 8:09 AM 17 7.75 Turbid No 681
117.3 31-Jul-18 8:32 AM 17 7.78 Turbid No 896
118.1 31-Jul-18 4:02 PM 17 7.79 Highly Turbid Low 484
118.2 31-Jul-18 4:21 PM 17 7.78 Highly Turbid Low 388
118.3 31-Jul-18 4:40 PM 17 7.78 Highly Turbid Low 47
119.1 1-Aug-18 7:30 AM 17 7.84 High Turbid High 503
119.2 1-Aug-18 7:30 AM 17 7.8 High Turbid High 353
119.3 1-Aug-18 7:30 AM 17 7.84 High Turbid High 513
120.1 1-Aug-18 4:30 PM 16 7.63 Turbid No 408
120.2 1-Aug-18 4:30 PM 16 7.62 Turbid No 456
120.3 1-Aug-18 4:30 PM 16 7.62 Turbid No 301
121.1 3-Aug-18 8:00 AM 16 7.8 Turbid No 192
121.2 3-Aug-18 8:00 AM 16 7.8 Turbid No 325
121.3 3-Aug-18 8:00 AM 16 7.78 Turbid No 199
122.1 3-Aug-18 4:00 PM 16 7.8 High Turbid Low 448
122.2 3-Aug-18 4:00 PM 16 7.8 High Turbid Low 260
122.3 3-Aug-18 4:00 PM 16 7.82 High Turbid Low 338
123.1 4-Aug-18 7:00 AM 17 7.7 Turbid No 431
123.2 4-Aug-18 7:00 AM 17 7.7 Turbid No 583
123.3 4-Aug-18 7:00 AM 17 7.7 Turbid No 999
124.1 4-Aug-18 5:30 PM 16 7.75 Turbid No 1361
124.2 4-Aug-18 5:30 PM 16 7.76 Turbid No 561
124.3 4-Aug-18 5:30 PM 16 7.79 Turbid No 782
125.1 5-Aug-18 6:00 AM 17 8.5 High Turbid High 908
125.2 5-Aug-18 6:00 AM 17 8.8 High Turbid High 1076
125.3 5-Aug-18 6:00 AM 17 8.8 High Turbid High 1105
126.1 5-Aug-18 4:30 PM 17 8.1 High Turbid High 903
126.2 5-Aug-18 4:30 PM 17 8.1 High Turbid High 1340
126.3 5-Aug-18 4:30 PM 17 8.9 High Turbid High 1367
127.1 6-Aug-18 8:00 AM 16 8.5 High Turbid Low 353
127.2 6-Aug-18 8:00 AM 16 8.5 High Turbid Low 1197
127.3 6-Aug-18 8:00 AM 16 8.5 High Turbid Low 1696
128.1 6-Aug-18 4:00 PM 17 8.15 High Turbid Low 233
128.2 6-Aug-18 4:00 PM 17 8.12 High Turbid Low 1169
128.3 6-Aug-18 4:00 PM 17 8.12 High Turbid Low 863
129.1 7-Aug-18 7:00 AM 15 9.1 High Turbid Low 979
129.2 7-Aug-18 7:00 AM 15 9.15 High Turbid Low 2770
129.3 7-Aug-18 7:00 AM 15 9.18 High Turbid Low 2690
130.1 7-Aug-18 5:30 PM 15 9.2 High Turbid Low 870
130.2 7-Aug-18 5:30 PM 15 9.2 High Turbid Low 3474
130.3 7-Aug-18 5:30 PM 15 9.16 High Turbid Low 2151
131.1 8-Aug-18 6:00 AM 15 89.12 High Turbid Low 2183
131.2 8-Aug-18 6:00 AM 15 9.12 High Turbid Low 2777
131.3 8-Aug-18 6:00 AM 15 9.1 High Turbid Low 2108
132.1 8-Aug-18 4:00 PM 15 9.2 High Turbid Low 2353
132.2 8-Aug-18 4:00 PM 15 9.2 High Turbid Low 2261
132.3 8-Aug-18 4:00 PM 15 9.16 High Turbid Low 595
133.1 9-Aug-18 7:00 AM 15 8.6 High Turbid Low 1340
133.2 9-Aug-18 7:00 AM 15 8.65 High Turbid Low 1641
133.3 9-Aug-18 7:00 AM 15 8.65 High Turbid Low 2108
134.1 9-Aug-18 5:30 PM 15 8.62 High Turbid No 1687
134.2 9-Aug-18 5:30 PM 15 8.6 High Turbid No 1771
134.3 9-Aug-18 5:30 PM 15 8.6 High Turbid No 1752
135.1 10-Aug-18 6:00 AM 16 8.2 High Turbid Low 1596
135.2 10-Aug-18 6:00 AM 16 8.2 High Turbid Low 1399
135.3 10-Aug-18 6:00 AM 16 8.23 High Turbid Low 1164
136.1 10-Aug-18 5:30 PM 16 8.25 Turbid No 798
136.2 10-Aug-18 5:30 PM 16 8.25 Turbid No 915
136.3 10-Aug-18 5:30 PM 16 8.26 Turbid No 801
137.1 11-Aug-18 6:00 AM 16 8.25 High Turbid Low 955
137.2 11-Aug-18 6:00 AM 16 8.3 High Turbid Low 995
137.3 11-Aug-18 6:00 AM 16 8.3 High Turbid Low 1015
138.1 11-Aug-18 4:00 PM 16 8.32 High Turbid No 995
138.2 11-Aug-18 4:00 PM 16 8.35 High Turbid No 922
138.3 11-Aug-18 4:00 PM 16 8.35 High Turbid No 983
139.1 12-Aug-18 7:00 AM 16 8.95 High Turbid High 2832
139.2 12-Aug-18 7:00 AM 16 8.9 High Turbid High 3182
139.3 12-Aug-18 7:00 AM 16 8.85 High Turbid High 3632
140.1 12-Aug-18 5:30 PM 16 8.8 High Turbid High 4288
140.2 12-Aug-18 5:30 PM 16 8.82 High Turbid High 2568
140.3 12-Aug-18 5:30 PM 16 8.82 High Turbid High 2658
141.1 14-Aug-18 6:00 AM 15 9.25 High Turbid No 1177
141.2 14-Aug-18 6:00 AM 15 9.15 High Turbid No 1859
141.3 14-Aug-18 6:00 AM 15 9.1 High Turbid No 2349
142.1 14-Aug-18 4:30 PM 15 9.5 High Turbid No 2251
142.2 14-Aug-18 4:30 PM 15 9.3 High Turbid No 1084
142.3 14-Aug-18 4:30 PM 15 9 High Turbid No 1414
143.1 15-Aug-18 8:00 AM 15 8.85 High Turbid Low 1998
143.2 15-Aug-18 8:00 AM 15 8.83 High Turbid Low 1708
143.3 15-Aug-18 8:00 AM 15 8.8 High Turbid Low 2255
144.1 15-Aug-18 4:00 PM 15 8.75 High Turbid Low 938
144.2 15-Aug-18 4:00 PM 15 8.7 High Turbid Low 709
144.3 15-Aug-18 4:00 PM 15 8.7 High Turbid Low 2442
145.1 16-Aug-18 7:00 AM 15 8.5 High Turbid High 874
145.2 16-Aug-18 7:00 AM 15 8.5 High Turbid High 1012
145.3 16-Aug-18 7:00 AM 15 8.45 High Turbid High 856
146.1 16-Aug-18 5:30 PM 15 8.4 High Turbid No 3639
146.2 16-Aug-18 5:30 PM 15 8.4 High Turbid No 2780
146.3 16-Aug-18 5:30 PM 15 8.45 High Turbid No 3204
147.1 17-Aug-18 6:00 AM 15 8.97 High Turbid Low 2621
147.2 17-Aug-18 6:00 AM 15 8.98 High Turbid Low 2134
147.3 17-Aug-18 6:00 AM 15 8.98 High Turbid Low 2459
148.1 17-Aug-18 4:00 PM 15 8.95 High Turbid Low 2191
148.2 17-Aug-18 4:00 PM 15 8.97 High Turbid Low 2381
148.3 17-Aug-18 4:00 PM 15 8.97 High Turbid Low 2323
149.1 18-Aug-18 7:00 AM 15 9.25 High Turbid Low 1658
149.2 18-Aug-18 7:00 AM 15 9.25 High Turbid Low 1681
149.3 18-Aug-18 7:00 AM 15 9.27 High Turbid Low 2146
150.1 18-Aug-18 5:30 PM 15 9.2 High Turbid High 1724
150.2 18-Aug-18 5:30 PM 15 9.18 High Turbid High 1363
150.3 18-Aug-18 5:30 PM 15 9.1 High Turbid High 1622
151.1 20-Aug-18 7:30 AM 16 8.95 High Turbid Low 487
151.2 20-Aug-18 7:30 AM 16 8.95 High Turbid Low 418
151.3 20-Aug-18 7:30 AM 16 8.96 High Turbid Low 768
152.1 20-Aug-18 4:30 PM 16 9.5 High Turbid No 580
152.2 20-Aug-18 4:30 PM 16 9.1 High Turbid No 679
152.3 20-Aug-18 4:30 PM 16 9.1 High Turbid No 984
153.1 21-Aug-18 8:00 AM 16 8.99 Turbid Low 931
153.2 21-Aug-18 8:00 AM 16 8.95 Turbid Low 501
153.3 21-Aug-18 8:00 AM 16 8.94 Turbid Low 944
154.1 21-Aug-18 4:00 PM 16 8.9 High Turbid No 2495
154.2 21-Aug-18 4:00 PM 16 8.9 High Turbid No
154.3 21-Aug-18 4:00 PM 16 8.85 High Turbid No 909
155.1 22-Aug-18 7:00 AM 16 9.15 High Turbid Low 1515
155.2 22-Aug-18 7:00 AM 16 9.18 High Turbid Low 1903
155.3 22-Aug-18 7:00 AM 16 9.2 High Turbid Low 1144
156.1 22-Aug-18 5:30 PM 16 9.25 High Turbid Low 1609
156.2 22-Aug-18 5:30 PM 16 9.25 High Turbid Low 1355
156.3 22-Aug-18 5:30 PM 16 9.2 High Turbid Low 1262
157.1 23-Aug-18 6:00 AM 15 9.15 High Turbid Low 1492
157.2 23-Aug-18 6:00 AM 15 9.1 High Turbid Low 1609
157.3 23-Aug-18 6:00 AM 15 9.1 High Turbid Low 2683
158.1 23-Aug-18 4:30 PM 15 8.8 High Turbid Low 1805
158.2 23-Aug-18 4:30 PM 15 8.87 High Turbid Low 2292
158.3 23-Aug-18 4:30 PM 15 8.85 High Turbid Low 1892
159.1 24-Aug-18 8:00 AM 15 9.5 High Turbid Low 2765
159.2 24-Aug-18 8:00 AM 15 9.5 High Turbid Low 2431
159.3 24-Aug-18 8:00 AM 15 9.7 High Turbid Low 2550
160.1 24-Aug-18 4:00 PM 15 9.1 High Turbid No 2560
160.2 24-Aug-18 4:00 PM 15 9.12 High Turbid No 3143
160.3 24-Aug-18 4:00 PM 15 9.12 High Turbid No 2415
161.1 25-Aug-18 7:00 AM 15 9.75 High Turbid No 2469
161.2 25-Aug-18 7:00 AM 15 9.8 High Turbid No 2755
161.3 25-Aug-18 7:00 AM 15 9.8 High Turbid No 2418
162.1 25-Aug-18 5:30 PM 15 9.7 High Turbid Low 2479
162.2 25-Aug-18 5:30 PM 15 9.69 High Turbid Low 2491
162.3 25-Aug-18 5:30 PM 15 9.69 High Turbid Low 2540
163.1 26-Aug-18 6:00 AM 14 9.45 High Turbid Low 2029
163.2 26-Aug-18 6:00 AM 14 9.45 High Turbid Low 2010
163.3 26-Aug-18 6:00 AM 14 9.44 High Turbid Low 937
164.1 26-Aug-18 4:00 PM 14 9.25 High Turbid Low 2168
164.2 26-Aug-18 4:00 PM 14 9.23 High Turbid Low 1959
164.3 26-Aug-18 4:00 PM 14 9.2 High Turbid Low 1914
165.1 27-Aug-18 7:00 AM 14 9.55 High Turbid Low 1683
165.2 27-Aug-18 7:00 AM 14 9.54 High Turbid Low 1504
165.3 27-Aug-18 7:00 AM 14 9.54 High Turbid Low 4115
166.1 27-Aug-18 5:30 PM 14 9.3 High Turbid Low 505
166.2 27-Aug-18 5:30 PM 14 9.28 High Turbid Low 2933
166.3 27-Aug-18 5:30 PM 14 9.25 High Turbid Low 2388
167.1 28-Aug-18 6:00 AM 15 9.1 High Turbid No 1804
167.2 28-Aug-18 6:00 AM 15 9.1 High Turbid No 1515
167.3 28-Aug-18 6:00 AM 15 9.1 High Turbid No 1345
168.1 28-Aug-18 5:30 PM 15 8.98 High Turbid No 1292
168.2 28-Aug-18 5:30 PM 15 8.95 High Turbid No 1481
168.3 28-Aug-18 5:30 PM 15 8.95 High Turbid No 1809
169.1 29-Aug-18 6:00 AM 15 8.75 High Turbid Low 4610
169.2 29-Aug-18 6:00 AM 15 8.73 High Turbid Low 1059
169.3 29-Aug-18 6:00 AM 15 8.73 High Turbid Low 1086
170.1 29-Aug-18 4:00 PM 15 8.45 High Turbid Low 1207
170.2 29-Aug-18 4:00 PM 15 8.4 High Turbid Low 959
170.3 29-Aug-18 4:00 PM 15 8.4 High Turbid Low 1260
171.1 30-Aug-18 7:00 AM 17 8.7 High Turbid No 589
171.2 30-Aug-18 7:00 AM 17 8.65 High Turbid No 649
171.3 30-Aug-18 7:00 AM 17 8.6 High Turbid No 768
172.1 30-Aug-18 5:30 PM 17 8.68 High Turbid No 966
172.2 30-Aug-18 5:30 PM 17 8.65 High Turbid No 615
172.3 30-Aug-18 5:30 PM 17 8.65 High Turbid No 323
173.1 31-Aug-18 6:00 AM 17 8.5 Turbid No 658
173.2 31-Aug-18 6:00 AM 17 8.47 Turbid No 518
173.3 31-Aug-18 6:00 AM 17 8.45 Turbid No 669
174.1 31-Aug-18 4:30 PM 17 8.38 Turbid No 683
174.2 31-Aug-18 4:30 PM 17 8.38 Turbid No 873
174.3 31-Aug-18 4:30 PM 17 8.4 Turbid No 817
175.1 1-Sep-18 8:00 AM 17 8.36 Highly Turbid No 596
175.1 1-Sep-18 8:00 AM 17 8.36 Highly Turbid No 654
175.2 1-Sep-18 8:00 AM 17 8.36 Highly Turbid No 695
176.1 1-Sep-18 4:00AM 17 8.35 Highly Turbid No 883
176.2 1-Sep-18 4:00AM 17 8.4 Highly Turbid No 708
176.3 1-Sep-18 4:00AM 17 8.4 Highly Turbid No 434
177.1 2-Sep-18 8:00 AM 17 8.45 Highly Turbid No 542
177.2 2-Sep-18 8:00 AM 17 8.4 Highly Turbid No 334
177.3 2-Sep-18 8:00 AM 17 8.4 Highly Turbid No 674
178.1 2-Sep-18 4:00AM 16 8.25 Highly Turbid No 611
178.2 2-Sep-18 4:00AM 16 8.27 Highly Turbid No 553
178.3 2-Sep-18 4:00AM 16 8.3 Highly Turbid No 308
179.1 3-Sep-18 8:00 AM 16 8.3 Highly Turbid Low 770
179.2 3-Sep-18 8:00 AM 16 8.28 Highly Turbid Low 869
179.3 3-Sep-18 8:00 AM 16 8.28 Highly Turbid Low 843
180.1 3-Sep-18 4:00AM 16 8.4 Highly Turbid Low 1085
180.2 3-Sep-18 4:00AM 16 8.35 Highly Turbid Low 769
180.3 3-Sep-18 4:00AM 16 8.34 Highly Turbid Low 719
181.1 4-Sep-18 8:00 AM 17 8.2 Highly Turbid Low 494
181.2 4-Sep-18 8:00 AM 17 8.19 Highly Turbid Low 424
181.3 4-Sep-18 8:00 AM 17 8.19 Highly Turbid Low 585
182.1 4-Sep-18 4:00AM 17 8.03 Highly Turbid High 748
182.2 4-Sep-18 4:00AM 17 8.03 Highly Turbid High 792
182.3 4-Sep-18 4:00AM 17 8.03 Highly Turbid High 677
183.1 5-Sep-18 8:00 AM 16 7.5 Highly Turbid No 524
183.2 5-Sep-18 8:00 AM 16 7.52 Highly Turbid No 526
183.3 5-Sep-18 8:00 AM 16 7.55 Highly Turbid No 658
184.1 5-Sep-18 4:00AM 16 7.68 Highly Turbid No 691
184.2 5-Sep-18 4:00AM 16 7.7 Highly Turbid No 586
184.3 5-Sep-18 4:00AM 16 7.7 Highly Turbid No 691
185.1 6-Sep-18 8:00 AM 17 7.8 Turbid No 214
185.2 6-Sep-18 8:00 AM 17 7.8 Turbid No 179
185.3 6-Sep-18 8:00 AM 17 7.8 Turbid No 703
186.1 6-Sep-18 4:00AM 17 7.9 Turbid No 263
186.2 6-Sep-18 4:00AM 17 7.89 Turbid No 384
186.3 6-Sep-18 4:00AM 17 7.89 Turbid No 505
187.1 7-Sep-18 9:00 AM 16 7.62 Turbid No 430
187.2 7-Sep-18 9:00 AM 16 7.62 Turbid No 292
187.3 7-Sep-18 9:00 AM 16 7.58 Turbid No 457
188.1 7-Sep-18 4:00AM 16 7.45 Turbid No 258
188.2 7-Sep-18 4:00AM 16 7.45 Turbid No 436
188.3 7-Sep-18 4:00AM 16 7.45 Turbid No 389
189.1 8-Sep-18 8:00 AM 16 7.4 Turbid No 365
189.2 8-Sep-18 8:00 AM 16 7.23 Turbid No 297
189.3 8-Sep-18 8:00 AM 16 7.23 Turbid No 508
190.1 8-Sep-18 4:00AM 18 7.2 Turbid No 437
190.2 8-Sep-18 4:00AM 18 7.15 Turbid No 482
190.3 8-Sep-18 4:00AM 18 7.13 Turbid No 545
190.4 9-Sep-18 9:00 AM 18 7.2 Turbid No 586
190.5 9-Sep-18 9:00 AM 18 7.2 Turbid No 346
190.6 9-Sep-18 9:00 AM 18 7.2 Turbid No 396
19.7 9-Sep-18 4:00AM 18 7.22 Turbid No 452
190.8 9-Sep-18 4:00AM 18 7.22 Turbid No 351
190.9 9-Sep-18 4:00AM 18 7.22 Turbid No 347
191.1 10-Sep-18 9:00 AM 17 7.19 Turbid No 256
191.2 10-Sep-18 9:00 AM 17 7.19 Turbid No 564
191.3 10-Sep-18 9:00 AM 17 7.19 Turbid No 702
192.1 10-Sep-18 4:00AM 17 7.24 Turbid No 621
192.2 10-Sep-18 4:00AM 17 7.23 Turbid No 163
192.3 10-Sep-18 4:00AM 17 7.23 Turbid No 532
193.1 11-Sep-18 8:00 AM 20 7.12 Turbid No 865
193.2 11-Sep-18 8:00 AM 20 7.11 Turbid No 925
193.3 11-Sep-18 8:00 AM 20 7.11 Turbid No 1062
194.1 11-Sep-18 4:00AM 20 7.1 Turbid No 1034
194.2 11-Sep-18 4:00AM 20 7.1 Turbid No 1250
194.3 11-Sep-18 4:00AM 20 7.09 Turbid No 971
195.1 12-Sep-18 8:00 AM 19 6.99 Highly Turbid No 1039
195.2 12-Sep-18 8:00 AM 19 6.98 Highly Turbid No 923
195.3 12-Sep-18 8:00 AM 19 6.95 Highly Turbid No 978
196.1 12-Sep-18 4:00AM 20 6.93 Highly Turbid No 1299
196.2 12-Sep-18 4:00AM 20 6.95 Highly Turbid No 1004
196.3 12-Sep-18 4:00AM 21 6.94 Highly Turbid No 864
197.1 13-Sep-18 8:00 AM 21 6.8 Turbid No 587
197.2 13-Sep-18 8:00 AM 21 6.8 Turbid No 644
197.3 13-Sep-18 8:00 AM 21 6.8 Turbid No 548
198.1 13-Sep-18 4:00AM 21 6.46 Turbid No 427
198.2 13-Sep-18 4:00AM 21 6.45 Turbid No 653
198.3 13-Sep-18 4:00AM 21 6.45 Turbid No 563
199.1 14-Sep-18 8:00 AM 21 6.45 Turbid No 408
199.2 14-Sep-18 8:00 AM 21 6.43 Turbid No 1529
199.3 14-Sep-18 8:00 AM 21 6.43 Turbid No 598
200.1 14-Sep-18 4:00AM 21 6.4 Turbid No 3833
200.2 14-Sep-18 4:00AM 21 6.4 Turbid No 314
200.3 14-Sep-18 4:00AM 21 6.38 Turbid No 195
201.1 15-Sep-18 9:00 AM 20 6.36 Turbid No 412
201.2 15-Sep-18 9:00 AM 20 6.36 Turbid No 916
201.3 15-Sep-18 9:00 AM 20 6.36 Turbid No 226
202.1 15-Sep-18 4:00AM 20 6.3 Turbid No 353
202.2 15-Sep-18 4:00AM 20 6.3 Turbid No 601
202.3 15-Sep-18 4:00AM 20 6.3 Turbid No 614
203.1 16-Sep-18 8:00 AM 15 6.34 Turbid No 614
203.2 16-Sep-18 8:00 AM 15 6.34 Turbid No 395
203.3 16-Sep-18 8:00 AM 15 6.32 Turbid No 170
204.1 16-Sep-18 4:00AM 15 6.23 Turbid No 166
204.2 16-Sep-18 4:00AM 15 6.25 Turbid No 56
204.3 16-Sep-18 4:00AM 15 6.25 Turbid No 60
205.1 17-Sep-18 8:00 AM 15 6.15 Turbid No 160
205.2 17-Sep-18 8:00 AM 15 6.15 Turbid No 290
205.3 17-Sep-18 8:00 AM 15 6.15 Turbid No 427
206.1 17-Sep-18 4:00AM 16 6.15 Turbid No 221
206.2 17-Sep-18 4:00AM 16 6.15 Turbid No 1296
206.3 17-Sep-18 4:00AM 16 6.15 Turbid No 104
207.1 18-Sep-18 8:00 AM 16 6.1 Turbid No 204
207.2 18-Sep-18 8:00 AM 16 6.1 Turbid No 16
207.3 18-Sep-18 8:00 AM 16 6.1 Turbid No 69
208.1 18-Sep-18 4:00AM 17 6.1 Turbid No 133
208.2 18-Sep-18 4:00AM 17 6.09 Turbid No 201
208.3 18-Sep-18 4:00AM 17 6.09 Turbid No 134
209.1 19-Sep-18 8:00 AM 17 6.08 Turbid No 233
209.2 19-Sep-18 8:00 AM 16 6.08 Turbid No 129
209.3 19-Sep-18 8:00 AM 16 6.08 Turbid No 45
210.1 19-Sep-18 4:00AM 16 6.05 Turbid No 56
210.2 19-Sep-18 4:00AM 16 6.05 Turbid No 50
210.3 19-Sep-18 4:00AM 16 6.05 Turbid No 77
211.1 20-Sep-18 9:00 AM 18 5.96 Turbid No 97
211.2 20-Sep-18 9:00 AM 18 5.94 Turbid No 84
211.3 20-Sep-18 9:00 AM 18 5.94 Turbid No 159
212.1 20-Sep-18 4:00AM 18 5.87 Turbid No 51
212.2 20-Sep-18 4:00AM 18 5.87 Turbid No 97
212.3 20-Sep-18 4:00AM 18 5.87 Turbid No 28
213.1 21-Sep-18 8:00 AM 15 5.85 Turbid No 19
213.2 21-Sep-18 8:00 AM 15 5.85 Turbid No 60
213.3 21-Sep-18 8:00 AM 15 5.85 Turbid No 57
214.1 21-Sep-18 4:00AM 16 5.88 Turbid No 109
214.2 21-Sep-18 4:00AM 16 5.88 Turbid No 59
214.3 21-Sep-18 4:00AM 16 5.85 Turbid No 82
215.1 22-Sep-18 9:00 AM 15 5.87 Turbid No 57
215.2 22-Sep-18 9:00 AM 15 5.87 Turbid No 87
215.3 22-Sep-18 9:00 AM 15 5.86 Turbid No 64
216.1 22-Sep-18 4:00AM 16 5.86 Turbid No 77
216.2 22-Sep-18 4:00AM 16 5.86 Turbid No 22
216.3 22-Sep-18 4:00AM 16 5.833 Turbid No 7
217.1 23-Sep-18 8:00 AM 15 5.83 Turbid No 73
217.2 23-Sep-18 8:00 AM 15 5.83 Turbid No 104
217.3 23-Sep-18 8:00 AM 15 5.84 Turbid No 94
218.1 23-Sep-18 4:00AM 16 5.85 Turbid No 119
218.2 23-Sep-18 4:00AM 16 5.85 Turbid No 130
218.3 23-Sep-18 4:00AM 16 5.85 Turbid No 125
219.1 24-Sep-18 9:00 AM 15 5.85 Turbid No 131
219.2 24-Sep-18 9:00 AM 15 5.8 Turbid No 561
219.3 24-Sep-18 9:00 AM 15 5.8 Turbid No 602
220.1 24-Sep-18 4:00AM 16 5.8 Turbid No 209
220.2 24-Sep-18 4:00AM 16 5.79 Turbid No 316
220.3 24-Sep-18 4:00AM 16 5.79 Turbid No 193
221.1 25-Sep-18 9:00 AM 15 5.79 Turbid No 115
221.2 25-Sep-18 9:00 AM 15 5.7 Turbid No 128
221.3 25-Sep-18 9:00 AM 15 5.76 Turbid No 102
222.1 25-Sep-18 4:00AM 16 5.76 Turbid No 47
222.2 25-Sep-18 4:00AM 16 5.76 Turbid No 71
222.3 25-Sep-18 4:00AM 16 5.76 Turbid No 51
223.1 26-Sep-18 8:00 AM 14 5.82 Turbid No 94
223.2 26-Sep-18 8:00 AM 14 5.8 Turbid No 68
223.3 26-Sep-18 8:00 AM 14 5.8 Turbid No 36
224.1 26-Sep-18 4:00AM 14 5.67 Turbid No 25
224.2 26-Sep-18 4:00AM 14 5.67 Turbid No 51
224.3 26-Sep-18 4:00AM 14 5.66 Turbid No 58
225.1 27-Sep-18 9:00 AM 15 5.64 Turbid No 88
225.2 27-Sep-18 9:00 AM 15 5.64 Turbid No 84
225.3 27-Sep-18 9:00 AM 15 5.62 Turbid No 99
226.1 27-Sep-18 4:00AM 15 5.62 Turbid No 93
226.2 27-Sep-18 4:00AM 15 5.6 Turbid No 54
226.3 27-Sep-18 4:00AM 15 5.6 Turbid No 77
227.1 28-Sep-18 8:00 AM 14 5.57 Turbid No 82
227.2 28-Sep-18 8:00 AM 14 5.56 Turbid No 29
227.3 28-Sep-18 8:00 AM 14 5.56 Turbid No 74
228.1 28-Sep-18 4:00AM 14 5.56 Turbid No 84
228.2 28-Sep-18 4:00AM 14 5.55 Turbid No 87
228.3 28-Sep-18 4:00AM 14 5.55 Turbid No 83
229.1 29-Sep-18 9:00 AM 15 5.53 Turbid No 92
229.2 29-Sep-18 9:00 AM 15 5.33 Turbid No 112
229.3 29-Sep-18 9:00 AM 15 5.45 Turbid No 61
230.1 29-Sep-18 4:00AM 15 5.5 Turbid No 67
230.2 29-Sep-18 4:00AM 15 5.5 Turbid No 17
230.3 29-Sep-18 4:00AM 15 5.49 Turbid No 67
231.1 30-Sep-18 9:00 AM 14 5.45 Turbid No 58
231.2 30-Sep-18 9:00 AM 14 5.45 Turbid No 56
231.3 30-Sep-18 9:00 AM 14 5.45 Turbid No 62
233.1 1-Oct-18 08:00AM 14 5.43 Clear No 21
233.2 1-Oct-18 08:00AM 14 5.43 Clear No 43
233.3 1-Oct-18 08:00AM 14 5.43 Clear No 50
234.1 1-Oct-18 04:00PM 15 5.4 Clear No 220
234.2 1-Oct-18 04:00PM 15 5.4 Clear No 250
234.3 1-Oct-18 04:00PM 15 5.4 Clear No 128
235.1 2-Oct-18 10:00AM 14 5.37 Clear No 44
235.2 2-Oct-18 10:00AM 14 5.37 Clear No 104
235.3 2-Oct-18 10:00AM 14 5.37 Clear No 110
236.1 3-Oct-18 08:00AM 15 5.33 Clear No 35
236.2 3-Oct-18 08:00AM 15 5.33 Clear No 47
236.3 3-Oct-18 08:00AM 15 5.33 Clear No 53
237.1 4-Oct-18 08:00AM 15 5.28 Clear No 42
237.2 4-Oct-18 08:00AM 15 5.26 Clear No 39
237.3 4-Oct-18 08:00AM 15 5.26 Clear No 84
238.1 5-Oct-18 10:00AM 14 5.24 Clear No 76
238.2 5-Oct-18 10:00AM 14 5.24 Clear No 64
238.3 5-Oct-18 10:00AM 14 5.24 Clear No 57
239.1 6-Oct-18 08:00AM 14 5.2 Clear No 93
239.2 6-Oct-18 08:00AM 14 5.2 Clear No 82
239.3 6-Oct-18 08:00AM 14 5.2 Clear No 69
240.1 7-Oct-18 08:00AM 14 5.14 Clear No 29
240.2 7-Oct-18 08:00AM 14 5.14 Clear No 37
240.3 7-Oct-18 08:00AM 14 5.14 Clear No 29
241.1 8-Oct-18 08:00AM 16 5.08 Clear No 74
241.2 8-Oct-18 08:00AM 16 5.08 Clear No 43
241.3 8-Oct-18 08:00AM 16 5.08 Clear No 63
242.1 9-Oct-18 08:00AM 16 5.05 Clear No 46
242.2 9-Oct-18 08:00AM 16 5.05 Clear No 127
242.3 9-Oct-18 08:00AM 16 5.05 Clear No 67
243.1 10-Oct-18 08:00AM 16 4.96 Clear No 38
243.2 10-Oct-18 08:00AM 16 4.96 Clear No 36
243.3 10-Oct-18 08:00AM 16 4.96 Clear No 23
244.1 11-Oct-18 08:00AM 16 4.98 Clear No 16
244.2 11-Oct-18 08:00AM 16 4.98 Clear No 29
244.3 11-Oct-18 08:00AM 16 4.98 Clear No 37
245.1 12-Oct-18 08:00AM 15 4.94 Clear No 74
245.2 12-Oct-18 08:00AM 15 4.94 Clear No 25
245.3 12-Oct-18 08:00AM 15 4.94 Clear No 26
246.1 13-Oct-18 08:00AM 15 4.85 Clear No 18
246.2 13-Oct-18 08:00AM 15 4.85 Clear No 40
246.3 13-Oct-18 08:00AM 15 4.85 Clear No 20
247.1 14-Oct-18 08:00AM 14 4.69 Clear No 32
247.2 14-Oct-18 08:00AM 14 4.69 Clear No 47
247.3 14-Oct-18 08:00AM 14 4.69 Clear No 20
248.1 15-Oct-18 08:00AM 14 4.62 Clear No 36
248.2 15-Oct-18 08:00AM 14 4.62 Clear No 33
248.3 15-Oct-18 08:00AM 14 4.62 Clear No 30
249.1 16-Oct-18 08:00AM 14 4.53 Clear No 24
249.2 16-Oct-18 08:00AM 14 4.52 Clear No 38
249.3 16-Oct-18 08:00AM 14 4.48 Clear No 39
250.1 17-Oct-18 08:00AM 15 4.45 Clear No 54
250.2 17-Oct-18 08:00AM 15 4.45 Clear No 15
250.3 17-Oct-18 08:00AM 15 4.45 Clear No 25
251.1 18-Oct-18 08:00AM 15 4.35 Clear No 23
251.2 18-Oct-18 08:00AM 15 4.35 Clear No 33
251.3 18-Oct-18 08:00AM 15 4.35 Clear No 16
252.1 19-Oct-18 08:00AM 15 4.28 Clear No 20
252.2 19-Oct-18 08:00AM 15 4.28 Clear No 18
252.3 19-Oct-18 08:00AM 15 4.28 Clear No 21
253.1 20-Oct-18 08:00AM 15 4.16 Clear No 28
253.2 20-Oct-18 08:00AM 15 4.16 Clear No 23
253.3 20-Oct-18 08:00AM 15 4.16 Clear No 37
254.1 21-Oct-18 08:00AM 15 4.14 Clear No 30
254.2 21-Oct-18 08:00AM 15 4.14 Clear No 29
254.3 21-Oct-18 08:00AM 15 4.14 Clear No 12
255.1 22-Oct-18 08:00AM 15 4.08 Clear No 20
255.2 22-Oct-18 08:00AM 15 4.08 Clear No 33
255.3 22-Oct-18 08:00AM 15 4.08 Clear No 45
256.1 23-Oct-18 08:00AM 14 4.04 Clear No 49
256.2 23-Oct-18 08:00AM 14 4.04 Clear No 36
256.3 23-Oct-18 08:00AM 14 4.04 Clear No 13
257.1 24-Oct-18 08:00AM 14 3.94 Clear No 39
257.2 24-Oct-18 08:00AM 14 3.94 Clear No 37
257.3 24-Oct-18 08:00AM 14 3.94 Clear No 35
258.1 25-Oct-18 08:00AM 14 3.91 Clear No 38
258.2 25-Oct-18 08:00AM 14 3.91 Clear No 36
258.3 25-Oct-18 08:00AM 14 3.91 Clear No 23
259.1 26-Oct-18 08:00AM 14 3.92 Clear No 40
259.2 26-Oct-18 08:00AM 14 3.92 Clear No 18
259.3 26-Oct-18 08:00AM 14 3.92 Clear No 25
260.1 27-Oct-18 08:00AM 14 3.93 Clear No 29
260.2 27-Oct-18 08:00AM 14 3.93 Clear No 12
260.3 27-Oct-18 08:00AM 14 3.93 Clear No 18
261.1 28-Oct-18 08:00AM 15 3.92 Clear No 20
261.2 28-Oct-18 08:00AM 15 3.92 Clear No 11
261.3 28-Oct-18 08:00AM 15 3.92 Clear No 23
262.1 29-Oct-18 08:00AM 15 3.93 Clear No 43
262.2 29-Oct-18 08:00AM 15 3.93 Clear No 32
262.3 29-Oct-18 08:00AM 15 3.93 Clear No 32
263.1 30-Oct-18 08:00AM 15 3.92 Clear No 22
263.2 30-Oct-18 08:00AM 15 3.92 Clear No 12
263.3 30-Oct-18 08:00AM 15 3.92 Clear No 35
264.1 31-Oct-18 08:00AM 15 3.91 Clear No 23
264.2 31-Oct-18 08:00AM 15 3.91 Clear No 13
264.3 31-Oct-18 08:00AM 15 3.91 Clear No 18
265.1 1-Nov-18 10:00 AM 9 3.84 Clear No 14
265.2 1-Nov-18 10:00 AM 9 3.84 Clear No 18
265.3 1-Nov-18 10:00 AM 10 3.84 Clear No 22
266.1 2-Nov-18 1:00 PM 10 3.98 Clear No 19
266.2 2-Nov-18 1:00 PM 9 3.98 Clear No 21
266.3 2-Nov-18 1:00 PM 11 3.98 Clear No 20
267.1 3-Nov-18 10:00 AM 11 3.81 Clear No 30
267.2 3-Nov-18 10:00 AM 9 3.81 Clear No 28
267.3 3-Nov-18 10:00 AM 10 3.81 Clear No 25
268.1 4-Nov-18 2:00 PM 10 3.8 Clear No 14
268.2 4-Nov-18 2:00 PM 9 3.8 Clear No 25
268.3 4-Nov-18 2:00 PM 11 3.8 Clear No 28
269.1 5-Nov-18 10:00 AM 9 3.77 Clear No 23
269.2 5-Nov-18 10:00 AM 9 3.77 Clear No 20
269.3 5-Nov-18 10:00 AM 10 3.77 Clear No 28
270.1 6-Nov-18 2:00 PM 10 3.77 Clear No 17
270.2 6-Nov-18 2:00 PM 9 3.77 Clear No 16
270.3 6-Nov-18 2:00 PM 11 3.77 Clear No 24
271.1 7-Nov-18 11:00 AM 11 3.74 Clear No 13
271.2 7-Nov-18 11:00 AM 9 3.74 Clear No 15
271.3 7-Nov-18 11:00 AM 10 3.74 Clear No 10
272.1 8-Nov-18 2:00 PM 10 3.67 Clear No 14
272.2 8-Nov-18 2:00 PM 9 3.67 Clear No 12
272.3 8-Nov-18 2:00 PM 11 3.67 Clear No 14
273.1 9-Nov-18 11:00 AM 9 3.65 Clear No 21
273.2 9-Nov-18 11:00 AM 9 3.65 Clear No 18
273.3 9-Nov-18 11:00 AM 10 3.65 Clear No 16
274.1 10-Nov-18 2:00 PM 10 3.6 Clear No 22
274.2 10-Nov-18 2:00 PM 9 3.6 Clear No 15
274.3 10-Nov-18 2:00 PM 11 3.6 Clear No 12
275.1 11-Nov-18 10:00 AM 11 3.61 Clear No 22
275.2 11-Nov-18 10:00 AM 9 3.61 Clear No 17
275.3 11-Nov-18 10:00 AM 10 3.61 Clear No 16
276.1 12-Nov-18 12:00 PM 10 3.59 Clear No 26
276.2 12-Nov-18 12:00 PM 9 3.59 Clear No 21
276.3 12-Nov-18 12:00 PM 11 3.59 Clear No 12
277.1 13-Nov-18 10:00 AM 9 3.57 Clear No 7
277.2 13-Nov-18 10:00 AM 9 3.57 Clear No 11
277.3 13-Nov-18 10:00 AM 10 3.57 Clear No 10
278.1 14-Nov-18 2:00 PM 10 3.58 Clear No 15
278.2 14-Nov-18 2:00 PM 9 3.58 Clear No 11
278.3 14-Nov-18 2:00 PM 11 3.58 Clear No 18
279.1 15-Nov-18 11:00 AM 11 3.57 Clear No 45
279.2 15-Nov-18 11:00 AM 9 3.57 Clear No 6
279.3 15-Nov-18 11:00 AM 10 3.57 Clear No 10
280.1 16-Nov-18 2:00 PM 10 3.55 Clear No 16
280.2 16-Nov-18 2:00 PM 9 3.55 Clear No 19
280.3 16-Nov-18 2:00 PM 11 3.55 Clear No 18
281.1 17-Nov-18 10:00 AM 10 3.52 Clear No 10
281.2 17-Nov-18 10:00 AM 10 3.52 Clear No 24
281.3 17-Nov-18 10:00 AM 9 3.52 Clear No 7
282.1 18-Nov-18 2:00 PM 11 3.54 Clear No 3
282.2 18-Nov-18 2:00 PM 11 3.54 Clear No 6
282.3 18-Nov-18 2:00 PM 9 3.54 Clear No 6
283.1 19-Nov-18 10:00 AM 10 3.52 Clear No 4
283.2 19-Nov-18 10:00 AM 10 3.52 Clear No 6
283.3 19-Nov-18 10:00 AM 9 3.52 Clear No 10
284.1 20-Nov-18 1:00 PM 11 3.5 Clear No 5
284.2 20-Nov-18 1:00 PM 9 3.5 Clear No 8
284.3 20-Nov-18 1:00 PM 9 3.5 Clear No 10
285.1 21-Nov-18 10:00 AM 10 3.48 Clear No 8
285.2 21-Nov-18 10:00 AM 10 3.48 Clear No 6
285.3 21-Nov-18 10:00 AM 9 3.48 Clear No 9
286.1 22-Nov-18 2:00 PM 11 3.45 Clear No 1
286.2 22-Nov-18 2:00 PM 11 3.45 Clear No 1
286.3 22-Nov-18 2:00 PM 9 3.45 Clear No 1
287.1 23-Nov-18 10:00 AM 10 3.42 Clear No 4
287.2 23-Nov-18 10:00 AM 10 3.42 Clear No 3
287.3 23-Nov-18 10:00 AM 9 3.42 Clear No 12
288.1 24-Nov-18 2:00 PM 11 3.4 Clear No 3
288.2 24-Nov-18 2:00 PM 9 3.4 Clear No 3
288.3 24-Nov-18 2:00 PM 9 3.4 Clear No 7
289.1 25-Nov-18 10:00 AM 10 3.37 Clear No 22
289.2 25-Nov-18 10:00 AM 10 3.37 Clear No 8
289.3 25-Nov-18 10:00 AM 9 3.37 Clear No 17
290.1 26-Nov-18 2:00 PM 11 3.36 Clear No 30
290.2 26-Nov-18 2:00 PM 11 3.36 Clear No 13
290.3 26-Nov-18 2:00 PM 9 3.36 Clear No 11
291.1 27-Nov-18 10:00 AM 10 3.35 Clear No 10
291.2 27-Nov-18 10:00 AM 10 3.35 Clear No 8
291.3 27-Nov-18 10:00 AM 9 3.35 Clear No 12
292.1 28-Nov-18 2:00 PM 11 3.33 Clear No 13
292.2 28-Nov-18 2:00 PM 9 3.33 Clear No 18
292.3 28-Nov-18 2:00 PM 9 3.33 Clear No 8
293.1 29-Nov-18 10:00 AM 10 3.29 Clear No 9
293.2 29-Nov-18 10:00 AM 10 3.29 Clear No 12
293.3 29-Nov-18 10:00 AM 9 3.29 Clear No 5
294.1 30-Nov-18 1:00 PM 11 3.27 Clear No 9
294.2 30-Nov-18 1:00 PM 11 3.27 Clear No 12
294.3 30-Nov-18 1:00 PM 9 3.27 Clear No 4
295.1 12/1/2018 8:00 AM 12 3.27 Clear No 8
295.2 12/1/2018 8:00 AM 12 3.25 Clear No 14
295.3 12/1/2018 8:00 AM 12 3.24 Clear No 7
296.1 12/7/2018 8:00 AM 12 3.22 Clear No 2
296.2 12/7/2018 8:00 AM 12 3.22 Clear No 7
296.3 12/7/2018 8:00 AM 12 3.2 Clear No 4
297.1 12/14/2018 8:00 AM 12 3.12 Clear No 3
297.2 12/14/2018 8:00 AM 12 3.12 Clear No 1
297.3 12/14/2018 8:00 AM 12 3.12 Clear No 1
298.1 12/21/2018 8:00 AM 10 3.08 Clear No 8
298.2 12/21/2018 8:00 AM 10 3.07 Clear No 1
298.3 12/21/2018 8:00 AM 10 3.07 Clear No 1
299.1 12/28/2018 10:00 AM 10 2.97 Clear No 1
299.2 12/28/2018 10:00 AM 10 2.97 Clear No 1
299.3 12/28/2018 10:00 AM 10 2.97 Clear No 1
300.1 2-Jan-19 3:30 PM 1 2.91 Clear No 43
300.2 2-Jan-19 4:30 PM 1 2.9 Clear No 17
300.3 2-Jan-19 3:08 PM 1 2.9 Clear No 33
301.1 9-Jan-19 4:50 PM 1 2.93 Clear No 41
301.2 9-Jan-19 3:30 PM 1 2.92 Clear No 61
301.3 9-Jan-19 3:30 PM 1 2.92 Clear No 41
302.1 16-Jan-19 3:30 PM 1 2.91 Clear No 49
302.2 16-Jan-19 4:30 PM 1 2.91 Clear No 45
302.3 16-Jan-19 3:30 PM 1 2.92 Clear No 28
303.1 23-Jan-19 3:30 PM 1 2.9 Clear No 30
303.2 23-Jan-19 3:08 PM 1 2.9 Clear No 28
303.3 23-Jan-19 3:23 PM 1 2.9 Clear No 35
304.1 30-Jan-19 3:30 PM 1 2.91 Clear No 40
304.2 30-Jan-19 12:30 PM 1 2.91 Clear No 45
304.3 30-Jan-19 1:30 PM 1 2.9 Clear No 38