This document outlines the Plan-Do-Check-Act (PDCA) process for continuous improvement. It involves planning a project by identifying a problem area and target, analyzing the current situation to select and verify the root cause, planning and implementing countermeasures, checking results and confirming the problem is decreased, and standardizing solutions to prevent recurrence. Key tools include graphs, flowcharts, check sheets, histograms, Pareto diagrams, and control charts used during each step to identify issues, analyze data, verify solutions, and monitor ongoing performance. The overall goal is to continuously improve work processes and customer satisfaction through this systematic problem-solving approach.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views1 page

PDCA

This document outlines the Plan-Do-Check-Act (PDCA) process for continuous improvement. It involves planning a project by identifying a problem area and target, analyzing the current situation to select and verify the root cause, planning and implementing countermeasures, checking results and confirming the problem is decreased, and standardizing solutions to prevent recurrence. Key tools include graphs, flowcharts, check sheets, histograms, Pareto diagrams, and control charts used during each step to identify issues, analyze data, verify solutions, and monitor ongoing performance. The overall goal is to continuously improve work processes and customer satisfaction through this systematic problem-solving approach.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Step Objective Helpful Tools Key Activities

Reason for Improvement PLAN PLAN


• Graph •Research for themes
• Control chart -Review department indicators
• Process flowchart -Survey internal/External customers
Identify a problem area and the • Control system
-Interview individuals from the work area
reason for working on it
•Consider customer needs to help select the theme

Team project planning worksheet Graph Flowchart

Current Situation PLAN PLAN


• Check sheet • Collect data on all aspects of the theme
• Histogram • Stratify the theme from various viewpoints
• Pareto diagram • Select a problem from the stratification of the theme
Select a problem and set a target • Control Chart • Identify the customer's requirements
for improvement • Graph • Write a clear problem statement
• Use the data to establish the target

Pareto Graph

Analysis PLAN PLAN


• Cause and effect diagram • Perform cause and effect analysis on the problem
• Check sheet • Continue analysis to the level of actionable root cause
• Pareto diagram • Select the root cause with probable greatest impact
Identify and verify the root cause
• Histogram • Verify the selected root cause with data
of the problem
• Graph
• Scatter diagram
Fishbone Pareto Scatter Diagram

Countermeasures DO DO
• Cost benefit analysis • Develop and evaluate potential countermeasures which
Plan and implement • Barriers and aids -Attack verified root causes
countermeasures that will correct • Action plan -Meet Customers' valid requirements
the root cause of the problem • Structure tree • Develop a Acton plan
-Answers who, what. Where, when and how
• Implement countermeasures
Countermeasures Matrix Action Plan

Results CHECK CHECK


• Histogram • Confirm the effects of the countermeasures
• Pareto diagram -Checking to see if the root cause has been reduced
Confirm that the problem and its
• Control chart • Compare the problem before and after using the indicator
root cause have been decreased
• Graph • Compare the results obtained to the target
and the target for improvement
• Implement additional countermeasures, if results are not
has been met
satisfactory
Pareto Diagram Graph
I
Standardization ACT ACT
• Control System
• Control chart • Assure that countermeasures become part of daily work
-Create/revise the work process and explain need
Prevent the problem and its root • Graph
• Procedure • Train employees on revised process and explain need
causes from recurring
• Training • Establish checks to monitor countermeasures
• Consider areas for replication
Control System Control Chart

Future Plans PDCA AGAIN PDCA CONTINUALLY


• Action Plan • Analyze and evaluate any remaining problems
• PDCA • Plan further actions if necessary
Plan what to do about any • Review lessons learned related to problem solving skills
remaining problems and evaluate • Team effectiveness
-What was done well
the team's effectiveness
-What could be improved or done differently
Action Plan
Plan Do Check Act

PDCA Roadmap-Henry Ford Production System