Power Flow Control Using Fact Devices in Power System With Simulink Software PDF
Power Flow Control Using Fact Devices in Power System With Simulink Software PDF
ISSN-p: 2521-2419
ISSN-e: 2409-2770
Vol. 8, Issue 10, PP. 249-261, October 2021
https://www.ijew.io/
https://doi.org/10.34259/ijew.21.8010249262
Authors retain all © copyrights 2021 IJEW. This is an open access article distributed under the CC-BY License, which permits
unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Modern wattage systems even have 3 parts i-e generation,
createTheir network is also expandable. As a result, power
transmission and distribution. At power generating centers,
flow control is critical for the capacity system's stability. Any
wattage is generated by synchronous alternators that area unit
modern AC cable, even though it is inexpensive to instal and
usually driven by either steam or hydro turbines. At generating
modify, necessitates the construction of a new line. it'll need
stations, most of the facility generation takes place that will
heaps of value in thronged areas. it's lucky that power physics
contain quite one such alternator-turbine combination. The
technology improvement, quick governable versatile AC gear
generating stations area unit classified relying upon the sort of
(FACTS) devices to save lots of the required flexibility.
fuel used, like thermal, hydro, nuclear etc. These generating
station area unit remotely settled. Power transmission is that E. Objective of Research
the transmission of electrical power generated at any station The basic objectives of this research work are:
over long distances to the load centers in cities or cities. In
rural areas, power transmission towers and transmission lines • To Increase the transmission potential of the power grid
are very typical [1]. Power transmission lines connect • To Enhancement of the voltage profile
generating stations and cargo centres in modern power
systems, which are advanced networks. Wattage is provided at • Increasing the power system's transient reliability
either a 50Hz or 60Hz frequency.
F. Contribution of Results
Power demand has more than doubled in the last ten years, Following square measure the most contributions of this
limiting the growth of power generation and transmission due analysis work:
to a shortage of energy and environmental constraints.Some
transmission lines area unit powerfully loaded thanks to high a. to spotlight the angle applications of SSSC in Asian
load demand within the space. The system stability becomes nation organization.
an important issue for power transfer. For overcoming this b. Insight issues of grid associated with voltage profile and
example, installation become interlinked and sophisticated. power losses developed.
therefore installation can't be analyzed simply. one amongst
the important issues in wattage system is that the management c. This analysis work also will be helpful for utility
of uncontrolled oscillation. Uncontrolled oscillation causes corporations.
total or partial installation suspension. a lack of sufficient The analysis result work are often used by PESCO, as
damping in the system is that the vital think about case of Kohat,Gurguri and Tall Grid station squar measure their
sustained or growing oscillation. installation stabilizer is that authority in terms of providing intellectual profit to the cable,
the initial live that has been wont to increase damping. FACTS transmission potential.
devices are progressively used. To optimize each the steady
state and dynamic performance of system, G. Paper Overview
FACTS devices ar used. For dynamic reactive This study is divided into five chapters, each of which is
compensation, the primary generation thyristor controlled divided into five sections. is organized in the manner
FACTS device, like static power unit compensator (SVC) and described below. The introduction to the analysis work is
thyristor controlled series electrical device (TCSC) are utilized mentioned in the first chapter. In the second chapter, FACTS
in power grid. FACTS devices would like absolutely rated technology is mentioned. This chapter briefly mentions the
electrical device or reactor bank to provide or absorb reactive power flow construction in transmission lines, power flow
power. by using self-commutated voltage sourced shift management methodology, and FACTS technology square
converters to appreciate static synchronous voltage sources at measure. The SSSC is mentioned in the third chapter. The
harmonic The second generation FACTS instruments are the fourth chapter concludes the execution of the case study in
static synchronous sequence compensator (SSSC) and MATLAB. Chapter 5 discusses the outcomes of possible
combined power flow controller (UPFC). These limitations scenarios. The sixth chapter contains the conclusion and future
have an effect on the quality of electricity generated. The case work.
study of PESCO is the subject of this article. The PESCO
II. LITERATURE REVIEW
Company has 132kV grid stations, all of which are
interconnected. Before we get into FACTS Technology, there are a few
topics that will help us understand the FACTS concepts.
A Research Problem
On the 132kV line between Kohat and Gurguri, increased A. Principal of power transimission
power flow and transient stabilisation are needed because To build a simulation of the procedure a conductor are often
voltage at Gurguri bus and Tall bus fall to dangerously low shown for point are shown in the diagram. The equivalent
levels during peak hundreds, causing current to rise and the impedance (j X/2) of every Thevenin equivalent, as shown in
system to become overloaded, causing not only power Figure 2, represents the “short-circuit resistivity” on each side
interruptions but also loss to PESCO. to beat overload, forced of the point.
load shedding is allotted. so as to beat losses and compelled Assume that the amplitude of the terminal voltages,
voltage profile, load shedding ought to be increased to boost Vs=Vr=Vm=V, remains constant and necessary. Two voltages
the the flow of energy system. because it is known that at the terminals are often represented in rectangular
improvement in power demand, useful corporations need to coordinates using phasor notations, as shown below.
International Journal of Engineering Works Vol. 8, Issue 10, PP. 249-261, October
2021 www.ijew.io