Master FIELD TEST
Master FIELD TEST
Doc No :
N= 9719747.224 E=
2 Compression Area 4 319805.813 13.38 2.009 1.772 1.954 BP 0001 90.66 90 Acceptable
N= 9719751.127 E=
3 Compression Area 4 319779.225 12.61 2.017 1.791 1.954 BP 0001 91.56 90 Acceptable
Doc. No : P104-LMAK-QC-DCPT-00
Rev. :
STA : Date :
Point of Test : Koordinat :
Location : Zone / Grid Hammer Weight : 8 kg
Type of Layer :
A B C D E F G H
Penetration
Number of Cummulative Penetration per Hammer DCP Index Moisture Content if
Between Reading CBR Correlated %
Blows Penetration (mm) Blow (mm) Factor mm/blow any %
(mm)
0.000 - - - -
N B : S K ET C H O F T ES T P O IN T
Notes
Prepared By : Witness/Approved By :
LMA Konsorsium PT. Eskapindo Matra
Date : Date :
PT. ESKAPINDO MATRA New Airport Development - Earthwork and
consulting engineers
River Diversion
Number Of Test
Layer
Point of Test
Remarks
Coordinate
Notes
Date :
Layer
Point of Test
Remarks
Coordinate
16 % Retained no. 4 %
18 Laboratory w opt. %
STA : Date :
LOCATION : Zona / Grid Tested by :
Coordinate : Proving Ring :
Layer : Capacity : lbf
Description :
2 2.54
Load (lbs)
3 3.81
6.00
4 5.08
6 7.62
8 10.16
4.00
10 12.7
2.00
CBR Results
NO. Weight of Water Above Point Test Weight of Water in Hole Weight of Control Fraksion Weight of Oversize
1 kg kg kg kg
2 kg kg kg kg
3 kg kg kg kg
4 kg kg kg kg
5 kg kg kg kg
6 kg kg kg kg
7 kg kg kg kg
8 kg kg kg kg
9 kg kg kg kg
10 kg kg kg kg
11 kg kg kg kg
12 kg kg kg kg
13 kg kg kg kg
14 kg kg kg kg
15 kg kg kg kg
16 kg kg kg kg
17 kg kg kg kg
18 kg kg kg kg
19 kg kg kg kg
20 kg kg kg kg
Bruto kg kg kg kg
Netto kg kg kg kg
Doc. No : P104-LMAK-QC-FDT-00
Work Item : Trial Compaction LTP MSEWall + Geogrid (10 Passing) Borrow area : LTP 100 % Crusher MGM
Lokasi : Zona B Grid G-13 ST 2 Tanggal Test 6-Aug-21
Layer 1 1 1
Titik Test 1 2 3
Keterangan
Koordinat 0604997, 9142400 0605000, 9142400 0605006, 9142404
1 Berat Botol + Pasir Penuh g 7135.3 7024.4 6937.6
2 Berat Botol + Pasir Tersisa g 2235.4 2204.8 2783.7
3 Berat Pasir yang digunakan = (1 - 2 ) g 4899.9 4819.6 4153.9
4 Berat Pasir di corong (attached) g 1640.1 1640.1 1640.1
5 Berat pasir dalam lubang = (3 - 4) g 3259.8 3179.5 2513.8
6 Berat Volume Pasir, (g sand, attached) g/cm3 1.398 1.398 1.398
7 Volume lubang = ( 5/6 ) cm3 2331.76 2274.32 1798.14
8 Berat kontainer + tanah basah g 5066 4957.9 3940.6
9 Berat Kontainer g 10 10 10
10 Berat tanah basah dalam lubang = (8 - 9) g 5056 4947.9 3930.6
11 Berat isi basah ( g m ) (10/7) g/cm 3
2.168 2.176 2.186
12 Berat Basah Lolos 3/4" (M MF) g 2919.0 2919.6 2230.2
13 Berat Basah Tertahan 3/4" (M Mc) g 2137.0 2028.3 1700.4
14 Pembacaan Jarum div 6 6.2 7
Kadar Air Lolos
15 3/4" by Speedy Faktor koreksi alat (attached) 1.567 1.6 1.564
(wf)
16 Kadar Air =(14x15) % 9.40 9.72 10.95
17 Berat Tanah basah + Cawan (a) g 515.40 541.31 540.52 570.35 550.45 531.87
18 Berat Tanah Kering + Cawan (b) g 497.10 523.49 517.99 549.75 534.98 514.47
Kadar Air
19 Tertahan 3/4" by Berat cawan kosong (c) g 31.42 31.15 31.40 32.51 36.52 35.55
Oven (wc)
20 Kadar Air % 3.93 3.62 4.63 3.98 3.10 3.6
21 Kadar Air Rata - rata % 3.77 4.31 3.37
22 Bulk Specific Gravity (Gm) 2.642 2.642 2.642
23 Berat Lolos 3/4" kering (MDF) = 𝑀_𝑀/(1+𝑤) g 2668.1 2661.1 2010.1
24 Berat Tertahan 3/4" kering (MDC) = 𝑀_𝑀/(1+𝑤) g 2059.3 1944.6 1645.0
25 Persentase Berat Lolos 3/4" kering (P F=100𝑀_𝐷𝐹/(𝑀_𝐷𝐹+𝑀_𝐷𝐶)
) % 56.44 57.78 54.99
26 Persentase Berat Tertahan 3/4" kering (P C) =100𝑀_𝐷𝐶/(𝑀_𝐷𝐹+𝑀_𝐷𝐶) % 43.56 42.22 45.01
27 Koreksi kadar air total material (W t) =(𝑤_𝐹 𝑃_𝐹+𝑤_𝐹 % 6.95 7.43 7.54
𝑃_𝐶)
28 Koreksi berat isi kering dari total material (ꙋDT) 𝐺_𝑀 𝛾_𝑤/(𝛾_𝐷𝐹 𝑃_𝐶+𝐺_𝑀 𝛾_𝑤 𝑃_𝐹)
=100𝛾_𝐷𝐹 2.040 2.029 2.052
29 Berat isi kering lap. ( gd ) = (23+24)/7 g/cm 3
2.027 2.025 2.033
30 Test w optimum % 6.22 6.22 6.22
Laboratorium
31 (attached) gd maksimum g/cm 3
1.735 1.735 1.735
32 Persentase Kepadatan Lapangan =(29/28)*100 % 99.38 99.80 99.06
Location :
Date :
Layer
Point of Test
Remarks
Coordinate
3 Weight of water to fill testpit + Template space (1-2) gram #REF! #REF!
15 Laboratory w opt. %
Nb:
Location of Test :
Type of Layer
Point No
Remarks
Elevation
Coordinate
16 % Retained #4
17 MDD Corection
18 Laboratory w opt. %
1200
Load
1 1.27 32 343.776
600
1 1/2 1.91 45 483.435
2 2.54 65 698.295 500
3 3.81 78 837.954
400
4 5.08 95 1020.585
6 7.62 102 1095.786 300
0
0 5 10 15 20
Penetration mm
READING
READING 0.1" 0.2"
C B R VALUE
CBR 0.1" 0.2"
698.30 1,020.59
% x 100 % x 100 %
3 x 1000 3 x 1500
23.28 % 22.68 %
NB :
SKETCH OF TEST POINT
Comments :