5.1 HIRA For Installation of DUCT
5.1 HIRA For Installation of DUCT
5.1 HIRA For Installation of DUCT
Note:
1 In the event Severity is 5 or the legislation is "NO"- irrespective of overall low score the Risk is always Low.
Risk Evaluation
Page 1 of 3
Project HIRA
Project Name:HB03 SYNGENE INTERNATIONAL HYDERABAD
Prepared by Reviewed by: Approved by: Audit Comments
Name VISHNU OB
Signature
Date 12-10-2020
Process: Erection, installation of Scaffolding and Duct
EXPOSOURE IMPACT EXISTING
SEVERITY PROBABLITY LEGISLATION
SR NO. ACTIVITY HAZARDS ASSOCIATED RISK FREQUENCY RISK CONTROL IN RISK LEVEL ACTION MEASURE FOR RISK CONTROL
S P L (SxExP)
E PLACE
1. Before entering the site safety induction training will be given &
Untrained worker Gate pass will be ensured.
Damage to property
1 Mobilization of manpower Language barrier 3 3 1 No 9 Yes LOW 2.Ensure work permit before start of any work activity.
Personal injury
Medically unfit worker 3. PPE's( Safety Helmet, reflective jacket, safety shoes, goggle.
Page 2 of 3
1. Give the TBT before start the work.
Personal Injury 2. Check the equipment's(hand tools) before start the work.
Slip , Trip hazard due to in proper segregation
Cut injury 3. Stock the fabricate material in prepare place and access area to
5 Duct fabrication Sharp edges 2 4 1 No 8 Yes LOW
Temporary reduction in hearing be clear.
Noise
sensitivity 4. Used the proper PPE's (cotton hand gloves, safety goggles).
5. Clean the area daily basis.
1. Check the all height equipment's (scaffolding) as per check lot
points before work start.
2. Trained person to be involved in height work.
Collapse of scaffolding 3. Ensure the SWL of scaffolding don not overloaded scaffolding
Material damage
6 Duct installation work Falling of duct 4 3 1 No 12 Yes LOW while installation time
Personal injury
Over turning of scaffolding 4. Provide double line yard harness for worker who going to do
height work.
5. Barricaded the work area before start the activity
6. Sign board to be provide to near height work.
Page 3 of 3