Material Schedule Calculation Sheet
Material Schedule Calculation Sheet
C Excavation works
excavation of column bases
according to structural drawings to
a depth not less than 1200mm to
receive blinding for pad
3
foundaation 12 m
excavation of strip footing 690mm
wide and 950mm deep to receive
3
mass concrete 14 m
D concrete works
cement F.A C.A
provision of concrete for
bllinding of ratio; 1 1.5 3
3
total volume of blinding 100 m
CEMENT
3
density 1400 kg/m
3
volume 1m
mass 1400 kg
weight of 1 bag of cement 50 kg
implying 1m3 of cement contains 28 bags of cement
Page 1 of 8
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
3
implying 1m of concrete contains 8.48 bags of cement
wastage 5%
3
if we add wastage, implying 1m of
concrete contains; 8.9090909 bags of cement
FINE AGGREGATES
3
density 1300 kg/m
3
volume 1.5 m
mass 1950 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 590.91 kg of F.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 620.45455 kg of F.A
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 1454.55 kg of C.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 1527.2727 kg of C.A
Page 2 of 8
therefore for the blinding works for
pad footing and strip footing, we
require; 152.727 tonnes of C.A Using a truck of say 4 tonnes
then we would convert it into trips
cement F.A C.A
provision of concrete for Pad
footing of ratio; 1 1.5 3
3
total volume of blinding 100 m
CEMENT
3
density 1400 kg/m
3
volume 1m
mass 1400 kg
weight of 1 bag of cement 50 kg
implying 1m3 of cement contains 28 bags of cement
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 8.48 bags of cement
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 8.91 bags of cement
FINE AGGREGATES
3
density 1500 kg/m
3
volume 1.5 m
mass 2250 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 682 kg of F.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 716 kg of F.A
Page 3 of 8
then we would convert it into trips
COARSE AGGREGATES
3
density 1600 kg/m
3
volume 3m
mass 4800 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
3
implying 1m of concrete contains 1455 kg of C.A
wastage 5%
3
if we add wastage, implying 1m of
concrete contains; 1527.2727 kg of C.A
CEMENT
3
density 1400 kg/m
3
volume 1m
mass 1400 kg
weight of 1 bag of cement 50 kg
implying 1m3 of cement contains 28 bags of cement
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 8.48 bags of cement
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 8.91 bags of cement
FINE AGGREGATES
3
density 1500 kg/m
Page 4 of 8
3
volume 1.5 m
mass 2250 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
3
implying 1m of concrete contains 682 kg of F.A
wastage 5%
3
if we add wastage, implying 1m of
concrete contains; 716 kg of F.A
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 1455 kg of C.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 1527.2727 kg of C.A
CEMENT
3
density 1400 kg/m
3
volume 1m
mass 1400 kg
weight of 1 bag of cement 50 kg
implying 1m3 of cement contains 28 bags of cement
Page 5 of 8
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
3
implying 1m of concrete contains 8.48 bags of cement
wastage 5%
3
if we add wastage, implying 1m of
concrete contains; 8.91 bags of cement
FINE AGGREGATES
3
density 1500 kg/m
3
volume 1.5 m
mass 2250 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 682 kg of F.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 716 kg of F.A
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 1455 kg of C.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 1527.2727 kg of C.A
Page 6 of 8
therefore for the blinding works for
pad footing and strip footing, we
require; 153 tonnes of C.A Using a truck of say 4 tonnes
then we would convert it into trips
E REINFORCEMENT WORKS
G FORMWORK
H BACKFILLING AND COMPACTION
J DAMP PROOF MEMBRANE
K BRC MESH
L GROUND FLOOR SLAB
cement F.A C.A
provision of concrete for ground
floor slab of ratio; 1 1.5 3
3
total volume of blinding 100 m
CEMENT
3
density 1400 kg/m
3
volume 1m
mass 1400 kg
weight of 1 bag of cement 50 kg
implying 1m3 of cement contains 28 bags of cement
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 8.48 bags of cement
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 8.91 bags of cement
FINE AGGREGATES
3
density 1500 kg/m
3
volume 1.5 m
mass 2250 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 682 kg of F.A
wastage 5%
Page 7 of 8
3
if we add wastage, implying 1m of
concrete contains; 716 kg of F.A
COARSE AGGREGATES
3
density 1600 kg/m
3
volume 3m
mass 4800 kg
3
total volume ratio 5.5 m
shrinkage 40 %
3
volume of wet concrete 3.3 m
implying 1m3 of concrete contains 1455 kg of C.A
wastage 5%
if we add wastage, implying 1m3 of
concrete contains; 1527.2727 kg of C.A
Page 8 of 8