JS Scaffolding
JS Scaffolding
JS Scaffolding
Sheet : Of
Keperluan / Proyek :
Letak / Lokasi :
Desa : Pemilik Tanaman / Bangunan
Kecamatan :
Kabupaten : Nama :
CC / AFE No. : Alamat :
SPK No. : Hp :
Tanaman :
Klasifikasi Tanaman Jumlah
No Jenis Keterangan Tanaman
Hasil Sedang Kecil Tanaman
Bangunan :
Klasifikasi Tanaman
No Jenis Keterangan Tanama
Ukuran Luas Kondisi
Sketch / Gambar :
Juru hitung Surveyor Pemilik Tnm / Bang Pertanahan PT. PHR Desa
SURVEY FIELD SKETCH
Date : Location :
Job Description : Project Title :
SR No :
QS-PDC QS-TPE
PT. PERTAMINA HULU ROKAN
Construction Services Work Unit Rate Earthwork Package
Contract No : SPHR00361A
SKETCH DRAWING (JOINT SURVEY)
Initiated Date : 03-May-23 Location : 29 AB 8
Work Title : Install Braching power pole sintong feeder dan ketigul feeder SPK No. : CCMSPHR/SPK/3700103287
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 47.12 m3
Spot 1 1.9
2.25
Spot 2
1.9
3.05
3.8
2.97
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 44.30 m3
Spot 1 1.82
2.4
Spot 2
1.83
2.94
3.65
2.92
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 53.39 m3
Spot 1 1.7
2.5
Spot 2
1.8
2.8
3.5
3.8
Note:
1. In the event the Actual Installed Quantities are greater than the Scaffolding Plan and assuming there are no approved charges, the Billing Quantities should equal the agreed upon Scaffoldng Plan Quantities.
2. In the event the Actual Installed Quantities are less than the Scaffolding Plan and assuming there are no approved charges, the Billing Quantities should equal the agreed upon Scaffoldng Plan Quantities
3. Billable Quantities will be measured by the actual installed quantities ± any approved change.
4. Scaffolding Report - Summary should be accompanied by the Scaffolding Report-Plus any revisions and Scaffolding Report-Actual for all periods as documentation to support the summary.
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 57.10 m3
Spot 1 1.8
3.0
Spot 2
1.27
2.95
3.07
3.95
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 56.36 m3
Spot 1 1.85
2.53
Spot 2
1.05
3.5
2.9
3.8
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 56.46 m3
Spot 1 1.67
2.9
Spot 2
1.23
3.4
2.9
3.84
SCAFFOLDING CALCULATION
SPOT L x P x T = M3
TOTAL = 65.15 m3
Spot 1 1.9
4.1
Spot 2
1.7
3.95
3.6
2.98
SCAFFOLDING CALCULATION
1 1.80 x 2.9 x 2.75 = 14.36 m3
TOTAL 39.16 m3
Spot 1 1.8
2.75
Spot 2
2.75
2.95
2.9
2.9
SCAFFOLDING CALCULATION
1 1.72 x 2.88 x 3.92 = 19.42 m3
TOTAL 51.23 m3
Spot 1 1.72
2.88
Spot 2
1.22
2.76
2.9
4
2
3.9
SCAFFOLDING CALCULATION
1 1.77 x 2.9 x 1.7 = 8.73 m3
TOTAL 34.63 m3
Spot 1 1.7
7
1.7
Spot 2
3.08
2.9
2.9
SCAFFOLDING CALCULATION
1 3.0 x 1.5 x 3.5 = 15.75 m3
TOTAL 50.55 m3
1.5
Spot 1 0
3.50
Spot 2
2.90
4.0
0
0
3.0
Spot 1 2.7
SCAFFOLDING CALCULATION
1 2.9 x 2.7 x 3.8 = 29.24 m3
TOTAL 59.58 m3
3.8
Spot 2
2.73
3.9
0
5
2.8
SCAFFOLDING CALCULATION
Spot 1 1.4
1 3.86 x 1.4 x 2.96 = 16.00 m3
TOTAL 47.46 m3
2.96
Spot 2
2.86
2. 8
5
6
3.8
SCAFFOLDING CALCULATION
1 2.95 x 1.2 x 3 = 10.62 m3
Spot 2
2.89
2.9
1
6
2.9
Spot 1 1.2
5 SCAFFOLDING CALCULATION
SPOT 1
4.07 M X 1.25M X 2.87M = 14.60 M3
SPOT 2
4.07M X 3.07M X 2,73M = 34,11 M3
TOTAL VOLUME
2.87
Spot 2
2.73
3.0
7
7
4. 0
Spot 1 0.9
9 SCAFFOLDING CALCULATION
SPOT 1
2,85 M X 0,99M X 2.15M = 06,06 M3
SPOT 2
2,89M X 2,85M X 2,58M = 21,25 M3
TOTAL VOLUME
2.15
Spot 2
2.58
2.8
9
5
2. 8
Spot 1 1.4
9 SCAFFOLDING CALCULATION
SPOT 1
2,9 M X 1,49M X 2.2M = 09,50 M3
SPOT 2
3,43M X 2,9M X 2,45M = 24,57 M3
TOTAL VOLUME
2.2
09,50M3 + 24,57M3 = 33,87 M3
Spot 2
2.45
3.4
3
2.9
PROPOSED FINAL
WELL NO NORTHING EASTING ELEVATION NORTHING EASTING LATITUDE LONGITUDE
ELEVATION
NORTHING EASTING ELEVATION
METER FEET