Outgoing Feeder List

The document provides details of 6 feeders from an existing emergency switchboard that are proposed to supply temporary uninterruptible power supply (UPS) systems and battery chargers. It lists the feeder tags, reference numbers, voltages, existing spare feeder ratings, and proposed changes to fuses. It also provides outgoing feeder details for the UPS systems, including voltages, reference numbers, ratings, and equipment being powered.

Uploaded by

arshadbaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views2 pages

Outgoing Feeder List

The document provides details of 6 feeders from an existing emergency switchboard that are proposed to supply temporary uninterruptible power supply (UPS) systems and battery chargers. It lists the feeder tags, reference numbers, voltages, existing spare feeder ratings, and proposed changes to fuses. It also provides outgoing feeder details for the UPS systems, including voltages, reference numbers, ratings, and equipment being powered.

Uploaded by

arshadbaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document Title

SITE SURVEY REPORT_P-1103(EPC FOR UPGRADE


EXISTING SAFT NIFE UPS AND DC BATTERY CHARGER)

Sheet No. Rev.


Doc. No: P1103-PE-REP-00001
10 of 24 B

Following are the details of feeders which are proposed to feed the Temporary UPS systems and
Battery charger systems from existing Emergency Switch Board No. U-SWE-8-3-1 A/B.

Feeder Existing
Sr. Voltage
Tag no. Reference spare Fdr. Remarks
No. level
number Rating

Fuse of 80A will be


1. UPS-841A 3A13 400V 125AF/80AT
changed to 100AT
Fuse of 6A will be changed
2. UPS-851A 4A01 400V 125AF/6AT
to 40AT
Fuse of 80A will be
3. UPS-852A 3A13 400V 125AF/80AT
changed to 100AT
Fuse of 6A will be changed
4. UPS-853A 5A03 400V 125AF/6AT
to 15AT
5. UPS-861B 5B01 400V 125AF/16AT No change required
Outgoing Feeder details are as follows:

O/G
Sr. Voltage FURTHER FEED TO
FEEDER Feeder Rating
No. level LQ UPS INSTRUMENT
Ref.

FROM To V Amps

Outgoing Feeders from AC UPS-841 A/B 230V 2 WIRE ACDB BUS

LQ IPT RACK#30- 63A


1 230V Q3
RCK-LQ-11 MCB

40A
2 USB 30-4-1 QG II 230V Q4
MCB

25A
3 SAPRE Q5
MCB

16A
4 SW-7-3-1/PLC PDC 230V Q6
MCB

16A
5 SW-8-3-1/PLC PDC 230V Q7
MCB

16A
6 NOT USED 230V Q8
MCB

40A
7 SPARE 230V Q9
MCB

Outgoing Feeders from 48V DC Battery Charger UPS-851 A/B 48V DC 2 WIRE OUTPUT BUS
Document Title

SITE SURVEY REPORT_P-1103(EPC FOR UPGRADE


EXISTING SAFT NIFE UPS AND DC BATTERY CHARGER)

Sheet No. Rev.


Doc. No: P1103-PE-REP-00001
11 of 24 B

400 V
16A
1 SWITCHBOARD D- 48 V
MCB
SW-7-3-1 A
400 V
16A
2 SWITCHBOARD D- 48 V
MCB
SW-8-3-1 A
16A
3 EQUIPPED SPARE 48V
MCB
400 V
16A
4 SWITCHBOARD D- 48 V
MCB
SW-7-3-1 B
400 V
16A
5 SWITCHBOARD D- 48 V
MCB
SW-8-3-1 B

16A
6 EQUIPPED SPARE 48V
MCB

Outgoing Feeders from AC UPS-852 A/B 48V 2 WIRE DCDB BUS

300A
1 PA/GA 48V
MCB

Outgoing Feeders from AC UPS-852 A/B 48V 2 WIRE DCDB BUS

25A
1 PABx PANEL 48V Q1
MCB

16A
2 PABx MDF 48V Q2
MCB

Outgoing Feeders from AC UPS-861 A/B 24V 2 WIRE DCDB BUS

MET/VHF/PACKAGE
16A
1 RACK U-04-VHF- 24V
MCB
0001

BATTERY 16A
2 24V
CHARGER MCB
10A
3 EQUIPPED SPARE 24V
MCB
10A
4 EQUIPPED SPARE 24V
MCB

HLO CONSOLE 16A


5 24V
U-04-CON-00002 MCB

ROR CONSOLE 16A


6 24V
U-04-CON-00001 MCB