ANNEX 2-1c
DECISION CHART FOR DETERMINATION OF REQUIREMENTS FOR PROJECT MODIFICATION
DECISION CHART FOR DETERMINATION OF REQUIREMENTS FOR PROJECT MODIFICATION
Increase in capacity or
Non-exceedance of PDR (non-covered
auxiliary component of the ECC Amendment
project) threshold is assumed that ECC Amendment
original project which will ECC Amendment /Letter Request
impacts are not significant; Updating PDS
either not entail exceedance /Letter Request with with brief
3. of PDR (non-covered brief description of description of not applicable (Annex 2-6) &
Modification scenario and decision Environmental
project) thresholds or EMP & additional capacity or additional
process are applicable to both non- 3
ERA can still address component capacity or Status
implemented and operating projects
impacts & risks arising from component
issued ECCs
modification
ANNEX 2-1c
DECISION CHART FOR DETERMINATION OF REQUIREMENTS FOR PROJECT MODIFICATION
ANNEX 2-1c
Management Plan
Plan (EPRMP)
(EPRMP)
ANNEX 2-1c
DECISION CHART FOR DETERMINATION OF REQUIREMENTS FOR PROJECT MODIFICATION
ANNEX 2-1c
8. type (e.g. bunker-fired plant
baseline; However, for operating / EIS /IEEC, IEER /PDR, IEEC, /New EIA Report
to gas-fired)
projects, there may be need to request IEER, EIS
for Relief from ECC Commitment prior to
applying for new project type to ensure
ANNEX 2-1c
DECISION CHART FOR DETERMINATION OF REQUIREMENTS FOR PROJECT MODIFICATION
ANNEX 2-1c
operations is within the ECC limits. Modification scenarios may be applied to both single and co-located projects. Projects that are operational or implemented prior to 1982 without having stopped for >5
years and without modification/expansion falling within thresholds of covered projects under Group I and II are not covered by any documentary requirement of the Philippine EIS System.
2
Proponent will be required a Project Briefing; EMB Review to be assisted by one (1) EIA Review Committee to assess the likely impacts of increasing the area (with transfer of facilities/incremental
impacts in new area) and changes in the environment from at least 5 years before 3 Proponent will be required a Project Briefing; and review to be undertaken by EMB only