VERIFY TAPPING POINT STUB OUT / COORDINATE TO ENGINEERING/ADMIN

PB
TO BUILDING
METER CENTER CHECK
M
METER

4-30mm² THHN +
1-8.0mm² THHN-G
IN 32mmØ IMC

NOTE:
100 AT
1. PROVIDE DIRECTORY 3P
2. WIRE TAGGING
3. MICA TUBING 40A,3P 20A,1P
4. RUBBER INSULATOR
1 2
20A,1P 20A,1P

3 4
20A,1P 40A,1P

5 6
SPACE 20A,1P

7 8
1 GROUND FLOOR POWER LAYOUT
SCALE
NEUTRAL GROUND

PANEL - LP (NEMA-1)
25 KAIC MIN.

1 GROUND FLOOR LIGHTING LAYOUT


SCALE
2 SCHEDULE OF LOADS