List - of - Documents 3
List - of - Documents 3
List - of - Documents 3
PRODUCTION FORMATS
1 Project Execution Plan cum report
2 Paint Mixing report
3 Process Validation report
4 Process Flow Diagrame
5 Process Control Plan
6 SOP for Paint coating
7 SOP for Film installation
8 SOP for Mesh installation
9 WI for Process Validation
MAINTENANCE FORMATS
1 List of machinery and equipment
2 Daily maintenance checklist
3 Machine break down register
STORES FORMATS
1 Material inward register
2 RM Stock book
3 FG Stock Book
4 Packing List
QUALITY FORMATS
1 Incoming inspection report
2 Final inspection report (Coating/Film/ Mesh)
3 List of Monitering and Measuring Resources
4 Calibration History card
5 CAPA
6 Re work registor
INSTALLATION FORMATS
1 Pre Installation Audit Report
2 Post Installation Audit Report
3 Warranty Report