Risk Assess T-25 - Scaffolding Erection & Dismantling
Risk Assess T-25 - Scaffolding Erection & Dismantling
Risk Assess T-25 - Scaffolding Erection & Dismantling
QAD 210.13.14
TASK ANALYSIS SCHEDULE
Falls of equipment – Scaffold poles and Care shall be taken to ensure suitable means of
clips etc. can fall easily if not adequately manoeuvring equipment during the erection
secured during the erection process. process are implemented by using mechanical
equipment where possible.
Falls of personnel – can occur if PPE shall be worn at all times, such as full
personnel overbalance, slip or loose their body safety harness and enertia reels etc.
grip when erecting or dismantling
scaffold.
Continued on next page.
H:WORD/SAFETY/RISKASSESS/T25
Continued. Only nominated and qualified scaffolders
shall erect, alter or dismantle scaffolding.
M H
Injury from jagged ends of scaffold Jagged ends shall be protected by end caps or
tubes – this can occur when lengths of taped with masking tape etc..
tubes are cut.
M L
Adverse weather conditions – such as Suitable judgement to be made by safety
high winds, rain, snow and frost. department whether scaffolding can be worked
on in high winds.
L H
Scaffold collapse – can occur if scaffold Scaffolds shall only be erected and dismantled
is not dismantled in a safe manner, taking by authorised scaffolders, no other persons
into account stresses on the scaffold and shall alter scaffold in any way or form.
main supports and ties etc.
The area around the scaffold to be barriered
off to prevent access to unauthorised
personnel.
L H
M M
H:WORD/SAFETY/RISKASSESS/T25
Lead Assessor Name D. Gorman Job Title SHE Officer
Assisted by Name B. Yeoman Job Title Production Manager
Assisted by Name W. Hegarty Job Title Superintendent
Assisted by Name P.J. Quayle Job Title Q.A. / Environmental
Engineer
Assisted by Name E. Jackson Job Title Safety Representative
H:WORD/SAFETY/RISKASSESS/T25