JSA Loading & Unloading

This Job Safety Analysis document summarizes the potential hazards and safety procedures for loading and unloading materials. Key steps include preparing the storage area and loading/unloading activities. Potential hazards identified include tripping hazards, improper rigging positioning, being struck by materials, and riggers without proper training. To control hazards, the document outlines cleaning work areas, installing barricades and signage, special rigger training, checking rigging equipment, and using tag lines during lifting. Required safety equipment includes hard hats, safety shoes, gloves, harnesses, and other PPE. Applicable safe work practices include hot work permits, emergency plans, confined space procedures, and pollution prevention measures.

Uploaded by

Sodikin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
408 views2 pages

JSA Loading & Unloading

This Job Safety Analysis document summarizes the potential hazards and safety procedures for loading and unloading materials. Key steps include preparing the storage area and loading/unloading activities. Potential hazards identified include tripping hazards, improper rigging positioning, being struck by materials, and riggers without proper training. To control hazards, the document outlines cleaning work areas, installing barricades and signage, special rigger training, checking rigging equipment, and using tag lines during lifting. Required safety equipment includes hard hats, safety shoes, gloves, harnesses, and other PPE. Applicable safe work practices include hot work permits, emergency plans, confined space procedures, and pollution prevention measures.

Uploaded by

Sodikin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB SAFETY ANALYSIS

BANYU URIP EPC 1 PROJECT

WORK ACTIVITY (JOB): Loading & Unloading Material


WORK TEAM: JSA PREPARED BY:

DATE:

SUPERVISOR APPROVAL: (………………………………)


CRITICAL QUESTIONS: Everyone Ready/Capable To Work?  Potential Spill/Gas Release Addressed?  Worst Case Discussed? 
BASIC JOB STEPS POTENTIAL INCIDENTS OR HAZARDS WAYS TO ELIMINATE OR CONTROL HAZARDS
1. Mempersiapkan Area Penyimpanan Tersandung Bersihkan Area
Preparing storage area Trip Cleaning area
Area kerja tidak diberi tanda / Barikade Memberi barikade untuk radius crane & safety sign
Work area without sign Install barricade
2. Bongkar muat Rigger tidak berkompetensi Pelatihan khusus rigger
Unloading & Loading Rigger not competent Training for rigger
Rigging tidak dalam posisi benar Pelatihan khusus rigger & Periksa Alat Angkat (Sling / Webbing Sling)
Position rigging isn’t correct Special training for rigger and check sling/webbing sling
Tertabrak material Tag Line, Barikade & Safety Sign
Crash by material Install tag line, barricade & safety sign
Tertimpa material Tag Line, Barikade & Safety Sign
Struck down by material Install tag line, barricade & safety sign

REQUIRED SAFETY EQUIPMENT


Hard Hats Goggles Safety Hearing Protection Barricades Other (List):___________________________________
Safety Shoes Face Shield Harness Flame Resistant Clothing LEL _______________________________________________________
Safety Glasses Work Vests Cotton Fire Extinguisher Monitor ___________________________________
Gloves H2S
Leather Monitor
Gloves
APPLICABLE SAFE WORK PRACTICES/SPECIAL PRECAUTIONS
Hot Work Permit Special Pre-Job Safety Discussions Confined Space Entry Permit Pollution Prevention Measures
Energy Isolation Review Emergency Action Plans Use of Specialized PPE Redundant Protection Measures
Written Procedure Site/Job Orientation Overhead/Underground Utility Lines Simultaneous Operations
POTENTIAL HAZARDS

Lifting Hazards Short Service Employees Elec. Shock/ Flash (includes utility lines) Dropped/Falling Objects Low Lighting Ionizing
Fall Potential Water/Drowning Hazard Haz. Chemical Exposure (includes H2S) Tripping/Slipping Breathing Hazard Radiation
Skin Irritants Mech. Equip. Hazards Sharp Edges or Hot/Cold surfaces Excavation Hazard Environmental Other:_________
Confined Spaces Fire/Explosion Potential Pinch/Crush/Striking Hazards Confined spaces Extremes ________________
Elev. Load/Work High Noise Levels Potential Release of Energy Elevated load or work Vehicle Operations ________________