Main Activity Scaffolding erection and modification work Plant & Location:
Date Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7
Permit Nos.
(Day1-7)
S.No Sub Activities Hazards Control Measures
List the tasks required to perform Both existing as well as potential against each task list the List the control measures required to eliminate or minimize the risk of
the activity in the sequence they hazards that could cause injury /damage to people , injury arising from the identified hazard.
are carried out equipment or the environment
Shifting of scaffolding martial Injury due to improper handling Use trolley the scaffolding martial. Do not use bare hands.
Injury due to improper house keeping for shifting scaffolding martial to height use rope and pulley
arrangement with sufficient manning and barricading: tie rods properly
to avoid slips
Martial to be kept at one location away from walking area. Area to be
barricaded
1.
Damage to workplace due to hitting / climbing on pipes, Scaffolding erected should not block identification escape routes of the
Erection of scaffolding specially SBCs plant
All SBCs work location must be identified
Injury due to fall (slip/trip) while climbing up Depending on critically, SBC may be marked by wrapping with
barricading tape.
2. Scadequate care must be taken to avoid hitting on SBCs
Scaffolding pipes must be at least 6’’ away from all SBCs and process
Struck (injury) be falling objects.
line.
Do not kept pipes/ clamps over the cable trays.
Injury due to fall (slip/trip) from the work location.
Tools, tackles etc. are not to be carried with hands while climbing. use
Injury due to sudden collapse of incomplete scaffolding.
pouch, belt or other lifting device, ladder must be free of oil / grease
Do not use scaffolding branches for climbing up, use ladders
Gloves with good grip must be used while climbing.
Standard lifting procedure to be used for lifting objects
Scaffolding rods/planks should not be manually shifted ( do not shift
with hands alone).
Do not keep planks loose at height. Area must be barricaded
No person to be allowed to stand underweight is being lifted.
If scaffolding erection is above normal walkways, use safety net.
Use safety full body harness.
Ensure proper tightening of bolts and nuts and follow sequence of
erection.
Use correct tool. Use mandatory PPEs.