Gujarat Technological University

This document appears to be an exam for an operations research course, consisting of 5 questions worth a total of 70 marks. Question 1 has 3 parts worth 3, 4 and 7 marks respectively. Question 2 has 3 parts worth 3, 4 and 7 marks. Questions 3-5 follow a similar format with parts worth 3-4 and 7 marks. The questions cover topics like linear programming, transportation problems, assignment problems, PERT/CPM networks and game theory.

Uploaded by

KALPESH MALI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views3 pages

Gujarat Technological University

This document appears to be an exam for an operations research course, consisting of 5 questions worth a total of 70 marks. Question 1 has 3 parts worth 3, 4 and 7 marks respectively. Question 2 has 3 parts worth 3, 4 and 7 marks. Questions 3-5 follow a similar format with parts worth 3-4 and 7 marks. The questions cover topics like linear programming, transportation problems, assignment problems, PERT/CPM networks and game theory.

Uploaded by

KALPESH MALI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Seat No.: ________ Enrolment No.

___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTER–V(NEW) EXAMINATION – SUMMER 2022
Subject Code:3151910 Date:17/06/2022
Subject Name:Operation Research
Time:02:30 PM TO 05:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
4. Simple and non-programmable scientific calculators are allowed.

MARKS

Q.1 (a) Summarize applications of operation research. 03


(b) Explain significance of positive, zero and negative opportunity cost with 04
respect to transportation problem.
(c) Solve graphically 07
Maximize Z= 10 x1 +15 x2
Subject to, 2 x1 + x2 ≤ 26
2 x1 + 4x2 ≤ 56
x1 - x2 ≥ -5
x1, x2 ≥ 0
Q.2 (a) Define slack and surplus variable with respect to linear programming problem 03

(b) A person wants to invest up to 500000 in fixed securities scheme. Broker 04


recommends two bonds: Bond A yielding 8% and bond B yielding 10%. He
decide to invest at most 100000 in bond A and at least 200000 in bond B. he
also wants the amount invested in bond A to be at least equal to amount
invested in bond B. Formulate the problem
(c) A simplex problem and its solution is given in table. 07
(i) Formulate dual to the given problem
(ii) Verify the objective function value for both the primal and dual using value
given in table
Maximize Z = x1 + 1/2 x2
Subjects to 6x1 + 2x2 ≥ 24
3x1 + 2x2 ≥ 18
x1 + 3x2 ≥ 12 and x1, x2 ≥ 0
Basis x1 x2 S1 S2 S3 A1 A2 A3 bi
x1 1 ` 0 -1/3 1/3 0 1/3 -1/3 0 2
S3 0 0 0 7/6 -8/3 1 -7/6 8/3 -1 8
x2 1/2 0 1 1/2 -1 1 -1/2 1 0 6
cj 1 1/2 0 0 0 M M M
solution 2 6 0 0 8 0 0 0
∆j 0 0 1/12 1/6 0 M-1/12 M-1/6 M
OR
(c) Solve the following LPP using Simplex method 07
Maximize: Z = 2x1 + 4x2
Subject to 2 x1 + x2 ≤ 18
3 x1 + 2x2 ≥ 30
x1 + 2x2 = 26 and
x1, x2 ≥ 0
1
Q.3 (a) How profit maximization problem can be solved in assignment technique? 03
(b) Amul milk has three plant A, B & C with daily milk processing capacity (in 04
Mega Liter) as 11, 6 & 5 and requirement at distribution center P, Q, R & S are
8, 4, 7 & 3 Mega liter respectively. Unit transportation cost is given in the table.
Find the initial feasible solution using N-W corner method.

Unit transportation cost


(Rs. in 1000/ Mega Litre)
P Q R S
A 2 5 3 8
B 4 1 6 4
C 7 5 8 2
(c) To repair four road of city five contractor bid the tender (amount in lakhs). 07
Using assignment techniques find…
1 optimum cost of road repairing?
2 Which contractor will be unable to get contract?
Road
A B C D
P 9 14 19 25
Q 7 17 20 19
contractor

R 9 18 21 18
S 10 12 18 19
T 10 15 21 16

OR
Q.3 (a) Explain degeneracy in transportation problem. 03
(b) Is given solution of assignment problem is correct as per the criterion of 04
travelling salesmen problem? If not, then modified it.

I II III IV V

I M 5 15 30 0
II 20 M 0 30 0
III 20 15 M 0 15
IV 40 0 5 M 5
V 0 10 0 35 M

(c) Find the optimum solution for the following transportation table. 07
W1 W2 W3 W4 Capacity
F1 19 30 50 10 7
F2 70 30 40 60 9
F3 40 8 70 20 18
Requirement 5 8 7 14

Q.4 (a) Explain ‘zero-sum’ in the context of game theory. 03


2
(b) Bikes arrives at fuel pump in poisons fashion with an average of 9 bikes per 5 04
minutes. service boy can refuel 10 bikes in 5 minutes. Find...
1. Average number of bikes in a system. And in queue.
2. Average time a bike spends in system.
3. Average time a bike waits before being served.

(c) Running cost and resale value of bike whose purchase price is ₹ 60,000, given 07
in the table, find the age of replacement.
Year 1 2 3 4 5 6 7
Resale value 30000 15000 7500 3750 2000 2000 2000
Running cost 10000 12000 14000 18000 23000 28000 34000
OR
Q.4 (a) Define a) Balking b) Jockeying c) Reneging with respect to queueing 03
(b) Discuss group replacement policy with suitable example. 04
(c) In a game of matching coins with two players, player A wins ₹1 when there 07
are two heads, wins nothing when there are two tails and loose ₹1/2 when one
head and one tail. Determine the payoff matrix, strategies and value of game.
Q.5 (a) Explain predecessor, successor and dummy activity with diagram. 03
(b) Jyoti CNC introduce three model of CNC machine, which can lead to increase, 04
neutral and decrease in sales. Sales department workout the payoff in terms of
yearly net profit for each type of sales action as tabulated below.

Estimated net profit (In Crores)


Machine types Increase Neutral Decrease
Model 1 60 30 30
Model 2 30 40 30
Model 3 15 10 25
help to take decision using Maximax and Laplace criterion.
(c) Draw a network corresponding to following tabular information and calculate 07
early and latest start & finish time also determine critical path.
Activity 1-2 1-3 2-6 3-4 3-5 4-6 5-6 5-7 6-7
Duration 4 6 8 7 4 6 5 19 10
OR
Q.5 (a) Discuss the difference between decision-making under certainty, under 03
uncertainty and under risk.
(b) Differentiate PERT and CPM 04
(c) Tasks A to I constitutes a project in which the precedence relationships are 07
A < D; A < E; B < F; D < F; C < G; C < H, F < I; G < I.
Time in day for each task is as follows:
Task A B C D E F G H I
Time 8 10 8 10 16 17 18 14 9
Draw the network to represent the project and find out total float of each
activity and identify critical path

*************