5 RFI-WP5-DEC-TNK-00674 Tank WP5 Visual Inspection Visual Inspection Bottom Plate W S Bottom Plate for 80-TK-511B LINE-800-RB-1-6108 DAEAH 2023-07-18 2023-07-20 10:00 Daud ATM Tank Area (WP5)
6 RFI-WP5-DEC-TNK-00675 Tank WP5 Fit-up Inspection Fit-up Inspection Annular to Shell W SW Shell Plate for 80-TK-601 LINE-800-RB-1-9104 DAEAH 2023-07-18 2023-07-20 9:00 Daud ATM Tank Area (WP5)
9 RFI-WP5-DEC-TNK-00683 Tank WP5 Visual Inspection Visual Inspection Annular to Shell W S Shell Plate for 90-TK-406 LINE-904-RB-1-5103 DAEAH 2023-07-18 2023-07-20 9:00 Daud ATM Tank Area (WP5)
11 RFI-WP5-DEC-TNK-00685 Tank WP5 Fit-up Inspection Fit-up Inspection Roof Compression Ring W SW Roof Plate for 90-TK-401B LINE-904-RB-1-1109 DAEAH 2023-07-18 2023-07-20 15:00 Daud ATM Tank Area (WP5)
12 RFI-WP5-DEC-TNK-00686 Tank WP5 Welder Qualification Test Welder Qualification Test W W Welder Test (5 Welders / SMAW) N/A DAEAH 2023-07-18 2023-07-20 9:00 Daud DAEAH Site Office Area (WP5)
LINE-800-RB-1-8111
LINE-800-RB-1-8112
Workshop PT Daeah E&C
13 RFI-WP5-DEC-TNK-50553 Tank WP5 Fit-up of Joint Fit-up Inspection W SW Internal Pipe for 80-TK-541 LINE-800-RB-1-8113 DAEAH 2023-07-18 2023-07-20 8:00 Josua
Rangkasbitung
LINE-800-RB-1-8114
LINE-800-RB-1-8115
LINE-801-RB-1-1120
LINE-801-RB-1-1121 Workshop PT Daeah E&C
14 RFI-WP5-DEC-TNK-50554 Tank WP5 Dimensional Check Inspection Dimensional SW S Clip Stairway for 80-TK-121 DAEAH 2023-07-18 2023-07-20 9:00 Josua
LINE-801-RB-1-1122 Rangkasbitung
LINE-801-RB-1-1123
LINE-801-RB-1-1120
LINE-801-RB-1-1121 Workshop PT Daeah E&C
15 RFI-WP5-DEC-TNK-50555 Tank WP5 Fit-up of Joint Fit-up Inspection W SW Clip Stairway for 80-TK-121 DAEAH 2023-07-18 2023-07-20 15:00 Josua
LINE-801-RB-1-1122 Rangkasbitung
LINE-801-RB-1-1123
LINE-904-RB-1-3134
LINE-904-RB-1-3135 Workshop PT Daeah E&C
16 RFI-WP5-DEC-TNK-50556 Tank WP5 Dimensional Check Inspection Dimensional SW S Internal Pipe for 90-TK-404A DAEAH 2023-07-18 2023-07-20 8:00 Josua
LINE-904-RB-1-3136 Rangkasbitung
LINE-904-RB-1-3137
LINE-904-RB-1-3134
LINE-904-RB-1-3135 Workshop PT Daeah E&C
18 RFI-WP5-DEC-TNK-50558 Tank WP5 Fit-up of Joint Fit-up Inspection W SW Internal Pipe for 90-TK-404A DAEAH 2023-07-18 2023-07-20 15:00 Josua
LINE-904-RB-1-3136 Rangkasbitung
LINE-904-RB-1-3137
Nozzle & Manhole to Roof with/without 5.3.1 Orientation and Diameter Marking Nozzle & Manhole to Roof with/without
21 RFI-WP5-KSA-TNK-00338 Tank WP5 W R VD-90-TK-208-152 KSO STE ATA 2023-07-17 2023-07-20 9:00 Hendro
Repad Check (MH-1) Repad (90-TK-208)
Compression Ring itself or to Shell and to Compression Ring itself or to Shell and to
25 RFI-WP5-KSA-TNK-00342 Tank WP5 5.1.2 Visual Examination on Welds SW R VD-90-TK-208-105 KSO STE ATA 2023-07-18 2023-07-20 14:00 Hendro
Roof Roof (90-TK-208)
26 RFI-WP5-KSA-TNK-00343 Tank WP5 Grinding and Fit-up Cleaning Surface Prep 5.1.1 Fit-up Inspection W - Compression Ring to Shell (90-TK-203) VD-90-TK-203-105 KSO STE ATA 2023-07-18 2023-07-20 10:00 Hendro
Roof Platform
27 RFI-WP5-KSA-TNK-50028 Tank WP5 Roof Platform Fabrication Visual/Dimensional; Pre-Shipment; SW R N/A KSO STE ATA 2023-07-18 2023-07-20 9:00 Jaerudi
(90-TK-208, 90-TK-203 & 90-TK-201)
30 RFI-WP5-KTT-TNK-00266 SP Tank WP5 Fit-up Fit-up Inspection WL-6-12 S S Tank, Shell Plate (90-TK-301A) 90-TK-301A/B-005 KTT-SSA JO 2023-07-18 2023-07-20 14:00 Devara
31 RFI-WP5-KTT-TNK-00267 SP Tank WP5 Sattlement Inspection Sattlement Inspection 3/4 Water Filling W SW Tank, Shell Plate (90-TK-304A) 90-TK-304A/B-002 KTT-SSA JO 2023-07-18 2023-07-20 9:00 Devara
32 RFI-WP5-DEC-PIP-00720 Piping WP5 Fit-up of joints Above Ground Fit-up Inspection (Above Ground) W S Piping See Attached Iso DAEAH 2023-07-18 2023-07-20 8:00 Joko
33 RFI-WP5-DEC-PIP-00721 Piping WP5 Visual of joints Above Ground Visual Inspection (Above Ground) W S Piping See Attached Iso DAEAH 2023-07-18 2023-07-20 8:00 Joko
34 RFI-WP5-DEC-PIP-00722 Piping WP5 Bolting of Flange Bolt and Nut Tightening Gasket Verification SW S Piping See Attached Iso DAEAH 2023-07-18 2023-07-20 9:00 Joko
35 RFI-WP5-DEC-PIP-00723 Piping WP5 Fit-up of joints Under Ground Fit-up Inspection (Under Ground) W S Piping See Attached Iso DAEAH 2023-07-18 2023-07-20 8:00 Joko
36 RFI-WP5-DEC-PIP-50341 Piping WP5 Fit-up of Joints Fit-up Inspection W S Piping Shop Attached RFI DAEAH 2023-07-18 2023-07-20 8:00 Josua WP5 Rangkasbitung Shop
37 RFI-WP5-DEC-PIP-50342 Piping WP5 Welding of Joint Visual Inspection of Welded Joints W S Piping Shop Attached RFI DAEAH 2023-07-18 2023-07-20 13:00 Josua WP5 Rangkasbitung Shop
38 RFI-WP5-DEC-PIP-50343 Piping WP5 Fit-up of Joints Fit-up Inspection Support W S Piping Shop Attached RFI DAEAH 2023-07-18 2023-07-20 8:30 Josua WP5 Rangkasbitung Shop
39 RFI-WP5-DEC-PIP-50344 Piping WP5 Welding of Joint Visual Inspection of Support W S Piping Shop Attached RFI DAEAH 2023-07-18 2023-07-20 9:30 Josua WP5 Rangkasbitung Shop
40 RFI-WP7-TEK-PIP-00138 Piping WP7 Fit-up of Joints Fit-up Inspection W S Piping See Attached DWG. TEKNIKO 2023-07-18 2023-07-20 8:30 Y.W.Song Jetty Area (Lotte Site)
41 RFI-WP7-TEK-PIP-00139 Piping WP7 Welding of Joints Visual Inspection of Welded Joints W S Piping See Attached DWG. TEKNIKO 2023-07-18 2023-07-20 9:00 Y.W.Song Jetty Area (Lotte Site)
45 RFI-WP7-TEK-PNT-50281 Painting WP7 Surface Preparation & Painting Application Primer Coat (DFT&Visual) W S Primer Coat Inspection for Piping N/A TEKNIKO 2023-07-18 2023-07-20 10:30 Rakhma / Afi PT. CKN Workshop