ITP Structural Steel
ITP Structural Steel
ITP Structural Steel
SP-05-18016-C04-C05-B01-0004
Package : C04 ( Structural Steel ) Sheet No :
Rev. 1 2
1 of 1
Washers :
JIS B1186 F35, ASTM F436M Type 1, or equivalent
-. Welding Maping And NDT N/A N/A -. Approved Welding maping and NDT report -. According welding maping and NDT report Welding Maping and NDT Report R R R
Plan Report
Project Name : Document No :
SP-05-18016-C04-C05-B01-0004
Package : C04 ( Structural Steel ) Sheet No :
Rev. 1 2
1 of 1
-. Check Drilling for Holling of Visual, Measure -. Specification Project magma number 0341, point 5.2 Holes for bolts shall not be more than 1/16 inch (2 - S S S
At Visit Workshop fabrication mm) in diameter, unless otherwise
bolt
-. Shopdrwaing Approval specifically required by design
-. Check Cutting size At Visit Workshop Visual, Measure -. Shopdrwaing Approval -. According specification and shopdrawing Inspection record on fabrication S S S
-. Welding Record Daily Visual -. Shopdrawing -. Thickness of weld according shopdrawing Dailly Welding Report W S S
-. Welding Map and NDT Plan Report -. Good quality of weld, no sparter
Project Name : Document No :
SP-05-18016-C04-C05-B01-0004
Package : C04 ( Structural Steel ) Sheet No :
Rev. 1 2
1 of 1
-. Testing of Welding Random -. Specification Magma Project Number 0341, point 5.4 -. the weld shall not have any cracks, undercut -. NDT Test Report H H H
LPT (Liquid Penetrant Test) Welding exceeded 0.8 mm depth, exposed surface porosity
shall be performwed at the and slag inclusion
rate of 10% random, but
subjecty to change
depending on welding
production performance.
D. Surface Preparation
D.1. Sand blast Before Painting Visual -. Approved Work Method and Specification Project - Inspetion Record W W W
number DD-EQ-M03_SPE_0011-R0, -. Material Free from oil / Grase before sandbalst
point 5.5 and 8.2.3
-. Welding flux in crevices shall be removed.
-. Burrs, weld splatter, slivers, mill scale,
indentations, and other sharp surface have to
remove before paint
Testing test thickness painting -. Specfication project magma number 0341, point 7. -. According Specification and work method
b. Check Thickness At Site visit Wokshop - Inspetion Record W W W
with electrometer Painting -. Approve for thickness painting report
-. Primer = 50 µ
-. Intermediate = 150 µ -. RFI number 18016-RFI-01-0048
-. Finish = 50 µ
D.3. Holiday Detector After finish paint Holiday test, -. Specification Project for Surface Preparation & No Holiday Testing report W W W
( By vendor Coating ) Protective Coating
DED-EQ-M03-SPE-0011
F. Pre Work Setting out marking Daily Visual / Survey check -. Inspection Checklist item -. Approved Checklist item Inspection record W S S
-. Approved Shopdrawing
'-. Pre tightening Bolt Dailly Visual -. Approved Work Method Indication strip Mark on the Bolt, - W S S
( White Color )
Legends :
H -----> Hold Point : The notification RFIT is necessary, and the work for the next step can't continue without approval
W ---- > Whitness Point : The Notification RFIT is necessary, and the approval from the stackholder still need but no need attend
S -----> Surveillance : The notification RFIT is not necessary, but the random inspection still carry out and the finding have to rectify
R -----> Review : The Notification Document still necessary, this work can't continue for the next step without approval