015-Lifting Plan Method & Risk Assessment
015-Lifting Plan Method & Risk Assessment
015-Lifting Plan Method & Risk Assessment
Date:
Lifting Plan
Project Date
Site/location Client
Appointed Person carrying
Date of Assessment:
out the Assessment:
Site contact: Phone:
Description of lift:
F-HSE-015 Page: 1 of 3
Rev : 04
Date:
E. Lifting Accessories
Type of Slings Total Numbers Size Rated Capacity
Slings (wire rope)
Slings (chains):
Slings (webbing
Shackles
Other Accessories:
F. Identification of Hazards
Proximity Hazard Present? Proximity Hazard (cont.) Present?
Overhead power lines Other hazards identified
Other overhead obstacles
Underground services
Excavations Load Hazard Present?
Unstable/ Soft ground Slinging difficulties
Hazardous chemicals/materials Top heavy
Confined working area Sharp edges
Restricted access - width Other hazards identified
Restricted access - height
Other vehicles
Does the Risk assessment have been prepared for the lifting plan? (Attach copy to the plan)
F-HSE-015 Page: 2 of 3
Rev : 04
Date:
Method Statement
Responsibilities
Personnel
The following personnel should be nominated as a part of the lifting plan:
Weather Conditions
The Appointed Person or, in his absence, the Crane Supervisor, will ensure that the lifting operation only
takes place if the weather conditions are within the limits recommended by the crane manufacturer. 3 day
weather forecast.
Ground Conditions
Have assurances been obtained that the ground can withstand the load?
Sequence of Operations (use another sheet if necessary) Yes/No
2
3
4
F-HSE-015 Page: 3 of 3