LLP Plan
LLP Plan
S-73
Realizers 28-Jun 29-Jun 30-Jun ###
### 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul ###
###
Gaurav
Rohit
Hari
Ashutosh
Varun
Mani
Swati
Koushik
Devasena
DEMO
Bulk List
Appr-Reject
Sum @90%
0
10-Jul 11-Jul Velocity
0
Parsing - Exception during
FP response
0
0
planned leaves unplanned leaves sick leaves / public off
S-73
Realizers 14-Jun 15-Jun 16-Jun ###
### 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun ###
###
28497 28523 28523 PETS defects 28464 28464 PETS defects 28491 ###
Rohit
Hari
28103 28103 28103 28531 28531 DAST FIXES DAST FIXES DAST FIXES
Ashutosh
DAST FIXES DAST FIXES DAST FIXES DAST FIXES DAST FIXES DAST FIXES DAST FIXES DAST FIXES
Varun
PETS PETS
28314 28314
Mani defect-fix defect-fix
Swati
Koushik
Devasena
DEMO
Bulk List
Appr-Reject
Sum @90%
0
26-Jun 27-Jun Velocity
Google props count
mismatch
0
0
400 | Amount paid by First Paym Capture
DAST FIXES DAST FIXES card should be equal or failed in split payment
more than security deposit displayed as "Paid" in
for card and reward look up pg
0
Error Handling - missing
28313 + 27858 token at 2-paym FE Label Change
+ RV functional issue
transaction
0
TI / mandatory select
0
planned leaves unplanned leaves sick leaves / public off
S-72
30/30 28/24
Realizers 31-May 1-Jun 2-Jun ###
### 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun ###
###
28121 +
27786 28121
Guru Bulk Edit - fixes
1 1 1
28119
28119 28119 + 27786 28119 28120 28120 28120 28387
Gaurav (analysis)
1 1 1
Hari
1 1 1
28487+
27938 27939 27939 27939 27939 27939
Mani 27939
1 1
Swati
1 1 1
Koushik
1 1 1
Devasena
1 1
DEMO
Bulk List
Appr-Reject
Sum @90%
17.6
2.4
New Cancellation AWS Logging Optimize
Workflow
Multi Cancel - Concurrency - 2nd Paym Recon
0
2.4
Exception during FP pets-ph2
response Res lookup
2.4
Google Address API Retry/resend issue
DAST DAST
Spike + Implement support
0
1.6
2.4
2.4
1.6
planned leaves unplanned leaves sick leaves / public off
S-71
Realizers 17-May 18-May 19-May ###
### 22-May 23-May 24-May 25-May 26-May ###
###
1 1 1 1 1 1 1 1
28160
28160 28160 28160 28160 28160
Gaurav 27921
1 1
1 1
PETS FE
PETS FE rampup AVS=N
issue
27760 27786 27786 rampup 28152 28152 27921
Pankush
1 1
glass box
28018 28018 28018 28018 28151 AWS Trng AWS Trng
Varun 27953
P
1 1 e
t
PET sync with s
27544 28155 28155 dev - ? 27938 27938 27938
Mani P
h
1 1 -
2
Swati
Koushik
Devasena
DEMO
Bulk List
Appr-Reject
Sum @90%
15.2
29-May 30-May Velocity
1.6
Security defects
triage
0
1.6
AVS=N issue "Exception in processing FP
27921 27921 SERP - local currency for 2nd paym response"
1.6
1.6
1.6
0
planned leaves unplanned leaves sick leaves / public off
S-70
Realizers 3-May 4-May 5-May ###
### 8-May 9-May 10-May 11-May 12-May ###
###
27904
def 27914 defects in bulk edit bulk edit bulk edit * At Risk bulk edit
Guru (in 27332) 27332 test support 27904 count-RCA
0.5 1 1 1 1 1 1
1 1 1 1 1 1 1
Swati
Koushik
Devasena
DEMO
Bulk List
Appr-Reject
Sum @90%
35.05
15-May 16-May Velocity
bulk edit
count-RCA
28117 27332 defects bulk edit
5.85
5.6
ramp + SERP -
ramp + 27760
27760 local curr
4.4
4.8
5.6
0
S67 43215
S68 44014
Issue FE SP BE SP
28117 "DATA ISSUE" --- PROD Issue | Count not matching when uploading data (listings
getting dropped by validation API) 1 3
1) FE (no logic, FE to only construct the count-breakup based on BE response)
2) Fix in BE: validation API
HOLD > 28173 Basic Template Validation --> System should stop the flow in case of Basic HOLD HOLD
Template Issue (Extension Validation, Mandatory Headings)
HOLD > 28087 Change in Approval reason not reflecting in ops portal or csv file HOLD HOLD
BACKLOG > 28078 Edge Case - Show error if Listing ID not updated in published buckets HOLD HOLD
Breakup (3 categories)
- Success
- Failure to be combination of
"exact failure", +
"unknown reason")
Gaps / Observations
Lack of good knowledge of existing validation API (jointly by all crafts, dev +
product)
ACs not fully in line with existing valdiation API on prod, whereas dev team
assumed that existing behavior of validation API will remain same. This
assumption was not explicitly vetted with product
TBD - More time/effort was needed to understand the current vadilation API
behavior and clearly defining in ACs if any current behavior needs a change?
Ninjas Realizers
Ravi Varun
Nitin Ashutosh
Navjeet Mani
Pankush
Mohit Rohit
Shaurya Gaurav
Preeti Guru
Balaji Swati
Ekta Devasena
Mithun
Ramesh Koushik
People switching craft should not be part of prod supp since this needs 100% focus (Pankush, Ashutosh)
Swati / Balaji not to be core members of prod supp since they need to oversight Sprint delivery + regression plan
Due to lesser capacity, when Realizers BE & QE moves to prod support, backfill to be done from Ninjas
Next Steps
JIRA new Shared Teams > HVMI-ProdSupport
Create JIRA board and dashboard
Move all prod tickets to the new JIRA Board
Current Model
Pros Cons
Less Meetings Difficult to reserve people / capacity
Less planning / overheads (roster / leaves) Functional expertise @squad level
DAST/Perf Freeze communition is more manageable in 2 squads
Clear accountability
Clear reporting
Prod skills
Clear capacity sizing
Sprint scope not to be modified /unless for P0
KT<
fixable / Prod issues to be prioritized as a thumb rule
Improvement Status
Lower Env SWAT force In place
Lower Env - Health Check Automated Job WIP
SME Functional Areas In place
Prod defects - Traceability In place
Prod defects - Triage output template In place
Development - QE TC reviews by dev In place