RIGGING PLAN * # * BU -

PROJECT INFORMATION
Rigging Plan No. Revision No. Crown App No.

Completed By/Company Date


Crown BU No. Site Name
Latitude
Site Address
Longitude
RIGGING PLAN CLASS

RESPONSIBLE PERSONS NAME COMPANY PHONE


Competent Rigger
GC PM
Crown Castle PM Crown Castle
Crown Castle CM Crown Castle
DESIGN ENGINEER OF RECORD (EOR)
EOR EOR Project No.
GENERAL SCOPE OF WORK (Check All That Apply)
Install New Structure Perform General Tower Maintenance
Deconstruct/Demo Existing Structure Install Tower Reinforcement
Install New Tower Foundations Perform Cutting and/or Welding
Modify Existing Tower Foundations Replace Structural Members
Install Antennas, Lines, and/or Mounts Replace Structural Components (Bolts, Stiffeners, etc.)

Remove Antennas, Lines, and/or Mounts Replace Guy Cables


Other (Specify): Tower Plumb and/or Guy Re-Tensioning
MAXIMUM GROSS LIFT LOAD (Check Only One)
350 lbs or Less 351 lbs to 500 lbs 501 lbs to 2,000 lbs Exceeds 2,000 lbs
STRUCTURE DATA
Manufacturer Height
Face Width at Base Typical Section Length
STRUCTURE TYPE Rooftop

CED-FRM-10258 Version 1.0


RIGGING PLAN * # * BU -
CONSTRUCTION DURATION

Planned Mobilization Date Planned De-Mobilization Date Days 0


PRIMARY CONSTRUCTION EQUIPMENT (Check All That Apply)
LOAD HOIST TAG HOIST GUY PULL HOIST

OTHER EQUIPMENT
Crane Gin Pole Drill Rig
Manlift Forklift Backhoe/Dozer
Other (Specify):
LIFTING SYSTEM DATA

LIFT DATA (Check All That Apply)


Regular Lift Personnel Lift Special Engineered Lift
GROSS LOAD DATA
Max Load Wt. Load Line Wt. Tag Line Wt.
Ball Wt. Misc Rigging Wt. MAX GROSS LOAD 0 lbs
LIFTING AND CONTROL LINE DATA
LINE SIZE/GRADE TYPE CONFIG END TERM WLL
Load Line
Tag Line
Maximum Load Position Angle Max Tag Angle
LOAD TESTING AND VERIFICATION
Special Load Testing, Verification, and/or Monitoring Requirements
TEMPORARY BRACING (Check All That Apply)
Temporary Bracing/Shoring Required PE Sealed Temporary Bracing Plan Included
FINAL SIGN-OFFS (Competent Rigger Sign-Off May Be Done Onsite )
I hereby certify this rigging plan and identified construction means and methods have been developed by the
identified parties below, and the listed Competent Rigger shall be present onsite during all construction
activities and shall communicate all details of the plan to construction crew to ensure a safe working
environment.

Competent Rigger Signature Date

LOAD HOIST DATA


Model/Type No. Of Drums
Max Anticipated Line Pull Hoist WLL Rating
Hoist Anchorage Config. Hoist Distance From Tower
Anchorage Verification PROOF LOAD
DRUM NO. SIZE/GRADE TYPE *END FITTING LINE WLL
CED-FRM-10258 TAG HOIST DATA Version 1.0
RIGGING PLAN * # * BU -
Model/Type No. Of Drums
Max Anticipated Line Pull Hoist WLL Rating
Hoist Anchorage Config. Hoist Distance From Tower
Anchorage Verification PROOF LOAD
DRUM NO. SIZE/GRADE TYPE *END FITTING LINE WLL
GUY PULL HOIST DATA
Model/Type No. Of Drums
Max Anticipated Line Pull Hoist WLL Rating
Hoist Anchorage Config. Hoist Distance From Tower
Anchorage Verification PROOF LOAD
DRUM NO. SIZE/GRADE TYPE *END FITTING LINE WLL

CED-FRM-10258 Version 1.0


RIGGING PLAN * # * BU -
RIGGING PLAN CHECKLIST
Select "X" below to add appendix titles to plan
The following additional items shall be included in all rigging plan submissions:
Scope of work including copies of construction related plans/drawings
Construction sequence including duration of all phases impacting the structure's strength or stability
Lifting system details

For ALL rigging attached to structure, include drawings/details to identify primary rigging components
and specific attachment arrangements to tower along with imposed loads onto structure

Site layout depicting hoist locations, work face, staging area(s), etc.

*Include any special site hazards and/or obstructions such as overhead power lines, transmitter buildings,
tanks, creeks/streams, etc.

Where applicable, plans shall also include:


Qualified engineer review letter for ALL Class IV plans
Temporary bracing/shoring details
Special load testing, verification, and/or monitoring requirements
Load charts for gin pole, hoists, etc.
Maximum allowable wind limits during construction
Special bracing/shoring requirements should forecasted or actual winds exceeds specified limits
Special procedures and/or details for ensuring a safe work environment during construction
Other ~ Specifiy:
Other ~ Specifiy:
Other ~ Specifiy:
Notes:

CED-FRM-10258 Version 1.0


RIGGING PLAN * # * BU -

LIFT SYSTEM DETAILS


STRUCTURE TYPE
Self-Support (Tri-Face)

LIFTING SYSTEM DATA


Top Block Only With Straight Tag

Version 1.0
RIGGING PLAN * # * BU -

LIFT SYSTEM DETAILS


STRUCTURE TYPE
Self-Support (Tri-Face)

LIFTING SYSTEM DATA


Top And Heel Blocks With Straight Tag

Version 1.0
RIGGING PLAN * # * BU -

TOP BLOCK ATTACHMENT DETAILS


STRUCTURE TYPE
Self-Support (Tri-Face)

Instructions:
1) Denote North.
2) Sketch top block attachment configuration. Denote size, type, and WLL for all slings, shackles, etc.
(PROVIDE DETAILS/DRAWINGS DEPICTING

Elevation Top Block Configuration


COMPONENT SIZE/TYPE CONFIG WLL
ATTACHMENT TO TOWER)
TOP BLOCK DATA

Top Block
Sling #1
Sling #2
Shackle #1
Shackle #2

Other (Specify)
Version 1.0
RIGGING PLAN * # * BU -

HEEL BLOCK ATTACHMENT DETAILS

Instructions:
1) Denote North.
2) Sketch heel block attachment configuration. Denote size, type, and WLL for all slings, shackles, etc.
(PROVIDE DETAILS/DRAWINGS DEPICTING

Elevation Heel Block Configuration


COMPONENT SIZE/TYPE CONFIG WLL
ATTACHMENT TO TOWER)
HEEL BLOCK DATA

Top Block
Sling #1
Sling #2
Shackle #1
Shackle #2

Other (Specify)

*NOTE: Input Heel Block data in "STD TEMPLATE"

Version 1.0