SOUTH EASTERN RLY


PROJECT-KGP-
ELECTRICAL
SR. DEE/G/KGP,
KHARAGPUR,
721301
West Bengal,
India

 
Letter No: PROJECT-KGP-ELECTRICAL /
Dated:
114-Elc-G-KGP-22-23-21 /
02/03/2023
10659360072658
 
M/s SUN RISE CONSTRUCTION-
HOWRAH
BAINAN, BAINAN, BAGNAN
HOWRAH- 711303
West Bengal, India
 
Sub: Letter Of Acceptance

Ref: 1. Tender No. 114-Elc-G-KGP-22-23-21 closing date


25-01-2023 15:00 for Electrical work for
Connectivity of Line No. 5, 6, 7 & 8 at KGP end
at Nimpura Reception Yard
2. Your bid ID 14769145 dated 25/01/2023 14:17
3. Your Negotiation bid IDs [ 14883928 dated
23/02/2023 17:43 ]
 
The Competent Authority has accepted your offered rates in
connection with the subject work. The total cost of the work at
the accepted rates works out to Rs. 1472793.1 (Rupees Fourteen
Lakh Seventy-Two Thousand Seven Hundred And Ninety-
Three Rupees And Ten Paise Only)

A sum of Rs.29500 deposited as Earnest Money vide


IREPS reference ID PE64417619608 has been retained towards
initial Security Money for due and faithful fulfillment of the
contract, and the balance Security Money will be recovered
from the progressive bills @ 6 % of the bill amount till it
reaches 5 % of the contract value in terms of clause 16.1 of
GCC - 2022. The balance amount of the security money of
Rs.44139.65/- may either be deposited in cash or will be
recovered at a percentage deduction of 6% from the periodical
payment on account of work done, to make the full Security.
Security deposit will be recovered only from the running bills
of the contract and no other mode of collecting SD such as SD
in the forminstruments like BG, FD etc. shall be accepted
towards security deposit. Security deposit shall be returned after
the physical completion of the work, clearance of allcontractual
finalbills and further maintenance period of 12(Twelve)months
after the date of completion of the work and as certified by the
Competent Authority. TheCompetent Authority shall normally
be the authority who is competent to sign the contract. If this
Competent Authority is of the rank lower than JA Grade, then a
JA Grade Officer (concerned with the work) should issue the
certificate.

You are requested to submit Performance Guarantee in the


form as given in Clause 16.4 of GCC - 2022 equivalent to 3 %
of the contract value amounting to Rs. 44183.79 (Rupees
Fourty-Four Thousand One Hundred And Eighty-Three Rupees
And Seventy-Nine Paise Only) within 21 days from the date of
issue of Letter of Acceptance, valid up to stipulated date of
completion plus 60 days so that contract agreement can be
executed. A penal interest of 12% per annum shall be charged
for the delay beyond 21days, if the contractor fails to submit the
requisite PG even after 60 days from the date of issue of LOA,
the contract is liable to be terminated. The value of PG to be
submitted by the contractor will not change for variation up to
25 %(either increase or decrease). In case during the course of
execution, value of the contract increases by more than25% of
the original contract value, an additional Performance
Guarantee amounting to 3% (Three percent) for the excess
value over the original contract value shall be deposited by the
contractor. The performance Guarantee (PG)shall be released
after physical completion of the work based on 'Completion
Certificate' issued by the competent authority stating that the
satisfactorily. The Security Deposit shall, however, be released
only after passing the final bill based on 'No Claim Certificate'
from the contractor. Whenever the contract is rescinded, the
Security Deposit shall be forfeited and the Performance
Guarantee shall be encashed. The balance work shall be got
done independently without risk & cost of the failed contractor.
The failed contractor shall be debarred from participating in the
tender for executing the balance work. If the failed contractor is
a JV or a Partnership firm, then every member/partner of such a
firm shall bedebarred from participating in the tender for the
balancework in his/ her individual capacity or as a partner ofany
other JV/Partnership firm. The engineer shall notmake a claim
under the Performance Guarantee except for amounts to which
the President of India is entitled under the contract
(notwithstanding and/ or without prejudice to any other
provisions in the contract agreement) in the event of:(i) Failure
by the contractorto extend the validity of the Performance
Guarantee as described herein above, in which event the
Engineer may claim the full amount of the Performance
Guarantee. (ii) Failure by the contractor to pay President of
India any amount due, either as agreed bythe contractor or
determined under any of the Clauses/Conditions of the
Agreement, within 30 days of the service of notice to this effect
by Engineer. (iii)TheContract being determined or rescinded
under provisions of the GCC, the Performance Guarantee shall
be forfeited in full and shall be absolutely at the disposal of the
President of India.

The entire work shall be completed within 6 month from the


date of issue of Letter of Acceptance. Carry
maintenance/warranty period of 12 months after the date of
completion of the work.
Labour License: As per General Conditions of the Contract, you
are to get yourself registered, if not already registered, with the
Asst. Labour Commissioner(Central) concerned as required
under the Contract Labour Regulations Act- 1970 & 71 and
obtain a License from the Asst. Labour Commissioner
(Central)and produce the same to this office before
commencement of the work failing which the contract awarded
will be terminated on the ground that you have not complied
with the legal provision of the said Act and the Earnest Money
will be forfeited.

Shramik kalyan portal: Contractors must get themselves


registered in Shramik Kalyan Portal. After receiving of LOA,
they have to enter the details of LOA within15 days. They have
to enter the details of workmen engaged against the concerned
LOA. They have to enter the payment details i.e. minimum
wages, PF, ESI etc. in the Shramik Kalyan Portal. The agency
should give certification that they have entered the payment
details in Shramik Kalyan Portal along with the Bill. Above
provisions shall be applicable for contractual labours who are
working in Railway premises under Railway supervision.

ON ACCOUNT PAYMENT: a) On account Payment to the


extent of 85% of Supply items on the total unit prices of such
items included in the schedule only after supply, inspection,
testing & acceptance of material. All invoices shall be
accompanied by the following. i) Supplier s challan for supply
items only. ii) Manufacture s certificate for large value items
wherever necessary as decided by Railway Engineer duly
countersigned, along with Inspection certificate granted by the
Sr. DEE/G/KGP or his authorized representative iii) Certificate
of current statutory taxes and duties. iv) Detailed entries made
in the measurement book. For supply of materials against
schedule of price, the payment will be made only to the extent
of materials required by purchaser. On account payment will
commence only when schedule assessment is approved by the
purchaser. (b) After successful erection & testing of material to
the satisfaction of railway in terms of contract, payment to the
extent of remaining 15% of supply & 100% of erection price
(after adjustment of 85% vide (a) above, if any) will be payable
by Railway. NOTE: Contractor s supply items/Railway s supply
items will beissued to contractor of purchaser depot for erection
purpose on submission of indemnity Bond on stamp duty. The
indemnity bond shall be in the prescribed form. The contractor
will safeguard against the theft etc. on material till the complete
assets are taken over by Railway.

Final Payment: Balance payment (after adjustment of on


account payment, if any) will be payable by the purchaser
through the Final bill after satisfactory completion of the entire
contractual work, satisfactory operation and handing over of the
assets to the Railway duly tested and commissioned subject to
compliance of the following. No claim certificate in favour of
Railways issued by the contractor. ii. Detailed entries in the
measurement book. iii. Supply of one set RTF and three sets of
blueprint of as erected drawings, pertaining to the work (if
required). iv. On supply of catalogue and Operation
Manual/Instruction Books wherever applicable.

GST: Rates accepted are inclusive of GST @ 18%.

Consignee: SSEE/North/KGPwill draw the measurement of the


portion of work as completed by you and forward the bills for
payments. Please meet the above consignee or the Field Officer
i.e. Asstt. Divisional Electrical.Engineer(G)/S.E. Rly/KGP
concerned for necessary instructionsr

Allocation: DF-3, PH-16

Estimate No.: Sr.DEE(G)/01/Sub-Sr.DOM/2022/NMP Yd (Det-


I)

Variation and Inspection & Testing: Conditions for variation


and Inspection & testing will be as per Srl 18 &25 of General
Instructions of NIT.

All Other terms and conditions, as stipulated in the tender


documents shall be applicable.
 
RAJESH KRISHNARAO DONGARE
Sr.DEE/G/KGP
Digitally Signed
View Signature Details

Awarded Quantities And Rates


Item Item Desc Item Item Qty Unit Escl. Advt.Value Bid Bid
Sno. Code Qty Unit Rate(Rs) (%) (Rs) Rate/ Amount
Unit (Rs)
Rate
  Schedule  A-Electrical work for Connectivity of Line %
No. 5, 6, 7 & 8 at KGP end at Nimpura Reception Yard 1472793.10 0.00 At 1472793.10
  (Item Directory - Not Applicable) Par
Electrical
work for
Connectivity
of Line No. 5,
1 6, 7 & 8 at View Details At Par 1472793.10    
KGP end at
Nimpura
Reception
Yard
Schedule Totals 1472793.10
Total Value 1472793.10 1472793.10
Rebate on Total
0.00
Value (%)
Net Bid Value 1472793.10

Item Breakup
Schedule A-Electrical work for Connectivity of Line No. 5, 6, 7 & 8 at KGP end at Nimpura
Reception Yard

Electrical work for Connectivity of Line No. 5, 6, 7 & 8 at KGP end at Nimpura
Item - 1
Reception Yard

Item
S No. Description of Item Unit Qty Rate Amount
No

Supply, Installation and


commissioning of High Mast
Tower having hot dip
galvanized flange mounted
type polygonal tapered type
high mast of 20mtrs ( with 02
No. of aviation obstruction
LED) with 12 Nos. 250 W LED
lights/pole., nominal mounting
height complete with
suspension system, head
frame canopy stainless steel
1 1 Numbers 1 485000.00 485000.00
wire ropes, to carry upto 12
nos. luminaries mounting
bracket & accessories
complete, one length 4 sq.mm
4 or more core round electrical
trailing copper. Supply,
installation and commissioning
of High Mast Tower to be made
as per South Eastern Railway's
specification no.
CEE/S/185/LED/12/21/Rev-0,
Dec 2021"

Electric Pole Cutting (Pole to


2 2 be deposited in Consignee's Numbers 5 1136.23 5681.15
Store)

Dismantling of pillar box with


the help of equipment, labour
and all other expenses,
3 3 Job 1 886.00 886.00
carrying cost and same supply
to the working site as per
concern consignee.

Dismantling of high mast


tower with the help of hydra,
truck, equipment, labour and
4 4 all other expenses, carrying Job 1 29500.00 29500.00
cost and same supply to the
working site as per concern
consignee.

Supply of L.T. Aluminum


Armoured and PVC sheathed
XLPE stranded cable of size 4
Core x 50 Sqmm for working
5 5 voltage upto & including 1100 Metre 1500 419.00 628500.00
Volts Confirming to IS: 7098
Part-1 1988 with amendment
number 1and 2 and 3
Reaffirmed 2005 or Latest.

6 6 Laying of cable / cables in Metre 1380 131.21 181069.80


under ground along the road
through cable trench etc . as
per standard drawing including
necessary termination ,
connection and testing.
Trenching and laying of U/G
cables in any kind of soil
trench of size minimum 0.40
mtr wide and 1 mtr deep
covered with necessary bricks
for protection of the cables
including filling of space
between brick and
cable/cables with sand and
refilling the trench with
excavated soil, leveling up,
and restoring the surface duly
rammed.

Laying of cable / cables across


the road, track, drain etc
through RCC/GI pipe
confirming to IS standard of
size 100mm or 150mm (or any
suitable size as per field
requirement based on the
actual size of the cable) as per
7 7 Metre 100 292.83 29283.00
relevant specification and as
per standard drawing with
necessary termination,
connections and testing .Cost
also includes collection of
cable/cables from Railway
store if required.GI pipe will be
supplied by contractor.

Laying of cable/ cables on wall


/ structure through PVC casing
pipe of size 4inches or 3inches
with accessories or as per site
requirement with suitable
clamp / saddle/ fixtures etc
8 8 Metre 20 89.03 1780.60
with necessary termination,
connection and testing as per
standard drawing. Cost also
includes collection of
cable/cables from Railway
store if required.

Supply of 16mm 6x36SW or as


per site requirement black
9 9 steel wire rope used for lifting Metre 200 144.00 28800.00
and lowering purpose for high
mast.

Fixing and Commissioning of


16mm 6x36SW or as per site
requirement black steel wire
10 10 Job 1 886.00 886.00
rope used for lifting and
lowering purpose for high
mast.

11 11 Supply of 20nos GI foundation Kg 100 80.00 8000.00


bolt for 30mtrs high mast
tower (flat washer-04nos,
spring washer-02 nos, nut-
05nos for each foundation
bolt) size -1200mm long at
730 dia or as per site
requirement or as per the
direction of consignee.

Supply of MS circular plate-


02nos for 30mtrs high mast
tower suitable for 20nos
12 12 foundation bolt, size-830mm Kg 6 80.00 480.00
dia X 30mm thick or as per
site requirement or as per the
direction of consignee.

Fixing and Commissioning of


(i) 20nos GI foundation bolt
for 30mtrs high mast tower
(flat washer-04nos, spring
washer-02 nos, nut-05nos for
each foundation bolt) size
-1200mm long at 730 dia or as
per site requirement or as per
13 13 Job 1 886.00 886.00
the direction of consignee and
(ii) MS circular plate-02nos for
30mtrs high mast tower
suitable for 20nos foundation
bolt, size-830mm dia X 30mm
thick or as per site
requirement or as per the
direction of consignee.

Supply of painted outdoor


pillar box made of 2mm
thickness sheet steel, rust
protected, powder coated
single door & locking
arrangement as per IP-54,
consisting with 4-pole MCCB
63 A, 25 kA - 02 Nos as
incoming with Analog Time
Switches for Tower Light,
Pump Installations & Street
Light Circuits etc.
14 14 Set 1 36659.00 36659.00
Floor/Panel/Tower/Wall
mounted, Supply Voltage 240V
AC, 50/60HZ, with FP 63A
power contractor and FP 63A
10kA MCB-02nos and DP 32A
10kA MCB-04nos as outgoing
with suitable Cu. busbar
(4nos), fuse and indicator etc.
The pillar box should be
mounted on cemented plinth
of appropriate size as per the
direction of consignee.

Fixing and Commissioning of


painted outdoor pillar box with
MCCB, MCB, Timer, Contactor,
suitable Cu. busbar (4nos),
15 15 fuse and indicator etc. The Set 1 2733.97 2733.97
pillar box should be mounted
on cemented plinth of
appropriate size as per the
direction of consignee.

16 16 Supply of FP 100 Amps, 35kA Numbers 2 9595.00 19190.00


MCCB ( as per CSE1NN125ATM
4P or same as) with sheet
steel powder painted
enclosure.

Fixing and commissioning of


FP 100 Amps MCCB with sheet
steel powder painted enclosure
17 17 Numbers 2 686.47 1372.94
with cable and necessary item
as per site requirement to
complete job.

Supply of Cable Junction Boxes


IP 55 / IP 65 with metric
knockouts for cable entry,
Cable Size upto 70 sq.mm,
18 18 Box Dimensions (LXBXH) Numbers 2 1134.00 2268.00
(mm)-200 x 150 x 125 or
more, 4 way terminals and
accessories as per requirement
of site.

Fixing and commissioning of


Cable Junction Boxes IP 55 /
IP 65 with metric knockouts
for cable entry, Cable Size
upto 70 sq.mm, Box
Dimensions (LXBXH)
19 19 (mm)-200 x 150 x 125 or Numbers 2 217.62 435.24
more, 4 way terminals and
accessories as per requirement
of site with appropriate size of
GI structure and rain
protection cover to complete
the job.

Supply of Earthing
arrangement with supply of
earth cone and all other
requisite materials as per
CEE/GRC's Drg. No.CEE/G/A-
3/P-150 including sump box
with salt and charcoal, metallic
cover etc. Cost also includes
20 20 Each 4 1591.98 6367.92
supply and connection of 35X3
SWG GI strip between earth
pole and main switch/DB/Rail
pole etc. as per site
supervisor's instruction. Cost
also includes earth clamp of
size 50X6mm GI and testing of
earth resistance.

21 21 Erection of Earthing Each 4 753.37 3013.48


arrangement with
commissioning of earth cone
and all other requisite
materials as per CEE/GRC's
Drg. No.CEE/G/A-3/P-150
including sump box with salt
and charcoal, metallic cover
etc. Cost also includes
connection of 35X3 SWG GI
strip between earth pole and
main switch/DB/Rail pole etc.
as per site supervisor's
instruction. Cost also includes
connection of earth clamp of
size 50X6mm GI and testing of
earth resistance.

  Total 1472793.10