VME-HSE-P-19 - HSE Induction

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Doc. No.

VME-HSE-P-19

HSE Management System Rev. Date 16/12/2019

HSE Induction Page No. 2 of 5

REVISION RECORD SHEET

List of
Rev. No Issue Date Purpose updated/modified
sections if any
02 16/12/2019 Revision made and reformat All pages

01 30/11/2018 Revision made after external audit All pages

00 01/09/2013 Issued for implementation

DISTRIBUTION

Recipient Company E-Mail Address Qty


Doc. No. VME-HSE-P-19

HSE Management System Rev. Date 16/12/2019

HSE Induction Page No. 3 of 5

1. Scope

This procedure is applicable to all personnel who include PT. VME and its subsidiary
companies, employees, subcontractor workers, project client site team members, vendors,
suppliers, auditors, potential clients and any others who are required to work/visit our yard on
official businesses.

2. References

Act No. 1/1970 Chapter 5 of Article 9 - Coaching


Minister of Manpower Regulation No. PER.5/MEN/1996 Element 12 -
Development of skills and abilities
Clause 7.3 ISO 45001: 2018 Awareness.

3. Abbreviations / Definition
HPMT : Head Project Management Team.
HOST : Means PT. VME employees who are tasked to take care of the visitors / suppliers /
auditors / vendors, etc whilst they are in the yard or company premises.
KTP : Indonesia Identification Card.
IDR : Indonesian Rupiah.

4. Responsibilities
4.1. Safety Induction Training will be conducted by HSE Department for all those who are required
to work in PT. VME. Any waiver for short period access to the work yard within PT. VME
premises shall be on a case by case basis.
4.2. For those who will be carrying out any work within the yard / company premises for a
considerable short period of time of 7 days, it’s can be extended to 7 days only. A short safety
briefing can be conducted by the PT. VME host. These people shall be given a copy of PT.
VME HSE Information for Visitors. In such case, the attendance record (VME-HSE-P16-
APPENDIX 003) of such briefing will be taken by the host and submit to HSE Department in
exchange of Visitor Badges.
4.3. The host is to ensure that these people are guided throughout the duration in the yard.
4.4. Details of the arrangement and co-ordination of the HSE Induction program is tabulated as
follows:
Who Arranged By Requirements

1. Ample notice to HSE Department and


Manager
New Employees inform all the new employees accordingly.
(HR / Admin)
2. To facilitate the entry into the yard the
Doc. No. VME-HSE-P-19

HSE Management System Rev. Date 16/12/2019

HSE Induction Page No. 4 of 5

contractor shall submit the list of workers’


particulars including the following
documents:
a. Copy of valid Identification Card / Kartu
Tanda Penduduk (KTP)
HPMT and / or b. Copy of Passport (For expatriate only)
Sub-Contractor c. Copy of Work Permit or Working Visa
Subcontractor
Workers (for expatriate only).
Supervisor
d. Copy of valid Medical Report (Fit-to-
Work) within 3 months prior to the
induction, in compliance with the
standard as set by PT. VME.
e. Curriculum Vitae

Client Site
HPMT
Representative

Auditors / Suppliers /
Vendors / Crane Host
Operators

5. Safety Induction Pass


5.1. All attendees who have attended the full Safety Induction training will be issued with Safety
Induction Sticker and badge at the end of the induction.
5.2. The Safety induction sticker and badge consist of for colors each color will be explained as
follow:
5.3. The safety induction sticker and badge will be valid until last of a project. Thereafter, refresher
Safety Induction Training will be conducted every next project, a new sticker and badge will be
issued.
5.4. For visitors, host will make a formal request to HR Department / Security Department on the
number of Visitor Badges he / she needs.
5.5. A safety induction badge must be returned to the HSE Department if:

▪ The workers in case of resignation or termination.


▪ The project has been completed and did not participate in the next project.

5.6. The visitor badge must be returned to Security Department by visitors who will leave the area
of PT. VME Process.

STICKER AS MENTIONED ABOVE IS NON-TRANSFERRABLE AND NO PERSON SHALL


ENTER PT. VME PROCESS WORKPLACE WITHOUT VALID HSE INDUCTION LABEL /
VISITOR BADGES AND BADGES SHALL BE PROPERLY CLIPPED ON FOR EASY
IDENTIFICATION OF PERSONNEL.

6. Badges Administration
6.1. For genuine wear and tear of the badge, replacement will be free of charge.
6.2. For lost badge, IDR 50,000 for each replacement will be charged.
Doc. No. VME-HSE-P-19

HSE Management System Rev. Date 16/12/2019

HSE Induction Page No. 5 of 5

6.3. Project Contract Manager will be informed and the amount will be deducted from the progress
payment to the Sub-Contractor concerned.
7. Appendix(s):

1. HSE Information for Visitor : VME-HSE-P-19-Appendix 001


2. PT. VME Safety Handbook : VME-HSE-P-19-Appendix 002
3. Permission To Allow Personnel to Temporarily
Enter/Work in Yard : VME-HSE-P-19-Appendix 003
4. Sample of Safety Induction Badge : VME-HSE-P-19-Appendix 004
5. Sample of Safety Induction Sticker : VME-HSE-P-19-Appendix 005
6. Loss of PT. VME Safety Induction Badge : VME-HSE-P-19-Appendix 006
7. Flow Chart for Safety Induction Training : VME-HSE-P-19-Appendix 007
8. Standing Instruction for Safety Induction Class : VME-HSE-P-19-Appendix 008
9. Safety Induction Slide for Visitor – English : VME-HSE-P-19-Appendix 009
10. Safety Induction Slide for Visitor – Indonesia : VME-HSE-P-19-Appendix 010
11. Safety Induction Training Slide
For Employee – English : VME-HSE-P-19-Appendix 011
12. Safety Induction Training Slide
For Employee – Indonesia : VME-HSE-P-19-Appendix 012
13. Register of Safety Induction Course and Training : VME-HSE-P-19-Appendix 013
14. Employee Safety Induction Attendance List : VME-HSE-P-19-Appendix 014
15. Visitor Safety Induction Attendance List : VME-HSE-P-19-Appendix 015

8. Related Documents;
1. HSE-MS Manual : Doc. No. VME-HSE-M-01
Doc. No: VME-HSE-P-19-
Appendix-001
HSE Management System

Emergency Evacuation Plan Page No. 1 of 3

Emergency Evacuation Plan


Evakuasi Keadaan Darurat

Muster Area

Your Safety
Keselamatan Anda

Is
In the event of an emergency…
Sekiranya terjadi keadaan gawat darurat…

• Long continuous siren will sound in the event of


emergency. adalah
Bunyi sirine panjang akan berbunyi dalam keadaan


darurat

Leave the building, site or fabrication shop immediately


by the nearest safe EXIT in a calm and orderly manner.
Our Concern
Segera keluar dari bangunan atau lapangan melalui Kepentingan Kami
jalan keluar yang aman dengan tertib dan teratur.
Safety Information
• Remain with your host or follow other employees to the
assembly area and wait for further instructions. for Visitor & Client
Tetap dengan pengiring atau ikut serta dengan karyawan Informasi Keselamatan untuk Tamu & Klien
yg lain menuju ketempat berkumpul and nantikan
petunjuk selanjutnya

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or in whole or use in any manner whatsoever without the written
approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-001
HSE Management System

Emergency Evacuation Plan Page No. 2 of 3

Welcome to PT. VME Process General


Umum
We hope that your visit to our yard will be a safe and smooth one.
Please comply with the following information which is intended 1. Obey all safety and warning signs.
to ensure your health and safety whilst on our premises. Taati semua rambu dan tanda peringatan keselamatan
Kami harap kunjungan anda ke kawasan kami berjalan lancar
dan aman. Mohon untuk mentaati informasi berikut untuk
2. Strictly no smoking in undesignated area.
Dilarang keras merokok dtempat yang tidak ditetapkan.
memastikan keselamatan dan kesehatan anda sepanjang
keberadaan anda di tempat kami. 3. Do not enter into unauthorized area.
Jangan memasuki kawasan yang tidak berkepentingan.
Should you have any query with regard to our Health, Safety and 4. Do not speed, the speed limit on all roads in the yard is 25
Environment Management System please do not hesitate to ask km/h; and on the pier is 10 km/h.
your host. Batas laju adalah 25 km per jam dan 10 km per jam di
Jika ada pertanyaan yang bersangkutan dengan K3 dan Sistem pinggiran pelabuhan.
Manajemen Linkungan Hidup silahkan ajukan ke pengiring anda. 5. Beware of other road users, e.g. forklift, cyclist etc.
Waspadalah akan pengguna jalan yang lainnya.
It is our policy to seek for continual improvement; your 6. Park your vehicles at the authorized areas only.
constructive suggestion is most welcome. Parkir kendaraan anda hanya ditempat yang ditetapkan.
Telah menjadi kebijakan kami untuk terus meningkatkan usaha
kami, kritik dan saran yang membangun dari anda akan kami 7. Remain with your host at all times.
hargai. Senantiasa mendampingi pengiring anda.

Thank you and have a safe and pleasant visit.


Terima Kasih, semoga kunjungan anda aman dan menyenangkan.

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or in whole or use in any manner whatsoever without the written
approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-001
HSE Management System

Emergency Evacuation Plan Page No. 3 of 3

Personal Protective Equipment Required


Type of PPE On Module On Site Shop
PAKAIAN PELINDUNG
Yes Yes Yes
LONG SLEEVE SHIRT

PELINDUNG KEPALA
Yes Yes Yes
SAFETY HELMET

PELINDUNG MATA
Yes Yes Yes
SAFETY GLASSES

PELINDUNG KAKI
Yes Yes Yes
SAFETY SHOES
Any other areas where construction is in progress
PELINDUNG JATUH
and liable to fall from height
FALL PROTECTION
To be advised by host

Others (gloves, ear plugs etc.)

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or in whole or use in any manner whatsoever without the written
approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-002
HSE Management System
SAFETY HANDBOOK Page No. 1 of 1

SAFETY
HANDBOOK

PT. VME Process ISO 9001:2008


PT. VME Process | Jalan Tamalatea RT 004 / RW 003
Kelurahan Tanjung Sengkuang | Batu AmparBatam 29452 | Indonesia Certificate No: 44493

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or
in whole or use in any manner whatsoever without the written approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-003
HSE Management System
Permission to Allow Personnel to Temporarily Enter / Work in the Yard Page No. 1 of 2

To :
Date :

(SPECIAL CASE ONLY)*

1. Company’s Name :

2. Company’s Address :

3. Company’s Rep. (Subcon / Vendor) :

4. Company Host Name (PT. VME Process) :

5. Period of Work From (Date) :

6. Location of Work in Company :

7. Description of Work :

S/N Name Passport/KITAS/KTP/SIM Position

10

Safety Briefing Conducted By:


Name Designation Signature Date

* For work / visit for 7 days.

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or in
whole or use in any manner whatsoever without the written approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-004

HSE Management System


Sample of Safety Induction Pass Page No. 1 of 1

1. Sample of Safety Induction Pass


a. PT.VME (Green Colored SIP)
b. Subcontractor under VME (Blue Colored SIP)
c. Client of PT.VME (Pink Colored SIP)
d. Temporary Workers (Yellow Colored SIP)

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or
in whole or use in any manner whatsoever without the written approval of PT. VME Management
Doc. No: VME-HSE-P-
19-Appendix-006
HSE Management System
Page
Loss of Company HSE Induction Badge / Temporary Badge 1 of 1
No.

To:
Address:

Loss of Company HSE Induction Badge / Temporary Badge

Please be informed that the following personnel of your company have reported lost of
the Company of the Temporary Badge / HSE Induction Badge:

S/N Name Company Position


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Name & Signature of HSE Officer Date

C.c. Accounts Department, Company Indonesia


HSE Manager, Company Indonesia
HPMT, Company Indonesia (Project): _________________________)

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or
in whole or use in any manner whatsoever without the written approval of PT. VME Management
Doc. No: VME-HSE-P-
19-Appendix-007
HSE Management System
Page
SAFETY INDUCTION TRAINING FLOWSHEET 1 of 1
No.

Pre-Employment
Medical Check-Up

Medical Check-Up
(A copy of test record submit to HSE
Department)

Fit for Work Unfit for Work

Register for HSE


Induction at Rejected
Reception Area
(one day in advance)

Attend HSE
Induction Course

Commence Work

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or
in whole or use in any manner whatsoever without the written approval of PT. VME Management
Doc. No: VME-HSE-P-19-
Appendix-008

HSE Management System


Standing Instructions for Company Safety Induction Class Page No. 1 of 1

To: All Company HOD, PMT and Clients / Contractors / Vendors / Auditors / Suppliers /
Operator

Please be informed that the new schedule for Company Safety Induction Class are as follows:

1. HSE Induction class will be held every Tuesday, Thursday and Saturday except Public
Holiday.

2. The venue for the Safety Induction Class will be held in the VME Conference Room.

3. Please ensure that all participants for the Safety Induction Class are to report for
registration, in the HSE Department, by 8:30 AM.

4. The Safety Induction Class will commence at 10:00 AM. Late-comers will not be
entertained.

5. Safety Induction Class booking must reach the HSE Department one day in advance (by
3:00 PM). Late submission will not be entertained, so plan wisely in advance to ensure
that Safety Induction Class does not exceed the maximum seating arrangements.

6. All participants must be accompanied by Supervisor / Foreman in charge. This is to ensure


and facilitate the smooth running of the class.

7. All Safety Induction Class booking must use the prescribed Safety Induction Class Booking
Form and shall be clearly filled up and submitted in the tray provided via Company
Receptionist (located at the Company Main Office). No filling of the Safety Induction Class
Booking Form is allowed in the HSE Department.

8. Please refer to Company OSH Management System Procedure VME-HSE-P-10 : Safety


Induction for more information and clarification.

Your kind and full cooperation in this matter is very much appreciated.

Kindly refer to Company HSE Management Representative or the undersigned for any query
pertaining to the above mentioned.

Thank you.

HSE Department

Abbreviation:

HOD : Head of Department


PMT : Project Management Team

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or
in whole or use in any manner whatsoever without the written approval of PT. VME Management
P2-S13-F7 Revision: 30/11/2018 1
P2-S13-F8 Revision: 30/11/2018 1
P2-S13-F9 Revision: 30/11/2018 1
1
Doc. No: VME-HSE-P-19-
Appendix-013
HSE Management System
Page No. 1 of 1
REGISTER OF SAFETY INDUCTION COURSE AND TRAINING

DATE OF
NO REG. NO NAME COMPANY DESIGNATION
INDUCTION
PROJECT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Dengan ini diinformasikan kepada semua pihak bahwa nama - nama tersebut di atas benar –
benar telah mengikuti Safety Induction Course pada hari …. yang diadakan di PT. VME dan
diperbolehkan untuk memasuki area proyek PT. VME .

Herewith, this be informed to all parties that the name list above they have followed the Safety
Induction Course on _________ held at the PT. VME and allowed to enter PT. VME project area.

Hormat Saya Approved by


Knowledge by
Regards
QHSE Manager
HRD Security Coordinator
HSE – Dept

This document is the property of PT. VME No part of it is to be disclosed to any third party, reproduced as part or in
whole or use in any manner whatsoever without the written approval of PT. VME Management
VME Employees - Yard HSE Induction Course (HSE IC) Registration Form
Date (dd/mm/yy): ______________________ Time: 9 am sharp Conducted By: Saverius Seda
Company :___________________________________
Doc. No : VME-HSE-P-19- Appendix 014

Years of experience
in Marine/Oil/ Years experience
NRIC/ FIN/ English Proficiency
S/N Name Designation Petrochemical/ with present WP Type Signature
WP/Passport No (Yes/ No)
Construction employer
Industry

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Disclaimer:
I confirm that the information as set out in the form was provided by me and that the said information is true and correct. PT. VME reserves the right to reject any applicant or revoke the HSEIC if the
information is incorrect.

Form Submitted by: _____________________ Contact Number: _____________ Designation: ____________________ Sign: _________________

Important Points to note:

1. All VME and its Subsidiary Companies shall submit the EID/EKTP/NRIC/FIN/WP/Passport Copies to PT.VME HSE Department with this form.
2. Please ensure all attendees have valid Medical Fitness Certificates before application.
3. All attendees are requested to bring their Passport size photo, Original & Photo Copies of the NRIC/WP/EP/Passports.
4. On day of HSE-IC, please report to PT.VME Reception. Late comers will not be entertained
5. Please send the completed form (soft copy) to respective PT. HSE personnel for approval.
6. All Foreigners or Expats employee and/or workers will have valid work permit.
7. All Locals and/or Green Card Holders of Indonesia will have valid EID/EKTP/KITAS to work and live in Indonesia

You might also like