Combined Osp-Pds Sow-Aljouf-Checkpoint

This document outlines specifications for cabling works for a new checkpoint building in Al-Jouf, Saudi Arabia. It includes specifications for outside plant works like fiber optic cable installation in communication manholes. It also covers inside plant works like installing structured cabling systems for voice and data. The document provides general information, system requirements, materials, construction and installation, testing procedures, standards, drawings and a list of approved contractors.

Uploaded by

RENJITH K NAIR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views36 pages

Combined Osp-Pds Sow-Aljouf-Checkpoint

This document outlines specifications for cabling works for a new checkpoint building in Al-Jouf, Saudi Arabia. It includes specifications for outside plant works like fiber optic cable installation in communication manholes. It also covers inside plant works like installing structured cabling systems for voice and data. The document provides general information, system requirements, materials, construction and installation, testing procedures, standards, drawings and a list of approved contractors.

Uploaded by

RENJITH K NAIR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

‫الشركة السعودية للكهرباء‬

CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D
DESCRIPTION

ATTACHMENT-1
NO.

DOCUMENT

PREPARED BY
SZS OSP/PDS-LAN-WAP
DATE

CHK’D BY
SCOPE OF WORK &
APPROVED
CONSTRUCTION SPECIFICATIONS
ITC/PPD/PROJS. ENGG DIV.

DDC for
JGT

CHECKPOINT BUILDING AT AL-JOUF PP

ISSUED FOR CONSTRUCTION


CERTIFIED

ASU
BY:

DATE:

THIS DOCUMENT IS

Saudi Electricity Company


NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED Kingdom of Saudi Arabia

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 1
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

TABLE OF CONTENTS
CHK’D

PART I - GENERAL INFORMATION


1.1 PROJECT DESCRIPTION
1.2 PROJECT SUMMARY
DESCRIPTION

1.2. A.1 OUTSIDE PLANT WORKS


1.2. A.2 INSIDE PLANT WORKS
1.2. A.3 DOCUMENTATION
1.2. A.4 SAUDI ELECTRICITY (SEC) CONNECTIVITY
PART 2 - SYSTEM REQUIREMENTS
2.1 GENERAL SCOPE OF WORK
NO.

2.2 TECHNICAL SPECIFICATION


DOCUMENT
A. ELECTRICAL WORKS RELATED TO COMMUNICATION
SZS B. COMMUNICATION WORKS
PREPARED BY
B.1 OUTSIDE PLANT SYSTEM
B.2 INSIDE PLANT SYSTEM
DATE

CHK’D BY
2.3 DOCUMENTATION
APPROVED
PART 3 - BASIC REQUIREMENTS AND GUIDELINES
ITC/PPD/PROJS. ENGG DIV. 3.1 GENERAL CONDITION
3.2 CONSTRUCTION PROGRESS REPORTING
DDC
3.3 MATERIAL TESTS AND INSPECTION
JGT 3.4 AS-BUILT DRAWINGS
3.5 PROJECT RECORD BOOKS
3.6 OUTAGE SCHEDULE/SHUTDOWN COORDINATION
3.7 SAFETY REQUIREMENTS
3.8 QUALITY ASSURANCE/QUALITY CONTROL REQUIREMENTS
3.9 NON-DISCLOSURE AGREEMENT (NDA) AND Declaration of Non-Disclosure
Agreement (DND)
PART 4 - MATERIALS
4.1 OUTSIDE PLANT
CERTIFIED
4.2 INSIDE PLANT/STRUCTURED CABLING SYSTEM (PDS-LAN-WAP)
ASU 4.3 APPROVED MANUFACTURERS
BY:

DATE: PART 5 - CONSTRUCTION AND INSTALLATION


5.1 SITE PREPARATION
5.2 CIVIL WORKS
5.3 COMMUNICATION MANHOLES/HANDHOLES
5.4 FIBER OPTIC CABLE SPLICING
5.5 CABLE MARKER POST / SURFACED MARKER
THIS DOCUMENT IS
5.6 UNDERGROUND NON-METALLIC FIBER OPTIC CABLE, SINGLE MODE
NOT TO BE USED FOR
CONSTRUCTION OR
5.7 OPTICAL CABLE JOINT BOX/OPTICAL FIBER PATCH PANEL
FOR
MATERIALS
ORDERING
UNTIL
PART 6 - TESTING AND COMMISSIONING
CERTIFIED AND DATED
6.1 TYPE TEST REPORT
6.2 ACCEPTANCE TEST AND PLAN PROCEDURES
6.3 PRE-COMMISSIONING TEST-ALL ELECTRONIC EQUIPMENT AND CABLES

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 2
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

6.4 FINAL ACCEPTANCE AND COMMISSIONING TEST


CHK’D

6.5 TEST EQUIPMENT


PART 7- APPLICABLE STANDARDS
7.1 COMPANY STANDARDS
7.2 INTERNATIONAL STANDARDS
DESCRIPTION

PART 8 - REFERENCE DRAWINGS AND ATTACHMENTS


8.1 DETAILED DESIGN DRAWINGS
8.2 ATTACHMENT 1A DETAILS OF MATERIALS

PART 9 – LIST OF APPROVED ITC CONTRACTORS


NO.

9A & 9B LIST OF APPROVED IT&C CONTRACTORS for CONSTRUCTION


3

DOCUMENT

SZS
PREPARED BY

DATE

CHK’D BY

APPROVED

ITC/PPD/PROJS. ENGG DIV.

DDC
JGT

CERTIFIED

ASU
BY:

DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 3
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

DIVISION 16 - ELECTRICAL
CHK’D

SECTION 16740 - COMMUNICATION SYSTEM

PART I - GENERAL INFORMATION


DESCRIPTION

1.1 PROJECT DESCRIPTION:


This Project provides for the requirement for Construction of Outside Plant Telephone Cabling
System and its associated Communication Manhole and Conduit Systems, and all other required
accessories for the construction of Outside Plant Cabling Systems, for the New CHECKPOINT
BUILDING AT AL-JOUF PP.
NO.

DOCUMENT
This Project also provides the requirement for Construction of Inside Plant Telephone Cabling
SZS System, LAN-Premise Distribution System/Structured Cabling Systems for Voice & Data, New
PREPARED BY
Checkpoint – from the respective IT & Communication Room to the end users locations through
information outlets, Copper (UTP Indoor Type Cable) and its associated Data Cabinets, Joint
DATE

CHK’D BY
Boxes, Protectors, Data Distribution Panels and Conduits, Pull-Boxes, Junction Boxes,
Information Outlets, Dedicated Power Supply, Grounding System and other accessories for the
construction of Inside Plant Cabling Infrastructure, for Proposed New CHECKPOINT BUILDING
APPROVED

ITC/PPD/PROJS. ENGG DIV.


AT AL-JOUF PP.
DDC
JGT A. The Construction Work for OSP/PDS-LAN Cabling Civil & Comm., shall only be done by
IT&C/PP&D-PED Certified / Approved Contractors (Refer to Part-9A & 9B – for List of ITC
approved Contractor for Construction). All Material Document Submittals related to IT&C
Equipment & Cabling Infrastructure shall be reviewed & approved with stamp by SEC-
ITC/P&PD-Projects Engineering Division prior to purchasing and start of
installation/construction work

1.2 PROJECT SUMMARY:


The CONTRACTOR(s) shall perform construction works, material procurement, quality
CERTIFIED
management and inspection, supply and delivery of all the materials to the WORK site, install,
test, commission, and perform all associated WORK to put into service with guarantee the
ASU
BY: communication WORK, as described in this Scope of WORK and Technical Specifications.
DATE:

A. THE JOB SHALL COVER, BUT NOT LIMITED TO THE FOLLOWING:


A.1. OUTSIDE PLANT WORKS:
1). CONTRACTOR shall verify all existing Communication Manholes/Handholes &
Conduits and Data Cabinets at the project site.
2). All existing Underground Facilities (Fiber & Copper Cables, Water, Power, and
THIS DOCUMENT IS Sewer etc.) that will be affected by the Construction of New CHECKPOINT
BUILDING AT AL-JOUF PP shall be replaced, re-routed and restored completely
NOT TO BE USED FOR
CONSTRUCTION OR

whether shown or not shown in the approved Drawings.


FOR ORDERING
MATERIALS UNTIL

3). CONTRACTOR shall provide & Install the complete OSP/PDS-LAN-WAP cabling
CERTIFIED AND DATED

solution for IT & Communication related works whether shown or not shown in the
approved Detailed Drawings.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 4
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

4). Perform trenching, excavation, asphalting, concrete pouring, backfilling, compaction


CHK’D

and restoration after completion of civil work. (Refer to Drawing No. EA-896829, EA-
896830, EA-896831)
5). CONTRACTOR shall provide & construct a new & Dedicated Communication
Manholes for ITC use only and shall include Manhole Frame & Cover, Hardware &
DESCRIPTION

Accessories and its subsequent grounding in accordance to SEC Standards. (Refer


to SEC Standard Drawing No. SA-036357 or TA-800097, SB-036373 or TB-800077
& SB 036358 TA-800098). The New Comm. Manholes shall be constructed for the
New CHECKPOINT BUILDING AT AL-JOUF PP including the requirements for
SEC Cable Interface. (Refer to Drawing No. EA-896829, EA-896830, EA-896831)
6). Furnish, supply and construction of all Comm. Duct Banks & other support cabling
infrastructure (Conduits System) for ITC use only from new Checkpoint Building
NO.

DOCUMENT to the Existing Admin Building.


7). Supply & Install 25.0mm Diameter HDPE Type Sub-Duct (for Outdoor Installation)
SZS shall be provided for all fiber optic cable to serve as mechanical protection for the
PREPARED BY

DATE
following section:
CHK’D BY 7.1 From new Checkpoint Bldg. to ITC Equipment Room located in Existing Admin
Building.
APPROVED 8). Furnish, supply and installation marker post and surface marker, joint boxes & heat
ITC/PPD/PROJS. ENGG DIV. resistance marker tag.
9). Supply and Installation of 1 each x 12 Core Fiber Optic Cable, Single Mode-Non
DDC
Metallic from New Checkpoint Bldg. to ITC Equipment Room located in Existing
JGT
Admin Building. All Fiber/Core shall be all splice with pigtail & terminated all in the
New F.O. Patch Panel, High Density 1U Sliding Fiber Panel & Cassette Type 12-LC-
Single Mode Blue with Pigtails iPatch Ready.
10). The new OSP Type Fiber Optic Cables shall be provided and install to interconnect
the New Checkpoint Building (IT&C Data Cabinet) having a physical “STAR”
Topology scheme.
11). Perform Fiber Optic Cable splicing using Fiber Cassette 12 LC Single mode Blue
iPatch ready with Pigtails & terminated all in High Density 1U Sliding Fiber Panel at
both end location for the following buildings:
CERTIFIED 11.1 New Checkpoint Building
ASU 11.2 Existing Admin Building (ITC Equipment Room)
BY:
12). Supply & installation of pre-terminated LC Duplex Type Fiber Patch Cables. The
quantity shall be provided for each section or link & multiply by four (for Outdoor
DATE:

Cabling) at the following locations:


12.1 at New Checkpoint Building
12.2 at Existing Admin Building (ITC Equipment Room)
13). Perform End-to-End Attenuation Test of Fiber Optic Cables (using Power Meter &
OTDR for Outdoor Cabling). All fiber/core shall Tested & Contractor shall provide
THIS DOCUMENT IS
NOT TO BE USED FOR
cable records as follows:
CONSTRUCTION
FOR
OR
ORDERING
13.1 Between New Checkpoint Building & Existing Admin Building
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 5
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

A.2. INSIDE PLANT WORKS/PREMISE DISTRIBUTION SYSTEM:


CHK’D

1) Supply & install Information Outlets (Simplex/Duplex/Quadplex Type) for Voice/


Data, Wireless Access Points and Special Purpose Outlet for the New Checkpoint
Building. The proposed Special Purpose Information Outlet are not shown in the
approved layouts & shall be coordinated to the assigned SEC-Project In-Charge
DESCRIPTION

(FM/TSD) or SEC-Project Proponent/User for the exact location & installation of the
said Special Purpose Information Outlets as needed.
2) The Outdoor Type Fiber Optic Cable, Non-Metallic Type with 12 Core minimum from
service entry pipe to Data Cabinet shall be installed in a 25.0 mm diameter Plenum
Type Corrugated Sub-Duct or Wrap with Fire Retardant Tape inside the IT&C Room
of New Checkpoint Building & Existing Admin Building. All Fiber/Core shall be all
splice with pigtail & terminated all in the F.O. Patch Panel.
NO.

DOCUMENT 3) Supply & install Information Outlets (Simplex/Duplex/Quadplex Type) for Voice/
Data, Wireless Access Points and Special Purpose Outlet for the New Checkpoint
SZS
PREPARED BY
Building. The proposed Special Purpose Information Outlet that are not shown in the
DATE approved layouts shall be coordinated to the assigned SEC-Project In-Charge
CHK’D BY (FM/TSD) or SEC-Project Proponent/User for the exact location & installation of the
said Special Purpose Information Outlets as needed.
APPROVED 4) Furnish, Supply & installation of CAT-6A UTP Cable (Voice/Data, Wireless Access
ITC/PPD/PROJS. ENGG DIV. Point Locations & S.P.O.) from new Data Cabinet to various Information Outlets
DDC within the New Checkpoint Building. All Cable Pairs (Indoor & UTP Copper Cables)
shall be terminated at Patch Panel and User Outlet location.
JGT
5) Supply, installation of rack mounted 19” UTP modular CAT-6A Type Intelligent Patch
Panels (CATEGORY 6A U/UTP PATCH PANEL) equipped with 12 Ports RJ45
modules/jacks inside equipment distribution cabinet in New Check Point Building.
6) Furnish, supply and installation of all support cabling structure (i.e. EMT Conduits,
Cable Raceways etc.).
7) Supply, installation of front access New 12U-Data Cabinet /Equipment Distribution
Cabinets (Racks, Rittal Type). The New Data Cabinet shall accommodate all active &
non-active components with space free for future expansion and subject for SEC-ITC
Planning & Projects Dept. for review & approval. (See Material Specification in Part 4).
CERTIFIED
8) Utilize the Existing 42 U Type Data Cabinet and Supply & install one(1) each rack
ASU mounted 19 inches fiber optic Intelligent HD 1U sliding fiber panel equip with one (1)
BY:

DATE:
each –Fiber Cassette 12 LC Single mode Blue iPatch ready complete with splice trays
and horizontal cable management rack to be installed at Existing ITC Room, Admin
Building. All Fiber/Core shall be all splice using Fiber Cassette 12 LC Type, Single
Mode Blue iPatch ready.
9) Supply of pre-terminated Category 6A UTP Patch Cables on both ends (1.5 Meters on
equipment Side & 3 to 5 Meters on User Side). The quantity shall be based on the
number of Information Outlets installed.
THIS DOCUMENT IS
NOT TO BE USED FOR 10) Supply and Install Grounding systems (Main Ground Busbar & Telecom Ground
CONSTRUCTION
FOR
OR
ORDERING Busbar) dedicated for IT& Communications Equipment.
MATERIALS UNTIL
CERTIFIED AND DATED 11) Supply of pre-terminated LC Duplex Type Fiber Patch Cables. The quantity shall be
provided for each section or link & multiply by four (for Indoor Cabling).
12) Tagging of cables and labeling of panel boards, cabinets and other ITC Equipment.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 6
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

13) Section Test of UTP Cables using SEC approved Test Equipment. All cable test
CHK’D

records shall be submitted to SEC-IT&C Planning & Projects Department


14) Supply and Install Electrical Outlet & Power Branch Distribution Panel equip with
Circuit Protection dedicated for ITC Equipment only.
A.3. Documentation covering “AS-BUILT” drawings.
DESCRIPTION

A.4 SEC (SAUDI ELECTRICITY CO.) CONNECTIVITY

A.4.1 The Contractor shall provide/install/construct New Manholes & Conduit Systems,
as provision to interconnect the New Checkpoint Building to the Existing Admin
Building.
NO.

DOCUMENT A.5 CONTRACTOR shall supply and delivery of all permanent and expandable materials, tools
and equipment to complete the WORK.
SZS
PREPARED BY
A.6 CONTRACTOR shall be responsible for providing equipment and personnel required to
DATE
transport/deliver material to WORK SITE. SEC-ITC/Planning & Projects Dept.-Projects
CHK’D BY Engineering Division PRIOR shall submit the proposed Material & Equipment for the project
for review & approval to purchasing, delivery & installation of any IT&C related Equipment
APPROVED or Material.
ITC/PPD/PROJS. ENGG DIV. A.7 CONTRACTOR shall be responsible for providing equipment and personnel required to
DDC transport/deliver the material to the WORK SITE.
JGT
A.8 CONTRACTOR shall perform WORK in accordance with the requirements of this SECTION. The
COMPANY REPRESENTATIVE shall approve deviation in writing prior to implementation.
A.9 The CONTRACTOR shall perform complete Civil, Structural, Cabling Works, Installation, Testing
and Commissioning.
A.10 The CONTRACTOR shall supply all Communication Cabling, Civil Works and Materials required
completing this project whether or not shown in this SECTION or Drawings, unless otherwise
specified.
A.11 CONTRACTOR shall provide a dedicated Cabling System for Security Camera (CCTV) and Fire
CERTIFIED
Alarm Systems separate from ITC Cabling Infrastructure.
ASU
BY: END OF PART-1
DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 7
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART 2.0 - SYSTEM REQUIREMENTS


CHK’D

2.1 GENERAL SCOPE OF WORK:


A. The Construction of Outside Plant/Premise Distribution System-Local Area Network (OSP/PDS-
LAN-WAP) Cabling, Civil, Communication. IT&C-PPD /PED Certified / Approved Contractors,
DESCRIPTION

shall only do construction Works. Refer to Part-9 for the List of these ITC-Approved
Contractors.

B. The Contractor shall be responsible for all work involved to accomplish the establishment and
provision of the complete IT & Communication Systems Facilities (Voice/Data, Wireless Access
Points and Special Purpose Information Outlet), which includes the survey, documentations,
supply, delivery, installation, testing, and commissioning.
NO.

DOCUMENT
C. All materials, equipment, and accessories needed for the successful installation of the complete
SZS IT & Communication Systems Facilities (Voice/Data, Wireless Access Points and Special
PREPARED BY
Purpose Information Outlet) for this Project unless otherwise specified, shall be new and
unused and shall be provided by the CONTRACTOR.
DATE

CHK’D BY

2.2 TECHNICAL SPECIFICATIONS


APPROVED

ITC/PPD/PROJS. ENGG DIV. A. ELECTRICAL WORKS related to IT & COMMUNICATIONS


DDC 1. GENERAL REQUIREMENTS
JGT All electrical WORKS to be performed by CONTRACTOR under this project shall include
the supply of new materials, labor, equipment subject to the approval of COMPANY
REPRESENTATIVE, furnishing, details of installation, testing and commissioning of all
electrical systems required for the subject project. This project generally consists of
fluorescent lighting, power outlet, IP telephone outlet, data outlet, wiring, conduits, junction
boxes, etc. All electrical materials that are required for this project, whether shown or not on
the drawings, shall be supplied by CONTRACTOR.
2. CODES AND STANDARDS

CERTIFIED
The electrical system shall be installed in accordance with the latest edition of American/or
International Standard and COMPANY Standards. In case of any discrepancy between the
ASU
BY: COMPANY Standards and any other standards, COMPANY Standard shall prevail.
3. WIRES AND CABLES
DATE:

a. All interior power, branch circuits and control wires shall be copper, stranded, Polyvinyl
Chloride (PVC) insulated, thermoplastic material, 75C maximum operating
temperatures, heat moisture flame resistant and rated 600V. Size of wire for power
lighting shall be No. 12 AWG and signal/control wires shall be No. 14 AWG.
THIS DOCUMENT IS
NOT TO BE USED FOR
b. All cable joints shall be made electrically and mechanically secured with approved wire
CONSTRUCTION
FOR
OR
ORDERING
(nut) connectors, then covered with two layers of insulating tape, covered with two
MATERIALS UNTIL
CERTIFIED AND DATED
layers of friction tape. All tapes shall be applied half wrap.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 8
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

c. During pulling of wires and cables, care must be exercised in pulling wires, into conduit,
CHK’D

not to kink the wire, put undue stress on the wire. No grease will be permitted in pulling
wires into conduit, soapstone or talc only being permitted for this purpose.
d. Wires Color Code
DESCRIPTION

 Main service feeder (low voltage, power application other than for building):

A B C
Phase Conductors Red Yellow Blue
Neutral Black
 Internal wiring (electrical wiring of building)
NO.

DOCUMENT
Phase Conductors Brown Red Orange
SZS
PREPARED BY
Neutral White
DATE
 Grounding conductor Green with yellow Stripe.
CHK’D BY

e. All wiring shall be installed inside the conduits. All external wirings shall be rated for
APPROVED operation in 50C (122F), ambient temperatures.
f. Neutral Conductor or cable shall be the same size as the Phase conductor.
ITC/PPD/PROJS. ENGG DIV.

DDC
4. CONDUITS
JGT
a. Electrical metallic tubing shall be installed inside the building; minimum size shall be 20
mm. Diameter (3/4”).
b. The conduit shall run in the shortest straight runs whenever possible. Conduit runs
between lighting fixture and lighting fixture, fitting and fitting, lighting fixture and fitting
shall not contain more than four (4) quarter bends, including bends located at the
lighting fixture or fitting. All conduit bends shall comply with tables 346-10 of National
Electrical Code (NEC).
c. Seal and repair structures affected by conduit penetration.
CERTIFIED

5. JOINTS: All joints shall be made with standard couplings. The ends of all conduits shall be
ASU
BY: cut square, reamed, brought to a shoulder, threaded and red lead applied to male
DATE:
threads only. Running threads shall not be used.
6. INSTALLATION: Conduits and other parts of the electrical system, where exposed, shall be
painted to cover abrasions, wrench marks, or other damage to the original finish.
7. FABRICATION: All conduits bend in the JOBSITE shall have a radius not less than six
times the inside diameter of the conduits. Conduits shall be offset where necessary to
THIS DOCUMENT IS
enter the boxes of fittings perpendicularly or where required to improve the
NOT TO BE USED FOR
CONSTRUCTION OR
appearance of the WORK.
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED
8. PULL BOXES:
a. Pull boxes with full removable cover shall be installed so that wires in them can be
accessible without removing any part of the building.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 9
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

b. Lighting fixtures shall not be used as a pull box or junction box.


CHK’D

9. RECEPTACLE CONVENIENCE OUTLETS:


a. The 208-220V outlet shall be duplex type with grounding connections Receptacle
outlets shall be Underwriters Laboratories, Inc. (UL) approved.
DESCRIPTION

b. Number of duplex type outlets shall be installed on floor and wall as required. The exact
location of general purpose outlet shall be coordinated with the equipment and furniture
arrangement for which they will be installed. Power outlets shall be rated 20 Amps. 220
volts. All the power outlets shall be flushed mounted.
10. MOUNTING HEIGHTS:
a. Power Outlets & Receptacle - As required (0.3 & 1.4 meter above finished floor)
NO.

DOCUMENT
b. Information Outlet or IP Telephone outlet - 0.3 to 0.5 meter above finished floor
SZS
PREPARED BY
B. COMMUNICATION WORKS:
DATE
B.1. OUTSIDE PLANT SYSTEM:
CHK’D BY
1. COMMUNICATION MANDHOLE & DUCTBANK INFRASTRUCTURE:
APPROVED
Construction of New Dedicated Communications Manhole, Handholes & duct bank
ITC/PPD/PROJS. ENGG DIV.
for all the AREAS as required and as specified herein:
a. Construction of Dedicated Communication Manhole & Duct Banks to route
DDC efficiently and systematically the proposed outside plant cables from main
JGT communications room to different buildings & other locations. These include
construction of concrete-encased duct bank, provision of sub duct, cable
entrance conduits, provision of pulling ropes, duct seals/plugs, cable
racks/support, marker posts & surface marker, labeling/tagging, warning tapes,
grounding systems, and others.
b. The proposed Communications Manhole & Duct Bank shall be constructed in
accordance with the Company Engineering & Constructions Standard.
c. The proposed 4.0” diameter PVC Conduit shall be encased in concrete (PVC
Conduit shall be “EB Type”). Concrete shall have a minimum compressive
CERTIFIED strength of 20.7 MPa (3,000 psi).
ASU
d. Manhole Layout shall include details of Frame & Cover, Cable Racks, Cable
BY:
Hooks, Grounding System, all hardware & accessories. Manhole Cover shall
DATE:
have an identifying mark “CAUTION & SEC COMMUNICATION” in English &
Arabic stamped in the cover.
e. Conduit Lateral configuration shall not have more than two 90 degree turns.
f. Conduit bends having less than a 36 inch radius shall not be used in conduit
laterals.
g. All IT&C Material Document Submittal shall be submitted to the Company (SEC-
THIS DOCUMENT IS ITC P&PD/Projects Engineering Div.) for review and approval prior to any
construction implementation.
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL

2. OUTSIDE PLANT CABLING INFRASTRUCTURE:


CERTIFIED AND DATED

Construction, supply, delivery, installation, testing, and commissioning of Outside


Plant Cables as required and as specified herein:
OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 10
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

a. Construction for OSP Cabling System shall be as per SEC-Engineering &


CHK’D

Construction Standard. These include Construction and installation of Terminal


Cabinets, Data Cabinets, Protection Modules, Data Distribution Panels for UTP
and Fiber Optic (LC-Type Connector) and Grounding System etc
b. OSP Cabling System (Fiber Optic Cable) shall be as per SEC-Engineering &
DESCRIPTION

Construction Standard, and shall be Physical Star-Topology.

c. Specify and show all the civil work and material requirements to provide a
standard OSP Cabling Infrastructure.

d. OSP Fiber Distribution Cables shall be provided with ID, i.e., length of cable,
NO.

cable number, size, core assignment or numbering to Fiber Distribution Panel


3

DOCUMENT and indicates Cable Splicing & Cable Tagging Sequence.


SZS
PREPARED BY e. All Outdoor Type UTP Cable shall not be terminated directly to Data Patch Panel.
DATE
The Outdoor Type Cable shall be interface with Protection Unit Modules for data
CHK’D BY
application installed in the IT&C Room.
APPROVED
f. Supply, installation, splicing, termination, testing and commissioning of OSP Type
ITC/PPD/PROJS. ENGG DIV. UTP CAT-6A Cable for Data Connection. The Outdoor Type UTP Cable shall be
interface with Protection Unit Modules for data application installed in the IT&C
DDC
Room.
JGT
g. Supply, installation, splicing, termination, testing and commissioning of Non-
Metallic Fiber Optic Cables Single Mode, 12 cores minimum. All fibers/core shall
be splice using Fiber Cassette 12 LC Single Mode Blue iPatch ready capable to
meet the requirements for Automated Infrastructure Management Monitoring.
h. Supply, installation, splicing, termination, testing and commissioning of Fiber
Optic Cables for LAN/Data/IP Telephony Systems.
i. Supply and installation of joint boxes and splice cases.

CERTIFIED
j. Supply and Installation and cabling of Indoor Wireless Access Points with
watertight, dust-tight, and corrosion resistant material.
ASU
k. The Contractor shall insure that the quantity requirements meet for the outside
BY:

DATE:
plant cables to be distributed to different buildings and other different locations.
The quantity requirements shall consider both the current and future
requirements.
l. The new OSP network shall also include the installation/construction to
interconnect the outside plant tie cables for Saudi Telephone Company (STC)
THIS DOCUMENT IS
facility coming from the STC interface/distribution point.
NOT TO BE USED FOR
CONSTRUCTION
FOR
OR
ORDERING
m. Strategic Plan and Installation for the distribution of outside plant cable shall be
MATERIALS UNTIL
CERTIFIED AND DATED
done by the Contractor for the efficient utilization and management of
communications duct bank and cables.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 11
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

n. The distribution/routing, joints, and terminations of all Outside Plant Cables shall
CHK’D

be in accordance with Company Installations Standards and International


Installations Standards.
o. All installed cables shall be properly labeled/tagged in accordance to Company’s
Standard Scheme and EIA/TIA-606 Standard.
DESCRIPTION

p. All Materials shall be submitted to the Company (SEC-ITC Planning & Projects
Department / Projects Engineering Division) for review and approval prior to any
construction implementation
B.2. INSIDE PLANT / PREMISE DISTRIBUTION SYSTEM (PDS-LAN-WAP):
Construction, supply, installation, testing and commissioning of New Premise Distribution
NO.

System (PDS-LAN-WAP) / Inside House Distribution System (Voice/Data) for various


3

DOCUMENT
locations:
SZS 1. The Contractor shall construct a new Premise Distribution System / Structured
PREPARED BY Cabling System for the New Checkpoint Building to economically, efficiently and
DATE
systematically route / distribute the Premises Cables / Inside House Cables to the
CHK’D BY
end users locations through information outlets. The installation shall specify and
show all the civil work and material requirements to provide a standard PDS-LAN-
APPROVED
WAP Cabling Infrastructure. These include installation of Data Cabinets, Data
Distribution Panels for UTP Copper (Copper (RJ-45) RSC-Conduit (Outdoor Riser
ITC/PPD/PROJS. ENGG DIV.

DDC Application), EMT-Conduits, Pull boxes, Junction Boxes, Special Purpose


JGT Information Outlets (Voice/Data, Wireless Access Points) Dedicated Power Supply,
Grounding System, and other accessories.
2. The Premise Distribution System shall be constructed in accordance with BICSI-
TDMM (latest edition), EIA/TIA 568-A, EIA/TIA 569-A, and the Company
Construction and Installation Standards.
3. Horizontal cabling shall conform to physical star topology. Horizontal cables shall be
“home run” from the telecommunications closet (Data Cabinet) to the information
outlets. Horizontal cables shall be 100-Ω, 4 PR x 23 AWG, solid copper and as a
minimum shall meet EIA/TIA-568A-5 Category 6A specifications for data and voice
CERTIFIED
applications.
ASU
BY: 4. UTP cable termination on the RJ-45 patch panel and information outlets (I/O) shall
DATE:
be based on EIA/TIA 568-B standard color-coding scheme. Also, All Cable Pairs
shall be terminated in the Terminal/Data Cabinet.
5. Backbone cables to be used for Data/LAN application shall be Single Mode fiber
optic, tight buffer (indoor application) & loose tube type (outdoor application).
6. Data Information Outlet shall be equipped with:
THIS DOCUMENT IS
NOT TO BE USED FOR a. Spring dust cover.
CONSTRUCTION OR
FOR
MATERIALS
ORDERING
UNTIL
b. Labels/Tags to distinguish data/voice ports.
CERTIFIED AND DATED
7. UTP Intelligent patch panel shall be equipped with dust cover & cable management
rack.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 12
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

8. All proposed Information Outlets for Voice & Data shall be provided with minimum of
CHK’D

one(1) spare per outlet for future use & maintenance purposes.

2.3 DOCUMENTATION:
DESCRIPTION

The CONTRACTOR shall be responsible for all documentation covering system


proposals, materials catalog/brochure submittals, price quotations, and “As-Built” drawings
(Hard copy and soft copy).

END OF PART-2
NO.

DOCUMENT

SZS
PREPARED BY

DATE

CHK’D BY

APPROVED

ITC/PPD/PROJS. ENGG DIV.

DDC
JGT

CERTIFIED

ASU
BY:

DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 13
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART-3 BASIC REQUIREMENTS AND GUIDELINES


CHK’D

3.1 GENERAL CONDITION


A. All Components, materials and required WORK for the satisfactory completion and operation of
the PROJECT, and other accessories covered under the scope of this PROJECT, specified in
DESCRIPTION

detail or not, shall be supplied, installed and commissioned by the CONTRACTOR as


necessary.
B. The material specifications and installation of materials under this PROJECT shall be in
accordance with the Scope of WORK and Technical Specifications and COMPANY Standards.
However, in case of a conflict of requirements between the COMPANY Standards and the
Technical specifications specified in this document, the CONTRACTOR shall bring this to the
NO.

attention of the COMPANY (SEC-ITC P&PD/Projects Engineering Division) and shall obtain
3

DOCUMENT approval for such applicable requirements in writing from the COMPANY. The COMPANY
SZS reserves the right to reject any or the complete part of such WORK arising out of the
PREPARED BY CONTRACTOR’S own decision.
C. CONTRACTOR shall not procure any IT&C related materials until CONTRACTOR’s proposed
DATE

CHK’D BY
material for the project has been approved by the COMPANY (SEC-ITC Planning & Projects
APPROVED
Dept./Projects Engineering Division.
ITC/PPD/PROJS. ENGG DIV.
D. It is the CONTRACTOR’s responsibility to visit the WORK SITE and to satisfy himself as to the
DDC extent of the WORK, location and all conditions under which the WORK will be carried out. No
claims based on the lack of any such knowledge shall be entertained.
JGT
E. The CONTRACTOR shall furnish all WORK including services for the test and inspection
required by the COMPANY.
3.2 CONSTRUCTION PROGRESS REPORTING:
A. The CONTRACTOR shall submit Project Progress Reports to the responsible COMPANY
Project Engineer. The format shall be mutually agreed to between the CONTRACTOR and the
COMPANY REPRESENTATIVE.
Progress Report shall include:
a. Material Procurement and Delivery
CERTIFIED
b. Construction and Installation
BY:
ASU c. Testing and Commissioning
DATE:
d. Manpower and Equipment
e. Statement of items worked and/or completed during the reporting period.
f. Problem areas which can have adverse effect on the schedule
g. Overall Completion
h. Safety Meeting

3.3 MATERIAL TEST AND INSPECTION


A. All materials shall be subject to inspection and tests as required in relevant COMPANY’s
THIS DOCUMENT IS
NOT TO BE USED FOR

Material Standard Specifications, QA&QC Procedures, and applicable Industry Standards or as


CONSTRUCTION OR
FOR ORDERING

may be decided by the COMPANY REPRESENTATIVE. All design (type) and production
MATERIALS UNTIL
CERTIFIED AND DATED

(routine) tests prescribed in relevant COMPANY’s Material Standard Specifications shall be


performed in accordance with the applicable Industry Standards.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 14
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

B. The CONTRACTOR shall submit a detailed testing and inspection program to the COMPANY
CHK’D

REPRESENTATIVE for review, at least one (1) month before the commencement of testing.
The program shall include the Quality Assurance and Quality Control Monitoring Activity
Schedule.
DESCRIPTION

C. The COMPANY (SEC-ITC P&PD/Projects Engineering Division) reserves the right to reject any
materials proposed by the CONTRACTOR if the material does not conform to the specification,
or based on unsatisfactory past operating experience or any other reasons. In such cases, the
CONTRACTOR shall propose alternative material for review and acceptance by the
COMPANY.

D. CONTRACTOR shall not procure an IT&C related materials until CONTRACTOR’s proposed
NO.

material for the project has been approved by the COMPANY (SEC-ITC P&PD/Projects
DOCUMENT
Engineering Division).
SZS
PREPARED BY
3.4 AS-BUILT DRAWING
DATE
A. As the PROJECT nears completion, the “As-Built Drawings” shall be prepared by the
CHK’D BY
CONTRACTOR in sufficient details recording all Changes/Modifications and locations of
underground substructure or any sub-surface utilities that was identified and located in the field
during construction stages of the Project. The “As-Built” Drawings shall be prepared in
APPROVED

ITC/PPD/PROJS. ENGG DIV.


Microstation V81 Format or latest version in accordance with COMPANY DRAFTING
DDC STANDARD (SEEDS II Rev.1 or latest issue). All changes or additions shall be listed and
JGT proper reference shall be indicated.

B. The “As-Built Drawings” shall be submitted to the COMPANY for review as to accuracy,
completeness, legibility and conformity to SEC Drafting Standards. If returned, the
CONTRACTOR shall make corrections and improve the quality as instructed prior to re-
submittal and COMPANY acceptance. The revised “As-built Drawings” shall be duly certified
and resubmitted to the COMPANY.

C. The As-Built Documents shall be submitted to the COMPANY within four (4) weeks after
Mechanical Completion of the PROJECT. As-Built Scope of Work and List of Materials shall be
included as part of the drawing.
CERTIFIED

ASU
BY:

DATE:
3.5 PROJECT RECORD BOOKS
The PROJECT Record Book shall contain the following documents as a minimum:
a. All calculation sheets.
b. Brief Technical Specification of all materials.
c. Material test reports of each major material installed.
d. All field test reports
THIS DOCUMENT IS
e. Commissioning and Site Test Reports
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 15
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

3.6 OUTAGE SCHEDULE/SHUTDOWN COORDINATION


CHK’D

A. Any WORK which required shutdown or outage on overhead line/distribution feeders or


substation shall be closely coordinated with the COMPANY through the COMPANY
REPRESENTATIVE. Outages shall be granted only during winter or low load periods.
DESCRIPTION

B. All outages shall be scheduled at least four (4) weeks in advance. Any requested outage must
be approved by the COMPANY at least two (2) working weeks before actual WORK is carried
out

3.7 SAFETY REQUIREMENTS


A. The CONTRACTOR shall provide all barricades, appropriate and efficient danger signs with
red warning lights or signals, suitable types and sizes of portable fire extinguishers, other
NO.

DOCUMENT necessary precautionary measures for protection of construction worker and safety of general
public.
SZS
PREPARED BY
B. The CONTRACTOR shall comply with all the safety and loss prevention requirements under
DATE GI 65.111 relative to work permits and safe working procedures in substations, transmission
CHK’D BY lines and the requirements outlined in the schedule of contract document. The
CONTRACTOR shall submit a Loss Prevention Program or Safety Manual for this project
APPROVED for approval by COMPANY’s Loss Prevention Division prior to commencement of
ITC/PPD/PROJS. ENGG DIV. construction work.
DDC C. The CONTRACTOR shall refer and adhere to the safety rules, procedures and precautions
set forth in COMPANY’s Accident Prevention and Construction Safety Manuals personnel
JGT
should wear and use appropriate personal protective clothing and safety equipment while
working at the job site CONTRACTOR shall provide first aid/CPR facility for his personnel and
shall have qualified employees to Control and operate the facility.
D. In order to prevent theft/loss of material/equipment, the CONTRACTOR at site shall take all
necessary precautionary measures but not limited to:
1. All the materials under this contract shall be stored by CONTRACTOR in safe and
secured locations even if it is for short period of time.
2. If the equipment/materials are to be retained in SEC vicinities for a substantial period,
then the CONTRACTOR shall ensure that they are kept in locked containers or any other
CERTIFIED
appropriate method of storage which will keep the material/equipment not easily
ASU noticeable by people with any intention of theft or pilferage. Moreover, such containers
BY:

DATE:
shall be placed at a distance from the fence/boundary wall.
3. CONTRACTOR shall also consider all the storage requirements of the (i.e., temperature,
etc.) being stored in containers to avoid any damage during such storage period.

3.8 QUALITY ASSURANCE/QUALITY CONTROL REQUIREMENTS


A. QUALITY MANAGEMENT
CONTRACTOR shall implement an effective quality management which addresses all direct
THIS DOCUMENT IS
NOT TO BE USED FOR and indirect activities related to the PROJECT to ensure that all contractual conditions are
CONSTRUCTION OR
FOR
MATERIALS
ORDERING
UNTIL
met. Quality planning, quality control, quality assurance and quality improvement shall be part
CERTIFIED AND DATED
of CONTRACTOR's quality management. To effectively manage the PROJECT quality,
CONTRACTOR shall develop & provide a clearly defined PROJECT Quality Plan/Quality
Program. The PROJECT Quality Plan/Quality Program shall be implemented from PROJECT
OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 16
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

start until completion and communicated at different levels of the PROJECT organization. In
CHK’D

addition, CONTRACTOR shall also require manufacturers/ suppliers to develop, provide and
implement Quality Control Plan/Inspection and Test Plan for each major material/equipment.

B. QUALITY CONTROL PLAN / INSPECTION AND TEST PLAN


DESCRIPTION

1. CONTRACTOR shall submit to the COMPANY the Quality Control Plan/Inspection and
Test Plan for each major material/equipment of the PROJECT. The quality activities
including but not necessarily limited to, inspection and testing, for the material/equipment
shall be planned and documented in the form of a Quality Control Plan/Inspection and
Test Plan. The Quality Control Plan/Inspection and Test Plan shall be submitted to the
COMPANY together with the PROJECT Quality Plan/Quality Program.
NO.

2. The essential features of the required Quality Control Plan/Inspection and Test Plan are
3

DOCUMENT as follows:
SZS a. It is specifically identified to a particular material/equipment.
PREPARED BY b. It has provision for revisions to be made and is assigned a unique document
DATE
number.
CHK’D BY
c. It lists all the inspection and testing activities sequentially.
d. It states the location at which the activity is to be carried out.
APPROVED
e. It identifies the applicable standard, test procedure to be followed and the
acceptance criteria for the inspection or test activity.
ITC/PPD/PROJS. ENGG DIV.

DDC f. It identifies the extent of inspection, sampling frequency and sample size, or
JGT extent of check.
g. It identifies the hold point, witness point and surveillance point.
h. It identifies the record document to be generated, reviewed and retained.
The Quality Control Plan/Inspection and Test Plan shall indicate the scheduled dates of testing and
inspection at the designated location.

3.9 NON-DISCLOSURE AGREEMENT (NDA) AND Declaration of Non-Disclosure Agreement


(DND)

CERTIFIED
1.1 All COMPANY information & data shall be confidential and CONTRACTOR Personnel,
involved in the CONTRACT execution, shall not, under any circumstance, disclose the
ASU
BY: COMPANY information, documents, charts, designs, procedures & directives.
DATE:

1.2 CONTRACTOR shall, upon CONTRACT Signing and prior starting to perform WORKS,
shall sign the Non-Disclosure Agreement (NDA), in accordance with the Attachment-"Y"
of this Schedule “B”.

1.3 Every CONTRACTOR Personnel, working under this CONTRACT, shall sign the
THIS DOCUMENT IS
Declaration of Non-Disclosure Agreement (DND) in accordance with the Attachment-"Z"
NOT TO BE USED FOR
CONSTRUCTION OR
of this Schedule “B”.
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED END OF PART-3

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 17
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D

PART 4 - MATERIALS

4.1 OUTSIDE PLANT:


A. CONDUITS:
DESCRIPTION

1. PVC conduit properties for outside plant cable facilities shall meet or exceed the
requirements according to 23-SMSS-1, 23-SMSS-2 and 25-SMSS-1 (Rev.-4). 110mm
diameter PVC conduit shall be used for all Outside Plant Network.
2. RSC-PVC coated conduit (Rigid Pipe for Outdoor Application).
3. EMT conduit. (PDS-LAN-WAP for Indoor Application)
4. Square duct cable raceway.
5. Flexible Corrugated Sub-Duct (Plenum & Non-Plenum Type).
NO.

DOCUMENT
B. TELECOMMUNICATION CABLES (VOICE AND DATA):
SZS
PREPARED BY
1. OSP Unshielded Broadband CAT-6A Cable
DATE  Conductor: Solid Annealed Bare Copper; 23 AWG (0.57mm)
CHK’D BY  Insulation: Solid Polyolefin
 Jacket: Black Polyethylene Outer Jacket
APPROVED  Balance Twisted Pairs: Unshielded
ITC/PPD/PROJS. ENGG DIV.  Shielding System: Aluminum Tape Shield, Protection against EMI/RFI
 Cable Assembly: 4 Balanced Twisted Pairs
DDC
 Fully Field Core
JGT

C. Fiber Optic Cable: Outdoor Type


a. Inter /Intra Building (Campus) Installation: Loose Buffer (breakout design) shall be
suitable for indoor/outdoor installation as per 11-SMSS-14 (Issue Sept 25 2002) and
48-TMSS-02 (Issue December 25, 2016).
b. Fiber Type: Single-Mode.
c. Fiber Count Per Cable: Minimum 12 core FOC
d. The non-metallic fiber optic cable shall meet all the requirements of this Scope of
Work/Technical Specifications and COMPANY Material Standard Specification 11-
CERTIFIED
SMSS-14. The cables shall be supplied with approved end seals (waterproof) which
BY:
ASU shall not be removed until immediately prior to optical jointing.
DATE:
e. Optical loss variation in the temperature range -20°C to the temperature reached during
fault current at the worst environmental conditions shall not exceed 0.05 db.
f. The CONTRACTOR and cable manufacturer shall ensure that all drums of optical cable
to be supplied shall have matching parameters in order for the CONTRACTOR to
achieve a good splice with splice loss within the specified allowable limit. These are
mode field diameter/ eccentricity and non-circularity or cladding surface.
g. The CONTRACTOR shall submit complete technical description, Specification/ Data
and representative samples of the cables for COMPANY review and approval prior to
THIS DOCUMENT IS
NOT TO BE USED FOR

purchase and shipment. The CONTRACTOR shall not procure any cable until
CONSTRUCTION OR
FOR ORDERING

reviewed and approved by the COMPANY.


MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 18
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

h. CONTRACTOR shall field verify on site to determine/measure the length of Fiber Optic
CHK’D

Cables that are required in this project before any cutting or pulling of cables is to be
done.
D. TELEPHONE CABLE MARKER POST: All cable marker posts that will be used in this project
shall conform to COMPANY approved standard, Dwg. No. SB-036365.
DESCRIPTION

E. GROUND CABLE:
1. A minimum of No. 6 AWG the gauge necessary to provide 5 Ohms maximum ground
resistance and insulated (green with yellow stripes).
2. Underground bonding / interconnection shall be bare conductors not smaller than No. 2
AWG. The bare conductor shall be connected to the grounding rod and shall be buried not
NO.

less than 460 mm (18 inches) below grade level of the completed site.
3

DOCUMENT
F. GROUND ROD
SZS
PREPARED BY Ground Rod shall have a minimum dimension of 2.42M (8ft) long x 16mm (5/8 inch)
DATE diameter made of copper. Additional ground rod quantity or longer ground rod shall be
CHK’D BY
installed to provide 5 Ohms maximum ground resistance.

APPROVED G. OSP ENTRANCE CABLE PROTECTOR


ITC/PPD/PROJS. ENGG DIV.
1. DATA: Protector Units shall be Systimax-Commscope Protector or approved equivalent for
DDC high-performance 4-pair Category 6A Outside Plant Cable for data applications that meets
JGT
the electrical specifications of TIA/EIA 568B.2-1 for Category-6A channel performance. The
protector terminal/module shall have a 16 volt clamping voltage and a 2-5 nanosecond
response time. These protector unit/modules shall be supplied and installed with all
accessories (e.g. grounding screw to module, grounding wire, shield grounding clips, etc.)
needed for standard installation.

H. TELEPHONE PEDESTAL
All Telephone Pedestals shall be in accordance with SEC Standard Drawing SB-036369
Standard Pedestal Installation.
CERTIFIED
I. PULL-BOX
BY:
ASU The Pull-Box / Housing (36”X25”X8”, 36”x12”x5”, 36”x12”x4” etc. with two entrance holes
DATE: for 2-conduits &1-hole for grounding) shall be rigid, weatherproof, corrosion resistant,
NEMA–4X, KRONE metallic enclosure. These enclosures shall be supplied and installed
with all accessories needed for standard installation.

J. INDOOR/OUTDOOR TERMINAL BOX


The terminal box/housing shall be rigid, weatherproof, corrosion resistant, NEMA–4X,
THIS DOCUMENT IS
KRONE metallic enclosure. These enclosures shall be supplied and installed with all
NOT TO BE USED FOR
CONSTRUCTION OR
accessories needed for standard installation.
FOR ORDERING

K. LABELS/TAGS
MATERIALS UNTIL
CERTIFIED AND DATED

1. Labeling/tagging of all communications equipment and materials shall be in accordance to


EIA/TIA-606 standard.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 19
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

2. Cable tags made of lead (strap type-25/PK).


CHK’D

L. CONDUIT PLUGS/SEAL
1 All conduits (vacant and occupied) shall have watertight rubber plugs or seals with proper
fire stop ratings.
DESCRIPTION

2 Seal all Building Entrances conduits with watertight plugs & seal with CAULK Fire Barrier
Sealant.

M. GROUNDING MATERIALS
The CONTRACTOR shall provide copper - clad ground wires, which will satisfy the
requirements of COMPANY Materials Standard Specification, 10-SMSS-6 Rev. 1 clamps;
Connectors and other materials to be installed on the required grounding system shall be
NO.

DOCUMENT in accordance with the Company Engineering Standard SES-P-122.10.


SZS
PREPARED BY
N. CONCRETE
DATE 1. The CONTRACTOR shall furnish all materials required for concrete WORK. All cement
CHK’D BY
shall be stored so as to prevent deterioration and contamination. Cement which has
become caked, partially set or otherwise deteriorated, damaged or contaminated shall not
APPROVED be used.
ITC/PPD/PROJS. ENGG DIV.
2. The source of supply for all sand and aggregate shall be accepted by the COMPANY
DDC REPRESENTATIVE. Fine and coarse aggregate shall be stored and handled so as to
JGT
preserve the gradation and cleanliness of the material. Segregation and/or contamination
are caused for rejection, and deficient material shall be removed and replaced.
3. Selective processing and washing of aggregates and sand is required to reduce salt
contamination. All necessary steps shall be taken to prevent recontamination from dewfall,
dust and other sources. Concrete constituents shall be isolated from the ground and
covered with protective sheeting prior to use.
4. All materials required for the concrete shall conform to COMPANY Materials Standard
Specification 71-SMSS-5. Type of concrete shall be concrete subject to severe exposure
condition.
CERTIFIED
O. REINFORCING STEEL
BY:
ASU Reinforcing steel shall be deformed steel bars conforming to SASO SSA-2/79 with a yield
DATE: stress of 420 MPa. Deformation shall conform to ASTM A-615M.

P. PROTECTIVE COATING MATERIALS


1. On Above Grade Surfaces: A single component, liquid applied, moisture cure, polyurethane
water-proofing membrane with the following properties:
a. Chemically resistant to alkalis, acids, chlorides and sulfates, and can withstand
THIS DOCUMENT IS
service temperature up to 90°C.
NOT TO BE USED FOR
CONSTRUCTION OR
b. Priming Coat and Subsequent Coats (except Top Coats), Aromatic formulation,
FOR
MATERIALS
ORDERING
UNTIL
700 microns dft:
CERTIFIED AND DATED  Color : Black
 Modulus at Break : 3 MPa
 Tear Resistance : 25 kN/m

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 20
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

 Ultimate Elongation
CHK’D

: 400%
 Tensile Set Recovery : 95 %
 Adhesion to Mortar : 3000 N/m
 Shore "A" Hardness : 0.4 metric perms.
 Service Temperature : Up to 90°C
DESCRIPTION

 Re-coatability : Excellent
 Chemically resistant to alkalis, acids, chlorides and sulfates.
2. Top coats, Aliphatic formulation, 300 microns dft:
 Color : Black
 Ultimate Elongation : 130%
 Tensile Strength : 22 Mpa
NO.

 Shore "A" Hardness : 85 ± 5


DOCUMENT
 Tear Resistance : 17.5 kN/m
SZS  total Solids by Weight : 60%
 and by volume
PREPARED BY

DATE

CHK’D BY 3. On Below Grade Surfaces: A two-component, high-build, high-solids (at least 70%) coal tar
and epoxy resin with the following properties:
APPROVED  Bond Strength to Concrete : 3 MPa
ITC/PPD/PROJS. ENGG DIV.  Bond Strength to (Sandblast- : 7.5 MPa prepared) Steel
4. Water to be Used in Cleaning The Concrete:
DDC
Maximum Recommended Concentration
JGT
Form of Contamination Dissolved Solids Excluding
Those Listed Below:
PPM (%)
Sulfates, Alkali, Carbonates 500 0.05
Bicarbonates 400 0.04
Chlorides 300 0.03
Suspended Solids 500 0.05
pH Value 7.0-8.5

CERTIFIED Q. REPAIR MORTARS:


ASU 1. Patch Repairs: High performance, shrinkage compensated, cementitious repair mortar
satisfying the following requirements:
BY:

DATE:
Compressive Strength at 28 Days Age : 60 MPa
Modulus of Elasticity at 28 Days Age : 30,000 MPa
Slant Shear Bond Strength w/ Concrete : 60 MPa@ 28 Days Age
Coefficient of Linear Thermal Expansion : 11 x 10-6/°C
: Very Low (less than 1000 coulombs as per ASTM
Chloride Ion Penetrability
C1202-91)
THIS DOCUMENT IS Setting Time at 20°C : Initial - 6-1/2 Hours Final - 9 Hours.
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED 2. Concrete Surface: A high-built cementitious repair mortar with the following properties at
28 days age:

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 21
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D

Compressive Strength at 20°C : 30 MPa


Flexural Strength : 7 MPa
Bond Strength to Concrete : 23 MPa
Coefficient of Linear Thermal : 7.0 x 10-6/°C
Expansion
DESCRIPTION

: Typically 2 to 4 hours dependent on water content and


Setting Time at 20°C
temperature

R. BACKFILL MATERIALS:
1. All materials and earthwork shall conform to the requirements specified in the COMPANY
Engineering Standards SCS-Q-002.
2. All backfill materials shall be furnished from a source accepted by the COMPANY
NO.

DOCUMENT
REPRESENTATIVE. Acceptance of a backfill source shall not mean automatic acceptance
of all materials obtained from the source, and the COMPANY REPRESENTATIVE may
SZS withdraw approval of the source at any time that materials produced by the source are not
PREPARED BY
suitable for backfill. If suitable, excavated material can also be used for backfill.
DATE

CHK’D BY
3. Certified Test Reports from the COMPANY approved testing agency shall be enclosed
along with the request to the COMPANY for approval of the material.

S. GROUT:
APPROVED

ITC/PPD/PROJS. ENGG DIV.


Grout shall be the non-shrink type using ASTM C-150, type of cement shall be in accordance
DDC with 71-SMSS-5. Grout proportions shall be as recommended by the manufacturer. Non-shrink
JGT grout shall be thoroughly mixed in the mechanical mixer. Mixing time shall not be less than
three (3) minutes, and shall be in strict accordance with the manufacture’s recommendations.
Re-mixing or reworking of grout which has begun to set prior to placing will not be allowed.

4.2 INSIDE PLANT/PREMISE DISTRIBUTION SYSTEM (PDS-LAN-WAP):


A. INDOOR & OUTDOOR UTP CABLES:
1. UTP Distribution Cable:
a. Distribution Cable (for Data/Voice)
 Unshielded Twisted Pair (UTP)
CERTIFIED  100 ohms; solid conductor
ASU  4-pair x 23 AWG
BY:
 Shall meet Category 6A cable specification
 Ratings shall be in accordance with specific area classifications
DATE:

B. INFORMATION OUTLET (I/O)


1. Supply and Install Information Outlets, installed in floor mounted service outlet boxes and
wall mounted outlet boxes in accordance with this PTS.
2. All information outlets (I/O), special purpose outlets and accessories for voice and data
THIS DOCUMENT IS
NOT TO BE USED FOR
shall be a modular type Simplex (1-Voice), Simplex (1-Data), Duplex (1-data and 1-voice),
CONSTRUCTION
FOR
OR
ORDERING
Duplex (2-Data), Quadplex (2 Data and 2-Voice) RJ-45 jack and comply with Category 6A
MATERIALS UNTIL
CERTIFIED AND DATED
for data & voice applications in accordance to TIA/EIA-568A Standard.
3. The proposed Information Outlet shall be provided with minimum one(1) spare per outlet for
future use & maintenance purposes.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 22
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

4. The modular faceplate shall be Plastic, high impact, flame-retardant, UL-rated 94V-
CHK’D

thermoplastic with dust cover and with complete labeling/icon accessories in accordance to
ANSI/TIA/EIA-606 labeling standard.
5. UTP cable termination shall be based on EIA/TIA 568-B standard color-coding scheme.
6. Spring dust cover.
DESCRIPTION

7. Labeling window with exchangeable labeling strip.


8. Printed circuit technology.
9. Angled housing (preferred).

C. Fiber Optic Cable (Indoor Application)


Inter /Intra Building (Campus) Installation: Tight Buffer (breakout design) shall be suitable
for indoor/outdoor installation as per 11-SMSS-14 (Issue Sept 25 2002) and 48-TMSS-02
NO.

DOCUMENT
(Issue December 25, 2016).

SZS
PREPARED BY
Quadplex Duplex
DATE Location/ Building WAP
S/N (4Data- (Wall Type)
CHK’D BY Name 2- Data
(Wall Type) (2-Data)

APPROVED NEW CHECKPOINT


1 01 02 01
ITC/PPD/PROJS. ENGG DIV. AT AL-JOUF PP

DDC
Total *01 *02 *01
JGT
*Indicates Minimum Estimated Quantity: CONTRACTOR shall Provide All ITC requirements whether shown
or not shown in the attached Layouts. Any additional quantity required in order to complete this project is
Contractor responsibility without any additional cost to the COMPANY.

D. UTP CAT-6A MODULAR INTELLIGENT PATCH PANEL:


1. 19 inch rack mountable Intelligent patch panel equip (CATEGORY 6A U/UTP PATCH
PANEL, 12/24/48 PORT) with Cable Management Rack with the following specifications:
a. Position jack (RJ45, 24 and/or 48 ports).
CERTIFIED
b. Meet or exceed EIA/TIA 568-A Cat.6A standard.
c. UL listed or approved equal.
ASU
BY: d. Based of Printed Circuit Board Technology.
DATE:
e. EIA/TIA-568B Termination Sequence.
f. Equipped with removable Labeling Strip.
g. Spring dust cover
h. Cable ties.

THIS DOCUMENT IS
E. FIBER OPTIC INTELLIGENT PATCH PANEL :
NOT TO BE USED FOR
CONSTRUCTION OR
The 19 inches Fiber Intelligent (High Density minimum) Patch Panel (High Density 1U Sliding
FOR
MATERIALS
ORDERING
UNTIL
fiber Panel, accepts MPO panels, providing up to 48 duplex LC ports) capable to meet new
CERTIFIED AND DATED
requirements for Automated Infrastructure Management Monitoring and shall conform to 19”
rack/cabinet standards. It shall be modular type equipped with single mode LC Cassette 12 LC

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 23
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

Singlemode Blue with Pigtails iPatch Ready). It shall be equipped with all Cable Management
CHK’D

Rack and accessories.

F. UTP CAT-6A PATCH CORD:


Shall meet or exceed Category 6A UTP cable specifications (100 ohms; stranded conductor; 4
DESCRIPTION

pair x 23 AWG). Both ends terminated on RJ-45 plug. CONTRACTOR shall supply 100% of the
total UTP Category 6 patch cables. Patch cord length on the equipment side shall be 1.5
meters long. Patch cord length on the user side shall be 3 meters or 5 meters long.

G. FIBER OPTIC PATCH CORD:


Fiber optic patch cord shall be constructed from high performance 9-10/125μm Single Mode
cables. It shall be Duplex Type (SC/ST/LC/FC combination as applicable) with two (2)
NO.

connectors on one end and two (2) connectors on the other end. Both ends shall have color-
DOCUMENT
coded both to facilitate identification of transmit and receive cores.
SZS
PREPARED BY
H. SECONDARY GROUNDING BUSBAR (SGBB) OR TELECOMM GROUND BUSBAR :
DATE
Telecommunications ground bus bar shall be 300 x 50 x 6 (mm) made of solid copper; equip with
insulated stand-off bracket.
CHK’D BY

APPROVED I. PRIMARY GROUNDING BUSBAR (PGBB) OR MAIN/MASTER GROUND BUSBAR:


ITC/PPD/PROJS. ENGG DIV.
Main/Master ground bus bar shall be 500 x 102 x 6 (mm) minimum made of solid copper; equip
DDC with insulated stand-off bracket. All grounding connections using two-hole with approved copper
JGT
terminal lugs.

J. DATA EQUIPMENT CABINET/ENCLOSURE:


Data equipment cabinet shall conform to 19” rack/cabinet standards. It shall be sized to
accommodate current and future installation requirement. It shall be equipped with:
S/N MINIMUM SPECIFICATIONS 42U 12U/15U/20U/24U/27U
1 Dimensions: Height (mm) 2000 Standard
Width (mm) 800 800
Depth(mm)– Network & Server Cabinet 1000 800
CERTIFIED
2-12way Rack mounted Power Outlet 220V-UK
Type Outlet; Vertical mounted power distribution
ASU 2 Two (2) Two (2)
BY: panel, 24 plugs with 30-60A Circuit Breaker
DATE: Minimum.
3 Standard smoked glass front door with lock  
Standard Perforated (85%) front & rear double
4  
door with lock
5 Removable side panels with lock  
Top mounted fan tray-4 fans, 220 VAC, 60 Hz, fan
THIS DOCUMENT IS 6 mounting plate for TS IT incl. thermostat, RAL  
NOT TO BE USED FOR
CONSTRUCTION OR 7035, fan expansion kit
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED
7 Earth continuity kit  
All accessories such as leveling feet, (2) twin
8  
castors wheel with brackets, (3) cable

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 24
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

management route and cable duct with fingers,


CHK’D

Gland plates, cable shunting rings, earth rail,


component shelf 2U, blanking panel 3U, air baffle
plate, slide rail,
9 Plinth kit for cable access to the cabinet 200MM  N/A
DESCRIPTION

Swing-type intermediate part to facilitate rear


10 N/A 
access (for wall mounted enclosure)
 Note:
a. Standard Perforated doors for Racks/Cabinets shall be provided if the cabinet will be installed
in Data Center or Main IT&C Equipment Room.
b. Fans top of the rack is not required only if Racks/Cabinets are located in Data Center.
c. End user shall verify the load weight required for the rack also in case the rack required
NO.

DOCUMENT special standing on the ground.


d. Any unused space in the rack should be covered with blanking device
SZS
PREPARED BY

DATE K. BOTTOM VENTILATED CABLE TRAY


CHK’D BY 1. Cable Trays are used to support horizontal distribution system of the building.
2. Aluminum, 2 mm thick; 30 mm inward flange at 90 degrees; 90 mm side rail height; 2.44 M
APPROVED long and width as required.
ITC/PPD/PROJS. ENGG DIV.
3. Aluminum cable tray construction and mechanical loading shall be in accordance with
DDC NEMA VE1. Aluminum cable trays shall be C-Profile type (perforated) or as required by the
COMPANY.
JGT
4. Cable trays fittings shall be designed and constructed exactly as the straight section with
respect to side rail, material, gauge, finish and dimension.
5. All necessary accessories shall also be provided.
6. The allowable fill area for cable trays will be as requirements of NEC Article 318.

L. SQUARE DUCTS (CABLE RACEWAYS)


Telecommunications Cable Raceways shall be Chatsworth Products, Square-D Products (or
approved equal) which is constructed of No.12 gauge high strength alloy. Minimum size shall
be 150 mm x 150mm and shall be with 20-25mm knock-outs along the overall section/length of
CERTIFIED the cable raceway. Each overall section/length is finished in telephone gray baked enamel and
ASU shall be provided with removable cover. Only fittings/mountings (joints/elbows/accessories)
which are approved by the Telecommunications Cable Raceway Manufacturer will be accepted
BY:

DATE:
by the COMPANY.

M. LABELS/TAGS:
1. Labeling/tagging of all communications equipment and materials shall be in accordance to
EIA/TIA-606 standard.
2. Engraved plastic tags shall be used in tagging the proposed cables on the existing cable
THIS DOCUMENT IS
NOT TO BE USED FOR
trays, pull boxes, junction boxes, and terminal boxes. The tags on the cables laid on cable
CONSTRUCTION
FOR
OR
ORDERING
tray shall be placed in a uniform interval not exceeding 30 meters.
MATERIALS UNTIL
CERTIFIED AND DATED
3. Engraved plastic tags-adhesive back shall be installed on the front cover of all proposed
terminal boxes, junction boxes, and pull boxes.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 25
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

Note:
CHK’D

1. For Terminal boxes, these tags shall indicate the Contract number, type, location, and
link destination.
2. For Cables, these tags shall indicate the Contract number, cable size, cable type,
cable count, and link destination. Refer to schematic diagram of the design drawings
DESCRIPTION

for the cable count details.

4.3 APPROVED MANUFACTURERS:


S/N A. OSP/PDS/LAN/WAP/VIDEO CONF. CABLING:
1 SUPERIOR ESSEX CABLE (US) 10 MULTI MEDIA CONNECT (MMC) - FRANCE
2 BELDEN-CDT (US) 11 ORTRONICS/LEGRAND (US)
3 WESTERN ELECTRIC – (KSA) 12 PREFORMED LINE PRODUCTS (PLP) –
NO.

DOCUMENT (UK)
4 KRONE – (GERMANY) 13 HUBBEL PREMISE WIRING (US)
SZS 5 COMMSCOPE/SYSTIMAX– (Ireland/US) 14 3M - (US)
6 PANDUIT – (US) 15 R & M (SWITZERLAND)
PREPARED BY

DATE

CHK’D BY
7 SIEMON – (US) 16 CORNING CABLE SYSTEM (US)
8 MOLEX PREMISES – (US) 17 CORDECK (US)
9 WIREMOLD-LEGRAND/WALKERDUCT
UNDERFLOOR DUCT SYSTEM (US)
APPROVED

ITC/PPD/PROJS. ENGG DIV.


B. CABINET/ENCLOSURES MANUFACTURERS
DDC 1 RITTAL ( Germany ) 4 CHATTSWORTH
JGT 2 IMRAK (APW) 5 CANOVATE
3 KRONE 6 HUAWIE

4.4 CONTRACTOR shall supply all permanent and expendable materials, tools, equipment and
all else required for successful completion of this PROJECT, whether shown or not on the
Drawings. All materials supplied by CONTRACTOR shall be new and unused; such materials
shall meet all contractual standards and specifications.

4.5 MATERIAL HANDLING, DELIVERY AND STORAGE:


1. Deliver all materials in manufacturer’s standard sealed packing. Store all materials above
CERTIFIED

BY:
ASU ground and in a dry place, not exposed to the sun.
DATE: 2. CONTRACTOR shall be responsible for safeguarding such items and ensuring that they are
treated with due care and maintained/used in a prudent manner.

END OF PART-4

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 26
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART 5 - CONSTRUCTION AND INSTALLATION


CHK’D

5.1 SITE PREPARATION:


A. Site preparation, clean-up and restoration after completion of works will be the responsibility of
the CONTRACTOR.
DESCRIPTION

B. The CONTRACTOR shall be responsible for returning all affected concrete and asphalt
surfaces to their original or better condition in accordance with COMPANY Standard Material
and installation specification and to the satisfaction of the COMPANY REPRESENTATIVE.

5.2 CIVIL WORKS:


A. Civil works shall include, but not limited to the following:
1. Excavation, trenching, masonry, asphalt, backfilling and restoration of affected
NO.

DOCUMENT areas/surfaces.
2. Placing of 110 mm diameter conduits.
SZS
PREPARED BY
3. Installation of 25 mm HDPE sub-duct (non-Plenum type) for Outdoor Application and
DATE installation of 25 mm diameter corrugated (Plenum Type) sub duct.
CHK’D BY 4. Concrete encasement of entrance conduits and all conduits crossing cemented pavement
and asphalt roads.
APPROVED 5. Installation of cable surface marker.
ITC/PPD/PROJS. ENGG DIV. 6. Construction of Dedicated Communication Manholes.
7. PDS-LAN-WAP Cabling Structural Support.
DDC
8. Other miscellaneous civil works.
JGT

5.3 COMMUNICATION MANHOLE:


A. Communication Manholes shall be constructed and installed at every change in direction;
crossings; start and end of communication duct bank as required by the COMPANY and at
every 200 meters of continuous run.
B. Installation of Manhole/Handhole near the building walls or take-off structures shall be six (6)
meters from the base of the structure/wall to the outside end of the conduit.
C. Manhole/Handhole shall be waterproof in accordance with SEC Standard SA-036356/TA-
800096, SA-036357/TA-800097, SB-036358/TA-800098 & SB-036361. Additionally; sides and
CERTIFIED base slab of Handhole shall be provided with elastomeric water proofing membrane with a
ASU minimum 4mm thick with 250 gsm non-woven polyester reinforcement shall be used at the
bottom and sides, the membrane shall be protected by 50 mm thick cement screed and 15 mm
BY:

DATE:
thick protection board and the interior surface of the Manholes shall be coated with two (2)
coats of elastomeric cementitious impermeable membrane.

5.4 FIBER OPTIC CABLE SPLICING


Cable Splicing shall be in accordance with SEC Construction Standard SCS-T-557.06/TCS-T-
111.06.
THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
5.5 UNDERGROUND NON-METALLIC FIBER OPTIC CABLE:
FOR
MATERIALS
ORDERING
UNTIL
A. The underground non-metallic fiber optic cables, Single Mode, shall be installed inside rigid
CERTIFIED AND DATED
sub-ducts in dedicated duct banks and Manholes , and routed up to the communication
room/building in accordance with the COMPANY Construction Standard SCS-T-557.08/TCS-T-
111.08. The underground Fiber Optic Cables shall be loop inside the Communications

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 27
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

Room/Area of the building in accordance with COMPANY Construction Standard and shall
CHK’D

meet all the requirements of SEC Materials Specification 11-SMSS-14 (Rev 2)/48-TMSS-02
and manufacturer’s recommendation.
B. Sufficient extra length of the underground fiber optic cable shall be securely and carefully loop
inside the end Manholes for future splice requirements. All other location of Manholes shall be
DESCRIPTION

provided with an extra two loops of fiber optic cable.


C. All necessary conduits, sub-ducts, cable trays, raceways and ladders shall be provided to route
the optical fiber and other communication cables from their designated ends up to the
communication equipment locations. (Note: Plenum Type Sub-Duct shall be provided &
installed inside the Building Vicinity).
D. Splicing requirements - At all Fiber Optic’s splice locations where CONTRACTOR shall be
required by COMPANY to splice.
NO.

DOCUMENT E. The average loss per splice shall be 0.05 dB maximum (measured in both direction), the Optical
Fiber splice loss measured in each direction using an OTDR & Power Meter shall be 0.15 dB
SZS maximum.
PREPARED BY

DATE
F. Fiber Optic Splicing shall be done by experienced Fiber Optic cable splicers using an Automatic
CHK’D BY Fusion Optical Fiber Splicing Machine with built-in estimated Optical Fiber Splice Loss Reading
capability. The estimated splice loss shall be less than 0.05 dB.
APPROVED

ITC/PPD/PROJS. ENGG DIV. 5.6 CABLE MARKER POST/SURFACE MARKER


A. Cable marker post shall be installed at all locations directly above the cable route.
DDC
B. Cable surface marker shall be used in all Concrete and Asphalt surfaces located inside
JGT
COMPANY property.
C. Cable marker post shall also be installed in accordance with COMPANY standard, Drawing No.
SB-036365.
D. Cable marker post and cable surface marker shall be of a type approved by COMPANY.

5.7 OPTICAL FIBER INTELLIGENT PATCH PANEL


A. Provide and install Cassette 12 LC Single mode Blue iPatch Ready, with HD 1U sliding fiber
panel, accepts (4) InstaPATCH 360 modules for fiber cable splicing.
B. Labeling Format for Terminal Splice Tray/Optical Fiber Patch Panel located inside
CERTIFIED Communications Room.
ASU
BY:

DATE:
1. SEC FIBER OPTIC TELECOMMUNICATIONS SYSTEM
 CONTRACT NO. :
 PATCH PANEL NO. :
 LINK DESTINATION :
 CABLE TYPE/# OF CORES :
 CABLE MANUFACTURER :
THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
 INSTALLATION YEAR :
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

END OF PART-5

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 28
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART- 6 TESTING AND COMMISSIONING


CHK’D

6.1 TYPE TEST REPORT:


A. The Contractor shall provide two copies of the initial Type Test report to the Company for each
Major Equipment item. The type test report submitted by the Contractor shall contain all
DESCRIPTION

applicable tests and measurements and test methods/procedures, which are required in order
to verify Manufacturer's equipment specifications, and other specifications, which are indicated
in these SOW/TS.

6.2 ACCEPTANCE TEST PLAN AND PROCEDURES:


A. Contractor shall prepare an acceptance test plan and procedures (which the Contractor shall
use during the field testing, pre-commissioning and commissioning phases of the project),
NO.

DOCUMENT which shall be submitted, to the Company for review and approval at two stages of the project.
These stages are as follows:
SZS
PREPARED BY
B. Preliminary Acceptance Test Plan and Procedures for Contractor installed equipment shall be
DATE provided as part of the Project.
CHK’D BY C. Detailed Acceptance Test Plan and Procedures (based on the Company approved Preliminary
Acceptance Test Plan and Procedures, and Manufacturer's Recommendations), which is to be
APPROVED provided at least two weeks prior to the start of Contractor's pre-commissioning tests.
ITC/PPD/PROJS. ENGG DIV.

6.3 PRE-COMMISSIONING TESTS - ALL ELECTRONIC EQUIPMENT AND CABLES:


DDC
A. After completing installation of all cables, equipment, and other accessories for the system,
JGT
Contractor shall perform all local and end-to-end tests to verify and ensure satisfactory
operating condition of the overall system. Contractor is required to verify that:
B. All tests (standard manufacturer's equipment tests and special tests required by the Company)
are performed and that test results are within manufacturer(s) specified tolerance limits, and as
per applicable Company standards.
C. All test results are recorded and tabulated according to standard on manufacturer's
recommended formats, or Company Specified forms/test sheets. Test title, link/sites name,
date and time when test was performed, equations/formulas used to reach calculated or
unmeasured figures need to be listed and explained as necessary.
CERTIFIED D. The Pre-commissioning tests for the equipment shall follow the same plan and format as
ASU required under the final commissioning test procedures (See Section 6.4 - Final Acceptance
and Commissioning Tests).
BY:

DATE:
E. The Contractor must finish the pre-commissioning tests successfully and submit his test results
to Company Representative for evaluation before starting the Final Acceptance and
Commissioning Tests.

6.4 FINAL ACCEPTANCE AND COMMISSIONING TESTS:


A. Recommended Tests/Measurements
THIS DOCUMENT IS
NOT TO BE USED FOR Contractor, as a minimum, shall be required to perform final acceptance testing of all equipment
CONSTRUCTION
FOR
OR
ORDERING included in this SOW/TS in accordance with the Company approved Contractor's Detailed
MATERIALS UNTIL
CERTIFIED AND DATED Acceptance Test Plan and Procedures.

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 29
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

B. Procedures and Other Conditions


CHK’D

The following are general procedures and the order, which is to be followed during the final
acceptance and commissioning tests for the equipment, which is to be provided/installed, by
Contractor:
1. The Company shall designate its Representative(s) to witness the commissioning and
DESCRIPTION

acceptance tests prior to putting the system in operation, and commencing the system trial
period.
2. Contractor shall ensure that all mark-up construction documents/drawings pertaining to the
Commissioning Acceptance Test are handed over to the Company at least six (6) weeks
prior to the commissioning and acceptance test date.
3. Contractor shall submit 3 copies of pre-commissioning test results, acceptance test
schedule, and invite the Company in writing at least ten (10) working days before the
NO.

DOCUMENT proposed date to commence the acceptance and commissioning tests.


4. Contractor shall demonstrate, by simulation or type test report, that the equipment are
SZS operating under maximum design limits and extreme environmental conditions which are
PREPARED BY

DATE
specified in the SOW/TS and that results are within the manufacturer's specified nominal
CHK’D BY values, previously approved by the Company.
5. Equipment tests shall include testing of all wiring for future expansion up to full capacity, by
APPROVED inserting appropriate modules or cards, as required.
ITC/PPD/PROJS. ENGG DIV. 6. The Commissioning and Acceptance Tests will be performed according to the following
order:
DDC
a. Physical/Mechanical Inspection
JGT
b. Inventory of Installed equipment, spare materials, and documents
c. Validation of As-Built Drawings
d. Local Tests
e. End-to-End Test (Overall System Performance)
f. The tests shall be performed in sequential order as listed above.
7. Contractor shall clear all major discrepancies pointed by Company representative before
resuming all related tests.
8. Final Testing and Commissioning tests shall include detailed testing of Contractor’s
supplied spare parts.
CERTIFIED

ASU 6.5 TEST EQUIPMENT:


Contractor, under the scope of this project, is responsible to provide all standard test equipment
BY:

DATE:
(conventional and special, as recommended by the manufacturer(s) to be used in testing and
commissioning.
All test equipment must have updated valid calibration certificate from a recognized calibration-
laboratory In or Out-of-Kingdom. The Company shall not accept tests performed using un-
calibrated test equipment.

THIS DOCUMENT IS
NOT TO BE USED FOR
END OF PART-6
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 30
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART-7 APPLICABLE STANDARDS


CHK’D

7.1 COMPANY STANDARDS:


If conflicts exist between the latest editions of these codes and standards, those conflicts
shall be brought to the attention of the COMPANY Representative for resolution.
DESCRIPTION

A. SEC STANDARDS:
1. SMSS: (Adopt Latest Edition)
a. 23-SMSS-1 (Rev-2) : PVC Conduits and Fittings for Underground Ducts
b. 24-TMSS-01 : Wireways, Cable Trays, Boxes & Enclosures
c. 25-SMSS-1 (Rev-4) : Specification for Duct Sealing Units
d. 11-SMSS-14 (Rev 2)/48-TMSS-02: Specifications for Non-Metallic Fiber Optic Cable
e. 48-TMSS-12: Fiber Optic Interconnecting Devices & Passive Components.
NO.

DOCUMENT
2. SES: (Adopt Latest Edition)
SZS
PREPARED BY
a. SES-T-559 : Communications Distribution Cables
DATE
b. SES-P-111.02/TES-T-111.02 :Communications Facility Grounding System
CHK’D BY c. SES-T-011 :Communications Symbols
d. TES-T-111.10 :Communication Feeder Cables
APPROVED e. TES-T-111.12 : Outside Plant (Communication) Standards and Practices for
ITC/PPD/PROJS. ENGG DIV. Facility Area Design & Remote Distribution Area Plan Design
f. SES-T-742/TES-T-111.17 : Building Engineering Fire Protection of Communication
DDC
Facilities
JGT
3. SCS: (Adopt Latest Edition)
a. SCS-T-557/TCS-T-111 : Communications/Underground Communications Cable
Installation
 TCS-T-111.01: Acceptance/Commissioning, Test & Inspection of Communication
Network Equipment
 TCS-T-111.02: Conduit Sealing for Underground Communication Cable
 TCS-T-111.03: Communication Cable Splicing
 TCS-T-111.04: Underground Telephone Cable Installation
 TCS-T-111.05: Long Pulls and Reel Length Limitations of Underground
CERTIFIED
Telephone Cables
BY:
ASU  TCS-T-111.06: Optical Fiber Cable Splicing
DATE:  TCS-T-111.08: Installation of Underground Non Metallic Fiber Cable
 TCS-T-111.11: Design and Installation of Underground Communications Conduit
and Manhole System.
4. SEC-IT HIGH LEVEL FACTS & REQUIREMENT DEFINITIONS FOR AN APPLICATION
(SW / HW / NW) SOLUTION

THIS DOCUMENT IS
B. SEC STANDARD DRAWINGS: (Adopt Latest Revision)
NOT TO BE USED FOR
CONSTRUCTION OR
1. SA-036350/TA-800094: Typical Duct Splaying Layout for Manhole Entry
FOR
MATERIALS
ORDERING
UNTIL
2. SB-036352: Joint Easement for Direct Comm. Power Cables
CERTIFIED AND DATED 3. SB-036353/TB-800067: Direct Buried Cable Trench Detail for Rocky Areas
4. SB-036354/TB-800079: PVC Conduit Installation Concrete Encased (Vital
Communications)

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 31
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

5. SB-036355/TB-800090: Concrete Encased Duct Detail For Rocky Areas (Vital


CHK’D

Communications)
6. SA-036356/TA-800096: Standard Manhole Type-1
7. SA-036357/TA-800097: Standard Manhole Type-2
8. SB-036358/TA-800098: Manhole Accessories (Communications)
DESCRIPTION

9. SB-036359: Std Manhole Materials Take-Off List and Typical Manhole Standards Guide
(Communications)
10. SB-036360: Road Crossing typical major Asphalt Auger Bore Method
11. SB-036361: Communication Cables Manhole Water Proof Treatment Installation.
12. SB-036362: Pipeline Crossing for Communication Cables
13. SB-036363: Electronic Marker System installation Details (Communications)
14. SB-036364: Road Crossing Typical Major Marl Road Open Cut for Comm. Cables
NO.

DOCUMENT 15. SB-036365: Marker Post


16. SB-036366: Pedestal Guard Installation Details
SZS 17. SB-036367: Standard Conduit Formation for Communication Cables
PREPARED BY

DATE
18. SB-036368: Detail and Assembly Drawing Main Distributing Frame (MDF)
CHK’D BY 19. SB-036369: Telecommunication Standard Pedestal Installation
20. SB-036370: PVC Conduit Installation Conc. Encased (Non-Vital Communications)
APPROVED 21. SB-036371: Conc. Encased Duct Det. for Rocky Areas (Non-Vital Communications)
ITC/PPD/PROJS. ENGG DIV. 22. SB-036373/TB-800077: Standard Communication Handhole (Traffic Type)
DDC
7.2 INTERNATIONAL STANDARDS: (Adopt Latest Edition)
JGT
A. BICSI-TDMM : Building Industry Consultative Services International-Telecom
Distribution Method Manual
B. EIA/TIA-568 A & B : Commercial Building Telecommunications Cabling Standards
C. EIA/TIA-569 : Commercial Building Standard for Telecommunications Pathways and
Spaces
D. EIA/TIA-570 : Residential and Light Commercial Telecommunication Wiring
Standard
E. EIA/TIA-606 : Controlistration Standard for the Telecommunication Infrastructure of
Commercial Buildings
CERTIFIED
F. EIA/TIA-607 : Commercial Building Grounding and Bonding Requirements for
ASU Telecommunications
BY:

DATE:
G. TSB-36 : Commercial Building Wiring Standard
H. TSB-67 : Transmission Performance Specifications for Field Testing of UTP
Cabling Systems
I. NEC-NFPA 70 : National Electric Code-National Fire Protection Association 70
J. NESC-ANSI C2 : National Electrical Safety Code-American National Standards Institute
K. UL : Underwriters Laboratories, Inc.
L. GTE Practices : No. 256-050-206 (or latest edition) Cabling Methods – Central Office
THIS DOCUMENT IS
NOT TO BE USED FOR Running & Securing Power Cable
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED
END OF PART-7

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 32
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D

PART-8 REFERENCE DRAWINGS & ATTACHMENTS


CHK’D

8.1 DETAILED DESIGN DRAWINGS

S/N DRWG NO. DRAWING TITLE NO. OF


DESCRIPTION

SHEETS
EA-896829 TRENCH AND CONDUITS LAYOUT 01
EA-896830 MANHOLE/HANDHOLE FOLDOUT DETAILS 02
EA-896831 FIBER CABLE SCHEMATIC DETAILS 01
EA-896849 VOICE AND DATA CABLING LAYOUT 01
EA-896850 VOICE/DATA INSTALLATION DETAILS 01
SB-036373 OR SEC STANDARD HANDHOLE (TRAFFIC TYPE) 02
NO.

DOCUMENT
TB-800077
SB-036358 OR MANHOLE ACCESSORIES 02
SZS TA-800098
PREPARED BY

DATE
8.2 ATTACHMENT – 1A: DETAILS OF MATERIALS (New CHECKPOINT Building)
CHK’D BY

APPROVED

ITC/PPD/PROJS. ENGG DIV.

DDC END OF PART- 8


JGT

CERTIFIED

ASU
BY:

DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

OSP-PDS-LAN-WAP CABLING PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CONSTRUCTION SOW/PTS FOR
JOB ORDER NO. NEW CHECKPOINT BUILDING AT AL-JOUF PP PTS- 33
SE0546 A 21EF702 OF 01
EASTERN REGION SAUDI ARABIA 36
‫الشركة السعودية الموحدة للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D
DESCRIPTION

Attachment No. 1A
NO.

DOCUMENT

SZS
DRAWN BY

DATE

CHK’D BY OSP/PDS Details of Materials


APPROVED

ENGINEERING DEPT.

JGT/DDC Of

OPERATING DEPT.
NEW CHECKPOINT BUILDING AT
AL-JOUF PP
Note: (For reference only, refer to SOW & Design
Drawings for Complete Details)

CERTIFIED

BY: AMT
DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED Saudi Electricity Company
Kingdom of Saudi Arabia

PLANT NO. INDEX DRAWING NO. PAGE NO. REV.


PDS DETAILS OF MATERIALS FOR
GATEHOUSE 1
JOB ORDER NO.
NEW CHECKPOINT BUILDING AT AL-JOUF PP OF
SE0546 A PTS-21EF702 01
3
EASTERN REGION SAUDI ARABIA
‫الشركة السعودية الموحدة للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D

NEW CHECKPOINT BUILDING AT AL-JOUF PP


(for reference only, refer to SOW & Design Drawings for Complete Details)
COMMUNICATIONS: PREMISE DISTRIBUTION SYSTEM UNIT QUANTITY
01.01 Distribution ducts & conduits
1. RSC-PVC coated conduit (Rigid and Flexible) LOT 1
DESCRIPTION

2. EMT conduit LOT 1


3. Square duct cable raceway LOT 1
4. Flexible Corrugated PVC conduit LOT 1
5. HDPE Sub-Duct & Plenum Type Corrugated Sub-Duct LOT 1
6. PVC Conduit ; EB Type LOT 1
01.02 Supply and install telecommunication cables
NO.

1. Category 6A UTP cables, 100 ohms;4 pair x 23AWG (for Voice


3

LOT 1
DOCUMENT and Data)
SZS
01.03 Supply and Install Fiber Optic Cable: 1-12 Core Single Mode Intra LOT 1
DRAWN BY Building Installation: Loose Tube (breakout design) shall be suitable
DATE for indoor/outdoor installation.
CHK’D BY
01.04 Supply and Install PULL-BOX, 36” x 15” x 6” minimum with two(2)
entrance hole & 1 hole for grounding, NEMA-4X weather approved EA 1
APPROVED
type, hinge cover.
01.05 Supply and Install Information Outlets, installed in wall mounted
ENGINEERING DEPT.

JGT/DDC outlet boxes in accordance with following table:


1. QUADPLEX(4DATA) LOT 1
2. DUPLEX(2 DATA) WALL TYPE LOT 1
3. SPECIAL PURPOSE OUTLET, DUPLEX (2 DATA) LOT 1
OPERATING DEPT.
4. WAP OUTLET, DUPLEX (2 DATA) LOT 1

01.06 Supply and Install Ground Rod ;2.42M (8ft) long x 16mm (5/8 inch)
LOT 1
diameter made of copper.
01.07 Supply and Install GROUND BUS BAR (GBB):
500 x 102 x 12 (mm) minimum, made of solid copper, equipped EA 1
CERTIFIED
with insulated stand-off bracket.
01.08 Supply and Install Communication Handhole, that includes Manhole
AMT LOT 1
BY: Cover, Cable Racks, Cable Holder, Ladder, Grounding Systems
DATE:
and other required Manhole Hardware Accessories.
LOT 1
01.09 Excavation, Trenching, Backfilling, Compaction, Asphalting
01.10 Supply and Install Communication Conduit Systems or Duct Banks,
LOT 1
Hardware Accessories, Terratape etc
01.11 The 19 inches Fiber Intelligent (High Density minimum) Patch Panel
(High Density 1U Sliding fiber Panel, accepts (4) InstaPATCH® 360
THIS DOCUMENT IS
modules or MPO panels, providing up to 48 duplex LC ports),
NOT TO BE USED FOR capable to meet new requirements for Automated Infrastructure
CONSTRUCTION OR EA 2
FOR
MATERIALS
ORDERING
UNTIL
Management Monitoring and shall conform to 19” rack/cabinet
CERTIFIED AND DATED standards. It shall be modular type equipped with Cassette 12 LC
Single Mode Blue with Pigtails iPatch Ready. It shall be equipped
with all Cable Management Rack and accessories.

PLANT NO. INDEX DRAWING NO. PAGE NO. REV.


PDS DETAILS OF MATERIALS FOR
GATEHOUSE 2
JOB ORDER NO.
NEW CHECKPOINT BUILDING AT AL-JOUF PP OF
SE0546 A PTS-21EF702 01
3
EASTERN REGION SAUDI ARABIA
‫الشركة السعودية الموحدة للكهرباء‬
CERT.
SAUDI ELECTRICITY COMPANY
APP’D
CHK’D

01.12 Supply and Install Fiber Optic Patch Cord; high performance LOT 1
9-10/125μm Single-mode cables; duplex type (SC-LC and LC-LC
type connectors). Both ends shall have color-coded both to facilitate
identification of transmit and receive cores.
01.13 Supply and Install CONDUIT PLUGS/SEAL: LOT 1
DESCRIPTION

01.14 Supply and Install LABELS/TAGS: LOT 1


01.15 19 inch rack mountable Intelligent patch panel equip (CATEGORY
6A U/UTP PATCH PANEL, 12/24/48 PORT) with Cable
LOT 1
Management Rack, RJ45 Position Jack, Meet or exceed EIA/TIA
568-A Cat.6A standard, Spring dust cover etc.
01.16 Supply and Install Category 6A UTP Patch Cord cable
specifications (100 ohms; stranded conductor; 4 pair x 23 AWG).
NO.

LOT 1
DOCUMENT Both ends terminated on RJ-45 plug; 3-5 meters long on the user
side & 1.5 meter on system side
SZS
DRAWN BY 01.17 Supply and Install Data equipment cabinet conforming to 19”
DATE rack/cabinet standards Double Section Type for Wall Mounting
CHK’D BY Cabinet equipped with: 12units Outdoor Type standard and height.
One (1) 6-way Rack Mounted Power Outlet, 220 V UK or Universal EA 1
APPROVED Type; Standard smoked glass front door with lock; Removable side
ENGINEERING DEPT.
panels with lock; Top mounted fan tray-4 fans, 220 VAC, 60 Hz;
JGT/DDC Earth continuity kit.

OPERATING DEPT.

CERTIFIED

BY: AMT
DATE:

THIS DOCUMENT IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

PLANT NO. INDEX DRAWING NO. PAGE NO. REV.


PDS DETAILS OF MATERIALS FOR
GATEHOUSE 3
JOB ORDER NO.
NEW CHECKPOINT BUILDING AT AL-JOUF PP OF
SE0546 A PTS-21EF702 01
3
EASTERN REGION SAUDI ARABIA