Foam Deluge
Foam Deluge
Foam Deluge
Sub.Date 27/1/2022
Manufacturer Inball
Email [email protected]
Company AApproved
Responsibility
BApproved with
Tel No Remarks
Cell No C
Not Approved
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engi Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolat N/A
(ii) Equipment checked for remote control or BMS interfacing compatibility N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Supplier TIMA
Email [email protected]
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isol N/A
(ii) Equipment checked for remote control or BMS interfacing compatibili N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer Inball
Address Heidelberg Rd
Doornfontein
Johannesburg
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engi Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolatN/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer Angus
Supplier TIMA
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engi Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolat N/A
(ii) Equipment checked for remote control or BMS interfacing compatibility N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer TIMA
Supplier TIMA
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical i N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer Tyco
Supplier Tyco
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical iN/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Equipment Foam
Address 20 Patrick Rd
Jet park
Kuils rivier
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Eng Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isola N/A
(ii) Equipment checked for remote control or BMS interfacing compatibilit N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Address Trevallyn
industrial park west
Kya sands
Email [email protected]
Company A Approved
Responsibil
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Eng Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor fire water layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isola N/A
(ii) Equipment checked for remote control or BMS interfacing compatibilit N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A