Project Charter 1

This project timeline outlines the key tasks and milestones for developing a new dual cavity mold from July 2023 through October 2023. It involves designing the mold, fabricating soft and hard tooling, validating the molding process, and releasing the manufacturing instructions. Major steps include generating 3D models, creating factory prints, designing the molding program, production trials with soft and hard tools, and presenting the final results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

Project Charter 1

This project timeline outlines the key tasks and milestones for developing a new dual cavity mold from July 2023 through October 2023. It involves designing the mold, fabricating soft and hard tooling, validating the molding process, and releasing the manufacturing instructions. Major steps include generating 3D models, creating factory prints, designing the molding program, production trials with soft and hard tools, and presenting the final results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Duration Start Finish Jul 2, '23 Jul 9, '23 Jul 16, '23 Jul 23,

Jul 2, '23 Jul 9, '23 Jul 16, '23 Jul 23, '23 Jul 30, '23 Aug 6, '23 Aug 13, '23 Aug 20, '23 Aug 27, '23 Sep 3, '23 Sep 10, '23 Sep 17, '23 Sep 24, '23 Oct 1, '23 Oct 8, '23 Oct 15, '23 Oct 22, '23
Mode S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S
1 Project kick-off meeting
2 days Mon 7/24/23Tue 7/25/23
2 Share Project Charter
1 day Mon 7/24/23Mon 7/24/23
3 kick-off meeting 1 day Tue 7/25/23 Tue 7/25/23
4 Design Dual Cavity Mold
9 days Wed 7/26/23Mon 8/7/23
5 Generate models 5 days Wed 7/26/23Tue 8/1/23
6 Create Factory Prints
3 days Wed 8/2/23 Fri 8/4/23
7 Design Review / 1 day Mon 8/7/23 Mon 8/7/23
Release

8 Soft tooling Fabrication


16 days Tue 8/8/23 Tue 8/29/23
9 Procure Mold 10 days Tue 8/8/23 Mon
materials 8/21/23

10 Generate Internal 1 day Tue 8/22/23 Tue 8/22/23


Order

11 Fabricate Soft Tool 5 days Wed 8/23/23Tue 8/29/23


12 Develop Molding 4 days Wed Mon 9/4/23
Program 8/30/23

13 Mold process 3 days Wed Fri 9/1/23


simulations 8/30/23

14 Write Molding 1 day Mon 9/4/23 Mon 9/4/23


Program

15 Validate Soft tooling 9 days Tue 9/5/23 Fri 9/15/23


16 Release Validation WO
2 days Tue 9/5/23 Wed 9/6/23
17 Production Trial 5 days Thu 9/7/23 Wed
(Soft Tool) 9/13/23

18 Soft tooling Validation


2 days Thu 9/14/23 Fri 9/15/23
19 Hard tooling Fabrication
41 days Tue 8/8/23 Tue 10/3/23
20 Select Hard tool 3 days Tue 8/8/23 Thu 8/10/23
fabricator

21 Procure Hard tools 10 days Mon 9/18/23Fri 9/29/23


22 Receive & Inspect tools
2 days Mon 10/2/23Tue 10/3/23
23 Qualify Molding 9 days Wed Mon
Base & Process 10/4/23 10/16/23

24 Release Validation WO
2 days Wed 10/4/23Thu 10/5/23
25 Production Trial 5 days Fri 10/6/23 Thu
(hard tools) 10/12/23

26 Hard Tool validation2 days Fri 10/13/23 Mon 10/16/23


27 Release 5 days Tue Mon
Manufacturing 10/17/23 10/23/23
Process &
28 Update Molding 2 days Tue Wed
Instructions 10/17/23 10/18/23

29 Release Documents2 days Thu 10/19/23Fri 10/20/23


30 FAI Report 1 day Mon 10/23/23Mon 10/23/23
31 Presentation of Final 3 days Tue Thu
results 10/24/23 10/26/23

32 Create closing 2 days Tue Wed


presentation 10/24/23 10/25/23

33 Close project 1 day Thu 10/26/23Thu 10/26/23

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Project Charter 1
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sun 7/2/23
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 1