Set 1
Set 1
Set 1
PLAN APPROVAL
Form-A
Application for Permission for subdivision/layout or reconstitution or
amalgamation of land for building purposes. And for change of use of land.
From
2. I/We, have absolute right over the land applied for and have not made any
encroachment on any government land.
3. The names of the persons employed by me/us for the preparation of plans,
and supervision of the work are as under:
a) The plans are prepared by Registered Architect/Engineer/Town Planner
---------------------------- [name]
4. I/We, have read the Building Rules applicable for the Local body wherein
the site lies and claim to be fully conversant with it; I/We will abide to the
provisions of the Building Rules fully.
www.faceatp.com 00
1. Applicant's name :
Signature of Owner/Registered
Date :
Developer or
Authorised agent of the owner
www.faceatp.com 00
Form-B
Application for Permission for carrying out construction of building or
structure, change of use of building.
From
To
The Executive Authority of Local Body (Affix stamp size
photo graph of
the applicant)
----------------------------------------------
1. I/We, hereby apply for permission for carrying out construction of building or
structure, change of use of building as described in the accompanying plans and
drawings.
2. I/We, have absolute right over the land applied for and have not made any
encroachment on any government land.
5. The structural report, details and drawings have been prepared and supplied
by the Registered Structural Engineer --------------------- [name and registration
number]
7. For the foundation work of the High rise building, the services of the
Registered Geo-technical Engineer ………….. (name and registration number) will be
availed.
9. I/We, have read the Building Rules applicable for the Local body framed under
the provisions of the relevant Act and claim to be fully conversant with it.
10. I/We, shall fulfill my duties and responsibility in accordance with the
provisions of the Building Rules.
www.faceatp.com 00
FORM-C
Form of undertaking to be executed by the land owner or power of attorney holder or
builder or promoter and structural engineer, architect, geo-tech expert and site engineer.
2. I assure that I will put up the construction only in accordance with the
approved plan without any deviation and if any construction is later on found not in
accordance with the approved plan and any unauthorized addition is made, I agree for the
forfeiture of the Security Deposit which will be collected while issuing Planning Permission, and
also agree to demolish the such a deviation marked by the ………………………………………..
(competent authority) within thirty days after such notice, failing which, apart from forfeiture of
Security Deposit, the ……………………………………………………… may demolish or cause to demolish
such unauthorized or deviated constructions at the site under reference and recover the cost of
demolition from me.
3. I/We, (Land Owner or Power of Attorney Holder or Builder or Promoter) also assure
that the open space around the building to be left or the usage of the building, including the
car parking in ground floor, will be kept as specified in the approved plan and it will not be
converted into any other use except the purpose for which it is approved. If any structural
modification or usage differs from the approved plan, the competent authority is at liberty at
any time to remove any structural modification or usage and the Expenses incurred by the
competent authority is recoverable from me for non-compliance of their request or order.
www.faceatp.com 00
4. I/We, (Land Owner or Power of Attorney Holder or Builder or Promoter)
further assure that I will not convert any place of the construction in contravention to the
approved plan, especially in respect of car parking as specified in the sanctioned plan. At any
time in future, I will not convert the car parking on stilts by covering them fully, and use the car
parking space for any other purposes. If any construction work in car parking place, converting
them either as a flat or for any other purpose, is done either by me or by my successor or by any
other person to whom the said construction is transferred in future, without getting
appropriate order for doing so from the competent authority, the Authority is at liberty at any
time to take any action to remove any structural modification or usage and the expenses
incurred by the Authority is recoverable from me/my successor or from any other person to
whom the said construction is transferred in future.
10. We shall be liable for all future consequences in case of land falling under Land
Ceiling, Land Reforms or Land Acquisition.
11. I / We, (Land Owner or Power of Attorney Holder or Builder or Promoter) have
engaged the following as the consultant for the proposed development:
www.faceatp.com 00
E-Mail ID &
Consultant Name and Address Registration No. Signature
Mobile No.
Architect /
L.S.Structural Engineer
Geo-Tech Expert
Site SupervisionEngineer
This is to certify that I the Architect / LS of the site has inspected the site at
S.No. / R.S.No. / T.S.No. Block No. Village Taluk
I have personally verified the site measurements on ground and dimensions given in the plan
correspond with the actual on the ground.
The residuary plot details including structures thereon evidenced by documents correspond
with the actual on the ground.
Distance between the site and nearby water body, if any, is _____ m.
Distance between the site and quarry / crusher, if any, within 500m is ------ m.
Distance between the site and burial ground, if any, within a distance of 30 m from a place
declared and used as a burning or burial place / ground is -----m.
The Street Alignment Portion / Road Widening Portion / OSR Area shown in the Site Plan
tallies to the dimensions in the ground condition.
The site approval for Non-High-Rise Buildings / High rise building is enclosed (in such cases
item No.1 to 7 does not arise).
The building plans prepared and submitted herewith satisfy the relevant provisions of
development regulations vide planning parameters compliance statement.
www.faceatp.com 00
Topo Plan furnished showing the surrounding developments for a radius of 500 m
correspond with the actual on the ground.
In case of non-issuance of NOC, I shall obtain NOC / remarks from the department's
concerned before commencement of the construction and comply the conditions stipulated
by the concerned NOC /Remarks issuing Department during the construction and submit
the NOC / remarks along with certificate from the concerned agencies on fulfillment of the
NOC conditions at the time of applying for Completion Certificate.
(White washing, colouring, fixing, water supply, drainage or other sanitary fitments) and
before obtaining regular connection for water supply / electricity.
If any deviation to the approved plan is proposed to be made, I the Architect / LS shall obtain
prior approval of the Chennai Metropolitan Development Authority.
The above information furnished is correct. If any information furnished is found wrong, I am
aware that action shall be initiated against me and I shall not be henceforth allowed to sign in
the Plans for the Planning Permission Applications processed by GCC, Local Body, CMDA and
DTCP. To this effect an Undertaking shall be obtained from Architect / Licensed Surveyor and
owner.
www.faceatp.com 00
We, (Owner / Builder / Structural Engineer / Architect / Geo-Tech Expert) certify that the
structural plans of the building meet the structural safety requirements for all situations
including natural disasters, as applicable, as stipulated under Part 6 Structural Design of the
National Building Code of India and other relevant Codes; T he design has been done after
detailed soil test and we are satisfied as to the adequacy of soil test carried out and the
information given therein is factually correct to the best of our knowledge and
understanding.
The site is fit for the proposed construction, it has been tested vide soil test report.
No......................... dt..................... done by ...................................
We,(Owner / Builder / Structural Engineer / Architect / Site Engineer) certify that the
development, erection, re-erection or making alteration in the building shall be carried out
under our supervision and we certify that all the materials (type and grade) and the
workmanship of the work shall be generally in accordance with the general and detailed
specifications, as per NBC standards and to meet out the structural design of the proposed
building.
We, (Owner / Builder / Structural Engineer / Architect / Site Engineer) undertake not to
continue construction without any supervision by the our Site Engineer and submit the report
to the local body.
I, (Landowner / Builder) certify to engage the above mentioned Engineers for the active
period of building execution and I hereby assure to give Revised Certificate in case of any
change of Engineer, I shall ensure no work is taken up in this period till required Engineers are
engaged by me.
In case construction work is entrusted by a Builders Agreement to a 3rd Party, I (Land Owner
or Power of Attorney Holder or Builder or Promoter) shall undertake to include these
conditions as part of the agreement.
I, (Structural Engineer / Architect / Site Engineer) hereby certify that the development,
erection, re-erection or for making alteration in the building has been carried out under our
supervision and we certify that all the materials (type and grade) and the workmanship of the
work was in accordance with the general and detailed specifications, as per NBC standards
and met out the structural design of the constructed building. The construction was made
under the supervision of Site Engineer and submitted the report to the local body
periodically.
I, (Owner / Builder / Structural Engineer / Architect) hereby certify that the building, has been
designed by me ………………………………………………and the Structural
www.faceatp.com 00
Design was made by Thiru……………………………………………………………… , to the approved plans
sanctioned in the Planning Permission No. ………………………… dated ……………………andt h e
Building Permit No………………………………, dated………………………….. The Building has been
constructed and completed under my guidance and supervision as per the structural design
furnished by the Structural Engineer engaged by us. I also assure and undertake that I have
signed in the plan and in “as on site” plan and the same is structurally safe and fit for
occupancy based on my personal assessment and certification of the Structural Engineer
engaged by us.
E-Mail
Consultant Name and Address Registration No. Signature
ID & Mobile No.
Owner of the
land / Power of
Attorney Holder /
Lease Holder
Architect / L.S.
Structural Engineer
Geo-Tech Expert
Site Supervision
Engineer
1. DEPONENT Witnesses:
2.
Duly attested by the seal
www.faceatp.com 00
GOVERNMENT RULES & REGULATIONS
FOR A CONSTRUCTION COMPANY
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
www.faceatp.com 00
FACEAT & P COMMON CONSTRUCTION
AGREEMENT
AGREEMENT BETWEEN THE OWNERS AND THE
CONTRACTOR FOR CONSTRUCTION OF BUILDING
THIS AGREEMENT made at Chennai dated on------------, between--------------
-------------------------------------expression shall unless repugnant to the
context or meaning thereof, be deemed to include his heirs, legal
representatives, executors and administrators) of the ONE PART and
Er.S.JAGADEESAN (M/s.TRINITY ENGINEERING ASSOCIATES) having
construction business at Chennai ------------------------------------------------
--- (hereinafter referred to as "the Contractors" which expression shall, unless
repugnant to the context or meaning thereof, be deemed to include its
successors and assigns) of the OTHER PART.
AND WHEREAS The Owner has agreed to appoint the contractors for the said
works;
AND WHEREAS the contractors have requested the Owner to execute these
presents which he has agreed to do so.
www.faceatp.com 00
complete the said works more particularly described in the works order here to
and shown on the said drawings, strictly in accordance with the general
specifications annexed hereto and marked annexure.
2. The Owner shall pay the contractors said contract amount or such other
sum as shall become payable at the times and in the manner specified in works
order.
3. For the purposes of this contract, "built up area" means the total covered
area of the building at floor level out-to-out measurement of wall surface
(architectural projection/Wardrobes etc., excepted) and shall be inclusive of
staircase and balconies. Stilt floor and Balconies shall be measured and paid per
sqft in a different rate as per the price summary sheet below.
a) Technical supervision of the works. A full time qualified Site Engineer will be
at the site till completion for co-ordination between the client Architect and
shall be appointed by the Contractor.
b) Cost of all materials for construction.
c) Wages of labour, technical supervisors, all other workers and staff
required for execution of the said works in accordance with the costing, terms &
conditions as specified in the works order.
d) Cost of all electrical, Rain water harvesting, Sanitary, and plumbing (Both
hot and cold water) fittings.etc. Cost of the same is included in the price agreed
by the Contractor.
e) For the purpose of the Construction and the estimated contract value,
the Contractor has considered the drawings with reference ---------------------
----------------
f) Cost of all other items as specified in the works order.
The contract amounts are shown as reasonably possible for estimation purpose
and the actual billing will be based on the actual area measurement.
www.faceatp.com 00
6. The Owner may require alteration of the drawings and the nature of the
work by adding / modifying or omitting any items of work or having portions of
the same carried out. any major modifications from the plan, can be carried out
only on the written request of the Owner. The Owner shall make payment for
the differential excess charges arising out of the alterations, at such rates as
may be mutually agreed upon.
7. The contractors shall commence the work within 15 days of the handing
over of the site to them and complete the entire work within ----- months
thereafter, subject nevertheless to the provision for reasonable extension of
time as provided in the said conditions.
8. The contractors, while carrying out the said works, shall comply with the
provisions of all laws, rules and bye-laws for the time being in force affecting
the said works and will give all necessary notices to and obtain the requisite
sanction of the concerned local authorities in respect of the said works and will
comply with the building and other regulations of such authority and will keep
the Owner indemnified against all fines, penalties and losses incurred by reason
of the breach of the contractors of any such laws, bye-laws and regulations.
9. The Owner shall make all payments under this contract at Chennai as per
the works order.
10. The contractor will have to co-ordinate with an architect for construction
of the building and the payment will be released stage by stage after due
confirmation from the architect.
11. In case of any dispute or difference should arise between the parties,
whether in respect of quality of material used by the contractors or work done
or in respect of delay in completion of works or in respect of payment of extra
work required to be done and so executed or in respect of measurement of
work done or in respect of delay of payment to the contractors or touching the
interpretation, fulfillment of any of the terms of these presents or any other
matter arising out of or in connection with these presents or the carrying out of
the work, shall be referred to arbitration of two arbitrators, one to be appointed
by each party. The arbitrators shall appoint an umpire before entering upon the
reference. The arbitrators shall make their award within six months from the
date of entering on the reference.
www.faceatp.com 00
If the arbitrators do not make their award within the stipulated period or have
delivered to any party or to the umpire a notice in writing stating that they
cannot agree, the umpire shall forthwith enter on the reference and shall make
his award within three months of entering on the reference or within such
extended time as the parties may agree and in the absence of such agreement,
as the Court may allow. The arbitrators or umpire, as the case may be, shall be
entitled to consult any expert, after previous notice to the parties, the cost
whereof shall be borne by the parties equally. The proceedings of the
arbitrators shall be recorded in English, a copy whereof shall be furnished to
each party.
12. The provisions of the Arbitration and Conciliation Act, 1996 so far as
applicable and are not inconsistent or repugnant to these presents, shall apply
to this reference to arbitration. The cost of the reference and award shall be in
the discretion of the arbitrators, who may direct by whom and in what manner,
the same or any part thereof shall be paid. The award of the arbitrators or
umpire shall be final and binding on the parties and the parties, their executors
and administrators shall on their respective parts obey, abide by the award and
shall not challenge on any ground excepting fraud or collusion or error
apparent on the face of the award. It is hereby agreed between the parties that
the parties shall resort to arbitration, before filing any suit for the enforcement
of any right under these presents.
.
13. The Contractor hereby agrees to follow all Safety norms at the work site,
like using of Safety helmets, by all including the workmen as well as Supervisors,
Project Managers, visitors, etc
www.faceatp.com 00
SPECIFICATIONS:
Sl Classifications
Specifications
No.
1 Structure RCC framed structure based on Architectural /
Structural design to ground, First, second & head
room. Height of each floor, Grade of concrete,
thickness of slab, openings, and coverings and
other reinforcement and mix design details shall
be as per Structural designer. River sand/M Sand
shall be used concreting and other civil works.
www.faceatp.com 00
Sl Classifications
Specifications
No.
a) Main Hall & Dining in I floor, vitrified Tiles
(Kajaria/Somani/Johnson/RAK or equivalent
- Basic Cost – 60 / Sqft)
b) Granite/Marble flooring @ Rs 80 /-per sqft to
be provided for the staircase area as per
Architects drawing / instruction. (Basic cost
Rs.80/ -per sqft)
Granite slabs with nosing for steps. Edges &
sides shall be double thickness with required
no. of grooves as required by the owner.
Granite steps shall start from Ground floor to
2nd floor.
www.faceatp.com 00
Sl Classifications
Specifications
No.
b) Bedroom & Other doors : Clear Opening size
– 7'x3'
c) Providing & fixing of 32mm thick Approved
make kutty or equivalent flush door with Teak
wooden frame of size 100 x 75mm with 3 nos of M S
hold fasts per side and also to have 2 Nos of 125 mm
long 8mm dia tower bolts, 4nos of 125mm heavy
duty hinges, 1 No door stopper (or) 1 No magnetic
catch wherever required etc, complete.
www.faceatp.com 00
Sl Classifications
Specifications
No.
Approved water proofing at roof to be done prior
fixing of tiles.
b) Interior – Birla or equivalent patty with Berger /
Asian/ICI Premium emulsion paint
c) Exterior – apex Weather Proof Emulsion
Toilet sunken: Plastering with Cm (1:3) 20mm thick
admixed with approved admixture, curing and
testing and filling with brick jelly concrete (1:4:8)
etc., complete.
11 Miscellaneous a) Provision for open cupboards in bedroom only.
b) Staircase/inner courtyard handrails will be of
MS. as per attached photo.
c) 4' clear ht parapet wall of 41/2” thick brick wall
measured from the finished water proofing level.
d) All side balconies are MS grill with railing as per
the architects requirements
e) Air-conditioner provision on split in all
bedrooms, living and dining with necessary drain
arrangements connected to proper drain line.
Providing shelves in store & pooja with 5 Nos 20mm
thick quality cuddappah slab & necessary brick wall
& plastering
www.faceatp.com 00
Sl Classifications Specifications
No.
www.faceatp.com 00
Sl Classifications Specifications
No.
www.faceatp.com 00
ANNEXURE II
TERMS AND CONDITIONS :
1. All construction area calculations are based on the given drawings. The work
is to be carried out as per the drawing provided by the architect. Any deviation
is to be done only on specific written request and approval of both the architect
and client. Discrepancy in drawings should be brought to the notice of the
architect before work is executed.
2. The area for payment is the calculated plinth area including head room as
mentioned in
the drawing.
3. Water and Electricity will be supplied at free of cost by client
4. An interest free mobilization advance of10% of the contracted value shall be
paid
5. All statutory taxes applicable and will be under the scope of the contractor.
6. Works are to be carried out as per respective Indian standard and as per the
manufacturer's specifications.
7. The following brand of materials are to be used:
a. CEMENT (OPC 53 GRADE): :
DALMIA KCP, BHARATHI, ZUARI, CHETTINADU, ULTRATEC
b. REINFORCEMENT STEEL :
KAMAKSHI, AMMAN, SSI, ARS & Any ISI MATERIALS.
c. TEAK WOOD : TEAK FIRST QUALITY
d. TEAK WOOD :
TEAK WOOD FOR DOOR AND WINDOW - ALL FRAMES BY TEAK ONLY
e. FLOORING & DADO : AS PER SPECIFICATION
www.faceatp.com 00
ANNEXURE II
10. Land /Space for workers to be provided by
client with one point of electricity & water at free of cost.
11. ESI, PF, CAR Policy, all taxes not included in the rate.
12. M sand only considered if river sand required extra cost will be
applicable.
13. Duration 8 months
BASIC RATES :
CEMENT : Rs.380/- per bag
STEEL : Rs.43, 500/- per MT
BRICKS : Rs. 20,500/- per 3,000/- Nos.
FIRST QUALITY TEAK WOOD : Rs. 4,500/- per Cft.
PAYMENT SCHEDULE :
Stage Description Percentage Amount
Stage 1 Mobilization Advance 10%
Stage 2 On completion of basement 15%
Stage 3 On completion of ground floor roof slab 10%
Stage 4 On completion of 1st floor roof slab 10%
Stage 5 On completion of Second roof slab 10%
Stage 6 On completion of brick work, 10%
lintels, lofts & sunshades
Stage 7 Plastering and Joineries 12%
Stage 8 completion of flooring 7%
Stage 9 On completion of Plumbing & Electrical 8%
Stage 10 On completion of painting 5%
Stage 11 Handling over 3%
www.faceatp.com 00
IN WITNESS WHERE OF the employer has set his hands to these presents and a
duplicate here of and the contractors have caused its common seal to be affixed
here unto and a duplicate here of the day and the year first here in above
written.
Witnesses;
Signed and delivered by the
1 hand of Owner
Contractor Seal
Signatures
www.faceatp.com 00
CIVIL ENGINEERING ABBREVIATION
The common abbreviation used in civil engineering are as
follows.
A.B – Anchor Bolt or Asbestos Board
AC – Asphalt Concrete
A.S.C – Allowable Stress of concrete.
A.S.T.M – American society for testing materials
AC – Asbestos cement AE – Assistant Engineer
APM – Assistant Project Manager B.M – Benchmark
B.M – Bending moment BLK – Block Work
BOQ – Bill of Quantities BRW – Brick Retaining Wall
BWK – Brick Work B.O.F – Bottom of Foundation
CHK – Bedroom, Hall, Kitchen C.I.Pipe – Cast iron pipe.
C.I.Sheet – Corrugated Iron sheet. CL- Centre Line
CRW – Concrete Retaining Wall CBW – Concrete Block Wall
CIP – Cast In Place CMU – Concrete Masonry Unit
CJ – Construction Joint CC – Centre To Centre
CC – Cement concrete CE – Chief Engineer
CP – Cement plaster. CPM – Critical path method.
CS – Comparative statement D – Diameter
DL – Development Length Dia – Diameter
DIM – Dimension D.L – Dead load.
DPC – Damp proof course. DPR – Daily Progress Report
DRG – Drawings DWLS – Dowels
EJ – Expansion Joint E.L – Environmental load.
EL – Existing Load EGL – Existing ground level.
ELCB – Earth Leak Circuit Breaker F.M – Fineness Modulus.
Ft – Foot or Feet FL – Floor Level
FGL – Formation ground level. FOC – Factor of Safety
GL – Ground Level GL – Ground level.
GP – Ground plane. HFL – Highest Flood Level.
HAC – High Alumina Cement HP – Horizontal plane.
IOM – Inter Office Memo ISI – Indian Standard Institute.
JE – Junior Engineer JST – Joist
Kg – Kilogram. L.L – Live load.
LW – Light Weight LWC – light Weight Concrete
LC – Lime concrete M – Meter
MM – Millimeter MB – Measurement book.
MCB – Miniature Circuit Breaker
MEP – Mechanical Electrical Plumbing
www.faceatp.com 00
MFL – Maximum Flood Level MRC – Material Receipt Challan
MT – Metric Tonnes N – Newton
NCF – Neat cement finishing OPC – Ordinary Portland Cement
OGL – Original ground level. OSR – Open Space Reservation Area
PC – Pile Cap PC – Precast Concrete
PCC – Plain Cement Concrete
PERT – Programme Evaluation and Review Technique.
PL – Plinth level PM – Project Manager
PO – Purchase Order PPE – Personal Protective Equipment
PPR – Poly Propylene Random. PVC – Poly vinyl chloride
PSF – Pound Per Square Foot PSI – Pound Per Square Inch
PWD – Permanent Works Engineer QC – Quality control
QS – Quantity Surveyor RC – Reinforced Concrete
R.B.W – Reinforced brick work. RBC – Reinforced Brick concrete.
RCC – Reinforced Cement Concrete RMC – Ready Mixed Concrete.
RL – Reduced level. SCC – Self Compacting Concrete
STP – Sewage Treatment Plant SRC – Sulphate Resisting Cement
SWG – Standard wire gauge. TB – Tie Beam
TBM – Tunnel Boring Machine TDS – Total Dissolved Solids
TOB – Top of Beam TMT – Thermo Mechanical Treatment
TOC – Top of Concrete TOW – Top of Wall
U.S.C – Ultimate stress of concrete.
UPVC – Unplasticized Polyvinyl chloride.
USD – Ultimate strength design. VP – Vertical plane.
W.C – Water closet. WL – Working Level
W.S.D – Working stress Design WO – Work Order
www.faceatp.com 00
CPM - Critical path method . USD - Ultimate strength design.
W.S.D - Working stress design. PL - Plinth level.
GL - Ground level. EGL - Existing ground level.
OGL - Original ground level . FGL - Formation ground level.
HFL - Highest flood level. RL - Reduced level.
A.C.I - American concrete institute.
A.A.S.H.T.O - American Association of state highway Transport Official.
A.R.E.A - American Railway engineering association.
A.S.T.M - American society for testing materials.
ISI - Indian standard institute. W.C - Water closet.
B.M - Bending moment. L.L - Live load.
D.L - Dead load. E.L - Environmental load.
U.S.C - Ultimate stress of concrete. A.S.C - Allowable Stress of concrete.
F.M - Fineness modulus. . B.M - Bench mark.
. PVC - Poly vinyl chloride.
. UPVC - Unplasticized Poly vinyl chloride.
. PPR - Poly Propylene Random.
www.faceatp.com 00
ENGINEERING FORMULA
Statistics Mode
Probability
Independent Events
Frequency P (A and B and C) = PAPBPC
Conditional Probability
( ) ( | )
Pk = binomial probability of k successes in n trials ( | )
p = probability of a success ( ) ( | ) ( ) ( | )
q = 1 – p = probability of failure
P (A|D) = probability of event A given event D
k = number of successes P(A) = probability of event A occurring
n = number of trials P(~A) = probability of event A not occurring
P(D|~A) = probability of event D given event A did not occur
www.faceatp.com 00
Plane Geometry Ellipse Rectangle
2b
Circle Perimeter = 2a + 2b
2a
Area = ab
Triangle B
Parallelogram c
Area = ½ bh a h
h 2 2 2
Area = bh a = b + c – 2bc·cos∠A A
2 2 2
b = a + c – 2ac·cos∠B C b
2 2 2
b c = a + b – 2ab·cos∠C
f
2 2 2
c =a +b
c
a n = number of sides
θ
b Trapezoid a
h
Area = ½(a + b)h h
h
b
Solid Geometry h
Cube
Sphere
3
s
Volume = s r
2 3
Surface Area = 6s Volume r
s s 2
Surface Area = 4 r
Rectangular Prism
Cylinder
h r
Volume = wdh
Volume = r h
2 h
Surface Area = 2(wd + wh + dh) w d 2
Surface Area = 2 r h+2 r
h
Irregular Prism
√ r h
Volume = Ah
A = area of base
Pyramid
h Constants
2 2
A = area of base g = 9.8 m/s = 32.27 ft/s
-11 3 2
G = 6.67 x 10 m /kg·s
π = 3.14159
www.faceatp.com 00
Conversions
SI Prefixes
Numbers Less Than One Numbers Greater Than One
Power of 10 Prefix Abbreviation Power of 10 Prefix Abbreviation
10-1 deci- d 101 deca- da
10-2 centi- c 102 hecto- h
10-3 milli- m 103 kilo- k
10-6 micro- µ 106 Mega- M
10-9 nano- n 109 Giga- G
10-12 pico- p 1012 Tera- T
10-15 femto- f 1015 Peta- P
10-18 atto- a 1018 Exa- E
10-21 zepto- z 1021 Zetta- Z
10-24 yocto- y 1024 Yotta- Y
Temperature Force
Equations
F = ma
TK = T C + 273
Mass and Weight F = force
TR = T F + 460 m = mass
M = VDm
a = acceleration
W = mg
W = VDw Equations of Static Equilibrium
V = volume TK = temperature in Kelvin ΣFx = 0 ΣFy = 0 ΣMP = 0
Dm = mass density TC = temperature in Celsius
m = mass Fx = force in the x-direction
TR = temperature in Rankin Fy = force in the y-direction
Dw = weight density TF = temperature in Fahrenheit
g = acceleration due to gravity MP = moment about point P
www.faceatp.com 00
Equations (Continued) Electricity
Ohm’s Law
Energy: Work Fluid Mechanics V = IR
P = IV
W = work RT (series) = R1 + R2+ ··· + Rn
F = force ’L
d = distance
(Guy-L ’ L
Power Kirchhoff’s Current Law
P1V1 = P2V2 By ’ L IT = I1 + I2 + ··· + In
Q = Av or ∑
U = potential energy
m =mass L
g = acceleration due to gravity A1v1 = A2v2
h = height
v = v0 + at
Energy: Kinetic d = d0 + v0t + ½at
2
P = rate of heat transfer
2 2 Q = thermal energy
v = v0 + 2a(d – d0) A = Area of thermal conductivity
τ = dFsinθ U = coefficient of heat conductivity
K = kinetic energy (U-factor)
m = mass s = speed ∆T = change in temperature
v = velocity v = velocity
a = acceleration R = resistance to heat flow ( R-value)
Energy: Thermal X = range k = thermal conductivity
t = time v = velocity
d = distance Pnet = net power radiated
g = acceleration due to gravity = 5.6696 x 10
-8
Q = thermal energy d = distance
m = mass θ = angle e = emissivity constant
c = specific heat τ = torque T1, T2 = temperature at time 1, time 2
∆T = change in temperature F = force
www.faceatp.com 00
Section Properties
x̅ and y̅
Ixx = moment of inertia of a rectangular section
about x-x axis
Semi-circle Centroid
Complex Shapes Centroid
∑x ∑y x̅ y̅
x̅ ∑
and y̅ ∑
x̅ x
x̅ x
y̅ y
y̅ y
xi = x distance to centroid of shape i
yi = y distance to centroid of shape i
Ai = Area of shape i
Structural Analysis
Material Properties
Beam Formulas
( )
(at √ )
www.faceatp.com 00
Simple Machines
Inclined Plane
y ( )
Wedge
IMA = Ideal Mechanical Advantage
AMA = Actual Mechanical Advantage
DE = Effort Distance DR = Resistance Distance L
FE = Effort Force FR = Resistance Force
Lever
Screw
1st
Class IMA =
Pitch =
2nd C = Circumference
Class r = radius
Pitch = distance between
threads
TPI = Threads Per Inch
3rd
Class Compound Machines
Wheel and Axle Gears; Sprockets with Chains; and Pulleys with
Belts Ratios
Effort at Axle
( )
Compound Gears
B
Effort at Wheel GRTOTAL = ( )( )
GR = Gear Ratio
in = Angular Velocity - driver
Pulley Systems out = Angular Velocity - driven
Nin = Number of Teeth - driver
IMA = Total number of strands of a single string Nout = Number of Teeth - driven
supporting the resistance din = Diameter - driver
dout = Diameter - driven
in = Torque - driver
IMA =
out = Torque - driven
www.faceatp.com 00
Structural Design
Steel Beam Design: Shear Steel Beam Design: Moment Spread Footing Design
qnet = qallowable - pfooting
Vn = 0.6FyAw Mn = FyZx
www.faceatp.com 00
Hazen-Williams Constants
www.faceatp.com
00
555 Timer Design Equations
B
y y
B
T = period
f = frequency
RA = resistance A
RB = resistance B
C = capacitance
Boolean Algebra
( )
fm = ft·nt·N
Plunge Rate = ½·fm
N = spindle speed (rpm)
CS = cutting speed (in./min)
d = diameter (in.)
fm = feed rate (in./min)
ft = feed (in./tooth)
nt = number of teeth
www.faceatp.com 00
Aerospace Equations Propulsion Orbital Mechanics
( )
Forces of Flight
√
√ √
FN = net thrust
L W = air mass flow
L vo = flight velocity
vj = jet velocity
= eccentricity
I = total impulse
b = semi-minor axis
Fave = average thrust force
a =semi-major axis
CL = coefficient of lift t = change in time (thrust
T = orbital period
CD = coefficient of drag duration)
a = semi-major axis
L = lift Fnet = net force
gravitational parameter
D = drag Favg = average force
F = force of gravity between two
A = wing area Fg = force of gravity bodies
density vf = final velocity G = universal gravitation constant
Re = Reynolds number a = acceleration M =mass of central body
v = velocity t = change in time (thrust m = mass of orbiting object
l = length of fluid travel duration) r = distance between center of two
= fluid viscosity
objects
F = force NOTE: Fave and Favg are
m = mass
g = acceleration due to gravity easily confused.
Ber oulli’s L w
M = moment
d = moment arm (distance from Energy
datum perpendicular to F) ( ) ( )
PS = static pressure
v = velocity
y
Atmosphere Parameters
K = kinetic energy
m =mass
v = velocity ( )
U = gravitational potential energy [ ]
G = universal gravitation constant
M =mass of central body
m = mass of orbiting object ( )
R = Distance center main body to
center of orbiting object T = temperature
E = Total Energy of an orbit h = height
p = pressure
density
www.faceatp.com 00
LIST OF DRAWINGS FOR BUILDING
CONSTRUCTION
ARCHITECTURAL DRAWINGS
a. Site Layout
b. Floor Plans
c. Sections
d. 2D & 3D Elevations
e. Joinery details
f. Interior details
g. Finishing specifications
STRUCTURAL DRAWINGS
a. Foundation Layout
b. Footing details / Pile details
c. Plinth Beam layout & Details
d. Column Details
e. Lift Pit / Wall details
f. Floor Beam Layouts
g. Longitudinal Sections & Cross Sections of Beams
h. Floor Slab layout & Reinforcement details
i. Head Room Details
j. Overhead & Sump RC details
k. Misc Standard construction details
l. Basic Technical Specifications
MEP DRAWINGS
a. Plumbing drawings
b. Rainwater harvesting details
c. Floor wise electrical conduit layout
d. SLD
e. Solar Panel details
www.faceatp.com 00
IMPORTANCE OF SOIL TESTING
All construction projects are made on the soil. The soil has to take the weight
of the structures. The soil testing before construction is first step and
important step for many reputed construction companies.
Soil testing is primarily done to test the bearing capacity of the soil. It also
shows the physical and chemical composition of the soil. These
characteristics may vary from layer to layer of the same soil. The
characteristics of the soil can change within small area due to weather, climate
change and the management of the site can also change the bearing capacity
of the soil. The soil must be able to withstand the weight of the building
otherwise the loss to property and life can occur. The soil investigations or
analysis determines not only the bearing capacity of the soil, but it also rate of
settlement of the soil. This rate determines the rate of the structure
stabilization on the soil.
The soil must be able to withstand the weight of the building otherwise the
loss to property and life can occur. The soil investigations or analysis
determines not only the bearing capacity of the soil, but it also rate of
settlement of the soil. This rate determines the rate of the structure
stabilization on the soil.
The soil testing also determines the length and depth of the pillars put in the
soil to lay the foundation of the building. The selection of suitable
construction technique and knowing the possible foundation problems all
are based on the results of the soil testing. The water table level of the soil can
be known only from the soil testing. The level of water table shows the likely
problem to the foundation of the building and level of humidity within the
foundation. The choice of construction material may also be affected by the
chemical and mineral component of the soil. If analysis of the soil reveals that
it contains sulphur, then the sulphur resisting cement is used to protect the
foundation of the buildings.
Apart from ascertaining the highest level ever reached by the groundwater
table and tests for classification of soil as per IS 1498 – 1970 based on grain
size analysis as per IS 2720 (Part –IV)– 1985, index properties of soil as per IS
2720 (Part-V) – 1985, the following tests are required to determine safe
bearing capacity based on shear strength consideration:
1. Standard penetration test as per IS 2131 – 1991 for coarse grained / fine
grained cohesion less soils with semi-pervious clayey soils (i.e. soils with
clay upto 30%).
2. Direct shear test (controlled strain) as per IS 2720 (Part – 13) – 1986.
Consolidated undrained tests for cohesive and for soils and consolidated
drained tests for cohesion less soils. The results may be compared with
standard penetration test / static cone penetration test results.
Since there is escape of pore water during box shear, partial drainage vitiates
the consolidated undrained test. Hence this test is not exact for semi-pervious
soils such as clayey sands / silts (i.e. with clay more than 15% but less than
30%). For such soils, triaxial tests are required if shear strength is critical
criterion.
3. Static cone penetration test as per IS 4968 (Part -3) – 1976 for foundations
on non-stiff clayey soils such as fine grained soils (i.e. more than 50% passing
through 75 micron sieve). In fine and medium coarse sands such tests are
done for correlation with standard penetration test and to indicate soil
profiles at intermediate points.
www.faceatp.com 00
4. Unconfined compressive strength test as per IS 2720 (Part-10) – 1973 for
highly cohesive clays except soft / sensitive clays.
5. Vane shear tests for impervious clayey soils except stiff or fissured clays.
6. Triaxial shear tests for predominantly cohesive soils. If shear strength is
likely to be critical.
www.faceatp.com 00
Apart from other tests for shallow foundations, the following soil tests are
required especially for raft foundations:
1. Static cone penetration test as per IS 4968 (Part-3) – 1976 for cohesion less
soils to determine modulus of elasticity as per IS 1888 – 1982.
2. Standard penetration test as per IS 2131 – 1981 for cohesion less soils and
soils to determine modulus of sub-grade reaction.
3. Unconfined compressive strength test as per 2720 (Part -10) – 1973 for
saturated but no pre-consolidated cohesive soil to determine modulus of
sub-grade reaction.
4. As specified in IS 2950 (Part -1) – 1981¸plate load test as per IS 1888 – 1982
where tests at Sl. No. – 1 to 3 above is not appropriate such as for fissured clays
/ clay boulders.
5. In case of deep basements in pervious soils, permeability is determined
from pumping test. This is required to analyze stability of deep excavation and
to design appropriate dewatering system.
www.faceatp.com 00
LABOUR AND MATERIAL CONSTANTS (IS 10067-1982) NORTH ZONE
www.faceatp.com
soil),for foundations not exceeding Mazdoor 0.50 _
1.5m in width and for
shafts,wells,cesspits and the like,
not exceeding 10m3 and on plan,
depth up to 1.5m and removal(up to
one meter away from edge)
00
banker, cement concrete (with Mixer 0.07 _
20mm graded coarse aggregate) operator 0.07 _
Mixer
www.faceatp.com
6) Reinforced cement concrete in situ M3 mason 0.17 The constants
in foundations,footings,bases for mazdoor 2.00 for items include
columns,etc excluding form work bhisti 0.90 mixing, pouring,
and reinforcement mixer 0.07 consolidating
operator 0.07 and curing. This
mixer 0.07 does not include
vibrator fair finish.
00
vibrator
www.faceatp.com
scaffolding.
10) Brick work in walls, one brick thick, M2 mason 0.25 The constants
in cement/lime mortar mazdoor 0.40 could be
bhisti 0.10 adopted for brick
work with any
mix or mortar.
11) Form work : Carpenter 0.25 _
a) fabrication and erection Mazdoor 0.20 _
with all supports, struts, Carpenter 0.23 _
braces, etc, and dressing Mazdoor 0.20 _
with oil as cleaning of Carpenter 0.30 _
formwork : Mazdoor 0.20 _
1) rectangular column and M3
walls M2
00
A Ready Reckoner For Quantity Surveyors 60
2) suspended floors/roofs M2
3) sides and soffits of beam
12) Reinforcement: Quintal Bar bender 1.00 _
Bar reinforcement including cutting Mazdoor 1.00 _
to length, hooked ends, cranking or
bending, hoisting and placing in any
position, binding wire and holding
firmly so as not to be disturbed
while placing and ramming of
concrete
www.faceatp.com
13) Plastering and pointing : mason 0.08 _
a) 15mm thick cement plaster to M2 mazdoor 0.10 _
ceiling including mixing of mortar. bhisti 0.10 _
M2 _
b) 15mm thick cement plaster on mason 0.06 _
brick walls (exterior) including mazdoor 0.10 _
mixing of mortar M2 bhisti 0.10
_
c) tuck pointing to random rubble mason 0.10 _
masonry in cement mortar mazdoor 0.15 _
including mixing mortar. bhisti 0.10
14) Damping proof course : M3 mason 0.10 _
a) Laying damp proof course 40mm thick mazdoor 0.10 _
cement concrete including form work and bhisti 0.01 _
fair finishing to edges and mixing.
00
A Ready Reckoner For Quantity Surveyors 61
Material constants in mortars:
s.no. Item(mix by volume) Constants per m3 of mortar
Slaked
Cement Surkhi Sand
Lime
(bags) 3 M3 M3
M
Cement mortar 1:4
1 (1 cement : 4 sand) 6.79 _ _ 0.9
Cement mortar 1:6
2 (1 cement : 6 sand) 4.65 _ _ 0.99
www.faceatp.com
composite mortar 1:1:6
3 (1 cement: 1 lime : 6 sand) 4.48 0.16 _ 0.96
00
A Ready Reckoner For Quantity Surveyors 62
www.faceatp.com
sand)
3 Half brick masonry in 506 1.08 0.153 506 0.94 0.133
cement 1:4 (1 cement :4
sand)
Material constants for cement concrete flooring
Sno Description of item Constants for 10 M2
Cement (bags) Sand (coarse) M3 Coarse aggregate M2
1 75 mm thick cement concrete 4.81 0.31 0.62
flooring 1: 2:4 (1 cement : 2 sand :4
Shingle20 mm nominal gauge)
finished with a floating coat of neat
cement
2 40 mm thick cement concrete 2.80 0.164 0.328
flooring 1: 2:4 (1 cement : 2 sand :4
Shingle20 mm nominal gauge)
finished with a floating coat of neat
00
A Ready Reckoner For Quantity Surveyors 63
cement
www.faceatp.com
(1 cement : 6 sand) 0.67 0.143 0.78 0.139
3 20 mm cement plaster 1:4
1.53 0.217 1.51 0.213
(1 cement : 4 sand)
4 20 mm cement plaster 1:6
(1 cement : 6 sand) 1.05 0.224 1.03 0.220
00
MINIMUM ROOM SIZES
Size standards for rooms
Minimum heights and size standards for rooms ensures that there is good
ventilation, lights and comfortable living inside the room. Height and size
standards for rooms vary from one country to another and are mostly based
on the preference of clients to meet their demand.
www.faceatp.com 00
6. Hallways
Minimum height should be 2.1 m
2. Dining room
Ÿ It should have a floor area not less than 9.5m2 with a minimum width of
2.4m.
Ÿ According to OBC, dining room shall have at least 3.25 m2 of floor space
when combined with other
rooms, and at least 7.0m2 of
area when not combined.
Ÿ Minimum dimension of 2.3 m.
Ÿ Dining rooms vary greatly in
size. It should be ensured that
furniture is accommodated.
Ÿ Natural ventilation shall be
provided.
www.faceatp.com 00
3. Primary Bedrooms
Ÿ One bedroom shall have at least 9.8m2 of floor area
Ÿ Minimum dimension should be 2.7 m
Ÿ Natural ventilation must be provided
4. Secondary Bedrooms
Ÿ It shall have at least 7m2 of floor area
Ÿ Minimum dimension is 2.0 m
5. Kitchen
Ÿ Minimum floor area required is not less than 5.5 m2. But OBC specify that
kitchen room shall have at least 4.2m2 of floor area
Ÿ It should not be less than 1.8min width at any
part. With a separate storeroom, the area may
be reduced to 4.5m2.
Ÿ Mechanical ventilation must be provided
(exhaust fan).
Ÿ Ensure that appliances can all open without
interfering with one another, and that
standing space is provided.
7. Ledge
Ÿ A ledge in a habitable room shall not cover more than 25% of the floor area
of the floor on which it is constructed
Ÿ It should not interfere with the ventilation of the room under any
circumstances.
8. Hallways
Hallways shall have a width of at least 860 mm except where the overall width
of the building is less than 4.3 m, and this may be reduced to 710 mm
9. Mezzanine floor
The minimum size of a mezzanine floor, if it is used as a living room, should
not be less than 9.5m2.
www.faceatp.com 101