PRODUCT DATA

• on-peak and off-peak demand setpoints


LOADSHED / DATA • Loadshed alarms
TRANSFER • Peak limit option

The user can configure the Loadshed Option from


The supervisory parts of the Loadshed Option and the either the Building Supervisor or the Service Tool.
Data Transfer Option for CCN are available as a pack- Configuration involves identifying the system element
age in one CIO Module. The two options both retain that contains the supervisory part, the wattmeter(s) that
their full functionality when packaged together in this monitor electrical demand, the limits to which demand
way. is to be controlled, and the devices to be controlled or
shed.
The Loadshed Option supervisory part consists of one
Loadshed supervisory part configuration table and 99 For additional information on the Loadshed Option,
Load Device configuration tables. The user configures consult the Loadshed Option Product Data Sheet.
those tables to control the way in which the option
performs its demand limiting function. Data Transfer Option
The Data Transfer Option supervisory part consists of The Data Transfer Option for the Carrier Comfort Net-
96 Data Transfer tables. Each of those tables can be work (CCN) enables the user to transmit point data from
configured to transfer the value of a point or a named one system element to another. It also supports broad-
variable from any CCN system element to any other cast transmissions from one system element to multiple
system element. system elements. The transmissions take place on the
CCN’s communication bus.
FEATURES
Loadshed Option The Data Transfer Option supervisory part included in
the Data Collection/Data Transfer CIO Module consists
The Loadshed Option enables the user to configure the of 48 Data Transfer tables. The user can configure each
system so that electrical demand is automatically re- table to control the transfer of data from one point or
duced when user-defined limits are exceeded. When named variable. There is no equipment part for the
the option is used with a UT203 FID, that reduction Data Transfer Option.
takes the form of first extending normal cycle off times
and commanding devices to operate at lower or higher The user configures the Data Transfer Option from the
setpoints, and then, if that action is not sufficient, turning Building Supervisor or the Service Tool. Only the single
off (shedding) devices in a prearranged order. PIC supervisory part requires configuration; none is needed
devices may also be shed by this option, and each PIC for the individual system elements that are involved in
may take other equipment-dependent demand limiting the data transfer.
actions.
For additional information on the Data Transfer Option,
The Loadshed option is divided into two portions: a consult the Data Transfer Option Product Data Sheet.
supervisory part and an equipment part. The supervi-
sory part, which resides in the Loadshed/Data Transfer
CIO Module, coordinates the option’s function. The
equipment part, which resides in each system element
subject to the Loadshed Option, receives commands
from the supervisory part and acts accordingly.

The Loadshed Option provides the following features:

• Loadshed of up to 99 devices
• one or two wattmeter operation

Specifications subject to change without notice. © 1989, Carrier Corporation, Syracuse, NY 13221 Printed in U.S.A.