IntroductionToContractManagement TrainingMaterial Module3
IntroductionToContractManagement TrainingMaterial Module3
IntroductionToContractManagement TrainingMaterial Module3
CONTRACT
MANAGEMENT
Contractual Governance
The Law
obligations obligations
Competent Most
Value Oversight Effective
and skilled appropriate
added and contract
contract contracting
contracts assurance administration
team strategies
Foundation of Eskom’s Governance Framework
Public Enterprises
National Treasury
Public Works
Labour
Environmental Affairs
Energy Delivery!
Mining
Investment Procurement
Projects Contracts
A B C D I II III IV
Contract I for Project A
Contract III for Project D
Task Order for Project C under Bulk/Framework Contract VI
Task Order for Project B under Bulk/Framework Contract VI
1. Informed of 2. Assist during the 3. Contract Eastablishment & Contract Administration 4. Close Out &
projects’ development of Handover
Contract Managemet level of Involvement
Sourcing Strategy
Business Investment Contracting
Need Budget
Approval Strategy
Mandate Mandate
Negotiate
Feedback Approval
Tender
Contract Award Reports Cross functional Tendering
Evaluation
Approval checking Meeting (Team)
In addition,
To avoid irregular expenditure in terms of the PFMA (and being
disciplined for it), a contract custodian must exercise his/her
delegated authority at all times within its parameters.
That is, as reflected in the approved procurement submission
documents, which should include the Delegation Consent Form
(DCF) even if no contingency is provided in it, and as reflected
in SAP.
Successful Delivery of Objectives AND Compliance
NB: DCF is issued to a contract custodian by an Eskom authority (usually Procurement and Tender
Committees (PTC)) and usually contains limits of additional cost and time which can be used
for managing contingencies arising under the contract. An Investment Committee can similarly
approve a project’s parameters to include the overall contingency for the project.
IDC*
Overheads
Project Contingency
Cost
Monetary Value
Monetary contingency %
R1
Time contingency %
R2
t Time Time tx
Change to be approved by Change to be approved by
Applicable Authorization Level Applicable Authorization Level
Change = ‘modification’
Can be any time during
contract duration
Result of overlay
R1 + R2 At any time during the approved
Monetary Value
Time
Some enablers include: Contractor’s programme, regular site meetings, Risk Register updates, early warnings, assessments for payment etc.
Authority for Goods, Services or Works Information
Changes and Variations
Where established, claims, variations and compensation event
committees / forums are to assist contract custodian in deliberations.
Always re-project / forecast cost , time and scope following an event
and get approval (e.g. a modified DCF) where required!
Usually NO revision of delegated authority (as reflected in SAP)
required to effect a payment if:
• There would be NO increase required to the approved/SAP cost
and time limits AND total accumulated compensation events/claims
do not, or are not likely to, exceed DCF contingency limits; AND
• Any change in Works, Services or Goods Information (e.g. drawing
corrected, minor change in a specification etc.) or Pricing Data (e.g.
additional line item in bill of quantities or changes to quantities)
would not equate to a change in Scope as indicated in the
Procurement Submission Documents previously approved by the
Eskom authority (PTC).
If in doubt, NOTIFY Procurement (e.g. relevant buyer) to confirm and
provide feedback to authority (PTC).
Controlled and Authorized Scope Changes
Note: Compliance with National Treasury Requirements Contract Management PG8 Approval
(SIPDM) (240-125481734) – see particularly subsections (ii) and (iv) provided.
Proposed, desired or
considered changes
in scope (e.g. Works
Information) Approved by Eskom
Delegated Approval Implement
Authority (e.g. Procurement changes
and Tender Committee)
Likely
increase needed in Yes
DCF contingency
limits (cost and/or Supported by Claims, Variations
time)? & Compensation Events
Yes Committee / Forum No
No
Changes in Scope Does a Claims,
Variations &
(increase or decrease Yes Compensation Events
from latest approved
procurement Committee / Forum
submissions)? exist to assist in
deliberations?
Other
compensation No
events
Contract & Payment Management process flow in SAP
(for works, with services & goods slightly different)
Procurement process/es
Service Entry
Payment Purchase Order SAP Release
loaded on SAP
Certified SAP data aligned (#500...)
(#108...)
EHPUM (level 0)
Communication Meetings
• Correspondence in all forms, including
• Agendas, attendance registers and
memos, notes, letters, and emails
minutes of:
• All communication which can be read, copied
• Site meetings
and recorded, including:
• Safety, health, environmental and
• Instructions
quality specific meetings
• Certificates
• Progress review meetings
• Submissions
• Risk reduction meetings
• Proposals
• Integration/coordination meetings
• Records
and any other meetings related to the
• Acceptances
works/services/goods.
• Notifications
• Replies
A notification required in terms of a contract
must be communicated distinctly and clearly e.g.
usually separate from other communication.
• Also, if applicable,
• Requests (e.g. for further Information)
• Approvals
• Determinations
• Notices
Managing Contract Documentation
and Records (3)
Scope and design Quality and completion
• Documents as reflected in the contract’s • Test and inspection results
Works Information (or subsequently • Laboratory testing reports
provided), including: • Non-compliance reports
• architectural or engineering drawings, • Instructions related to defects
• standards. specifications etc. • Conditional/ unconditional notices of substantial
• Clarifications of requirements completion
• Updated ‘as-built’ drawings • Notice of practical completion
• Testing & commissioning records
• Defects Certificate
Site • Certificates of completion (e.g. substantial, final etc.)
• Daily reports, logs, access registers and
•
diaries
Contractor payroll records and time
Time and schedule
• Contract milestone schedules
cards/ labour dockets
• Notices to proceed
• Contractor cost reports
• Updated construction schedules
• Construction progress photos
• Accepted Programmes reflecting:
• Productivity reports
• Key Dates,
• Weather measurements
• effective dates,
• Accident reports
• Sectional Completion Dates etc.
• Material deliveries/receipts
• Baseline versus actual
• Itemised machinery / equipment
• Contractor Progress Reports
charged for works
• Sub-contractor progress reports
Managing Contract Documentation
and Records (4)
Disputes
• Adjudicator’s contract
• Submissions sent to Adjudicator or Dispute Adjudicating Board (DAB) from both parties
• Adjudicator/DAB’s decision/s
• Logistical arrangements for arbitration
• Submissions of both parties to court/tribunal/arbitrator/s
• Tribunal/arbitrator/s’s award/s or Court order/s
To ensure compliance, remember:
workshop
Assessments
Instructions on completion of your assessment:
• This is an individual assessment.
• Therefore, soliciting assistance from others during the
assessment is prohibited.
• Learners are allowed to refer to all available study material
during the assessment.
• Once you have completed the assessment, hand in your
answers to your facilitator.
The learner assessments test the level and extent of
understanding created by the training sessions.
Please complete these quietly.
Should you require clarity, please put up your hand and the
facilitator will attend to you.
Good Luck!
Acknowledgement