CEEM 460K AHWU - Technical Specification - Rev 2014

Download as pdf or txt
Download as pdf or txt
You are on page 1of 38

460K

ADVANCED
460K TECHNICAL
S P E C I F I C AT I O N S HYDRAULIC
1 460K AHWU
1.1
1.2
1.3
GENERAL
DESIGN PHILOSOPHY
MODULAR DESIGN
WORKOVER
1.4 ENVIROMENTAL CONDITIONS
1.5
1.6
DESIGN LOADS
DESIGN FEATURES UNIT
2 HEALTH, SAFETY
AND ENVIROMENT
(HSE)
2.1 GENERAL
2.2 EQUIPMENT DESIGN
2.2.1 RISK ASSESMENT
2.2.2 EVACUATION AND ESCAPE
ROUTES
2.2.3 AREA CLASSIFICATION
2.2.4 NOISE EXPOSURE
2.2.5 FINAL DOCUMENTATION

3 OVER THE WELL


EQUIPMENT
3.1 HYDRAULIC JACK
3.2 WORKBASKET "Canadian Energy Equipment Manufacturing FZE. is a
3.3 MAIN CONTROL PANEL
3.4 TONG CONTROL PANEL unique manufacturing company that provides solutions
3.5 COUNTERBALANCE CONTROL
PANEL to problems faced by Industry Professional’s"
3.6 MAIN WINCH CONTROL PANEL
3.7 BASKET RISER (WORKOVER) CEEM as a recognized supplier of CEEM has now assembled a package
3.8 BASKET RISER (DRILLING) oilfield equipment has become a consisting of all the advancements
3.9 DERRICK solution provider to the oil exploration made to the hydraulic work-over units
3.10 COUNTERBALANCE WINCH and production sector. CEEM has as well as bundling of all of the support
ASEMBLY routinely implemented improvements equipment that has brought success to
3.11 MAIN WINCH to equipment designs and provided many projects.
3.12 ROTARY TABLE operational solutions with specially
3.13 TONG DELVERY designed equipment. The CEEM 460K AHWU is designed
3.14 WORK WINDOW to be rigged up as a stand-alone unit,
3.15 ADJUSTABLE WORK WINDOW CEEM has participated in the and to be used for the work over of
PLATE refurbishment and enhancement of existing wells Offshore and Land
3.16 LOWER BASKET equipment owned by all of the Major based. The rig is designed to complete
3.17 MID-LEVEL BASKET HWU suppliers. In doing so it has all work-over functions completed by a
3.18 WORK WINDOW BASKET developed a strong sense of market conventional rig with the additional
requirement and has a wealth of capability of working with pressure in
4 SUPPORT knowledge related to HWU services snubbing and underbalanced
and commercial requirements. situations.
EQUIPMENT
4.1 STAIR ACCESS TOWER

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
1 460K AHWU

1.1 General
CEEM as a recognized supplier of oilfield equipment has become a solution provider to the oil
exploration and production sector. CEEM has routinely implemented improvements to equipment
designs and provided operational solutions with specially designed equipment.

CEEM has participated in the refurbishment and enhancement of equipment owned by all of the
Major HWU suppliers. In doing so it has developed a strong sense of market requirement and has a
wealth of knowledge related to HWU services and commercial requirements.

CEEM has now assembled a package consisting of all the advancements made to the hydraulic
work-over units as well as bundling of all of the support equipment that has brought success to many
projects.

The CEEM 460K AHWU is designed to be rigged up as a stand-alone unit, and to be used for the
work over of existing wells Offshore and Land based. The rig is designed to complete all work-over
functions completed by a conventional rig with the additional capability of working with pressure in
snubbing and underbalanced situations.

The CEEM 460K AHWU has the following advantages compared to a conventional rig:

• No drill line required (no slipping or cutting drill).


• Function of mast for lifting single joints of pipe and bottom hole assemblies
• Individual component weights can be reduced to 8 tons
• Low center of gravity.
• Unexpected pipe movement maximum 10 feet
• Can accommodate any bop stack configuration.
• Under-balanced operations and snubbing operations integrated
• Small operational footprint
• Noise reduced to minimum.

The CEEM 460K AHWU has the following advantages compared to a conventional
HWU:

• Simplified rig up
• All parts of the rig are compatible as they have been designed to work in a system
• All components are sized to fit in standard shipping containers
• All spares and consumables have custom storage to protect the asset until it is required
• 15 ton main winch for deploying and recovering bottom hole assemblies
• Individual component weights can be reduced to 8 tons

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
• Rig components have been simplified in order to utilize less experienced personnel
• Equipment has been built with common components used in other standard equipment allowing
for purchase from common vendors world wide
• Equipment has been built to withstand in field abuse and neglect and require only the most basic
maintenance of lubrication and service

The CEEM 460K AHWU containerized rig standard package consists of:

• HYDRAULIC JACK
• MAIN WORK BASKET
• MAIN CONTROL PANEL
• MAIN WINCH PANEL
• TONG PANEL
• COUNTERBALANCE PANEL
• BASKET RISER WORKOVER (two meter height)
• BASKET RISER DRILLING (three meter height)
• TELESCOPIC DERRICK
• COUNTERBALANCE WINCHES (two units typical)
• MAIN WINCH (15 ton)
• ROTARY TABLE
• TONG DELIVERY
• WORK WINDOW (three meter inside height)
• ADJUSTABLE WORK WINDOWN PLATE (within jack frame)
• LOWER BASKET
• MID LEVEL BASKET
• WORK WINDOW BASKET
• SLIP BOWLS (4 SETS)

1.2 Design Philosophy


CEEM 460K AHWU containerized rig is designed and constructed to bring increased profit to HWU
service providers over using their existing equipment:

HWU service providers face a number of obstacles to reaching maximum performance on the
commercial side of their operations.

• They cannot get a contract without having equipment and they cannot build equipment without
having a contract
• They have some of the equipment but it is out of spec and mismatched so when they get a
contract they are not in a position to “load and go”
• The equipment when mobilized is out of dimension and cost of shipping is hit and miss as carriers
will not move the equipment on quote
• The equipment is open to the elements and when shipped material is lost and damaged routinely

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
• The equipment requires special handling for loading and off loading so personnel have to be
present at both the shipping point and the destination
• The equipment requires trained personnel to operate as it has unique requirements for assembly
and operation
• The equipment is under built for the task and frequently breaks down and requires large amounts
of maintenance and spares that are unique to the equipment
• The rig does not have proper storage for assets and many are lost or spoiled as a result
• The rig when demobilized is packed up and shipped back in the same method as it was mobilized
and materials are lost and damaged

CEEM HAS PROVIDED SOLUTIONS TO EACH OF THESE PROBLEMS


CEEM can provide a complete package on a specified timeline so that an HWU service provider
can tender contracts with the security of knowing that equipment will be available when required

CEEM AHWU unit has all features currently required for contract work built into its design or
incorporated in the package as a result of included support equipment

CEEM does not build equipment that cannot be shipped via standard shipping line within ISO
dimensions

CEEM packages all equipment to fit inside the shipping container for storage or inside of purpose
built frame that are easily fit inside shipping containers for mobilization

CEEM equipment being shipped inside of standard shipping containers requires no special
handling at point of departure or destination.

CEEM equipment has been simplified and standardized so that personnel with the most minimal
of mechanical knowledge can maintain the equipment

CEEM equipment is built according to the service the equipment will see. Overbuilt components
that can handle abuse during operation. In the each components design standardized parts that
are interchangeable with more common equipment are used such as Caterpillar seals, bearings
from drilling rigs etc.. allowing the equipment to take advantage of stock parts world wide
CEEM AHWU comes complete with specialized storage for all tools and spares to protect assets
from loss or damage as well as to make sure they are locatable when required

CEEM AHWU is inventoried out to a job and inventoried in from the job. The equipment is
packaged the same for mobilization as it is for demobilization allowing the asset to be returned in
the best possible condition. Spares can be ordered as per stock levels at job completion. The rig
can be turned around in a shorter time period and be a “Load and Go” condition when leaving the
job rather than after months of refurbishment in the yard.

By incorporating these solutions in to the design of the equipment the CEEM 460K AHWU
containerized rig provides the highest rate of return to the rig owner

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
1.3 Modular Design
The CEEM 460K AHWU containerized rig achieves its most fundamental profit enhancement by
being modular with all components containers sized.

• All components within container dimension


• All components can be disassembled to achieve a maximum per piece weight of 8 tons
• All materials have designated storage or shipping frames within the package to protect them
• All components have API lifting eyes for loading, unloading and assembly

1.4 Environmental Conditions


The rig is constructed for the following environmental conditions.

Minimum water temperature : N/A


Maximum water temperature : N/A
Ambient extreme maximum : +50º C
Design temperature. min. : -20º C
(class)
Atmosphere : Salty & corrosive
Maximum relative humidity : 100%

1.5 Design Loads


The CEEM 460K AHWU containerized rig is designed to meet expected operational loads and
comply with applicable API guidelines. All steel structures are modeled and verified by FEA prior to
build. After construction materials are proof loaded as required and NDT is completed

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
1.6 Design Features

• All components are able to be shipped inside of shipping containers

JACK

• HUSCO valve mounted on milled flat bracket to ensure zero tension on housing that may cause
spool sticking

• HUSCO valve piping connected by way of fully machined manifold block to prevent any tension on
HUSCO valve body

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
• Hydraulic piping is 2.5 inch through the tee and then reduces to 2 inch to the cylinders allowing for
maximum flow
• CEEM designed swivel flanges on hydraulic piping allowing for zero stress connection with perfect
flange alignment
• Valves for two leg four leg selection are full port 2.5 inch flanged connection
• Hydraulic piping from barrel end of cylinder is routed on backside of post allowing for maximum
work space in window area
• Threaded connection on the piping are joined by flanged connection making for quick repair in the
event a threaded connection becomes damaged

• Hydraulic cylinders are manufactured with full opening flange on rod end allowing for rod and
piston to be removed through the opening. This allows rod and piston service with pipe in the hole
and no requirement to rig down

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
• Jack is assembled with four post that form the structure of the jack, cylinders are not stresses by
forces other than the movement of tubular
• Jack cylinders can be removed from jack through the top of the jack frame. This can be done with
pipe in the hole and no requirement to rig down

JACK WORK WINDOW

• Jack work window is formed by the main posts of the jack and has line bored holes at 300mm
intervals bored on each post
• Jack work window plate can travel the full length of the jack structure allowing the slips to be
positioned at any height
• Jack work window through manipulation of slip position can be utilized to create an effective
stroke of 20 feet for the removal / installation of long tool assemblies
• Jack work window plate can be positioned near the top of the frame allowing banding of cable to
completed below the slip bowls

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
MAIN WORKBASKET

• Folding design allows for transport and storage inside a standard shipping container
• Flat finished floor with zero projections above the grating

• All floor gratings are hot dipped galvanized


• All floor gratings are removable for repair and replacement by threaded fasteners
• All main run hydraulic hoses are located within the floor structure and are covered by stainless
steel bulkhead plates complete with stainless steel fasteners

• All panels are mounted in the basket by threaded fasteners and are left in position during normal
shipping (folded basket)
• Connected to basket riser by way of three inch acme threaded fasteners

CONTROL PANELS

• All panels are constructed of 316 stainless steel


• All control levers are profile cut 316 stainless steel
• All knobs and dials are machines 316 stainless steel
• All fasteners are stainless steel
• Control panel lever locks have been designed to operate in both working positions and neutral
position
• Control panel lever lock pins are connected to the panel by stainless steel 1000kg test braided line
• Control panel lever locks have convenient storage hole adjacent to the lever assembly they are
used with

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
DERRICK

• Crown assembly is bolted construction allowing easy assembly / disassembly for inspection and
service intervals in the field
• Crown assembly is mounted on a hinge pin allowing the crown assembly to tip up so the derrick
can sit on the ground or work deck directly requiring no special stands
• Derrick has rollers built in to the base and tip so that it can be tailed in/out easily during rig
up/down as well as for rolling in/out of containers for storage and shipping
• Derrick rigs in from the horizontal requiring a lower sling lift height than the workbasket for
placement

A link arm is connected from the jack travelling head to the derrick

The travelling head is raised and the derrick is rotated to the vertical position and pinned in place

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
Derrick is attached at basket riser allowing for interchangeable drilling riser and work over riser as well as
creating clear walk around on both mid level basket and lower work basket

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
Derrick is hydraulically extended by a single stage cylinder located atop of the derrick

• Derrick is pinned in the extended position by way of spring over hydraulic cylinders
• Cylinders are double rod design with internal rod pushing a 75mm 4130 pin that locks the travel of
the derrick extension
• Exterior rod shows to workers as a visual indication of lock position, rod flush to outside of cylinder
barrel end lock is engaged, rod showing lock is in the open position

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
COUNTERBALANCE WINCH

• Winches are mounted over/under allowing both winch drums to run centerline and cable is
spooled evenly across the centerline of the drum

MAIN WINCH

• Winch is strung as two line utilizing die formed cable to reduce overall cable size
• Winch block is designed to have 20 percent greater weight than cable on back side when block at
crown to provide no load travel down from crown
• Winch block is slim line to allow for minimum distance between counterbalance winches and
provide all three winches with near to center hole operation

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
JACK PLATE GUIDE

• Jack plate is guided on rails to dampen torque pulsations from rotary table
• Guide in drilling riser is full stroke
• Guide in work over riser is half stroke
• Guide is utilized on derrick deployment

TRAVELLING PLATE ON GUIDE RAILS

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
ROTARY TABLE HOSE GUIDE

• Rotary supply, return and case drain hoses are protected from snagging during continuous
rotating and jacking operations
• Hoses are kept out of the way of workers and do not block entry or exit to the work floor

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
BREAK/MAKE CYLINDERS

• Located on bottom side of basket


• Left Side / Right side
• Used for operating manual tongs in work basket

HYDRAULIC HOSE CONNECTION

Hydraulic hoses at work basket level are connected with special pipe ends with integral lifting eye

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
2 Health, Safety and Environment (HSE)

The CEEM 460K AHWU is designed as described below.

2.1 General
The CEEM 460K AHWU is designed for easy and safe operation. There are four specialized operator
consoles within the workbasket. Each console has a minimum of controls specific to the intended
task:

• Main operators console is located to the farthest point from the hole center allowing a clear view
of all operations and eliminating the potential for operations to be conducted outside of the
operators line of sight
• Tong panel allows for control of the pressure of the power tongs and shifting of the tongs on and
off and diverting hydraulic pressure to the main winch panel this allows the operator to designate
operation of these controls to a roughneck as there are no controls other than those for the task
located in the panel eliminating the potential for miss operation.
• Counterbalance panel is located at the front of the work floor next to the V-door allowing the
operator line of sight to the ground as well as to basket operations. All necessary controls for pick
up and lay down of tubular are located in this position and the counterbalance operator has full
control of the task.
• Main winch panel is located at the opposite side of the V-door from the counterbalance and
remain un-manned unless in use. When operated a line of site view to the ground and well as
basket operations is available. With these controls removed from other control panels eliminates
the chance of miss operation.

2.2 Equipment Design


The CEEM 460K AHWU has been designed with the following aspects in mind.

2.2.1 Risk Assessment


Risk Assessment with regards tripping hazards, squeeze hazards, dropped objects.

2.2.2 Evacuation and Escape Routes


Evacuation and escape routes are arranged with two independent escape ways from the work
basket. Stairs can be rigged up on both sides of the AHWU. In the event that space is limited a ladder
can be rigged in as a secondary egress.

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
2.2.3 Area Classification
The CEEM 460K AHWU will be used in the well head area of existing platforms and land based
locations.

The rig area is regarded as naturally ventilated area. Hazardous area is based on normal drilling and
workover operations.

All electrical equipment is built in accordance with zoning classifications

All diesel driven equipment is built in accordance with zoning classification

2.2.4 Noise Level


The CEEM 460K AHWU has sound attenuated features to reduce worker exposure

The diesel driven generators are in sound attenuated enclosures

The electric driven hydraulic pumps are in sound attenuated enclosures

Workers will be primarily in work areas that are less than 80 DBA and appropriate signage is present
in all areas requiring hearing protection

2.2.5 Final Documentation


Final documentation will consist of:

CLIENT COPY CEEM COPY

HAZID/HAZOP Report HAZID/HAZOP Report


Vendors data books Vendors data books

3rd Party certificate for all lifting equipment 3rd Party certificate for all lifting equipment
General dimension drawings Construction drawings
Design verification (Test & Inspection) Design verification (Test & Inspection) certificates
certificates
Construction documentation (welding and Construction documentation (welding and material
material traceability, NDT inspection records, traceability, NDT inspection records, etc.)
etc.)
User & Maintenance Manuals User & Maintenance Manuals
c/w Declaration of Conformity c/w Declaration of Conformity
Arrangement and rig assembly drawings Arrangement and rig assembly drawings
Spare Parts lists Spare Parts lists

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3 Equipment Description (over the hole)

3.1 HYDRAULIC JACK SPECIFICATION


• 460 000 pounds lift force
• 230 000 pounds push force
• 24 inch through bore
• HUSCO 6500 control valve
• 2 leg and 4 leg operation
• 10 foot stroke
• 3000 psi working pressure, 3500 psi test pressure
• Footprint of 1.8 meters x 1.8 meters
• Length 4.5 meters
• Pad eyes located on all corners for guide wires
• Pad eyes on top plate for lifting of hydraulic jack

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.2 WORK BASKET

• Fabricated mild steel


• Footprint of 4.2 meter x 5 meters
• Handrail on all sides
• 2 access points
• Pad eyes for lifting
• Pad eyes on all side for guide wires
• Panels mounted in work basket
• Folded for shipping within ISO container dimension

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.3 MAIN CONTROL PANEL

Gauges for: Controls for:

Pipe light (Martin Decker lbs graduation) Jack up/down


Pipe heavy(Martin Decker lbs graduation) Jack up pressure adjust
Pipe light (hydraulic pressure) Jack down pressure adjust
Pipe heavy (hydraulic pressure) Regeneration in/out
System pressure Slip open close x 5
Air pressure Slip pressure adjust
Slip pressure Tong delivery x 2
Tong delivery valve bank pressure Tong delivery pressure adjust
Slip valve bank pressure BOP open/close x 2
Bop valve bank pressure BOP open/close pressure adjust
HCR / Aux. valve bank pressure HCR / Aux. valve x 2
Annular pressure HCR / Aux. valve pressure adjust
Return pressure Annular open/close
Annular pressure adjust
Martin Decker pipe light isolation valve
Martin Decker pipe heavy isolation valve

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.4 TONG CONTROL PANEL

Gauges for: Controls for:


Tong / Main winch Pressure Pressure adjustment

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.5 COUNTER BALANCE CONTROL PANEL

Gauges for: Controls for:


Counter Balance One Pressure Counter Balance One Pressure adjustment
Counter Balance Two Pressure Counter Balance Two Pressure adjustment
Counter Balance One Up / Down valve
Counter Balance Two Up / Down valve
Counter Balance One On / Off spring brake
Counter Balance Two On / Off spring brake

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.6 MAIN WINCH CONTROL PANEL

Gauges for: Controls for:


Winch operating pressure Winch Up / Down valve

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.7 BASKET RISER- WORKOVER

• Fabricated mild steel

• Mounts located on two sides for torque rail


for dampening of rotational force of rotary table

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.8 BASKET RISER- DRILLING

• Fabricated mild steel

• Approximate length of 3000 mm

• Mounts located on two sides for torque rail for


dampening of rotational force of rotary table

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.9 TELESCOPIC DERRICK

• 15 ton load rated


• Rigged in from horizontal
• 13 meters under the sheave to workbasket floor one stage extended
• 18.5 meter under sheave to work basket floor two stages extended
• Box boom construction
• Hydraulic telescoping

3.10 CROWN ASSEMBLY

• 2 main winch sheaves


• 2 x 2 counter balance winch sheaves
• Stainless steel fasteners
• Full sheave guards

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.11 COUNTERBALANCE WINCHES

• Planetary gear
• Spring break / hydraulic release
• Mounted in transport frame
• Pinned in place on derrick during operation

3.12 MAIN WINCH

• 20 000 lb rated winch


• Strung as two line
• Dead line anchored at crown
• Hydraulic stop Crown saver feature
• Manual override for crown saver
• Main winch operates from power tong circuit

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.13 ROTARY TABLE

• 11 500 ft /lbs torque high range at 2850 psi


• 22 000 ft /lbs torque low range at 2850 psi
• Rated 136 RPM
• Continuous operation
• 460 000 lbs compression load rating
• 230 000 lbs tension load rating
• Rotary Control Valve

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.14 TONG DELIVERY

• Mounted in basket floor


• Useable with tongs up to 2 meters in width
• Length of tong body is not limited
• Mechanical stops to prevent over travel
• Hydraulically bring tongs to position on pipe
• 3500 Kg working load
• Hydraulic extension of one meter allows working over the hole or over the mouse hole at front of
basket
• 180 degrees rotation tongs clear floor over rear hand

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.15 WORK WINDOW

• 460 000 lb load rating


• Pad eyes on all sides for guy wires
• Bolted construction for easy transport
• Can be assembled with different length posts to meet job requirement and lessen rig up height

3.16 ADJUSTABLE WORK WINDOW PLATE

• Allow stationary slips to be moved to different positions within the jack


• Double the effective stroke of the jack for removal of tools from well bore
• Can be removed from the jack to lessen rig up weight
• Can be removed from the jack if setting up for use as a space saver for drilling rig assist work

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.17 LOWER BASKET

• Wraps around base of jack


• Small walkway behind derrick pinned in after rig up
• Access for rig in of derrick
• Work floor for stripper bowl and slips

3.18 MID LEVEL BASKET

• Mounts on two the handrail


of the lower basket

• Provides access to the cylinder


operating head and other
hydraulic piping

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
3.19 WORK WINDOW BASKET

• Wraps around base of work window


• Work floor for slips and tool handling

4.11 STAIR ACCESS TOWER (OPTIONAL SUPPORT EQUIPMENT)

PRODUCT INTRODUCTION:

Canadian Energy Equipment Manufacturing FZE., is a unique manufacturing company that provides
solutions to problems faced by industry professionals. The CEEM stair tower product was designed to
solve access problems for Hydraulic Work Over Equipment used on land and offshore.

The identified problem:

- We are unable to provide safe access and egress from work platforms at elevations up to 100 feet for
our workers.

Design criteria:
- Equipment must be mobile between locations within a given field
- transportable around the globe by all forms of transport
- set up and maintained by rig personnel
- Operationally conform to industry and government standards

The CEEM stair tower meets and exceeds all requirements and provides the solution to ACCESS and
EGRESS to elevated work platforms in the Hydraulic Work Over industry. It has also been adapted
for use in other industries where the same challenges were faced.

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
OPERATIONAL DESIGN:

The Stair tower is constructed of mild steel components that are welded into sub assemblies that are
finished by hot dip galvanizing. These sub assemblies are bolted together to form platform section
that are stacked for transport to the work site. These stacked platforms are then erected by use of a
crane and trained personnel into the required stair tower.

The CEEM stair tower product can be easily erected with a small team of personnel and a crane of
appropriate rating to be determined in installation plan.

The CEEM stair tower can be lifted in either the stacked down or stacked up state:

STACKED DOWN FOR TRANSPORT OR STORAGE

TYPICAL LEVEL WILL BE STORED AND SHIPPED STACKED UP FOR USE OR STORAGE
COMPLETE WITH ALL COMPONENTS FOR ITS
ERECTION IN PLACE

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
BASKET LEVEL GANGWAY PROVIDING CLEAR ENTRY AND EXIT FOR WORKERS

MISMATCHED LEVELS CAN BE ACCESSED BY MULTI STEP GANGWAYS ASSEMBELED ON SITE


FROM TYPICAL COMPONENTS BASED ON THE HEIGHT DIFFERENCE AND DISTANCE BETWEEN THE
TOWER AND THE WORK PLATFORM (SOME SAMPLE LAYOUTS BELOW)

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae
CEEM STAIR TOWER RIGGED UP OFF SHROE ON A TYPICAL HWU JOB

Al Ghail Industrial Park, Ras Al Khaimah, UAE Tel +971.7.258.9484 Fax +971.7.258.9485 www.ceemfze.ae