Interview Assignment.
Neil Parekh.
04/07/2023
12
2 of 15
2
Interview
Project manager
Time : 1:00 pm
13
3 of 15
3
Trafalgar Engineering is an Ontario based, privately owned Civil Engineering company founded in 1992
and located in the Town of Oakville. In the Greater Toronto and Hamilton Area, they offer consulting
engineering services in the fields of municipal engineering and land development. They give different
type of services like site plan services which include Official Plan Amendments (OPA), Zoning By-Law
Amendments (ZBA/RZA), Site Plan Applications (SPA), and building permits. They also Services for
subdivision in which they Draught Plan of Subdivision to Assumption, the organisation provides strong
engineering principles-based advice to its clients. They also Services for Stormwater Management,
Feasibility Study Services, field services. The services provided by Trafalgar Engineering encompass all
aspects of municipal and land development engineering. The company has a wealth of experience in
conducting pre-design and feasibility studies, as well as detailed design work. Trafalgar Engineering also
handles municipal liaison, approvals, tendering, administration, and supervision of construction for a
diverse range of civil construction projects. Many of these projects are multi-disciplined in nature,
necessitating an integrated approach that entails coordination and collaboration with other consulting
professionals..
14
4 of 15
4
Discussion
During the interview with the project manager, he highlighted an ongoing project involving the road
extension of Kennedy Circle Road in Milton. Although the project has not yet reached its completion
stage, all the necessary servicing and roadwork have been successfully executed. The project manager's
primary responsibility is to supervise all construction-related activities. This entails overseeing contract
administration, coordinating with the town, region, and contractors, and ensuring that schedules are
adhered to. Additionally, the project manager is actively involved in coordinating with the school board,
as the road extension is crucial for providing access to a new school being constructed across the street.
The school serves as a prominent client, and the project team works closely with the town until the road is
A description of the team member roles and working/reporting relationships for this project. Were
During the interview he told me that For the project involving the road extension of Kennedy Circle Road
in Milton, clear team member roles and working/reporting relationships were established.
15
5 of 15
5
Project organization charts were created to provide a visual representation of the project structure and
reporting lines. Position descriptions were also developed to outline the specific responsibilities and
expectations for each team member. There were a variety of individuals with distinct roles in the Milton
Kennedy
Circle Road extension project team. The roles of the team members were based on their expertise and the
requirements of the project. The project manager was responsible for all aspects of the project's execution,
including contract administration and coordination with contractors, the town, the region, and the school
board. They had to make sure that deadlines were followed and that the project was finished within the
allotted timeframes. The construction supervisor worked closely with the project manager to ensure that
construction activities were carried out in accordance with the specifications, monitor progress, and
resolve any issues that arose during the process. Pre-design and feasibility studies, detailed design work,
and technical support were carried out by the civil engineering professionals on the engineering team all
through the project. Joint effort with the task director guaranteed arrangement of designing viewpoints
with project objectives. Contract administrators were in charge of managing contracts with a variety of
stakeholders, diligently ensuring that contractual obligations were adhered to, managing payments,
change orders, and contract compliance. The town and regional liaisons were crucial in their role as the
project team's primary point of contact with the local municipality and regional authorities. They made it
16
6 of 15
6
easier to coordinate, got the permits and approvals that were needed, and made sure that the right
During the interview, the project manager provided insights into how the team communicated and
exchanged project information. Firstly, the project manager mentioned that a communications plan was
developed before the project was launched. This plan outlined the communication channels, frequency,
and stakeholders involved in project communication. It provided a structured framework for effective and
timely information exchange. Regarding the frequency of project information communication, the project
manager indicated that communication occurred on a daily basis. The project manager personally visited
the construction site and generated daily construction site reports. These reports documented the activities
carried out during the day and provided updates on the project's status. This ensured that the entire team
had access to the latest information regarding the project's progress. In terms of the communication forms
used within the team, the project manager mentioned that email and phone calls were the primary modes
of communication. Email facilitated formal communication, such as sharing important project documents,
updates, and notifications. Phone calls were used for more immediate and interactive discussions,
allowing for quick decision-making and issue resolution. Furthermore, the project manager emphasized
the importance of direct communication for clarification purposes. When there were complex or critical
matters that required immediate attention, team members engaged in direct communication to ensure
clear understanding and alignment. The project team also held regular meetings to discuss project
progress, challenges, and upcoming tasks. Although the specific frequency of these meetings was not
17
7 of 15
7
mentioned in the interview, it is essential to highlight the importance of regular communication and
collaboration among team members. In terms of reporting, the project manager confirmed that regular
status reports
were produced. These reports provided a comprehensive overview of the project's status, including
updates on milestones, key accomplishments, challenges, and upcoming activities. The production of
status reports ensured that all stakeholders, including senior management and relevant parties, were kept
The project manager emphasised that one of the main difficulties in project management is
communication. The project manager stressed that maintaining efficient communication with clients,
contractors, and other project stakeholders faced continual challenges. Ensuring precise and proper
execution of complicated project designs became a top focus. To communicate design requirements,
resolve concerns, and set expectations with contractors and other parties involved, open lines of
communication were essential. The project manager also acknowledged that dealing with complex
designs entailed a unique set of difficulties. The manager emphasised the necessity of close collaboration
and communication with contractors to guarantee that the complex plans were correctly understood and
carried out. To do this, it was necessary to convey the design concept clearly, clarify any potential
8 of 15
8
Pandemic impact.
The manager shared insights into how they have navigated the challenges posed by the pandemic,
The project manager highlighted that the pandemic presented unique challenges on construction sites,
with social distancing requirements making it difficult to work efficiently. The need for contractors to
wear masks, especially in hot weather conditions reaching up to 40 degrees Celsius, added to the physical
discomfort and potential productivity constraints. The manager acknowledged the importance of
prioritizing the health and safety of the team members while ensuring the project's progress.
In terms of team management, the project manager mentioned the need for increased coordination and
adaptability. With multiple projects and locations to visit, managing the team's schedules and ensuring
compliance with pandemic-related protocols required careful planning and flexibility. The manager had to
adapt to remote working arrangements whenever possible and schedule virtual meetings to maintain
Communicating with the team posed its own set of challenges during the pandemic. With restrictions on
direct interactions and site visits, the project manager had to rely heavily on virtual communication
channels such as video conferencing, emails, and phone calls. This ensured that important project
19
9 of 15
9
updates, instructions, and information were effectively communicated to the team members. However, the
manager acknowledged that direct on-site communication was still necessary for certain activities and
The manager shared that they completed their civil engineering degree at Mohak College, showcasing a
solid foundation in the field of engineering. Their academic pursuits equipped them with the technical
knowledge and skills required to understand and navigate complex construction projects.
The interviewee mentioned that they obtained their Civil Engineering Technician (CET) certification in
2019. This certification further enhanced their qualifications and demonstrated their commitment to
Furthermore, the project manager expressed their current goal of attaining the Project Management
Professional (PMP) certification. This certification is widely recognized and valued in the project
management industry, emphasizing the interviewee's dedication to advancing their project management
10 of 15
10
The project manager shared valuable practical information that could benefit a developing project
manager. One key piece of advice was to start small and gradually expand responsibilities. By taking on
smaller projects initially, a project manager can gain practical experience, develop essential skills, and
The project manager emphasized the importance of knowing the project inside and out. This entails a
comprehensive understanding of the project's objectives, scope, timelines, resources, and potential
challenges. By having a deep knowledge of the project, a project manager can make informed decisions,
effectively communicate project details, and proactively address any issues that may arise.
The interviewee stressed the significance of being proactive and aggressive in learning about the project.
This involves actively seeking information, engaging with stakeholders, and conducting thorough
research to gain a comprehensive understanding of all aspects of the project. Being proactive in learning
allows the project manager to anticipate potential obstacles and find appropriate solutions, leading to
Furthermore, the project manager emphasized the importance of being honest when it comes to project
knowledge. If there are aspects of the project that the project manager is not familiar with, it is crucial to
admit it rather than providing incorrect information. Asking questions and seeking clarification when
needed demonstrates a willingness to learn and ensures that accurate information is communicated.
1 11
11 of 15
11
Personal Reflection
As a personal reflection on the assignment, I had the opportunity to interview the project manager through
a connection with my brother's friend. This exercise of conducting the interview has indeed made me feel
more comfortable with networking as it allowed me to establish a professional connection and engage in a
meaningful conversation with someone in the field of project management. The interview itself went
exceptionally well, and I found the project manager to be highly knowledgeable and experienced. Their
responses were insightful and provided valuable perspectives on various aspects of project management. I
was particularly impressed by their emphasis on starting small, being proactive in learning, and
maintaining open communication. These principles resonated with me as important factors for successful
project management.
During the interview, there were no specific disappointments. On the contrary, I was pleasantly surprised
by the project manager's candidness and willingness to share their experiences, challenges, and best
practices. It created a conducive environment for learning and gaining practical insights into the field of
project management. One of the surprising aspects of the interview was the project manager's adaptability
1 12
12 of 15
12
and resilience in managing projects during the pandemic. Their ability to navigate challenges such as
social distancing requirements, wearing masks in extreme temperatures, and managing multiple projects
Tying the information from the interview to what I have learned in the program so far was a significant
aspect of the exercise. The insights shared by the project manager aligned with the principles and theories
covered in the program. It reinforced the importance of comprehensive project knowledge, effective
communication, and continuous learning in project management. Considering the project management
standards followed by the interviewee and their company, I would rate their adherence to formal practices
and guidelines at a solid 9 on a scale of 1 to 10. The project manager demonstrated a strong commitment
to project management principles, as evident from their emphasis on thorough project understanding,
proactive learning, and open communication. Their pursuit of professional certifications, such as the
In conclusion, the interview experience was enlightening and provided valuable insights into project
management. It enhanced my understanding of real-world project challenges and the practical application
of project management principles. Engaging in this exercise has not only expanded my knowledge but
also instilled confidence in networking and connecting with professionals in the field.