0% found this document useful (0 votes)
97 views13 pages

FormworkPropSupport ILP FRAME

This document provides notes on casting reinforced concrete beams. It specifies that RC beams of dimensions 350x1100mm, 300x600mm, and 250x500mm are to be casted. Safety cautions are provided regarding limiting concrete pouring to less than double the existing slab thickness. Details are given on scaffolding tubular fittings complying with British standards BS 1139 and MS 1462.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views13 pages

FormworkPropSupport ILP FRAME

This document provides notes on casting reinforced concrete beams. It specifies that RC beams of dimensions 350x1100mm, 300x600mm, and 250x500mm are to be casted. Safety cautions are provided regarding limiting concrete pouring to less than double the existing slab thickness. Details are given on scaffolding tubular fittings complying with British standards BS 1139 and MS 1462.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

NOTE :

All scaffolding tubular fitting RC Beam 350x1100mm to be casted


comply to,
- BS 1139 - 1.1 : 1990,
RC Beam
- MS 1462 - 2 - 1 : 2010 350x1100mm
to be casted

1.0m

1.0m
1.0m

1.0m
BEAM 350 x 1100

Note:
- HW = HardWood
- D40 Lowes Grade of HW Timber
RZteraju
runding resources
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent
- Adjustable U-Head / Base Plate :
* Length 900mm ( Max Length 600mm )
* Length 600mm ( Max Length 400mm )

LEGEND
1500

HT 101 VERTICAL FRAME TRIANGLE

STANDARD, 1m

1.0m
CAUTION!! HT 109 ADJUSTABLE FRAME
High Limit of Pumping Pouring ILP Pasir Gudang
Concrete Should LESS THAN 1 time BASE POST
DETAIL BEAM 350 x 1100
Present Slab Thickness HT 301H CROSS BRACE U-HEAD, 500mm
Modular
PERHATIAN!!
JACK BASE, 500mm
Had Curahan Membukit Konkrit HT 301J CROSS BRACE
Semasa Konkrit Pam Dijalankan
2m
HT 486C GI PIPE
Adalah TIDAK MELEBIHI 1 kali ganda HT 104 VERTICAL FRAME HT 701 JOINT PIN
Ketebalan Lantai Semasa HT 601 JACK BASE
HT 602 U-HEAD A B
Double Volume Beam 300 x 600
CAUTION!!
RC Beam 300x600mm to be casted High Limit of Pumping Pouring
Concrete Should LESS THAN 1 time
RC Beam Present Slab Thickness
300x600mm
to be casted PERHATIAN!!
Had Curahan Membukit Konkrit
Semasa Konkrit Pam Dijalankan
1.0m

1.0m
1.0m

1.0m

1.0m

1.0m
Adalah TIDAK MELEBIHI 1 kali ganda
Ketebalan Lantai Semasa

Note:
1.0m

1.0m
- HW = HardWood
- D40 Lowes Grade of HW Timber
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent
- Adjustable U-Head / Base Plate :
* Length 900mm ( Max Length 600mm )
* Length 600mm ( Max Length 400mm )
1.0m

1.0m
NOTE :
All scaffolding tubular fitting
comply to,
- BS 1139 - 1.1 : 1990,
- MS 1462 - 2 - 1 : 2010

BEAM 300 x 600

RC Beam
RC Beam 250x500mm to be casted
RZteraju
runding resources
250x500mm
to be casted

LEGEND
1.0m

1.0m
1.0m

1.0m

1.0m

1.0m
1500

HT 101 VERTICAL FRAME TRIANGLE


1.0m

1.0m
STANDARD, 1m

1.0m
HT 109 ADJUSTABLE FRAME
BASE POST
ILP Pasir Gudang
HT 301H CROSS BRACE U-HEAD, 500mm
DETAIL BEAM 300 x 600
JACK BASE, 500mm DETAIL BEAM 250 x 500
1.0m

1.0m

HT 301J CROSS BRACE Modular


2m
HT 486C GI PIPE
HT 104 VERTICAL FRAME HT 701 JOINT PIN
HT 601 JACK BASE
HT 602 U-HEAD
A B

BEAM 250 x 500


NOTE :
All scaffolding tubular fitting RC Beam 350x1100mm to be casted
comply to,
- BS 1139 - 1.1 : 1990,
RC Beam
- MS 1462 - 2 - 1 : 2010 350x1100mm
to be casted

2m 2m 2m

BEAM 350 x 1100

Note:
- HW = HardWood
- D40 Lowes Grade of HW Timber
RZteraju
runding resources
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent
- Adjustable U-Head / Base Plate :
* Length 900mm ( Max Length 600mm )
* Length 600mm ( Max Length 400mm )

LEGEND
1500

HT 101 VERTICAL FRAME TRIANGLE

STANDARD, 1m

1.0m
CAUTION!! HT 109 ADJUSTABLE FRAME
High Limit of Pumping Pouring
Concrete Should LESS THAN 1 time BASE POST ILP Pasir Gudang

Present Slab Thickness HT 301H CROSS BRACE DETAIL BEAM 350 x 1100
U-HEAD, 500mm
PERHATIAN!!
JACK BASE, 500mm
Had Curahan Membukit Konkrit HT 301J CROSS BRACE
2m
Semasa Konkrit Pam Dijalankan 2m
HT 486C GI PIPE
4m

Adalah TIDAK MELEBIHI 1 kali ganda HT 104 VERTICAL FRAME HT 701 JOINT PIN
Ketebalan Lantai Semasa HT 601 JACK BASE
HT 602 U-HEAD A B
Double Volume Beam 300 x 600
CAUTION!!
RC Beam 300x600mm to be casted High Limit of Pumping Pouring
Concrete Should LESS THAN 1 time
RC Beam Present Slab Thickness
300x600mm
to be casted PERHATIAN!!
Had Curahan Membukit Konkrit
Semasa Konkrit Pam Dijalankan
Adalah TIDAK MELEBIHI 1 kali ganda
Ketebalan Lantai Semasa

Note:
- HW = HardWood
- D40 Lowes Grade of HW Timber
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent
- Adjustable U-Head / Base Plate :
* Length 900mm ( Max Length 600mm )
* Length 600mm ( Max Length 400mm )

NOTE :
2m 2m 2m
All scaffolding tubular fitting
comply to,
- BS 1139 - 1.1 : 1990,
- MS 1462 - 2 - 1 : 2010

BEAM 300 x 600

RC Beam
RC Beam 250x500mm to be casted
RZteraju
runding resources
250x500mm
to be casted

LEGEND
1500

HT 101 VERTICAL FRAME TRIANGLE

ILP Pasir Gudang


STANDARD, 1m

1.0m
HT 109 ADJUSTABLE FRAME DETAIL BEAM 300 x 600
DETAIL BEAM 250 x 500
BASE POST
HT 301H CROSS BRACE U-HEAD, 500mm
2m 2m 2m JACK BASE, 500mm
HT 301J CROSS BRACE
2m
HT 486C GI PIPE
HT 104 VERTICAL FRAME HT 701 JOINT PIN
A B
HT 601 JACK BASE
BEAM 250 x 500 HT 602 U-HEAD
CAUTION!!
RC Beam 350x1350mm to be casted High Limit of Pumping Pouring
Concrete Should LESS THAN 1 time
Present Slab Thickness
RC Beam
350x1350mm PERHATIAN!!
to be casted
Had Curahan Membukit Konkrit
Semasa Konkrit Pam Dijalankan
Adalah TIDAK MELEBIHI 1 kali ganda
Ketebalan Lantai Semasa

Note:
- HW = HardWood
- D40 Lowes Grade of HW Timber
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent
- Adjustable U-Head / Base Plate :
* Length 900mm ( Max Length 600mm )
* Length 600mm ( Max Length 400mm )

2m 2m 2m
NOTE :
All scaffolding tubular fitting
comply to,
- BS 1139 - 1.1 : 1990,
- MS 1462 - 2 - 1 : 2010

BEAM 350 x 1350

RC Beam 350x800mm to be casted


RZteraju
runding resources
RC Beam
350x800mm
to be casted

LEGEND
1500

HT 101 VERTICAL FRAME TRIANGLE

STANDARD, 1m

1.0m
HT 109 ADJUSTABLE FRAME
BASE POST
ILP Pasir Gudang
HT 301H CROSS BRACE U-HEAD, 500mm
DETAIL BEAM 350 x 1350
JACK BASE, 500mm DETAIL BEAM 350 x 800
HT 301J CROSS BRACE
2m
HT 486C GI PIPE
HT 104 VERTICAL FRAME HT 701 JOINT PIN
2m 2m 2m
HT 601 JACK BASE
HT 602 U-HEAD
A B

BEAM 350 x 800


RC Slab 200mm thk. to be casted RC Slab 200mm thk. to be casted

CAUTION!!
High Limit of Pumping Pouring
Concrete Should LESS THAN 1 time
Present Slab Thickness
PERHATIAN!!
Had Curahan Membukit Konkrit
Semasa Konkrit Pam Dijalankan
Adalah TIDAK MELEBIHI 1 kali ganda
Ketebalan Lantai Semasa

2m 2m 2m

SLAB 200 mm
LEGEND
RC Slab 150mm thk. to be casted RC Slab 200mm thk. to be casted
1500

RZteraju
runding resources
HT 101 VERTICAL FRAME TRIANGLE

STANDARD, 1m

1.0m
HT 109 ADJUSTABLE FRAME
BASE POST
HT 301H CROSS BRACE U-HEAD, 500mm
JACK BASE, 500mm
HT 301J CROSS BRACE
2m
HT 486C GI PIPE
HT 104 VERTICAL FRAME HT 701 JOINT PIN ILP Pasir Gudang
HT 601 JACK BASE DETAIL SLAB 200mm
DETAIL SLAB 150mm
HT 602 U-HEAD
Note:
2m 2m
- HW = HardWood
NOTE :
- D40 Lowes Grade of HW Timber
- HW Timber Grade D60 = Kapur/ Kempas/ or Equivalent All scaffolding tubular fitting
- Adjustable U-Head / Base Plate : comply to, A B
* Length 900mm ( Max Length 600mm ) - BS 1139 - 1.1 : 1990,
* Length 600mm ( Max Length 400mm ) - MS 1462 - 2 - 1 : 2010
SLAB 150 mm OPEN END FRAME 762
2m 2m 2m 2m

4m

4m

4m

4m

4m
RZteraju
runding resources

2m 2m 2m 2m 2m 2m

ILP Pasir Gudang

SECTION VIEW
ARAS TANGKI AIR

A B
1.0m 1.0m

2m
1.0m

2m
1.0m 1.0m 1.0m

2m
2m
1.0m

1.0m 1.0m 1.0m

1.0m

1.0m 1.0m 1.0m

1.0m

1.0m 1.0m 1.0m

1.0m

1.0m 1.0m 1.0m


2m
2m

1.0m 1.0m
ARAS 2
ILP Pasir Gudang

SECTION VIEW

A
B
runding resources
RZteraju
Box 1500 x 1500
Modular

Box 1524 x 1219


Open End Frame

Box 1524 x 762


Open End Frame

RZteraju
runding resources

ILP Pasir Gudang

SCAFFOLD ARRANGEMENT
ARAS BUMBUNG

A B
RZteraju
runding resources

ILP Pasir Gudang

STRUCTURE DRAWING
ARAS TANGKI AIR

A B
Box 1500 x 1500
Modular

Box 1524 x 1219


Open End Frame

Box 1524 x 762


Open End Frame

RZteraju
runding resources

ILP Pasir Gudang

SCAFFOLD ARRANGEMENT
ARAS TANGKI AIR

A B
RZteraju
runding resources

ILP Pasir Gudang

STRUCTURE DRAWING
ARAS 2

A B
Box 1500 x 1500
Modular

Box 1524 x 1219


Open End Frame

Box 1524 x 762


Open End Frame

RZteraju
runding resources

ILP Pasir Gudang

SCAFFOLD ARRANGEMENT
ARAS 2

A B