JSA - Field Instruments Installation

The document provides a job safety analysis for field instrumentation installation works. It identifies potential hazards at each step of the work including general preparation, dust control, lifting heavy objects, summer working hours, and work completion. Control measures are outlined to eliminate or reduce risks, such as using personal protective equipment, lifting devices, scheduled breaks, and maintaining good housekeeping. The analysis was prepared by Mr. Sagar Padhiyar and reviewed by the joint venture health and safety manager.

Uploaded by

Sagar Padhiyar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views4 pages

JSA - Field Instruments Installation

The document provides a job safety analysis for field instrumentation installation works. It identifies potential hazards at each step of the work including general preparation, dust control, lifting heavy objects, summer working hours, and work completion. Control measures are outlined to eliminate or reduce risks, such as using personal protective equipment, lifting devices, scheduled breaks, and maintaining good housekeeping. The analysis was prepared by Mr. Sagar Padhiyar and reviewed by the joint venture health and safety manager.

Uploaded by

Sagar Padhiyar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Page 1 of 4

JVCGCINTHIEICO-HSE-FORM-008 Rev01
JOB SAFETY ANALYSIS

Loca on: JCC Person in-charge: Mr. Sagar Padhiyar Date: 09/07/2023

Work ac vity or Job Descrip on: FIELD INSTRUMENTATION INSTALLATION WORKS

Work team / JSA prepared by: Mr. Sagar Padhiyar

Reviewed and approved by: JV - HSE Ahetesham

Hazards/Events and their


Job steps Control measure to eliminate or reduce the poten al and/or Verifica on: Verifica on: JV
poten al consequence
(in sequence) consequence of the iden fied hazards JV Engineer HSE
associated with each step
1. General Prepara on  Personal Injury  Obtain PTW from Concerned authori es before star ng the work.
and Work Area  Reputa onal damage  Employees to be medically fit for the ac vi es.
Inspec ons  Daily basis thermal scanning to be done.
 Authorized person only be used for the task.
 Toolbox shall be conducted by the Supervisor. Use of necessary PPE shall be
checked and enforced by the safety officer. (Safety Glass, Safety Shoe, Helmet,
Coverall, etc.)
 Physically inspect work areas prior to start of work.
 Follow good housekeeping prac ces: create walkways.
 Keep work areas clean & neat, free from rubbish & debris.
 Watch where you walk.
 Be careful on slopes or wet/muddy areas.
 Be aware of rep les and snakes.
 An Emergency Response Plan should be in place.
2. Dust Control  Breathing & Eyes irritant,  Safety Googles to be used.
property damage  Use dust mask as needed.
3. Filed Instruments  Objects may fall from Hight  Use Hiab or J.C.B. for loading and offloading.
shi ing to site. at me of Li ing  Shi ing devices must be used for loading and unloading to avoid damage the
(Pressure Transmi er, Objects.
Pressure Gauge, Level  Used Suitable Loading equipment never drops the panel down.
Transmi er and Level  Objects should only be transported with suitable Vehicles and must be fixed, so that
Switch) and Objects they cannot shi during transporta on.
falling from Height
4. Use of Li ing (belt,  Falls of objects  A person shall be made aware through toolbox talks and training about safe
ropes, slings etc.)  Noise & Vibra on movements and good housekeeping in the area to avoid slip, trip and fall, pinch
Damage li ing gear. point etc.
 Collision between moving  Vehicles shall be enforced of a sensible speed limit.
vehicles and pedestrians.  All material must be ed up before moving.
Page 2 of 4
JVCGCINTHIEICO-HSE-FORM-008 Rev01
JOB SAFETY ANALYSIS

Loca on: JCC Person in-charge: Mr. Sagar Padhiyar Date: 09/07/2023

Work ac vity or Job Descrip on: FIELD INSTRUMENTATION INSTALLATION WORKS

Work team / JSA prepared by: Mr. Sagar Padhiyar

Reviewed and approved by: JV - HSE Ahetesham

Hazards/Events and their


Job steps Control measure to eliminate or reduce the poten al and/or Verifica on: Verifica on: JV
poten al consequence
(in sequence) consequence of the iden fied hazards JV Engineer HSE
associated with each step
 Load falling or breaking  All vehicles movement must be controlled by competent signal man.
slings.  All li ing gear insisted and clear code by li ing supervisor.
 Strong wind or heavy rain  All the li ing tools must be visually inspected by riggers before using. -proper
 Crush injury. storage and housekeeping
 All rigging teams must wear PPE.
 Li ing opera on control by competent regard and monitoring by supervisor.
 Proper barricade shall be executed to prevent entry of unauthorized personnel
entering worksite.
5. Moving to Installa on  Lower back, arm, shoulder  Conduct the TBM before working.
Area (Handling, Pallet) strain.  Inspect the area immediately around the load and route for clearance and tripping
 Pinch toes. hazards.
 Slip, trip and fall  Clear movable object from the route.
 Unclear access way  Clear up spills that could affect foot trac on
6. Equipment and  Pinch Point  Pinch points Shall be Iden fied and avoided while work.
Instruments  Unstable Installa on  Installa on surface must be surveyed and cleaned before star ng the work.
Installa on Surface  Parts of the body exposed for sharp objects shall be protected.
 Sharp Edge.  Safety goggles shall be worn by workers doing the work.
 Un compliance li ing  Li ing, rigging equipment and tools must be inspected by contractor HSE Person.
rigging tools.  Use Proper li ing, rigging equipment and tools with Suitable.
 Housekeeping shall be conduct a er finish work and make sure there are no tools
or material was le inside the equipment.
7. Summer Working  Heat exhaus on, Heat  Follow summer working hours ming and guidelines.
Hours (Applicable from stress, Heat stroke,  Drink plenty of water including dehydra on drinks.
June –Aug) unaware of heat illness and  encourage workers to drink plenty of water to avoid dehydra on.
fine implica on by  schedule work to minimize exposure.
Authori es  Provide shaded area along with mist fan.
 Monitor weather condi ons and suspend ac vity if thermal work limit is high.
 Provide loose clothing.
Page 3 of 4
JVCGCINTHIEICO-HSE-FORM-008 Rev01
JOB SAFETY ANALYSIS

Loca on: JCC Person in-charge: Mr. Sagar Padhiyar Date: 09/07/2023

Work ac vity or Job Descrip on: FIELD INSTRUMENTATION INSTALLATION WORKS

Work team / JSA prepared by: Mr. Sagar Padhiyar

Reviewed and approved by: JV - HSE Ahetesham

Hazards/Events and their


Job steps Control measure to eliminate or reduce the poten al and/or Verifica on: Verifica on: JV
poten al consequence
(in sequence) consequence of the iden fied hazards JV Engineer HSE
associated with each step
 Avoid drinking alcohol/ caffeine drink.
 Provide emergency management such as first aid, stand by vehicles etc.
 keep workers informed about the dangers of sun exposure.
 Training and awareness to be carried out and retain the records.
8. Work Comple on  Personnel Injury /Poor  Ensure Work has Been Completed Sa sfactorily in all aspects.
Housekeeping/ Slip & Trip  General Housekeeping, remove all Surface, unwanted waste material from the
working area.
 Ensure Suitable Bari-ca on provided with Signages
9. housekeeping  Trip / fall / Slip / Fire  Good housekeeping for working area.
hazard  Removal for combus ble materials from the site.
 Providing a suitable number of fire ex nguishers.
 Wearing full PPE.
 First aid kit to be available on the working site.
 Team works to be provided with trained persons for firefigh ng.
 and first aid.
 Check cables and welding machine before and during working.
 hours.
Page 4 of 4
JVCGCINTHIEICO-HSE-FORM-008 Rev01
JOB SAFETY ANALYSIS

Loca on: JCC Person in-charge: Mr. Sagar Padhiyar Date: 09/07/2023

Work ac vity or Job Descrip on: FIELD INSTRUMENTATION INSTALLATION WORKS

Work team / JSA prepared by: Mr. Sagar Padhiyar

Reviewed and approved by: JV - HSE Ahetesham

Hazards/Events and their


Job steps Control measure to eliminate or reduce the poten al and/or Verifica on: Verifica on: JV
poten al consequence
(in sequence) consequence of the iden fied hazards JV Engineer HSE
associated with each step
PPE / SYSTEMS /STANDARDS / PROCEDURES REQUIRED TO DO THE JOB
Standard PPE Addi onal PPE Specific Procedures / Standards: Other Systems
☐ Hard hat ☐ Face shield ☐ Scaffolding
☒ Safety boots /shoes ☐ Chemical resistant apron ☐ Barrier tape
☐ Coverall ☐ Chemical resistant gloves ☐ Warning signs
☐ Standard work gloves ☐ Chemical resistant boots ☐ Lockout/tagout
☒ Safety glasses ☐ Respiratory protec on ☐ Work permit required.
☐ Goggles ☐ Dielectric gloves ☐ Hot work permit
☒ Ear plug ☐ Personal fall protec on ☐ Confined space permit
☐ Ear defenders ☐ Others (specify) ☐ Excava on
☐ Welding apron
☐ Welding Helmet