Scoring Rubrics
Scoring Rubrics
Criteria 5 4 2
The group finished the The group finished the The group finished the
Timeliness (20%) installation of the lamp installation of the lamp performance task late
ahead of time. on time. from the given time.
SCORING RUBRICS
Criteria 5 4 2
The group finished the The group finished the The group finished the
Timeliness (20%) installation of the lamp installation of the lamp performance task late
ahead of time. on time. from the given time.
6. Make sure that the two cables do not touch each other.
7. Install the LED lamp.
Instructions:
1. Write your Surname (Group members) in the given box provided.
2. Check the completeness of tools, materials, and devices.
3. Attach two (2) different wires on each terminal of the receptacle.
4. Mount the receptacle at the center of the lamp frame using screws.
5. Attach the plug at the other end of the wires.
6. Make sure that the two cables do not touch each other.
7. Install the LED lamp.
8. Call your Teacher “P
9. OGI!” for testing.