Gantt Chart Riprap

The document outlines a project schedule with 15 tasks taking place between June 3rd and November 4th. It includes tasks for site preparation, construction, earthworks, control measures, closing activities, and inspection. The longest tasks are structure embankment lasting 60 days, grouting lasting 52 days, and clearing lasting 25 days. Most tasks occur in June and July with the final tasks in October and November.

Uploaded by

Alvin Concepcion
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views8 pages

Gantt Chart Riprap

The document outlines a project schedule with 15 tasks taking place between June 3rd and November 4th. It includes tasks for site preparation, construction, earthworks, control measures, closing activities, and inspection. The longest tasks are structure embankment lasting 60 days, grouting lasting 52 days, and clearing lasting 25 days. Most tasks occur in June and July with the final tasks in October and November.

Uploaded by

Alvin Concepcion
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

TASK Task Duration Start Date End Date

Site Preparation
Construction of Facilities for 4 3-Jun 7-Jun
Engineer

Prov. Of Furniture, Equipment


2 3-Jun 5-Jun
& Appliances for Field Engineers

Hiring of Manpower and


Equipments 7 3-Jun 10-Jun

Purchase of Materials 7 3-Jun 10-Jun


Mobilization 7 3-Jun 10-Jun
Earthworks
Structure Excavation 1 10-Jun 11-Jun
Structure Embankment 60 11-Jun 10-Aug
Control
Laying Stone 23 10-Aug 2-Sep
Grouting 52 10-Aug 1-Oct
Concrete Toe Foundation 12 10-Aug 22-Aug
Curing 7 1-Oct 8-Oct
Closing
Clearing 25 8-Oct 2-Nov
Inspection 1 2-Nov 3-Nov
Handover 1 3-Nov 4-Nov
Task
TASK Task Duration Start Date End Date

3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
No.

1 Construction of Billboard 1 3-Jun 4-Jun X X


2 Construction of Facilities 4 3-Jun 7-Jun
for engineers X X X X X
3 Prov. Of Furniture, Equipment 2 3-Jun 5-Jun
& Appliances for Field Engineers X X X
4 Hiring of Manpower and 7 3-Jun 10-Jun
Equipments X X X X X
5 Purchase of Materials 7 3-Jun 10-Jun X X X X X
6 Mobilization 7 3-Jun 10-Jun X X X X X
7 Structure Excavation 1 10-Jun 11-Jun
8 Structure Embankment 60 11-Jun 10-Aug
9 Laying Stones 23 10-Aug 2-Sep
10 Grouting 52 10-Aug 1-Oct
11 Concrete Toe Foundation 12 10-Aug 22-Aug
12 Curing 7 1-Oct 8-Oct
13 Clearing 25 8-Oct 2-Nov
14 Inspection 1 2-Nov 3-Nov
15 Handover 1 3-Nov 4-Nov
8-Jun
9-Jun

X X X
X X X
X X X
10-Jun

X X
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
X X X X X X X X X X X X X X X X X X X X X X X X X X X X

8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Aug
2-Aug
3-Aug
4-Aug
X X X X X X X X X X X X X X X X X X X X X X X X X X X X

5-Aug
6-Aug
X X

7-Aug
X
8-Aug

X
9-Aug

X
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug

15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug

28-Aug
29-Aug

30-Aug
31-Aug
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep

6-Sep
7-Sep
8-Sep
9-Sep
10-Sep
11-Sep
12-Sep
13-Sep

14-Sep

15-Sep
16-Sep

17-Sep
18-Sep

19-Sep
20-Sep

21-Sep
22-Sep
23-Sep

24-Sep

25-Sep
26-Sep

27-Sep

28-Sep
29-Sep
30-Sep
1-Oct

2-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct

9-Oct
10-Oct
11-Oct
12-Oct
13-Oct

14-Oct
15-Oct

16-Oct
17-Oct
18-Oct
19-Oct

20-Oct
21-Oct
22-Oct

23-Oct
24-Oct
25-Oct
26-Oct

27-Oct

28-Oct
29-Oct
30-Oct

31-Oct
1-Nov
2-Nov
3-Nov

4-Nov