Shivamogga Bypass Rob Rly M 59

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Joint Feasibility Report for Proposal No.

: SWRMYS0040
Reporting Date: 09/06/2023

Proposal ID SWRMYS0040 Proposal Date 16/02/2021


Track Details
Gauge BG Route RRB TLGP
No. of Tracks 1 Proposed Lines 2
Clearance Required With Respect to Rail Level
Height Above Rail Level 6525 mm
Lateral Clearance (Right) From 9000 mm
Lateral Clearance (Left) From Centre of Nearest Track 20000 mm Centre of Nearest Track
Feasibility of Construction
Road Over Bridge (ROB) Feasible Road Under Bridge (RUB) Not Feasible
Limited Height Subway (LHS) Not Feasible
Proposed Road Over Bridge/Road Under Bridge/Limited Height Subway Location Details
Mysore / South Western
District/State Shimoga / Karnataka Division/Railway Railway
Proposal for ROB
Road New Category of Road Class I- National Highways
NH13 CHITRADURGA
Name of Road Location/Chainage on the Road 522 km 905 m
SHIVAMOGGA SECTION
Villages/Towns on Either Side Shivamogga Nearest City/Town Shivamogga
BHADRAVATHI &
Between Railway Stations Major Railway Section Birur-Talguppa
SHIVAMOGGA TOWN
Location (on Railway Line) 59 km 140 m TP No. of Lane(s) 6
Skew Angle (wrt. normal to
Width of Road 15.1 m 38
track)
Existing LC data (If applicable)
LC No. Class of LC
Location of LC km m Average no. of Trains per day
TVU / Year of TVU / LC Will be closed or not
Any Level Crossing to be closed in lieu of Road Over Bridge/Road Under Bridge/Limited Height Subway No
Road Traffic Diversion
Whether required or not No
Through Temporary Diversion No Through Temporary LC No
Whether additional RUB is
Whether FOB is required to close LC No No
required to close LC
Utility Shifting
OHE No Cables (S&T, DOT, OFC) No
Cables (Electricals) No Pipe Lines (Water, Severe) No
Structures/Equipment No Any Other
Note:- Utility shifting charges to be included in detailed estimate after approval of GAD.
Railway & Other Land Details
Width of Railway land on Right
Width of Railway land on Left Hand Side from centre of nearest 20 m Hand Side from centre of 9m
track nearest track
Centre to Centre distances among tracks 5.3 m
min m Availability of land outside min m
Availability of land outside railway on Left Hand Side max m railway on Right Hand Side max m
Details of Encroachment if any NA
Approach Gradient Right Hand 40
Approach Gradient Left Hand Side (1 in_) 40 Side (1 in_)
Joint Site Inspection
Joint Site Inspection Date 02/03/2021
Joint Site Inspection Date Proposed as 17/02/2021 Confirm/Revised as
Actual Date of Joint Site Inspection Done 02/03/2021
Name (Designation)
Sponsoring Organization: MORTH Ashok Kumar (AEE/NH Sub-Div/SMET)
Railway Officials at Joint Site Inspection
Engineering D.Jagadeesh (ADEN/SMET/SWR)
Signing of Joint Feasibility Report
Is Joint Feasibility Report signed by Sr.DEN/DEN? Yes
Is Joint Feasibility Report signed by Road Authority? Yes
Remark by Sr.DEN/DEN
Span Arrangement for ROB in Railway Portion By CBE
No. of Spans in Railway Portion 1
48m(0 deg; STEEL)
Span arrangement in Railway Land Note:- From left to right facing in the direction of increasing railway chainage.
Length of viaduct/span on Right 1X30.0m
Length of viaduct/span on Left Hand side outside railway 1x30.0m Hand side outside railway
No. of GADs applicable for this proposal 1
Way-leave charges
MORTH/NHAI to deposit way-leave charges to Railways as Rs.12,000/- per annum for 10 years in advance i.e. Rs. 1,20,000/-
View GAD, Mou, Compliance of Checklist etc
Date of depositing hard copy of GAD, MoU, Compliance of 11/11/2022
Checklist etc in CBE's office
Signing of GAD, etc by Divisional Officers
Date of Examination of GAD by Drawing Office of 05/06/2023
Sr.DEN/CENTRAL
Date of Signing by Electrical/TRD 05/06/2023
Date of Signing by S&T 05/06/2023
Y/w.563/NHD ROBs/NH-13
Signed & Forwarded to CBE vide letter no. & date Remark GAD approved on 14.11.2022
05/06/2023
Approval of GAD By Chief Bridge Engineer/South Western Railway
Date of Examination of GAD by Drawing Office of Chief Bridge 05/06/2023
Engineer/South Western Railway
Date of Approval 06/06/2023
Remark The GAD was physically approved by CBE/SWR on 14.11.2022.