- Leroy Lo from Albemarle approved the first four attachments to an email about pumps for a NEBO project with comments and asked the recipient to discuss any issues. - The other attachments were approved without comments. - Abhilash Kurian from IDEX Middle East clarified that manufacturing will only begin after document approval and lead time is based on approval date.

Uploaded by

Abhilash Kurian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

Attachment - 1

- Leroy Lo from Albemarle approved the first four attachments to an email about pumps for a NEBO project with comments and asked the recipient to discuss any issues. - The other attachments were approved without comments. - Abhilash Kurian from IDEX Middle East clarified that manufacturing will only begin after document approval and lead time is based on approval date.

Uploaded by

Abhilash Kurian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Kurian, Abhilash

From: Li-Wei Lo <[email protected]>


Sent: 01 July 2022 00:18
To: Kurian, Abhilash; Mohammad Mustafa
Cc: John Koch; Abdullah R.Zoubi; Firas Al Shayeb; Khaled Abdelqader; Christopher Romito; Barry
McKenzie; Jason Picou; Ali Golshan; Keyur Shah; Martin Berdon; Narkar, Sonal; yassir qudah; John
Koch; Khaled Abdelqader; Nick Kimble; Hayden O'Neal; Scott Johnson
Subject: RE: PO#221279 , REQ-00109151 , PRJ#21099 NEBO P-3045 & 3046 Br Bottoms Pumps
Attachments: 1. P-3045 3046 Br Btooms Pump DS_comments.pdf; 11. Pulsation Dampener
Drawing_comments.PDF; Motor Datasheet_comments.pdf; 4. Pump GA Drawing_comments.pdf;
10. Actuator Wiring Drawing.pdf; 2. Pump Datasheet - Vendor format.pdf; 3. Pump Theoretical
Flow Curve.pdf; 5. Pump Cross-sectional Drawing.pdf; 7. Motor datasheet - vendor format.pdf; 8.
Motor Performance Curves.pdf; 9. Motor GA Drawing.pdf

[CAUTION: This email originated from outside of the IDEX systems.


Do not open attachments or click on links unless you recognize, and can verify the sender and know the
content is safe.]
 

Dear Abhilash, 
 
Hope you are doing well!  
 
First four attachments approved with our comments‐ Please let us know if there is anything to discuss or not clear, 
we can have some more discussions. 
 
Other attachments‐ approved with no comments.  
 
Many Thanks. 
 
 
Leroy Lo PE,PMP
| Mechanical Engineer
Mobile 857.205.6894 |[email protected] 
 
 
 
From: Kurian, Abhilash <[email protected]>  
Sent: Wednesday, June 22, 2022 8:45 AM 
To: Li‐Wei Lo <[email protected]>; Mohammad Mustafa <[email protected]
Cc: John Koch <[email protected]>; Abdullah R.Zoubi <[email protected]>; Firas Al 
Shayeb <[email protected]>; Khaled Abdelqader <[email protected]>; 
Christopher Romito <[email protected]>; Barry McKenzie <[email protected]>; 
Jason Picou <[email protected]>; Ali Golshan <[email protected]>; Keyur Shah 
<[email protected]>; Martin Berdon <[email protected]>; Narkar, Sonal 
<[email protected]>; yassir qudah <[email protected]>; John Koch 
<[email protected]>; Khaled Abdelqader <[email protected]
Subject: RE: PO#221279 , REQ‐00109151 , PRJ#21099 NEBO P‐3045 & 3046 Br Bottoms Pumps 
 
WARNING: This message was sent from an EXTERNAL email address. Be cautious of links and attachments,
  and do not enter your ID or password.
Report any suspicious content.
1
Dear Leroy, 
 
Thanks for the below email.  
Please note that manufacturing shall start only after approval of documents, and lead time shall be calculated from 
that date. 
 
Regards, 
Abhilash Kurian 
IDEX Middle East FZE,  
PO Box 61290, Near RA08, Office TA07  
Jebel Ali Free Zone Authority, Dubai, UAE 
Office: +971 4 2600342 | Mobile: +971 56 1755124  
 
From: Li‐Wei Lo <[email protected]>  
Sent: Wednesday, June 22, 2022 5:44 PM 
To: Kurian, Abhilash <[email protected]>; Mohammad Mustafa 
<[email protected]
Cc: John Koch <[email protected]>; Abdullah R.Zoubi <[email protected]>; Firas Al 
Shayeb <[email protected]>; Khaled Abdelqader <[email protected]>; 
Christopher Romito <[email protected]>; Barry McKenzie <[email protected]>; 
Jason Picou <[email protected]>; Ali Golshan <[email protected]>; Keyur Shah 
<[email protected]>; Martin Berdon <[email protected]>; Narkar, Sonal 
<[email protected]>; yassir qudah <[email protected]>; John Koch 
<[email protected]>; Khaled Abdelqader <[email protected]
Subject: RE: PO#221279 , REQ‐00109151 , PRJ#21099 NEBO P‐3045 & 3046 Br Bottoms Pumps 
 
[CAUTION: This email originated from outside of the IDEX systems.
Do not open attachments or click on links unless you recognize, and can verify the sender and know the
content is safe.]
 

Abhilash, 
 
We are incorporating our comments now and will provide to you by next week. Thank you. 
 
 
Leroy Lo PE,PMP
| Mechanical Engineer
Mobile 857.205.6894 |[email protected] 
 
 
 
From: Kurian, Abhilash <[email protected]>  
Sent: Wednesday, June 22, 2022 7:48 AM 
To: Mohammad Mustafa <[email protected]
Cc: John Koch <[email protected]>; Abdullah R.Zoubi <[email protected]>; Firas Al 
Shayeb <[email protected]>; Khaled Abdelqader <[email protected]>; 
Christopher Romito <[email protected]>; Barry McKenzie <[email protected]>; 
Jason Picou <[email protected]>; Ali Golshan <[email protected]>; Keyur Shah 
<[email protected]>; Martin Berdon <[email protected]>; Narkar, Sonal 
<[email protected]>; yassir qudah <[email protected]>; John Koch 
<[email protected]>; Li‐Wei Lo <[email protected]>; Khaled Abdelqader 
<[email protected]
Subject: RE: PO#221279 , REQ‐00109151 , PRJ#21099 NEBO P‐3045 & 3046 Br Bottoms Pumps 
 