Department of Civil Engineering: Pulchowk Campus Survey Instruction Committee Major Traverse by Total Station

1. This document contains observations from a major traverse survey conducted using a total station. 2. The survey established 7 control points (CP-1, CP-2, 7M1, 7M2, 7M3, 7M4, 7M5, 7M6) and measured horizontal and vertical angles, distances between points, and target heights. 3. The observations are presented in a table format with two sets of measurements for redundancy and quality control of the survey. Mean values are calculated to derive final coordinates for adjustment.

Uploaded by

Aastate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
247 views7 pages

Department of Civil Engineering: Pulchowk Campus Survey Instruction Committee Major Traverse by Total Station

1. This document contains observations from a major traverse survey conducted using a total station. 2. The survey established 7 control points (CP-1, CP-2, 7M1, 7M2, 7M3, 7M4, 7M5, 7M6) and measured horizontal and vertical angles, distances between points, and target heights. 3. The observations are presented in a table format with two sets of measurements for redundancy and quality control of the survey. Mean values are calculated to derive final coordinates for adjustment.

Uploaded by

Aastate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station

F Set -I Set -II


Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
(m) (m) (m)
E D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(")
L 00 00 00 90 00 00
CP-1 (-)0'2" 0'1" 100.376 2.298 1.950
CP-2 R 179 59 57 270 00 02
155 17 58 155 17 44 155 17 51
(1.22m) L 155 17 51 245 17 40
7M1 17'56" 17'45" 76.313 -1.939 1.895
R 335 18 02 65 17 49
L 00 00 00 90 00 00
CP-2 (-)0'2" 0'0" 76.312 3.199 1.950
7M1 R 179 59 56 270 00 01
202 47 35 202 47 21 202 47 28
(1.345m) L 202 47 29 292 47 19
7M2 47'33" 47'21" 102.613 0.606 1.900
R 22 47 37 112 47 23
L 00 00 00 90 00 00
7M1 0'0" 0'0" 102.612 1.486 1.650
7M2 R 180 00 01 270 00 00
102 33 02 102 33 05 102 33 03
(1.19m) L 102 33 03 192 33 08
7M3 20'22" 33'05" 126.024 -2.806 1.430
R 282 33 02 12 33 02

GROUP 7 5
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse By Total Station
F Set -I Set -II
Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M2 0'0" 0'2" 126.022 3.214 1.650
7M3 R 180 00 00 270 00 03
160 20 22 160 20 14 160 20 18
(1.329m) L 160 20 23 250 20 22
7M4 20'22" 20'16" 103.982 -4.200 1.425
R 340 20 21 70 20 20
L 00 00 00 90 00 00
7M3 0'0" 0'0" 103.982 4.874 2.000
7M4 R 180 00 00 270 00 01
226 46 27 226 46 27 226 46 27
(1.375m) L 226 46 32 316 46 30
7M5 46'27" 46'27" 99.938 -1.992 1.805
R 46 46 22 136 46 25
L 00 00 00 90 00 00
7M4 0'1" (-)0'1" 99.929 2.686 1.650
7M5 R 180 00 02 269 59 58
104 13 54 104 13 53 104 13 53
(1.322m) L 104 13 52 194 13 54
7M6 13'56" 13'52" 99.148 -3.771 2.150
R 284 13 59 14 13 50

GROUP 7 6
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station
F Set -I Set -II
Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M5 0'8" 0'8" 99.151 4.885 1.650
7M6 R 180 00 15 270 00 15
205 18 32 205 18 24 205 18 28
(1.4m) L 205 18 40 295 18 37
7M7 18'40" 18'32" 77.234 -3.875 1.450
R 25 18 40 115 18 26
L 00 00 00 90 00 00
7M6 (-)0'4" 0'8" 77.234 4.115 1.650
7M7 R 179 59 52 270 00 15
87 28 55 87 28 45 87 28 50
(1.43m) L 87 28 42 177 28 51
7M8 28'51" 28'53" 99.832 -4.686 1.380
R 267 29 00 357 28 55
L 00 00 00 90 00 00
7M7 0'5" (-)0'1" 99.826 4.849 1.650
7M8 R 180 00 10 269 59 58
212 42 07 212 42 17 212 42 12
(1.41m) L 212 42 16 302 42 08
7M9 42'12" 42'16" 94.040 -5.163 1.600
R 32 42 08 122 42 23

GROUP 7 7
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station
F Set -I Set -II
Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M8 0'2" (-)0'1" 94.043 5.598 1.650
7M9 R 180 00 05 269 59 58
109 27 34 109 27 38 109 27 36
(1.341m) L 109 27 34 199 27 36
7M10 27'36" 27'37" 63.449 9.787 1.700
R 289 27 37 19 27 38
L 00 00 00 90 00 00
7M9 (-)0'2" 0'3" 63.448 -9.175 1.650
7M10 R 179 59 57 270 00 06
307 20 56 307 20 38 307 20 47
(1.353m) L 307 20 52 37 20 35
7M11 20'54" 20'41" 73.980 -0.217 1.630
R 127 20 57 217 20 47
L 00 00 00 90 00 00
7M10 (-)0'6" 0'5" 73.981 0.845 1.700
7M11 R 179 59 48 270 00 10
136 53 53 136 53 47 136 53 50
(1.474) L 136 53 57 226 53 51
7M12 53'47" 53'52" 63.574 2.357 1.735
R 316 53 37 46 53 53

GROUP 7 8
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station
F Set -I Set -II
Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M11 (-)0'4" 0'4" 63.575 -1.298 2.150
7M12 R 179 59 52 270 00 07
129 34 49 129 34 31 129 34 40
(1.37m) L 129 34 55 219 34 40
7M13 34'45" 34'35" 78.347 -2.262 2.160
R 309 34 35 39 34 30
L 00 00 00 90 00 00
7M12 0'6" (-)0'4" 78.344 3.634 2.030
7M13 R 180 00 13 269 59 53
120 59 35 120 59 22 120 59 28
(1.371m) L 120 59 40 210 59 25
7M14 59'42" 59'18" 93.422 10.358 1.680
R 300 59 43 30 59 12
L 00 00 00 90 00 00
7M3 0'6" 0'3" 93.423 -9.323 2.160
7M14 R 180 00 12 270 00 06
158 15 27 158 15 17 158 15 22
(1.43m) L 158 15 26 248 15 15
7M15 15'33" 15'20" 116.375 2.045 1.700
R 338 15 40 68 15 25

GROUP 7 9
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station
F Set -I Set -II
Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M14 (-)0'10" (-)0'3" 116.372 -1.226 1.860
7M15 R 179 59 41 269 59 54
210 39 40 210 39 28 210 39 34
(1.27m) L 210 39 30 300 39 25
7M16 39'30" 39'25" 117.847 2.829 1.690
R 30 39 30 120 39 24
L 00 00 00 90 00 00
7M15 (-)0'2" (-)0'1" 117.849 -1.573 2.100
7M16 R 179 59 57 269 59 58
149 16 38 149 16 28 149 16 33
(1.348m) L 149 16 32 239 16 25
7M17 16'37" 16'27" 100.240 5.622 2.155
R 329 16 42 59 16 28
L 00 00 00 90 00 00
7M16 0'2" (-)0'3" 100.223 -3.951 2.150
7M17 R 180 00 04 269 59 54
124 28 32 124 28 56 124 28 44
(1.245m) L 124 28 33 214 28 57
7M18 28'34" 28'53" 90.214 1.570 1.528
R 304 28 34 34 28 50

GROUP 7 10
Survey Camp 2078

Tribuvan University
Institute of Engineering
Pulchowk Campus
Department of Civil Engineering
Survey Instruction Committee
Major Traverse by Total Station

F Set -I Set -II


Inst st and

Sighted to
Ht of inst

A Mean Horizontal Angle Horizontal Vertical Target


HCR Observation Mean Horizontal Angle HCR Observation Mean Horizontal Angle distance distance height
C
D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") M-S D(°) M(') S(") D(°) M(') S(") (m) (m) (m)
E
L 00 00 00 90 00 00
7M17 (-)0'2" (-)0'1" 90.211 -0.691 1.950
7M18 R 179 59 57 269 59 58
214 29 19 214 29 25 214 29 22
(1.333m) L 214 29 20 304 28 28
CP-1 29'17" 29'24" 85.537 5.285 1.530
R 34 29 14 124 29 20
L 00 00 00 90 00 00
7M18 (-)0'4" 0'5" 85.539 -4.209 2.100
CP-1 R 179 59 52 270 00 10
121 06 43 121 06 30 121 06 36
(1.199m) L 121 06 39 211 06 36
CP-2 6'39" 6'35" 100.376 -1.328 1.500
R 301 06 39 31 06 33

GROUP 7 11