A Comprehensive Guide to

Waterproofing Inspection

INSPECTION
TEST PLAN
JAN OWEN MARTIN
CONSTRUCTION
C O R P O R AT I O N
A Comprehensive Guide to
Waterproofing Inspection
Pre-Installation Inspection

Material Inspection

Application of Waterproofing Membrane

Application of Sealants

Flashing and Edge Details

Quality of Workmanship

Field Testing

Compliance with Regulations and Specifications

Documentation and Reporting


Pre-Installation
Installation Inspection
Verify that the substrate is clean, dry, and free from any debris, oil, or contaminants.
Verify

Check if the substrate has been properly prepared, including crack repairs.
Check repairs

Ensure that all necessary structural repairs have been completed before waterproofing.
Ensure
Material Inspection
Check the delivered materials for compliance with the project specifications and approved
Check
material list.

Verify the brand and type of the waterproofing material.

Inspect the packaging for any signs of damage.


Application of Waterproofing
Membrane
Verify that the waterproofing membrane(PVC Membrane) is the specified type, thickness, and is
properly installed with no wrinkles, air pockets, and seams sealed according to manufacturer
instructions. Inspect for adequate adhesion and any penetrations sealed.
Application of Sealants
Verify that the specified sealants are being used for joints, corners, and penetrations.
Verify

Inspect the sealant application for uniformity, proper coverage, and smooth finish.
Inspect

Check for any gaps or voids in the sealant and ensure that it is fully cured before further
Check
construction activities.
Flashing and Edge Details
Inspect the installation of flashing and edge details to ensure proper integration with the
Inspect
waterproofing membrane.

Check that the flashing materials are compatible with the membrane and provide sufficient
Check
protection against water ingress.

Verify that the flashing is securely fastened and properly sealed.


Verify
Quality of Workmanship
Check for any visible defects, such as blisters, cracks, or uneven application of the waterproofing
Check
materials.

Ensure that the application is consistent with the manufacturer's guidelines.


Ensure

Inspect for any damage to the waterproofing system caused by subsequent construction
Inspect
activities.
Field Testing
Conduct field tests as specified in the project documents, such as floodtesting.
Conduct

Verify that the test results meet the required standards and that the waterproofing system
Verify
performs as expected.

Document the test results and maintain records for future reference.
Document
Compliance with Regulations and
Specifications
Ensure that the waterproofing installation complies with all standards and specifications.
Ensure

Check that the work meets the specifications and requirements outlined in the project
Check
documents.

Confirm that any deviations or non-conformance


conformance items have been appropriately addressed.
Documentation and Reporting
Maintain detailed inspection records, including photographs, test reports, and any non-
Maintain non
conformance issues identified.

Prepare inspection reports highlighting the findings, observations, and recommendations for
Prepare
corrective actions, if necessary.

Communicate the inspection results to the relevant parties, such as the QA/QC.
Communicate