238 Preventive Check Sheet of Press Brake Machine
238 Preventive Check Sheet of Press Brake Machine
238 Preventive Check Sheet of Press Brake Machine
1 Clean the Machine C Dust Dust free Clean Leads to B/D Hand Operator
2 Check pressure in both cylinders I Pressure in gauge As per standard Inform to maintenance Leads to B/D Visual Operator
3 Door of electrical panel & junction box I Fully closed Fully closed Closed Leads to B/D Visual & Hand Operator
4 Check oil level in tank L I Level Gauge Max. Level Inform to maintenance Leads to B/D Visual Operator
5 At all joints, seals I Leakage No Leakage Inform to maintenance Leads to B/D Visual Operator
8 Check the bolts of machine T Looseness of bolts Proper tight Inform to maintenance Leads to B/D Hand Operator
10
11
12
Name
Shift Operator (Sign.) :
Sign.
Name
Shift Engineer (Sign.) :
Sign.
Name
HOD (Sign.) :
Sign.
JCME/LM/F/024
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
1 Check RAM main cylinders Nut & Bolts for proper tightening By Spanner No looseness
3 Check oil level in Hyd. Power pack tank Level Gauge Above min. level
5 Check all hydraulic hoses or pipe for any leakage or damage Visual No Leakage
8 Check the high pressure filters for impurities By Hand Filter should be clean
10
11
12
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/025
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
Date :
10 Check emergency stop on two hand control By operating Interlocking not bypass
14
15
16
17
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/026
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
4 Check the connections of hydraulic pipes are well fitted Visual No Leakage/proper tight
5 Check the sealing of hydraulic cylinder against all leakage Visual Not damage
9 Check the condition of inclination protection limit switch Visual Proper tight & functionable
10 Check the incoming supply of all the electrical equipments By multimeter 240V AC / 24V DC
11 Check all connections in the main panel and the electrical switches By Screw driver No looseness
12 Clean the panel with blower & all wires are properly dressed By blower Dust free
13 All indication lamps & push button working By operating Working condition/No damage
14 Check all proximate switches & limit switch woking By operating Interlocked
24 Check the condition of ball bearing and play in coupling Visual No wear/tear
26
27
28
29
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/027
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)