009 Data Sheet For Pile Load Test

This 3 sentence summary provides key details about a pile load test from the given data sheet: The data sheet documents a pile load test including details of the test pile such as its location, date of casting, diameter, load applied either vertically or laterally, and type of pile whether driven, bored or cast in situ. It also includes instrumentation details like the make, capacity and readings of dial gauges, hydraulic jacks, and pressure gauges used during the test. The data sheet records readings from the instruments, loads applied to the pile, gross settlements measured, and signatures of representatives from the contractor, sub-contractor and consultant who performed or witnessed the test.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views2 pages

009 Data Sheet For Pile Load Test

This 3 sentence summary provides key details about a pile load test from the given data sheet: The data sheet documents a pile load test including details of the test pile such as its location, date of casting, diameter, load applied either vertically or laterally, and type of pile whether driven, bored or cast in situ. It also includes instrumentation details like the make, capacity and readings of dial gauges, hydraulic jacks, and pressure gauges used during the test. The data sheet records readings from the instruments, loads applied to the pile, gross settlements measured, and signatures of representatives from the contractor, sub-contractor and consultant who performed or witnessed the test.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DATA SHEET FOR PILE LOAD TEST

Contract

Client

Concessionaire

IC

EPC Contractor

Test Pile no: Details of Dial Gauge Details of Hydraulic Jack Details of Pressure Gauge
Location: Make: Capacity Make:
Date of Casting: Range: Dia of Ram: Range:
Dia of Pile: Least Count: Area of Ram: Least Count:
No of Gauges: No of Jacks: No of Gauges:

Type of Load Applied: Vertical Lateral Type of Pile Load test:: Initial Routine Type of Pile: Driven Bored cast-in-situ

Pressure gauge Actual load Dial gauge Reading AV Reading


Date Time Required load (MT) Gross settlement (mm) Remarks
Reading (kg/cm2) (MT) A B C D (mm)

Contractor's Representative Sub-Contractor Consultant's Representative


Name : Name : Name :
Designation: Designation: Designation:
Sign.: Sign.: Sign.:
Date : Date : Date :
Page No.: 1 of 1