NAME OF THE CONTRACT : ABR/B215-000-CJ-TN-8004/1001 Contractual Start Date : 08.06.2019 Reporting Date: 08.05.2023
NAME OF THE AGENCY : Punjab Engineering Company (Project Division) Contractual Compln Date : 06.04.2022 Status as of: 06.05.2023
PROJECT, LOCATION : Building work (Part A) for Assam Bio Refinery Project, Numaligarh
Sl No. Item Description Previous day's Status
Total Work Cum Balance to Today's
Uom Load
Work front
Completed complete Programme
Remarks
CONSTRUCTION WORKS Programme Actual
Signatue of contractor
CONTRACTOR'S DAILY PROGRESS REPORT
NAME OF THE CONTRACT: ABR/B215-000-CJ-TN-8004/1001 Contractual Start Date : 08.06.2019 Reporting Date:08.05.2023
NAME OF THE AGENCY : Punjab Engineering Company(PD) Contractual Compln Date : 06.04.2022 Status as of: 06.05.2023
PROJECT, LOCATION : Building work (Part A) for Assam Bio Refinery Project, Numaligarh
ESTIMATED RECEIVED
S. NO DETAILS OF MATERIAL UOM TOTAL DURING THE CUMULATIVE RECEIVED
SCOPE STATUS DAY
1 Reinforcement Bar MT 1300.0 1193.27
2 Cement MT 4600.0 2650.5
3 Corrosion Inhibiting Admixture LTR. 23000.0 21600
4 100 mm dia GI PIPE RM 500.0 252
5 MS angle MT 14.0 18
6 PVC pipe(150mm dia) RM 900.0 900
E. Hindrance: