BSBPMG530 Self-Study Guide

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Self-Study Guide

BSBPMG530 Manage project scope


BSBWRT301 Write simple documents Trainer Guide

About this document

This document is to be used as a self-study guide at home/in your own time to complement the
formal learning you are doing as part of your classroom or online studies. It is a requirement of your
course that you complete the activities in this guide.
You will need to take your notes/completed activities to class, or follow your trainers direction about
how to complete activities.
If you are unsure about anything, talk to your trainer/assessor.

Self-study Guide

Unit code and title BSBPMG530 Manage project scope

Instructions You are to complete each of the self-study tasks below. Each activity
is a mandatory part of your study. After completing each of the tasks,
tick the box below to show that you have completed the activity and
bring evidence of this to class to share.

© 2020 RTO Works <RTO Name and ID> Page


BSBPMG530 Manage project scope Self-study Guide

Expected
Activity Task time Completed

Watch & research Watch one of the videos from the RTO Works 2 hours

video series:

● Celebrating innovation

Conduct your own research to answer the


following questions:

● How can an innovative mindset assist in


managing projects?

● Why is innovation important when managing


a projects scope?

● How does innovating thinking aid in


resolving issues within a project?

Practical activity Write a project scope statement for an existing 4 hours



project. Following the correct template, create
the scope using clear and concise information.
Information that should appear in the statement:

● Scope Description

● Project deliverables

● Acceptance criteria

● Constraints

● Assumptions

Research Research scope management plans and how to 4 hours



create your own.
Which methods work best? How can you
implement a scope management plan? What are
the key processes in a scope management
plan? Take notes to share in class.

Review Review your assessment requirements for this 3 hours



unit and read through your Project Portfolio so
you know what you will be required to do. Make

© 2021 RTO Works


BSBPMG530 Manage project scope Self-study Guide

Expected
Activity Task time Completed

sure you review your Student Guide if you need


to revisit some areas of your training. Ask your
trainer any questions before you begin your
assessment to ensure you understand all of the
learning and are ready to be assessed.

Reflection Reflect on the following: 2 hours


● Information learned during your training

● Your main key “takeaways” from this unit

● What did you learn that you didn’t know


already? How can you apply this in your
study/work/life?

● What did you find challenging or


confronting? How did you overcome these
challenges or barriers?

© 2021 RTO Works

You might also like