KONTRAK KERJA 2 Bahasa
KONTRAK KERJA 2 Bahasa
KONTRAK KERJA 2 Bahasa
(SURAT PERJANJIAN)
WORKING CONTRACT
(AGREEMENT LETTER)
TANGGAL KONTRAK :
CONTRACT DATE :
[email protected]
@culinary_profesional
SURAT PERJANJIAN/KONTRAK KERJA
AGREEMENT LETTER/WORKING CONTRACT
ANTARA/ BETWEEN
RENJANA CULINARY
DENGAN/WITH
THE UMALAS SIGNATURE - BALI
UNTUK/FOR
PERENCANAAN DAPUR HOTEL THE UMALAS SIGNATURE UMALAS – BALI
KITCHEN DESIGN PLANNING THE HOTEL MAGNUM UMALAS – BALI
1. Stanisslav Sadovnikov
Owner Representative - THE UMALAS SIGNATURE – BALI, based on this
person’s title and position within the company - THE UMALAS SIGNATURE –
BALI, located in Jl. Bumbak No. 156, Kerobokan, Kuta Utara, Badung 80361,
Bali. Furthermore, will act upon and mentioned as FIRST PARTY within this
contract.
2. Chrisfian Nehemia
Consultant Head - RENJANA CULINARY, based on this person’s title and
position within the company - RENJANA CULINARY, located in JI. Puri Gading
No. 9 Jimbaran – Bali. Furthermore, will act upon and mentioned as SECOND
PARTY within this contract.
Dengan ini menyatakan KEDUA BELAH PIHAK, telah setuju dan sepakat untuk saling
mengikat diri dalam suatu PERJANJIAN/KONTRAK KERJA PERENCANAAN HOTEL THE
UMALAS SIGNATURE – BALI
This states that BOTH PARTIES have agreed and agreed to mutually bind themselves in an
AGREEMENT LETTER/WORKING CONTRACT of KITCHEN DESIGN PLANNING, FOR HOTEL THE
UMALAS SIGNATURE – BALI.
[email protected]
@culinary_profesional
PASAL 1
DASAR PELAKSANAAN PEKERJAAN
ARTICLE 1
BASIS OF WORK COMPLETION
A. Kitchen Design Planning for HOTEL THE UMALAS SIGNATURE - BALI has to be
completed by the FIRST PARTY based on the Offer Letter date… APRIL 2023 and
in accordance with the agreement of BOTH PARTIES as an integral part of this
Agreement Letter/Working Contract.
PASAL 2
TUGAS DAN KEWAJIBAN PIHAK PERTAMA
A. PIHAK PERTAMA memberi tugas pekerjaan kepada PIHAK KEDUA dan PIHAK
KEDUA menyatakan menerima tugas dan pekerjaan tersebut di atas
sebagaimana tercantum dalam Ayat B. Pasal 2 ini.
[email protected]
@culinary_profesional
ARTICLE 2
DUTIES AND OBLIGATION OF FIRST PARTY
A. FIRST PARTY have to provide task of work to SECOND PARTY and the
SECOND PARTY have to state they have received the task and work as
stated in Paragraph B. Article 2.
B. Task and work spoken about in Paragraph A. is the kitchen design planning
for HOTEL UMALAS SIGNITURE which is located in Jl. Bumbak No. 156,
Kerobokan, Kuta Utara, Badung 80361, Bali.
E. FIRST PARTY is obligated to pay the SECOND PARTY for the completion of
the work plan according to the price stated in the contract.
PASAL 3
TUGAS DAN KEWAJIBAN PIHAK KEDUA
ARTICLE 3
TASK AND OBLIGATIONS OF SECOND PARTY
A. SECOND PARTY is obligated to conduct and complete all the work plan in
accordance with the provisions of the contract document until it is
submitted to the FIRST PARTY.
[email protected]
@culinary_profesional
C. Scope of task to be conducted by SECOND PARTY is based on the provisions
that apply based on the stages that must be carried out as follows:
a. Preparation for the work plan includes surveys such as, measuring
the location, as well as collecting data and information from the
site.
PASAL 4
BIAYA PEKERJAAN DAN TATA CARA PEMBAYARAN
C. Pembayaran Ketiga sejumlah 10% dari jumlah biaya perencanaan yaitu: 10%
x Rp. 111.000.000,00 = Rp. 11.100.000,00 (SEBELAS JUTA SERATUS RIBU
RUPIAH) dibayar setelah konsultan perencana menyelesaikan dan
menyerahkan hasil karya perencanaan berupa:
D. Apabila terjadi revisi setelah masa maksimum pada Pasal 4 paragraf C.a.
maka akan di kenakan biaya tambahan sesuai dengan kesepakatan Kedua
Belah Pihak.
ARTICLE 4
SERVICE FEE AND PAYMENT PROCEDURES
[email protected]
@culinary_profesional
B. Second payment to SECOND PARTY as much as 60% from the total service
fee which is: 60% x Rp.111.000.000,00 = Rp. 66.600.000,00 (SIXTY-
SIXMILLION SIX HUNDRED THOUSAND RUPIAH) must be paid once the
consultation services is finished and the result of the work plan has been
submitted in the form of:
C. Third payment to SECOND PARTY as much as 10% from the total service fee
which is: 10% x Rp. 111.000.000,00 = Rp. 11.100.000,00 (ELEVEN MILLION
ONE HUNDRED THOUSAND RUPIAH) must be paid once the consultation
services is finished and the result of the work plan has been submitted in the
form of:
Payment will be processed using this Bank BCA with account name Chrisfian
Nehemia and Account Number: 61301375588
PASAL 5
JANGKA WAKTU PELAKSANAAN PEKERJAAN PERENCANAAN
ARTICLE 5
TIME PERIOD FOR IMPLEMENTATION OF WORK PLAN
[email protected]
@culinary_profesional
A. Time period for implementation of work plan mentioned in ARTICLE 1 has to be
completed within 90 (ninety) business days.
B.
PASAL6
LAIN-LAIN
A. Segala sesuatu yang belum diatur dalam kontrak pekerjaan ini atau perubahan-
perubahan yang dipandang perlu oleh kedua belah pihak akan diatur lebih
lanjut dalam surat perjanjian tambahan (addendum) dan merupakan perjanjian
yang tidak terpisahkan dari kontrak kerjasama ini.
B. Kontrak pekerjaan ini dibuat dalam rangkap dua dengan dua versi bahasa
(Inggris dan Indonesia) bermaterai cukup dan mempunyai kekuatan hukum
yang sama masing-masing untuk PIHAK PERTAMA dan PIHAK KEDUA.
ARTICLE 6
OTHER THINGS
A. Everything that has not been arranged in this work contract or changes deemed
necessary by BOTH PARTIES will be further arranged in an additional agreement
(addendum) and is an agreement that is inseparable from this cooperation
contract.
B. This contract is made in duplicate with two language version (English and
Indonesian) with enough subject matter and have the same legal force
respectively for the FIRST PARTY and the SECOND PARTY.
PASAL 7
PENYELESAIAN PERSELISIHAN
A. Jika terjadi perselisihan antara kedua belah pihak, maka pada dasarnya akan
sebisanya di selesaikan secara musyawarah.
B. Apabila terjadi perbedaan persepsi tentang isi kontrak, maka akan di selesaikan
mengunakan kontrak dengan versi Bahasa Indonesia sesuai dengan kedudukan
dimana kesepakatan kontrak dibuat (Indonesia).
ARTICLE 7
DISPUTE RESOLUTION
A. If there is a dispute between the two parties, then basically it will be resolved
as much as possible by deliberation.
[email protected]
@culinary_profesional
B. If there are differences in perceptions about the contents of the contract, it will
be resolved using the contract with the Indonesian version according to the
position where the contract agreement was made (Indonesia).
PASAL 8
PENUTUP
ARTICLE 8
ENDING STATEMENT
A. This Consultation Work Planning Contract is signed by BOTH PARTIES in……. day
and dated written above.
B. This Consultation Work Plan Contract is declared valid since it was signed by
the FIRST PARTY and the SECOND PARTY.
[email protected]
@culinary_profesional
[email protected]
@culinary_profesional
[email protected]
@culinary_profesional