North Port Tariff

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

TARIFF

For further details, please refer to Port Klang


Authority Scale of Rates Dues and Charges.

General Line : +603 3169 8888


Customer Service Centre : +603 3169 8000
Fax : +603 3169 8080
Email : [email protected]
Table of Contents

Terminal Handling Charges 1

Storage Charges 2 -3

Reefer Charges 3

Inter Terminal Transfer (ITT) To Westports 3

Verified Gross Mass (VGM) Charges 3

Extra Movement Charges 3

Miscellaneous Charges 3

Break Bulk 4 -5

Liquid Bulk 5

Dry Bulk 5

RO-RO 6

Marine Charges 7

Fireman & Security Charges 8


Last updated 1st March 2019 Page 1 of 8

CONTAINER TARIFF
TERMINAL HANDLING CHARGES HANDLING CHARGES OF OOG CONTAINERS

20’ 40’ >40’ 20’ 40’ >40’


Description
Container Status Discharge / Load per move Per Lift Rate (RM)
(RM)
a) FCL containers
a) Full Container Load (FCL) 300 450 546 460 560 630
(Import / Export)
b) Less Container Load (LCL) 430 645 728 b) FCL DG containers
560 680 760
c) Empty Container (MT) 250 375 457 (Import / Export)

d) Transhipment Container
i) Laden 182 273 312
SHIFTING CHARGES
ii) Empty 180 270 300

20’ 40’ >40’


Description
DANGEROUS GOODS IMPORT / EXPORT CONTAINERS Rate (RM)

a) Shifting of container within the 65


20’ 40’ >40’ same bay or hatch.
Description
Rate (RM) b) Shifting of container from bay to 130
bay or hatch to hatch.
Group 1 450 680 760
c) Opening and subsequently 130
Group 2 390 590 660 closing of hatches (Hatch
Cover Lifting)
Group 3 340 510 570
d) Loading of gearbox on the wharf 130
and subsequently re-lifting gearbox

DANGEROUS GOODS TRANSHIPMENT CONTAINERS e) Re-stow of container 286 435 487

20’ 40’ >40’


Description UNCONTAINERISED CARGO (UC) LIFTING
Rate (RM)

Group 1 290 435 490 Per lift per


hour or part
Group 2 250 380 430 Description thereof
Rate (RM)
Group 3 220 330 380
a) Not exceeding 15 tonnes 800
b) Not exceeding 25 tonnes 1,000
c) Not exceeding 35 tonnes 1,800
d) Not exceeding 50 tonnes 3,000
e) Not exceeding 60 tonnes 4,500
f) Exceeding 60 tonnes 5,500
Last updated 1st March 2019 Page 2 of 8

STORAGE CHARGES IMPORT FCL CONTAINERS STORAGE CHARGES


Import and Export FCL and MT containers shall be calculated - MALAYSIAN PORTS
from the time containers are stacked in CY to the time the
containers are removed from the terminal. All Export containers 20’ 40’ >40’
calculated from the time the containers are stacked in CY to the No. of Days
time containers are loaded onto vessel for export. Rate (RM)
First 7 days Free Free Free
8th day 15 22 26
IMPORT FCL CONTAINERS STORAGE CHARGES
9th day 30 45 52
Origin ASEAN Non-ASEAN 10th day 45 67 78
20' 40' >40' 20' 40' >40' 11th day 60 90 104
Rate (RM)
12th day 75 112 130
1st day Free Free Free Free Free Free
2nd day Free Free Free Free Free Free 13th day 90 135 156
rd
3 day Free Free Free Free Free Free 14th day 105 157 182
4th day Free Free Free Free Free Free 15th day 120 180 208
5th day Free Free Free 15 22 26 16th day 135 202 234
th
6 day 15 22 26 30 45 52
17th day 150 225 260
7th day 30 45 52 45 67 78
18th day 165 247 286
8th day 45 67 78 60 90 104
19th day 180 270 312
9th day 60 90 104 75 112 130
10th day 75 112 130 90 135 156 20th day 195 292 338
11th day 90 135 156 128 193 223 21st day 210 315 364
th
12 day 128 193 223 156 234 270 From 4th week and subsequent
weeks per week or part thereof
13th day 156 234 270 175 262 304 270 405 468
in addition to charges payable
14th day 175 262 304 196 293 338 on 21st day
15th day 196 293 338 215 321 372
16th day 215 321 372 234 352 406 20’ 40’ >40’
17th day 234 352 406 253 380 440 OVERSTAYING CHARGES
18th day 253 380 440 274 409 474 Rate (RM)
19th day 274 409 474 293 439 508 Apply on Import and Transhipment
20th day 293 439 508 312 468 540 containers in the container yard not 65 100 110
removed within the free storage period
21th day 312 468 540 331 496 574
From 4th week
and subsequent EXPORT FCL / LCL & IMPORT / EXPORT EMPTY STORAGE
weeks per week CHARGES
or part thereof 352 527 608 352 527 608
in addition to
charges payable 20’ 40’ >40’
on 21st day No. of Days
(RM)

Within free days Free Free Free


IMPORT DANGEROUS GOODS CONTAINERS
Subsequent days per day 4 8 9
or part thereof
20’ 40’ >40’
No. of Days
(RM)
Free storage period for Import FCL / MT containers shall
First 3 days Free Free Free subject to its origin country.
Export containers are entitled for 5 days free storage.
Subsequent days per
25 38 42 Transhipment containers shall be given 14 days free storage
day or part thereof
calculated from the date containers are stacked in CY.
Transhipment containers not reshipped within the prescribed
free storage period shall lose the right to Transhipment rates.
EXPORT DANGEROUS GOODS CONTAINERS Storage charges will be levied on containers based on the
free period granted for Import FCL or MT containers.
20’ 40’ >40’ Transhipment Dangerous Goods containers shall be given 7
No. of Days days free storage calculated from the date containers are
(RM) stacked in CY. Transhipment containers not reshipped within
the prescribed free storage period shall lose the right to
First 3 days Free Free Free Transhipment rates. Storage charges will be levied on
containers based on the free period granted for Import FCL
Subsequent days per 10 15 20 Dangerous Goods containers.
day or part thereof
Last updated 1st March 2019 Page 3 of 8

OOG CONTAINERS STORAGE CHARGES EXTRA MOVEMENT CHARGES (EMC)

20’ 40’ >40’ 20’ 40’ >40’


No. of Days Rate per day per container Rate (RM)
(RM)
a) When an MT, Transhipment or FCL
First 3 days Free Free Free container is received from haulier’s
chassis or rail wagon and is not 130 200 220
4th day to 21st day 30 46 52 shipped but subsequently delivered
back to haulier’s chassis or rail
22nd day and wagon (2 EMC).
76 116 134
thereafter
b) Movement after an Import LCL
container is unpacked at CFS and the
MT container is subsequently 65 100 110
REEFER CHARGES - IMPORT / EXPORT CONTAINERS delivered to haulier’s chassis or rail
wagon (1 EMC).

20’ 40’ >40’ c) Late advise on status of container,


change of container status, change of
(RM) operator code, change of port
destination, conversion of export to
a) Plugging and unplugging of reefer 15 15 15 import and vice versa, conversion of 65 100 110
containers on board vessel MT pool to MT Export and vice versa,
(per operation) late advise for Health, Agriculture,
Veterinary or Fisheries Department
b) Reefer monitoring and electricity
35 50 60 after vessel’s arrival (1 EMC).
(per shift or part thereof)
d) Movement of container from CY to
b) Pre-trip inspection (per operation) 70 70 70
examination area and back to CY
after Customs, Health, Agriculture, 130 200 220
Veterinary or Fisheries Department’s
INTER TERMINAL TRANSFER (ITT) TO WESTPORTS examination (2 EMC).

e) When an MT, Transhipment or FCL


Container Size Rate (RM) container is received from haulier’s
chassis or rail wagon and is shut-out 65 100 110
20’ ( ≤ 21 tonnes) 80 and subsequently shipped via
another vessel (1 EMC).
20’ ( > 21 tonnes) 200
f) Inter Terminal Transfer (ITT) of
40’ / 45’ 160 container to/from CT1/CT2 (per 65 100 110
Rate on ITT to Westports will be applied for all types of move).
transportation mode (by barge, road or rail).
g) Any additional container movement
not stated above shall be levied an 65 100 110
extra movement charges (per move).
VERIFIED GROSS MASS (VGM) CHARGES

Rate per unit


MISCELLANEOUS CHARGES
(RM)

a) Single unit container through gate 5 20’ 40’ >40’


Services
b) Twin hauled (back to back) 30 Rate (RM)

c) Container from CLFS 30 a) Usage of bath tub trailer 500

d) Penalty on VGM (2 EMC) 130 / 20’ b) Storage on bath tub trailer (charges will
be applied from second shift onwards – 600
200 / 40’
per shift or part thereof)
Penalty on VGM will be imposed if there is no VGM declaration
through e-SOLAS c) Patching of torn container (per container) 65 100 110

d) Re-arrange door position for export


65 100 110
container only

e) Photo service per request (max 5


containers per request or part 20
thereof)

f) Carpenter (per container) 10

g) Port Pass Registration (per year) 10

h) Vehicles sticker (per sticker) 3

i) Reissuance of document (gate 25


pass & etc)
Last updated 1st March 2019 Page 4 of 8

CONVENTIONAL TARIFF
BREAK BULK CHARGES FOR LATE REQUEST, CHANGES OR CANCELLATION OF
STEVEDORAGE SERVICE, ETC
Rates for Break Bulk cargo is chargeable based on tonne or - Not less than four hours before beginning of each shift
measurement weight, whichever is greater.
Per transaction
WHARFAGE CHARGES (RM)

Cargo loaded or Cargo loaded into or Cargo loaded into or a) Late application and alteration 20.00
discharged at wharf discharged from ship discharged from ship
per tonne or part moored alongside at anchorage per b) Cancellation of stevedore gang 700.00
thereof another ship berthed tonne or part thereof
at wharf per tonne or c) Stevedore ordered but not worked, unless due to 100.00
part thereof rain or arising from the fault of terminal operator
per gang per hour or part thereof

(RM)
Type of
cargo Foreign Domestic Foreign Domestic Foreign Domestic WHARF HANDLING CHARGES FOR IMPORT / EXPORT (GENERAL
CARGO)
a) Cargo other
than rice, Type of cargo Receiving and Receiving at wharf,
wheat grain 2.50 2.00 1.25 1.00 0.65 delivering at wharf storing and
and salt loaded per tonne or part delivering at
or discharged
thereof warehouse or open
b) Rice, wheat storage and vice
2.00 1.00 0.65
grain and salt versa per tonne or
part thereof
c) T/S cargo for
each operation
2.50 1.25 0.65 (RM)
of unloading
and reloading
Non- Non-
Malaysian Malaysian
Malaysian Malaysian
Port Port
Port Port
STEVEDORAGE
a) General cargo
5.00 7.00 8.80 10.60
Per tonne or part (below 1.00 MT)
Types of cargo (discharged or loaded) thereof
b) Heavy lift
9.00 9.00 15.00 15.00
(RM) (above 1.00 MT)

a) General cargo 7.30 c) DG : Group 3 6.50 9.00 10.80 14.00

b) Loose bagged cargo 8.50 d) DG : Group 1 & 2 13.00 18.00 21.60 28.00

c) Palletised or unitized cargo 4.40 e) All cargo loaded


into or discharged
d) DG cargo 10.00 from ship moored
alongside another 1.00
e) Transhipment cargo 6.50
ship berth at wharf
f) Shifting of cargo on board 8.50 or ship at
anchorage
g) Landing cargo on wharf and subsequently
17.00
reshipping into the same ship
WHARF HANDLING CHARGES FOR TRANSHIPMENT
(GENERAL CARGO)
ADDITIONAL STEVEDORES GANG
Per tonne or
Per hour or part Per shift or part Through meal per Description part thereof
Description thereof thereof hour or part thereof *
(RM)
(RM)
a) Cargo received and shipped at wharf 3.80
a) Per gang 200.00 700.00 200.00
b) Cargo received from ship at wharf, removing and
warehousing and reshipped at wharf to 7.00
b) Per person 20.00 70.00 20.00
destination port

* Applicable to Stevedore charges tabled above if the services are


provided through meal hour. LIFTING SERVICE CHARGES

Per tonne per


lift or part
Description thereof
(RM)

a) Not exceeding 5 tonnes 4.00

b) Exceeding 5 tonnes but not exceeding 10 tonnes 6.50

c) Exceeding 10 tonnes but not exceeding 20 tonnes 9.00

d) Over 20 tonnes 18.00


Last updated 1st March 2019 Page 5 of 8

Per tonne per day or LIQUID BULK


STORAGE CHARGES part thereof
i) Import – Covered (RM)
WHARFAGE CHARGES
(Open Storage – Half of Covered Rates) General Damaged
Per tonne or part
Cargo Cargo Cargo loaded or discharged at wharf
thereof (RM)
First 3 days (inclusive of Common
Free Free a) Domestic trade ships 3.00
Landing Date)
th b) Foreign going ships 3.50
4 day 2.00 4.00
th
5 day 4.50 9.00
6th day 7.50 15.00 WHARFAGE CHARGES
th
7 day 11.00 22.00 Cargo loaded into or discharged from
Per tonne or part
ship moored alongside another ship
8th day 15.80 31.60 thereof (RM)
berthed at wharf
9th day 21.90 43.80
a) Domestic trade ships 1.50
10th day 29.30 58.60
th b) Foreign going ships 1.75
11 day 38.00 76.00
12th day 48.00 96.00
WHARFAGE CHARGES
13th day 59.30 118.60
th
14 day 71.90 143.80 Cargo loaded into or discharged from ship Per tonne or part
15th day onwards additional per day or at the anchorage thereof (RM)
13.90 27.80
part thereof a) Domestic trade ships 0.65
b) Foreign going ships 0.65
Per tonne per day or
STORAGE CHARGES part thereof
Per tonne or part
ii) Export or Shut Out – Covered (RM)
thereof (RM)
(Open Storage – Half of Covered Rates) General Damaged PIPELINE CHARGES
General Tranship-
Cargo Cargo
Cargo ment
First 7 days Free Free
a) Non - Dangerous Goods 2.50 1.80
8th to 21st day 1.00 2.00
nd
b) Dangerous Goods 4.00 2.80
22 day and thereafter 1.70 3.40

Per tonne per day or


part thereof
DRY BULK
STORAGE CHARGES
iii) Transhipment or Overlanded – Covered (RM)
(Open Storage – Half of Covered Rates) WHARFAGE CHARGES
General Damaged
Cargo Cargo Per tonne (RM)
Description
First 28 days Free Free Foreign Domestic
29th to 42nd day 0.70 1.40 Dry Bulk Vessel 2.50 2.00
43rd day and thereafter 1.30 2.60
GENERAL WHARF HANDLING CHARGES
Per tonne per day or Per tonne or part
STORAGE CHARGES part thereof Description
iv) Dangerous Cargo (DG2 & DG3) Import thereof (RM)
(RM) a) With conveyor and crane facilities 9.00
– Covered
(Open Storage – Half of Covered Rates) General Damaged b) With other than conveyor and crane
Cargo Cargo 7.30
facilities
First 21 days 26.00 52.00 c) Trimming 1.30
nd
22 day and thereafter 182.00 364.00

WAREHOUSE RENTAL
Per tonne per day or RM2.02 per sq.m per week or RM8.08
STORAGE CHARGES part thereof
v) Dangerous Cargo (DG2 & DG3) Export per sq.m for first 28 days
(RM) Cargo in warehouse
– Covered RM5.38 per sq.m per week from 29th
(Open Storage – Half of Covered Rates) General Damaged day onwards
Cargo Cargo
RM1.01 per sq.m per week or RM4.04
First 3 days Free Free per sq.m for first 28 days
th Cargo at open yard
4 day and thereafter 26.00 52.00 RM2.69 per sq.m per week from 29th
day onwards

Per tonne or part


OVERSTAYING CHARGES thereof
(RM)
Import cargo in the warehouse not
removed within 3 days after the Common 2.00
Landing Date
Last updated 1st March 2019 Page 6 of 8

RORO SERVICES OTHERS WHARFAGE

WHARF HANDLING CHARGES (RORO) PASSENGER SHIP (RM)


Motor & Import Export Transhipment Per tonne GT per 24 hours or part thereof 0.10
Heavy
Vehicles Per unit (RM)

Below 1.5 PASSENGER & LUGGAGE CHARGES


22.00 15.00 16.50
tonnes
Per
1.5 tonnes Person Per Unit
45.00 30.00 34.00 (RM)
to 3 tonnes (RM)
45.00 with 30.00 with 34.00 with a) Adult 10.00
More than 3 addition of 9.00 addition of 9.00 addition of 6.00
tonnes per tonne or per tonne or per tonne or b) Child under 12 years of age 10.00
part thereof part thereof part thereof
c) Passenger’s luggage 1.00

RORO CHARGES

Per unit per FOREIGN WAR SHIP (RM)


Discharged/loaded by RORO Vessel transfer
Per meter LOA plus 50 meters per hour 5.50
(RM) or part thereof
a) Vehicles less than 5 tonnes 20.00

b) Vehicles 5 tonnes but not exceeding 10 MINIMUM WHARFAGE CHARGES


40.00
tonnes - shall be applied if the wharfage charges
(RM)
c) Vehicles exceeding 10 tonnes 80.00 is less than RM100.00

d) General cargo (per tonne or part thereof) 2.00


100.00 per day or
a) Not exceeding 1,000 GT
part thereof
Rate per unit per day
STORAGE CHARGES Free days
(RM) 0.10 per tonne GT
a) Import First 3 days 8.00 b) Exceeding 1,000 GT per day or part
thereof
b) Export First 7 days 8.00
c) Transhipment First 28 days 8.00
ANY SHIP OVERSTAYING AT WHARF (RM)
If RORO cargo is collected after the free storage period,
the storage charges shall be calculated from Common Per 100 GT or part thereof per hour or part
Landing Date thereof 15.00
Transhipment RORO cargo shall be entitled to a free
storage period of 28 days from Common Landing Date
Transhipment RORO cargo not transhipped within free
storage period shall be treated as Import RORO cargo
Last updated 1st March 2019 Page 7 of 8

MARINE CHARGES
CONSOLIDATED MARINE CHARGES OTHER RELATED CHARGES
The consolidated Marine Charges are based on the length overall
(LOA) of a vessel per call and levied for the following services: a) Pilotage Dues
a) Pilotage from pilot station / inner anchorage to berth If a vessel only requires pilotage service for transit
b) Pilotage from berth to pilot station / inner anchorage within the pilotage limit, the charges shall apply
c) Towage operation during berthing & unberthing of vessel for the following services:
RM3 per meter
i) Piloting a vessel from designated pilot LOA per
These rates shall apply to every vessel loading and discharging stations inwards to any anchorage or from
goods and/or passenger engaged in any other services at the wharf movement
an anchorage outwards to a pilot station;
including man-of-war.
ii) Piloting a vessel from any inner anchorage to a
wharf outwards to any inner anchorage or from
LENGTH OVERALL RM wharf to another wharf.
a) Not exceeding 100 meters 3,000 b) Tugboat Charges
b) Exceeding 100 meters but not exceeding 140 meters 4,200 If a vessel requires towage services for transit RM9.50 per meter
c) Exceeding 140 meters but not exceeding 200 meters 8,400 between the port limits or for additional tugboats LOA per tugboat per
other than that provided for the vessel’s size, the movement
d) Exceeding 200 meters but not exceeding 250 meters 13,200
following charges shall apply.
e) Exceeding 250 meters but not exceeding 300 meters 14,400
f) Exceeding 300 meters but not exceeding 350 meters 16,800 c) Pilot Detention Charges
g) Exceeding 350 meters 18,500 Where the pilot waits at the Pilot Station for the
arrival of a vessel or at wharf or anchorage for the RM200 for every half
departure of a vessel, a pilot detention charges hour or part thereof
shall be imposed for every half hour or part
thereof calculated from the time service is
required.

d) Amendment or Cancellation Charges of Pilotage


Services
Where the service of a pilot is requested and the
time of such service is subsequently amended or
cancelled less than the following period stipulated
below before the time the service is required, an RM500
amendment or cancellation charges shall be
imposed:
- Arrival 2 hours
- Departure and Shifting within the
pilotage limit 1 hour

e) Tugboat Detention Charges


RM200 per tugboat
Where the tugboat is detained due to delay in the for every half hour or
arrival or departure of a vessel, a detention charges part thereof
shall be imposed.

f) Amendment or Cancellation Charges of Tugboat


Services
Where the service of a tugboat is requested and the RM500 per
time of such service is subsequently amended or tugboat
cancelled less than 1 hour before the time the
service is required, an amendment or cancellation
charges shall be imposed.

g) Pilotage Service Charges


Where the services of pilot is requested for a ship
with defective propulsion or other unusual
characteristic. (per movement)
i) LOA not exceeding 200 meters RM500
ii) LOA exceeding 200 meters RM1,000

h) Towage Service Charges


Where the services of tugboat is requested for a
ship with defective propulsion or other unusual
characteristic. (per movement)
i) LOA not exceeding 200 meters RM1,500
ii) LOA exceeding 200 meters RM2,500

i) Tugboat Escort Charges


RM6 per meter
Where the tugboat escort service is requested for LOA per hour per
a ship with defective propulsion or other unusual tugboat
characteristic. (per movement)
Last updated 1st March 2019 Page 8 of 8

FIREMAN CHARGES SECURITY CHARGES


GENERAL SERVICES SPECIAL SERVICE

In Fire Fighting / Per hour per man (RM)


Salvage
Attendance Operation War /
Special &
General Services Services Passenger
Cargo Ship
Per hour or Per hour or Ship
part thereof part thereof
a) Junior Security Assistant 20 26
(RM) (RM)
b) Assistant Security Officer 30 39
a) Fire-fighting Vessel 350
c) Security Officer 40 52
b) Fire Engine / Salvage
100 125
Operations

c) Senior Fire Officer 30 45


VEHICLE FOR ESCORTING OR PATROLLING
d) Junior Fire Officer 25 35 PURPOSE

e) Non Commission Officer 20 25


Per hour per unit
Vehicle for Escorting or Patrolling Purpose
f) Fireman 15 (RM)

a) Motorcycle 20

TURNOUT OF FIGHTING UNIT b) Car 40

c) 4WD 50
Per hour or part
Turnout of Fighting Unit
thereof (RM)

a) On land 600

b) At sea 1,000

AMBULANCE SERVICES

Ambulance services calculated from time the


ambulance leaves the base to the time of its return.

Per hour or part


Ambulance Services thereof (RM)

Port to General Hospital 55

WATER SUPPLY

Per m3 or part
Services
thereof (RM)

a) Fresh water supply to ship from


9
port’s water main

b) Fresh water supply to ships from


12
port tugs or other vessels

c) Fresh water supply to tenants from


2.50
port’s water main

You might also like